Class VI Carbon Sequestration Wells:
April 16, 2024
Permitting and State Program Primacy
Angela C. Jones
Permitting and State Program Primacy Updated October 19, 2026 (R48033) Jump to Main Text of Report

Contents

Summary

The U.S. Environmental Protection Agency (EPA) regulates wells used for underground injection
The U.S. Environmental Protection Agency (EPA) regulates wells used for underground injection
Analyst in Environmental
of carbon dioxide, known as Class VI wells.of carbon dioxide, known as Class VI wells. The Safe Drinking Water Act (SDWA), The Safe Drinking Water Act (SDWA),
Policy
administered by EPA, prohibits underground injection of fluids without a permit, including administered by EPA, prohibits underground injection of fluids without a permit, including

underground injection of carbon dioxide for geologic sequestration. Under SDWA, EPA is underground injection of carbon dioxide for geologic sequestration. Under SDWA, EPA is
authorized to delegate primary enforcement authority, or authorized to delegate primary enforcement authority, or primacy, for underground injection , for underground injection

control (UIC) programs to individual states that meet minimum UIC program requirements. As control (UIC) programs to individual states that meet minimum UIC program requirements. As
the number of carbon capture and sequestration (CCS) projects using deep well injection has increased in the United States in the number of carbon capture and sequestration (CCS) projects using deep well injection has increased in the United States in
recent years, Class VI permitting and state program primacy have been topics of interest to Congress.recent years, Class VI permitting and state program primacy have been topics of interest to Congress.
EPA has established minimum permitting requirements for Class VI injection wells and for state UIC programs. EPA has established minimum permitting requirements for Class VI injection wells and for state UIC programs.
Requirements are specified for well siting and construction, operation and maintenance, monitoring and testing, reporting and Requirements are specified for well siting and construction, operation and maintenance, monitoring and testing, reporting and
recordkeeping, site closure, financial responsibility, and post-injection site care. The minimum contents of a permit are recordkeeping, site closure, financial responsibility, and post-injection site care. The minimum contents of a permit are
established in regulation, but each Class VI permit is developed and approved based on the site-specific characteristics of the established in regulation, but each Class VI permit is developed and approved based on the site-specific characteristics of the
injection well project and is designed to address potential leakage or endangerment of underground sources of drinking water.injection well project and is designed to address potential leakage or endangerment of underground sources of drinking water.
Currently, there are Currently, there are 4at least 8 federal EPA-permitted Class VI federal EPA-permitted Class VI wells in Illinois and Indiana, and at least 11 state-permitted Class VI
wells in operation in the United Statesprojects with at least 13 permitted wells operating in 5 U.S. states. According to EPA, . According to EPA, 130142 Class VI Class VI permitspermit applications are currently pending review by the agency. are currently pending review by the agency.
Additional permits are under review by Additional permits are under review by three states with delegated authority for state Class VI UIC programs.states with delegated authority for state Class VI UIC programs.
Class VI permits are required to include information about the project and underground formations, demonstrate site Class VI permits are required to include information about the project and underground formations, demonstrate site
suitability, and provide financial assurances. Permits must also include six required plans that provide detail on how the suitability, and provide financial assurances. Permits must also include six required plans that provide detail on how the
owner or operator will conduct injection well activities throughout the project lifecycle of the project. When reviewing permit owner or operator will conduct injection well activities throughout the project lifecycle of the project. When reviewing permit
applications, the permitting authority (either EPA or a state) typically conducts five stages of review: completion review, applications, the permitting authority (either EPA or a state) typically conducts five stages of review: completion review,
technical review, draft permit, public comment, and final permit. The technical review, which involves evaluation of technical review, draft permit, public comment, and final permit. The technical review, which involves evaluation of
information and plans in the application package, is the longest and most complex step in the permitting process. Once the information and plans in the application package, is the longest and most complex step in the permitting process. Once the
permit is in place, the permitting authority is responsible for ensuring the permit requirements continue to be met.permit is in place, the permitting authority is responsible for ensuring the permit requirements continue to be met.
EPA has approved UIC Class VI program primacy for EPA has approved UIC Class VI program primacy for three states: North Dakota, Wyoming, and Louisianasix states: Arizona, Louisiana, North Dakota, Texas, West Virginia, and Wyoming. When granted . When granted
primacy for a class of UIC wells, a state administers that UIC program through enforcement of state laws and regulations in primacy for a class of UIC wells, a state administers that UIC program through enforcement of state laws and regulations in
lieu of EPA regulations. EPA retains oversight authority over all state UIC programs under federal law. EPA UIC regulations lieu of EPA regulations. EPA retains oversight authority over all state UIC programs under federal law. EPA UIC regulations
set out the specific requirements for state programs in permitting, compliance evaluation, enforcement, and information set out the specific requirements for state programs in permitting, compliance evaluation, enforcement, and information
sharing. A state must demonstrate that it has the legal authorities and processes in place to administer the Class VI program. sharing. A state must demonstrate that it has the legal authorities and processes in place to administer the Class VI program.
A memorandum of agreement between a state A memorandum of agreement between a state with primacy and EPA, which is submitted along with other required and EPA, which is submitted along with other required
documents, typically serves as the foundation of a statedocuments, typically serves as the foundation of a state’'s specific responsibilities and commitments in administering the s specific responsibilities and commitments in administering the
Class VI program.Class VI program.
Congress has appropriated funding in recent years to EPA for implementation of federal and state Class VI programs. Congress has appropriated funding in recent years to EPA for implementation of federal and state Class VI programs. In
2021On top of regular annual appropriations in several fiscal years for Class VI activities, the Infrastructure Investment and Jobs Act (IIJA; P.L. 117-58) provided $50 million in supplemental appropriations to , the Infrastructure Investment and Jobs Act (IIJA; P.L. 117-58) provided $50 million in supplemental appropriations to
EPA for grants to states that have or are working toward Class VI primacyEPA for grants to states that have or are working toward Class VI primacy. The IIJA provided an additional and $25 million to $25 million to
EPA for Class VI program administration. As Congress continues to debate policy on Class VI well permitting and state EPA for Class VI program administration. As Congress continues to debate policy on Class VI well permitting and state
primacy, several issues may arise regarding Class VI wells, including EPA appropriations, legislation, and EPA oversight. primacy, several issues may arise regarding Class VI wells, including EPA appropriations, legislation, and EPA oversight.
Specific policyThese issues may include issues may include
• the levels of EPA resources needed to process and oversee Class VI permits and state primacy applications;the levels of EPA resources needed to process and oversee Class VI permits and state primacy applications;
• state resources and capacity to administer UIC Class VI programs;state resources and capacity to administer UIC Class VI programs;
• whether EPAwhether EPA’'s Class VI regulations should be amended; ands Class VI regulations should be amended; and
• whether Congress should address stakeholder concerns about public participation in whether Congress should address stakeholder concerns about public participation in the permit and primacy permit and primacy
processesprocess, and concerns about the potential environmental and community impacts of carbon sequestration , and concerns about the potential environmental and community impacts of carbon sequestration
through Class VI wells.through Class VI wells.
Congressional Research Service


link to page 4 link to page 4 link to page 5 link to page 6 link to page 6 link to page 7 link to page 7 link to page 8 link to page 8 link to page 9 link to page 9 link to page 10 link to page 11 link to page 12 link to page 13 link to page 14 link to page 15 link to page 15 link to page 16 link to page 16 link to page 16 link to page 17 link to page 17 link to page 11 link to page 13 link to page 18 Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

Contents
Introduction ..................................................................................................................................... 1
Class VI Injection Wells .................................................................................................................. 1
Class VI Well Permits ...................................................................................................................... 2
Class VI Permit Phases ............................................................................................................. 3
Elements of a Class VI Permit .................................................................................................. 3

General Project Information and Permit Conditions ........................................................... 4
Required Plans .................................................................................................................... 4
Optional Injection Depth Waiver ........................................................................................ 5
Class VI Permitting Process ...................................................................................................... 5
Permit Compliance and Enforcement ....................................................................................... 6
Public Participation ................................................................................................................... 6
Class VI Well Permits Issued .................................................................................................... 7
State UIC Class VI Program Primacy ............................................................................................. 8
Current States with UIC Class VI Program Primacy ................................................................ 9
UIC Class VI Program Primacy Requirements ....................................................................... 10
Primacy Application Process .................................................................................................... 11
Enforcement and EPA Oversight ............................................................................................. 12
UIC Grants for States .............................................................................................................. 12
State Public Participation and Environmental Justice ............................................................. 13
Issues for Congress ........................................................................................................................ 13
EPA Funding and Resources ................................................................................................... 13
Potential Amendments to the 2010 Class VI Rule .................................................................. 14
Environmental Justice Concerns ............................................................................................. 14


Figures
Figure 1. Class VI Permits Issued and Under Review by EPA ....................................................... 8
Figure 2. States with UIC Class VI Program Primacy .................................................................. 10

Contacts
Author Information ........................................................................................................................ 15

