The U.S. government uses federal credit (direct loans and loan guarantees) to allocate financial capital to a range of areas, including home ownership, higher education, small business, agriculture, and energy. At the end of FY2013, outstanding federal credit totaled $3.2 trillion. This report explains the budgetary treatment of federal credit, examines proposed reforms, and describes recent legislation.
Title V of the Omnibus Budget Reconciliation Act of 1990 (P.L. 101-508), the Federal Credit Reform Act of 1990 or FCRA, changed how the unified budget reports the cost of federal credit activities (i.e., federal direct loans and loan guarantees) to an accrual basis beginning in 1992. Before FY1992, for a given fiscal year, the budgetary cost of a new direct loan or loan guarantee was the net cash flow for that fiscal year. This cash flow measure did not accurately reflect the cost of a loan or loan guarantee, which is its subsidy cost over the entire life of the loan or loan guarantee, that is, its accrual cost.
Beginning with FY1992, FCRA required that the reported budgetary cost of a credit program equal the estimated subsidy costs at the time the credit is provided. FCRA defines the subsidy cost as “the estimated long-term cost to the government of a direct loan or a loan guarantee, calculated on a net present value basis, excluding administrative costs.” This arguably places the cost of federal credit programs on a budgetary basis equivalent to other federal outlays. Because the subsidy costs of discretionary credit programs (such as the business loan programs of the Small Business Administration and the loan guarantee programs of the Export-Import Bank) are now provided through appropriations acts, this change meant that discretionary credit programs must compete with other discretionary programs on an equal basis. In contrast, funding for most mandatory credit programs (generally entitlement programs) is provided by permanent appropriations. The director of the Office of Management and Budget (OMB) is responsible for coordinating the estimation of subsidy costs to the federal government.
Since the passage of FCRA, federal agencies, working with OMB, have steadily improved their compliance with credit reform standards. In October 1990, the Federal Accounting Standards Advisory Board (FASAB) was established. In August 1993, this board required that agencies’ accounting procedures be consistent with their budgetary procedures for their federal credit programs. On August 5, 1997, the Balanced Budget Act of 1997 (P.L. 105-33) was enacted, amending FCRA to make technical changes, including codifying several guidelines set by OMB.
Four proposals to expand credit reform have been discussed: the principles of credit reform could be applied to government-sponsored enterprises (GSEs); the principles of credit reform could be extended to federal insurance programs; the budgetary cost of capital for credit programs could be changed to include market risk; and the administrative costs of credit programs could be included in the calculation of the costs of these programs. These proposals are described in this report.
In the 113th Congress, two bills have been proposed with provisions concerning the budgetary treatment of federal credit: the Honest Budget Act of 2013 (H.R. 1270) and the Budget and Accounting Transparency Act of 2014 (H.R. 1872). The latter passed the House but has not been acted on by the Senate. This report will be updated as events warrant.
The U.S. government uses federal credit (direct loans and loan guarantees) to allocate financial capital to a range of areas, including home ownership, higher education, small business, agriculture, and energy. At the end of FY2013, outstanding federal credit totaled $3.2 trillion. This report explains the budgetary treatment of federal credit, examines proposed reforms, and describes recent legislation.
Title V of the Omnibus Budget Reconciliation Act of 1990 (P.L. 101-508), the Federal Credit Reform Act of 1990 or FCRA, changed how the unified budget reports the cost of federal credit activities (i.e., federal direct loans and loan guarantees) to an accrual basis beginning in 1992. Before FY1992, for a given fiscal year, the budgetary cost of a new direct loan or loan guarantee was the net cash flow for that fiscal year. This cash flow measure did not accurately reflect the cost of a loan or loan guarantee, which is its subsidy cost over the entire life of the loan or loan guarantee, that is, its accrual cost.
Beginning with FY1992, FCRA required that the reported budgetary cost of a credit program equal the estimated subsidy costs at the time the credit is provided. FCRA defines the subsidy cost as "the estimated long-term cost to the government of a direct loan or a loan guarantee, calculated on a net present value basis, excluding administrative costs." This arguably places the cost of federal credit programs on a budgetary basis equivalent to other federal outlays. Because the subsidy costs of discretionary credit programs (such as the business loan programs of the Small Business Administration and the loan guarantee programs of the Export-Import Bank) are now provided through appropriations acts, this change meant that discretionary credit programs must compete with other discretionary programs on an equal basis. In contrast, funding for most mandatory credit programs (generally entitlement programs) is provided by permanent appropriations. The director of the Office of Management and Budget (OMB) is responsible for coordinating the estimation of subsidy costs to the federal government.
Since the passage of FCRA, federal agencies, working with OMB, have steadily improved their compliance with credit reform standards. In October 1990, the Federal Accounting Standards Advisory Board (FASAB) was established. In August 1993, this board required that agencies' accounting procedures be consistent with their budgetary procedures for their federal credit programs. On August 5, 1997, the Balanced Budget Act of 1997 (P.L. 105-33) was enacted, amending FCRA to make technical changes, including codifying several guidelines set by OMB.
Four proposals to expand credit reform have been discussed: the principles of credit reform could be applied to government-sponsored enterprises (GSEs); the principles of credit reform could be extended to federal insurance programs; the budgetary cost of capital for credit programs could be changed to include market risk; and the administrative costs of credit programs could be included in the calculation of the costs of these programs. These proposals are described in this report.
In the 113th Congress, two bills have been proposed with provisions concerning the budgetary treatment of federal credit: the Honest Budget Act of 2013 (H.R. 1270) and the Budget and Accounting Transparency Act of 2014 (H.R. 1872). The latter passed the House but has not been acted on by the Senate. This report will be updated as events warrant.
The U.S. government uses federal credit (direct loans and loan guarantees) to allocate capital to a range of areas including home ownership, education, small business, farming, energy, infrastructure investment, and exports.1 A direct loan is "a disbursement of funds by the government to a nonfederal borrower under a contract that requires the repayment of such funds with or without interest."2 A loan guarantee is "a pledge with respect to the payment of all or part of the principal or interest on any debt obligation of a non-federal borrower to a non-federal lender."3 At the end of fiscal year (FY) 2013, outstanding federal direct loans totaled $947 billion and outstanding guaranteed loans totaled $2,207 billion. Thus, at the end of FY2013, outstanding federal credit totaled $3,154 billion.4
The Federal Credit Reform Act of 1990 (FCRA) in the Omnibus Budget Reconciliation Act of 1990 (P.L. 101-508, §13201; 104 Stat. 1388, 1388-610) changed the budgetary treatment of federal credit from cash-flow accounting to accrual accounting. Cash flow accounting measured the cost of a new loan or new loan guarantee by its net cash flow in the fiscal year it was provided. FCRA measures the cost of new federal credit as the net present value of cash flows over the life of the loan or loan guarantee at the time the credit is extended, using Treasury interest rates to discount the value of future cash flows.5
The purpose of this report is to explain the provisions of FCRA; examine the implementation of credit reform, including credit reform provisions of the Balanced Budget Act of 1997 (P.L. 105-33, §1011; 111 Stat. 254,692); discuss proposed modifications of credit reform; and describe proposed legislation in the 113th Congress. In order to achieve these objectives, it is necessary to initially discuss justifications for credit programs, federal credit concepts, and the budgetary treatment of federal credit before the enactment of FCRA.6
Before FY1992, the budgetary cost of a new loan or new loan guarantee was reported as its net cash flow for that fiscal year. This cash flow measure did not accurately reflect the cost of a loan or loan guarantee (federal credit) to the federal government because it did not provide a good measure of the economic and budgetary effects.7 Therefore, it was often difficult for policy makers to accurately monitor and therefore make informed decisions about federal credit. In addition, administrators at agencies could understate costs by using budgetary techniques such as generating "savings" from the fees on increased volumes of new guarantees, while ignoring the increase in expected losses, and offsetting the (cash) cost of new direct loans with current year collections from old loans.
To remedy these problems, Congress included credit reform in the Omnibus Budget Reconciliation Act of 1990 (OBRA90). The President signed OBRA90 into law on November 5, 1990. The legislation added a new title to the Congressional Budget Act, Title V, the Federal Credit Reform Act of 1990 (FCRA). Beginning with FY1992, FCRA changed the methodology in the unified budget for measuring and reporting the cost of federal direct loans and federal loan guarantees.8
An effectively functioning federal government credit program can reduce existing imperfections in the market. Federal credit programs are justified economically on two grounds: equity and efficiency.
