Energy and Water Development 
Appropriations: Nuclear Weapons Activities 
Updated March 14, 2022 
Congressional Research Service 
https://crsreports.congress.gov 
R44442 
 
  
 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Summary 
The annual Energy and Water Development appropriations bill funds, among other activities, the 
National Nuclear Security Administration (NNSA), a semiautonomous agency within the 
Department of Energy (DOE). NNSA operates three programs: Defense Nuclear 
Nonproliferation, Naval Reactors, and Weapons Activities. The last is the subject of this report.  
The Weapons Activities account supports U.S. nuclear warheads, provides the materials and 
components for those weapons, and sustains the infrastructure that supports that mission. They 
provide for “the maintenance and refurbishment of nuclear weapons to continue sustained 
confidence in their safety, reliability, and performance; continued investment in scientific, 
engineering, and manufacturing capabilities to enable production and certification of the enduring 
nuclear weapons stockpile; and manufacture of nuclear weapon components.” 
NNSA’s budget request for FY2022 sought $15.48 billion for Weapons Activities, an increase of 
0.9% over the enacted funding of $15.35 billion in FY2021, within a total budget of $19.7 billion 
for NNSA. Congress provided $15.9 billion for Weapons Activities, within a total of $20.7 billion 
for NNSA, in H.R. 2471, the Consolidated Appropriations Act, 2022. The increase follows a 
nearly 25% increase in NNSA’s budget for Weapons Activities between FY2020 and FY2021, 
when funding grew from $12.6 billion to $15.35 billion. 
NNSA reorganized and renamed its programs areas in its FY2021 budget request. The four main 
programs, each with a request of over $2 billion for FY2023, include the following: 
  Stockpile Management contains many projects included in Directed Stockpile 
Work from previous years. It supports work directly on nuclear weapons, 
including life extension programs, warhead surveillance, maintenance, and other 
activities. The FY2020 appropriation for Directed Stockpile Work that became a 
part of Stockpile Management was $3.7 billion. Congress appropriated $4.3 
billion for them in FY2021 and $4.6 billion in FY2022. 
  Production Modernization programs focus on maintaining and expanding the 
production capabilities for the components of nuclear weapons. According to 
NNSA, these include primaries, canned subassemblies, radiation cases, and non-
nuclear components. The FY2020 appropriation for programs now included in 
this program area was $1.6 billion; Congress appropriated $2.5 billion for them 
in FY2021, and $2.9 billion in FY2022. 
  Stockpile Research, Technology, and Engineering replaces the Research, 
Development, Test and Evaluation program area. These programs provide the 
scientific foundation for science-based stockpile decisions. The FY2020 
appropriation for programs now in program area was $2.6 billion. Congress 
provided $2.8 billion in FY2021 and FY2022. 
  Infrastructure and Operations maintains, operates, and modernizes the NNSA 
infrastructure. It supports construction of new facilities and funds deferred 
maintenance in older facilities. The FY2020 appropriation for programs now in 
this program area was $3.2 billion. Congress appropriated $4.1 billion for these 
programs FY2021 and $3.9 billion in FY2022. 
Weapons Activities also includes several smaller programs, all of which are described in this 
report: Secure Transportation Asset, Defense Nuclear Security, Information Technology and 
Cybersecurity, and Legacy Contractor Pensions. 
Congressional Research Service 
 link to page 5  link to page 5  link to page 5  link to page 6  link to page 6  link to page 9  link to page 11  link to page 12  link to page 15  link to page 15  link to page 17  link to page 17  link to page 18  link to page 19  link to page 20  link to page 20  link to page 20  link to page 21  link to page 21  link to page 22  link to page 22  link to page 22  link to page 23  link to page 23  link to page 23  link to page 24  link to page 24  link to page 24  link to page 25  link to page 25  link to page 25  link to page 26  link to page 26  link to page 7  link to page 11  link to page 17  link to page 21 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Contents 
Overview ......................................................................................................................................... 1 
The Nuclear Security Enterprise ............................................................................................... 1 
Reorganization of the Nuclear Security Enterprise ................................................................... 1 
The Nuclear Weapons Complex ................................................................................................ 2 
Funding Trends Since 2010 ................................................................................................ 2 
Managing the Nuclear Weapons Stockpile ................................................................................ 5 
Stockpile Management .................................................................................................................... 7 
Stockpile Major Modernization ................................................................................................ 8 
Stockpile Sustainment .............................................................................................................. 11 
Weapons Dismantlement and Disposition (WDD)................................................................... 11 
Production Operations ............................................................................................................. 13 
Production Modernization ............................................................................................................. 13 
Primary Capability Modernization .......................................................................................... 14 
Secondary Capability Modernization ...................................................................................... 15 
Non-nuclear Capability Modernization ................................................................................... 16 
Tritium and Domestic Uranium Enrichment ........................................................................... 16 
Stockpile Research, Technology, and Engineering (SRT&E) ....................................................... 16 
Assessment Science ................................................................................................................ 17 
Engineering and Integrated Assessments ................................................................................ 17 
Inertial Confinement Fusion Ignition and High Yield Program .............................................. 18 
Advanced Simulation and Computing (ASC) Program .......................................................... 18 
Weapon Technology and Manufacturing Maturation .............................................................. 18 
Infrastructure and Operations (I&O) ............................................................................................. 19 
Operations of Facilities ........................................................................................................... 19 
Safety and Environmental Operations ..................................................................................... 19 
Maintenance and Repair of Facilities ...................................................................................... 20 
Recapitalization ....................................................................................................................... 20 
Construction ............................................................................................................................ 20 
Other Programs .............................................................................................................................. 21 
Secure Transportation Asset .................................................................................................... 21 
Defense Nuclear Security ........................................................................................................ 21 
Information Technology and Cybersecurity ............................................................................ 22 
Legacy Contractor Pensions .................................................................................................... 22 
 
Figures 
Figure 1. Funding for NNSA Nuclear Weapons Activities .............................................................. 3 
Figure 2. Realignment Out of Directed Stockpile Work ................................................................. 7 
Figure 3. Realignment into Production Modernization ................................................................. 13 
Figure 4. Realignment into SRT&E .............................................................................................. 17 
  
Congressional Research Service 
 link to page 10  link to page 10  link to page 26 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Tables 
Table 1. Funding for Weapons Activities, FY2017-FY2020 ........................................................... 6 
Table 2. Funding for Weapons Activities, FY2021 Budget ............................................................. 6 
  
Contacts 
Author Information ........................................................................................................................ 22 
  
Congressional Research Service 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Overview 
The Nuclear Security Enterprise 
Responsibility for U.S. nuclear weapons resides with both the Department of Defense (DOD) and 
the Department of Energy (DOE). DOD develops, deploys, and operates the missiles and aircraft 
that can deliver nuclear warheads. It also generates the military requirements for the warheads 
carried on those platforms. The National Nuclear Security Administration (NNSA), a 
semiautonomous agency within the Department of Energy, oversees the research, development, 
test, and acquisition programs that produce, maintain, and sustain the warheads. NNSA is also 
responsible for storing and securing the warheads that are not deployed with DOD delivery 
systems and for dismantling warheads that have been retired and removed from the stockpile. 
Congress authorizes funding for both DOD and NNSA nuclear weapons activities in the annual 
National Defense Authorization Act (NDAA); it funds the NNSA budget through the Energy and 
Water Development Appropriations Act. This report focuses on the portion of the Energy and 
Water Development Appropriations Act that funds NNSA’s nuclear weapons activities. 
Reorganization of the Nuclear Security Enterprise 
During World War II, when the United States first developed nuclear weapons, the Army 
managed the nuclear weapons program. In 1946, Congress passed the Atomic Energy Act of 1946 
to establish the Atomic Energy Commission (AEC). The AEC was an independent civilian agency 
tasked with managing the U.S. nuclear weapons program. In the Energy Research and 
Development Act of 1974, Congress dissolved the AEC and created the Nuclear Regulatory 
Commission and the Energy Research and Development Administration (ERDA), which among 
other functions managed the nuclear weapons program. That program was moved again by the 
Department of Energy Organization Act of 1977, which dissolved ERDA and created DOE.1 
Congress, in passing the National Defense Authorization Act for Fiscal Year 2000 (P.L. 106-65, 
Title XXXII), established the semiautonomous National Nuclear Security Administration. In 
addition to managing the nuclear weapons program, NNSA also manages the Defense Nuclear 
Nonproliferation and Naval Reactors programs. 
These reorganizations stem, in part, from long-standing concerns about the management of the 
nuclear weapons complex. Many reports and legislative provisions have been written over the 
past several decades to address this issue.2 Congress has also expressed concerns about cost 
growth and transparency in NNSA’s programs. These concerns have focused on both major 
construction projects and weapons refurbishment programs. Congress may continue to focus on 
cost growth and program management as it reviews NNSA’s budget request for FY2021; NNSA 
has requested a 25% increase in its FY2021 budget for Weapons Activities. 
                                                 
1 For a history of the nuclear weapons program and related topics, 1939-2010, see U.S. Department of Energy, National 
Nuclear Security Administration, “NNSA Timeline,” https://www.energy.gov/articles/history-energy-departments-role-
nuclear-security. 
2 Most recently, in the National Defense Authorization Act for Fiscal Year 2013 (P.L. 112-239), Congress established 
the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise and directed the panel to make 
recommendations on “the most appropriate governance structure, mission, and management of the nuclear security 
enterprise.” Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise, “A New Foundation 
for the Nuclear Enterprise,” November 2014, pp. ix-x, http://cdn.knoxblogs.com/atomiccity/wp-content/uploads/sites/
11/2014/12/Governance.pdf?ga=1.83182294.1320535883.1415285934. 
Congressional Research Service  
 