Congressional Research Service


Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

Introduction

Introduction

Several industries in the United States are expanding the Several industries in the United States are expanding the useprocess of injecting captured carbon dioxide of injecting captured carbon dioxide
(CO2(CO2) through deep ) through deep underground wells into wells into underground geologic formations geologic formations in order to reduce CO2 emissions
reachingwith the objective of reducing CO2 levels in the atmosphere. As one the atmosphere. As one potential option for mitigating the potential impacts of climate option for mitigating the potential impacts of climate
change, this carbon capture and sequestration (CCS) process could reduce the amount of change, this carbon capture and sequestration (CCS) process could reduce the amount of CO2—
an importantCO2—a greenhouse gas— greenhouse gas—emitted from power plants and other large industrial facilities. The U.S. from power plants and other large industrial facilities. The U.S.
Environmental Protection Agency (EPA) issues permits for Environmental Protection Agency (EPA) issues permits for CO2CO2 injection wells, known as injection wells, known as Class
VI wells
, used for injection and geologic sequestration of , used for injection and geologic sequestration of CO2CO2. In some cases, EPA delegates . In some cases, EPA delegates
authority to states, known as authority to states, known as program primacy, to administer underground injection programs and , to administer underground injection programs and
issue Class VI permits.issue Class VI permits.
In recent years, Class VI permitting and state program delegation has been a topic of interest to In recent years, Class VI permitting and state program delegation has been a topic of interest to
Congress. Congress provided targeted appropriations for Class VI well activitiesCongress. In 2022, in response to a directive in the in the
Consolidated Appropriations Act, 2021 (P.L. 116-260Consolidated Appropriations Act, 2021 (P.L. 116-260). The act also directed) directing EPA to provide EPA to provide
recommendations to recommendations to “"improve Class VI permitting proceduresimprove Class VI permitting procedures.”1
In 2022, EPA responded with," EPA provided a report to Congress on Class VI permitting. a report to Congress on Class VI permitting.21 For FY2026, Congress provided targeted appropriations for Class VI well activities in the Commerce, Justice, Science; Energy and Water Development; and Interior and Environment Appropriations Act, 2026 (P.L. 119-74). Some Members have Some Members have
continued to express interest in Class VI well permitting and primacy issues, including the continued to express interest in Class VI well permitting and primacy issues, including the current
status of applications, EPA review processes, public participation in applications, and options for status of applications, EPA review processes, public participation in applications, and options for
increasing the numbers of approved well permits and state increasing the numbers of approved well permits and state delegationprogram primacy applications. applications.
This report discusses the statutory and regulatory framework for permitting Class VI wells; This report discusses the statutory and regulatory framework for permitting Class VI wells;
describes Class VI permit application requirements and the permit review process; describes state describes Class VI permit application requirements and the permit review process; describes state
primacy requirements and the primacy review process; and highlights selected policy issues for primacy requirements and the primacy review process; and highlights selected policy issues for
Congress.Congress.
Other environmental regulations and permit requirements may apply to projects injecting Other environmental regulations and permit requirements may apply to projects injecting CO2,
CO2, depending on the scope and purpose of the project, such as requirements under the Clean Air Act depending on the scope and purpose of the project, such as requirements under the Clean Air Act
and Clean Water Act administered by EPA. EPA also regulates injection of and Clean Water Act administered by EPA. EPA also regulates injection of CO2 for crude CO2 for oil oil
production (in a process known as enhanced oil recovery) through Class II production (in a process known as enhanced oil recovery) through Class II UIC injection wells.3
Underground Injection Control (UIC) wells.2 These regulations and permits are beyond the scope of this report. For more information on These regulations and permits are beyond the scope of this report. For more information on CO2
CO2 injection and sequestration, including the federal statutory and regulatory framework, and general injection and sequestration, including the federal statutory and regulatory framework, and general
policy issues, see CRS Report R46192, policy issues, see CRS Report R46192, Injection and Geologic Sequestration of Carbon Dioxide:
Federal Role and Issues for Congress
, by Angela C. Jones., by Angela C. Jones.
Class VI Injection Wells
As part of the CCS process, As part of the CCS process, CO2CO2 is first captured from a stationary source, such as a coal-fired is first captured from a stationary source, such as a coal-fired
power plant or chemical production facility. The power plant or chemical production facility. The CO2CO2 is then injected into subsurface geologic is then injected into subsurface geologic
formations for formations for geologic sequestration, the long-term containment of a fluid (including a gas, , the long-term containment of a fluid (including a gas,
liquid, or supercritical liquid, or supercritical CO2CO2 stream) in subsurface geologic formations.3 The CO2 is injected through Class VI wells, typically injecting fluid a half stream) in subsurface geologic formations.4

1 P.L. 116-260, Division G, Title II, Environmental Protection Agency.
2 U.S. Environmental Protection Agency (EPA), EPA Report to Congress: Class VI Permitting, October 2022,
https://www.epa.gov/system/files/documents/2022-11/
EPA%20Class%20VI%20Permitting%20Report%20to%20Congress.pdf (hereinafter, EPA Report to Congress).
3 Through multiple injection cycles into the underground formation, injection of CO2 for enhanced oil recovery (EOR)
results in incidental underground storage of some of the injected CO2.
4 CO2 for injection is initially captured as a gas and then is compressed into a supercritical fluid, a relatively dense fluid
(continued...)
Congressional Research Service

1

link to page 11 Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

The CO2 is injected through Class VI wells, typically injecting fluid a half a mile or more below mile or more below
the earththe earth’'s surface. Geologic formations used for injecting s surface. Geologic formations used for injecting CO2CO2 include, for example, large deep include, for example, large deep
saline reservoirs (underground basins containing salty fluids) and oil and gas reservoirs no longer saline reservoirs (underground basins containing salty fluids) and oil and gas reservoirs no longer
in production.in production.
The Safe Drinking Water Act (SDWA), administered by EPA, provides authorities for regulating The Safe Drinking Water Act (SDWA), administered by EPA, provides authorities for regulating
the underground injection of fluids.the underground injection of fluids.54 SDWA prohibits any underground injection activity, except SDWA prohibits any underground injection activity, except
when authorized by a permit or rule, to prevent endangerment of underground sources of drinking when authorized by a permit or rule, to prevent endangerment of underground sources of drinking
water (USDWs).water (USDWs).65 As part of EPA As part of EPA’s Underground Injection Control (UIC)'s UIC program, the agency has program, the agency has
promulgated regulations and established minimum federal requirements for injection wells, promulgated regulations and established minimum federal requirements for injection wells,
including for Class VI wells for the purpose of long-term geologic sequestration.including for Class VI wells for the purpose of long-term geologic sequestration.7
6 SDWA also authorizes EPA to delegate primary enforcement authoritySDWA also authorizes EPA to delegate primary enforcement authority, called primacy, of—the aforementioned primacy—for UIC UIC
programs to states (seeprograms to states (see “ "State UIC Class VI Program Primacy” below" below). As directed by SDWA, ). As directed by SDWA,
EPA has established minimum requirements for state UIC programs and permitting for injection EPA has established minimum requirements for state UIC programs and permitting for injection
wells.wells.87 EPA has delegated primacy for EPA has delegated primacy for the state UIC Class VI programs state UIC Class VI programs in North Dakota,
Wyoming, and Louisiana.
to six states to date. Class VI Well Permits
Federal requirements for injection well permits, including Class VI well permits, are codified in Federal requirements for injection well permits, including Class VI well permits, are codified in
UIC regulations at 40 C.F.R. §§144-146. UIC regulations at 40 C.F.R. §§144-146. Class VI permits are issued by EPA, or in certain cases, states that have been granted authority for the Class VI well program (discussed in detail later in this report). Minimum requirements are specified for well siting and Minimum requirements are specified for well siting and
construction, operation and maintenance, monitoring and testing, reporting and recordkeeping, construction, operation and maintenance, monitoring and testing, reporting and recordkeeping,
site closure, financial responsibility, and post-injection site care. The well owner or operator must site closure, financial responsibility, and post-injection site care. The well owner or operator must
seek a permit for each individual Class VI well.seek a permit for each individual Class VI well.98
Each UIC Class VI permit is specific to the characteristics of the individual injection site and Each UIC Class VI permit is specific to the characteristics of the individual injection site and
operation. Site-specific permitting is necessary to address the risks of operation. Site-specific permitting is necessary to address the risks of CO2CO2 injection at high injection at high
pressures, such as leaks into the atmosphere, underground leaks, or movement of formation water pressures, such as leaks into the atmosphere, underground leaks, or movement of formation water
into USDWs that could affect drinking water quality.into USDWs that could affect drinking water quality.
Class VI permit requirements and standards are generally more stringent than requirements for Class VI permit requirements and standards are generally more stringent than requirements for
other well classes. EPA based the regulation and permitting requirements of Class VI wells on other well classes. EPA based the regulation and permitting requirements of Class VI wells on
several risk factors specific to this type of injection activity. These risk factors include the large several risk factors specific to this type of injection activity. These risk factors include the large
volumes of volumes of CO2CO2 expected to be injected through wells, the mobility of CO2 within subsurface formations, and the corrosive properties of CO2 expected to be injected through wells, the mobility of CO2 within subsurface

with both gas-like and liquid-like properties. An emerging technology that captures CO2 directly from the
atmosphere—called direct air capture—could also provide a source of CO2 for geologic sequestration. For more
information on carbon capture and direct air capture, see CRS In Focus IF11501, Carbon Capture Versus Direct Air
Capture
, by Ashley J. Lawson.
5 SDWA Part C, “Protection of Underground Sources of Drinking Water” (42 U.S.C. §§300h-300h-9).
6 SDWA §1421; 42 U.S.C. §300h. EPA defines underground source of drinking water as an “aquifer or its portion
which supplies any public water system or which contains a sufficient quantity of ground water to supply a public
water system; and currently supplies drinking water for human consumption; or contains fewer than 10,000 mg/l total
dissolved solids; and which is not an exempted aquifer” (40 C.F.R. §146.3).
7 EPA has established six “classes” of underground injection wells, based on the types of fluids injected; 40 C.F.R.
§§144-146; EPA, “Federal Requirements Under the Underground Injection Control (UIC) Program for Carbon Dioxide
(CO2) Geologic Sequestration Wells; Final Rule,” 75 Federal Register 77230-77303, December 10, 2010, p. 77245.
(Hereinafter, “EPA, Federal Requirements”).
8 40 C.F.R. §§144-146.
9 SDWA regulations for some other UIC well classes allow wells to be permitted in groups, known as “area permits.”
Congressional Research Service

