The Bureau of Ocean Energy Management (BOEM), within the Department of the Interior (DOI), has prepared a five-year plan—referred to by BOEM as a "five-year program"—for offshore oil and gas leasing on the U.S. outer continental shelf (OCS) from mid-2017 through mid-2022. Currently, BOEM is implementing a previous five-year program for the 2012-2017 period. BOEM develops the leasing programs under Section 18 of the Outer Continental Shelf Lands Act, as amended (OCSLA; 43 U.S.C. §1331 ff§1331-1356b). The law requires the Secretary of the Interior to prepare and maintain forward-looking plans that indicate proposed public oil and gas lease sales in U.S. waters. In doing so, the Secretary must balance national interests in energy supply and environmental protection.
BOEM's development of a five-year program typically takes place over two or three years, during which successive drafts of the program are published for review and comment. All available leasing areas are initially examined, and the selection may then be narrowed based on economic and environmental analysis to arrive at a final leasing schedule. At the end of the process, the Secretary of the Interior must submit each program to the President and to Congress for a period of at least 60 days, after which the proposal may be approved by the Secretary and may take effect with no further regulatory or legislative action. BOEM also develops a programmatic environmental impact statement (PEIS) for the leasing program, as required by the National Environmental Policy Act (NEPA; 42 U.S.C. §4321). The PEIS examines the potential environmental impacts from oil and gas exploration and development and considers a reasonable range of alternatives to the proposed plan.
On November 18, 2016, BOEM published the final version of its 2017-2022 offshore oil and gas leasing program, known as the proposed final program (PFP). The PFPJanuary 17, 2017, former Secretary of the Interior Sally Jewell issued a record of decision approving BOEM's final offshore oil and gas leasing program for 2017-2022. The final program schedules 11 OCS lease sales, including 10 in the Gulf of Mexico and 1 in the Alaska region. No sales are scheduled for the Atlantic or Pacific regions. Three sales proposed in earlier drafts of the program—one in the Atlantic and two off of Alaska—were not ultimately included in the PFP. Under the OCSLA, the Secretary of the Interior must submit the PFP to the President and Congress for a period of at least 60 days, after which the Secretary may approve the program as finalprogram. An incoming Administration could not revise a finalized program—for example, to restore excluded sales or to add new sales—without restarting the program development process.
Congress has typically been actively involved during the planning phases of BOEM's five-year leasing programs. For example, Members of Congress may conveyhave conveyed their views on the Administration's proposals by submitting public comments on draft versions of the programprograms during formal comment periods, and may evaluate the program and have evaluated programs in committee oversight hearings. The 114th Congress exercised both of these types of influence with respect to the proposed program for 2017-2022. Further, although Congress's role under the OCSLA does not include approval or disapproval of the program, Members may directly influence the terms of a program through legislation. Some legislation in the 114th Congress, including H.R. 1487/S. 791, H.R. 1663, H.R. 3682, H.R. 4749, S. 1276, S. 1278, S. 1279, S. 2011, and S. 3203, would alterhave altered the 2017-2022 program by adding certain lease sales or making other programmatic changes. Other bills, including H.R. 1895, H.R. 2630, H.R. 3927, H.R. 4535, S. 1430, S. 2155, and S. 2238, would influencehave influenced the program by prohibiting leasing in various parts of the OCS.
Under the Outer Continental Shelf Lands Act (OCSLA), as amended,1 the Department of the Interior (DOI) must prepare and maintain forward-looking five-year plans—referred to by DOI as "five-year programs"—that indicate proposed public oil and gas lease sales in U.S. waters over a five-year period.2 In preparing each program, DOI must balance national interests in energy supply and environmental protection.3 The lead agency within DOI responsible for the program is the Bureau of Ocean Energy Management (BOEM).4
BOEM's development of a five-year program typically takes place over two or three years, during which successive drafts of the program are published for review and comment. All available leasing areas are initially examined,5 and the selection may then be narrowed based on economic and environmental analysis to arrive at a final leasing schedule. At the end of the process, the Secretary of the Interior must submit each program to the President and to Congress for a period of at least 60 days, after which the proposal may be approved by the Secretary and may take effect with no further regulatory or legislative action.6
As required by the National Environmental Policy Act (NEPA), the planning process includes a programmatic environmental impact statement (PEIS).7 The PEIS examines the potential environmental impacts from oil and gas exploration and development and considers a reasonable range of alternatives to the proposed plan. Public comments from stakeholders, including state governors, companies, individuals, and public interest organizations, are addressed in both the PEIS and the five-year program itself.
On November 18, 2016, BOEM released the third and final version of its oil and gas leasing program for 2017-2022.8 This version is referred to as the "proposed final program," or PFP, because it awaits review by Congress and the President and approval by the Secretary of the Interior. The PFP was revised from a March 2016 proposed program (PP)9 and a January 2015 draft proposed program (DPP).10 The PFPBecause of the stages of review and comment required under both the OCSLA and NEPA, the Administration could not revise a finalized program—for example, to add new sales—without restarting the program development process. However, scheduled sales could potentially be canceled (but could not be added) during implementation of the program, based on requirements for environmental review that are associated with each individual sale.
On November 18, 2016, BOEM released the third and final version of its oil and gas leasing program for 2017-2022.8 Former Secretary of the Interior Sally Jewell issued a record of decision approving the final program on January 17, 2017.9 The final program was revised from a March 2016 proposed program (PP)10 and a January 2015 draft proposed program (DPP).11 The final program schedules 11 lease sales on the OCS: 10 in the Gulf of Mexico region, 1 in the Alaska region, and none in the Atlantic or Pacific regions (see Table 3). Three sales proposed in earlier versions of the program—one in the Atlantic and two off of Alaska—were not ultimately included in the PFP.11
The leasing decisions in BOEM's five-year programs may affect the economy and environment of individual coastal states and of the nation as a whole. Accordingly, Congress has typically been actively involved in the planning process for the five-year programs. Under the OCSLA, Congress's review of BOEM's final program does not include approval or disapproval of the program. However, Members of Congress may influence the program in other ways. Members may convey their views on the Administration's proposals by submitting public comments on draft versions of the program during formal comment periods, and they may evaluate the program in committee oversight hearings. More directly, Members may introduce legislation to set or alter a program's terms. The 114th Congress has pursued all these types of influence with respect to the proposed program for 2017-2022.
The first two sections of this report discuss the history and legal framework for BOEM's five-year offshore oil and gas leasing programs. Subsequent sections outline BOEM's development process, briefly summarize previous years' programs, and analyze the program for 2017-2022. The final section of the report discusses the role of Congress, with a focus on congressional oversight and legislation related to the 2017-2022 program.
In 1953, Congress enacted two laws that addressed jurisdiction and rights off the coasts of the United States, including rights to regulation of subsurface oil and natural gas exploration and production. The first of these acts, the Submerged Lands Act,1314 provides that coastal states are generally entitled to an area extending 3 geographical miles1415 from their officially recognized coasts (or baselines).1516 The second, the OCSLA, defined the OCS as "all submerged lands lying seaward of" state coastal waters that are subject to the jurisdiction and control of the United States.1617 The OCSLA has as its primary purpose "expeditious and orderly development [of OCS resources], subject to environmental safeguards, in a manner which is consistent with the maintenance of competition and other national needs."17
As offshore activities expanded in the years following adoption of the OCSLA, Congress sought a means by which to allow for expedited exploration and production in order to achieve national energy goals while also providing for environmental protection, opportunities for state and local governments affected by offshore activity to have their voices heard, and a competitive bidding and leasing process.1819 The product was the Outer Continental Shelf Lands Act Amendments of 1978.1920 This legislation added a number of new provisions to the OCSLA, including Section 18, which mandates the creation and maintenance of an OCS leasing program to "best meet national energy needs for the five-year period following its approval or reapproval."2021 These five-year programs, which include schedules for lease auctions, have provided the framework for OCS oil and gas exploration and production ever since the first one was adopted by DOI in 1980.
Although the 1978 amendments were the last major overhaul to the OCSLA, Congress has taken other actions since that time that have altered the scope of offshore oil and gas exploration and production. The Deep Water Royalty Relief Act of 1995 attempted to encourage exploration and production in deep water by providing relief from otherwise applicable royalty payment requirements for some deepwater oil and natural gas production.2122 The Gulf of Mexico Energy Security Act of 2006 directed the leasing of certain regions of the Gulf of Mexico for oil and gas exploration and production and placed a moratorium on leasing in other regions. It also created a mechanism for sharing revenues from leasing in the region with Gulf states and the Land and Water Conservation Fund.2223 Also, starting in 2008, Congress removed language from annual Interior appropriations legislation that had been in place to bar leasing and related activities in certain OCS regions.2324 These legislative actions helped to shape subsequent five-year programs.