1 
 link to page 7 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
The Nuclear Weapons Complex 
At the end of the Cold War in 1991, the U.S. nuclear weapons complex consisted of 14 sites—3 
laboratories, the nuclear weapons test site in Nevada, and a number of manufacturing plants for 
weapons materials and components. As the number of nuclear weapons in the U.S. arsenal 
declined and demand for new warheads and materials abated in the 1990s, the United States 
closed several facilities in the complex.  
The complex now consists of eight sites in seven states. These sites include three laboratories 
(Los Alamos National Laboratory, NM; Lawrence Livermore National Laboratory, CA; and 
Sandia National Laboratories, NM and CA); four production sites (Kansas City Plant, MO; 
Pantex Plant, TX; Savannah River Site, SC; and Y-12 National Security Complex, TN); and the 
Nevada National Security Site (formerly Nevada Test Site). NNSA manages and sets policy for 
the complex; contractors operate the eight sites.3 
Funding Trends Since 2010 
The Obama Administration requested increased funding for the nuclear weapons complex in each 
of its annual budgets. In an editorial published in January 2010, then-Vice President Biden noted 
that U.S. nuclear laboratories and facilities had been “underfunded and undervalued” for more 
than a decade.4 He stated that the President’s budget request for FY2011 would include “$7 
billion for maintaining our nuclear-weapons stockpile and complex, and for related efforts,” an 
amount that was $600 million more than Congress appropriated for FY2010. He also stated that 
the Administration would “boost funding for these important activities by more than $5 billion” 
over the next five years. Although the passage of the Budget Control Act in late 2011 slowed the 
increases in NNSA budgets, as is evident in the figure below, the actual appropriations for 
NNSA’s weapons activities have begun to exceed the 10-year expectations outlined in 2010. 
The Obama Administration outlined a 10-year projection of its funding plans for the nuclear 
weapons enterprise in a May 2010 report to Congress, known as the “1251 report,” in support of 
the ratification of the New START Treaty.5 In the November 2010 update of that document, the 
Obama Administration projected weapons stockpile and infrastructure costs for FY2011-FY2021 
at between $85.4 billion and $86.2 billion. As shown i
n Figure 1, funds appropriated for these 
programs fell below the projected levels early in the decade, after passage of the Budget Control 
Act. However, beginning in FY2017, NNSA budget requests have exceeded the amount predicted 
in the 2010 report, in response to policy decisions and growing program requirements.  
The Trump Administration sharply increased funding for NNSA’s budget for Weapons Activities, 
above both the level expected in the 1251 report and the level projected in earlier NNSA budgets. 
In its budget for FY2018, the Trump Administration requested an additional $1 billion for NNSA 
weapons activities over the level appropriated in FY2017. While the Administration had indicated 
that this increase would support both accumulated deferred maintenance requirements at NNSA 
weapons facilities and ongoing warhead life extension programs, it continued to direct funding to 
the higher-priority life extension programs while funding for deferred maintenance remained 
                                                 
3 For details on the sites in the Nuclear Weapons Complex, see CRS Report R45306, 
The U.S. Nuclear Weapons 
Complex: Overview of Department of Energy Sites, by Amy F. Woolf and James D. Werner. 
4 Joe Biden, “The President’s Nuclear Vision,” 
Wall Street Journal, January 29, 2010. 
5 Congress had requested this report in the National Defense Authorization Act for Fiscal Year 2010 (P.L. 111-84), 
Section 1251, and mandated that it outline a comprehensive plan to “(1) maintain delivery platforms [that is, bombers, 
missiles, and submarines that deliver nuclear weapons]; (2) sustain a safe, secure, and reliable U.S. nuclear weapons 
stockpile; and (3) modernize the nuclear weapons complex.” 
Congressional Research Service  
 
2 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
essentially unchanged. Most of the increases in the funding request for FY2018 divided between 
the life extension programs and research and development activities. Congress enacted a budget 
of $10.642 billion for weapons activities for NNSA in FY2018, in the Consolidated 
Appropriations Act, 2018 (P.L. 115-141). 
Figure 1. Funding for NNSA Nuclear Weapons Activities 
Projected, Requested, and Appropriated, FY2011-FY2022 (billions of current dollars) 
18
16
November 2010
14
projection (1251
Report)
12
Budget Request
10
8
Appropriations
6
4
2
0
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22
 
Sources: NNSA budget requests, congressional appropriations reports, CRS estimates. 
The Trump Administration’s budget for FY2019 requested $11.02 billion, an increase of nearly 
$400 million over the funding enacted in FY2018. Congress enacted a budget of $11.1 billion for 
weapons activities in the Energy and Water, Legislative Branch, and Military Construction and 
Veterans Affairs Appropriations Act, 2019 (P.L. 115-244). The FY2020 budget requested $12.4 
billion, an increase of $1.3 billion (12%) over the funding enacted in 2019. The House Energy 
and Water Appropriations Subcommittee recommended $11.7 billion—$660.8 million above the 
funding enacted for FY2019, but $647.8 million below the budget request for FY2020 (H.R. 
2960, H.Rept. 116-83), while the Senate Energy and Water Appropriations Subcommittee 
recommended $12.7 billion (S. 2470, S.Rept. 116-102). Congress appropriated $12.5 billion in 
the Further Consolidated Appropriations Act, 2020 (P.L. 116-94). 
In its FY2020 budget documents, NNSA projected that it would request $12.8 billion for 
Weapons Activities in FY2021, within a total budget of $16.9 billion for NNSA. The FY2021 
budget request, however, sought $15.6 billion for Weapons Activities within a total of $19.8 
billion for NNSA. This would amount to a 25% increase in funding for Weapons Activities, an 
18% increase in funding for NNSA over the amount appropriated in FY2020, and a 21% increase 
in funding for Weapons Activities and a 17% increase in funding for NNSA over the amount 
NNSA had expected to request for FY2021. The House approved $13.7 billion for Weapons 
Activities in its version of the FY2021 Energy and Water Development appropriations bill (H.R. 
7613, H.Rept. 116-449). While this would have been an increase of $1.203 billion (10%) over the 
amount appropriated in FY2020, it was a reduction of $1.942 billion from the FY2021 budget 
request. Congress, however, appropriated $15.3 billion in H.R. 133, the Consolidated 
Appropriations Act for 2021.  
Congressional Research Service  
 
3 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Press reports indicate that the Office of Management and Budget initially reduced NNSA’s 
request for FY2021 from $19.6 billion to $18.6 billion, with the White House cutting it further to 
$17.5 billion.6 However, reports indicate that, after some Members of Congress appealed to the 
President, the White House approved the request for $19.6 billion for NNSA in FY2021.7 
In a hearing before the Strategic Forces Subcommittee of the House Armed Services Committee 
on March 3, 2020, Lisa Gordon-Hagerty, the Administrator of NNSA, outlined the goals for the 
increased funding: 
The  weapons  activities  request  of  $15.6  billion  will  allow  us  to  modernize  the  nation’s 
nuclear weapons stockpile and infrastructure and meet national security requirements after 
several  decades  of  neglect.  It  will  modernize  the  stockpile  with  five  weapons 
modernization  programs,  execute  stockpile  sustainment  activities,  and  conduct  annual 
assessment  activities  on  all  weapon  systems.  With  this  request,  we  will  continue  the 
dismantlement and disposition of weapons and components from weapons retired from the 
stockpile and support production modernization activities for nonnuclear components and 
strategic materials, including a two-site plutonium pit strategy. We will also continue to 
recapitalize NNSA’s aging infrastructure, including the Y12 uranium processing facility, 
the  NNSS  U1A  complex  enhancements  project,  and  the  high  explosive  science  and 
engineering facility at Pantex. 
She noted that NNSA had not asked for or expected this level of funding in the FY2020 budget 
request because “we have budget caps and we were operating other—under other situations.” She 
stated that the FY2021 budget request was “a realistic number to get us to resolve the decades-
long neglect that has been applied to NNSA and our enterprises.”8 
While this explanation focused on the need to pursue modernization programs across the NNSA 
portfolio, press reports indicate that the magnitude of the budget increase was not just a result of 
the scope of the effort. According to these reports, “internal government documents show the 
raise is devoted substantially to covering previously undisclosed cost overruns” and to avoid 
“years of new delays in the majority of U.S. atomic weapons programs.” Consequently, “the 
additional funds are needed not so much to advance capabilities as merely to keep troubled 
programs from falling further behind.”9 
During the March 3, 2020, House Armed Services Committee hearing, Allison Bawden of the 
Government Accountability Office raised concerns about the size and scope of NNSA’s FY2021 
budget request. She noted that “the nuclear security enterprise is embarking on its most ambitious 
level of effort since the Cold War era, and NNSA is currently managing four weapon 
modernization programs, proposing a fifth, and undertaking infrastructure projects that affect 
every strategic material and component used in nuclear weapons.” She stated that it was 
important for NNSA to set “priorities among its efforts in the event of budget shortfalls or cost or 
                                                 
6 Steve Hayes, “Budget Squabble Threatens U.S. Nuclear Modernization Efforts,” 
The Dispatch, January 21, 2020, 
https://thedispatch.com/p/budget-squabble-threatens-us-nuclear. 
7 Joe Gould, “Trump will seek 20% budget boost for nukes, says Inhofe,” 
Defense News, January 28, 2019, 
https://www.defensenews.com/congress/2020/01/28/trump-will-seek-20-budget-boost-for-nukes-says-inhofe/?
utm_source=Sailthru&utm_medium=email&utm_campaign=EBB%2001.29.20&utm_term=Editorial%20-
%20Early%20Bird%20Brief. 
8 U.S. Congress, House Committee on Armed Services, Subcommittee on Strategic Forces, 
Fiscal 2021 Budget Request 
for the Nuclear Forces and Atomic Energy Defense Activities, Hearing, 116th Cong., 2nd sess., March 3, 2020. 
9 John M. Donnelly, “Undisclosed delays plague atomic programs, cost billions to fix,” 
Congressional Quarterly, 
March 19, 2020, https://plus.cq.com/doc/news-5863379?0&searchId=4tcMmrz2. 
Congressional Research Service  
 
