Intercity Passenger Rail: Federal Policy and Programs

Intercity Passenger Rail: Federal Policy and Programs

Updated January 8, 2025

Congressional Research Service

https://crsreports.congress.gov

R47260

Congressional Research Service

SUMMARY

Intercity Passenger Rail: Federal Policy and Programs

The federal government has been involved in preserving and improving passenger rail service since 1970, when the bankruptcies of several major railroads prompted Congress to create Amtrak—officially, the National Railroad Passenger Corporation—to preserve a basic level of intercity passenger rail service. Successive surface transportation reauthorizations have expanded existing programs and established new ones intended to improve existing passenger rail service or serve new areas. Despite federal efforts and investment, several obstacles to passenger rail expansion remain for Congress to consider as it contemplates reauthorizing rail programs.

Rail ridership has rebounded but remains comparatively low. Prior to the Coronavirus Disease 2019 (COVID-19) pandemic, Amtrak had registered several years of record travel volume. However, Amtrak still served far fewer passengers than road or air travel, including in many corridors linking major cities 100-400 miles apart (where passenger rail is often most competitive). Part of this can be attributed to a lack of frequent service in most markets. Amtrak serves over 500 stations nationwide, but most Amtrak trains run no more than once or twice a day, and only one state receives intercity passenger rail service from another provider. In FY2024, system-wide ridership surpassed pre-pandemic levels for the first time, with rapid growth in Boston-New York-Washington travel offsetting a slower recovery on other routes.

Federal funding commitments for passenger rail have increased, with only modest service improvements. Amtrak’s expenses exceed its revenues each year, and Amtrak makes up the difference with federal appropriations from the general fund. Prior to the COVID-19 pandemic, Amtrak had been on pace to break even on its operating costs (before capital and depreciation costs, which are considerable). When ridership and revenue suddenly dropped during the pandemic, Amtrak experienced its largest-ever operating losses. Congress provided an increase in advance funding through FY2026 and removed Amtrak’s statutory goal to reduce its federal subsidy. The effective result has been an increase in federal subsidy per rider. Congress also provided advance appropriations for several discretionary grant programs intended to promote expansion or improvement of passenger rail service. These expansion plans are expected to be led by state-level project sponsors whose priorities may or may not be aligned with those of Amtrak or the federal government.

Non-Amtrak passenger rail projects have made uneven progress. Early construction is proceeding on the state-led California High-Speed Rail program, the largest passenger rail project in the country. The project timeline has been extended repeatedly, capital cost estimates have increased, and a funding source has not yet been identified for a large portion of project costs. One private-sector passenger rail company, Brightline, has provided (non-high-speed) service in Florida since 2018. Brightline benefited from tax- exempt private activity bonds to finance construction of its initial route in Florida and plans to do the same on a high-speed route connecting Los Angeles, CA, to Las Vegas, NV, that was also selected to receive federal grant funds. Other private ventures to construct high-speed rail in Texas and ultra-high-speed maglev trains in the Northeast have not advanced to construction.

Amtrak on-time performance lags in many areas, but new enforcement measures are available. A federal law passed in 2008 required two agencies, the Federal Railroad Administration and the Surface Transportation Board, to establish new standards for Amtrak on-time performance. A series of court challenges delayed the promulgation of new standards for several years, but the standards entered into effect in 2021. Under these rules, penalties can be assessed against host freight railroads if poor on-time performance is found to be the result of interference by freight trains using the same tracks.

Passenger rail expansion depends on obtaining permission from freight rail companies. Most Amtrak routes, and many proposals for new routes, require the use of tracks owned by private freight railroads. Under a long-standing but rarely enforced federal statute, freight railroads are required to grant Amtrak access to their tracks upon request. In practice, this has generally entailed negotiation for new privately owned infrastructure to be constructed using public funds to mitigate the purported impact on freight traffic. This could impose additional costs in time and expense for implementing new passenger services.

R47260

January 8, 2025

Ben Goldman Analyst in Transportation Policy

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service

Contents

Intercity Passenger Rail Overview .................................................................................................. 1

Characteristics of the Intercity Passenger Rail System ............................................................. 1 Ridership Performance .............................................................................................................. 2

Funding and Support Programs ....................................................................................................... 3

Federal Funding for Amtrak ...................................................................................................... 3

Infrastructure Funding and Financing ....................................................................................... 6

Federal-State Partnership for Intercity Passenger Rail ....................................................... 6 Restoration and Enhancements ........................................................................................... 7 Amtrak National Network Funds for Corridor Development ............................................. 7 Other Rail/Multimodal Programs ....................................................................................... 8

Corridor Planning and Development ......................................................................................... 9

Intercity Rail Corridor Identification and Development Program ...................................... 9 Interstate Compact Incentive Program ................................................................................ 9

Northeast Corridor Commission and NEC Future ............................................................ 10

Federally Led Multistate Rail Plans .................................................................................. 10

Amtrak Connects US 2035 ............................................................................................... 10

Non-Amtrak Passenger Rail Projects ............................................................................................. 11

California High-Speed Rail ...................................................................................................... 11

All Aboard Florida/Brightline .................................................................................................. 11

XpressWest/Brightline West .................................................................................................... 12

Texas Central Railway ............................................................................................................ 13 Northeast Maglev .................................................................................................................... 13

Other Passenger Rail Issues ........................................................................................................... 14

On-Time Performance ............................................................................................................. 14

Cost of Access to Freight Railroad Tracks .............................................................................. 15 Electrification and Rolling Stock Acquisition ......................................................................... 17

Considerations for Reauthorization ............................................................................................... 17

Figures

Figure 1. Amtrak System Map......................................................................................................... 2 Figure 2. Amtrak and Brightline Ridership by Business Line, FY2008-FY2024 ........................... 3 Figure 3. Annual Grants to Amtrak (Authorized and Appropriated), FY2016-FY2026 .................. 6

Figure 4. Amtrak Customer On-Time Performance, FY2024 ....................................................... 15

Tables

Table 1. Amtrak Revenues, Expenses, and Federal Support, FY2019-FY2024 .............................. 4

Contacts

Author Information ........................................................................................................................ 18

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 1

Intercity Passenger Rail Overview

The United States has the largest railroad network in the world but a comparatively small passenger rail system. The federal government has been involved in preserving and improving passenger rail service since 1970, when the bankruptcies of several major railroads threatened the continuance of passenger trains altogether. Congress responded by creating Amtrak—officially, the National Railroad Passenger Corporation—to preserve a basic level of intercity passenger rail service while relieving private railroad companies of the obligation to maintain a business that had lost money for decades. In the years since, the federal government has funded Amtrak and, in recent years, has funded other passenger rail efforts of varying size and complexity through grants, loans, and tax subsidies. Most recently, the Infrastructure Investment and Jobs Act (IIJA; P.L. 117-58) expanded existing programs and established new ones intended to improve existing passenger rail service or serve new areas.

