< Back to Current Version

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Changes from August 1, 2014 to March 3, 2015

This page shows textual changes in the document between the two versions indicated in the dates above. Textual matter removed in the later version is indicated with red strikethrough and textual matter added in the later version is indicated with blue.


Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs August 1, 2014March 3, 2015 Congressional Research Service 7-5700 www.crs.gov RL32665 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Summary The Navy’s proposed FY2015FY2016 budget requests funding for the procurement of sevennine new battle force ships (i.e., ships that count against the Navy’s goal for achieving and maintaining a fleet of 306 ships). The sevennine ships include two Virginia-class attack submarines, two DDG-51 class Aegis Aegis destroyers, and three Littoral Combat Ships (LCSs), one LPD-17 class amphibious ship, and one TAO(X) class oiler. The Navy’s proposed FY2015FY2019FY2016-FY2020 five-year shipbuilding plan includes a total of 4448 ships, compared to a total of 4144 ships in the FY2014-FY2018 the FY2015-FY2019 five-year shipbuilding plan. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy’s shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy’s FY2015 30-year (FY2014FY2015-FY2044) shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough ships to fully support all elements of the Navy’s 306-ship goal over the entire 30-year period. In particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027, and a shortfall in attack submarines from FY2025 through FY2034. The Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. The Navy estimates in the report that the plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement. The Congressional Budget Office (CBO) is now preparing its own estimate of the cost to implement the plan; this estimate will be made available later this year. CBO’s estimates of the cost to implement past annual versions of the Navy’s 30-year shipbuilding plan have been higher than the Navy’s estimates. Some of the difference between CBO’s estimate and the Navy’s estimate, particularly in the latter years of the plan, has been due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. Potential issues for Congress in reviewing the Navy’s proposed FY2015 shipbuilding budget, its proposed FY2015-FY2019 five-year shipbuilding plan, and its FY2015 30-year (FY2015FY2044) shipbuilding plan include the following: • the Navy’s proposal to defer until FY2016 a decision on whether to proceed with the mid-life nuclear refueling overhaul of the aircraft carrier George Washington (CVN-73); • the Navy’s proposal to put 11 of its 22 Aegis cruisers into some form of reduced operating status starting in FY2015, and then return them to service years from now; • the Navy’s proposal to retire all 10 of its remaining Oliver Hazard Perry (FFG-7) class frigates in FY2015; • the Navy’s proposal to modify the rules for what ships to include in the count of the number of battle force ships in the Navy; • the potential impact on the size of the Navy of limiting DOD spending in FY2013-FY2021 to the levels set forth in the Budget Control Act of 2011, as amended; • the appropriate future size and structure of the Navy in light of budgetary and strategic considerations; and Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • the affordability of the 30-year shipbuilding plan. , including an average of about $15.7 billion per year during the first 10 years of the plan, an average of about $19.7 billion per year during the middle 10 years of the plan, and an average of about $14.6 billion per year during the final 10 years of the plan. A December 2014 Congressional Budget Office (CBO) report on the Navy’s FY2015 30-year shipbuilding plan estimates that the plan will require about 13% more funding to implement than the Navy estimates, including about 6% more than the Navy estimates during the first 10 years of the plan, about 14% more than the Navy estimates during the middle 10 years of the plan, and about 20% more than the Navy estimates during the final 10 years of the plan. Over the years, CBO’s estimates of the cost to implement the Navy’s 30-year shipbuilding plan have generally been higher than the Navy’s estimates. Some of the difference between CBO’s estimates and the Navy’s estimates, particularly in the latter years of the plan, is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. The program that contributes the most to the difference between the CBO and Navy estimates of the cost of the 30-year plan is a future destroyer that appears in the latter years of the 30-year plan. Potential issues for Congress in reviewing the Navy’s proposed FY2015 shipbuilding budget, its proposed FY2015-FY2019 five-year shipbuilding plan, and its FY2015 30-year (FY2015FY2044) shipbuilding plan include the following: • the potential impact on the size and capability of the Navy of limiting DOD spending through FY2021 to the levels set forth in the Budget Control Act of 2011, as amended; • the appropriate future size and structure of the Navy in light of budgetary and strategic considerations; and • the affordability of the 30-year shipbuilding plan. Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Funding levels and legislative activity on individual Navy shipbuilding programs are tracked in detail in other CRS reports. Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Contents Introduction...................................................................................................................................... 1 Background ...................................................................................................................................... 1 Navy’s Ship Force Structure Goal ............................................................................................. 1 January 2013 Goal for Fleet of 306 Ships ........................................................................... 1 306-Ship Goal Reflects 2012 Strategic Guidance and Projected DOD Spending Shown in FY2013 and FY2014 Budget Submissions ...................................................... 1 Goal for Fleet of 306 Ships Compared to Earlier Goals ..................................................... 1 February 2015 Navy Testimony Referring to Goal for Fleet of 308 Ships ......................... 3 Navy’s Five-Year and 30-Year Shipbuilding Plans ................................................................... 34 Five-Year (FY2015-FY2019) Shipbuilding Plan ................................................................ 34 30-Year (FY2015-FY2044) Shipbuilding Plan ................................................................... 56 Navy’s Projected Force Levels Under 30-Year Shipbuilding Plan ............................................ 68 Comparison of First 10 Years of 30-Year Plans......................................................................... 9 11 Oversight Issues for Congress for FY2015FY2016.................................................................................... 13 Mid-Life Refueling Overhaul of Aircraft Carrier George Washington (CVN-73) .................. 13 Proposal to Put 11 Cruisers into Reduced Operating Status .................................................... 15 Proposal to Retire All 10 Remaining FFG-7 Frigates in FY2015 ........................................... 17 Proposal to Modify What Ships Are Included in the Count of Battle Force Ships ................. 1715 Potential Impact on Size and Capability of Navy of Limiting DOD Spending to BCA Caps Through FY2021 ................................................................................................................................. 18 15 Appropriate Future Size and Structure of Navy in Light of Strategic and Budgetary Changes ................................................................................................................................ 2219 Affordability of 30-Year Shipbuilding Plan ............................................................................ 3127 Estimated Ship Procurement Costs ................................................................................... 3127 Future Shipbuilding Funding Levels ................................................................................. 3329 Legislative Activity for FY2015FY2016 .................................................................................................... 34 FY201531 FY2016 Funding Request ........................................................................................................ 3431 CRS Reports Tracking Legislation on Specific Navy Shipbuilding Programs ....................... 35 FY2015 National Defense Authorization Act (H.R. 4435/S. 2410) ........................................ 35 House (Committee Report) ............................................................................................... 35 House (Floor Action)......................................................................................................... 40 Senate ................................................................................................................................ 40 FY2015 DOD Appropriations Act (H.R. 4870) ....................................................................... 45 House................................................................................................................................. 45 Senate ................................................................................................................................ 4631 Figures Figure 1. Navy Table on Mission Impacts of Limiting Navy’s Budget to BC Levels ................... 19 Tables Table 1. Current 306 Ship Force Structure Goal Compared to Earlier Goals .................................. 2 Table 2. Navy FY2014FY2016 Five-Year (FY2015-FY2019FY2016-FY2020) Shipbuilding Plan ....................................... 34 Table 3. Navy FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan .......................................... 57 Table 4. Projected Force Levels Resulting from FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan ......................................................................................................................... 79 Table 5. Ship Procurement Quantities in First 10 Years of 30-Year Shipbuilding Plans ............... 10 Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 12 Table 6. Projected Navy Force Sizes in First 10 years of 30-Year Shipbuilding Plans ................. 