2

Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

formations, and the corrosive properties of CO2 in the presence of water that can affect well in the presence of water that can affect well
materials.materials.10
9 To assist states and owners/operators with the permitting process, EPA has issued 11 technical To assist states and owners/operators with the permitting process, EPA has issued 11 technical
guidance documents on Class VI wells.guidance documents on Class VI wells.1110 These documents are not legally enforceable, but they These documents are not legally enforceable, but they
provide additional information on site characterization, area of review, construction, reporting and provide additional information on site characterization, area of review, construction, reporting and
recordkeeping, site closure, financial responsibility, and other permit elements.recordkeeping, site closure, financial responsibility, and other permit elements.
Class VI Permit Phases
During the Class VI well permit application process, the owner or operator works with the During the Class VI well permit application process, the owner or operator works with the
permitting authority, either EPA or a statepermitting authority, either EPA or a state, that has primacy for the Class VI UIC program. EPA that has primacy for the Class VI UIC program. EPA
identifies four phases of permitting for a Class VI project:identifies four phases of permitting for a Class VI project:12
1. 11 1. Pre-construction. The permitting authority reviews geologic, underground The permitting authority reviews geologic, underground
formation, hydrogeologic, engineering, and financial information about a formation, hydrogeologic, engineering, and financial information about a
proposed Class VI project to confirm site suitability. The permitting authority proposed Class VI project to confirm site suitability. The permitting authority
then develops a draft permit.then develops a draft permit.
2. 2. Pre-operation.. Following well testing and submission of additional site Following well testing and submission of additional site
information, the permitting authority confirms the adequacy of well construction information, the permitting authority confirms the adequacy of well construction
and makes a determination regarding authorization to inject and makes a determination regarding authorization to inject CO2.
3. CO2. 3. Injection. After granting an authorization to inject, the permitting authority After granting an authorization to inject, the permitting authority
confirms that the well and the project are operating in compliance with the permit confirms that the well and the project are operating in compliance with the permit
and that USDWs are not endangered.and that USDWs are not endangered.
4. Post-injection 4. Post-injection. After injection is complete, the well is plugged, and the site After injection is complete, the well is plugged, and the site is
closed, the permitting authority verifies that the project continues to be protective closed, the permitting authority verifies that the project continues to be protective
of USDWs and that the injection and monitoring wells at the site will not of USDWs and that the injection and monitoring wells at the site will not
endanger USDWs after site closure.endanger USDWs after site closure.
Class VI permits extend for the operating life of the facility and a 50-year post-injection site care Class VI permits extend for the operating life of the facility and a 50-year post-injection site care
period.period.1312 The duration of a Class VI well injection project varies depending on the amount of The duration of a Class VI well injection project varies depending on the amount of CO2CO2
captured for storage and the capacity of the underground formation, but current projects estimate captured for storage and the capacity of the underground formation, but current projects estimate
a 10- to 15-year timeframe for injection. Permitting authorities are required to review Class VI a 10- to 15-year timeframe for injection. Permitting authorities are required to review Class VI
permits at least once every five years.permits at least once every five years.14
13 Elements of a Class VI Permit
For EPA-issued Class VI permits, 40 C.F.R. Parts 144 and 146 set out specific requirements for For EPA-issued Class VI permits, 40 C.F.R. Parts 144 and 146 set out specific requirements for
the permit application and approval process. While the minimum contents of a permit are the permit application and approval process. While the minimum contents of a permit are
established in federal regulation, the site-specific permit conditions, technical standards, and other established in federal regulation, the site-specific permit conditions, technical standards, and other
requirements in each permit are based on the permitting authorityrequirements in each permit are based on the permitting authority’'s evaluation of the potential s evaluation of the potential
risks to USDWs and the necessary conditions and standards required for the project to prevent risks to USDWs and the necessary conditions and standards required for the project to prevent
and manage potential endangerment of USDWs. Permits are updated based on site or project and manage potential endangerment of USDWs. Permits are updated based on site or project

10 EPA, “Federal Requirements,” p. 77234.
11 “Class VI Guidance Documents,” EPA, https://www.epa.gov/uic/class-vi-guidance-documents.
12 EPA Report to Congress. For more details on permitting requirements and guidelines, see “Class VI Guidance
Documents.”
13 40 C.F.R. §144.36.
14 Ibid.
Congressional Research Service

3

link to page 11 Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

circumstances. States must have equivalent requirements if administering their own UIC Class VI circumstances. States must have equivalent requirements if administering their own UIC Class VI
programs and issuing Class VI permits (programs and issuing Class VI permits (see “see "State UIC Class VI Program Primacy”).
"). General Project Information and Permit Conditions
Class VI permit applicants are required to include general project information and Class VI permit applicants are required to include general project information and set outto meet the the
permit conditions applicable to all UIC permits, as well as Class VI-specific permit criteria and permit conditions applicable to all UIC permits, as well as Class VI-specific permit criteria and
standards.standards.1514 Injection project information includes Injection project information includes
• basic facility and siting information;basic facility and siting information;
• detailed information on the detailed information on the CO2 stream;
• CO2 stream; geochemical data on subsurface formations, including relevant USDWs;geochemical data on subsurface formations, including relevant USDWs;
• detailed information on the geologic structure and hydrogeologic properties of detailed information on the geologic structure and hydrogeologic properties of
the storage site and overlaying formation; andthe storage site and overlaying formation; and
• the history of seismic activity at the site.the history of seismic activity at the site.16
15Class VI Class VI permitspermit applications are also required to applications are also required to
• identify the area of review for the project that accounts for the physical and identify the area of review for the project that accounts for the physical and
chemical properties of chemical properties of CO2;
• CO2; demonstrate that the injection site is in a suitable geologic formation for geologic demonstrate that the injection site is in a suitable geologic formation for geologic
sequestration;sequestration;
• document that the materials used for well construction are adequate to prevent document that the materials used for well construction are adequate to prevent
movement of fluids into or between USDWs and are suitable for long-term movement of fluids into or between USDWs and are suitable for long-term
contact with contact with CO2CO2 for the life of the project; for the life of the project;1716 and and
• include the ownerinclude the owner’'s or operators or operator’'s financial assurances in the form of financial s financial assurances in the form of financial
responsibility instruments to cover corrective action, injection, well plugging, responsibility instruments to cover corrective action, injection, well plugging,
post-injection site care, and any emergency and remedial response that meets the post-injection site care, and any emergency and remedial response that meets the
regulatory requirements of those actions.regulatory requirements of those actions.18
17For more information on Class VI well standards and permitting requirements, see CRS Report For more information on Class VI well standards and permitting requirements, see CRS Report
R46192, R46192, Injection and Geologic Sequestration of Carbon Dioxide: Federal Role and Issues for
Congress
, Appendix C, Appendix C..
Required Plans
Class VI regulations require that permit application packages include several plans that provide Class VI regulations require that permit application packages include several plans that provide
detailed information on how the owner or operator will conduct injection well activities from detailed information on how the owner or operator will conduct injection well activities from
construction through closure.construction through closure.1918 These plans are finalized and approved by the permitting authority These plans are finalized and approved by the permitting authority
as part of the permitting process. The following plans are required in a permit application:as part of the permitting process. The following plans are required in a permit application:
• Testing and Monitoring PlanTesting and Monitoring Plan
• Injection Well Plugging PlanInjection Well Plugging Plan
• Site Closure Plan and Post-Injection Site Care PlanSite Closure Plan and Post-Injection Site Care Plan

15 40 C.F.R. §144.51; 40 C.F.R. §§144.82-146.95.
16 40 C.F.R. §144.82.
17 40 C.F.R. §144.83; §144.84; §144.86.
18 40 C.F.R. §144.85.
19 40 C.F.R. §144.82.
Congressional Research Service

4

Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

• Corrective Action Plan
•
  • Corrective Action Plan
  • Emergency and Remedial Response PlanEmergency and Remedial Response Plan
    • Quality Assurance Surveillance PlanQuality Assurance Surveillance Plan
    Optional Injection Depth Waiver
    By regulation, Class VI wells are defined as wells that are used for the geologic sequestration of By regulation, Class VI wells are defined as wells that are used for the geologic sequestration of
    CO2 CO2 "beneath the lowermost formation containing a USDW" (emphasis added). (emphasis added).2019 In some cases, the In some cases, the
    USDWs may be deep in the formation. In these cases, during the permitting process, well owners USDWs may be deep in the formation. In these cases, during the permitting process, well owners
    or operators may seek a waiver to allow injection into non-USDWs above or between USDWs. or operators may seek a waiver to allow injection into non-USDWs above or between USDWs.
    Class VI regulations include specific requirements for approval of a depth waiver, such as the Class VI regulations include specific requirements for approval of a depth waiver, such as the
    information to be provided to the state or EPA, consultations with state Public Water System information to be provided to the state or EPA, consultations with state Public Water System
    Directors and tribes, public notice, and approval or concurrence by the EPA Regional Directors and tribes, public notice, and approval or concurrence by the EPA Regional
    Administrator.Administrator.21
    20 Class VI Permitting Process
    Class VI permit regulations require that an owner or operator submitting a permit application Class VI permit regulations require that an owner or operator submitting a permit application
    package meet specific requirements and follow certain processes. Once an applicant submits a package meet specific requirements and follow certain processes. Once an applicant submits a
    permit application to EPA, that application is reviewed by staff in the EPA regional office permit application to EPA, that application is reviewed by staff in the EPA regional office
    covering that state. While EPA has stated that its objective is to complete the permit review covering that state. While EPA has stated that its objective is to complete the permit review
    process within two years, review times may vary due to differences in the initial completeness of process within two years, review times may vary due to differences in the initial completeness of
    the application, timing of revisions by the applicant, the public comment process, agency review the application, timing of revisions by the applicant, the public comment process, agency review
    capacity, and other factors.capacity, and other factors.22
    EPA’21 EPA's Class VI permit application review process includes five steps, listed below.s Class VI permit application review process includes five steps, listed below.23
    1. 221. Completeness Review—determination by EPA that the permit application —determination by EPA that the permit application
    package meets requirements for completeness and necessary information.package meets requirements for completeness and necessary information.
    2. 2. Technical Review—detailed review of the application by EPA to ensure the —detailed review of the application by EPA to ensure the
    project will not endanger USDWs.project will not endanger USDWs.
    3. 3. Draft Permit—preparation of the draft permit by EPA specifying conditions of —preparation of the draft permit by EPA specifying conditions of
    well construction and operation.well construction and operation.
    4. 4. Public Comment—opportunity for the public to review and comment on the —opportunity for the public to review and comment on the
    draft permit through written comments to EPA or requests for a hearing draft permit through written comments to EPA or requests for a hearing
    conducted by EPA.conducted by EPA.
    5. 5. Final Permit—preparation of final permit and authorization to construct or —preparation of final permit and authorization to construct or
    convert the injection well, construct monitoring wells, and perform required convert the injection well, construct monitoring wells, and perform required
    testing.testing.
    Once construction and testing are completed and approved, the final phase includes an Once construction and testing are completed and approved, the final phase includes an
    authorization from EPA to inject. At this point, the operator is permitted to begin injecting authorization from EPA to inject. At this point, the operator is permitted to begin injecting CO2.