Equity concerns the distributions of income, consumption, and wealth. The distribution of income has received the most emphasis among policy makers. Because economists cannot make interpersonal comparisons of utility, the optimal distributions of income, consumption, and wealth are normative; that is, they involve value judgments. In other words, economists cannot conclude that one distribution is better than another although the degree of inequality can be measured.
Another aspect of the debate on equity concerns the appropriate method of redistribution, if desired. Some Members of Congress support redistributive programs, including credit programs, to lessen income disparities. For example, credit assistance to students from lower-income families may assist the students in pursuing higher education and thus reduce income inequality. Some critics maintain that direct subsidies can usually better target assistance to the needy than can credit programs.
If an economy is productively efficient, it cannot produce more of one good without reducing the production of one or more other goods. For an economy to be efficient, private financial intermediaries should allocate capital to its most productive uses. Private financial intermediaries generally operate efficiently, but market imperfections exist, and these imperfections may cause an inadequate availability of credit in certain sectors of the economy. The Office of Management and Budget (OMB) states that market imperfections that can justify federal intervention "include information failures, monitoring problems, limited ability to secure resources, insufficient competition, externalities, and financial market instability."9 "Education, for example, generates positive externalities because the general public benefits from the high productivity and good citizenship of a well-educated person."10 Thus, arguably, credit assistance for higher education may improve economic efficiency.
Numerous terms in financial economics have specific meanings for federal budget practices. These terms include federal credit, federal credit subsidies, and the unified budget. Some of these terms are defined in FCRA—and are summarized in the sections below.
The Office of Management and Budget defines federal credit as federal direct loans and federal loan guarantees. The federal government extends federal credit by entering into a direct loan obligation or a loan guarantee commitment.
FCRA defines a direct loan as "a disbursement of funds by the government to a nonfederal borrower under a contract that requires the repayment of such funds with or without interest" [Section 502(1)]. According to FCRA, a direct loan obligation is "a binding agreement by a federal agency to make a direct loan when specified conditions are fulfilled by the borrower" [Section 502(2)]. FCRA defines a loan guarantee as a "pledge with respect to the payment of all or a part of the principal or interest on any debt obligation of a non-federal borrower to a non-federal lender" [Section 502(3)]. A loan guarantee commitment is "a binding agreement by a federal agency to make a loan guarantee when specified conditions are fulfilled by the borrower, the lender, or any other party to the guarantee agreements" [Section 502(4)].
When either a direct loan obligation or a loan guarantee commitment is extended, the federal government determines future credit flows because the government signs a contract to provide credit. In some cases the specified conditions may not be met, and, consequently, credit will not be provided even though a contract was signed. Furthermore, there is a time lag between the signing of these contracts and the actual disbursement of a direct loan by the federal government or the actual disbursement of a guaranteed loan by a private lender. In some cases, particularly for credit for construction, credit may be disbursed by either the federal government or a private lender in increments over several fiscal years.11
Federal credit recipients obtain funds on more favorable terms than they could receive from the private market. OMB has described subsidies from federal direct loans as consisting of one or more of the following:
Concerning loan guarantee subsidies, OMB stated the following:
The recipient of a federal loan guarantee receives a subsidy because the federal government covers part or all of the default risk—a subsidy conveyed by lower interest payments. Also, the federal government either levies no loan guarantee fee or charges a smaller fee than a private insurer would charge. Consequently, a private lender with a federal guarantee can charge the borrower a lower interest rate. In addition, with some guaranteed loans the federal government may pay to the lender part of the interest due on a guaranteed loan.13
Thus, a federal loan guarantee with or without a federal interest payment may provide a lower, equal, or higher level of subsidy than a federal direct loan.
An important budget reform that preceded credit reform was the adoption of a unified budget. Before 1967, the federal government most frequently used an administrative budget, which was not comprehensive in coverage because it excluded the trust funds (for example, the Social Security trust fund). The federal government also used two other broad budgets: the consolidated cash budget and the national income accounts budget. Each of these three budgets had a different coverage of federal programs and a different accounting method; consequently each had a different surplus or deficit.14 Each of these budgets had weaknesses, and the simultaneous use of three different budget concepts caused confusion.15
In March 1967, the President's Commission on Budget Concepts was created and instructed to make "a thorough and objective review of budgetary concepts."16 In October 1967, the commission produced a comprehensive report with detailed recommendations on implementing a unified budget. In its report, the commission stated that the two basic functions of the federal budget are resource allocation and macroeconomic stabilization.17 For resource allocation, the commission believed that the budget should "provide the integrated framework for information and analyses from which the best possible choices can be made in allocating the public's money among competing claims."18 This function of resource allocation should include comparisons among government programs and between the public and private sectors.19 For macroeconomic stabilization, the commission maintained that the budget should contain detailed and accurate information in order to evaluate the effects of federal fiscal activities.
Furthermore, the commission stated that the budget should include data necessary to undertake discretionary countercyclical fiscal policy.20 Thus, the commission recommended a unified budget that would be composed of all federal activities, including the trust funds and federal credit activities. The commission recommended that federal credit programs be measured by their cash flows, although it realized that this procedure provided a poor measure of the economic and budgetary effects of federal credit. In the FY1969 budget, the Johnson Administration adopted the unified budget concept, but with some structural differences from the proposal of the commission. However, it did adopt the commission's recommendation of measuring credit by its cash flows.
Subsequent implementation of federal credit reform would improve the use of the unified budget for resource allocation and macroeconomic stabilization as originally desired by the commission.21
Some budget experts and policy makers criticized the cash flow treatment of federal credit in the unified budget as not accurately measuring the cost of federal credit and its effect on resource allocation. Beginning in 1983, proposals for using accrual accounting for federal credit were debated and culminated in the Federal Credit Reform Act of 1990, which is the basis for the treatment of federal credit today.22
The four stated purposes of FCRA were listed in Section 501:
(1) measure more accurately the costs of federal credit programs;
(2) place the cost of credit programs on a budgetary basis equivalent to other federal spending;
(3) encourage the delivery of benefits in the form most appropriate to the needs of beneficiaries; and
(4) improve the allocation of resources among credit programs and other spending.
FCRA never uses the word subsidy; nevertheless, the budgetary and economic cost of a federal credit program is arguably the subsidy value at the time credit is provided. FCRA defines [subsidy] cost as "the estimated long-term cost to the government of a direct loan or loan guarantee, calculated on net present value basis, excluding administrative costs and any incidental effects on governmental receipts or outlays" [Section 502(5A)]. The discount rate used to calculate subsidy costs in terms of present value is the "average interest rate on marketable Treasury securities of similar maturity" [Section 502(5E)].23 Hence, the subsidy cost of a program is determined by the amount of credit provided and the discount rate used to calculate the net present value of that credit.
Any government action that changes the estimated present value of an outstanding federal credit program is counted in the budget in the year in which the change occurs as a change in the subsidy cost of that program [Section 502(5D)]. For example, the federal government could partially forgive the repayment of principal for low-income borrowers from a particular credit program, which would increase the subsidy cost of the program.
The director of the Office of Management and Budget is responsible for coordinating the estimation of subsidy costs. "The Director may delegate to agencies authority to make estimates of costs" [Section 503(a)]. But agencies must use written guidelines from the director, which are developed after consultation with the director of the Congressional Budget Office (CBO). The director of OMB and the director of CBO are responsible for developing more accurate historical data on credit programs, which are used to estimate subsidy costs (Section 503). The President's budget includes "the planned level of new direct loan obligations and new loan guarantee commitments associated with each appropriations request" (Section 504).
Beginning in FY1992, an appropriation for the annual subsidy cost of each credit program was placed into a budget account called a credit program account. The subsidy cost of federal credit is scored as an outlay in the fiscal year in which the credit is disbursed by either the federal government or a private lender [Section 504(d)].
Discretionary programs providing new direct loan obligations and new loan guarantee commitments require appropriations of budget authority equal to their estimated subsidy costs. Funding for the subsidy costs of discretionary credit programs is provided in appropriation acts and must compete with other discretionary programs for funding available under the constraints of a budget resolution.
Mandatory programs, generally credit entitlements (for example, guaranteed student loans), and existing credit programs of the Commodity Credit Corporation have indefinite budget authority [Section 505(a-c)]. Most mandatory credit programs receive automatic funding for the amount of credit needed to meet the estimated demand by beneficiaries, which depends on eligibility and benefits rules contained in substantive law. For mandatory credit programs, any additional cost from reestimates of subsidies for a credit program is covered by permanent indefinite budget authority. This additional cost is displayed in a subaccount in the credit program account.