4 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
schedule overruns” and raised several concerns about the existing program and schedule. She 
noted, among other concerns, that 
  because “NNSA’s modernization program is highly integrated, any delay could 
have a significant cascading effect on the overall effort”; 
  the “construction scheduled for pit facilities is aggressive, and a delay could have 
an impact on the schedule for the weapons programs it supports”; and 
  “because NNSA uses the same production infrastructure for each weapon 
program and capacity is limited, each program’s schedule can impact the next.”10 
The Biden Administration requested $15.5 billion for Weapons Activities in NNSA for FY2022, 
an increase of 0.9% over the enacted funding of $15.3 billion in FY2021. This was a reduction of 
around $460 million from the $15.9 billion the Trump Administration had signaled, in its FY2021 
budget documents, that it expected to request in FY2022. Congress appropriated $15.9 billion in 
H.R. 2471, the Consolidated Appropriations Act, 2022. In testimony before the Senate Armed 
Services Committee, Secretary of Energy Jennifer Grenholm and Charles Verdon, the acting 
Administrator of NNSA, noted in prepared testimony that the FY2022 budget would “enable 
NNSA to execute its long-standing nuclear modernization efforts,” while the Biden 
Administration completed its formal review of U.S, nuclear modernization efforts.11 Dr. Verdon 
further noted that he believed that the request balanced risk across the complex, with the warhead 
programs and major facility modernizations “getting the funding that they absolutely needed.”12  
Managing the Nuclear Weapons Stockpile 
The United States conducted 1,054 nuclear weapons test explosions between 1945 and 1992. 
These were the primary means by which the United States both determined whether its nuclear 
weapons designs would work and confirmed that the weapons remained reliable and effective as 
they aged. In 1992, Congress enacted a moratorium on U.S. nuclear weapons testing when it 
attached the Hatfield-Exon-Mitchell amendment to the Energy and Water Development 
Appropriations Act, 1993.13 President George H. W. Bush signed the bill into law (P.L. 102-377) 
on October 2, 1992.  
In the absence of nuclear weapons testing, the United States uses a science-based program to 
maintain and sustain confidence in the reliability of the nuclear stockpile. Congress established 
the Stockpile Stewardship Program in the National Defense Authorization Act for Fiscal Year 
1994 (P.L. 103-160). This program, as amended by the National Defense Authorization Act for 
Fiscal Year 2010 (P.L. 111-84, §3111), is to ensure “that the nuclear weapons stockpile is safe, 
secure, and reliable without the use of underground nuclear weapons testing.”  
                                                 
10 Ibid. 
11 U.S. Congress, Senate Committee on Armed Services, 
Department of Energy and National Nuclear Security 
Administration on Atomic Energy Defense Activities, Hearing, 117th Cong., 1st sess., June 24, Prepared Statement, 
https://www.armed-services.senate.gov/imo/media/doc/
June%2024,%202021%20SASC%20Joint%20Testimony%20of%20Secretary%20Granholm%20and%20Acting%20U
nder%20Secretary%20Verdon%20on%20DOE%20Posture%20Final.pdf. 
12 Ibid.  
13 This amendment banned testing before July 1, 1993, set conditions on a resumption of testing, and then banned 
testing after September 1996 unless another nation tested. The United States signed the Comprehensive Test Ban 
Treaty, which banned all nuclear explosive tests. Although Congress voted against giving its consent to ratification of 
this Treaty in 1999, and the Treaty has not yet entered into force, the United States continues to observe a moratorium 
on nuclear explosive testing. 
Congressional Research Service  
 
5 
 link to page 10  link to page 10  link to page 10 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
NNSA implements the Stockpile Stewardship Program through the activities funded by Weapons 
Activities account in the NNSA budget. Prior to this budget year, the account included three 
major program areas, each with a budget in excess of $2 billion, and several smaller programs. 
The aggregate funding for these programs appears i
n Table 1, below.  
Table 1. Funding for Weapons Activities, FY2017-FY2020 
(millions of current dollars) 
FY2017 
FY2018 
FY2018 
FY2019 
FY2019 
FY2020 
FY2020 
Program 
Enacted 
Request 
Enacted 
Request 
Enacted 
Request 
Enacted 
DSW 
3,308.3 
3977.0 
4,009.4 
4,666.2 
4,658.2 
5,426 
5,449 
RDT&E 
1,842.2 
2028.3 
2,034.4 
1,995.4 
2,014.2 
2,278 
2,398 
Programs 
I&O 
2,808.4 
2803.1 
3,117.8 
3,002.7 
3,087.9 
3,208 
3,151 
Oth
era 
1,359.5 
1430.8 
1,480.5 
1352.8 
1,339.7 
1,497 
1,459 
Total 
9,318,1 
10,239.2 
10,642.1 
11,017.1 
11,100.0 
12,409 
12,457 
Sources: NNSA Congressional Budget Requests, House and Senate Appropriations Committee reports. 
Notes: Details may not add to totals due to rounding. DSW: Directed Stockpile Work; RDT&E: Research, 
Development, Test and Evaluation; I&O: Infrastructure and Operations.  
a.  “Other” includes Secure Transportation Asset, Defense Nuclear Security, Information Technology and 
Cybersecurity, and Legacy Contractor Pensions. 
In the FY2021 budget request, NNSA reorganized the Weapons Activities account and renamed 
some of its main programs areas. The four largest program areas, each with a request of over $2 
billion for FY2021 and FY2022, include Stockpile Management; Production Modernization; 
Stockpile Research, Technology, and Engineering; and Infrastructure and Operatio
ns. Table 2 
displays the FY2020 enacted funding for the prior program areas and the FY2021 and FY2022 
funding requests for the new program areas; it also displays the comparable funding amount for 
these program areas if NNSA had requested funding according to this organization in FY2020. 
Table 2. Funding for Weapons Activities, FY2021 Budget 
Comparison of Reorganized Program Areas (millions of current dollars) 
FY2020 
FY2021 
FY2020 
 
Progra
FY2020, 
Program 
Comparable 
FY2021 
FY2021 
FY2022 
FY2021 
m Area   Enacted 
Area 
Request 
Request 
Enacted 
Request 
Enacted 
DSW 
5,449 
Stockpile 
3,680 
4,284.2 
4,290.2 
4,632.6 
4,647.6 
Management 
RDT&E 
2,398 
Production 
1,565,5 
2,457.9 
2,547.9 
2,910.9 
2,929.9 
Modernization 
I&O 
3,151 
Stockpile RTE 
2,553.1 
2,782.1 
2813.7 
2,690.6 
2,843.0 
Other 
1,459 
I&O 
3,199.5 
4,383.6 
4,087.5 
3,586.4 
3,868.3 
 
 
Other 
1,458.8 
1,694.2 
1605.6 
1,663.6 
1,631.2 
Total 
12,457 
Total 
12,457 
15,602 
15,345 
15,484.3 
15,920.0 
Source: NNSA Budget Request, FY2021, H.R. 133, Division D-Energy and Water Development and Related 
Agencies, Consolidated Appropriations Act, 2021. 
Notes: Details may not add to totals due to rounding. DSW: Directed Stockpile Work; RDT&E: Research, 
Development, Test and Evaluation; I&O: Infrastructure and Operations: Stockpile RTE: Stockpile Research, 
Technology, and Engineering; Other: Secure Transportation Asset, Defense Nuclear Security, Information 
Technology and Cybersecurity, and Legacy Contractor Pensions. 
Congressional Research Service  
 
6 
 link to page 11 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
The House rejected some of these proposed changes in the structure of the Weapons Activities 
programs, noting in the appropriations committee report (H.Rept. 116-449) that, although NNSA 
had sought “to engage in a constructive and transparent manner in communicating the proposed 
changes,” the committee “believes additional oversight and monitoring is necessary.” Congress, 
however, provided appropriations according to the new program areas in H.R. 133, the 
Consolidated Appropriations Act, 2021. 
Stockpile Management 
According to NNSA’s budget materials, the Stockpile Management program “maintains a safe, 
secure, and militarily effective nuclear weapons stockpile.”14 The activities in this program area 
include warhead life extension, modification and design efforts; the annual assessment process 
for the current active stockpile; stockpile sustainment activities; warhead dismantlement 
activities; and sustainment of manufacturing capabilities and capacities. According to NNSA, the 
Stockpile Management program includes four subprograms: Stockpile Major Modernization, 
Stockpile Sustainment, Weapons Dismantlement and Disposition, and Production Operations.  
As shown i
n Figure 2, and evident in the NNSA budget documents, all of the subprograms in the 
Stockpile Management program were part of the Directed Stockpile Work program in previous 
budgets, although some Directed Stockpile Work subprograms have moved to other program 
areas. Specifically, according to NNSA’s budget documents, parts of Stockpile Services 
subprogram moved into the Production Modernization program area and the Stockpile Research, 
Technology, and Engineering program area. Some of the Strategic Materials programs moved to 
Production Modernization and some moved to Infrastructure and Operations.  
Congress appropriated $5,449.3 million for 
Directed Stockpile Work in FY2020. NNSA 
Figure 2. Realignment Out of Directed 
requested $6,370.6 million, an increase of 
Stockpile Work 
17%, for the same subprograms in FY2021 
(although not all are in the Stockpile 
Management Program area). Congress 
provided $3,680.1 million in FY2020 for the 
portions of Directed Stockpile Work that are 
included in Stockpile Management in 
FY2021. NNSA then requested $4,284.2 
million for these program, an increase of 
16.5% over FY2020. Congress appropriated 
$4,290.2 million in H.R. 133, the 
Consolidated Appropriations Act, 2021. 
NNSA requested $4632.7 million for these 
programs in FY2022, an increase of 8% over 
 
the amount enacted in FY2021. Each of the key subprograms in Stockpile Management is 
described below. 
                                                 