This report describes the extent and performance of the intercity passenger rail system, and steps the federal government and other, nonfederal entities have taken to expand the system and/or improve performance. It discusses issues that present obstacles to implementing current passenger rail policy, which Congress may wish to consider as part of a reauthorization of surface transportation programs following the expiration of the IIJA.

Characteristics of the Intercity Passenger Rail System

Passenger rail service encompasses both intercity and commuter rail, which are mutually exclusive categorizations under federal law.1 Amtrak is the primary provider of intercity passenger rail service in the United States (only Florida receives intercity passenger rail service from another provider, Brightline, discussed further in the “All Aboard Florida/Brightline” section of this report).

Amtrak serves over 500 stations in 46 states and the District of Columbia, running more than 300 trains per day on a network approximately 22,000 miles long (Figure 1).2 Amtrak originally did not possess any rail infrastructure but eventually came to own some assets cast off by bankrupt private railroads. Amtrak is operated as a private company and not a government corporation, but the President appoints the members of its board of directors. Its primary stockholder is the U.S. Department of Transportation (DOT), with a small proportion of common stock held by other railroad companies.

Since 2008, Amtrak services have been grouped into three business lines: (1) the all-electric Washington, DC-New York-Boston Northeast Corridor (NEC), (2) short-distance corridors up to 750 miles long with service supported by state governments, and (3) long-distance trains serving destinations over 750 miles apart, usually once per day on an overnight schedule. Under the Fixing America’s Surface Transportation Act of 2015 (FAST Act; P.L. 114-94), the state- supported short-distance and long-distance routes were grouped together into the National Network. The Amtrak Thruway network of over 150 intercity bus routes serves as a feeder service for passenger trips originating or terminating in cities off the rail system.

1 “‘Intercity rail passenger transportation’ means rail passenger transportation, except commuter rail passenger transportation” (49 U.S.C. §24102(4)). “‘Commuter rail passenger transportation’ means short-haul rail passenger transportation in metropolitan and suburban areas usually having reduced fare, multiple-ride, and commuter tickets and morning and evening peak period operations” (49 U.S.C. §24102(3)).

2 Amtrak, FY2019 Company Profile, https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/ corporate/nationalfactsheets/Amtrak-Corporate-Profile-FY201IIJ 9-033120.pdf.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 2

Figure 1. Amtrak System Map

Source: CRS, based on Amtrak, General and Legislative Annual Report & Fiscal Year 2022 Grant Request. Notes: Numbers on map correspond to the following routes: 1. Cascades; 2. Coast Starlight; 3. Capitol Corridor, San Joaquin; 4. Pacific Surfliner; 5. Empire Builder; 6. California Zephyr; 7. Southwest Chief; 8. Sunset Limited; 9. Blue Water, Carl Sandburg, Hiawatha, Illini, Illinois Zephyr, Lincoln, Pere Marquette, Saluki, Wolverine, Borealis (initiated May 2024); 10. Missouri River Runner; 11. Heartland Flyer; 12. Texas Eagle; 13. City of New Orleans; 14. Lake Shore Limited; 15. Capitol Limited; 16. Cardinal; 17. Crescent; 18. Maple Leaf; 19. Adirondack, Empire, Ethan Allen; 20. Keystone, Pennsylvanian; 21. Vermonter, Valley Flyer (initiated August 2019); 22. Downeaster; 23. Northeast Corridor; 24. Carolinian, Piedmont, Virginia; 25. Auto Train, Palmetto; and 26. Silver Meteor, Silver Star. Where State-Supported and Long-Distance routes overlap, the State-Supported route is shown. Amtrak does not serve Alaska or Hawaii. Not shown: Brightline, a privately operated intercity rail service in Florida. Seasonal Amtrak services (Winter Park Ski Train, Berkshire Flyer) are also not shown.

Ridership Performance

A record 32.8 million trips were taken on Amtrak in FY2024, the first time ridership surpassed the previous record set before plunging due to the COVID-19 pandemic.3 At the end of FY2019, Amtrak system ridership had exceeded 30 million trips every year since 2011 and had increased 29% over the previous 16 years, with much of that growth coming on Amtrak’s state-supported short-distance corridors. When Brightline passengers are added, total intercity passenger rail ridership in the United States exceeded 35 million in FY2024 (Figure 2).

Approximately 44% of all Amtrak trips were taken on state-supported routes in FY2024, compared with 43% on the Northeast Corridor and 13% on long-distance trains. State-supported routes have accounted for the plurality of Amtrak trips among its three business lines every year since FY2005. One factor contributing to the growth of state-supported route traffic in the years

3 Amtrak, A New Era for Rail: Connecting More People and PlacesAmtrak Board Meeting: Update to the Public, December 4, 2024, https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/corporate/board- meetings/Amtrak-Public-Board-Meeting-Presentation-120424.pdf.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 3

preceding the pandemic is that Amtrak and its state partners had added new routes (e.g., in Virginia) and additional daily trains (e.g., in North Carolina). Post-pandemic ridership has been slower to recover on state-supported routes than on the Northeast Corridor, which had reached 97% of its pre-pandemic high during FY2023 (and exceeded it by 12% in FY2024). This is likely because, at least in part, service levels on some state-supported routes have not returned to pre- pandemic levels, meaning fewer seats are available for sale.

Figure 2. Amtrak and Brightline Ridership by Business Line, FY2008-FY2024

(in millions of trips)

Source: Compiled by CRS from Amtrak’s monthly performance reports and Brightline’s Federal Railroad Administration Form 6180.55 submissions.

Despite record ridership levels, Amtrak passengers have accounted for a relatively small fraction of intercity passenger travel volume nationwide across all modes. In 2019, Amtrak generated 6.5 billion passenger-miles (one passenger-mile is equal to one person traveling one mile) of traffic volume; by comparison, domestic air travel generated 754 billion passenger-miles, over 100 times as many as Amtrak. The NEC historically has been the only market in which Amtrak serves a larger share of intercity trips than airlines, with both rail and air lagging far behind highway travel.4 Lack of equipment and track capacity have inhibited Amtrak from increasing service on the NEC.

Funding and Support Programs

Federal Funding for Amtrak

Amtrak’s expenses exceed its revenues each year (Table 1). In FY2024, Amtrak’s revenues totaled $3.6 billion, against expenses of $5.4 billion, for a net loss of $1.8 billion. That loss was covered by federal grants made to Amtrak by DOT. Revenues covered 67% of the railroad’s total

4 Northeast Corridor Commission, Northeast Corridor Intercity Travel Study, September 2015, p. 9, at http://nec- commission.com/app/uploads/2018/04/2015-09-14_NEC-Intercity-Travel-Summary-Report_Website.pdf. See also Amtrak, Amtrak Five Year Service Line Plans, Base (FY2019) + Five Year Strategic Plan (FY2020-2024), 2019, p. 35, at https://www.amtrak.com/reports-documents under “FY20-24 Service Line Plans.”