The statutory framework governing BOEM's development of a five-year offshore oil and gas leasing program includes the OCSLA as well as other federal statutes, particularly NEPA and the Coastal Zone Management Act (CZMA).25
Section 18 of the OCSLA provides:
The Secretary [of the Interior] ... shall prepare and periodically revise, and maintain an oil and gas leasing program to implement the policies of this subchapter. The leasing program shall consist of a schedule of proposed lease sales indicating, as precisely as possible, the size, timing, and location of leasing activity which he determines will best meet national energy needs for the five-year period following its approval or reapproval.2627
Section 18 further provides that the OCS is to be managed in a manner "which considers economic, social, and environmental values" of the resources of the OCS as well as the potential impact of oil and gas exploration on the marine, coastal, and human environments.2728
Specifically, Section 18 directs the Secretary to schedule the timing and location of oil and gas exploration and production among the regions of the OCS based on consideration of a variety of factors, including existing geographical, geological, and ecological characteristics of the regions; relative environmental and other natural resource considerations of the regions; the relative interest of oil and natural gas producers in the regions; and the laws, goals, and policies of the states that would be affected by offshore exploration and production in the region. In addition to striking this balance, leasing under the five-year program must also "be conducted to assure receipt of fair market value for the lands leased and the rights conveyed by the Federal Government."2829 The OCSLA also requires that the five-year program include estimates on appropriations and staffing needs.29
The OCSLA also imposes a number of consultation requirements. During preparation of the five-year program, the Secretary of the Interior must "invite and consider suggestions for such program from any interested Federal agency, including the Attorney General, in consultation with the Federal Trade Commission, and from the Governor of any State which may become an affected State under such proposed program."3031 In addition to these mandatory consultation requirements, the Secretary may choose to consult with local government officials in affected states.3132
Once the Secretary has satisfied these consultation and other requirements and prepared a proposed program, that program must be submitted to the governor of each affected state for further comments at least 60 days prior to publication of the proposed program in the Federal Register.3233 The OCSLA also authorizes the Attorney General, in coordination with the Federal Trade Commission, to submit comments regarding potential effects of the proposed program on competition.3334 Subsequently, at least 60 days prior to its approval, the Secretary must submit the proposed program to Congress and the President, along with an explanation as to why any specific recommendation of the Attorney General or a state or local government was not accepted.3435 Once these steps have been completed, the Secretary is free to approve a final five-year program. The OCSLA also authorizes the Secretary to revise the five-year program at any time pursuant to a mandated review, although any revision that is "significant" must go through the process for the initial five-year program described above.35
The responsibilities of the Secretary of the Interior with respect to the five-year program under the OCSLA are carried out by BOEM. The regulations applicable to BOEM's preparation of the five-year program include details regarding these consultation requirements. For example, BOEM is required to send letters to governors of affected states requesting that they identify specific laws, goals, and policies that they would like BOEM to consider during preparation of the five-year program.3637 The regulations also outline requirements for publication of the proposed program in the Federal Register.
While the OCSLA and the applicable regulations guide the five-year planning process, other federal statutes also play a role in the program's formation. Two federal statutes that play a prominent role in the preparation of the five-year program are NEPA and the CZMA.
Section 102(2)(C) of NEPA requires all federal agencies to prepare a detailed statement of the environmental impact of and alternatives to major federal actions significantly affecting the environment.3738 In many cases the process for compliance with this requirement includes an environmental assessment (EA) that determines whether an action is a major federal action significantly affecting the environment.3839 However, if the agency has determined that the proposed action is a major federal action without conducting an EA, then the agency moves directly to preparing the statement of the environmental impact of and alternatives to the proposed federal action, known as an environmental impact statement (EIS).3940 This is the case with BOEM's five-year programs; the significance of the program's impact on the environment is assumed. Therefore, BOEM prepares a programmatic EIS (PEIS)4041 concurrently with preparation of the five-year program. This process is explained in further detail throughout this report.
Under the CZMA,4243 states are encouraged to enact coastal zone management plans to coordinate protection of habitats and resources in coastal waters.4344 The CZMA establishes a policy of preservation alongside sustainable use and development compatible with resource protection.4445 State coastal zone management programs that are approved by the Secretary of Commerce are eligible to receive federal monetary and technical assistance. State programs must designate conservation measures and permissible uses for land and water resources4546 and must address various sources of water pollution.4647
The CZMA also requires that the federal government and federally permitted activities comply with these state programs.4748 To that end, the BOEM regulations governing the five-year program provide that "[i]n development of the leasing program, consideration shall be given to the coastal zone management program being developed or administered by an affected coastal State."4849 The regulations require BOEM to request information concerning the relationship between a state's coastal zone management program and OCS oil and gas activity from both the governors of affected coastal states and the Secretary of Commerce prior to development of the leasing program.49
BOEM's development of a five-year program typically takes place over two or three years, during which successive drafts of the program are published for review and comment. The drafts are also submitted to state governors and federal agencies and, in later stages, to Congress and the President (see discussion of consultation requirements in the "Legal Framework" section, above). Each step of the process involves additional public comment and environmental review. After the program takes effect, individual lease sales also undergo environmental review and public comment, as do companies' exploration and development plans on leased tracts. Figure 1 outlines the steps from development of the five-year program to actual oil and gas production in an individual well.
Figure 1. OCS Oil and Gas Leasing, Exploration, and Development Process Source: BOEM oil and gas leasing flow chart, at https://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/BOEM-OCS-Oil-and-Gas-Leasing-Process-Diagram.aspx.
Because of the analysis and review undertaken at each stage of drafting the five-year program, the successive drafts represent a winnowing process. The initial draft proposed program (DPP) examines all of the agency's available planning areas for oil and gas leasing,5152 analyzing them according to factors in Section 18 of the OCSLA and considering public input, in order to develop an initial schedule of proposed lease sales. In the next version of the plan, the proposed program (PP), only those areas listed in the initial schedule undergo further analysis and environmental review. On the basis of this more targeted analysis, BOEM might remove proposed sales but would not add new sales. The same is true for the lastfinal version of the plan, the proposed final program (PFP)—the agency may remove proposed sales at thisthe final stage but may not add new sales without reverting to an earlier stage of the process and undertaking new environmental reviews. The steps of the process are discussed in greater detail below.
|
Notes: APD = application for permit to drill; BSEE = Bureau of Safety and Environmental Enforcement; CD = consistency determination; CZM = coastal zone management; EIS = environmental impact statement; NEPA = National Environmental Policy Act; NOI = notice of intent; PEIS = programmatic environmental impact statement; ROD = record of decision. The gold star indicates the current stage of development of the 2017-2022 OCS oil and gas leasing program. |
When the DPP is published, BOEM also issues a notice of intent (NOI) to publish a programmatic environmental impact statement (PEIS) for the proposed lease areas and seeks public input (through a scoping process) on the issues that should be analyzed in the PEIS. The NOI for the 2017-2022 program was published on January 29, 2015, along with the DPP.5556
57The PP is accompanied by a draft PEIS analyzing the OCS areas that were identified for leasing at the DPP stage. The comment period for the 2017-2022 draft PEIS closed on May 2, 2016.57
Along with the PFP, BOEM publishes a final PEIS that concludes the analysis of the areas proposed for leasing. The final PEIS is submitted to the President and Congress along with the PFP. BOEM released the final PEIS for the 2017-2022 program on November 18, 2016.5960
Since 1980, eight distinct five-year programs and a revised version of one program have been submitted to Congress. Following the 60-day review period required by the OCSLA, each of these five-year programs has taken effect as an approved program. This section briefly discusses the previous submissions, dating back to 1980, as shown in Table 1.
Years |
Administration Submitting Plan |
Congress |
Number of Sales Listed in Submission |
Number of Sales Held |
Approximate Acres Leased (in millions)a |
|||||
2017-2022 Obama 114th 11 — — |
Obama |
112th |
15 |
11 |
6. |
|||||
2007-2012 |
Obama / G. W. Bush |
111th / 110th |
16 / 21 |
11 |
21.7 |
|||||
2002-2007 |
G. W. Bush |
107th |
20 |
15 |
20.5 |
|||||
1997-2002 |
Clinton |
105th |
16 |
12 |
22.9 |
|||||
1992-1997 |
G. H. W. Bush |
102nd |
18 |
12 |
22.6 |
|||||
1987-1992 |
Reagan |
100th |
42 |
17 |
24.7 |
|||||
1982-1987 |
Reagan |
97th |
41 |
23 |
21.0 |
|||||
1980-1982 |
Carter |
96th |
36 |
12 |
4.1 |
Source: CRS.
a.
Acreage leased is shown in BOEM, OCS Lease Sale Statistics, "All Lease Offerings," at http://www.boem.gov/OCS-Lease-Sale-Statistics-All-Lease-Offerings/.
b.