14 Department of Energy, 
Budget Request For FY2021, Volume I, National Nuclear Security Administration, 
Washington, DC, February 2020, https://www.energy.gov/sites/prod/files/2020/03/f72/doe-fy2021-budget-volume-
1_2.pdf. 
Congressional Research Service  
 
7 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Stockpile Major Modernization 
The Stockpile Major Modernization subprogram funds activities that were included in the Life 
Extension Programs (LEP) and Major Alterations subprogram of Directed Stockpile work. 
According to NNSA, “the Stockpile Major Modernization subprogram is where all the approved 
warhead acquisition programs are conducted.” NNSA notes that these programs are necessary “to 
extend the expected life of stockpile systems for an additional 20 to 30 years.” 
NNSA completed an LEP for the W76 warhead for the Trident II (D-5) submarine-launched 
ballistic missile (SLBM) in 2019; this included a small number of low-yield W76-2 warheads. An 
LEP for the B61 bomb is ongoing, combining several older versions of the bomb into a single 
B61-12 version. NNSA is also pursuing an alteration for the W88 warhead currently deployed on 
Trident II (D-5) missiles and a life extension program for the W80 cruise missile warhead. The 
Air Force plans to deploy the new W80-4 on the new Long Range Standoff missile (LRSO) 
currently under development. The FY2022 budget also includes funding for another alteration to 
the W80-4 warhead, known as theW80-4 ALT-SLCM. The Navy would deploy this warhead on a 
new sea-launched cruise missile (SLCM) later in the decade. NNSA is also pursuing the W87-1 
modification program, which is to provide a warhead for the new U.S. land-based intercontinental 
ballistic missiles (ICBMs) in the 2030s. 
The FY2022 budget continues funding for the W93 sea-based warhead, which is expected to 
eventually replace the W76 and W88 warheads. In the past, DOD documents had referred to this 
warhead as the next Navy warhead, and had not expected to request funding for it until FY2023. 
A DOD official noted that because the warhead does not yet exist, this is not a life extension 
program, but neither NNSA nor DOD had designated this as a “new” warhead. 15 According to 
Admiral Richard, the Commander of USSTRATCOM, it is a new program of record.16 
In its FY2021 budget request, NNSA requested $2,666.9 million for the Stockpile Major 
Modernization subprogram. Congress approved this amount in Division D-Energy and Water 
Development and Related Agencies of the Consolidated Appropriations Act, 2021 (H.R. 133). 
NNSA has requested $2,832.3 million for Stockpile Major Modernization in FY2022. Congress 
approved this amount in Division D-Energy and Water Development and Related Agencies of the 
Consolidated Appropriations Act, 2021 (H.R. 2471). 
  NNSA requested no additional funding for the W76-1 LEP or the W76-2 
modification program—the low-yield version of the warhead. The W76-2 
modification reportedly entered service in January 2020.17 
  NNSA requested, and Congress appropriated, $771.7 million for the B61-12 LEP 
in FY2022, a decrease of $44 million from the $815.7 million enacted for 
FY2021. The B61-12 is to combine four existing types of B61 warheads; the Air 
Force plans to also add a tail kit assembly that is designed to improve the 
accuracy of the bomb. According to NNSA’s budget documents, the LEP 
                                                 
15 Aaron Mehta, “Inside America’s newly revealed nuclear ballistic missile warhead of the future,” 
Defense News, 
February 24, 2020, https://www.defensenews.com/smr/nuclear-arsenal/2020/02/24/inside-americas-newly-revealed-
nuclear-ballistic-missile-warhead-of-the-future/?utm_source=Sailthru&utm_medium=email&utm_campaign=
EBB%2002.25.20&utm_term=Editorial%20-%20Early%20Bird%20Brief. 
16 Patrick Tucker and Marcus Weisgerber, “A New Nuclear Warhead? STRATCOM Chief Can’t Answer Yes or No,” 
Defense One, February 27, 2019, https://www.defenseone.com/politics/2020/02/new-nuclear-warhead-stratcom-chief-
cant-answer-yes-or-no/163395/?utm_source=Sailthru&utm_medium=email&utm_campaign=EBB%2002.28.20&
utm_term=Editorial%20-%20Early%20Bird%20Brief. 
17 Aaron Mehta, “Trump’s new nuclear weapon has been deployed,” 
Defense News, February 4, 2020, 
https://www.defensenews.com/smr/nuclear-arsenal/2020/02/04/trumps-new-nuclear-weapon-has-been-deployed/. 
Congressional Research Service  
 
8 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
“reuses, or replaces all of the bomb’s nuclear and non-nuclear components to 
extend the service life of the B61 by at least 20 years, and to improve the bomb’s 
safety, effectiveness, and security.” The first production unit (FPU) was 
scheduled for FY2020 but was delayed due to an issue with capacitors used in six 
major electrical components. According to NNSA, it is on schedule to provide 
the first production unit in FY2022 and to complete the program in FY2026. 
  NNSA requested, and Congress appropriated, $207.2 million for the W88 
Alteration in FY2022, a reduction of $49.8 million from the $256.9 million 
enacted in FY2021. The program is intended to upgrade the arming-fuzing-firing 
system on the warhead and refresh the warhead’s conventional high explosives. 
This warhead is carried on a portion of the D-5 (Trident) submarine-launched 
ballistic missiles (SLBMs). NNSA expected to provide the FPU of this warhead 
in 2020, but according to NNSA, the delivery was delayed due to an issue with 
capacitors used in three major components. According to its budget documents, 
NNSA provided the first production unit of this warhead to the Navy in August 
2021 and will complete the program by FY2026. 
  NNSA requested, and Congress appropriated, $1,080.4 million for the W80-4 in 
FY2021, an increase of $80 million over the $1,000.3 million enacted in FY2021. 
This is the warhead for the new long-range cruise missile. The LEP would seek 
to use common components from other LEPs and to improve warhead safety and 
security. NNSA has begun to “ramp up engineering activities for development 
and design on the W80-4,” and the significant increases in the budget request for 
FY2021 and FY2022 reflect an increase in the scope of work on the program. 
The first production unit is scheduled for FY2025, with program completion 
expected in FY2031. 
  NNSA requested $10 million in FY2022 to begin work on the W80-4 Alteration 
for the new sea-launched cruise missile (SLCM). In this first year of the program, 
NNSA planned to work with the Department of Defense to “define specific 
operational requirements and translate those into warhead performance 
characteristics.” Both the House and the Senate Energy and Water Development 
Appropriations Subcommittees questioned this funding in their reports on the 
FY2022 appropriations. The House subcommittee (H.Rept. 117-98) eliminated 
funding for this alteration, noting that funding was premature because the Biden 
Administration had not yet completed its planned Nuclear Posture Review. The 
Senate subcommittee, in its report (S.Rept. 117-36), mandated that NNSA certify 
that there were operational requirements justifying the program before it 
obligated funding. Congress included this funding, however, in H.R. 2471, the 
Consolidated Appropriation Act, 2022. 
  NNSA requested, and Congress appropriated, $691 million for the W87-1 
warhead modification program in FY2022, a 28% increase over the $541 million 
enacted for the W87-1 in FY2021. This increase follows a nearly fivefold 
increase in funding in F2021 over the FY2020-enacted level. The increases in 
funding for the W87-1 reflect a “ramp-up” of activities across all program areas. 
The Air Force plans to deploy the W87-1 on the new U.S. land-based 
intercontinental ballistic missile (ICBM), the Ground-Based Strategic Deterrent 
(GBSD). NNSA has indicated that the FPU for the W87-1 is currently planned 
for FY2030. However, NNSA has also indicated that the W87-0 warhead, which 
is currently deployed on U.S. Minuteman III ICBMs, will also be “qualified and 
deployed onto the GBSD.” During recent testimony, Dr. Charles Verdon, the 
Congressional Research Service  
 
9 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
acting Administrator of NNSA, indicated that nearly half the W87-0 warheads on 
Minuteman III missiles will transition to the GBSD.18 
  NNSA requested $53 million in FY2021 to begin Phase 1 “concept assessment 
and refinement” activities for the W93 warhead. Although the House declined to 
appropriate this funding in its version of the FY2021 Energy and Water 
Development appropriations bill (H.R. 7613, H.Rept. 116-449) and expressed a 
number of concerns about the program, Congress approved the request in the 
Consolidated Appropriations Act, 2021 (H.R. 133). NNSA requested, and 
Congress appropriated, $72 million for the W93 warhead in FY2022, with the 
program transitioning from the Phase 1 concepts study to Phase 2, where NNSA 
and will review the concepts and provide a specific set of design options. 
In May 2019, NNSA indicated that the delivery of the first production units for both the B61-12 
and the W88 Alt were likely to slip after it identified defects in the electrical capacitors used in 
the modified warheads. NNSA’s Kansas City National Security Campus, which acquires the non-
nuclear parts of nuclear weapons, determined that the capacitors might not remain reliable for the 
30-year life of the modified warheads. As a result, NNSA plans to replace the capacitors that cost 
about $5 per unit with $75 units built to a higher standard. This is likely to add about $120-$150 
million to the cost of the W88-Alt LEP and $600 million to $700 million to the cost of the B61-12 
LEP.19 
As noted above, the W87-1 warhead will replace the W78 warhead on U.S. ICBMs, beginning 
with the deployment of the GBSD in the 2030s. 20 The W78, which is the oldest warhead in the 
U.S. stockpile, dating from 1979, was originally supposed to be replaced by a new warhead, 
known as the IW1, which would have been an interoperable warhead that could be delivered by 
ICBMs (in place of the W78 warhead) and SLBMs (in place of the W88 warheads). The FY2016 
budget request suspended work on the IW1, and the FY2017 and FY2018 budgets did not request 
any funding for it. The FY2019 budget requested $53 million to resume research and 
development activities on the IW1. Congress enacted this amount, but the conference report 
(H.Rept. 115-929) requested a study on the rationale for and alternatives to the plan to use an 
interoperable warhead as a part of the W78 life extension program. During 2019, NNSA dropped 
the IW1 designator and instead, pursued a life extension program for just the W78 ICBM 
warhead. It then designated this program as the W87-1, to reflect the fact that it has a similar 
primary design to the existing W87 ICBM warhead for the IW1. 
                                                 