    20 40 C.F.R. §144.6(f).
    21 40 C.F.R. §144.95. State programs with delegated authority may choose whether to offer injection waivers to owners
    or operators as part of a UIC Class VI program. 40 C.F.R. §146.95(d) requires that the relevant EPA regional
    administrator concur on approval of an injection depth waiver for a project.
    22 EPA Report to Congress.
    23 EPA Report to Congress. For more details on permitting requirements and guidelines, see herein “Class VI Guidance
    Documents.”
    Congressional Research Service

    5

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    CO2. The technical review is the longest and most complex step in the permitting processThe technical review is the longest and most complex step in the permitting process, with an
    estimated time frame of 18 months.24. During this step, EPA reviews the detailed siting, During this step, EPA reviews the detailed siting,
    construction, operation, injection, and closure information submitted, as well as each of the draft construction, operation, injection, and closure information submitted, as well as each of the draft
    plans required in the application package.plans required in the application package.
    During the review and drafting steps, EPA typically works with the applicant to seek clarification During the review and drafting steps, EPA typically works with the applicant to seek clarification
    on permit elements and identify additional information required. The permitting authority may on permit elements and identify additional information required. The permitting authority may
    issue a formal Request for Additional Information (RAI). Applicants are expected to respond to issue a formal Request for Additional Information (RAI). Applicants are expected to respond to
    an RAI within 30 days or provide an alternative timeline for a response.an RAI within 30 days or provide an alternative timeline for a response.
    Permit Compliance and Enforcement
    Once the permit is in place, the permitting authority is responsible for ensuring that the owner or Once the permit is in place, the permitting authority is responsible for ensuring that the owner or
    operator continues to meet the permit conditions and requirements.operator continues to meet the permit conditions and requirements.25 The permitting authority The permitting authority
    reviews testing, monitoring, and verification data reported by the owner and operator to evaluate reviews testing, monitoring, and verification data reported by the owner and operator to evaluate
    compliance and enforce permit conditions in place to prevent endangerment of USDWs.compliance and enforce permit conditions in place to prevent endangerment of USDWs.
    Potential violations include, among others, a loss of well mechanical integrity; failure to follow
    monitoring, testing, or reporting requirements; or movement of CO2 or formation fluids out of the
    designated injection zone. The permitting authority may also conduct on-site inspections to
    observe well testing and operation, review records, or evaluate procedures being taken to bring
    the facility into compliance, among other purposes.
    Public Participation
    The permitting authority may also conduct on-site inspections to observe well testing and operation, review records, or evaluate procedures being taken to bring the facility into compliance, among other purposes. Potential permit violations that may lead to compliance or enforcement actions from the permitting authority include, among others, a loss of a well's mechanical integrity; failure to follow monitoring, testing, or reporting requirements; or movement of CO2 or formation fluids out of the designated injection zone. Public Participation Class VI permit application review processes are subject to the general public participation Class VI permit application review processes are subject to the general public participation
    requirements under SDWA.requirements under SDWA.2623 These regulations apply to EPA issuance of UIC permits. They These regulations apply to EPA issuance of UIC permits. They
    outline minimum requirements for public information, public notice, and public consultation. outline minimum requirements for public information, public notice, and public consultation.
    Public participation activities may include providing notice in the media, holding hearings, Public participation activities may include providing notice in the media, holding hearings,
    responding to public comments, and involving stakeholders.responding to public comments, and involving stakeholders.
    While the above general public participation requirements exist, EPA has not issued specific While the above general public participation requirements exist, EPA has not issued specific
    regulatory requirements for public participation for the Class VI permit application process. EPA regulatory requirements for public participation for the Class VI permit application process. EPA
    guidance on public participation in Class VI permitting, issued in guidance on public participation in Class VI permitting, issued in 20112010, anticipated , anticipated “"high levelshigh levels”
    " of public interest in geologic sequestration.of public interest in geologic sequestration.2724 The guidance encouraged UIC programs and owners The guidance encouraged UIC programs and owners
    and operators to provide information on Class VI permits early in the process and to involve a and operators to provide information on Class VI permits early in the process and to involve a
    broad range of stakeholders.broad range of stakeholders.28
    25 In its 2022 report to Congress on Class VI well permitting, EPA identified several stakeholder In its 2022 report to Congress on Class VI well permitting, EPA identified several stakeholder
    concerns regarding environmental justice concerns regarding environmental justice (EJ) in the permitting process, including concerns about in the permitting process, including concerns about
    project siting and public involvement. EPA stated that the agency project siting and public involvement. EPA stated that the agency intendsintended to expand the amount of information available to the public about Class VI well permit applications and "explore to expand the amount of

    24 “Class VI—Wells Used for Geologic Sequestration of Carbon Dioxide,” EPA, https://www.epa.gov/uic/class-vi-
    wells-used-geologic-sequestration-carbon-dioxide.
    25 The permitting authority is either EPA or a state granted UIC Class VI program authority by EPA.
    26 40 C.F.R. Part 25. 40 C.F.R. §§124.10-124.11 requires the permitting authority to provide public notice of the permit
    application, hold a public hearing if it is determined to be of significant public interest, and consider public comments
    in making permit decisions.
    27 EPA, Geologic Sequestration of Carbon Dioxide – UIC Quick Reference Guide: Additional Considerations for UIC
    Program Directors on the Public Participation Requirements for Class VI Injection Wells
    , EPA 816-R-11-001, June
    2011, https://www.epa.gov/sites/default/files/2015-07/documents/uic-quick-reference-guide_public-participation_final-
    508.pdf.
    28 EPA, Geologic Sequestration of Carbon Dioxide – Quick Reference Guide.
    Congressional Research Service

    6

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    information available to the public about Class VI well permit applications and “explore
    additional ways in which EPA Class VI permitting can consider the specific needs of any EJ additional ways in which EPA Class VI permitting can consider the specific needs of any EJ
    communities located near a proposed Class VI project.communities located near a proposed Class VI project.”29
    "26 In August 2023, EPA issued a memorandum and accompanying guidance that outlined In August 2023, EPA issued a memorandum and accompanying guidance that outlined
    expectations for how agency staff should consider expectations for how agency staff should consider EJenvironmental justice in permitting and review of state applications for UIC Class VI program authority. EPA rescinded the guidance in August 2026, as part of a larger review of Office of Water guidance documents.27 Class VI Well Permits Issued

    As of September 2026, EPA had issued at least 23 Class VI individual well permits for injection of CO2, including permits for wells that were never constructed and permits initially issued by EPA and subsequently transferred to state authority.28 Currently, at least 13 EPA-permitted Class VI wells are in operation at 8 projects in California, Colorado, Illinois, Indiana, and Kansas.29

    In addition to EPA-permitted wells, some states with Class VI permitting authority have issued their own permits. For example, North Dakota has issued at least eight Class VI permits for three facilities for injection of CO2. Wyoming has issued at least three Class VI permits, including
    in permitting and primacy evaluations.30
    The guidance notes that, while Class VI wells are regulated under an “existing, rigorous”
    permitting framework, stakeholders have raised concerns about the potential impacts of Class VI
    well projects on “overburdened communities.”31 Specifically, the guidance includes information
    for EPA and state UIC programs on identifying communities with potential EJ concerns,
    enhancing public involvement during the permitting applications processes, conducting EJ
    assessments of potential well projects, and enhancing transparency in the permitting process.32
    Class VI Well Permits Issued
    As of March 2024, EPA has issued a total of eight Class VI permits for injection of CO . Four
    2
    EPA-permitted Class VI wells are currently in operation.
    • In 2015, EPA issued four Class VI permits associated with the FutureGen project
    in Illinois, but the project was cancelled before well construction.
    • In 2017, EPA issued final permits for two wells injecting CO into a saline aquifer
    2
    at the Archer Daniels Midland (ADM) ethanol plant in Decatur, Illinois.33
    • In 2024, EPA issued permits for two wells at Wabash Carbon Services in Indiana,
    which plan to store captured CO2 from offsite fertilizer production.34
    Two of the three states with Class VI permitting authority have issued permits:
    • North Dakota has issued eight Class VI permits for three facilities for injection of
    CO .35
    2
    • The Red Trail Energy (RTE) storage facility was permitted in 2022. RTE
    injects CO2 captured from ethanol production facilities.
    • The Dakota Gasification Company (DSG) storage facility was permitted
    in 2023. DSG injects CO2 captured from a natural gas production facility.
    • The Blue Flint storage facility was permitted in 2023. Blue Flint injects
    CO2 captured from ethanol production facilities.

    29 EPA Report to Congress.
    30 EPA, Environmental Justice Guidance for UIC Class VI Permitting and Primacy, August 17, 2023,
    https://www.epa.gov/system/files/documents/2023-08/
    Memo%20and%20EJ%20Guidance%20for%20UIC%20Class%20VI_August%202023.pdf (hereinafter, EPA,
    Environmental Justice Guidance).
    31 Ibid.
    32 Ibid.
    33 EPA, “Table of EPA’s Draft and Final Class VI Well Permits,” https://www.epa.gov/uic/table-epas-draft-and-final-
    class-vi-well-permits, accessed April 1, 2024.
    34 EPA, “EPA Approves Permits to Begin Construction of Wabash Carbon Services Underground Injection Wells in
    Indiana’s Vermillion and Vigo Counties,” news release, January 24, 2024, https://www.epa.gov/newsreleases/epa-
    approves-permits-begin-construction-wabash-carbon-services-underground-injection.
    35 North Dakota Department of Mineral Resources, “Class VI – Geologic Sequestration Wells,”
    https://www.dmr.nd.gov/dmr/oilgas/ClassVI, accessed December 7, 2023.
    Congressional Research Service

    7

    link to page 11
    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    • In 2023, Wyoming issued three Class VI permits to the Frontier Carbon Solutions
    the Frontier Carbon Solutions project for a storage hub that would store project for a storage hub that would store CO2CO2 from various capture projects. from various capture projects.36
    • Louisiana has not yet issued Class VI permits.
    30 Louisiana has issued at least one Class VI permit.31 According to EPA, as of According to EPA, as of April 2024, 130September 2026, Class VI permit applications Class VI permit applications arewere pending for 44 projects (including 142 individual wells).32 pending for 44 projects
    in 12 states and 1 tribal reservation.37 All of these permits being reviewed by EPA are in the pre-
    construction phase as of April 1, 2024. See Figure 1 for details on for details on EPA permit applications and Class permit applications and Class
    VI well locations.VI well locations.