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 4

expenses in FY2024, an improvement over pandemic-era lows but below its pre-pandemic high of approximately 80% set in FY2018.

By the end of FY2020, Amtrak’s financial performance began to suffer because of reluctance among the general public to travel, reduced economic activity, and strained finances of state governments that support certain routes. Ridership in April 2020 was nearly 95% below what it had been a year prior, and revenue was down 60%. Amtrak’s monthly expenses returned to pre- pandemic levels by September 2020, even as ridership was down nearly 80% compared with the previous year. The full year was a 50% drop in ridership and adjusted operating losses—once projected to be near zero5—of over $800 million. Financial results were worse in 2021, as ridership was slow to recover. Congress responded by appropriating additional funding as part of pandemic relief legislation.

Table 1. Amtrak Revenues, Expenses, and Federal Support, FY2019-FY2024

(in millions of nominal dollars)

FY2019 FY2020 FY2021 FY2022 FY2023 FY2024

Operating revenue

Ticket revenue 2,289 1,238 872 1,769 2,244 2,451

Food and beverage revenue

144 31 23 44 56 63

State-supported train revenue

234 342 353 329 348 314

Total passenger-related revenue

2,667 1,611 1,248 2,142 2,648 2,828

Commuter/other core revenue

300 303 308 305 329 360

Other/ancillary revenue 357 350 362 383 414 436

Total revenue 3,323 2,265 1,917 2,830 3,391 3,623

Total expenses 4,204 3,944 3,924 4,657 5,142 5,433

Net loss (881) (1,679) (2,007) (1,827) (1,751) (1,809)

Adjustments 852 890 926 940 979 1,104

Adjusted operating loss (29) (789) (1,081) (887) (772) (705)

Federal capital and operating grants

1,942 3,018 4,700 6,731 6,853 6,829

Regular appropriations

1,942 2,000 2,000 2,331 2,453 2,429

Supp. approps. (COVID-19)

— 1,018 2,700 — — —

Supp. approps. (IIJA)

— — — 4,400 4,400 4,400

5 Amtrak, General and Legislative Annual Report & Fiscal Year 2021 Grant Request, Table 9, February 15, 2020, https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/corporate/reports/Amtrak-General- Legislative-Annual-Report-FY2021-Grant-Request.pdf#page=47.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 5

Source: Amtrak monthly performance reports. Federal grants taken from annual and supplemental appropriations. Notes: FY2024 figures are preliminary. Amtrak changed its definition of total expenses in FY2017 to exclude depreciation and other items, which are captured in the “adjustments” category. Total expenses are therefore calculated as total revenue plus amount of net loss.

Congress addresses Amtrak’s subsidy in the annual Transportation, Housing and Urban Development, and Related Agencies Appropriations Act. For most of Amtrak’s existence until FY2016, Congress divided Amtrak’s funding into two categories, operating and capital grants. The operating grant could be thought of as relating to Amtrak’s annual cash loss and the capital grant as relating to the depreciation of Amtrak’s assets, as well as an amount for Amtrak debt repayments.

Since FY2017,6 Amtrak’s appropriation has been divided between funding for the operationally self-sufficient NEC, which has large capital needs, and the National Network, which has modest capital needs (as the tracks are almost entirely owned and maintained by freight railroads) but runs an annual operating deficit of several hundred million dollars. This structure was retained when Amtrak funding was reauthorized in the IIJA. Section 22101 of the IIJA amended Amtrak’s statutory mission and goals, replacing a directive to “minimize United States Government subsidies” with one to “maximize the benefits of Federal investment.”

Amtrak’s reliance on annual appropriations has made it difficult to fund long-term capital projects. DOT’s Inspector General has noted that the lack of long-term funding “has significantly affected Amtrak’s ability to maintain safe and reliable infrastructure and equipment, and increased its capital program’s annual cost.”7 The IIJA, in addition to reauthorizing Amtrak and other passenger rail program funding for FY2022-FY2026 at higher levels than in previous years, included a multiyear appropriation of $4.4 billion per year for Amtrak across its two accounts (Figure 3).

6 See P.L. 114-94, §11201.

7 Department of Transportation (DOT), Office of Inspector General, Amtrak Made Significant Improvements in Its Long-Term Capital Planning Process, CR-2011-036, January 27, 2011, p. 1.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 6

Figure 3. Annual Grants to Amtrak (Authorized and Appropriated), FY2016-FY2026

(in millions of nominal dollars)

Sources: Authorizations from the Fixing America’s Surface Transportation Act of 2015 (P.L. 114-94) and the Infrastructure Investment and Jobs Act (IIJA; P.L. 117-58); appropriations from the Consolidated Appropriations Act, 2016 (P.L. 114-116), the Consolidated Appropriations Act, 2017 (P.L. 115-31), the Consolidated Appropriations Act, 2018 (P.L. 115-141), the Consolidated Appropriations Act, 2019 (P.L. 116-6), the Further Consolidated Appropriations Act, 2020 (P.L. 116-94), the Continuing Appropriations Act, 2021 and Other Extensions Act (P.L. 116-159), the Consolidated Appropriations Act, 2022 (P.L. 117-103), the Consolidated Appropriations Act, 2023 (P.L. 117-328), the Consolidated Appropriations Act, 2024 (P.L. 118-42), as well as the Coronavirus Aid, Relief, and Economic Security Act of 2020 (CARES Act, P.L. 116-136), the Coronavirus Response and Relief Supplemental Appropriations Act of 2021 (CRRSA, P.L. 116-260), and the IIJA.

Infrastructure Funding and Financing

The federal government’s role as a funder of state-proposed passenger rail infrastructure projects has grown over the course of the past three multiyear rail policy reauthorizations. The Passenger Rail Investment and Improvement Act of 2008 (PRIIA; P.L. 110-432, Div. B) created several new grant programs, including the High-Speed Rail Corridor Development program, which received a large infusion of funds from the 2009 stimulus (i.e., American Recovery and Reinvestment Act of 2009; P.L. 111-5) but little to no funding in subsequent years. The FAST Act shifted the focus of federal grant programs from corridor development to achieving a state of good repair and replaced several targeted grant programs with a single program with wide eligibility. The IIJA revised certain programs created in PRIIA and the FAST Act and authorized funding for FY2022- FY2026 at considerably higher levels.

Current programs that can be used to support intercity passenger rail, all administered by the Federal Railroad Administration (FRA), are described below.