18 U.S. Congress, Senate Committee on Armed Services, Department of Energy and National Nuclear Security 
Administration on Atomic Energy Defense Activities, Hearing, 117th Cong., 1st sess., June 24, 2021, 
https://www.armed-services.senate.gov/imo/media/doc/
June%2024,%202021%20SASC%20Joint%20Testimony%20of%20Secretary%20Granholm%20and%20Acting%20U
nder%20Secretary%20Verdon%20on%20DOE%20Posture%20Final.pdf. 
19 Dan Leone, “Balky Capacitors Could Delay Two NNSA Nuke Refurb Programs,” 
Nuclear Security and Deterrence 
Monitor, May 10, 2019. https://www.exchangemonitor.com/balky-capacitors-delay-two-nnsa-nuke-refurb-programs/. 
See, also, Aaron Mehta, “How a $5 part used to modernize nuclear warheads could cost $850 million to fix,” 
Defense 
News, September 25, 2019. https://www.defensenews.com/smr/nuclear-arsenal/2019/09/25/nuclear-warhead-programs-
need-850m-fix-heres-how-the-government-plans-to-cover-it/?utm_source=Sailthru&utm_medium=email&
utm_campaign=EBB%2009.26.19&utm_term=Editorial%20-%20Early%20Bird%20Brief. 
20 U.S. Department of Energy, National Nuclear Security Administration, 
W78 Replacement Program (W87-1): Cost 
Estimates and Use of Insensitive High Explosives, Report to Congress, Washington, DC, December 2018, 
https://nukewatch.org/newsite/wp-content/uploads/2019/02/W78-Replacement-Program-Cost-Estimates-IHE-1.pdf. 
Congressional Research Service  
 
10 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Stockpile Sustainment 
According to NNSA, Stockpile Sustainment “directly executes maintenance, surveillance, 
assessment, surety, and management activities for all enduring weapons systems in the stockpile. 
These include the B61, W76, W78, W80, B83, W87, and W88 weapons.” This program area is 
essentially the same as the Stockpile Services program area in the FY2020 budget, which 
provided for routine maintenance, replacement of limited-life components, surveillance, and 
assessment of fielded systems for all weapons types in the active stockpile. It also includes the 
Multi-Weapon Systems subprogram, which had been funded under the Manufacturing, 
Technology, and Production subprogram in the Stockpile Services subprogram of Directed 
Stockpile Work in the FY2020 budget. 
NNSA requested $1,180.5 million for Stockpile Sustainment in FY2022, an increase of 18% over 
the $998.3 million that the programs in this area received in FY2021. Within this total, the budget 
request shows increases in sustainment funding for the B61 gravity bomb and the W76, W78, and 
W87 warheads, and the B83 bomb. According to NNSA’s budget documents, the increased 
funding request for FY2022 is driven, in part, by the need to extend the service life of the B83 
gravity bomb.  
In its FY2020 budget request, NNSA had sought $51.5 million to sustain the B83 gravity bomb, 
which the Obama Administration had planned to retire in the early 2020s. The Trump 
Administration reversed that decision in the 2018 Nuclear Posture Review and added funding for 
FY2020 to support B83 sustainment activities. Congress funded the Administration’s request for 
B83 sustainment in FY2020 but directed NNSA to submit a report on “the current status and 
future plans for the B83 system.” In FY2021, NNSA noted that it planned to continue to pursue 
the surveillance and assessment activities needed to support the requirement in the 2018 Nuclear 
Posture Review, but that it anticipated using prior years’ funding for this program. Congress 
provided $30.8 million for B83 sustainment in FY2021 and directed NNSA to provide Congress 
with “periodic and timely briefings concerning the status of sustainment efforts.” Congress noted 
that it remained concerned about the feasibility of maintaining the bomb with reduced funding 
and the possibility that the bomb might need eventual modifications for its warhead. 
NNSA requested $98.5 million for B83 sustainment in FY2022, a more than threefold increase 
over the funding enacted in FY2021. In its budget documents, NNSA noted that the Nuclear 
Weapons council issued a decision in June 2020 to extend the B83 service life; the funding 
increase will support that decision. This work will require the replacement of limited life 
components, such as the neutron generators and the tritium reservoirs. Both the House and the 
Senate Energy and Water Development Appropriations Subcommittees questioned this funding in 
their reports on the FY2022 appropriations. The House subcommittee (H.Rept. 117-98) 
eliminated funding for B83 sustainment, noting that funding was premature because the Biden 
Administration had not yet completed its planned Nuclear Posture Review. The Senate 
subcommittee, in its report (S.Rept. 117-36), mandated that NNSA certify that there were 
operational requirements justifying the program before it obligated funding. In H.R. 2471, the 
Consolidated Appropriations Act, 2022, Congress appropriated the requested amount of $98.5 
billion for FY2022. 
Weapons Dismantlement and Disposition (WDD) 
According to a fact sheet released by the State Department in 2017, the U.S. nuclear stockpile 
peaked at 31,255 warheads in 1967, stood at 19,008 warheads in 1991, and declined to 4,571 
Congressional Research Service  
 
11 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
warheads by 2015.21 It had declined further, to 4,014 warheads by 2016 and 3,822 by 2017. The 
WDD subprogram includes funding for the interim storage of warheads awaiting dismantlement, 
funding for actual dismantlement, and funding for the disposition of warhead components and 
materials. NNSA requested $68.9 million for WDD for FY2017, an increase over the 
appropriated level of $52 million in FY2016. According to NNSA, this increase was designed to 
support President Obama’s commitment, pledged at the 2015 Nuclear Nonproliferation Treaty 
Review Conference, to accelerate dismantlement of retired U.S. nuclear warheads by 20%. The 
Senate Energy and Water Development Appropriations Subcommittee approved this request and 
noted in its report (S.Rept. 114-236) that it supported the accelerated dismantlement plan “as a 
way of preparing its workforce for necessary stockpile production work beginning later this 
decade.” The House subcommittee, however, objected to the accelerated dismantlement plan and 
reduced total funding for directed stockpile work. The final version of the Consolidated 
Appropriations Act for FY2017 (P.L. 115-31) allocated $56 million to weapons dismantlement 
and disposition. 
NNSA requested $56 million for weapons dismantlement and disposition in FY2018 and 
FY2019; Congress approved this amount in both years. NNSA’s budget documents note that 
NNSA capped funding for this program at $56 million at the direction of the FY2017 and FY2018 
National Defense Authorization Acts. NNSA also noted that dismantlement activities serve as “a 
significant supplier of material for future nuclear weapons production and Naval Reactors.” 
Unlike in previous years, however, the FY2019 budget documents did not reiterate the goal, 
supported by previous budgets, of dismantling weapons retired prior to FY2009 by FY2022. 
NNSA requested $47 million for weapons dismantlement and disposition in FY2020. NNSA’s 
budget request noted that the decline in funding requested for this program area “results from a 
reduction in legacy component disposition … consistent with material and component needs for 
the stockpile and external customers.” Hence, as was the case in the FY2019 budget request, 
while NNSA still sees the WDD program as a supplier of materials to the U.S. weapons stockpile, 
it no longer sees it as a component of U.S. nonproliferation policy. Congress increased funding 
for this program in FY2020 in the Further Consolidated Appropriations Act, 2020 (P.L. 116-94), 
in which Congress approved $56 million for WDD. 
NNSA requested $50 million for WDD in FY2021. As was the case in FY2020, NNSA noted that 
the decline in funding for requested for this program area results from a “reduction of legacy 
component inventories.” The House, in its version of the FY2021 Energy and Water Development 
appropriations bill (H.R. 7613, H.Rept. 116-449), added $6 million to the WDD account; 
Congress accepted this position and appropriated $56 million for WDD in H.R. 133, the 
Consolidated Appropriations Act, 2021. 
NNSA has requested $51 million for WDD in FY2022. As in previous years, NNSA notes that the 
reduction in funding is a result of a “reduction of legacy component inventories.” The budget 
documents indicate that, in FY2022, NNSA will continue to pursue the “safe and secure 
dismantlement of nuclear weapons and components in excess of national security requirements” 
and will “recycle material and components from dismantled units.” In H.R. 2471, the 
Consolidated Appropriations Act, 2022, Congress appropriated $56 million for WDD. 
                                                 
21 U.S. Department of Defense, Stockpile Numbers, End of Fiscal Years 1962-2016. May 2016, 
http://open.defense.gov/Portals/23/Documents/frddwg/2015_Tables_UNCLASS.pdf. 
Congressional Research Service  
 