    Figure 1. EPA Class VI Well Permits Issued and Under Review by EPA

    Source: CRS graphic based on U.S. Environmental Protection AgencyCRS graphic based on U.S. Environmental Protection Agency, “Current Class VI Projects Under Review
    at EPA,” accessed on April 1, 2024, https://www.epa.gov/uic/current-class-vi-projects-under-review-epa.
    Note: Figure includes permits under review by EPA as of April 1, 2024 (EPA), "Underground Injection Control (UIC) Class VI Permit Tracker," accessed September 14, 2026, https://awsedap.epa.gov/public/single/?appid=8c074297-7f9e-4217-82f0-fb05f54f28e7&sheet=51312158-636f-48d5-8fe6-a21703ca33a9&theme=theme-colorbrewer&bookmark=6218ffed-bb6e-42e4-a4f1-52d87e036a1b&opt=ctxmenu. Note: Figure includes permits issued and under review by EPA as of September 14, 2026. Figure does not include permits that . Figure does not include permits that
    may be under review by states with UIC Class VI program primacy, as these are managed by individual states may be under review by states with UIC Class VI program primacy, as these are managed by individual states
    rather than EPA.rather than EPA.
    State UIC Class VI Program Primacy38
    Primacy33 SDWA authorizes EPA to delegate primary enforcement authority for UIC programs, known SDWA authorizes EPA to delegate primary enforcement authority for UIC programs, known
    as as primacy, to individual states., to individual states.3934 EPA grants a state primacy EPA grants a state primacy through a federal rulemaking through a federal rulemaking
    process for one or more classes of wells. To be delegated Class VI program primacy, states must process for one or more classes of wells. To be delegated Class VI program primacy, states must
    adopt laws and regulations at least as stringent as EPA regulations and must meet other statutory adopt laws and regulations at least as stringent as EPA regulations and must meet other statutory

    36 Wyoming Department of Environmental Quality, “Class VI,” https://deq.wyoming.gov/water-quality/groundwater/
    uic/class-vi/, accessed January 11, 2024.
    37 EPA, “Current Class VI Projects Under Review at EPA,” https://www.epa.gov/uic/current-class-vi-projects-under-
    review-epa, accessed April 1, 2024.
    38 This report focuses on requirements for new UIC Class VI programs. Applications for revisions of existing UIC
    programs may require the state to submit less information, as outlined in “Class VI Guidance Documents.”
    39 SDWA §1421; 42 U.S.C. §300h.
    Congressional Research Service

    8

    link to page 13 Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    and regulatory requirements. UIC regulations allow states to apply for primacy either for the and regulatory requirements. UIC regulations allow states to apply for primacy either for the
    Class VI program onlyClass VI program only, or for multiple UIC well programs at once. or for multiple UIC well programs at once.
    If granted primacy for a UIC program, such as a Class VI well program, a state administers the If granted primacy for a UIC program, such as a Class VI well program, a state administers the
    program through enforcement of state laws and regulations in lieu of EPA regulations. The state program through enforcement of state laws and regulations in lieu of EPA regulations. The state
    administers the UIC program and is responsible for day-to-day program responsibilities, administers the UIC program and is responsible for day-to-day program responsibilities,
    including issuing permits and enforcing permit requirements and standards. Under SDWA, EPA including issuing permits and enforcing permit requirements and standards. Under SDWA, EPA
    retains oversight of states with primacy to ensure that the state programs comply with federal retains oversight of states with primacy to ensure that the state programs comply with federal
    regulatory requirements.regulatory requirements.
    Current States with UIC Class VI Program Primacy
    EPA has delegated primacy for Class VI wells to EPA has delegated primacy for Class VI wells to threesix states: North Dakota ( states: North Dakota (in 2018), Wyoming 2018), Wyoming
    (2020), (2020), and Louisiana (2023).40 Additional states are applying for Class VI primacy. As of April
    1, 2024, West Virginia and Arizona are in a pre-application phase for all six well classes,
    including Class VI, and Texas is in a pre-application phase for the Class VI program.41Louisiana (2023), West Virginia (2025), Arizona (2025), and Texas (2025).35 In 2025, Louisiana paused all new permit approvals as the state considered various environmental and legal issues, as well as a lack of resources to process the more than 30 applications that were pending in the state.36 In addition, Alaska, Colorado, and Utah are in the process of applying for primacy or revising their underground injection program applications to include Class VI authority.37 See See
    Figure 2 for a map of states that have been granted UIC Class VI program primacy or are in the for a map of states that have been granted UIC Class VI program primacy or are in the
    application process. As Class VI wells require specific types of geologic conditions and application process. As Class VI wells require specific types of geologic conditions and
    underground formations to receive and store injected underground formations to receive and store injected CO2CO2, some states may not have , some states may not have appropriate
    suitable sites for Class VI wells. These states would not apply for Class VI program primacy.sites for Class VI wells. These states would not apply for Class VI program primacy.

    40 North Dakota, Wyoming, and Louisiana have primacy for all six UIC well classes. EPA implements Class VI
    programs in all other states and territories.
    41 EPA, “Primary Enforcement Authority for the Underground Injection Control Program,” https://www.epa.gov/uic/
    primary-enforcement-authority-underground-injection-control-program-0, accessed January 20, 2024.
    Congressional Research Service

    9


    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    Figure 2. States with UIC Class VI Program Primacy

    Figure 2. States with Underground Injection Control (UIC) Class VI Program Primacy and Applications in Process
    Source: CRS graphic based on U.S. Environmental Protection AgencyCRS graphic based on U.S. Environmental Protection Agency (EPA), ", “Primary Enforcement Authority for the Primary Enforcement Authority for the
    Underground Injection Control Program,Underground Injection Control Program,” " accessed August 6, 2026, https://www.epa.gov/uic/primary-enforcement-authority-https://www.epa.gov/uic/primary-enforcement-authority-
    underground-injection-control-programunderground-injection-control-program-0.
    ; and EPA press releases. UIC Class VI Program Primacy Requirements
    As directed in Section 1421 of SDWA, EPA has established minimum requirements for state UIC As directed in Section 1421 of SDWA, EPA has established minimum requirements for state UIC
    programs. If a state seeks primacy for its UIC program, Section 1422 of SDWA requires the state programs. If a state seeks primacy for its UIC program, Section 1422 of SDWA requires the state
    to submit an application to submit an application “"showing satisfactorilyshowing satisfactorily”" to EPA that, after reasonable notice and public to EPA that, after reasonable notice and public
    hearings, the state will implement a program that meets the minimum requirements of Section hearings, the state will implement a program that meets the minimum requirements of Section
    1421.1421.
    EPA UIC regulations promulgated at 40 C.F.R. Part 145 set out the specific requirements for state EPA UIC regulations promulgated at 40 C.F.R. Part 145 set out the specific requirements for state
    programs for permitting, compliance evaluation, enforcement, and information sharing. The programs for permitting, compliance evaluation, enforcement, and information sharing. The
    regulations set out the process and requirements for state applications to EPA for primacy, as well regulations set out the process and requirements for state applications to EPA for primacy, as well
    as the procedures EPA follows in evaluating primacy applications.as the procedures EPA follows in evaluating primacy applications.
    Class VI regulations require the state to demonstrate that it has the authorities and processes in Class VI regulations require the state to demonstrate that it has the authorities and processes in
    place to administer the Class VI program, includingplace to administer the Class VI program, including
    • legal authority to implement all permit requirements;legal authority to implement all permit requirements;
    • necessary procedures for the statenecessary procedures for the state’'s compliance evaluation program;s compliance evaluation program;
    • necessary administrative, civil, and criminal enforcement penalty remedies;necessary administrative, civil, and criminal enforcement penalty remedies;
    • state Class VI UIC regulations for permitting, inspection, operation, monitoring state Class VI UIC regulations for permitting, inspection, operation, monitoring
    and recordkeeping, and other requirements at least as stringent as federal Class and recordkeeping, and other requirements at least as stringent as federal Class
    VI regulations; andVI regulations; and
    Congressional Research Service

    10

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    • statewide jurisdiction over underground injection projects.statewide jurisdiction over underground injection projects.42
    38States seeking primacy are required to submit a detailed description of their UIC program that States seeking primacy are required to submit a detailed description of their UIC program that
    includes information onincludes information on
    • the structure and processes of the program;the structure and processes of the program;
    • staffing and expertise;staffing and expertise;
    • schedule and priorities for issuing Class VI permits;schedule and priorities for issuing Class VI permits;
    • expected number of permits to be issued; andexpected number of permits to be issued; and
    • the statethe state’'s compliance tracking and enforcement program.s compliance tracking and enforcement program.43
    39 A state seeking primacy must submit copies of its UIC statutes and regulations to EPA and must A state seeking primacy must submit copies of its UIC statutes and regulations to EPA and must
    demonstrate that these laws and regulations are at least as stringent as federal UIC requirements.demonstrate that these laws and regulations are at least as stringent as federal UIC requirements.
    Other documents required to be included in a primacy application package includeOther documents required to be included in a primacy application package include
    • a letter from the governor of the state requesting program approval;a letter from the governor of the state requesting program approval;
    • a state attorney general statement indicating that the state has adequate legal a state attorney general statement indicating that the state has adequate legal
    authority to carry out the UIC program;authority to carry out the UIC program;
    • a memorandum of agreement (MOA) between the state and the EPA Regional a memorandum of agreement (MOA) between the state and the EPA Regional
    Administrator that includes provisions on program administration, Administrator that includes provisions on program administration,
    implementation, and enforcement; andimplementation, and enforcement; and
    • documentation of the statedocumentation of the state’'s public participation activities prior to submission of s public participation activities prior to submission of
    the program application.the program application.44
    40 The MOA typically serves as the foundation of the stateThe MOA typically serves as the foundation of the state’'s specific responsibilities and s specific responsibilities and
    commitments in administering the UIC program. commitments in administering the UIC program.
    Primacy Application Process
    Once a state submits a Class VI primacy application, EPA assesses the completeness of the Once a state submits a Class VI primacy application, EPA assesses the completeness of the
    application and evaluates the contents of the application against federal regulatory requirements. application and evaluates the contents of the application against federal regulatory requirements.
    Specifically, EPA examines the stringency and equivalency of the stateSpecifically, EPA examines the stringency and equivalency of the state’'s regulations in protection s regulations in protection
    of USDWs. According to EPA, the agency maintains a goal of completing the review in 30 of USDWs. According to EPA, the agency maintains a goal of completing the review in 30
    days.days.45
    41 In reviewing applications, EPA seeks to ensure that the stateIn reviewing applications, EPA seeks to ensure that the state’'s UIC Class VI regulations are at s UIC Class VI regulations are at
    least as strict as federal regulations and that they contain the same necessary requirements for least as strict as federal regulations and that they contain the same necessary requirements for
    well permitting, construction, operation, recordkeeping, site closure, and other requirements well permitting, construction, operation, recordkeeping, site closure, and other requirements
    established in federal Class VI regulations. The typical UIC primacy application process involves established in federal Class VI regulations. The typical UIC primacy application process involves
    a series of communications and discussions among state agencies and the relevant EPA regional a series of communications and discussions among state agencies and the relevant EPA regional
    office during review and evaluation. During the review process, EPA may request additional office during review and evaluation. During the review process, EPA may request additional
    information or clarification from the state.