BOEM, OCS Lease Sale Statistics, "All Lease Offerings," at http://www.boem.gov/OCS-Lease-Sale-Statistics-All-Lease-Offerings/. Data for Lease Sale 241, conducted on March 23, 2016, are from BOEM, "Central Gulf of Mexico Lease Sale 241 Statistics," at http://www.boem.gov/Central-Gulf-of-Mexico-Lease-Sale-241-Statistics/. Data for Lease Sale 248, conducted on August 24, 2016, are from BOEM, "Western Gulf of Mexico Lease Sale 248 Statistics," at https://www.boem.gov/Western-Gulf-of-Mexico-Lease-Sale-248-Statistics/. The data for these two sales reflect acres bid on rather than acres leased.
c.
The George W. Bush Administration developed the original program for 2007-2012 and submitted it to the 110th Congress with a lease schedule containing 21 sales. Following a court order in 2009, DOI revised the program under the Obama Administration and resubmitted it to the 111th Congress with a revised lease schedule containing 16 sales.
d.
c. This program was originally referred to as the Comprehensive Program 1980-1985, but the covered years were changed to 1980-1982 due mainly to judicial activity. California v. Watt, 688 F.2d 1290 (D.C. Cir. 1981).
The five-year programs have reflected the offshore oil and gas leasing policies of different presidential administrations, along with input from states, Members of Congress, and other stakeholders.
In November 2016, BOEM released the third and final version of its offshore oil and gas leasing program for 2017-2022—the proposed final program (PFP).75 The PFP proposes.77 The final program schedules 11 lease sales in particular regions and planning areas of the OCS. BOEM identifies four OCS regions, comprising a total of 26 planning areas (see Figure 2 and Figure 3). The four regions are the Gulf of Mexico region, the Alaska region, the Atlantic region, and the Pacific region. The 2017-2022 PFPfinal program schedules lease sales in two of these regions (Gulf of Mexico and Alaska). The sections below discuss BOEM's decisions for each region—and the market conditions, resource estimates, and other factors affecting the proposals—in greater detail.
|
|
|
U.S. offshore crude oil production accounted for 16% of U.S. total production in FY2015,7779 a decline from FY2010, when offshore production represented 31% of U.S. total crude oil production.7880 Offshore production volumes declined by about 12% during this period, whereas U.S. total crude production soared to near-record levels of 9.4 million barrels per day (mbd), an increase of about 73% over FY2010 levels.7981
Offshore natural gas accounted for 4% of U.S. total production in FY2015, also a decline from FY2010, when it represented 9.5% of the total.8082 Offshore natural gas production volumes fell by nearly 50% between FY2010 and FY2015.8183 During the same period, U.S. total annual natural gas production rose by more than 30%, from 21.3 trillion cubic feet (Tcf) to 28.7 Tcf.8284
The surge in total U.S. crude oil and natural gas production is the result of increased production of shale gas and shale oil in several unconventional onshore formations throughout the United States (e.g., Marcellus, Bakken, Permian Basin, and Eagle Ford). The increased U.S. oil production has helped to reduce imports, primarily from members of the Organization of Petroleum Exporting Countries (OPEC). The onshore shale oil plays have lower production costs than the deepwater plays that are currently being explored and developed offshore.
As of November 1, 2016, there were 917 producing offshore oil and natural gas leases on 4.5 million acres of the OCS, out of a total of 3,431 active leases on 18.3 million offshore acres. Approximately 86% of the producing leases and 79% of the active leases were located in the Central Gulf of Mexico.
8385 In a low oil and natural gas price environment, the demand for the acquisition of new offshore leases is likely to be soft, which could impact future production levels. Overall, the Energy Information Administration (EIA) anticipates lower domestic investment in oil and gas projects over the 2015-2020 period.84 86
8588 In the most recent FY2017 budget request, estimated bonus bid revenues were closer to $500 million annually for FY2017-FY2021.8689 The Office of Management and Budget's crude oil price estimates fell from $80-$90 per barrel in the FY2015 budget request to $50-$60 per barrel in the FY2017 budget request. The longer low oil prices persist, the more impact the decline will have on new investment.
Nonetheless, crude oil production on federal lands, particularly offshore, likely will continue to make a significant contribution to the U.S energy supply picture. The EIA anticipates that offshore crude oil production in the Gulf of Mexico will reach record levels of 1.91 mbd in 2017, because of the potential for new deepwater oil projects to come online.8790 BOEM stated in the 2017-2022 PP that "energy diversification, including continued oil and natural gas production in the GOM [Gulf of Mexico], the primary OCS region currently available for energy production and development activities, remains vital ... and new production from other OCS regions can also contribute to meeting the country's energy needs."8891
Oil and gas exploration and production proceed in stages, during which increased data provide growing certainty about the volume of resources present. Prior to discovery by drilling wells, estimated volumes of oil and gas are termed undiscovered resources. When oil or gas is discovered, the volumes of that oil and gas are measured within pools or fields via well penetration or other technology, and are called reserves. Measured reserves are reported to the Securities and Exchange Commission by the owners of the wells.9093 Reserves have been reported for U.S. OCS areas that have been developed, such as the Central and Western Gulf of Mexico and some parts of the California coast, but no reserves of oil or gas have been reported along the Atlantic OCS, because there have been no discoveries. Only modest oil reserves have been reported on the Alaska OCS. Altogether, BOEM estimates that the U.S. OCS has 4.3 billion barrels of proven oil reserves and 16 Tcf of dry gas, nearly all of which are located in the Central and Western Gulf of Mexico.9194
According to BOEM, the U.S. OCS contains estimated undiscovered technically recoverable resources (UTRR) of 89.9 billion barrels of oil (Bbo) and 327.5 Tcf of natural gas (see Table 2).9295 The Gulf of Mexico contains about 54% of the UTRR for oil and an estimated 43% of the natural gas, with the vast majority of the resources in the Central Gulf of Mexico. About 90% of Alaska's UTRR estimates for oil and 80% for natural gas are contained in the Chukchi and Beaufort Seas. In preparing its five-year programs under the OCSLA, BOEM must consider the resource potential of individual OCS regions and planning areas along with other factors, such as potential environmental and socioeconomic impacts of oil and gas leasing.
Table 2. Oil and Gas Resource Estimates for the U.S. OCS, 2016
(undiscovered technically recoverable resources)
OCS Region |
Oil (Bbo) |
Natural Gas (Tcf) |
Alaska |
26.61 |
131.45 |
Atlantic |
4.59 |
38.17 |
Gulf of Mexico |
48.46 |
141.76 |
Pacific |
10.20 |
16.10 |
Total |
89.87 |
327.49 |
Source: BOEM, "Assessment of Undiscovered Technically Recoverable Oil and Gas Resources of the Nation's Outer Continental Shelf, 2016," Fact Sheet, at http://www.boem.gov/National-Assessment-2016/. For a discussion of undiscovered technically recoverable resources, see footnote 9295.
Note: OCS = outer continental shelf; Bbo = billion barrels of oil; Tcf = trillion cubic feet.
Some portions of the U.S. OCS arewere not available for leasing consideration in the 2017-2022 five-year program because the President has withdrawn themU.S. Presidents had withdrawn those areas from consideration,97 Congress hashad placed a moratorium on leasing in the areas, or the areas havehad a protected status that does not allow for oil and gas leasing. These unavailable areas, which BOEM did not consider for the 2017-2022 program, includeincluded the following.
In December 2016, after BOEM's publication of the final program, President Obama made additional withdrawals under the OCSLA. The President withdrew much of the U.S. Arctic from leasing disposition for an indefinite time period, including the entire Chukchi Sea planning area, almost all of the Beaufort Sea planning area, and planning areas in the North Bering Sea.101 The President also withdrew from leasing consideration certain areas of the Atlantic Ocean associated with major canyons and canyon complexes.102 The President's December 2016 withdrawals did not directly affect the 2017-2022 program, because none of the withdrawn areas overlapped with areas that BOEM had scheduled for leasing in the final program. However, the withdrawals would affect the areas that can be considered for leasing for future five-year programs.
Proposed Leasing Schedule by RegionBOEM's "tailored leasing strategy" separately considers each of the four U.S. ocean regions with respect to the criteria for leasing set out in Section 18 of the OCSLA (see "Legal Framework," above). For each region, BOEM weighs factors including the oil and gas resource potential of the region, existing infrastructure, other ocean uses, environmental issues, and state and local interests and concerns about offshore oil and gas development, among others.