Federal-State Partnership for Intercity Passenger Rail

The Federal-State Partnership for Intercity Passenger Rail (FSP) program created in the IIJA replaced an earlier program, the Federal-State Partnership for State of Good Repair. The previous program prioritized rehabilitation or replacement of aging infrastructure on the Northeast Corridor; the new program features broader eligibility in terms of project types and selection criteria.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 7

In the IIJA, Congress appropriated $36 billion for the program, of which no more than $24 billion may be awarded to projects on the NEC. Accordingly, at least $12 billion will be available for infrastructure projects (including those located on tracks owned by private railroads) necessary for off-NEC network expansion. The law also authorized $7.5 billion for the program contingent on future appropriations, of which $3.4 billion to $4.1 billion would be available for network expansion, with the remainder reserved for projects on the NEC.

The program allows the Secretary of Transportation to issue letters of intent committing future appropriations to selected applicants and/or to enter into phased funding agreements for larger projects. When FRA announced the projects that were selected to receive $13 billion in FSP funds made available in FY2022 and FY2023, it also announced $11 billion in funding that would be obligated in later years.8 This reduced the amount of funding available to commit to a new cohort of projects solicited for FY2024.9

Restoration and Enhancements

The Restoration and Enhancement grant program was created in the FAST Act and was reauthorized with few changes in Section 22304 of the IIJA. The program differs from other rail grant programs in that funds may be used to cover operating (as opposed to only capital) expenses for the first several years to defray costs ordinarily borne by states. Whereas federal law previously allowed the federal government to pay 80% of the cost of operating a new route in the first year, declining to 40% in the third year, under the IIJA, federal funds may be used to cover a share that declines from 90% to 30% over six years. This change could lessen the near-term cost of a new route for state governments and allow more time for state sponsors to generate ridership and identify sources of state funding.

The program originally was intended to support reactivation of routes previously served by Amtrak, such as the New Orleans, LA-Mobile, AL, corridor that has been without Amtrak service since 2005. Projects to restore service over routes served by Amtrak prior to 2015 are to be given priority, as well as routes “that would enhance connectivity and geographic coverage of the existing national network of intercity rail passenger service.” This suggests that a route that has received no intercity rail service since before the creation of Amtrak in 1970 would be eligible for funding under the program and entitled to receive priority in the selection process if it connects to the current network.

The IIJA appropriated $250 million for the program, to be withheld from amounts appropriated for Amtrak National Network Grants as described above. Additionally, the law authorized $250 million for the program contingent on future appropriations.

Amtrak National Network Funds for Corridor Development

The IIJA increased annual funding for National Network grants, which can cover Amtrak’s share of eligible costs associated with new and existing routes off the NEC after certain set-asides (including $250 million for Restoration and Enhancement grants as described above). Under Section 22101(h), Amtrak is now permitted to use up to 10% of National Network appropriations for the purposes of “corridor development,” including the payment of operating expenses in the same decreasing shares permitted under Restoration and Enhancement. Of $16 billion directly

8 DOT, Federal Railroad Administration (FRA), “FY22-23 Federal-State Partnership for Intercity passenger Rail Program Selections, Selected Projects Not Located on the Northeast Corridor,” December 8, 2023, https://railroads.dot.gov/elibrary/fy22-23-FSP-National-rail-program-selections.

9 DOT, FRA, “Notice of Funding Opportunity for Projects Located Off the Northeast Corridor for the Fiscal Year 2024 Federal-State Partnership for Intercity Passenger Rail Program,” 89 Federal Register 80304, October 2, 2024.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 8

appropriated for National Network grants through FY2026, up to $1.6 billion would therefore be available for corridor development, as well as up to $1.3 billion of the nearly $13 billion authorized but contingent on future appropriations. Funds set aside for corridor development would be available only for corridors selected as part of the Interstate Compacts program described below.10

Amtrak’s FY2022 legislative report and grant request proposed a more expansive corridor development program—separate from Amtrak’s annual grants—that could be used to cover capital projects in addition to 100% of operating costs for the first few years of a new or expanded service. The provisions enacted in the IIJA were more limited.

Other Rail/Multimodal Programs

Consolidated Rail Infrastructure and Safety Improvement

Intercity passenger rail projects remain eligible under the reauthorized Consolidated Rail Infrastructure and Safety Improvement (CRISI) grant program, for which the IIJA appropriated $5 billion over five years and authorized $5 billion subject to future appropriations over the same period. While a wide variety of passenger rail projects are eligible for funding, CRISI funds historically have gone mainly to projects that benefit freight railroads.

Grade Crossing Elimination

Similarly, Section 22305 of the IIJA created a new program designed to fund road-rail crossing grade separation projects, with $3 billion in appropriations over five years. Grade separation projects may benefit passenger rail corridors, but this is not the program’s primary intended purpose. FRA may prioritize other benefits when selecting projects to receive grants.

National Infrastructure Investments

Sections 21201 and 21202 of the IIJA codified two National Infrastructure Investments programs to be administered by the Office of the Secretary of Transportation. The programs received a total of $12.5 billion in supplemental appropriations split between “national” and “local” project assistance.11 Another $17.5 billion is authorized, pending future appropriations. Passenger rail projects remain an eligible use of these funds, although Amtrak would be allowed to apply only in partnership with states, transit agencies, or other eligible applicants. Since these are multimodal programs, passenger rail projects compete with freight rail, highway, and port projects for program dollars.

Rail Rehabilitation and Improvement Financing

Passenger rail projects are eligible under two federal loan programs, the Railroad Rehabilitation and Improvement Financing (RRIF) program and the Transportation Infrastructure Finance and Innovation Act (TIFIA) program. Neither of these programs was designed with passenger rail specifically in mind; RRIF was intended for use primarily by freight railroads, and TIFIA has

10 Amtrak has asserted that this is the result of a drafting error and that these funds should instead be made available for corridors accepted into the Corridor Identification and Development program. See Amtrak, General and Legislative Annual Report & Fiscal Year 2023 Grant Request, March 2022, p. 47.

11 The local project assistance program is essentially a codification of the Rebuilding American Infrastructure with Safety and Equity (RAISE) program, previously known as the Better Utilizing Investments to Leverage Development (BUILD) and Transportation Investment Generating Economic Recovery (TIGER) programs.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 9

primarily been used for toll road and transit projects. Because loans require a source of revenue for repayment, and because passenger rail lines rarely generate an operating profit, these programs have seen limited application to intercity rail. However, Amtrak has used RRIF loans to purchase new locomotives for the NEC. Amtrak’s two active RRIF loans, totaling over $3 billion, now represent almost 60% of total outstanding RRIF loan balances.

Corridor Planning and Development

Rail planning in the United States has tended to rely on project sponsors (usually states) to formulate their own plans, as opposed to implementing plans formulated at the federal level. The historical lack of reliable funding for passenger rail capital projects and operations has at times been an obstacle to planning, as some states did not want to invest time and resources into a plan that may not be achievable without additional federal support (the advance appropriations in the IIJA may help to address this hesitation). PRIIA contained provisions related to multistate regional rail planning, and the IIJA built upon these provisions with new programs for state-led corridor planning.