Each credit program also has a non-budget financing account. Each of these non-budget financing accounts receives payments from its associated credit program account equal to the subsidy cost at the time a new loan or loan guarantee is provided. The financing account for each new direct loan also acquires the value of the unsubsidized portion of that loan (actual disbursements by the government minus the subsidy cost). This amount is borrowed from the Treasury through the loan program.24
The financing accounts contain all other cash flows between the public and the government associated with each credit program [Section 502(5E6-7)]. These flows include "direct loan disbursements and repayments, loan guarantee default payments, fees, and recoveries on defaults from the public and the receipt of subsidy cost payments from program accounts, borrowing and repayments of Treasury debt to finance program activities and interest paid to or received from the Treasury" from intragovernmental transactions.25 Because these are non-budget accounts, the cash flows into and out of these accounts are not reflected in total outlays, receipts, or surplus/deficit. The budget authority of a credit program provides the means for the credit program account to pay to the financing account an amount equal to that program's estimated subsidy costs. The off-budget borrowing from the Treasury for the unsubsidized portion of a direct loan program is included in the national debt.
Another special account, the liquidating account, includes all ongoing cash flows of each credit program resulting from credit advanced prior to October 1, 1991 [Section 502(5E8)]. The budgetary procedures under FCRA also apply to modifications made by the U.S. government to credit terms on credit provided before FY1992.26
FCRA does not apply to the credit activities of the Federal Deposit Insurance Corporation, the National Credit Union Administration, the Resolution Trust Corporation, Pension Benefit Guaranty Corporation, National Flood Insurance, the National Insurance Development Fund, Crop Insurance, or the Tennessee Valley Authority (Section 506).
The Federal Credit Reform Act of 1990 was brief as a policy statement; it covered only five and one-half pages of the U.S. Code, Congressional and Administrative News.27 Numerous details necessary to make the act operational were absent. Furthermore, many federal agencies had inadequate financial and accounting systems to implement credit reform.28
On July 2, 1992, OMB issued a revised circular, which improved and clarified instructions for credit budget formulation.29 Furthermore, OMB simplified its credit subsidy model to help agencies estimate direct loan and loan guarantee subsidies.30 In November 2000, OMB updated Circular A-129 concerning the budgetary treatment of federal credit programs.31 On November 2, 2005, OMB also revised Circular A-11 to include federal credit reform procedures. In Circular A-11, OMB explains how agencies should fill out credit schedules in the course of preparing their budget requests.32
Since the passage of FCRA, OMB has continued to assist agencies in upgrading the quality of subsidy estimates. Beginning with FY1994, agencies have recorded reestimates of the cost of their credit programs, and aggregate subsidy estimates have been adjusted upward or downward annually.33 FCRA provided for permanent indefinite authority to cover the cost of reestimates so that new appropriations would not be needed. Agencies are required to incorporate improved knowledge into their subsidy estimates for future direct loan obligations and loan guarantee commitments.34
The Government Accountability Office examined subsidy estimates for 10 credit programs in five agencies for the period of fiscal years 1992 through 1998. GAO found problems with supporting documentation for subsidy estimates and the reliability of subsidy rate estimates and reestimates in each agency.35 But GAO concluded that agencies showed improvement in documenting their estimates.36
CBO examined credit subsidy reestimates for the period of FY1993 through FY1999. CBO concluded that even though errors are inevitable, the reestimates cannot be used for analysis because they "are in such disorder." However, the reestimates do not show any pattern of bias or any deliberate attempt to underestimate the credit subsidy.37
OMB established on-budget receipt accounts to receive payments of earnings from the financing accounts in those cases where federal credit programs are estimated to produce net income, that is, have negative subsidies.38 Usually, payments into a program's receipt account are recorded in the Treasury's general fund as offsetting receipts.39 "In a few cases, the receipts are earmarked in a special fund established for the program and are available for appropriation for the program."40
In October 1990, the Federal Accounting Standards Advisory Board (FASAB or "the Board") was established by the Secretary of the Treasury, the director of OMB, and the Comptroller General to consider and recommend accounting principles for the federal government. On September 15, 1992, the board issued an exposure draft recommending accounting standards for federal credit programs on a basis consistent with credit reform. The board received numerous substantive comments that were considered in revising its exposure draft, and on August 23, 1993, OMB issued the board's revised report titled Accounting for Direct Loans and Loan Guarantees.41 This report provided extensive detail, including numerous arithmetic examples, clarifying credit reform practices.42 It further required that federal agencies use of present value accounting for federal credit programs be consistent with the Federal Credit Reform Act of 1990.43 Thus, for their credit programs, agencies' accounting procedures were now required to be consistent with their budgetary procedures.
On August 5, 1997, the Balanced Budget Act of 1997 was enacted. This law amended the Federal Credit Reform Act of 1990 to make some technical changes including codifying several OMB guidelines. The law made important changes that continue to govern federal credit today.44
First, agencies are required to use the same discount rate to calculate the subsidy when they obligate budget authority for direct loans and loan guarantees and when submitting the agency's budget justification for the President's budget. Thus, the dollar value of loans for a specific credit program is known when Congress considers subsidy appropriations for that program. Prior to this change, agencies had used interest rates from the preceding calendar quarter to calculate the subsidy at the time a direct loan was advanced or a loan guarantee was obligated.
Second, agencies are required to use the same forecast assumptions (for example, default and recovery rates) to calculate subsidy rates when they obligate credit and when preparing the President's budget.
Third, agencies are required to transfer end-of-year unobligated balances in liquidating accounts (revolving funds for direct loans and loan guarantees made prior to the effective date of FCRA) to the general fund as soon as practicable after the close of the fiscal year.
Fourth, the same interest rate must be used on financing account debt (which generates interest payments to the Treasury), financing account balances, and the discount rate used to calculate subsidy costs.
Fifth, the definition of the term "cost" was modified so that the discount rate is based on the timing of cash flows instead of on the term of the loan.
Under this new approach, in the President's budget, a series of different rates would be used to calculate the present value of cost flows over a multi-year period. For example, for a 10-year direct loan (or loan guarantee), costs in the first year would be discounted using the interest rate on a one-year Treasury bill, costs in the second year would be discounted using the interest rate on a two-year Treasury note, etc. Under the prior approach, the interest rate of a 10-year Treasury note would have been used as the discount rate. The earlier method proved to be inferior because the flow of semiannual interest payments and the repayment of full principal on the last payment date did not match up well with yearly cost flows.45
Rather than having the federal government pay for the subsidy costs of credit programs, a credit program may result in some cases in the subsidy costs being paid by credit recipients. For example, the Energy Policy Act of 2005 (P.L. 109-58; 119 Stat. 594) includes Title XVII—Incentives for Innovative Technologies. Section 1702 (b) states that
No [loan] guarantee shall be made unless—(1) an appropriation for the cost has been made; or (2) the Secretary [of Energy] has received from the borrower a payment in full for the cost of the obligation and deposited the payment into the Treasury.
If credit recipients pay the subsidy costs and there is no ceiling on appropriations, then hypothetically there would be no limit to the size of the loan guarantee program. But this law does not state anything about an appropriations ceiling on the volume of loan guarantees. Some observers argue that loan guarantees with the recipients paying the estimated costs should not be provided unless there is a cap on appropriations in order to control the size of a credit program.46
In the Federal Credit Supplement47 for the FY2015 budget, OMB presents the loan characteristic variables for each credit program, which are loan maturity period, borrower interest rate, grace period, upfront fees, annual fees, other fees, assumed default rate, rate of recovery on defaults, and percent of loan guaranteed (for loan guarantee programs only). In addition, OMB separates the estimated subsidy rates into four components: defaults (net of recoveries), interest, fees, and all other.48
For FY2015, OMB estimates an aggregate proposed subsidy budget authority of new direct loans of negative $14.650 billion. This high negative subsidy budget authority amount was due, almost exclusively, to negative proposed subsidy budget authority of new direct loans for the Department of Education's Federal Direct Student Loan Program (negative $14.399 billion).49 This high negative subsidy level was due primarily to the use of Treasury interest rates to discount future credit flows. (Fair value budgeting, an alternative method of discounting future credit flows using market rates, is discussed in the next section.)