On the basis of its regional analyses, BOEM's proposal in the PFP is for included in the final program a total of 11 lease sales, all of which would take place in either the Gulf of Mexico region or the Alaska region. No lease sales are scheduled for the other two regions of the U.S. OCS, the Atlantic region and the Pacific region. An Atlantic lease sale and two Alaska lease sales proposed in earlier versions of the program were not ultimately included in the PFP. Table 3 shows the oil and gas lease sales scheduled in the PFPprogram. BOEM stated that, altogether, the PFP would makeprogram makes available for leasing almost half of the undiscovered technically recoverable oil and gas resources on the U.S. OCS.97
Year |
Program Area |
Sale Numbera |
|
1. |
2017 |
Gulf of Mexico |
249 |
2. |
2018 |
Gulf of Mexico |
250 |
3. |
2018 |
Gulf of Mexico |
251 |
4. |
2019 |
Gulf of Mexico |
252 |
5. |
2019 |
Gulf of Mexico |
253 |
6. |
2020 |
Gulf of Mexico |
254 |
7. |
2020 |
Gulf of Mexico |
256 |
8. |
2021 |
Gulf of Mexico |
257 |
9. |
2021 |
Alaska - Cook Inlet |
258 |
10. |
2021 |
Gulf of Mexico |
259 |
11. |
2022 |
Gulf of Mexico |
261 |
The Gulf of Mexico is the most mature of the four BOEM regions, in that it contains "the most abundant proven and estimated oil and gas resources, broad industry interest, and well-developed infrastructure."98104 The region accounts for about 97% of all U.S. offshore and gas production.99105 Also, the Gulf states—including Louisiana, Texas, Mississippi, and Alabama—are supportive of offshore oil and gas activities. For all these reasons, the majority of the lease sales in the 2017-2022 program, as in previous programs, are scheduled in the Gulf region (10 of the 11 proposed sales in the PFP).100).106
The region includes three BOEM planning areas: the Western Gulf, the Central Gulf, and the Eastern Gulf (see Figure 4). Almost all of the Eastern Gulf and a small portion of the Central Gulf are closed to oil and gas leasing by the congressional moratorium imposed under GOMESA (see "Moratoria and Withdrawals Affecting the 2017-2022 Program," above). In earlier five-year programs, BOEM and its predecessor agencies scheduled separate sales in each of the three Gulf planning areas. For the 2017-2022 program, BOEM has replaced these area-specific sales with region-wide sales that offer all available lease blocks in the Gulf in each sale. BOEM stated that the change is intended "to provide greater flexibility to industry, including more frequent opportunities to bid on rejected, relinquished, or expired OCS lease blocks, as well as facilitating better planning to explore resources that may straddle the U.S.-Mexico boundary."101
The PFP includes107
102108 BOEM attributed the decrease to the consolidation of area-specific sales in the Gulf. With all available Gulf blocks offered at each sale, BOEM stated, each individual planning area is made available more times, even though the overall number of lease sales has decreased.103
|
|
Interest in exploring for offshore oil and gas in the Alaska region of the U.S. OCS has grown as the region sees decreases in the areal extent of summer polar ice, allowing for a longer drilling season. Recent estimates of substantial undiscovered oil and gas resources in Arctic waters have also contributed to the increased interest.104110 However, the region's severe weather and perennial sea ice, and its lack of infrastructure to extract and transport offshore oil and gas, continue to pose challenges to new exploration. Among 15 BOEM planning areas in the region, the Beaufort and Chukchi Seas are the only two areas with existing federal leases, and only the Beaufort Sea has any producing wells in federal waters (from a joint federal-state unit). Stakeholders including the State of Alaska, as well as some Members of Congress, seek to expand offshore oil and gas activities in the region. Other Members of Congress as well as some environmental groups oppose offshore oil and gas drilling in the Arctic, due to concerns about potential oil spills and about the possible contributions of these activities to climate change.
The Obama Administration has at times expressed support for expanding offshore oil and gas exploration in the Arctic, while also pursuing safety regulations that aim to minimize the potential for oil spills.105111 In the current five-year program, for the period 2012-2017, BOEM included lease sales in three planning areas of the Alaska region: the Beaufort Sea, the Chukchi Sea, and Cook Inlet. However, in October 2015 BOEM canceled its scheduled Chukchi and Beaufort Sea lease sales for 2016 and 2017, citing difficult market conditions and low industry interest.106112
BOEM's earlier program drafts for 2017-2022 also included three Alaska lease sales—again, one each in the Beaufort Sea, Chukchi Sea, and Cook Inlet planning areas. However, for the PFPfinal program, BOEM removed the sales for the Beaufort and Chukchi Seas, and retained only the sale for Cook Inlet (see Figure 5). BOEM stated that it weighed factors that favored sales in the Beaufort and Chukchi planning areas, including the significant hydrocarbon resources in those waters and the support of the State of Alaska for the sales. Nonetheless, BOEM ultimately decided against the sales based on other factors, including "opportunities for exploration and development on [already] existing leases, the unique nature of the Arctic ecosystem, recent demonstration of constrained industry interest in undertaking the financial risks that Arctic exploration and development present, current market conditions, and sufficient existing domestic energy sources already online or newly accessible."107
Figure 5. BOEM's Final Program Area for Offshore Oil and Gas Leasing in Alaska Source: BOEM, 2017-2022 PP, "Maps," at http://www.boem.gov/Alaska-Program-Areas/.
BOEM noted in particular evidence of a declining industry interest in the Arctic OCS, in the face of low oil prices and Shell Oil Company's disappointing exploratory drilling effort in the Chukchi Sea in 2015. Subsequent to BOEM's publication of the final program, President Obama withdrew large portions of the Arctic OCS from future leasing consideration for an indefinite time period (see section on "Moratoria and Withdrawals Affecting the 2017-2022 Program"). The withdrawn areas do not overlap with BOEM's scheduled Alaska lease sale.108114 The agency stated that the number of active leases on the Arctic OCS declined by more than 90% between February 2016 and November 2016, as companies relinquished leases they had acquired in previous years rather than incurring the costs of continued investment.109115 BOEM observed that, based on the U.S. energy outlook for future years, industry interest in the Beaufort and Chukchi Seas may likely to be stronger in years following the 2017-2022 period.110116 Additionally, BOEM concluded that, because of the current overall strength of the domestic energy supply, the two Arctic lease sales were not immediately needed to satisfy U.S. energy needs.111117
|
|
The PFP for 2017-2022 excludes a lease sale in the Atlantic region that had beenwas proposed in the DPP version of the program. If conducted, it would have been the first offshore oil and gas lease sale in the Atlantic since 1983.
The lack of oil and gas activity in the Atlantic region in the past 30 years was due in part to congressional bans on Atlantic leasing imposed in annual Interior appropriations acts from FY1983 to FY2008, along with presidential moratoria on offshore leasing in the region during those years. Starting with FY2009, Congress no longer included an Atlantic leasing moratorium in annual appropriations acts. In 2008, President George W. Bush also removed the long-standing administrative withdrawal for the region.112 These changes meant that lease sales could now potentially be conducted for the Atlantic. However, no Atlantic lease sale has taken place in the intervening years.113
Geological and Geophysical (G&G) Activities in the Atlantic Ocean In addition to offshore oil and gas leasing, a separate issue for the Atlantic region is estimating the extent and location of its oil and gas resources. Earlier congressional and administrative moratoria on Atlantic leasing activities meant that geological and geophysical (G&G) surveys of the region's offshore resources could not be conducted over the past 30 years. Previous seismic surveys of the region's resources, dating from the 1970s, were accomplished with older technologies that are considered less precise than recent survey methods. In the past several years, BOEM has conducted environmental analysis for proposed new G&G surveys in the region, and it issued a record of decision (ROD) in July 2014 to allow the surveys to go forward. BOEM included in its record of decision measures to mitigate the impacts of G&G activities on marine life, such as time-area closures to protect the North Atlantic right whale and nesting sea turtles off of Florida. Some environmental advocacy groups, as well as some Members of Congress and other stakeholders, expressed opposition to the BOEM decision, arguing that the agency's analysis did not adequately account for the potential impacts of seismic surveys on marine mammals, among other issues. Following the 2014 ROD, a number of companies applied for permits to conduct G&G surveys in the Atlantic region. These applications are still under review by federal agencies and coastal states. The G&G permitting process is taking place outside of the five-year program, which is specifically concerned with lease sales. The House Energy and Natural Resources Committee held a hearing on Atlantic G&G testing in July 2015, during which some Members sought to expedite the permit review process while others opposed letting G&G testing go forward. Witnesses differed in their evaluations of the potential harm to Atlantic marine mammals from seismic activities. Members of Congress have also introduced legislation addressing Atlantic G&G activities. Some bills (such as S. 1279) aim to facilitate G&G surveys, while others (such as S. 2841) would prohibit such activities either in certain areas or throughout the Atlantic. Sources: BOEM, Record of Decision: Atlantic OCS Proposed Geological and Geophysical Activities, Mid-Atlantic and South Atlantic Planning Areas, Final Programmatic Environmental Impact Statement, at http://www.boem.gov/Record-of-Decision-Atlantic-G-G/; BOEM, "Atlantic G&G Permitting," at http://www.boem.gov/Atlantic-G-and-G-Permitting/; 2017-2022 PP, esp. pp. 3-5, 5-5 to 5-6, and 10-8; House Committee on Natural Resources, oversight hearing, "The Fundamental Role of Safe Seismic Surveying in OCS Energy Exploration and Development," July 14, 2015, at http://naturalresources.house.gov/calendar/eventsingle.aspx?EventID=398949; Rep. Mark Sanford, "Sanford Leads Effort to Halt Seismic Testing in the Atlantic," press release, December 10, 2015, at https://sanford.house.gov/media-center/press-releases/sanford-leads-effort-to-halt-seismic-testing-in-the-atlantic. |
For both the DPP and PP versions of the 2017-2022 program, BOEM analyzed of a variety of factors for the Atlantic region under Section 18 of the OCSLA. These factors included the region's resource potential and infrastructure needs, ecological and safety concerns, competing uses of the areas—especially by the Department of Defense and the National Aeronautics and Space Administration (NASA)—and state and local attitudes toward drilling, among others. The initial analysis for the DPP resulted in a planned lease sale in a combined portion of the Mid- and South Atlantic planning areas in 2021 (see Figure 6). However, after the comment period and further analysis, BOEM removed the Atlantic sale in the PP. BOEM gave several reasons for the removal, including "strong local opposition, conflicts with other ocean uses, ... current market dynamics, ... [and] careful consideration of the comments received from Governors of affected states."114120 In particular, BOEM cited conflicts with existing uses, including ocean-dependent tourism, commercial and recreational fishing, commercial shipping and transportation, and Department of Defense and NASA uses.115121 BOEM observed that some of these activities coexist with oil and gas activities in the Gulf of Mexico, which has a long history of offshore mineral production. By contrast, BOEM stated, because the Atlantic has little such history, the prospect of drilling has raised many concerns among those who use the ocean for competing purposes.116
(subsequently removed from the five-year program) |
Source: 2017-2022 PP, p. 4-12. |
BOEM further cited the broader U.S. energy situation as a factor in its decision not to hold an Atlantic lease sale in the 2017-2022 period. The agency observed that the increases over the past decade in onshore oil and gas production have made national energy needs less pressing. BOEM stated that "domestic oil and gas production will remain strong without the additional production from a potential lease sale in the Atlantic."117
Figure 6. BOEM's Originally Proposed Program Area for Offshore Oil and Gas Leasing in the Atlantic
(subsequently removed from the five-year program)
Source: 2017-2022 PP, p. 4-12.