12 
 link to page 17 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Production Operations 
According to NNSA’s budget documents, the Productions Operations program area includes the 
Production Support subprogram that had been a part of the Stockpile Services program area in the 
FY2020 budget structure. Other portions of Stockpile Services have been moved to other areas of 
the Weapons Activities budget. As noted above, NNSA renamed the Manufacturing, Technology, 
and Production subprogram as the Multi-Weapon Systems subprogram and moved it to the 
Stockpile Sustainment program area. Other parts of Stockpile Services have moved to the 
Production Modernization program area and the Stockpile Research, Technology, and 
Engineering program area. These program areas are discussed below.  
Production Operations “provides engineering and manufacturing labor, quality assurance, and 
programmatic equipment support for the manufacturing base that enables the individual site 
capability and capacity to sustain NNSA’s nuclear security enterprise’s production mission.” The 
activities in the production mission include weapon assembly, weapon disassembly, component 
production, surveillance, and weapon safety and reliability testing. NNSA also notes that 
Production Operations coordinates closely with Advanced Manufacturing Development program, 
which is funded through the Stockpile Research, Technology, and Engineering program area. 
NNSA requested $568.9 million for Production Operations in FY2021, an increase of $24.9 
million over the $544 million enacted for Production Support in FY2020. According to NNSA, 
this increase supports continued growth needed to support the LEP workload. Congress 
appropriated this amount in H.R. 133, the Consolidated Appropriations Act, 2021. NNSA also 
requested, and Congress appropriated, $568.9 million for Production Operations in FY2022. 
Production Modernization 
According to NNSA’s budget documents, the 
Production Modernization program area 
Figure 3. Realignment into Production 
“focuses on the production capabilities of 
Modernization 
nuclear weapons critical to weapon 
performance, including [plutonium] 
primaries, [uranium] secondaries, radiation 
cases, and non-nuclear components.” As 
Figure 3 shows, and as is evident in NNSA’s 
budget request, NNSA funded most of these 
subprograms through the Strategic Materials 
portion of Directed Stockpile Work in the 
FY2020 budget. The new program area also 
 
brings in subprograms from Stockpile 
Services and from other FY2020 program areas, such as portions of Advanced Manufacturing 
Development from the Research, Development, Test and Evaluation program area, and portions 
of Capabilities Based Investments from the Infrastructure and Operations Program Area. 
NNSA requested, and Congress approved, $1,501 million for Strategic Materials in FY2020. 
According to NNSA’s FY2021 budget documents, with additions from other program areas, the 
subprograms included in Production Modernization were funded at $1,565.5 million in FY2020. 
NNSA requested $2,457.9 million for Production Modernization in FY2021, an increase of 56% 
over FY2020. The House, in its version of the FY2021 Energy and Water Development 
appropriations bill (H.R. 7613, H.Rept. 116-449), approved $1,858.7 million and did not adopt all 
the program changes identified and the FY2021 budget request. However, in H.R. 133, the 
Congressional Research Service  
 
13 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Consolidated Appropriations Act for 2021, Congress maintained the program changes and 
appropriated $2,547.9 million for Production Modernization. 
NNSA requested, and Congress appropriated, $2,910.9 million for Production Modernization in 
FY2022, a 14% increase over the amount enacted in FY2021. According to NNSA, the increases 
in this budget will support preliminary design activities at the Savannah River Plutonium 
Processing Facility and the Los Alamos Plutonium Pit Production Project. They will also support 
“other key production capability modernization activities for high explosives and energetic 
materials, secondary capability, and non-nuclear components.”  
These activities are evident in the four key subprogams within the Production Modernization 
program area: Primary Capability Modernization, Secondary Capability Modernization, Non-
nuclear Capability Modernization, and Tritium and Domestic Uranium Enrichment. As noted 
below, the largest increases in funding in the FY2022 budget support Primary Capability 
Modernization (i.e., the plutonium pit activities). 
Primary Capability Modernization 
According to NNSA’s budget documents, the Primary Capability Modernization program 
“consolidates management of primary stage material processing and component production 
capabilities.” In nuclear weapons, primaries are the plutonium pits and high explosives that serve 
as the core of nuclear weapons. Consequently, this program area supports both plutonium 
modernization and high explosives and energetics modernization. 
NNSA began to ramp up funding for plutonium modernization in the FY2020 budget request, 
when it sought $712 million for plutonium sustainment, which represented a 97% increase over 
the $361.3 million enacted for plutonium sustainment in FY2019. The FY2020 budget documents 
noted that NNSA restructured this program to support the May 2018 decision to pursue a new 
approach for plutonium pit production to meet the requirement of producing a minimum of 80 
pits per year by 2030. Instead of focusing solely on building capacity at Los Alamos National 
Laboratory, NNSA decided to “repurpose the Mixed Oxide (MOX) Fuel Fabrication Facility at 
the Savannah River Site to produce at least 50 pits per year” and to continue work that would 
allow Los Alamos to produce “no fewer than 30 pits per year.”22 Consequently, NNSA requested 
$420 million to support design activities at Savannah River and begin the modifications needed to 
produce 50 pits per year at the repurposed facility by 2030. 
The Plutonium Modernization subprogram of Primary Capability Modernization includes four 
subprograms: Los Alamos Plutonium Modernization ($610.6 million enacted in FY2021; $660.4 
million requested and enacted for FY2022); Plutonium Pit Production Project at Los Alamos 
($226 million enacted in FY2021; $350 million requested and enacted for FY2022); Savannah 
River Plutonium Operations ($200 million enacted in FY2021; $128 million requested and 
enacted for FY2022); and Savannah River Plutonium Processing Facility ($241.9 million enacted 
in FY2021; $475 million requested and enacted for FY2022). The two program areas at Los 
Alamos fund activities needed to recapitalize buildings and capacity to meet pit production 
requirements at Los Alamos. The programs at Savannah River support efforts to plan for 
operations at the new pit facility, to work on its design, its site and facility preparation, and to 
begin long lead procurement. As is evident, the largest increases in funding would support pit 
                                                 
22 U.S. Department of Energy, National Nuclear Security Administration, 
Plutonium Pit Production, Fact Sheet, 
Washington, DC, April 2019, https://www.energy.gov/sites/prod/files/2019/05/f62/2019-05-13-FACTSHEET-
plutonium-pits.pdf. 
Congressional Research Service  
 
14 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
production at Los Alamos (an increase of 55% over FY2021 funding) and the design of the 
Savannah River Processing Facility (96% over FY2021 funding). 
In FY2021, Congress reiterated its concerns about NNSA’s pit production plans. It mandated that 
NNSA provide a plan outlining an integrated master schedule for “all pit production-related 
project and program activities” going forward. It also directed NNSA to develop “a 
comprehensive, integrated ten-year research program for pit and plutonium aging that represents 
a consensus program among the national laboratories and federal sponsors.” Both the House and 
the Senate Energy and Water Development Appropriations Subcommittees again stressed their 
concerns about these programs in their reports on the FY2022 appropriations. Both noted that 
NNSA had not yet submitted the required integrated master schedule. The House subcommittee 
(H.Rept. 117-98) also repeated its concerns about contingency planning at NNSA for pit 
production, noting “the timeline for achieving 80 pits per year will stretch beyond 2030.” The 
Senate subcommittee, in its report (S.Rept. 117-36), noted that it “continues to support the 
program of record” pit production, but suggested that it would be unable to continue this support 
without the information in the integrated master plan. 
When outlining its plan for supporting pit production sites at both Los Alamos and Savannah 
River, NNSA had announced that it would reach the goal of producing 30 pits per year at Los 
Alamos by 2026 and 50 pits per year at Savannah River by 2030. However, in testimony before 
Congress in support of the FY2022 budget, NNSA has indicated that the Savannah River site will 
not be capable of producing 50 pits per year until sometime between 2032 and 2035. According 
to Charles Verdon, the acting Administrator of NNSA, a detailed analysis completed when NNSA 
began its work on the Savannah River site showed that NNSA would not be able to place all the 
necessary equipment and people at the site in time to meet the 2030 objective.23 
The Primary Capability Modernization program area for Enterprise Plutonium Support funds 
activities that support pit production across the Nuclear Security Enterprise. NNSA requested, and 
Congress appropriated, $90.8 million in this area in FY2021; NNSA requested, and Congress 
appropriated, $107.1 million for FY2022. NNSA has also requested, and Congress appropriated, 
$67.4 million for High Explosives and Energetics in FY2021. This program focuses on 
modernizing production facilities and qualifying explosive and propellant materials used in 
nuclear warhead primaries. NNSA requested and Congress appropriated $68.8 million for High 
Explosives and Energetics in FY2022. 
Secondary Capability Modernization 
NNSA requested $457 million for Secondary Capability Modernization in FY2021, an increase of 
56% over the $293.5 million allocated to the same programs in FY2020. NNSA funded most 
programs in this area through the Strategic Materials portion of Directed Stockpile Work in 
FY2020, although $64 million was a part of the Advanced Manufacturing program area in 
Research, Development, Test, and Evaluation. Congress approved this request in H.R. 133, the 
Consolidated Appropriations Act, 2021. 
According to NNSA, this program area “is responsible for restoring and increasing manufacturing 
capabilities for the secondary stage of nuclear weapons.” The FY2022 budget included $306.7 
million for efforts to modernize enriched uranium operations at the Y-12 facility, an increase of 
                                                 
23 U.S. Congress, Senate Committee on Armed Services, Department of Energy and National Nuclear Security 
Administration on Atomic Energy Defense Activities, Hearing, 117th Cong., 1st sess., June 24, 2021, 
https://www.armed-services.senate.gov/imo/media/doc/
June%2024,%202021%20SASC%20Joint%20Testimony%20of%20Secretary%20Granholm%20and%20Acting%20U
nder%20Secretary%20Verdon%20on%20DOE%20Posture%20Final.pdf. 
Congressional Research Service  
 