For FY2015, OMB estimates an aggregate proposed subsidy budget authority of new loan guarantees of negative $14.098 billion.50 This negative subsidy budget authority amount was due primarily to negative proposed subsidy budget authority of new loan guarantees for the FHA-Mutual Mortgage Insurance Program Account51 of negative $12.190 billion.52
Four major proposals to expand credit reform have been discussed in recent years. Some of these proposed expansions are also included in legislation described in the next section on proposed legislation in the 113th Congress.
The principles of credit reform could be applied to government-sponsored enterprises (GSEs). GSEs are privately owned financial intermediaries, which were established and chartered by the federal government. GSEs pay lower interest rates on their securities because investors generally believe that securities issued by GSEs have an implied federal guarantee, making them appear less risky than other private sector securities.
Proponents of extending credit reform principles to GSEs have argued that the federal government has already "bailed out" one GSE (the Farm Credit System). In the late 1970s, agricultural prices declined, farm income plummeted, and agricultural land prices fell.53 Consequently, many farmers were unable to repay their loans and the Farm Credit System incurred large losses. A series of federal efforts to assist the Farm Credit System were unsuccessful, and eventually lead to the enactment of the Agriculture Credit Act of 1987 (P.L. 100-233) on January 6, 1988.54 This act provided federal financial assistance to prevent the Farm Credit System from defaulting on its debt.
Two decades later, on September 7, 2008, the federal government placed in conservatorship or receivership two financially troubled housing GSEs: the Federal National Mortgage Association (Fannie Mae) and the Federal Home Loan Mortgage Corporation (Freddie Mac).55 Legislation has been proposed to reform these housing enterprises.56 Hence, proponents argue that credit reform should cover the subsidy costs to taxpayers of all GSEs. Opponents have argued that the subsidy costs of GSEs are difficult to quantify; furthermore, the federal government has no legal responsibility to "bail out" GSEs. Opponents also maintain that the current low Treasury interest rates and the exclusion of both administrative costs and risk premiums may result in negative subsidy costs for GSEs.57
The principles of credit reform could be extended to federal insurance, which is treated primarily on a cash flow basis.58 Most federal insurance consists of deposit insurance or pension insurance.59 The Government Accountability Office maintains that credit reform could improve the budgetary information and incentives for federal insurance.60 But, for some federal insurance programs, significant difficulties exist in accurately estimating future claims for losses. Often, historical data are unavailable, frequent program modifications occur, and fundamental changes take place in the activities insured.61 Many federal insurance programs cover types of risk that the private sector has either refused or been unable to cover.62
The complexity of the issues involved and the need to build agency capacity to generate such estimates suggest that it is not feasible to integrate accrual-based costs directly into the budget at this time.63
GAO has suggested that a supplemental approach should precede the full inclusion of insurance programs under credit reform. Thus, GAO has recommended that accrual-based cost measures be initially included along with cash-based estimates as supplemental information in the budget documents.64
On April 25, 2002, GAO's director of federal budget analysis gave the following testimony before the House Committee on the budget:
While there are significant estimation and implementation challenges, accrual-based budgeting has the potential to improve budgetary information and incentives for these programs by providing more accurate and timely recognition of the government's costs and improving the information and incentives for managing insurance costs.
In 1997 we reported that the current cash-based budget generally provides incomplete information on the costs of federal insurance programs. The ultimate costs to the federal government may not be apparent up front because of time lags between the extension of the insurance, the receipt of premiums, and the payment of claims.65
Some opponents of the inclusion of insurance programs maintain that, because the current subsidy measure excludes administrative costs and a risk premium, some major insurance programs would record negative subsidies. Further, because insurance risks are open ended (i.e., not limited by a specified time period or liability amount), there is no definitive cash flow associated with these programs. This makes it difficult to calculate a single budgetary figure.66
The budgetary cost to taxpayers of providing federal credit could be changed to include market risk.67 When credit reform was debated, the Government Accountability Office (GAO), the Congressional Budget Office (CBO), the Office of Management and Budget (OMB), and the Senate Budget Committee all recommended that federal credit be measured by the net present value of credit subsidies.68 But, GAO and the Senate Budget Committee recommended a cost-to-the-government measure be used while CBO and OMB supported a "market-valuation oriented measurement approach, which calculates the economic benefit borrowers receive as a result of obtaining federal, rather than private sector, loans."69
A CBO study on federal credit subsidies examined two ways of including the market price for risk: risk-adjusted discount rates and options-pricing methods. The risk-adjusted discount rate (ADR) method "adds a spread—the difference between the interest rate on a Treasury security and the rate on a risky security—to Treasury rates and uses the resulting adjusted rate to discount expected cash flows associated with a loan." The ADR method results in a higher discount rate for both costs and revenues and, with a few exceptions for negative subsidies, raises the net cost of credit programs.70 Thus, the ADR method would result in larger budgetary costs for federal credit programs.
An option is a contract that gives the buyer the right, but not the obligation, to buy or sell a specified quantity of an instrument at a specific price within a specified period of time, regardless of the market price of that instrument.71 "The general idea behind options-pricing methods is that assets with the same payoffs must have the same price; otherwise, investors would have the opportunity to earn a risk-free profit by buying low and selling high." An options-pricing method is likely to be more accurate than the ADR method but only when the necessary data and model are available. Options-pricing models are seldom used to value credit provided to individuals; instead the use of the ADR method is usually appropriate. Option-pricing methods are usually better than ADR methods in valuing credit provided to commercial enterprises. The best method to use varies for other credit programs such as "loan assistance to sovereign states, municipalities, and special-purpose enterprises."72
As an example of the process, CBO applied a type of options pricing—the binomial pricing method—to calculate the risk-adjusted cost of extending federal loan guarantees to Chrysler in 1980 and to America West Airlines (AWA) in 2002. CBO computed that the market-value loss of the Chrysler loan guarantee was $239.0 million instead of the Treasury-rate loss of $107.6 million.73 CBO also found that the calculated market-value loss was $26.3 million for the AWA loan guarantee instead of a gain of $47.4 million using Treasury interest rates.74
For the past several fiscal years, the President's budget has contained a section on "Fair Value Budgeting for Credit Programs."75 OMB compared and contrasted the current cost to the government with fair value budgeting. In March 2012, CBO released an issue brief titled Fair-Value Accounting for Federal Credit Programs.76 CBO indicated its support for fair value accounting, but acknowledged that fair value accounting involves implementation issues. CBO stated that "the government already uses fair-value estimates in budgeting for a few types of programs or transactions, including commitments of resources for some International Monetary Fund lending facilities and the Troubled Asset Relief Program."77
Recent weakness in the economy and expansionary monetary policy has resulted in historically low nominal Treasury interest rates from FY2009-FY2011. Consequently, the use of Treasury interest rates in the cost to the government measure resulted in aggregate costs of federal credit of negative $19 billion for FY2009, negative $20 billion for FY2010, and negative $42 billion for FY2011. These negative costs reduced the sizes of the federal deficits. In contrast, the aggregate cost of federal credit averaged positive $3.1 billion annually for FY1998-FY2008.78 Arguably, these negative aggregate costs of federal credit have contributed to the debate about changing to fair value budgeting.79
As was discussed in the 1990 debate, administrative costs of credit programs could be included in the calculation of the costs of these programs. Proponents argue that the current exclusion of these costs understates the actual costs of credit programs. Proponents also stress that cost comparisons among credit programs are distorted. For example, the administrative costs per $1 million of credit are higher for direct student loans than guaranteed student loans. Opponents argue that agencies have difficulty separating the administrative costs of their credit programs from their general administrative costs.
In its analysis of fair-value budgeting, CBO stated,
Comprehensive fair-value estimates of subsidies for credit programs would incorporate certain administrative expenses, such as servicing and collection costs, that are essential to preserving the value of the government's claims (rather than accounting separately for those costs on a cash basis). Those essential preservation expenses can differ significantly among credit programs, and including them in subsidy cost estimates would make comparing various subsidy costs easier. However, doing so could erode Congressional control over program expenditures because, under FCRA, all increases in estimated costs after a loan or loan guarantee is initiated (including those arising from increased expenditures on servicing or loan collection) are automatically appropriated. Another concern is that implementing a switch from cash to accrual accounting for essential preservation expenses would be administratively complicated.80
Two bills have been introduced in the 113th Congress that included major proposals to reform the budgetary treatment of federal credit.81 Many of these bills were also introduced in prior Congresses. Some of the reforms in these proposals were discussed extensively in the prior section of this report.