Intercity Rail Corridor Identification and Development Program

Section 22308 of the IIJA directed the Secretary of Transportation to solicit proposals for the development of intercity passenger rail corridors from eligible entities. The Secretary is then directed to work with selected applicants to determine the level of financial support necessary to implement the proposals, support the completion of service development plans (SDPs), identify within those plans a “pipeline” of individual capital projects required for service initiation, and publish an annual report specifying the order in which those projects are to receive federal financial assistance and in what amounts. Projects identified in a service development plan and corridor inventory under this program would be given priority over other projects not located on the NEC when applying for Federal-State Partnership funds. In December 2023, FRA announced it had selected a total of 69 corridors to receive support under the Corridor Identification and Development (CID) program.12 Most selected corridors entered Step 1 of CID, which entails activities necessary to develop an SDP, but the SDP itself is not completed until Step 2. If an SDP is not finished until after FY2026, no funds appropriated by the IIJA would remain available to fund the identified pipeline of projects.

Interstate Compact Incentive Program

Section 22306 of the IIJA created a new program to provide financial support for interstate compacts to plan, oversee, or otherwise advance the creation of new intercity passenger rail routes. Up to 10 compacts among two or more states are eligible to be selected for a grant of up to $1 million per year; the appropriations are provided by a $3 million annual set-aside from Amtrak National Network grant funds.

Grants to interstate compacts would mainly be available for planning and administration, not construction of infrastructure or operation of services. Pursuant to the Amtrak Reform and Accountability Act of 1997 (P.L. 105-134), interstate compacts concerning passenger rail service do not require congressional approval.

12 DOT, FRA, “FY22 Corridor Identification and Development Program Selections,” December 8, 2023, https://railroads.dot.gov/elibrary/fy22-CID-program-selections.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 10

Northeast Corridor Commission and NEC Future

The PRIIA contained a requirement for a corridor improvement plan for the NEC. The planning project, titled NEC Future, has identified goals for rail service along the corridor and recommended specific infrastructure investments. A corridor-level environmental impact statement evaluated several alternatives, from maintaining the corridor at what are essentially current service levels to building a brand new railway capable of much faster trips but at a considerably higher capital cost. The alternative approved by FRA in July 2017 fell in between these two options and would improve the existing infrastructure without building a new parallel route.

One limitation of the existing Northeast Corridor is the path taken by trains along the coast of Long Island Sound in southeastern Connecticut. The tight curves along the shore reduce speeds and lengthen trip times. NEC Future planners initially recommended the construction of new tracks set farther inland along a straighter path but after facing opposition from local groups objecting to the construction of new rail lines, this segment of the corridor was marked for further study.13

Another obstacle to improving service on the NEC is that several state agencies own portions of the track in addition to Amtrak. As a result, Amtrak does not entirely control operations along the corridor.

Federally Led Multistate Rail Plans

The PRIIA also contained a requirement for FRA to develop a National Rail Plan. Rather than preparing a standalone document, FRA has issued guidance for states to follow when drafting their own rail plans, as well as cost estimation and cost-benefit analysis guidance for project sponsors to follow when planning new or improved rail lines. FRA has also worked with groups of states to create regional rail plans, identifying service goals and rough cost estimates for passenger rail service between major cities. Rail studies have been completed for the Southwest, Midwest, and Southeast regions. These regional rail plans are nonbinding and have no construction funding attached but have identified notional corridors and service levels for future evaluation. Some corridors accepted into the CID program have been the subject of study by these state or multistate planning efforts.

Amtrak Connects US 2035

As Congress deliberated on the IIJA, Amtrak released its own proposal for network expansion— Connects US 2035. The proposal identified some 40 potential new routes and another 20 or so existing routes that would receive improved service, such as additional trains per day or faster scheduled trip times. All of these routes would be located off the NEC (at least in part) and be less than 750 miles in length, meaning each would be subject to a cost-sharing requirement between Amtrak and the states served. All final route alignments, schedules, speeds, and service levels would be jointly determined by Amtrak, state partners, and the freight railroads that host Amtrak’s trains outside the NEC. Amtrak would not be able to implement any of the proposed changes unilaterally.

Many changes Amtrak proposed are drawn from existing regional rail or corridor plans, including some corridors that have been accepted into the CID program. Some, such as extensions of

13 Ana Radelat, “Feds drop Old Saybrook-to-Rhode Island bypass from final rail plan,” CT Mirror, July 12, 2017, https://ctmirror.org/2017/07/12/feds-drop-old-saybrook-to-rhode-island-bypass-from-final-rail-plan/.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 11

current service in Vermont or Virginia, enjoy strong support and are underway. Others, such as improved service between Albany and Buffalo, NY, have been studied but not implemented, in part because of the high estimated cost of the work required to allow higher speeds. Still others, such as establishing service between Atlanta and Nashville, have not been studied in detail. Amtrak has said it conducted its own basic ridership and revenue modeling exercise for each of the proposed changes, but detailed results of its analysis have not been made public.

Amtrak estimated that its proposal would require an investment of $5 billion per year over 15 years ($75 billion). Funding appropriated by the IIJA for Amtrak’s National Network was well short of what Amtrak says is needed to implement its proposal, but the IIJA also provided funds for discretionary grants that could be used to fund individual elements of the proposal if put forward by a project sponsor and selected for funding.

Non-Amtrak Passenger Rail Projects

California High-Speed Rail

The California High-Speed Rail (CAHSR) program is a project led by the State of California with the goal of implementing a system capable of speeds exceeding 200 miles per hour between Los Angeles and San Francisco via the Central Valley cities of Fresno and Bakersfield. Ground was broken on the Central Valley section in January 2015. Since that time, the California High-Speed Rail Authority (CHSRA) has completed civil works, such as construction of viaducts or grade separations, using $3.9 billion of federal High-Speed Intercity Passenger Rail (HSIPR) grants,14 state bond funds, and other sources. The project was also selected to receive a $3.1 billion FSP grant (including roughly $2 billion committed in a Phased Funding Agreement), and component projects have been selected to receive funding from other federal grant programs that received funding through the IIJA.

Funding for CAHSR has never been committed in sufficient quantities to cover the projected cost of constructing the “Phase 1” system connecting San Francisco and Los Angeles or extensions to Sacramento and San Diego. CHSRA’s 2023 project update report estimates the capital cost of the initial 171-mile segment between Merced and Bakersfield at between $29.8 billion and $32.9 billion, and the “Phase 1” system at between $88.5 billion and $127.9 billion.15 Construction of the full “Phase 1” system connecting San Francisco to Los Angeles—originally anticipated to be completed in 2028—is now expected to take until 2033.16

All Aboard Florida/Brightline

After the State of Florida turned down a federal high-speed rail grant that would have funded a Tampa-Orlando rail project,17 the private company All Aboard Florida (AAF) began making plans to initiate intercity passenger rail service between Miami and Orlando via West Palm Beach. That service, now called Brightline, operates between Miami and West Palm Beach using tracks owned

14 The High-Speed Intercity Passenger Rail program was created under the Passenger Rail Investment and Improvement Act of 2008 (PRIIA; P.L. 110-432, Div. B). No funds have been appropriated for the program since FY2010.