    42 40 C.F.R. §145.
    43 Ibid.
    44 Ibid.
    45 EPA, Geologic Sequestration of Carbon Dioxide: Underground Injection Control (UIC) Program Directors Class VI
    Primacy Manual for State Directors
    , April 2014, https://www.epa.gov/sites/default/files/2015-07/documents/
    epa816b14003.pdf. EPA standard operating procedures for Class VI primacy application review include a goal of a 30-
    day time frame for determining the completeness of the application, but this is not a statutory deadline.
    Congressional Research Service

    11

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    information or clarification from the state. Class VI regulations require that, once EPA determines that a new Class VI primacy application is Class VI regulations require that, once EPA determines that a new Class VI primacy application is
    complete, the agency must hold a public hearing announced through notice in the complete, the agency must hold a public hearing announced through notice in the Federal
    Register
    and provide information on the availability of the application to the public for review and provide information on the availability of the application to the public for review
    and comment.and comment.46
    42 Once the application is approved, EPA promulgates a rulemaking finalizing the decision to award Once the application is approved, EPA promulgates a rulemaking finalizing the decision to award
    primacy to the state for the UIC program. The regulations require that EPA must approve, primacy to the state for the UIC program. The regulations require that EPA must approve,
    disapprove, or approve in part the UIC program through a rule published in the disapprove, or approve in part the UIC program through a rule published in the Federal
    Register
    ..47 The three43 The six approved state Class VI primacy rules are available in the approved state Class VI primacy rules are available in the Federal Register
    and codified in 40 C.F.R. Part 147.and codified in 40 C.F.R. Part 147.48
    For the three state primacy applications that have been approved to date, the44 The timing from EPA timing from EPA
    receiving a complete primacy application package to approval has varied. For receiving a complete primacy application package to approval has varied. For example, with the first state to the first state to
    apply, North Dakota, the review process took four years. EPA approved Wyomingapply, North Dakota, the review process took four years. EPA approved Wyoming’'s primacy in s primacy in
    eight months.
    For Louisiana, the most recent state to be granted primacy, EPA finalized approval more than two
    years after a completed submission. In May 2023, EPA published a proposed rule indicating the
    agency’s intent to approve Louisiana’s Class VI program revision package and soliciting public
    comment. In August 2023, Louisiana amended its application to include a new state law related to
    long-term liability for injection well sites.49 EPA signed final approval for Louisiana’s Class VI
    primacy on December 28, 2023, effective on February 5, 2024.50
    eight months.45 Enforcement and EPA Oversight
    Once granted primacy, the state is responsible for the day-to-day administration of the program, Once granted primacy, the state is responsible for the day-to-day administration of the program,
    such as issuing permits, monitoring compliance with state regulations, and leading enforcement such as issuing permits, monitoring compliance with state regulations, and leading enforcement
    actions in the event of violations. Under SDWA, however, EPA retains oversight and enforcement actions in the event of violations. Under SDWA, however, EPA retains oversight and enforcement
    authority over all delegated UIC programs. The MOA between the state and EPA typically authority over all delegated UIC programs. The MOA between the state and EPA typically
    includes provisions specifying that EPA will conduct periodic performance evaluations of the includes provisions specifying that EPA will conduct periodic performance evaluations of the
    state program to ensure that minimum federal requirements are being met.state program to ensure that minimum federal requirements are being met.
    UIC Grants for States
    In recent years, Congress has appropriated funding for EPA to provide grants In recent years, Congress has appropriated funding for EPA to provide grants to states for implementation ofto states for
    implementation of new and existing UIC programs, including Class VI programs new and existing UIC programs, including Class VI programs. For example, for FY2026, Congress appropriated $12.3 million for UIC grants (including all well classes).46 Congress has provided specific funding for Class VI grants—in 2021, the. For FY2023,
    EPA’s enacted operating plan included $13.16 million for categorical grants for all classes of UIC
    wells, some of which is available for state Class VI well programs. In 2021, the Infrastructure Infrastructure
    Investment and Jobs Act (IIJAInvestment and Jobs Act (IIJA; ; P.L. 117-58) directed EPA to establish a P.L. 117-58) directed EPA to establish a specific UIC Class VI grant program for states. Division J of the act provided $50 million in supplemental appropriations to EPA for grants to states that have or are working toward Class VI primacy. States may use these funds for Class VI primacy applications, program revisions, or existing Class VI program implementation activities.47 Twenty-three states and two tribes submitted letters of intent to participate in the grant program. EPA allocated $1.93 million to each of these states and tribes, for a total of $48.25 million.48 Public Participation

    UIC regulations at 40 C.F.R. Section 145 establish requirements for public participation in the state primacy application process. During EPA's primacy application review, requirements include public notice of a state's intent to adopt a UIC program, a public comment period, and a public hearing, among other requirements.49 The regulations also require that a state with primacy provides for public participation in the state enforcement process.50

    EPA has addressed public participation and environmental justice during the rulemaking process for state UIC Class VI program approval, including for Louisiana and West Virginia. In the final 2024 rule granting Louisiana Class VI primacy, EPA stated that it worked with the state to incorporate the Class VI environmental justice guidance into Louisiana's permitting process and program description, including public participation and environmental justice considerations in environmental review.51 As noted earlier, however, EPA has since rescinded that guidance. Without this guidance, states with Class VI primacy may differ in considering public participation and environmental justice issues not specifically required in regulation when applying for primacy and implementation of Class VI programs. States may choose to go beyond federal minimum requirements. Issues for Congress In the 119th Congress
    specific UIC Class VI

    46 40 C.F.R. §145.31.
    47 Ibid.
    48 EPA, “State of North Dakota Underground Injection Control Program; Class VI Primacy Approval,” 83 Federal
    Register
    17758-17761, April 24, 2018, and 40 C.F.R. §147.1751 (North Dakota); EPA, “Wyoming Underground
    Injection Control Program; Class VI Primacy,” 85 Federal Register 64053-64056, October 2020, and 40 C.F.R.
    §147.2550 (Wyoming); EPA, “State of Louisiana Underground Injection Control Program; Class VI Primacy,” 89
    Federal Register 703-712, January 5, 2024 (Louisiana), rule signed on December 28, 2023.
    49 EPA, “State of Louisiana Underground Injection Control Program; Class VI Primacy,” 89 Federal Register 703-712,
    January 5, 2024 (Louisiana), rule signed on December 28, 2023.
    50 EPA, “Primary Enforcement Authority for Underground Injection Control Program,” https://www.epa.gov/uic/
    primary-enforcement-authority-underground-injection-control-program-0.
    Congressional Research Service

    12

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    grant program for states. Division J of the act provided $50 million in supplemental
    appropriations to EPA for grants to states that have or are working toward Class VI primacy.
    States may use these funds for Class VI primacy applications, program revisions, or existing
    Class VI program implementation activities.51 Twenty-three states and two tribes submitted letters
    of intent to participate in the grant program. EPA has allocated $1.93 million to each of these
    states and tribes, for a total of $48.25 million of the $50 million in grant funding available.52
    State Public Participation and Environmental Justice
    In December 2022, EPA sent a letter to all state governors regarding environmental justice
    considerations in Class VI well permitting and state primacy.53 The letter encouraged states to
    include approaches for considering the impact of Class VI well projects on vulnerable
    communities in their primacy applications and in implementation of their state programs once
    primacy is granted. EPA’s August 2023 publication Environmental Justice Guidance for UIC
    Class VI Well Permitting and Primacy
    provides further guidance for how states can support these
    objectives.
    Issues for Congress
    In recent Congresses, some Members have demonstrated interest in Class VI permitting and , some Members have demonstrated interest in Class VI permitting and
    primacy by introducing legislation specific to Class VI primacy by introducing legislation specific to Class VI wellsprograms, providing targeted appropriations to , providing targeted appropriations to
    EPA, and discussing Class VI well issues in hearings.EPA, and discussing Class VI well issues in hearings.5452 For example, For example, in the 117th Congress, the
    SECURE Act (H.R. 9230) would have amended IIJA appropriations to increase EPA
    appropriations for Class VI grants from $50 million to $100 million. In the 118th Congress, the
    Primacy Certainty Act of 2023 (H.R. 3568/S. 1718) would amend SDWA to require EPA to issue
    a determination on a state’s Class VI primacy application within 90 days.
    the Primacy Certainty Act of 2025 (H.R. 4880/S. 2505) would amend SDWA to require EPA to issue a determination on a state's Class VI primacy application within 180 days, among other provisions. More recently, in the Joint Explanatory Statement accompanying the Consolidated Commerce, Justice, Science; Energy and Water Development; and Interior and Environment Appropriations Act, 2026 (P.L. 119-74), Division C, Title II, Congress provided $5 million for FY2026 for EPA to "help develop expertise and capacity at the Agency … to expeditiously review and process Class VI permits and primacy applications from States and Tribes."53 As Congress continues debate on Class VI well permitting and state primacy, Members As Congress continues debate on Class VI well permitting and state primacy, Members may
    could consider several policy issues related to EPA appropriations, legislation, and oversight. While the consider several policy issues related to EPA appropriations, legislation, and oversight. While the
    issues outlined below focus on policies specifically related to Class VI wells, policy support for issues outlined below focus on policies specifically related to Class VI wells, policy support for
    CCS project deployment, such as research funding and federal tax credits, are part of broader CCS project deployment, such as research funding and federal tax credits, are part of broader
    climate change policy discussions in Congress. For more information on policy considerations for climate change policy discussions in Congress. For more information on policy considerations for
    Class VI wells and CCS as a climate change mitigation option, see CRS Report R44902, Class VI wells and CCS as a climate change mitigation option, see CRS Report R44902, Carbon
    Capture and Sequestration (CCS) in the United States
    ..
    EPA Funding and Resources
    As discussed As discussed earlier in this report, in this report, for the past several fiscal years, Congress has supported state UIC well programs through regular Congress has supported state UIC well programs through regular
    annual appropriations to EPA for grants to states to be used for UIC program implementation.

    51 EPA, Underground Injection Control (UIC) Class VI Wells Grant Program: Grant Implementation Document,
    November 2023, https://www.epa.gov/system/files/documents/2023-11/uic-class-vi-primacy-grant-implementation-
    document.pdf (Hereinafter, EPA, UIC Grant Implementation).
    52 Ibid.
    53 Letter from Michael S. Regan, EPA Administrator, to Governors, December 9, 2022, https://www.epa.gov/system/
    files/documents/2022-12/AD.Regan_.GOVS_.Sig_.Class%20VI.12-9-22.pdf.
    54 CRS searched Congress.gov with the term “Class VI” to identify relevant legislation in the 116th-118th Congresses.
    In November 2023, the Senate Committee on Energy and Natural Resources held a hearing on general CCS topics that
    included discussions of Class VI permitting and primacy.
    Congressional Research Service