The Honest Budget Act of 2013 was introduced by Representative Martha Roby on March 19, 2013. This legislation included provisions that would modify FCRA "to measure more accurately the costs of Federal credit programs and financial investments by accounting for them on a fair value basis."82 "Cost" is defined as "the sum of the Treasury discounting component and the risk component of a direct loan, loan guarantee, or financial investment or a modification thereof."83 Beginning with FY2017, the provisions of the bill would expand FCRA to include "financial investment commitments," which would include "an investment by the Government in any securities (debt or equity), stock, bonds, or futures, options, swaps, or other derivatives, issued by a non-federal entity…."84
The Budget and Accounting Transparency Act of 2014 was introduced by Representative Scott Garrett on May 8, 2013. The bill passed the House by a 230-165 vote on April 7, 2014.
Title I of this legislation contains provisions intended to replace FCRA with measures to more accurately record the costs of federal credit programs by accounting for them on a fair value basis. This bill defines the term "cost" as "the sum of the Treasury discounting component and the risk component of a direct loan, loan guarantee, or a modification thereof." Further, Title II of the legislation states that
Not later than 1 year after the date of enactment of this Act, the Directors of the Congressional Budget Office and the Office of Management and Budget shall each prepare a study and make recommendations to the Committees on the Budget of the House of Representatives and the Senate as to the feasibility of applying fair value concepts to budgeting for the costs of Federal insurance programs.
Provisions of this bill, if enacted, would go into effect in 2017.
Appendix A. Concepts of Present Value and Future Value
The concepts of present value and future value can be explained by using simple examples.85 A dollar received now is more valuable than a dollar received a year from now because a dollar today will be worth more a year from now because of the interest that dollar can earn over that period.86 Since dollars today are worth more than dollars in the future, we need some means of weighting cash flows that are received at different times so they can be compared.
The Mathematics of Interest:
The future value of an investment can be expressed in mathematical terms by means of the following formula or equation:
Fn = P ( 1 + r )ⁿ
Where: Fn = the balance (or future value) at the end of period n, P = the amount invested now, r = the rate of interest per period, and the n exponent is the number of periods.
Examples:
(1) Assume $100 is deposited in a bank saving account for one year, at an interest rate of 5%. Then P = $100, r = 0.05, and n = 1. Under these conditions, the future value at the end of year 1 or F1 = $105.
The $100 present outlay is called the present value of the $105 amount to be received in one year. It is also known as the discounted value of the future $105 receipt.
(2) Assume that the $105 is left in the bank for a second year at an interest rate of 5%. Thus, the initial $100 compounds over a two year period. Then P = $100, r = 0.05, and n = 2. Under these conditions, the future value at the end of year 2 or F2 = $110.25. Thus, at the end of the second year the original $100 deposit will have grown to $110.25.
The $100 present outlay is called the present value of the $110.25 amount to be received in two years. It is also known as the discounted value of the future $110.25 receipt.
The present value of any sum to be received in the future can be computed by turning the equation for future value or Fn = P (1 + r )ⁿ around and solving for P: P = Fn / ( 1 + r )ⁿ.
Appendix B. Federal Credit Data
Table B-1. Estimated Future Cost of Outstanding Federal Credit Programs, FY2013
(in billions of dollars)
Program |
Outstanding 2013 |
Estimated Future Costs of 2013 Outstandinga |
Direct Loans:b |
||
Federal Student Loans |
623 |
–54 |
Education Temporary Student Loan Purchase Authority |
90 |
–13 |
Farm Service Agency, Rural Development, Rural Housing |
53 |
6 |
Rural Utilities Service and Rural Telephone Bank |
54 |
2 |
Troubled Asset Relief Program (TARP)c |
18 |
6 |
State Housing Finance Authority Direct Loans |
9 |
1 |
Export-Import Bank |
18 |
2 |
Advance Technology Vehicle Manufacturing, Title 17 Loans |
14 |
2 |
Housing and Urban Development |
11 |
7 |
Disaster Assistance |
8 |
2 |
Transportation Infrastructure Finance and Innovation Act Loans |
7 |
* |
Small Business Lending Fund (SBLF)c |
4 |
–* |
Public Law 480 |
4 |
2 |
Agency for International Development |
3 |
1 |
Other direct loan programsc |
31 |
9 |
Total direct loans |
947 |
-27 |
Guaranteed Loans:b |
||
FHA-Mutual Mortgage Insurance Fund |
1,142 |
32 |
Department of Veterans Affairs (VA) Mortgages |
349 |
8 |
Federal Student Loan Guarantees |
264 |
* |
FHA General and Special Risk Insurance Fund |
148 |
9 |
Farm Service Agency, Rural Development, Rural Housing |
112 |
5 |
Small Business Administration (SBA) Loan Guaranteesd |
93 |
3 |
Export-Import Bank |
62 |
2 |
International Assistance |
21 |
2 |
Commodity Credit Corporation Export Loan Guarantees |
5 |
* |
Title 17 Loan Guarantees |
3 |
* |
Government National Mortgage Association (GNMA)d |
......... |
* |
Other guaranteed loan programsc |
8 |
1 |
Total guaranteed loans |
2,207 |
62 |
Total Federal Credit |
3,154 |
35 |
Source: U.S. Executive Office of the President. Office of Management and Budget. Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015 (Washington: GPO, 2014), Table 20-2.
Notes: * = $500 million or less.
a. Future costs represent balance sheet estimates of allowance for subsidy cost, liabilities for loan guarantees, and estimated uncollectible principal and interest.
b. Excludes loans and guarantees by deposit insurance agencies and programs not included under credit reform, such as Commodity Credit Corporation price supports. Defaulted guaranteed loans that result in loans receivable are included in direct loan amounts.
c. As authorized by statute, table includes TARP and SBLF equity purchases, and International Monetary Fund (IMF) transactions resulting from the 2009 Supplemental Appropriations Act. Future costs for TARP and IMF transactions are calculated using the discount rate required by FCRA adjusted for market risks, as directed in legislation.
d. To avoid double counting, outstandings for GNMA and SBA secondary market guarantees and TARP FHA Letter of Credit program are excluded from the totals.
Appendix C. Budgetary Treatment of Federal Credit Before FY1992
Before the implementation of the Federal Credit Reform Act of 1990, the unified budget treated federal credit in two different ways. Generally, the unified budget measured credit by its cash flows. After 1980, it included a separate credit budget that measured and selectively controlled gross credit flows.
Unified Budget
The federal unified budget used cash-basis accounting. Before FY1992, a new federal direct loan was treated as a budget outlay in the current fiscal year, and repayments of principal and payments of interest were treated as offsetting collections (negative outlays) in the future fiscal years in which they occurred. If a loan recipient paid a fee, this fee was treated as an offsetting collection. Loan defaults reduced repayments of principal and interest, and therefore offsetting collections. Administrative expenses were reported as outlays. In a given fiscal year, the budgetary cost of a loan program, not the individual loans, was its net cash flow. This equaled new loans made plus any administrative expenses associated with these loans (rarely recognized in the loan accounts) less any loan fees, repayments of principal, and payments of interest.
The federal acceptance of a contingent liability when a loan guarantee was provided was not included in the federal budget because no cash flow occurred. The administrative costs of a guarantee program were outlays in the fiscal year in which they occurred. Some guarantee programs charge fees to the recipient, and these fees were considered offsetting collections. Any federal outlays necessary to compensate lenders for any default losses covered by a federal guarantee were not shown in the budget until they were actually paid.
Credit Budget
In January 1980, the Office of Management and Budget introduced a federal "credit budget" to help monitor and control the growth of federal credit, including new direct loan obligations and new loan guarantee commitments. Federal credit was measured at the time that the government signed a binding contract to provide credit assistance. Initially, the credit budget consisted of nonbinding targets. Before FY1992, limits in the credit budget were included in the budget resolution and in annual appropriation acts for discretionary credit programs but not mandatory credit programs.87 Although the credit budget improved credit visibility, the credit budget did not measure or control the size of subsidies.
The Federal Credit Reform Act of 1990 decreased the importance of the credit budget because control of credit subsidies largely replaced limits on gross credit flows as a determinant of the amount of new federal credit for each program. Estimated limitations on credit loan levels are proposed in each presidential budget, although the term "credit budget" is not used by OMB.88 These limitations on credit loan levels are set too high to realistically affect the amount of credit extended.