15 California High-Speed Rail Authority, 2023 Project Update Report, March 2023, p. 59.

16 California High-Speed Rail Authority, 2022 Business Plan, May 2022, p. 92.

17 Office of Governor Rick Scott, “Florida Governor Rick Scott Rejects Federal High Speed Rail,” February 16, 2011, https://web.archive.org/web/20110217010419/http://www.flgov.com/2011/02/16/florida-governor-rick-scott-rejects- federal-high-speed-rail/.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 12

by Florida East Coast Industries, a regional freight railroad, that run parallel to and east of those used by Amtrak. Brightline is building new track that would allow operation between West Palm Beach and Orlando. The diesel-powered trains are expected to provide a three-hour trip between Miami and Orlando, more than two hours faster than Amtrak’s services between those two cities.

AAF initially sought a $1.6 billion federal RRIF loan to finance construction of the portion of the route between West Palm Beach and Orlando, but no loan was authorized. Instead, AAF applied to DOT for allocations of $600 million of qualified private activity bonds to finance work on the Miami-West Palm Beach segment and another $2.25 billion for the West Palm Beach-Orlando segment.18 The interest on these bonds is exempt from federal income tax; hence, the federal government is subsidizing the project by allowing it to borrow money from private investors at a lower interest rate than it would have to pay without the federal tax exemption.19 Brightline rail service between Miami and West Palm Beach began in 2018 and resumed in 2021 after being suspended due to the COVID-19 pandemic. Two additional stations along its South Florida route are under construction, paid for by local governments. Brightline initiated service to Orlando in September 2023.20

Brightline has announced plans to extend its service from downtown Miami to the city’s cruise ship terminals and from Orlando to Tampa.21 The Tampa extension received, in 2022, a $16 million CRISI grant to support preliminary engineering and environmental studies. Although Brightline had benefited from indirect federal support in the form of tax-exempt bonds, this was its first direct federal financial support.

XpressWest/Brightline West

In 2018, AAF acquired XpressWest, a private company planning to build and operate a passenger rail service between Las Vegas, NV, and the Los Angeles area. XpressWest had been in the early stages of applying for an RRIF loan that was ultimately not issued. The project was subsequently rebranded Brightline West. In January 2021, the project’s sponsor stated that it had contracted with Siemens Mobility for trainsets and petitioned FRA for the necessary regulatory waivers to put the trains in service,22 and it had reached design and construction agreements with the California and Nevada departments of transportation to build in the Interstate 15 corridor between Las Vegas and Apple Valley, CA. Further refinements of the project plan moved the line’s southern terminus to Rancho Cucamonga, CA, which is served by Los Angeles’s commuter rail system. As in Florida, Brightline West seeks to raise construction funds by selling private activity bonds, but a proposed bond sale in 2020 was postponed due to unfavorable market conditions and has not been rescheduled. The project sponsors subsequently sought federal grant funds made available by the IIJA and were selected to receive a $3 billion FSP grant (of which $1 billion was

18 Virgin Trains USA LLC, Form S-1 Registration Statement, November 16, 2018, p. F-39; Brightline, “Virgin Trains USA Closes $1.75 Billion Private Activity Bond Sale to Fund Phase 2 Expansion to Orlando,” press release, April 19, 2019; Shelly Sigo, “$950 million in bonds for Florida’s Virgin Trains USA price Thursday,” Bond Buyer, June 12, 2019.

19 CRS Report RL31457, Private Activity Bonds: An Introduction, by Steven Maguire and Joseph S. Hughes.

20 Brightline, “Making History: Brightline Opens Between Orlando and Miami,” press release, September 22, 2023, https://www.gobrightline.com/press-room/2023/brightline-history-brightline-opens-between-orlando-and-miami.

21 Brightline, “Brightline Florida,” https://www.gobrightline.com/florida-expansion, viewed March 13, 2023.

22 DOT, FRA, “Petition for a Waiver of Compliance,” 86 Federal Register 8479, February 5, 2021.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 13

committed in a Phased Funding Agreement). Service is not expected to begin until 2027 at the earliest.23

Texas Central Railway

Texas Central Partners, a private company, has proposed to construct an electrified high-speed rail line between the cities of Dallas and Houston. The project, which is backed by a Japanese rail operator and would use Japanese high-speed rail technology and equipment, would reach top speeds of 186 mph and take 90 minutes end-to-end. There is currently no direct passenger rail service linking Dallas and Houston. Although the sponsors have stated in the past that “this project is not backed by public funds,”24 news reports have indicated that the project is likely to depend on long-term loans from the federal RRIF and TIFIA programs.25

The project has not begun construction. It completed environmental reviews in 2020 and received a “rule of particular applicability” from FRA that will allow use of technology and equipment built to Japanese specifications, which would otherwise not comply with FRA safety and operating rules, but it has not received all permits necessary for construction. One persistent obstacle has been the acquisition of land on which to build the new tracks. There have been conflicting county-level court rulings on whether Texas Central can take the land it needs using eminent domain. The Texas Supreme Court ruled in June 2022 that the company did have eminent domain powers.26 That same month, the company’s CEO resigned and its board of directors disbanded, leaving the project’s future in doubt. Through a partnership with Amtrak, the corridor was selected to receive funding from the CID program in 2023.27

Northeast Maglev

Northeast Maglev, a privately held company associated with the Central Japan Railway Company, has proposed linking Washington, DC, with New York City with trains using magnetic forces to create a cushion of space between a vehicle and its guideway, operating at top speeds in excess of 300 miles per hour. Maglev technology has seen limited real-world use since its first demonstrations in the 1980s, in part because the straight and level tracks necessary to maintain high speeds require extensive viaducts and tunneling. The first 36 miles of the Northeast Maglev would be built mostly in tunnels between Washington, DC, and Baltimore, MD, with a stop at BWI Thurgood Marshall International Airport in between. The company has stated that half the cost of its project will be financed by the Japanese government, and “the remainder of funding will come from U.S. government loan and grant programs, and the private sector.”28

23 “Brightline West, Los Angeles to Vegas High-Speed Rail Project Updates,” Construction Review Online, March 6, 2023, https://constructionreviewonline.com/biggest-projects/brightline-west-los-angeles-to-vegas-high-speed-rail- projet-updates/.