    13

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    Congress has also directed additional funding support for Class VI permittingannual appropriations to EPA for grants to states to be used for UIC program implementation and for EPA Class VI permit activities. Congress has also provided targeted appropriations for state grants and EPA programs to support Class VI permit and primacy activities. and primacy
    activities, providing $25 million for EPA Class VI program administration in the IIJA.55
    EPA is currently reviewing at least EPA is currently reviewing at least 130142 Class VI permit applications. Congress may consider how Class VI permit applications. Congress may consider how
    the level of EPA UIC Class VI program resources aligns with some Membersthe level of EPA UIC Class VI program resources aligns with some Members’' interest in interest in
    increasing the number and increasing the number and facilitating the prompt processingduration of Class VI permit and primacy of Class VI permit and primacy
    approvalsapprovals, as part of supporting CCS projects as part of supporting CCS projects.
    As discussed generally. As noted earlier in this report, in this report, threesix states currently have Class VI primacy. In 2023, in response to a states currently have Class VI primacy. In 2023, in response to a
    request from EPA, 23 states and 2 tribes communicated an intent to pursue Class VI primacyrequest from EPA, 23 states and 2 tribes communicated an intent to pursue Class VI primacy. EPA
    , including four states that have been granted primacy since that time. Some Members argue that EPA would need sufficient staffing and resources at the headquarters and regional office level to would need sufficient staffing and resources at the headquarters and regional office level to
    manage the significant increase in primacy applications for review.manage the significant increase in primacy applications for review.
    For example, in the Joint Explanatory Statement accompanying P.L. 119-74, the Appropriations Committees noted the need for additional EPA resources and capacity to conduct Class VI permitting and primacy activities.54 Congress also appropriated $1.8 million for FY2026 for Class VI regulation education and training.55 If more states were to be granted primacy, there could be a long-term decrease in the number of If more states were to be granted primacy, there could be a long-term decrease in the number of
    Class VI permit applications under federal EPA review as these delegated states took on Class VI permit applications under federal EPA review as these delegated states took on
    permitting and enforcement responsibility. One consideration for Congresspermitting and enforcement responsibility. One consideration for Congress is whether states, however, is potential limits on states that would be able to be granted primacy and thus be able to review and enforce Class VI permits. States differ differ
    in in their capacity and expertise to administer all the elements of a Class VI program. For example, some capacity and expertise to administer all the elements of a Class VI program. For example, some
    states have regulated deep oil and naturalstates have regulated deep oil and natural -gas-related wells for decades, while other states with gas-related wells for decades, while other states with
    smaller numbers or different types of UIC wells have relied on EPA to administer programs. smaller numbers or different types of UIC wells have relied on EPA to administer programs.
    States without experience regulating wells for oil and gas production or complex wells may need States without experience regulating wells for oil and gas production or complex wells may need
    additional time and resources to establish state regulations and develop all the program elements additional time and resources to establish state regulations and develop all the program elements
    needed to administer a state UIC programneeded to administer a state UIC program.
    Potential Amendments to the 2010 Class VI Rule
    , or may not develop the capacity to manage the program without EPA assistance. Even some experienced oil and gas states with primacy have faced barriers to implementing Class VI programs. For example, Louisiana, a state with a relatively high number of potential Class VI projects, has been unable to process the large volume of applications and paused permit reviews.56 Potential Amendments to the 2010 Class VI Rule Another consideration for policymakers involves potential amendments to the 2010 Class VI rule Another consideration for policymakers involves potential amendments to the 2010 Class VI rule
    that established specific regulations and standards for Class VI wells and permitting. For that established specific regulations and standards for Class VI wells and permitting. For
    example, Congress could consider whether to direct EPA to amend the 2010 Class VI rule based example, Congress could consider whether to direct EPA to amend the 2010 Class VI rule based
    on new information available since it was promulgated. Some stakeholders support EPA on new information available since it was promulgated. Some stakeholders support EPA
    promulgating revisions to the rule. They note that the rule has been in place for over a decade and promulgating revisions to the rule. They note that the rule has been in place for over a decade and
    that requirements such as monitoring standards, that requirements such as monitoring standards, area of review modelingmodeling the area subject to the injection permit requirements, financial assurances, , financial assurances,
    and individual well permits should be revised to reflect more recent technology and conditions.and individual well permits should be revised to reflect more recent technology and conditions.56
    57 In the preamble to the 2010 rule, EPA stated its intention to review the rule every six years.In the preamble to the 2010 rule, EPA stated its intention to review the rule every six years.5758 In In
    its 2022 report to Congress, however, EPA stated that it would need additional data from more its 2022 report to Congress, however, EPA stated that it would need additional data from more
    projects before amending the Class VI rule.projects before amending the Class VI rule.5859 As the first permits for an operating facility were As the first permits for an operating facility were
    issued in 2017, and injection is expected to continue for approximately 10 years for that facility, issued in 2017, and injection is expected to continue for approximately 10 years for that facility,
    no Class VI well project has completed its permit cycle from construction and injection through no Class VI well project has completed its permit cycle from construction and injection through
    post-injection site care, which occurs once injection and well closure is complete.post-injection site care, which occurs once injection and well closure is complete.
    Environmental Justice Concerns
    In recent years Pollution and Public Participation Concerns As described earlier in this report, some stakeholders have raised concerns about the , some stakeholders have raised concerns about the environmental and community impacts of carbon community impacts of carbon
    capture and sequestration and Class VI well projects. Specifically, they have expressed concerns
    that the construction and operation of the wells may place additional burdens on certain

    55 P.L. 117-58, Division J.
    56 EPA Report to Congress.
    57 EPA, “Federal Requirements,” p. 77241.
    58 EPA Report to Congress.
    Congressional Research Service

    14

    Class VI Carbon Sequestration Wells: Permitting and State Program Primacy

    communities already facing disproportionate environmental, health, or economic challenges.59
    Congress may consider exploring these concerns, particularly in the context of other policy
    objectives.
    Some stakeholders support changes in public participation in the permitting of Class VI wells and
    the state UIC Class VI program primacy application process. capture and sequestration projects in general and with specific Class VI well projects. Congress may consider exploring these concerns, particularly in the context of other policy objectives related to climate change or energy policy.

    Although there are a limited number of active Class VI wells permitted by EPA, fluid migration within underground formations near well sites has led EPA to take compliance actions and has increased concern among some local communities. In September 2024, Archer Daniels Midland Company (ADM) paused injection at its Decatur, IL, Class VI well site when fluid migration was detected.60 In 2025, EPA issued an administrative order to ADM for violating the monitoring requirements of a well permit.61 At the site, fluid had migrated into an unauthorized zone of the underground formation, associated with the location and condition of the site monitoring wells.62 The order directs ADM to undertake compliance actions, such as implementing response plans for failure of well integrity, evaluating fluid migration, and reporting and documentation.63 ADM resumed injection in August 2025.64

    As discussed earlier in this report, As discussed earlier in this report,
    EPA has promulgated regulations on public participation and issued guidanceEPA has promulgated regulations on public participation and issued guidance (now rescinded) on consideration of on consideration of
    environmental justice in Class VI permitting and primacy processes. In environmental justice in Class VI permitting and primacy processes. In its oversight role,
    Congress may consider issuesearlier state program primacy application processes, some community groups had raised objections to Class VI projects as well as the UIC public participation process.65 With the rescission of the 2023 Class VI environmental justice guidance and implementation of other Trump Administration policies, the current role of public participation and environmental justice considerations in Class VI well permitting and state programs is less clear. Further, in 2025, President Trump issued multiple executive orders (EOs) that revoked prior environmental-justice-related EOs and changed direction to EPA and other executive branch agencies regarding consideration of environmental justice in agency activities and programs, including elimination of programs focused on environmental justice or diversity, equity, and inclusion.66 Congress could choose to take no action on these issues. Alternatively, Congress could consider oversight actions related to how EPA is implementing relevant public participation related to how EPA is implementing relevant public participation
    regulations and guidance, including actions detailed in the agencyregulations and guidance, including actions detailed in the agency’'s 2022 report to Congress on Class VI permitting. Congress also could consider legislation that would direct EPA to develop programs or regulatory actions related to the public health and environmental concerns expressed by stakeholders or codify actions that had been included in EPA's 2023 environmental justice guidance for Class VI wells.

    Other issues associated with Class VI permits and state primacy have been the subject of ongoing legal action that may affect future permitting and primacy decisions, such as the legal standing of environmental groups challenging permit and primacy approvals and whether state liability laws for well owners and operators meet federal minimum Class VI program standards. Analysis of these legal issues is beyond the scope of this report.67

    Footnotes

    1.

    U.S. Environmental Protection Agency (EPA), EPA Report to Congress: Class VI Permitting, October 2022, https://www.epa.gov/system/files/documents/2022-11/EPA%20Class%20VI%20Permitting%20Report%20to%20Congress.pdf (hereinafter, EPA Report to Congress).

    2.

    Through multiple injection cycles into the underground formation, injection of carbon dioxide (CO2) for enhanced oil recovery (EOR) results in incidental underground storage of some of the injected CO2.

    3.

    CO2 for injection is initially captured as a gas and then is compressed into a supercritical fluid, a relatively dense fluid with both gas-like and liquid-like properties. An emerging technology that captures CO2 directly from the atmosphere—called direct air capture—could also provide a source of CO2 for geologic sequestration. For more information on carbon capture and direct air capture, see CRS In Focus IF11501, Carbon Capture Versus Direct Air Capture, by Ashley J. Lawson.

    4.

    Safe Drinking Water Act (SDWA) Part C, "Protection of Underground Sources of Drinking Water" (42 U.S.C. §§300h-300h-9).

    5.

    SDWA §1421; 42 U.S.C. §300h. EPA defines underground source of drinking water as an "aquifer or its portion which supplies any public water system or which contains a sufficient quantity of ground water to supply a public water system; and currently supplies drinking water for human consumption; or contains fewer than 10,000 mg/l total dissolved solids; and which is not an exempted aquifer" (40 C.F.R. §146.3).

    6.

    EPA has established six "classes" of underground injection wells, based on the types of fluids injected; 40 C.F.R. §§144-146; EPA, "Federal Requirements Under the Underground Injection Control (UIC) Program for Carbon Dioxide (CO2) Geologic Sequestration Wells; Final Rule," 75 Federal Register 77230-77303, December 10, 2010, p. 77245 (hereinafter, EPA, "Federal Requirements").

    7.

    40 C.F.R. §§144-146.

    8.

    SDWA regulations for some other UIC well classes allow wells to be permitted in groups, known as "area permits."

    9.

    EPA, "Federal Requirements," p. 77234.

    10.

    EPA, "Final Class VI Guidance Documents," updated April 9, 2026, https://www.epa.gov/uic/class-vi-guidance-documents.

    11.

    EPA Report to Congress. For more details on permitting requirements and guidelines, see EPA, "Final Class VI Guidance Documents."

    12.

    40 C.F.R. §144.36.

    13.

    40 C.F.R. §144.36.

    14.

    40 C.F.R. §144.51; 40 C.F.R. §§144.82-146.95.

    15.

    40 C.F.R. §144.82.

    16.

    40 C.F.R. §144.83; §144.84; §144.86.

    17.

    40 C.F.R. §144.85.

    18.

    40 C.F.R. §144.82.

    19.

    40 C.F.R. §144.6(f).

    20.

    40 C.F.R. §144.95. State programs with delegated authority may choose whether to offer injection waivers to owners or operators as part of a UIC Class VI program. 40 C.F.R. §146.95(d) requires that the relevant EPA regional administrator concur with the approval of an injection depth waiver for a project.