Appendix D. Budgetary Treatment of a Hypothetical Direct Loan
(1) For a proposed direct loan program, CBO is required to estimate the subsidy cost if a bill including the loan program is considered on the House or Senate floor. If legislation enacted includes a new loan program, OMB becomes responsible for estimating the subsidy cost. If a direct loan program "L" has been enacted into law, agency "A" establishes a credit program account and a non-budget financing account.
(2) OMB in consultation with agency A estimates that the net present value of the cost of credit subsidies equals (in this example) 20% of loans disbursed under program L operated by agency A.
(3) If program L is a discretionary loan program, an appropriations bill for the fiscal year is passed by Congress and signed into law by the President.89 This bill includes an appropriation of (in this example) $100 million for the subsidy budget authority of program L. Within agency A, this $100 million is appropriated to the credit program account for program L. Furthermore, this appropriations bill must include an estimate of the dollar amount of new direct loan obligations supported by the subsidy budget authority appropriated to agency A for program L. For example, if program L has an estimated subsidy rate of 20%, the dollar amount of new direct loan obligations supportable would be $500 million.
(4) Agency A signs a contract to loan $10 million to a borrower under the auspices of program L. The estimated subsidy cost of this loan is $2 million (20% of $10 million).
(5) The borrower meets the terms and conditions of the loan contract. Agency A pays $2 million from its credit program account for L into its financing account for L. The financing account for program L borrows $8 million (unsubsidized portion of the loan) from the U.S. Treasury. At the same time that these budgetary transfers occur within agency A, the loan of $10 million is disbursed from the financing account for program L to the borrower. The subsidy payment of $2 million that goes into the financing account is scored as an outlay for agency A and for the federal budget. The $8 million borrowed from the Treasury is a non-budget means of financing, and consequently, does not affect the budget deficit, outlays, or revenues. But this $8 million, if the budget is in deficit, does increase the national debt.
(6) Agency A services the loan. Cash flows between the public and the non-budget financing account for fees, interest, defaults, etc., do not affect the budget deficit, outlays, or revenues. But the net cash flows of the financing account do affect the national debt.
(7) Repayments of principal and payments of interest are paid by the borrower into the financing account for program L. The financing account uses these monies to pay the interest and repay the principal on the $8 million borrowed from the Treasury.
Appendix E. Budgetary Treatment of a Hypothetical Loan Guarantee
(1) For a proposed loan guarantee program, CBO is required to estimate the subsidy cost if a bill including the loan guarantee program is considered on the floor. If legislation enacted includes a new loan guarantee program, OMB becomes responsible for estimating the subsidy cost. If a loan guarantee program "G" has been enacted into law, agency "A" establishes a credit program account and a financing account.
(2) OMB in consultation with agency A estimates that the net present value of the cost of credit subsidies equals (in this example) 10% of loans guaranteed under program G operated by agency A.
(3) If program G is a discretionary loan guarantee program, an appropriations bill for the fiscal year is passed by Congress and signed into law by the President.90 This bill includes an appropriation (in this example) of $60 million for the subsidy budget authority for program G. Within agency A, this $60 million is placed in the credit program account for program G. Furthermore, this appropriations bill must include an estimate of the dollar amount of guaranteed loan commitments supported by the subsidy budget authority appropriated to agency A for program G. For example, if program G has an estimated subsidy rate of 10%, the dollar amount of new guaranteed loan commitments supported would be $600 million.
(4) Agency A signs a contract to guarantee a loan of $15 million to the borrower. The estimated subsidy cost of this guarantee is $1.5 million (10% of $15 million). The loan guarantee fee (if any) is paid by the borrower to the financing account for program G at the time the loan guarantee is obligated.
(5) After the borrower (lender, or other party to the agreement) meets the terms and conditions of the loan guarantee contract, the borrower obtains the loan from the lender in the private sector. Agency A pays $1.5 million from its credit program account for G into its financing account for G. At the same time that this budgetary transfer occurs within agency A, the agency provides the guarantee in order for the borrower to obtain the loan from the private lender. The subsidy payment of $1.5 million that goes into the financing account is scored as an outlay for agency A and for the federal budget. The borrower must pay to the lender interest on the principal and repay the principal.
(6) Agency A services the loan guarantee. The cash flows between the public and the non-budget financing account do not affect the budget deficit, outlays, or revenues. But the net cash flow from the financing account affects the national debt.
(7) The subsidy amount and any loan guarantee fee earn interest, which is paid by the Treasury. If the borrower defaults on all or part of the guaranteed loan then the financing account is responsible for covering the cost of compensating the lender.
Appendix F. Direct Loan Data, FY2015
Table F-1. Subsidy Rates, Budget Authority, and Loan Levels for Proposed Direct Loans for FY2015
(in millions of dollars, unless noted)
Agency and Program |
Subsidy |
Subsidy |
Loan |
Agriculture: |
|||
Agricultural Credit Insurance Fund Program Account |
1.45% |
$41 |
$2,873 |
Farm Storage Facility Loans Program Account |
–3.00 |
–10 |
320 |
Rural Electrification and Telecommunications Loans Program Account |
–5.24 |
–298 |
5,690 |
Distance Learning, Telemedicine, and Broadband Program |
18.20 |
8 |
46 |
Rural Water and Waste Disposal Program Account |
-0.61 |
-7 |
1,200 |
Rural Community Facilities Program Account |
–12.41 |
–273 |
2,200 |
Multifamily Housing Revitalization Program Account |
55.93 |
48 |
87 |
Rural Housing Insurance Fund Program Account |
11.24 |
54 |
473 |
Rural Microenterprise Investment Program Account |
12.81 |
5 |
38 |
Rural Development Loan Fund Program Account |
30.80 |
3 |
10 |
Rural Economic Development Loans Program Account |
12.77 |
12 |
93 |
Commerce: |
|||
Fisheries Finance Program Account |
–4.39 |
–6 |
124 |
Defense—Military: |
|||
Defense Family Housing Improvement Fund |
......... |
......... |
......... |
Education: |
|||
College Housing and Academic Facilities Loans Program Account |
5.94 |
20 |
340 |
TEACH Grant Program Account |
16.53 |
18 |
108 |
Federal Perkins Loan Program Account |
–17.67 |
–828 |
4,684 |
Federal Direct Student Loan Program Account |
–10.22 |
–14,399 |
140,895 |
Energy: |
|||
Title 17 Innovative Technology Loan Guarantee Program |
2.17a |
123 |
5,666 |
Advanced Technology Vehicles Manufacturing Loan Program Account |
......... |
......... |
......... |
Health and Human Services: |
|||
Consumer Operated and Oriented Plan Program Account |
......... |
......... |
......... |
Consumer Operated and Oriented Plan Program Contingency Fund |
......... |
......... |
......... |
Homeland Security: |
|||
Disaster Assistance Direct Loan Program Account |
96.35 |
29 |
30 |
Housing and Urban Development: |
|||
FHA-Mutual Mortgage Insurance Program Account |
......... |
......... |
20 |
FHA-General and Special Risk Program Account |
......... |
......... |
1 |
Emergency Homeowners' Relief Fund |
......... |
......... |
......... |
State: |
|||
Repatriation Loans Program Account |
52.65 |
1 |
2 |
Transportation: |
|||
TIFIA General Fund Program Account, Federal Highway Administration, Transportation |
......... |
......... |
......... |
Federal-aid Highways |
9.53 |
925 |
9,706 |
Railroad Rehabilitation and Improvement Program |
........... |
........... |
600 |
Treasury: |
|||
Community Development Financial Institutions Fund Program Account |
0.30a |
3 |
1,025 |
Veterans Affairs: |
|||
Veterans Housing Benefit Program Fund |
–20.27 |
–68 |
331 |
Native American Veteran Housing Loan |
–13.31 |
–2 |
14 |
International Assistance Programs: |
|||
Overseas Private Investment Corporation |
–3.74 |
–26 |
700 |
Small Business Administration: |
|||
Disaster Loans Program Account |
12.37 |
136 |
1,100 |
Business Loans Program Account |
10.12 |
3 |
18 |
Export-Import Bank of the United States: |
|||
Export-Import Bank loans Program Account |
-9.26 |
-278 |
3,000 |
National Infrastructure Bank: |
|||
National Infrastructure Bank Program Account |
11.57a |
116 |
1,000 |
Total |
N/A |
–14,650 |
182,401 |
Source: U.S. Executive Office of the President. Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015 (Washington, DC: GPO, 2014), Table 20-3.
Notes: Additional information on credit subsidy rates is contained in the Federal Credit Supplement to the budget for 2015.