24 Texas Central, “Learn the Facts,” http://www.texascentral.com/facts/, viewed October 14, 2016.

25 Eric Nicholson, “Texas Central Railway’s Fuzzy Definition of ‘Privately Financed,’” Dallas Observer, August 11, 2015, http://www.dallasobserver.com/news/texas-central-railways-fuzzy-definition-of-privately-financed-7479867.

26 James Frederick Miles v. Texas Central Railroad & Infrastructure, Inc., and Integrated Texas Logistics, Inc., (Supreme Court of Texas 2022).

27 DOT, FRA, FY22 Corridor Identification and Development Program Selections, December 2023, https://railroads.dot.gov/sites/fra.dot.gov/files/2023-12/FY22%20CID%20Project%20Summaries-Map-r1.pdf.

28 Northeast Maglev, “Learn the Truth about the SCMaglev,” https://northeastmaglev.com/facts/, viewed March 13, 2023.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 14

A Draft Environmental Impact Statement for the project, published in January 2021, projected capital costs of $10 billion to $13 billion, roughly $280 million to $360 million per mile.29 The cost estimates are in line with projected per-mile costs of building a maglev project currently under construction in Japan. There are few examples of U.S. public transportation projects involving extensive tunneling with per-mile costs similar to those in Japan; most are more expensive.

Other Passenger Rail Issues

On-Time Performance

The PRIIA directed FRA and Amtrak, in consultation with the Surface Transportation Board (STB) and other railroads, to establish metrics and standards for on-time performance of Amtrak trains operating on freight railroad tracks. As enacted, the law contained a provision—Section 207(d)—allowing STB to resolve disputes between the parties negotiating these standards by appointing an arbitrator after an initial deadline had passed, but that provision was eventually severed in a federal court ruling.30 A set of standards issued in 2010 (but never enforced) was therefore voided, and new standards were issued by regulation in 2020.31

Under the regulation, STB can initiate an investigation of a host railroad either at Amtrak’s request or on its own accord if an intercity passenger train were to fail to meet the on-time performance standards for two consecutive quarters. If STB finds that on-time performance has suffered because of a host railroad’s failure to honor Amtrak’s statutory priority over other types of rail traffic, it may award damages to Amtrak.

The current standards, which measure the percentage of riders who arrive at their ticketed destinations on time (“customer on-time performance”) rather than the percentage of passengers or trains arriving at the train’s final destination on time, entered into effect on July 1, 2021. In Q4 FY2024, 10 of 43 Amtrak routes were found to have met or exceeded the 80% customer on-time performance threshold; 35 routes failed to meet the required standard for two consecutive quarters and could now be subject to STB investigation (Figure 4).32 In July 2023, STB granted a petition from Amtrak requesting an investigation into the long-distance Sunset Limited route.33 This was the first use of the PRIIA enforcement powers since the on-time performance standards entered into effect, but STB had not imposed any penalties or other remedies by the end of 2024.

29 Northeast Maglev, “Draft Environmental Impact Statement (DEIS) and Draft Section 4(f) Evaluation,” p. ES-20, January 2021, https://www.bwmaglev.info/index.php/project-documents/deis#draft-environmental-impact-statement- deis.

30 U.S. Court of Appeals for the District of Columbia Circuit, Association of American Railroads v. U.S. Department of Transportation, Decision of July 20, 2018.

31 These standards are codified in Part 273 of Title 49 of the Code of Federal Regulations.

32 DOT, FRA, “Intercity Passenger Rail Service Quality and Performance Reports,” https://railroads.dot.gov/rail- network-development/passenger-rail/amtrak/intercity-passenger-rail-service-quality-and.

33 Surface Transportation Board, “STB Opens Investigation into On-Time Performance of Amtrak’s Sunset Limited Service,” July 11, 2023, https://www.stb.gov/news-communications/latest-news/pr-23-12/. At the time of Amtrak’s original petition, the Sunset Limited was the worst-performing Amtrak route for three consecutive quarters.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 15

Figure 4. Amtrak Customer On-Time Performance, FY2024

(number of routes meeting quarterly on-time performance standards)

Source: Compiled by CRS using data from Federal Railroad Administration, “Intercity Passenger Rail Service Quality and Performance Reports,” https://railroads.dot.gov/rail-network-development/passenger-rail/amtrak/ intercity-passenger-rail-service-quality-and.

In an unrelated proceeding, the Department of Justice filed a lawsuit against Norfolk Southern Railway (NS) in July 2024, alleging that NS had routinely failed to give Amtrak trains priority on the long-distance Crescent route and that on-time performance was suffering as a result.34 By law, Amtrak trains are supposed to be given priority over freight traffic. In practice, a long freight train may be impossible to move out of the way of an overtaking or oncoming passenger train without the construction of new infrastructure to mitigate the potential for cascading effects on the fluidity of the rail network, meaning passenger trains can be directed to give way to freight trains. Only the Attorney General may file suit to enforce this provision; prior to July 2024, this had occurred once before, in 1979. Members of recent Congresses have introduced bills that would grant Amtrak the right to sue a host railroad on its own behalf.35

Cost of Access to Freight Railroad Tracks

Plans for expanded passenger rail service have generally assumed that Amtrak would operate trains over existing freight tracks. However, freight railroads often demand that additional infrastructure be constructed at public expense before new passenger service can start, on the grounds that without added capacity, the passenger traffic would interfere with freight trains.

34 Department of Justice, “Justice Department Files Complaint Against Norfolk Southern to Stop Amtrak Passenger Train Delays,” press release, July 30, 2024, https://www.justice.gov/opa/pr/justice-department-files-complaint-against- norfolk-southern-stop-amtrak-passenger-train. See also 49 U.S.C. §24308(c).

35 For example, see H.R. 9961 (118th Congress) and S. 1500 (117th Congress).

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 16

Freight railroads rely on rail traffic simulation models to identify the projects necessary to accommodate new passenger trains. Railroads defend these projects as necessary to avoid impeding the movement of freight, but they can be costly, even for modest passenger rail service improvements. For example, Pennsylvania has announced an agreement to invest over $200 million in state funds to increase from one train to two trains per day in each direction between Harrisburg and Pittsburgh.36

One dispute over the cost of obtaining access for passenger trains involves service along the Gulf Coast. This route was previously served by the long-distance Sunset Limited train, which ran once daily in each direction between Los Angeles, CA, and Orlando, FL, prior to the suspension of all service east of New Orleans as a result of Hurricane Katrina in 2005. Amtrak has proposed to restore service over a portion of the route by operating two daily trains in each direction between New Orleans and Mobile, AL. The Restoration and Enhancement grant program created in the FAST Act was intended to fund a portion of the restored route’s operating costs. The route was selected to receive federal funds from this program in 2020,37 but progress was slowed due to claims by the intended host railroads NS and CSX Transportation that Amtrak’s service would delay freight trains unless Amtrak or a state sponsor pays for additional infrastructure.38