Like other recent five-year programs, the 2017-2022 program schedules no lease sales for the Pacific region. No federal oil and gas lease sales have been held for the region since 1984, although some active leases with production remain in the Southern California planning area. Like the Atlantic region, the Pacific region was subject to congressional and presidential leasing moratoria for most of the past 30 years.118124 Although these restrictions were lifted in FY2009, the governors of California, Oregon, and Washington continue to oppose offshore oil and gas leasing in the region.
Environmental Analysis for the 2017-2022 Program Programmatic Environmental Impact Statement (PEIS). Along with BOEM's preparation of the five-year offshore oil and gas leasing program for 2017-2022, the agency prepared a PEIS for the program, as required under the National Environmental Policy Act (NEPA; 42 U.S.C. §§4321-4347). This document evaluates the potential environmental and socioeconomic impacts associated with the program and considers alternatives that may avoid or reduce impacts. BOEM released its final PEIS for the 2017-2022 program on November 18, 2016. Although the PEIS process is separate from that of the five-year program, it informs the implementation of the leasing program. For example, when implementing the program, BOEM may apply exclusions or mitigation measures identified in the PEIS to avoid or reduce program impacts. In addition to the environmental analysis contained in the PEIS, which is associated with publication of the five-year program, later steps in the offshore leasing and production process also require environmental evaluation under NEPA. For example, NEPA reviews are required at the pre-lease sale, exploration, and development and production stages. See Figure 1 for more information. Mitigation Strategy. The BOEM stated that the process prescribed by the OCSLA for developing the five-year program largely meets the criteria of the President's memorandum and related DOI policy guidance. The OCSLA requires a "landscape-level" approach to determine the areas most suitable for ocean energy development. In terms of the preferred strategies of avoidance and minimization, BOEM "eliminated numerous planning areas from potential leasing and minimized effects to certain areas through the Secretary's size, timing, and location decisions" (2017-2022 PFP, p. 1-14). Following program approval, BOEM stated, the agency will "integrate the mitigation hierarchy into the entire leasing process" to avoid, minimize, or compensate for impacts of the program (p. 1-14). Sources: 2017-2022 PFP, pp. 1-13 to 1-15; BOEM, Outer Continental Shelf Oil and Gas Leasing Program, 2017-2022: Final Programmatic Environmental Impact Statement, March 2016, at http://boemoceaninfo.com/fpeis/; CRS Report RL33152, The National Environmental Policy Act (NEPA): Background and Implementation, by |
Congress can influence the Administration's development of a five-year program in a number of ways. Members of Congress may convey their views on the Administration's proposal by submitting public comments on a draft program during the formal comment periods, or they may evaluate the program in committee oversight hearings. More directly, Members may introduce legislation to set or alter a program's terms. The 114th Congress has pursued all these types of influence with respect to the proposed program for 2017-2022. Congress also has a role under the OCSLA of reviewing each five-year program once it is finalized, but the OCSLA does not require that Congress directly approve the final program in order for it to be implemented.
The 114th Congress pursued all these types of influence with respect to the proposed program for 2017-2022. The 115th Congress could also address the 2017-2022 program—for example, through legislation to alter its terms—or could choose not to do so.
Public CommentMembers of Congress, along with other stakeholders such as state governors, interested agencies and organizations, and members of the public, may submit comments on draft versions of five-year programs. For the 2017-2022 program, BOEM received 15 comments from Members of Congress on its initial request for information (RFI), 12 comments from Members on the DPP, and 5 comments from Members on the PP. Some of these comments came from one or a few Members, and others had many signers (in some cases, 150 Members or more).119125 Some comments opposed the inclusion of certain regions in the program, whereas others supported the proposed lease sales or sought an expansion of lease areas and a higher number of sales. The comments also addressed related issues such as seismic testing in the Atlantic.
BOEM takes the public comments into account when developing successive drafts of a five-year program. Each draft contains an appendix summarizing the substantive comments that BOEM received on the previous version, including those from Members of Congress, and explaining BOEM's response to each.120126 BOEM may revise the program to partially or fully adopt a suggestion, or may explain why it declined to do so.
The House or Senate may hold oversight hearings to evaluate a proposed five-year oil and gas leasing program. Such hearings help to inform Members in their legislative decision-makingdecisionmaking concerning the program and provide an opportunity for BOEM to hear Members' views. After BOEM released the DPP for 2017-2022, the House held a hearing on the program on April 15, 2015.121127 Members and witnesses addressed issues such as the overall number of lease sales proposed for the program, whether leasing should occur in the Atlantic and Arctic, and whether seismic surveying should occur in the Atlantic, among others. On May 19, 2016, the Senate Energy and Natural Resources Committee held a hearing on the PP version of the program.122128 Members and witnesses discussed, among other issues, the PP's proposal for targeted rather than area-wide lease sales in Alaska and the factors that contributed to BOEM's decision to remove its earlier-proposed Atlantic lease sale from the 2017-2022 program.
Through legislation, Congress may direct specific terms for an upcoming program or modify a program that is currently in effect. Legislation could, for example, remove a scheduled lease sale, add a new lease sale, or make broader changes to the program.
The 114th Congress is consideringconsidered legislation that would affecthave affected the 2017-2022 program, including the following bills. (Except as indicated below, none of these bills has advanced beyond the referral stage.)
BOEM would behave been required to finalize a leasing program for 2016-2021 that compliescomplied with these provisions. BOEM would also needalso would have been required to conduct a specific previously proposed lease sale in the Atlantic region that was removed from the final 2012-2017 program, as well as lease sales off of South Carolina and Southern California. The bill containscontained other offshore energy provisions as well, such as those concerning revenue sharing with the states and the organization of the DOI ocean energy agencies.
Under the OCSLA, the final version of each five-year program must be submitted to Congress for a period of 60 days before the Secretary of the Interior can approve and implement the program.124132 However, Congress does not directly approve or disapprove the program during this period. Instead, either during or outside the 60-day period, Congress could introduce legislation to alter the program. For example, in the 112th Congress, during the 60-day review period for the current five-year leasing program (for 2012-2017), Representative Doc Hastings introduced H.R. 6082, which would have replaced the submitted program with a congressionally developed plan containing additional lease sales, including 13 sales in the Gulf of Mexico, 7 sales in the Alaska region, 6 sales in the Atlantic, and 3 sales in the Pacific. The bill passed the House but did not become law. As discussed above, bills under consideration in the 114th Congress would makehave made changes to the lease sale schedule for the 2017-2022 program.