N/A = Not applicable.
a. Rate reflects notional estimate. Estimates will be determined at the time of execution, and will reflect the terms of the contracts and other characteristics.
Appendix G. Loan Guarantee Data, FY2015
Table G-1. Subsidy Rates, Budget Authority, and Loan Levels for Proposed Loan Guarantees for FY2015
(in millions of dollars, unless noted)
Agency and Program |
Subsidy |
Subsidy |
Loan |
Agriculture: |
|||
Agriculture Credit Insurance Fund |
0.34% |
$12 |
$3,543 |
Commodity Credit Corporation Export Loans |
–1.11 |
–61 |
5,500 |
Rural Water and Waste Disposal Program Account |
0.59 |
1 |
172 |
Rural Community Facilities Program Account |
4.78 |
1 |
13 |
Rural Housing Insurance Fund Program Account |
–0.58 |
–141 |
24,150 |
Rural Business Program Account |
5.11 |
41 |
806 |
Rural Business Investment Program Account |
10.19 |
4 |
39 |
Rural Energy for America Program |
10.58 |
36 |
342 |
Biorefinery Assistance Program Account |
40.32 |
50 |
124 |
Commerce: |
|||
Economic Development Assistance Programs |
15.60 |
5 |
32 |
Health and Human Services: |
|||
Health Resources and Services |
4.37 |
* |
6 |
Housing and Urban Development: |
|||
Indian Housing Loan Guarantee Fund Program Account |
0.84 |
10 |
1,200 |
Native Hawaiian Housing Loan Guarantee Fund Program Account |
0.62 |
* |
25 |
Native American Housing Block Grant |
11.21 |
3 |
27 |
Community Development Loan Guarantees Program Account |
0.00 |
* |
500 |
FHA-Mutual Mortgage Insurance Program Account |
–8.10 |
–12,190 |
150,642 |
FHA-General and Special Risk Program Account |
–4.22 |
–886 |
20,945 |
Interior: |
|||
Indian Guaranteed Loan Program Account |
6.64 |
4 |
70 |
Transportation: |
|||
Minority Business Resource Center Program |
2.27 |
* |
18 |
Maritime Guaranteed Loan (Title XI) Program Account |
9.25 |
8 |
85 |
Veterans Affairs: |
|||
Veterans Housing Benefit Program Fund |
0.27 |
249 |
92,070 |
Loan Guarantees to Israel Program Account |
........... |
........... |
1,905 |
MENA Loan Guarantee Program Account |
........... |
........... |
........... |
Development Credit Authority Program Account |
6.30 |
37 |
581 |
Overseas Private Investment Corporation |
–5.60 |
–181 |
3,230 |
Small Business Administration: |
|||
Disaster Loans Program Account |
1.93 |
* |
18 |
Business Loans Program Account |
0.06 |
45 |
75,010 |
Export-Import Bank of the United States: |
|||
Export-Import Bank Loans Program Account |
–3.37 |
–1,163 |
34,557 |
National Infrastructure Bank: |
|||
National Infrastructure Bank Program Account |
8.85b |
18 |
200 |
Total |
N/A |
–14,098 |
415,810 |
Addendum: Secondary Guaranteed Loan Commitments |
|||
Government National Mortgage Association (GNMA): |
|||
Guarantees of Mortgage-backed Securities Loan Guarantee Program Account |
–0.28 |
–832 |
297,000 |
Treasury: |
|||
Troubled Asset Relief Program, Housing Programsa |
........... |
........... |
........... |
Small Business Association (SBA): |
|||
Secondary Market Guarantee Program |
........... |
........... |
12,000 |
Total, secondary guaranteed loan commitments |
N/A |
-832 |
309,000 |
Source: U.S. Executive Office of the President. Office of Management and Budget. Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015 (Washington, DC: GPO, 2014), Table 20-4.
Notes: Additional information on credit subsidy rates is contained in the Federal Credit Supplement.
N/A = Not applicable.
* = $500,000 or less.
a. Amounts reflect the TARP FHA Refinance Letter of Credit program. Subsidy costs for this program are calculated using the discount rate required by FCRA, adjusted for market risks, as directed in legislation.
b. Rate reflects national estimate. Estimates will be determined at the time of execution, and will reflect the terms of the contracts and other characteristics.
Acknowledgments
The original version of this report was written by [author name scrubbed], former Specialist in Public Finance at CRS. The current author has revised and updated this report and is available to respond to inquiries on this topic.
1. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the U.S. Government, Fiscal Year 2015 (Washington, DC: GPO, 2014), p. 317. |
2. |
Section 502(1) of the Federal Credit Reform Act of 1990. |
3. |
Section 502(3) of the Federal Credit Reform Act of 1990. |
4. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the U.S. Government, Fiscal Year 2015 (Washington, DC: GPO, 2014), Table 20-2. |
5. |
The concepts of present value and future value are explained in examples in Appendix A. |
6. |
Some of these concepts and the budgetary treatment of federal credit before FCRA are presented in more detail in the following source: [author name scrubbed], "The Bush Administration's Proposal for Credit Reform: Background, Analysis, and Policy Issues," Public Budgeting & Finance, vol. 11, no. 1, spring 1991, pp. 50-65. |
7. |
Under the cash flow method, appropriations had to be provided to cover the full cost of a new direct loan in the year it was issued. Loan guarantees did not require any set aside reserves to cover the anticipated losses and therefore did not show any budgetary cost in the year they were issued. See Appendix C for more information. |
8. |
This report will be updated as issues develop and in the event of legislative change. For the most current information about pending legislation, please consult the Legislative Information System (LIS) at http://www.congress.gov. |
9. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2013, pp. 373-374. |
10. |
Ibid., p. 374. |
11. |
For data on the estimated future cost of outstanding credit by program, see Appendix B. The number of credit programs depends on the degree of aggregation, and data in Table B-1 are highly aggregated. |
12. |
This list of subsidies is paraphrased from the following source, U.S. Executive Office of the President, Office of Management and Budget, Special Analysis F, Federal Credit Programs, Budget of the United States Government, Fiscal Year 1988 (Washington, DC: GPO, 1987), p. F32. |
13. |
Ibid., p. F33. |
14. |
For an explanation of these budget concepts, see Report of the President's Commission on Budget Concepts (Washington, DC: GPO, 1967), pp. 82-83. |
15. |
Ibid., p. 1. |
16. |
Ibid., p. 105. |
17. |
Ibid., p. 14. |
18. |
Ibid., p. 16. |
19. |
Ibid. |
20. |
Ibid., p. 18. |
21. |
More detail on the budgetary treatment of federal credit prior to FY1992 can be found in Appendix C. |
22. |
For hypothetical examples of the operation of a direct loan program and a loan guarantee program under the Federal Credit Reform Act of 1990, see Appendix D and Appendix E. |
23. |
The derivation of the discount rate was revised by the Balanced Budget Act of 1997. |
24. |
These transfers within the government represent transfers of budgetary resources rather than actual financial resources. |
25. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015 (Washington, DC: GPO,2014), p. 102. |
26. |
Ibid. |
27. |
U.S. Code, Congressional and Administrative News, 101st Cong., 2nd sess., vol. 6 (St. Paul, MN: West Publishing Co., 1991), pp. 610-615. |
28. |
David B. Pariser, "Implementing Federal Credit Reform: Challenges Facing Public Sector Financial Manager," Public Budgeting & Finance, vol. 12, no. 4, winter 1992, p. 28. |
29. |
U.S. Executive Office of the President, Office of Management and Budget, Budget of the United States Government, Fiscal Year 1994 (Washington, DC: GPO, 1993), p. 49. |
30. |
Ibid. |
31. |
U.S. Executive Office of the President. Office of Management and Budget, Policies for Federal Credit Programs and Non-Tax Receivables, Circular A-129 (Washington, DC: continually updated), p. 27. |
32. |
OMB's Circulars A-11 and A-129 are available at http://www.whitehouse.gov/omb/circulars. |
33. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015 (Washington, DC: GPO, 2014), Table 20-6. |
34. |
U.S. Executive Office of the President, Office of Management and Budget, Federal Credit Supplement, Budget of the United States Government, Fiscal Year 1997 (Washington, DC: GPO, 1996), pp. 48-49. |
35. |
U.S. General Accounting Office, Credit Reform: Greater Effort Needed to Overcome Persistent Cost Estimation Problems, Report no. AIMD-98-14 (Washington, DC: GPO, March 1998), pp. 9-10. |
36. |
Ibid., p. 11. |
37. |
Congressional Budget Office, Credit Subsidy Reestimates, 1993-1999, September 2000, pp. ix-xii. |