15 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
57% over the $194.2 million funded in FY2020. NNSA has again requested $306 million for 
uranium modernization in the FY2022 budget. The FY2021 budget also included $110.9 million 
for a new depleted uranium modernization program to restart capabilities that lapsed in the early 
2000s; NNSA has requested $138.2 million for this project for FY2022. The FY2021 budget also 
included $39.4 million for lithium modernization in FY2021. This project will modernize 
facilities at the Y-12 plant and process lithium to support defense programs. NNSA has requested 
$43.8 million for this project for FY2022. In H.R. 2471, the Consolidated Appropriations Act,  
2022, Congress appropriated the funds requested in the program area. 
Non-nuclear Capability Modernization 
The FY2021 budget included $107.1 million for Non-nuclear Capability. This was a sevenfold 
increase over the $14 million allocated to the programs in this area in FY2020, when they were 
funded through the Strategic Materials subprogram of Directed Stockpile Work and the 
Capabilities Based Investments subprogram of Infrastructure and Operations. NNSA has 
requested $144.6 million for this program area for FY2022. According to NNSA, this program 
area “provides funding to modernize production of non-nuclear components for multiple weapon 
systems.” The funding will support production of non-nuclear components at the Kansas City 
National Security Complex. Congress approved this request. 
Tritium and Domestic Uranium Enrichment 
NNSA has requested $489 million for Tritium and Domestic Uranium Enrichment in FY2022, a 
reduction of 10% from the $547.1 million enacted in the FY2021 budget. NNSA funded this 
program area through the Strategic Materials subprogram of Directed Stockpile Work in FY2020. 
The Tritium Modernization portion of this program ($312.1 million enacted in FY2021; $349 
million requested for FY2022) funds activities needed to produce, recover, and recycle the tritium 
gas used in U.S. nuclear weapons.24 The Domestic Uranium Enrichment Program ($70 million 
enacted in FY2021; $140 million requested in FY2022) is designed to ensure a reliable supply of 
enriched uranium to support U.S. national security and nonproliferation needs. According to 
NNSA, “its goal is to supply current enriched uranium needs and re-establish a domestic uranium 
enrichment capability.” In FY2021, Congress added $90 million for a Uranium Downblend 
subprogram; in FY2022, NNSA combined this program area with the Domestic Uranium 
Enrichment Program. In H.R. 2471, the Consolidated Appropriations Act, 2022, Congress 
appropriated the funding requested in this program area. 
Stockpile Research, Technology, and Engineering 
(SRT&E) 
According to NNSA’s budget request, Stockpile Research, Technology, and Engineering includes 
six subprograms that provide “the knowledge and expertise needed to maintain confidence in the 
nuclear stockpile without additional nuclear explosive testing.” This program area “provides the 
foundation for science-based stockpile decisions, tools, and components; focuses on the most 
pressing investments nuclear security enterprise needs to meet DOD warhead needs and 
schedules; and enables assessment and certification capabilities used throughout the Nuclear 
Security Enterprise.” It funds not only the science and engineering programs, but also large 
                                                 
24 Tritium is a radioactive form of hydrogen needed to boost the yield of nuclear weapons. Because it has a half-life of 
12.4 years and degrades at a rate of 5.5% per year, the tritium in nuclear weapons must be replenished regularly. 
Congressional Research Service  
 
16 
 link to page 21 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
experimental facilities, like the Enhanced Capabilities for Subcritical Experiments (ECSE) 
program and the Nevada National Security Site (NNSS) and NNSA’s first Exascale system at 
Livermore Laboratory. 
A
s Figure 4 shows, and as is evident in the 
NNSA budget request, the program areas 
Figure 4. Realignment into SRT&E 
funded through SRT&E FY2021 are similar 
to those funded though the Research, 
Development, Test and Evaluation (RDT&E) 
program in the FY2020 budget, with some 
program areas added from the Stockpile 
Services portion of Directed Stockpile Work. 
According to NNSA’s budget documents, 
Congress allocated $2553.1 million in 
FY2020 for the programs now included in 
SRT&E. NNSA requested $2,782.1 million 
 
for SRT&E in FY2021. Congress appropriated $2,813.7 million in H.R. 133, the Consolidated 
Appropriations Act, 2021. NNSA requested $2,690.6 million, and Congress appropriated $2,843 
million, for these programs in FY2022. 
Specific programs under SRT&E include the following. 
Assessment Science 
Assessment Science replaces the Science Program from prior years’ budgets. According to 
NNSA’s budget documents, the Assessment Science program provides “the scientific 
underpinnings required to conduct annual assessments of weapon performance and certification 
of LEPs” along with the “information required to understand the impacts of surveillance findings 
to assure that the nuclear stockpile continues to remain safe, secure, and effective.” Specifically, it 
performs experiments to obtain the materials and nuclear data required to validate and understand 
the physics of nuclear weapons performance and pursues activities that develop, exercise, and 
maintain the expertise of NNSA’s nuclear weapon design, engineering, and assessment 
community. 
NNSA requested $773.1 million for the Assessment Science program in FY2021, an increase of 
30% over the $594.8 million allocated to comparable programs in FY2020. According to NNSA’s 
budget documents, this funding increase addressed cost growth for planned installation of the 
equipment needed to support the W80-4 and W87-1 program certification requirements. Congress 
appropriated $769.4 million in FY2021. NNSA requested $689.6 million for this program area in 
FY2022. According to NNSA, the decrease in the budget request reflected a reallocation to 
higher-priority NNSA programs and projects. Some subprograms, however, did not see a 
decrease. The FY2021 budget had included $215.6 million for Enhanced Capabilities for 
Subcritical Experiments, an amount that remains the same in the FY2022 budget request. 
Congress appropriated $769.4 million in this program area, restoring funds to the level enacted in 
FY2021. 
Engineering and Integrated Assessments 
Engineering and Integrated Assessments replaced the Engineering Program from prior years’ 
budgets. It also includes some subprograms that had been funded through the Science Program 
and Stockpile Services in FY2020. According to NNSA, this program strengthens “the science, 
technology, and engineering base by maturing advanced technologies to improve future weapon 
Congressional Research Service  
 
17 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
systems” and provides “tools for qualifying weapon components and certifying weapons without 
nuclear explosive testing.” It includes funding for the Stockpile Responsiveness program, which 
NNSA had added to its budget request in FY2018, in response to congressional direction in the 
FY2016 National Defense Authorization Act (NDAA). NNSA requested, and Congress 
appropriated, $337.4 million for this program area in FY2021. NNSA requested $336.8 million 
for FY2022. Congress enacted $342 million for this program area. 
Inertial Confinement Fusion Ignition and High Yield Program 
This program develops the tools needed to create extremely high temperatures and pressures in 
the laboratory—approaching those of a nuclear explosion—to support weapons-related research 
and to attract scientific talent to the Stockpile Stewardship Program. The centerpiece of this 
campaign is the National Ignition Facility (NIF), the world’s largest laser, located at Lawrence 
Livermore National Laboratory. NIF is intended to produce “ignition,” the point at which a 
nuclear fusion reaction generates more energy than is used by the lasers to create the reaction. 
While achieving ignition has been delayed, NIF has nonetheless proven to be of value to stockpile 
stewardship at energy levels that do not reach ignition. NIF was controversial in Congress for 
many years, but controversy waned as the program progressed. NIF was dedicated in May 2009.25 
The program also supports the Z Facility at the Sandia National Laboratories (SNL), and the 
Omega Laser Facility (Omega) at the University of Rochester’s Laboratory for Laser Energetics 
(LLE). 
The FY2021 budget included $575 million for this program area. Congress appropriated $575 
million. Within this total, it allocated $349 million for NIF, $67 million for the Z facility, and $82 
million for the OMEGA Laser Facility. NNSA requested $529 million for FY2022, and Congress 
enacted $580 million. 
Advanced Simulation and Computing (ASC) Program 
The ASC program develops computation-based models of nuclear weapons that integrate data 
from other campaigns, past test data, and laboratory experiments, to create what NNSA calls “the 
computational surrogate for nuclear testing to determine weapon behavior.” NNSA notes that 
“modeling the extraordinary complexity of nuclear weapons systems is essential to maintaining 
confidence in the performance of our aging stockpile without underground testing.” This program 
also supports nonproliferation, emergency response, and nuclear forensics.  
In its FY2021 budget, NNSA moved the Construction subprogram in ASC to the Programmatic 
Construction subprogram within Infrastructure and Operations, leaving $767.8 million in 
comparable funding for FY2020 ASC programs. NNSA requested, and Congress appropriated, 
$732 million for the ASC Program in FY2021. NNSA requested and Congress appropriated $747 
million for ASC in FY2022. 
Weapon Technology and Manufacturing Maturation  
According to NNSA, the Weapon Technology and Manufacturing Maturation program will 
develop “agile, affordable, assured, and responsive technologies and capabilities for nuclear 
stockpile sustainment and modernization.” As a part of the FY2021 budget realignment, this 
                                                 
25 Lawrence Livermore National Laboratory, “Dedication of World’s Largest Laser Marks the Dawn of a New Era,” 
press release, May 29, 2009, https://publicaffairs.llnl.gov/news/news_releases/2009/NR-09-05-05.html. 
Congressional Research Service  
 
18 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
program area included subprograms that had been a part of the Engineering Program, the 
Advanced Manufacturing Development program, and the Stockpile Services program in 
FY2020.26 
NNSA requested, and Congress appropriated, $298 million for this program area in FY2021, a 
34% increase over the $222.3 million allocated to comparable programs in FY2020. NNSA 
requested and Congress appropriated $292.6 million in FY2022. 
Infrastructure and Operations (I&O) 
According to NNSA’s budget documents, the Infrastructure and Operations program area 
“maintains, operates, and modernizes the NNSA infrastructure in a safe, secure, and cost-effective 
manner to support program results while maximizing return on investment and reducing 
enterprise risk.” In FY2021 the program is to continue to “improve the condition and extend the 
design life” of existing buildings while also supporting construction of new facilities. There is 
widespread agreement that NNSA’s infrastructure is in need of significant upgrades, with some 
facilities dating from early in the nuclear age.  
NNSA requested $4,383.6 million for this program area in FY2021, an increase of 37% over the 
$3,199.5 million allocated to comparable programs in FY2020. NNSA’s budget documents 
indicated that this increase in funding “represents the acceleration of a long-term effort to 
modernize NNSA infrastructure.” Congress appropriated $4,087.5 million in H.R. 133, the 
Consolidated Appropriations Act, 2021. NNSA has requested $3,586.4 million for FY2022. In 
H.R. 2471, the Consolidated Appropriations Act, 2022, Congress appropriated $3,868.3 million 
for this program area. 
Specific programs under I&O include the following: 
Operations of Facilities 
The Operations of Facilities program includes the funding needed to “operate NNSA facilities in 
a safe and secure manner.” It contains, essentially, the operating budgets for each of the eight 
NNSA sites, funding such areas as “water and electrical utilities; safety systems; lease 
agreements; and activities associated with Federal, state, and local environmental, and worker 
safety and health regulations.” NNSA requested, and Congress appropriated, $1,014 million for 
this program area in FY2021. According to its budget documents “the increase … supports pit 
production at LANL and additional leased space at Kansas City to meet Life Extension Program 
(LEP) schedules.” NNSA also requested, and Congress enacted, $1,014 million for this program 
area in FY2022. 
Safety and Environmental Operations 
According to NNSA’s budget documents, the Safety and Environmental Operations program 
supports “safe, efficient operation of the nuclear security enterprise through the provision of 
safety data, nuclear material packaging, environmental monitoring, and nuclear material 
tracking.” NNSA requested, and Congress appropriated, $165.4 million for this program area in 
FY2021, with a significant portion of the increase over prior years supporting the Long Term 
                                                 