Author Contact Information
1. |
43 U.S.C. §§1331 |
|||
2. |
43 U.S.C. §1344. U.S. waters comprise an area referred to as the outer continental shelf, or OCS (43 U.S.C. §1331(a)). The OCS is an area of submerged lands, subsoil, and seabed that lies between the outer seaward reaches of a state's jurisdiction and the outer seaward reaches of U.S. jurisdiction. |
|||
3. |
The Secretary of the Interior must ensure, "to the maximum extent practicable," that the timing and location of leasing occurs so as to "obtain a proper balance between the potential for environmental damage, the potential for the discovery of oil and gas, and the potential for adverse impact on the coastal zone." 43 U.S.C. §1344(a)(3). |
|||
4. |
Prior to 2010, the Secretary of the Interior delegated this responsibility to the Minerals Management Service, and then to the Service's successor agency, the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE). The Bureau of Ocean Energy Management (BOEM), one of three successor agencies to BOEMRE, has had the responsibility since a departmental reorganization in October 2012. |
|||
5. |
Some areas of the OCS may be unavailable for leasing because of presidential or congressional leasing moratoria or other types of protection. For more information, see section on "Moratoria and Withdrawals Affecting the 2017-2022 Program." |
|||
6. |
43 U.S.C. §1344(d). Congress does not approve or reject the program during the review period, but congressional review may lead to separate legislative action. |
|||
7. |
42 U.S.C. §4321. For more information on environmental impact statements, see CRS Report RL33152, The National Environmental Policy Act (NEPA): Background and Implementation, by |
|||
8. |
BOEM, 2017-2022 Outer Continental Shelf Oil and Gas Leasing: Proposed Final Program, November 2016, at https://www.boem.gov/2017-2022-OCS-Oil-and-Gas-Leasing-PFP/, hereinafter | |||
9.
|
DOI, Record of Decision and Approval of the 2017-2022 Outer Continental Shelf Oil and Gas Leasing Program, January 17, 2017, at https://www.boem.gov/2017-2022-Record-of-Decision/.
10.
|
BOEM, 2017-2022 Outer Continental Shelf Oil and Gas Leasing: Proposed Program, March 2016, at http://www.boem.gov/2017-2022-Proposed-Program-Decision/, hereinafter referred to as "2017-2022 PP." |
||
BOEM, 2017-2022 Outer Continental Shelf Oil and Gas Leasing: Draft Proposed Program, January 2015, at http://www.boem.gov/2017-2022-DPP/, hereinafter referred to as "2017-2022 DPP." |
||||
For additional information on issues related to the program, see CRS Report R44692, Five-Year Program for Federal Offshore Oil and Gas Leasing: Status and Issues in Brief, by |
||||
This section was prepared by |
||||
43 U.S.C. §§1301 et seq. |
||||
A geographical or nautical mile is equal to 6,080.20 feet, as opposed to a statute mile, which is equal to 5,280 feet. The Submerged Lands Act (SLA) also provides for an extended seaward boundary if a state can show such a boundary was provided for by the state's "constitution or laws prior to or at the time such State became a member of the Union, or if it has been heretofore approved by Congress." 43 U.S.C. §§1301(b), 1312. After enactment of the SLA, the Supreme Court of the United States held that the Gulf coast boundaries of Florida and Texas extend to the 3-marine-league limit (a marine league is 3 nautical miles). Other Gulf coast states were unsuccessful in their challenges. See U.S. v. Louisiana, 363 U.S. 1, 66 (1960), U.S. v. Florida, 363 U.S. 121, 129 (1960). |
||||
43 U.S.C. §1301(b). |
||||
43 U.S.C. §1331(a). |
||||
43 U.S.C. §1332(3). |
||||
P.L. 95-372, §102 (43 U.S.C. §1802). |
||||
43 U.S.C. §1344(a). |
||||
P.L. 109-432. For more information on the Land and Water Conservation Fund, see CRS Report RL33531, Land and Water Conservation Fund: Overview, Funding History, and Issues, by |
||||
For further discussion of this appropriations-based moratorium, see CRS Report RL33404, Offshore Oil and Gas Development: Legal Framework, by |
||||
This section was prepared by |
||||
16 U.S.C. §§1451-1464. |
||||
43 U.S.C. §1344(a). |
||||
43 U.S.C. §1344(a)(1). |
||||
43 U.S.C. §1344(a)(4). |
||||
43 U.S.C. §1344(b). |
||||
43 U.S.C. §1344(c)(1). |
||||
Ibid. |
||||
43 U.S.C. §1344(c)(2). |
||||
43 U.S.C. §1344(d)(1). |
||||
43 U.S.C. §1344(d)(2). |
||||
43 U.S.C. §1344(e). |
||||
30 C.F.R. §556.16(b). |
||||
43 U.S.C. §1332(2)(C). For more information on NEPA, see CRS Report RL33152, The National Environmental Policy Act (NEPA): Background and Implementation, by |
||||
40 C.F.R. §1501.3(a). |
||||
Ibid. |
||||
A programmatic environmental impact statement (PEIS) evaluates the environmental impact of the federal program in question from a broad regional perspective; more detailed and geographically focused analyses in compliance with the requirements of NEPA are also conducted at the planning, leasing, and exploration and development stages. See BOEM, "Programmatic Environmental Impact Statement (2012-2017)," at http://www.boem.gov/5-year/2012-2017/PEIS/. |
||||
Some of the material in this section has been borrowed from CRS Report R40175, Wind Energy: Offshore Permitting, by |
||||
16 U.S.C. §§1451-1464. |
||||
Coastal U.S. states and territories, including the Great Lakes states, are eligible to receive federal assistance for their coastal zone management programs. Currently, there are 35 approved state and territorial plans. See National Oceanic and Atmospheric Administration (NOAA), Office of Ocean and Coastal Resource Management, State and Territory Coastal Management Program Summaries, at https://coast.noaa.gov/czm/mystate/. |
||||
16 U.S.C. §1452(1), (2). |
||||
16 U.S.C. §1455(d)(2), (9)-(12). |
||||
16 U.S.C. §1455(d)(16). |
||||
16 U.S.C. §1456(c). |
||||
30 C.F.R. §556.19. |
||||
Ibid. |
||||
This section prepared by Laura Comay, Analyst in Natural Resources Policy. |
||||
BOEM divides the U.S. OCS into 26 planning areas in four regions (the Atlantic, Pacific, Arctic, and Gulf of Mexico regions). The draft proposed program analyzes all of the planning areas except those that are closed to oil and gas leasing activities by congressional or presidential moratoria. |
||||
BOEM, "Request for Information and Comments on the 2017-2022 Outer Continental Shelf (OCS) Oil and Gas Leasing Program," 79 Federal Register 34349, June 16, 2014. A summary of the comments BOEM received is available in the 2017-2022 DPP, Appendix A. |
||||
A decision document is one on which the Secretary of the Interior must issue a decision. |
||||
BOEM, 2017-2022 DPP, at http://www.boem.gov/2017-2022-DPP/. Also see BOEM, "Notice of Availability (NOA) of and Request for Comments on the Draft Proposed Outer Continental Shelf (OCS) Oil and Gas Leasing Program from 2017-2022 (DPP)," 80 Federal Register 4941, January 29, 2015. |
||||
BOEM, "Outer Continental Shelf (OCS), 2017-2022 Oil and Gas Leasing Program," 80 Federal Register 4939. Public scoping meetings were announced for Alaska, Virginia, Maryland, North Carolina, South Carolina, Florida, Texas, Louisiana, Alabama, and Washington, DC. Additional public scoping meetings were later planned for New Jersey and Georgia (BOEM, "Outer Continental Shelf (OCS), 2017-2022 Oil and Gas Leasing Program," 80 Federal Register 12204, March 6, 2015). |
||||
2017-2022 PP, at http://www.boem.gov/2017-2022-Proposed-Program-Decision/. |
||||
BOEM, "Outer Continental Shelf Oil and Gas Leasing Program, 2017-2022: Draft Programmatic Environmental Impact Statement," March 2016, at http://boemoceaninfo.com/u/dpeis/dpeis_volume_I.pdf, hereinafter referred to as 2017-2022 Draft PEIS. BOEM published a notice of availability of the PEIS in the Federal Register (BOEM, "Draft Programmatic Environmental Impact Statement for the Outer Continental Shelf (OCS) Oil and Gas Leasing Program: 2017-2022," 81 Federal Register 14885, March 18, 2016, at http://www.boem.gov/81-FR-14885/). |
||||
2017-2022 PFP, at https://www.boem.gov/2017-2022-OCS-Oil-and-Gas-Leasing-PFP/. Also see BOEM, "Notice of Availability of the 2017-2022 Outer Continental Shelf Oil and Gas Leasing Proposed Final Program," 81 Federal Register 84612, November 23, 2016, at https://www.gpo.gov/fdsys/pkg/FR-2016-11-23/pdf/2016-28296.pdf. |
||||
BOEM, "Outer Continental Shelf Oil and Gas Leasing Program, 2017-2022: Final Programmatic Environmental Impact Statement," March 2016, at http://boemoceaninfo.com/fpeis/. |
||||
This section prepared by Laura Comay, Analyst in Natural Resources Policy, and |
||||
BOEM, Proposed Final Outer Continental Shelf Oil & Gas Leasing Program 2012-2017, June 2012, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/2012-2017_Five_Year_Program/PFP%2012-17.pdf. |
||||
The Deepwater Horizon events resulted in 11 worker fatalities, a massive oil release, and a national response effort in the Gulf of Mexico led by the federal government. Based on estimates from the U.S. Geological Survey, the oil spill was the largest in U.S. waters. For more information on the spill, including response activities and DOI safety reforms, see CRS Report R42942, Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments, by |
||||