A federally led working group estimated that $120 million in project costs would be necessary to initiate service,39 while freight railroads cited a figure closer to $400 million.40 With no agreement in place, Amtrak invoked a provision of federal law that allows STB to compel host railroads to grant access to additional passenger trains.41 The dispute came before STB for adjudication in an early test of the board’s attitude toward passenger rail expansion plans that are to be paid for with funds authorized in the IIJA; however, the parties reached a voluntary settlement before STB issued a binding decision in the case. A bill introduced in the 117th Congress would have created a Passenger-Freight Rail Transportation Advisory Council to provide recommendations to resolve future disputes between freight and passenger rail carriers as part of a multiyear reauthorization of the Surface Transportation Board.42

36 Commonwealth of Pennsylvania, “Governor Wolf Announces Commonwealth, Norfolk Southern Operating Agreement to Expand Western Pa. Passenger-Rail Access,” press release, June 27, 2022, https://www.governor.pa.gov/ newsroom/governor-wolf-announces-commonwealth-norfolk-southern-operating-agreement-to-expand-western-pa- passenger-rail-access/.

37 DOT, FRA, “U.S. Department of Transportation Announces More Than $22 Million in Grants to Restore and Enhance Intercity Passenger Rail Network,” May 5, 2020, https://railroads.dot.gov/newsroom/press-releases/us- department-transportation-announces-more-22-million-grants-restore-and-0.

38 STB Docket FD_36496, Application of the National Railroad Passenger Corp. Under 49 U.S.C. §24308(e)—CSX Transportation, Inc. and Norfolk Southern Corporation, STB served March 16, 2021, https://dcms- external.s3.amazonaws.com/DCMS_External_PROD/1616016906905/301767.pdf.

39 DOT, FRA, Gulf Coast Working Group Report to Congress, July 2017, p. 31, https://railroads.dot.gov/sites/ fra.dot.gov/files/fra_net/17156/2017-07- 17_Gulf%20Coast%20Working%20Group%20Report%20to%20Congress%20%28Main%20Section%29- %20Final.pdf.

40 DOT, FRA, “Statement of Administrator Amitabha Bose On Behalf of the U.S. Department of Transportation and the Federal Railroad Administration for Phase One of the Board’s Public Hearing,” February 15, 2022, https://railroads.dot.gov/newsroom/testimonies/written-statement-administrator-amitabha-bose-behalf-us-dot-and-fra- surface.

41 49 U.S.C. §24308(e).

42 H.R. 8649 (117th Congress), §301.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service 17

Electrification and Rolling Stock Acquisition

On the Northeast Corridor, most trains (and nearly all Amtrak trains) are pulled by electric locomotives drawing power from overhead wires, which can result in higher speeds and lower equipment maintenance costs.43 Outside the Northeast Corridor, diesel locomotive-hauled trains are the norm. Project sponsors, hoping to achieve higher performance and/or to reduce fuel consumption and emissions from diesel engines, have proposed expanding the use of passenger trains that produce no local emissions by using electric, battery, or hydrogen power sources.

No federal statute or regulation prioritizes or promotes railway electrification or decarbonization, and freight railroads typically do not receive federal funding because they are financially self- sufficient private businesses. Projects to electrify or decarbonize rail lines may be eligible for several different federal grant programs administered by FRA or the Federal Transit Administration, but no federal funds have been explicitly directed toward rail electrification since the New Haven-Boston segment of Amtrak’s Northeast Corridor was electrified in 2000. Other federal programs to support deployment of battery charging infrastructure or hydrogen fuel, such as those funded by the IIJA or the legislation known as the Inflation Reduction Act of 2022 (P.L. 117-169), have generally been targeted to highway uses, not railroads. However, Congress appropriated $2.5 million in FY2023 FRA funding to “continue ongoing research, development, and testing on innovative technologies and solutions for low- or no-emission alternative fuels for locomotives, engine improvements, and motive power technologies.” Amtrak is also using federal funds to replace some of its railcars and locomotives with new trainsets, some of which will be equipped with dual-mode diesel-electric and diesel-battery hybrid locomotives.

Considerations for Reauthorization

One consideration for Congress is whether to continue to include Amtrak and other passenger rail programs in a larger surface transportation bill that also encompasses highways and public transportation. The two most recent multiyear reauthorizations—the IIJA and the FAST Act— included a rail title, but passenger rail had been the subject of standalone legislation. Rail programs do not have a dedicated source of funding (such as the Highway Trust Fund) and do not require an active authorization for service to continue. (Congress previously appropriated funding for Amtrak in the absence of an authorization.) Because of this, it would be relatively straightforward to return to standalone legislation.

Whether as part of a standalone bill or a larger multimodal surface reauthorization, Congress may consider the amount of funding available for passenger rail and how that funding would be awarded or distributed. Congress could continue to authorize funding for Amtrak at or near the higher levels set by the IIJA or return to lower levels in line with pre-IIJA policy. By the same token, Congress may adjust the (intended) allocation of funding between the Northeast Corridor—where routes tend to perform better financially but serve a limited geographic area— and the National Network.

Outside of annual funding for Amtrak, Congress may consider the current slate of competitive discretionary grant programs, their funding levels, and the selection criteria for awarding those funds. Of particular interest may be the number of project sponsors seeking funding for new or upgraded corridors as a result of federally supported planning and development work. Many recipients of CID funding will be finalizing SDPs and generating prioritized lists of projects during the period covered by the next multiyear reauthorization.

43 See CRS In Focus IF12707, Options for Railroad Electrification and Decarbonization, by Ben Goldman.

Intercity Passenger Rail: Federal Policy and Programs

Congressional Research Service R47260 · VERSION 7 · UPDATED 18

Congress may also consider the source of funds for passenger rail programs. Rail advocates and some Members of Congress have called for the creation of a dedicated trust fund for rail programs in order to maintain a greater degree of predictability around future funding levels.44 In the IIJA, Congress did not establish a rail trust fund but provided advance appropriations for the five-year life of the bill. If Congress were to establish a trust fund, then how funding would be allocated among Amtrak, states, or other entities would be of consideration.

Author Information

Ben Goldman Analyst in Transportation Policy

Disclaimer

This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you wish to copy or otherwise use copyrighted material.

44 In 1997, the Senate passed a bill (S. 949, 105th Congress) that would have created a passenger rail trust fund, but the measure was not present in a companion House bill and the trust fund was removed by bill conferees; see Jeff Davis, “Looking Back – When Amtrak Almost Got its Own Trust Fund in 1997,” Eno Transportation Weekly, May 7, 2021, https://enotrans.org/article/looking-back-when-amtrak-almost-got-its-own-trust-fund-in-1997/. For one example of a more recent bill that would establish a rail trust fund, see S. 899 (117th Congress).