26 The third program in Advanced Manufacturing Development, the Process Technology Development subprogram, 
moved to the Production Modernization program area. 
Congressional Research Service  
 
19 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
Stewardship program that treats contaminated ground water at a number of facilities. NNSA also 
requested, and Congress appropriated, $165.4 million for this program area in FY2022. 
Maintenance and Repair of Facilities 
The Maintenance and Repair of Facilities program funds the “recurring day-to-day work required 
to sustain and preserve NNSA facilities and equipment in a condition suitable for their designated 
purpose.” This is the program area that addresses the backlog in deferred maintenance at NNSA 
facilities.  
NNSA requested and Congress provided $456 million for this program area in its FY2020 budget. 
NNSA requested a significant increase to $792 million for Maintenance and Repair of Facilities 
in its FY2021 budget. According to NNSA, this “elevates funding above the FY2019 level to 
address infrastructure risk and reduce deferred maintenance” at sites across the Nuclear Security 
Enterprise. Congress appropriated $667 million for this program area in FY2021. NNSA 
requested $670 million for this program area in FY2022. Congress appropriated $700 million in 
this program area. 
Recapitalization 
According to NNSA, the Recapitalization program is key to arresting the declining state of NNSA 
infrastructure. The program, which funds three subprograms—Infrastructure and Safety, 
Capabilities-Based Investments, and Planning for Programmatic Construction—is intended to 
address obsolete support and safety systems, revitalize aging facilities, and improve the 
reliability, efficiency, and capability of core infrastructure.  
The FY2020 budget included $583 million for Recapitalization. With the realignment of NNSA’s 
budget, the comparable amount for FY2020 would be $560.1 million. NNSA requested $903.9 
million for this program area in FY2021. Within this total, $84.7 million was allocated to the 
Planning for Programmatic Construction subprogram, which is new to the Recapitalization 
budget in FY2021. According to NNSA’s budget documents, this subprogram “consolidates the 
early planning activities … for a portfolio of project proposals that are under evaluation by the 
NNSA.” The budget request also includes $670 million for Infrastructure and Safety, an increase 
of nearly 50% over the FY2020 appropriation of $447.7 million. According to NNSA’s budget 
documents, this increase supports, among other things, the goal of producing 30 pits per year at 
Los Alamos.  
Congress appropriated $732.8 million for Recapitalization in the Consolidated Appropriations 
Act, 2021 (H.R. 133). It provided $573.7 for Infrastructure and Safety and only $10 million for 
Planning and Programmatic Construction. NNSA has requested $658 million for Recapitalization 
in FY2022, with $508.7 million allocated to Infrastructure and Safety. According to NNSA’s 
budget documents, the decrease from FY2021 “reflects a realignment to address higher priority 
NNSA activities, such as plutonium pit production infrastructure investments.” In H.R. 2471, the 
Consolidated Appropriations Act, 2022, Congress appropriated $797.6 million for 
Recapitalization, with $600 million allocated to Infrastructure and Safety. 
Construction 
According to NNSA’s budget documents, the Construction program focuses on two primary 
objectives: identifying construction projects that are needed to support the objectives of the 
weapons program and developing and executing these projects within approved cost and schedule 
baselines. NNSA is currently planning or managing 20 projects through this program area. This 
Congressional Research Service  
 
20 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
includes two controversial and expensive projects—the Uranium Processing Facility (UPF) at the 
Y-12 National Security Complex (TN) and the Chemistry and Metallurgy Research Replacement 
(CMRR) Project, which deals with plutonium, at Los Alamos National Laboratory (NM).  
NNSA requested, and Congress appropriated, $1,508.3 million for Construction in its FY2021 
budget request, a 30% increase over the $1,152.4 million approved for comparable programs in 
FY2020. According to NNSA’s budget documents, the increase in funding supported programs 
that include the resumption of funding for the Transuranic Liquid Waste Facility and the 
demolition of existing structures at the Lithium Processing Facility at Y-12. The FY2021 budget 
request also included $750 million for UPF at Y-12 and $169 million for CMRR. 
NNSA requested $1,085.4 million for Construction in FY2022. According to NNSA’s budget 
documents, the reduction in funding for FY2022 reflects the completion of funding for several 
projects, including the Transuranic Liquid Waste Facility and Exascale Computing Facility 
Modernization projects. NNSA also notes that “the reduction reflects the prioritization of funding 
for programmatic plutonium construction funded within Production Modernization, the beginning 
of the ramp down of funding for the Uranium Processing Facility project, and the use of 
carryover balances to fund work within the Chemistry and Metallurgy Research Replacement 
project.” Congress appropriated $1,183.4 million for this program area. 
Other Programs 
Weapons Activities has several smaller programs, including the following. 
Secure Transportation Asset 
This program provides for safe and secure transport of nuclear weapons, components, and 
materials. It includes special vehicles for this purpose, communications and other supporting 
infrastructure, and threat response. NNSA has sought significant increases in funding in this 
program in recent years, although Congress has not always approved the requested amounts.  
NNSA requested $390 million for this program area in its FY2021 budget request, an increase of 
33% over the amount enacted in FY2020. A significant portion of this funding would have 
supported the Operations and Equipment subprogram, with an increase of $81.4 million over the 
$185 million enacted in FY2020. NNSA indicated that the increase in funding for FY2020 would 
support its staffing requirements, the development and final testing of new specialized vehicles, 
and the procurement of replacement aircraft. Congress appropriated $348.7 million, reducing the 
request for the Operations and Equipment subprogram to $225 million. 
NNSA requested, and Congress appropriated, $330.8 million for Secure Transportation Asset in 
FY2022.  
Defense Nuclear Security 
According to NNSA’s budget documents, this program “provides protection for NNSA personnel, 
facilities, and nuclear weapons and materials from a full spectrum of threats, ranging from local 
security incidents to terrorism.” It provides operations, maintenance, and construction funds for 
protective forces, physical security systems, and personnel security. NNSA requested $826.9 
million for this program area in FY2021. According to NNSA, the increase in nearly 7% over the 
FY2020 budget is “based on additional security requirements associated with growth across the 
NNSA Nuclear Security Enterprise, including Plutonium Pit Production efforts.” Congress 
appropriated $789 million. 
Congressional Research Service  
 
21 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
NNSA has requested $847.6 million for this program area in FY2022. According to NNSA’s 
budget documents, the increases over FY2021 funding “are based on additional security needs 
associated with growth across the NNSA NSE [National Security Enterprise], including 
Plutonium Pit Production efforts.” Congress appropriated $844 million in this program area. 
Information Technology and Cybersecurity 
According to NNSA’s budget documents, this program provides funding “to develop information 
technology and cybersecurity solutions, including continuous monitoring, and security 
technologies to help meet increased proliferation-resistance and security.” It also funds programs 
to consolidate NNSA’s IT services. NNSA requested $375.5 million for this program area in 
FY2021, an increase of 25% over the amount enacted in FY2020. Within this increase, NNSA 
allocated $46.4 million to support cybersecurity modernization efforts at the NNSA sites and $29 
million to Information Technology modernization. Congress appropriated $366.2 million. NNSA 
requested, and Congress appropriated, $406.5 million in FY2022. This includes a $45.7 million 
increase in Cybersecurity, which, according to NNSA’s budget documents, reflects, in part, a 
“transfer of responsibility for the Emergency Communications Network (ECN) from the ... the 
Nuclear Counterterrorism and Incident Response program.”  
Legacy Contractor Pensions 
For many decades, the University of California (UC) operated Los Alamos and Lawrence 
Livermore National Laboratories. Laboratory employees, as UC employees, could participate in 
the UC pension plan. When the contracts for the labs’ operations were taken over by private 
corporations, the contracts between DOE and the new laboratory operators included provisions 
that provided pensions to employees who had worked under the UC contract that mirrored the UC 
pension benefits. These pensions were larger than those provided to employees hired after the 
contracts were granted to private employers. To make up the difference, NNSA has paid into the 
pension plan for those current employees who formerly worked under the UC system. NNSA 
requested, and Congress appropriated, $101.7 million for this program area in FY2021. NNSA 
requested, and Congress appropriated, $78.7 million for this program area in FY2022.  
 
Author Information 
 Amy F. Woolf 
   
Specialist in Nuclear Weapons Policy     
 
Acknowledgments 
This report revises and updates work prepared by Dr. Jonathan Medalia.
Congressional Research Service  
 
22 
Energy and Water Development Appropriations: Nuclear Weapons Activities 
 
 
 
Disclaimer 
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan 
shared staff to congressional committees and Members of Congress. It operates solely at the behest of and 
under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other 
than public understanding of information that has been provided by CRS to Members of Congress in 
connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not 
subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in 
its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or 
material from a third party, you may need to obtain the permission of the copyright holder if you wish to 
copy or otherwise use copyrighted material. 
 
Congressional Research Service  
R44442
 · VERSION 30 · UPDATED 
23