DOI, "Interior Department Cancels Arctic Offshore Lease Sales," press release, October 6, 2015, at https://www.doi.gov/pressreleases/interior-department-cancels-arctic-offshore-lease-sales. |
||||
Most recently, Lease Sale 248, in the Western Gulf of Mexico, was conducted on August 24, 2016. High bids for the sale totaled $18 million. BOEM, "Western Planning Area Lease Sale 248 Information," at https://www.boem.gov/Western-Gulf-of-Mexico-Lease-Sale-248-Statistics/. |
||||
During the 2007-2012 time frame, the George W. Bush Administration initiated an effort, beginning in August 2008, to modify the then-current five-year leasing program. The Administration published a DPP for 2010-2015 based on President Bush's lifting of the oil and gas leasing moratoria on areas in the Atlantic and Pacific planning areas. The 2010-2015 leasing program would have held 31 lease sales, including two in the Eastern Gulf of Mexico that would have required Congress to lift existing leasing restrictions under the Gulf of Mexico Energy Security Act of 2006 (P.L. 109-432). The DPP was published on January 21, 2009, but the time period was shifted by the Obama Administration from 2010-2015 to 2012-2017, and the 2012-2017 final program contained only 15 lease sales, as discussed above. |
||||
Center for Biological Diversity, et al. v. Department of the Interior, 563 F.3d 466 (D.C. Cir. 2009). |
||||
BOEMRE, Revised Program, Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012, December 2010, at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/RP-pdf.aspx. See also DOI history of related litigation, available at http://www.boem.gov/5-year/2007-2012FiveYearProgram.htm. |
||||
Minerals Management Service, Proposed Final Outer Continental Shelf Oil & Gas Leasing Program 2002-2007, April 2002, at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/Proposed-Final-Program-pdf.aspx. |
||||
Minerals Management Service, Proposed Final Outer Continental Shelf Oil & Gas Leasing Program 1997 to 2002, August 1996, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/PFP%2097-02.pdf. 59 Federal Register 59328 (November 16, 1996). |
||||
Minerals Management Service, Proposed Final Comprehensive Outer Continental Shelf Natural Gas and Oil Resource Management: Program, 1992-1997, April 1992, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/PFP%2092-97.pdf. 57 Federal Register 19308 (May 5, 1992). |
||||
Minerals Management Service, Outer Continental Shelf Oil & Gas: 5-Year Leasing Program, Mid-1987 to Mid-1992, April 1987, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/PFP%2087-92.pdf. 50 Federal Register 11585-11595 (March 22, 1985). |
||||
DOI, Tentative Proposed Final 5-Year OCS Leasing Program (1982-1987), March 1982, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/PFP%2082-87.pdf. |
||||
This program was originally referred to as the Comprehensive Program 1980-1985. It was later renamed the Comprehensive Program 1980-1982. California v. Watt, 688 F.2d 1290 (D.C. Cir. 1981). |
||||
See DOI, 5-Year OCS Program, at http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/PFP%2080-82.pdf. |
||||
2017-2022 PFP, available at https://www.boem.gov/2017-2022-OCS-Oil-and-Gas-Leasing-PFP/. See the section of this report titled "Five-Year Program Development Process" for more information on the publication process. |
||||
This section prepared by |
||||
BOEM, Budget Justifications and Performance Information, Fiscal Year 2017, p. 14, at http://www.boem.gov/BOEM-FY-2017-Budget-Justification/, hereinafter referred to as BOEM FY2017 Budget Justification. |
||||
CRS calculations from data at DOI's Office of Natural Resources Revenue (ONRR), Production Data, at http://www.onrr.gov/About/production-data.htm; and Energy Information Administration (EIA), Monthly Energy Review, February 2011, p. 37, at https://www.eia.gov/totalenergy/data/monthly/archive/00351102.pdf. |
||||
EIA, Monthly Energy Review, February 2016, p. 49, at https://www.eia.gov/totalenergy/data/monthly/archive/00351602.pdf; and EIA, Monthly Energy Review, February 2011, p. 37, at https://www.eia.gov/totalenergy/data/monthly/archive/00351102.pdf. |
||||
BOEM FY2017 Budget Justification, p. 14; and CRS calculations from ONRR, Production Data, at http://www.onrr.gov/About/production-data.htm, and EIA, Monthly Energy Review, February 2011, p. 69, at https://www.eia.gov/totalenergy/data/monthly/archive/00351102.pdf. |
||||
ONRR, "Production Data," at http://www.onrr.gov/About/production-data.htm. |
||||
EIA, Monthly Energy Review, February 2016, p. 83, at https://www.eia.gov/totalenergy/data/monthly/archive/00351602.pdf. |
||||
BOEM, "Combined Leasing Report," November 1, 2016, at http://www.boem.gov/Combined-Leasing-Report-November-2016/. |
||||
EIA, Today in Energy, September 24, 2015, at http://www.eia.gov/todayinenergy/detail.cfm?id=23072. |
||||
|
88.
A bonus bid is the winning highest dollar amount paid at the time of a lease sale. |
DOI, Office of the Secretary and Department-Wide Programs, Budget Justifications and Performance Information, Fiscal Year 2015, Office of Natural Resources Revenue, "Mineral Leasing Receipts," p. 188, at https://www.doi.gov/sites/doi.gov/files/migrated/budget/appropriations/2015/upload/FY2015_OS_Grennbook.pdf. |
||
Ibid., p. 184. |
||||
EIA, Today in Energy, February 18, 2016, at http://www.eia.gov/todayinenergy/detail.cfm?id=25012. |
||||
2017-2022 PP, p. 1-4. |
||||
This section prepared by |
||||
For a full glossary and explanation of oil and gas reporting terms, see Securities and Exchange Commission, "Modernization of the Oil and Gas Reporting Requirements," 17 C.F.R. Parts 210, 229, and 249 (Release Nos. 33-8935; 34-58030; File No. S7-15-08), RIN 3235-AK00. |
||||
BOEM, Estimated Oil and Gas Reserves, Gulf of Mexico, Pacific OCS Regions, as of December 2014. |
||||
BOEM, "Assessment of Undiscovered Technically Recoverable Oil and Gas Resources of the Nation's Outer Continental Shelf, 2016," Fact Sheet, at http://www.boem.gov/National-Assessment-2016/. BOEM defines undiscovered technically recoverable resources (UTRR) as "oil and gas that may be produced as a consequence of natural pressure, artificial lift, pressure maintenance, or other secondary recovery methods, but without any consideration of economic viability." By contrast, undiscovered economically recoverable resources (UERR) are defined as "the portion of the undiscovered technically recoverable resources that is economically recoverable under imposed economic and technologic conditions." Estimations of UERR will differ under different economic scenarios. |
||||
This section prepared by Laura Comay, Specialist in Natural Resources Policy. |
||||
|
98.
Under the OCSLA (43 U.S.C. §1341(a)), the President may, "from time to time, withdraw from disposition any of the unleased lands of the outer Continental Shelf." When the President withdraws ocean areas from leasing disposition, BOEM cannot conduct new oil and gas lease sales in those areas. The withdrawals do not affect valid existing rights under previously existing leases. Presidential withdrawals may be for a specified or an indefinite time period. |
P.L. 109-432. See BOEM, "Gulf of Mexico Energy Security Act (GOMESA)," at http://www.boem.gov/Revenue-Sharing/. Specifically, the law bans oil and gas leasing in that portion of the Eastern Gulf of Mexico planning area within 125 miles of the coast of Florida, all areas in the Gulf of Mexico east of a prescribed "Military Mission Line," and in the part of the Central Gulf of Mexico planning area that is within 100 miles of Florida, through June 30, 2022. |
||
See Presidential Memorandum, "Withdrawal of Certain Areas of the United States Outer Continental Shelf from Leasing Disposition," December 16, 2014, at http://www.whitehouse.gov/the-press-office/2014/12/16/presidential-memorandum-withdrawal-certain-areas-united-states-outer-con; and Presidential Memorandum, "Withdrawal of Certain Areas of the United States Outer Continental Shelf Offshore Alaska from Leasing Disposition," January 27, 2015, at http://www.whitehouse.gov/the-press-office/2015/01/27/presidential-memorandum-withdrawal-certain-areas-united-states-outer-con. |
||||
For more information, see CRS Report RL32154, Marine Protected Areas: An Overview, by |
||||
|
Presidential Memorandum, "Withdrawal of Certain Portions of the United States Arctic Outer Continental Shelf from Mineral Leasing," December 20, 2016, at https://www.whitehouse.gov/the-press-office/2016/12/20/presidential-memorandum-withdrawal-certain-portions-united-states-arctic. Earlier, President Obama had indefinitely withdrawn from leasing disposition certain smaller areas in the Beaufort and Chukchi Seas, including the Hanna Shoal region of the Chukchi Sea and other areas. Presidential Memorandum, "Withdrawal of Certain Areas of the United States Outer Continental Shelf Offshore Alaska from Leasing Disposition," January 27, 2015, at http://www.whitehouse.gov/the-press-office/2015/01/27/presidential-memorandum-withdrawal-certain-areas-united-states-outer-con. For the North Bering Sea withdrawals, see Executive Order 13754, "North Bering Sea Climate Resilience," December 9, 2016, at https://www.gpo.gov/fdsys/pkg/FR-2016-12-14/pdf/2016-30277.pdf. 102.