38. |
Marvin Phaup, "Credit Reform, Negative Subsidies, and FHA," Public Budgeting & Finance, vol. 16, no. 1, spring 1996, p. 24. |
39. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2007 (Washington, DC, GPO, 2006), p. 390. |
40. |
Ibid. |
41. |
For a discussion of the board's conclusions on issues raised by these comments, see U.S. Executive Office of the President, Office of Management and Budget, Accounting for Direct Loans and Loan Guarantees: Statement of the Federal Financial Accounting Standards, no. 2 (Washington, DC: August 23, 1993), pp. 21-42. |
42. |
For a detailed example of the estimation of credit subsidies, see U.S. General Accounting Office, Credit Subsidy Estimates for the Sections 7(a) and 504 Business Loan Programs, Report no. T-RCED-97-197 (Washington, DC: GPO, July 16, 1997), p. 19. |
43. |
U.S. Executive Office of the President, Office of Management and Budget, Accounting for Direct Loans and Loan Guarantees: Statement of the Federal Financial Accounting Standards, pp. 21-42. |
44. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States, Fiscal Year 1999 (Washington, DC: GPO, 1998), p. 170. |
45. |
U.S. Congress, Conference Committee, Balanced Budget Act of 1997, Conference Report to Accompany H.R. 2015, H.Rept. 105-217, 105th Cong., 1st sess. (Washington, DC: July 30, 1997), pp. 996-997. |
46. |
For a comprehensive analysis of this issue, see U.S. Government Accountability Office, DOE Loan Guarantee Program for Projects That Employ Innovative Technologies, Report no. GAO-07-339R, February 28, 2007. |
47. |
U.S. Executive Office of the President, Office of Management and Budget, Federal Credit Supplement, Budget of the United States Government, Fiscal Year 2015. |
48. |
Positive/negative subsidy rates indicate that the discounted present value of cash inflows is less than/exceeds the discounted value of cash outflows. Positive subsidy rates will increase the budget deficit, while negative subsidy rates will decrease the budget deficit. |
49. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015, Table 20-3. |
50. |
U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the United States Government, Fiscal Year 2015, Table 20-4. |
51. |
For an overview of FHA loans, see CRS Report RS20530, FHA-Insured Home Loans: An Overview , by [author name scrubbed]. |
52. |
For data on proposed loan levels on each loan guarantee program, see Appendix G. |
53. |
Julie Andersen Hill, "Bailouts and Credit Cycles: Fannie, Freddie, and the Farm Credit System," Wisconsin Law Review, vol. 2010, no. 1, July 2010, pp. 36-37. |
54. |
Ibid., pp. 38-42. |
55. |
For more information on the financial status of the GSEs, see CRS Report R42760, Fannie Mae's and Freddie Mac's Financial Status: Frequently Asked Questions, by [author name scrubbed]. |
56. |
For more information, see CRS Report R40800, GSEs and the Government's Role in Housing Finance: Issues for the 113th Congress, by [author name scrubbed]. |
57. |
Currently, OMB records the budgetary cost as cash transfers between the Treasury and the two GSEs. CBO records the budgetary cost of the GSEs as the subsidy cost associated with the GSEs' mortgage guarantees over the life of the mortgages on a fair value basis. Fair-value estimates utilize market-based interest rates. For more information, see Congressional Budget Office, Testimony of Deborah Lucas before the House Budget Committee, The Budgetary Cost of Fannie Mae and Freddie Mac and Options for the Future Federal Role in the Secondary Mortgage Market, June 2, 2011. |
58. |
The Budget Accounting and Transparency Act of 2014 (H.R. 1872, 113th Congress), for example, directs OMB and CBO to make recommendations on the feasibility of applying fair-value concepts to federal insurance programs. For a comprehensive analysis of the budgetary treatment of a federal insurance program, see Congressional Budget Office, The Budgetary Treatment of Subsidies in the National Flood Insurance Program, Testimony of Donald B. Marron, Acting Director, before the Senate Committee on Banking, Housing, and Urban Affairs, January 25, 2006. |
59. |
U.S. General Accounting Office, Budget Issues: Budgeting for Federal Insurance Programs, Report no. AIMD-97-16 (Washington, DC: September 1997), p. 6. |
60. |
Ibid., p. 7. |
61. |
U.S. General Accounting Office, Budget Issues: Budgeting for Federal Insurance Programs, Testimony before the Budget Task Force, Committee on the Budget, House of Representatives, Report no. T-AIMD-98-147 (Washington, DC, April 23, 1998), p. 9. |
62. |
Ibid. |
63. |
Ibid., p. 13. |
64. |
U.S. General Accounting Office, Budget Issues: Budgeting for Federal Insurance Programs, Report no. AIMD-97-16, p. 10. |
65. |
U.S,. General Accounting Office, Budget Process: Extending Budget Controls, Testimony of Susan J. Irving, Director, Federal Budget Analysis, before the House Committee on the Budget, April 26, 2002, p. 16. |
66. |
Perry, Neill and Puja Seam, Accrual Accounting for Federal Credit Programs: The Federal Credit Reform Act of 1990, Harvard Law School Federal Budget Policy Seminar, April 2005, Part II. |
67. |
This change would require new legislation because FCRA specifies that the subsidy cost of federal credit is the cost to the taxpayer rather than the market value to the recipient. |
68. |
U.S. General Accounting Office, Budgetary Treatment of Federal Credit Programs, Report No. AFMD-89-42 (Washington, DC, April 1989), p. 28. |
69. |
Ibid., p. 3. |
70. |
Congressional Budget Office, Estimating the Value of Subsidies for Federal Loans and Loan Guarantees, August 2004, pp. 7-8. |
71. |
For a detailed explanation of options, see CRS Report R40646, Derivatives Regulation and Legislation Through the 111th Congress, by [author name scrubbed], p. 27. |
72. |
Congressional Budget Office, Estimating the Value of Subsidies for Federal Loans and Loan Guarantees, August 2004, pp. 8-9. |
73. |
Ibid., pp. 12-19. |
74. |
Ibid. |
75. |
For example, see U.S. Executive Office of the President, Office of Management and Budget, Analytical Perspectives, Budget of the U.S. Government, Fiscal Year 2015 (Washington, DC: GPO. 2014), pp. 337-340. |
76. |
Congressional Budget Office, Fair-Value Accounting for Federal Credit Programs, March 2012. |
77. |
Ibid., p. 3. |
78. |
Congressional Budget Office, Fair-Value Accounting for Federal Credit Programs, p. 5. |
79. |
For a comprehensive analysis of the debate over the inclusion of market risk, see CRS Report R42503, Subsidy Cost of Federal Credit: Cost to the Government or Fair Value Cost?, by [author name scrubbed]. |
80. |
Congressional Budget Office, Fair-Value Accounting for Federal Credit Programs, March 2012, pp. 10-11. |
81. |
In addition, the House FY2014 budget resolution (H.Con.Res. 25, 113th Congress) and the House FY2015 budget resolution (H.Con.Res. 96, 113th Congress) contained provisions directing the Congressional Budget Office to provide estimates of certain credit costs based on the fair value accounting method to the "extent practicable." |
82. |
Section 501(1). |
83. |
Section 502(7)(A). |
84. |
Section 504(a) and Section 502(5)(A). |
85. |
This appendix is an edited excerpt from the following website: http://www.accounting4management.com/concept_of_present_value.htm. |
86. |
The purchasing power of a dollar today may not be worth more than the purchasing power of a dollar in the future if inflation rates are high. The real interest rate (nominal interest rate minus inflation rate) should be used to calculate the change in purchasing power. |
87. |
U.S. Executive Office of the President, Office of Management and Budget, Special Analysis F, Federal Credit Programs, Budget of the United States Government, Fiscal Year 1990 (Washington, DC: GPO, 1989), p. F4. |
88. |
The estimated appropriation acts limitation on credit loan levels by program are published annually in the Analytical Perspectives, Budget of the United States. |
89. |
If program L is a mandatory loan program, an automatic appropriation of budget authority to cover the estimated subsidy costs would occur for whatever amount of credit is needed to meet the estimated demand for services by beneficiaries. |
90. |
If program G is a mandatory loan guarantee program, an automatic appropriation of budget authority would occur for whatever amount of credit needed to meet the estimated demand for services by beneficiaries. |