    21.

    EPA Report to Congress.

    22.

    EPA Report to Congress. For more details on permitting requirements and guidelines, see EPA, "Final Class VI Guidance Documents."

    23.

    40 C.F.R. Part 25. 40 C.F.R. §§124.10-124.11 requires the permitting authority to provide public notice of the permit application, hold a public hearing if it is determined to be of significant public interest, and consider public comments in making permit decisions.

    24.

    EPA, "Underground Injection Control (UIC) Class VI Program, Public Participation Considerations for Geologic Sequestration Projects Fact Sheet," EPA 816-F-10-072, December 2010, https://www.epa.gov/uic/quick-reference-guides-class-vi-program-implementation (hereinafter, EPA, "Public Participation Considerations for Geologic Sequestration Projects Fact Sheet").

    25.

    EPA, "Public Participation Considerations for Geologic Sequestration Projects Fact Sheet."

    26.

    EPA Report to Congress.

    27.

    EPA, Memorandum from Radhika Fox, EPA Assistant Administrator, to EPA Regional Water Division Directors, Regions 1-X, "Environmental Justice Guidance for UIC Class VI Permitting and Primacy," August 17, 2023.

    28.

    EPA, "Underground Injection Control (UIC) Class VI Permit Tracker," accessed September 14, 2026, https://awsedap.epa.gov/public/single/?appid=8c074297-7f9e-4217-82f0-fb05f54f28e7&sheet=51312158-636f-48d5-8fe6-a21703ca33a9&theme=theme-colorbrewer&bookmark=6218ffed-bb6e-42e4-a4f1-52d87e036a1b&opt=ctxmenu (hereinafter, EPA, "Class VI Permit Tracker"). In 2015, EPA issued four Class VI permits associated with the FutureGen project in Illinois, but the project was canceled before well construction. In 2025, EPA issued at least six Class VI permits for facilities in Texas prior to the state being granted primacy for its Class VI program in December 2025.

    29.

    EPA, "Class VI Permit Tracker," accessed September 14, 2026.

    30.

    North Dakota Department of Mineral Resources, "Class VI—Geologic Sequestration Wells," accessed August 6, 2026, https://www.dmr.nd.gov/dmr/oilgas/ClassVI; Wyoming Department of Environmental Quality, "Class VI," accessed August 6, 2026, https://deq.wyoming.gov/water-quality/groundwater/uic/class-vi/.

    31.

    Louisiana Department of Conservation and Energy, "Class VI Carbon Sequestration Program," accessed August 6, 2026, https://www.denr.louisiana.gov/page/permits-and-applications#permit. In 2025, Louisiana paused all new permit approvals as the state considered various environmental and legal issues.

    32.

    EPA, "Class VI Permit Tracker," accessed September 14, 2026.

    33.

    This report focuses on requirements for new UIC Class VI programs. Applications for revisions of existing UIC programs may require the state to submit less information, as outlined in EPA, "Final Class VI Guidance Documents."

    34.

    SDWA §1421; 42 U.S.C. §300h.

    35.

    EPA, "Primary Enforcement Authority for the Underground Injection Control Program," accessed August 6, 2026, https://www.epa.gov/uic/primary-enforcement-authority-underground-injection-control-program.

    36.

    State of Louisiana, Executive Order Number JML 25-119, "CO2 Capture and Storage Limits and Moratorium," October 15, 2025, https://gov.louisiana.gov/assets/ExecutiveOrders/2025/Department-Directive-Order-No-B-2025-01-combined.pdf.

    37.

    EPA, "Primary Enforcement Authority for the Underground Injection Control Program," accessed August 6, 2026.

    38.

    40 C.F.R. §145.

    39.

    40 C.F.R. §145.

    40.

    40 C.F.R. §145.

    41.

    EPA, Geologic Sequestration of Carbon Dioxide: Underground Injection Control (UIC) Program Directors Class VI Primacy Manual for State Directors, April 2014, https://www.epa.gov/sites/default/files/2015-07/documents/epa816b14003.pdf. EPA standard operating procedures for Class VI primacy application review include a goal of a 30-day time frame for determining the completeness of the application, but this is not a statutory deadline.

    42.

    40 C.F.R. §145.31.

    43.

    40 C.F.R. §145.31.

    44.

    EPA, "State of North Dakota Underground Injection Control Program; Class VI Primacy Approval," 83 Federal Register 17758-17761, April 24, 2018, and 40 C.F.R. §147.1751 (North Dakota); EPA, "Wyoming Underground Injection Control Program; Class VI Primacy," 85 Federal Register 64053-64056, October 2020, and 40 C.F.R. §147.2550 (Wyoming); EPA, "State of Louisiana Underground Injection Control Program; Class VI Primacy," 89 Federal Register 703-712, January 5, 2024 (Louisiana), rule signed on December 28, 2023.

    45.

    EPA, "Class VI Permit Tracker," accessed September 14, 2026.

    46.

    P.L. 119-74.

    47.

    EPA, Underground Injection Control (UIC) Class VI Wells Grant Program: Grant Implementation Document, May 7, 2025, https://www.epa.gov/system/files/documents/2025-05/uic-class-vi-primacy-grant-implementation-document_5-7-25.pdf.

    48.

    EPA, Underground Injection Control (UIC) Class VI Wells Grant Program: Grant Implementation Document.

    49.

    40 C.F.R. §145.31.

    50.

    40 C.F.R. §145.13.

    51.

    EPA, "State of Louisiana Underground Injection Control Program; Class VI Primacy," 89 Federal Register 703, January 5, 2024, https://www.federalregister.gov/documents/2024/01/05/2024-00044/state-of-louisiana-underground-injection-control-program-class-vi-primacy.

    52.

    CRS searched Congress.gov with the term "Class VI" to identify relevant legislation in the 119th Congress. In November 2023, the Senate Committee on Energy and Natural Resources held a hearing on general carbon capture and sequestration (CCS) topics that included discussions of Class VI permitting and primacy.

    53.

    U.S. Congress, House Committee on Rules, Joint Explanatory Statement to accompany H.R. 4754, "Title II—Environmental Protection Agency," p. 47, https://rules.house.gov/bill/119/PIH-FY2026-CJS-EnergyWater-Interior.

    54.

    U.S. Congress, House Committee on Rules, Joint Explanatory Statement to accompany H.R. 4754, "Title II—Environmental Protection Agency," pp. 47-48, https://rules.house.gov/bill/119/PIH-FY2026-CJS-EnergyWater-Interior.

    55.

    U.S. Congress, House Committee on Rules, Joint Explanatory Statement to accompany H.R. 4754, "Title II—Environmental Protection Agency," p. 48, https://rules.house.gov/bill/119/PIH-FY2026-CJS-EnergyWater-Interior.

    56.

    Louisiana Department of Conservation and Energy, "Class VI Carbon Sequestration Program," https://www.dce.louisiana.gov/page/Class-VI.

    57.

    EPA Report to Congress.

    58. EPA, "Federal Requirements," p. 77241. 59.

    EPA Report to Congress.

    60.

    Archer Daniels Midland Company (ADM), "ADM Statement," press release, August 29, 2025, https://www.adm.com/globalassets/standalone-pages/carbon-capture-and-storage/adm-statement—8.29.25.pdf.

    61.

    EPA, "EPA Orders Archer Daniels Midland to Ensure Environmental Compliance of Carbon Sequestration Well in Decatur, IL," press release, August 13, 2025.

    62.

    EPA, "EPA Orders Archer Daniels Midland to Ensure Environmental Compliance of Carbon Sequestration Well in Decatur, IL."

    63.

    EPA, "EPA Orders Archer Daniels Midland to Ensure Environmental Compliance of Carbon Sequestration Well in Decatur, IL."

    64.

    ADM, "ADM Statement."

    65. For example, see "Allen Parish Policy Jury Reignites Opposition to Carbon Capture Activity," KALB5, October 6, 2025, https://www.kalb.com/2025/10/07/allen-parish-police-jury-reignites-opposition-carbon-capture-activity/; West Virginia Highlands Conservancy, "Carbon Dioxide Injection Program Approved Over Citizen Objections," February 6, 2025, https://www.wvhighlands.org/article/carbon-dioxide-injection-program-approved-over-citizen-objections/; "EPA Grants Louisiana Primacy to Permit CCS Wells, Despite EJ Concerns,"
    s 2022 report to Congress on
    Class VI permitting.

    Author Information

    Angela C. Jones

    Analyst in Environmental Policy



    Disclaimer
    This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan
    shared staff to congressional committees and Members of Congress. It operates solely at the behest of and
    under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other
    than public understanding of information that has been provided by CRS to Members of Congress in
    connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not
    subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in
    its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or
    material from a third party, you may need to obtain the permission of the copyright holder if you wish to
    copy or otherwise use copyrighted material.


    59 For example, see “EPA Grants Louisiana Primacy to Permit CCS Wells, Despite EJ Concerns,” InsideEPA.com, InsideEPA.com,
    December 29, 2023,December 29, 2023, https://insideepa.com/daily-news/epa-grants-louisiana-primacy-permit-ccs-wells-despite-ej-https://insideepa.com/daily-news/epa-grants-louisiana-primacy-permit-ccs-wells-despite-ej-
    concerns,” and “Biden Officials Face Fierce Opposition as They Defend CCS,” InsideEPA.com, January 8, 2024,
    https://insideepa.com/outlook/biden-officials-face-fierce-environmental-opposition-they-defend-ccs.
    Congressional Research Service
    R48033 · VERSION 1 · NEW
    15
    concerns; Letter from the Louisiana Wildlife Federation to Lisa Pham, EPA Region 6 Groundwater/UIC Section, July 29, 2023, https://lawildlifefed.org/wp-content/uploads/LWF-Comment-on-Primacy-La-Class-VI-wells-FINAL.pdf; and Letter from Earthjustice to Michael S. Regan, EPA Administrator, July 3, 2023, https://earthjustice.org/wp-content/uploads/2023/07/comments-on-epas-proposed-approval-of-la-class-vi-primacy-application_2023jul03.pdf. 66.

    Executive Order (EO) 14148, "Initial Recissions of Harmful Executive Orders and Actions," 90 Federal Register 8237, January 28, 2025; EO 14151, "Ending Radical and Wasteful Government DEI Programs and Preferencing," 90 Federal Register 8339, January 20, 2025; EO 14173, "Ending Illegal Discrimination and Restoring Merit-Based Opportunity," 90 Federal Register 8633, January 31, 2025.

    67.

    Congressional clients may contact the author of this report, Angela Jones, for more information on these legal issues and for referral to CRS's American Law Division.