|
|
Presidential Memorandum, "Withdrawal of Certain Areas Off the Atlantic Coast on the Outer Continental Shelf from Mineral Leasing," December 20, 2016, at https://www.whitehouse.gov/the-press-office/2016/12/20/presidential-memorandum-withdrawal-certain-areas-atlantic-coast-outer. |
2017-2022 PFP, p. S-2. BOEM bases the analysis on its Assessment of Undiscovered Technically Recoverable Oil and Gas Resources of the Nation's Outer Continental Shelf, 2016, at http://www.boem.gov/National-Assessment-2016/. Although these resources are estimated to be technically recoverable, not all of them may be economically viable to recover. See footnote |
2017-2022 PP, p. S3. |
||||
BOEM, "Gulf of Mexico OCS Region," at http://www.boem.gov/Gulf-of-Mexico-Region/. |
||||
Under the provisions of GOMESA, revenues from the federal offshore oil and gas lease sales in the Gulf are shared with the four Gulf producing states for coastal conservation, restoration, and hurricane protection. For more information, see CRS Report R43891, Mineral Royalties on Federal Lands: Issues for Congress, by |
||||
2017-2022 PFP, p. S-5. BOEM stated that if circumstances warrant, it could scale back any individual lease sale to focus on a specific planning area, similar to the traditional sales. |
||||
See, e.g., House Committee on Natural Resources, Subcommittee on Energy and Mineral Resources, hearing, "Examining the Future Impacts of President Obama's Offshore Energy Plan," April 15, 2015, at https://www.gpo.gov/fdsys/pkg/CHRG-114hhrg94270/pdf/CHRG-114hhrg94270.pdf, hereinafter referred to as 2015 House Offshore Energy Plan hearing. Also see the hearing memo (available at http://naturalresources.house.gov/uploadedfiles/hrgmemoemr4_15.pdf), which stated: "The draft plan we examine this week has the lowest number of lease sales in the history of the planning process and does very little to expand access to our nation's OCS resources." |
||||
2015 House Offshore Energy Plan hearing, p. 22. |
||||
For more information, see CRS Report R41153, Changes in the Arctic: Background and Issues for Congress, coordinated by |
||||
DOI, "Requirements for Exploratory Drilling on the Arctic Outer Continental Shelf," final rule, 81 Federal Register 46477, July 15, 2016. |
||||
DOI, "Interior Department Cancels Arctic Offshore Lease Sales," press release, October 16, 2015, at https://www.doi.gov/pressreleases/interior-department-cancels-arctic-offshore-lease-sales. |
||||
2017-2022 PFP, p. S-3. |
||||
2017-2022 PFP, p. S-7. Shell began exploratory drilling in summer 2015 but announced in late September 2015 that it would cease further exploration activity in offshore Alaska for the foreseeable future. Shell cited several reasons for the decision to halt its activity in the region, including insufficient indications of oil and gas at its Burger J well, the high costs associated with the project, and the "challenging and unpredictable" federal regulatory environment for offshore Alaska. Royal Dutch Shell, PLC, "Shell Updates on Alaska Exploration," press release, September 28, 2015, at http://www.shell.com/global/aboutshell/media/news-and-media-releases/2015/shell-updates-on-alaska-exploration.html. |
||||
2017-2022 PFP, p. S-7. Some have asserted that tepid industry interest in the region is due in part to an overly demanding federal regulatory environment rather than just to market conditions. See, e.g., Senate Committee on Energy and Natural Resources, "Sen. Murkowski Calls for Adaptable Arctic Leasing Structure Recognizing Frontier Nature of Region," press release, December 1, 2015, at http://www.energy.senate.gov/public/index.cfm/republican-news?ID=FB7D4EB[phone number scrubbed]-4D49-AAAF-85FDB44C458F. |
||||
2017-2022 PFP, p. S-8. |
||||
2017-2022 PFP, p. S-7. BOEM estimated that "without the Arctic OCS lease sales, cumulative U.S. oil and gas production will be less than one percent lower over the 70-year life of projected activity and only four percent lower during the 2017-2022 Program's years of peak production." |
||||
President George W. Bush, "Memorandum on Modification of the Withdrawal of Certain Areas of the United States Outer Continental Shelf from Leasing Disposition," Weekly Compilation of Presidential Documents, vol. 44 (July 14, 2008). |
||||
An Atlantic lease sale (Sale #220) was scheduled in the five-year program for 2007-2012, but it was canceled by then-Secretary of the Interior Ken Salazar following the April 2010 Deepwater Horizon oil spill. See BOEM, "Virginia Lease Sale 220 Information," at https://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Regional-Leasing/Gulf-of-Mexico-Region/Lease-Sales/220/Virginia-Lease-Sale-220-Information.aspx. |
||||
2017-2022 PP, p. S-2. |
||||
The Department of Defense (DOD) identified much of the area off of Virginia, as well as parts of the area off of North Carolina, as places where offshore oil and gas development would be incompatible with DOD activities. See 2017-2022 PP, p. S-9. BOEM's Atlantic lease sale proposal in the DPP included a 50-mile buffer zone off the coast where leasing would not take place, in order to reduce conflicts with DOD activities as well as other ocean uses. However, on further analysis, BOEM assessed that the areas of DOD concern "significantly overlap the known geological plays and available resources" (2017-2022 PP, p. S-10). Additionally, NASA's concerns about potential conflicts with activities at its Wallops Island flight facility (VA) influenced BOEM's decision. |
||||
2017-2022 PP, p. S-9. |
||||
2017-2022 PP, p. S-10. Specifically, BOEM estimated that U.S. oil production would be only 0.10% lower, and U.S. natural gas production 0.06% lower, without the production anticipated from a lease sale in the Mid- and South Atlantic Program Area. |
||||
Different portions of the Pacific region were subject to different restrictions during this period. The Washington/Oregon planning area and the Central California planning area were under annual congressional moratoria from FY1991 through FY2008, the Northern California planning area from FY1982 through FY2008, and much of the Southern California planning area from FY1985 through FY2008. Additionally, all these areas were under presidential withdrawal from 1990 to July 2008 (2017-2022 DPP, p. 3-6). |
||||
The 15 congressional comments received on the RFI are discussed on pp. A-46 to A-49 of the 2017-2022 DPP. The 12 congressional comments received on the DPP are discussed on pp. A-24 to A-26 of the 2017-2022 PP. The 5 congressional comments received on the PP are discussed on pp. A-49 to A-50 of the 2017-2022 PFP. |
||||
See Appendix A of each version of the program: the 2017-2022 DPP (summarizing comments on the RFI), the 2017-2022 PP (summarizing comments on the DPP), and the 2017-2022 PFP (summarizing comments on the PP). |
||||
House Committee on Natural Resources, Subcommittee on Energy and Mineral Resources, oversight hearing, "Examining the Future Impacts of President Obama's Offshore Energy Plan," April 15, 2015, at https://www.gpo.gov/fdsys/pkg/CHRG-114hhrg94270/pdf/CHRG-114hhrg94270.pdf. |
||||
U.S. Congress, Senate Committee on Energy and Natural Resources, "Hearing to Examine the Bureau of Ocean Energy Management's 2017-2022 OCS Oil and Gas Leasing Program," 114th Cong., 2nd sess., May 19, 2016, at http://www.energy.senate.gov/public/index.cfm/hearings-and-business-meetings?ID=110E5E8F-3A65-4BEC-9D25-5D843A0284D3. |
||||
|
Except as indicated below, none of the bills advanced beyond the referral stage. 130.
|
|
See footnote 67. |
Although BOEM five-year programs are typically developed by calendar year, H.R. 1487 and S. 791 propose a time period marked by the fiscal year. |
43 U.S.C. §1344(d)(2). The final program is also submitted to the President during this period. |