1113 Table 7. Recent Study Group Proposals for Navy Ship Force Structure ....................................... 2622 Table 8. Navy and CBO Estimates of Cost of FY2014 and FY2015 30-Year Shipbuilding Plans ........................................................................................................................................... 32 28 Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table B-1. Comparison of Navy’s 306-ship goal, Navy Plan from 1993 BUR, and Navy Plan from 2010 QDR Review Panel ........................................................................................... 5437 Table D-1. Total Number of Ships in the Navy Since FY1948 ..................................................... 5942 Table D-2. Battle Force Ships Procured or Requested/Programmed, FY1982-FY2019FY2020 ............... 6043 Appendixes Appendix A. Comparing Past Ship Force Levels to Current or Potential Future Ship Force Levels.......................................................................................................................................... 5033 Appendix B. Independent Panel Assessment of 2010 QDR .......................................................... 5235 Appendix C. U.S. Strategy and the Size and Structure of U.S. Naval Forces ............................... 5639 Appendix D. Size of the Navy and Navy Shipbuilding Rate ......................................................... 5841 Contacts Author Contact Information........................................................................................................... 6043 Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Introduction This report provides background information and presents potential issues for Congress concerning the Navy’s ship force-structure goals and shipbuilding plans. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy’s shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. Decisions that Congress makes on Navy shipbuilding programs can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Background Navy’s Ship Force Structure Goal January 2013 Goal for Fleet of 306 Ships On January 31, 2013, in response to Section 1015 of the FY2013 National Defense Authorization Act (H.R. 4310/P.L. 112-239 of January 2, 2013), the Navy submitted to Congress a report presenting a goal for achieving and maintaining a fleet of 306 ships, consisting of certain types and quantities of ships.1 The goal for a 306-ship fleet is the result of a force structure assessment (FSA) that the Navy completed in 2012. 306-Ship Goal Reflects 2012 Strategic Guidance and Projected DOD Spending Shown in FY2013 and FY2014 Budget Submissions The 2012 FSA and the resulting 306-ship plan reflect the defense strategic guidance document that the Administration presented in January 20122 and the associated projected levels of Department of Defense (DOD) spending shown in the FY2013 and FY2014 budget submissions. DOD officials have stated that if planned levels of DOD spending are reduced below what is shown in these budget submissions, the defense strategy set forth in the January 2012 strategic guidance document might need to be changed. Such a change, Navy officials have indicated, could lead to the replacement of the 306-ship plan of January 2013 with a new plan. Goal for Fleet of 306 Ships Compared to Earlier Goals Table 1 compares the 306-ship goal to earlier Navy ship force structure plans. 1 Department of the Navy, Report to Congress [on] Navy Combatant Vessel Force Structure Requirement, January 2013, 3 pp. The cover letters for the report were dated January 31, 2013. 2 For more on this document, see CRS Report R42146, Assessing the January 2012 Defense Strategic Guidance (DSG): In Brief, by Catherine Dale and Pat Towell. Congressional Research Service 1 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table 1. Current 306 Ship Force Structure Goal Compared to Earlier Goals Changes to February 2006 313ship plan announced through mid-2011 February 2006 Navy plan for 313-ship fleet 260ships 325ships 20022004 Navy plan for 375ship Navya 2001 QDR plan for 310ship Navy Early-2005 Navy plan for fleet of 260-325 ships 306ship plan of January 2013 ~310316 ship plan of March 2012 Revised 313-ship plan of September 2011 Ballistic missile submarines (SSBNs) 12b 12-14b 12b 12b 14 14 14 14 14 Cruise missile submarines (SSGNs) 0c 0-4c 4c 0c 4 4 4 4 2 or 4d Attack submarines (SSNs) 48 ~48 48 48 48 37 41 55 55 Aircraft carriers 11e 11e 11e 11e 11f 10 11 12 12 Cruisers and destroyers 88 ~90 94 94g 88 67 92 104 116 Frigates 0 0 0 0 0 0 0 0 Littoral Combat Ships (LCSs) 52 ~55 55 55 55 63 82 56 0 Amphibious ships 33 ~32 33 33h 31 17 24 37 36 MPF(F) shipsi 0j 0j 0j 0j 12i 14i 20i 0i 0i Combat logistics (resupply) ships 29 ~29 30 30 30 24 26 42 34 Dedicated mine warfare ships 0 0 0 0 0 0 0 26k 16 10l 10l 10l 21l 3 0 0 0 0 17 10 11 25 25 313 260 325 375 310 or 312 Ship type Joint High Speed Vessels (JHSVs) Otherm Total battle force ships 23 ~23 16 24n 306 ~310316 313 328 Sources: Table prepared by CRS based on U.S. Navy data. Note: QDR is Quadrennial Defense Review. The “~” symbol means approximately and signals that the number in question may be refined as a result of the Naval Force Structure Assessment currently in progress. a. Initial composition. Composition was subsequently modified. b. The Navy plans to replace the 14 current Ohio-class SSBNs with a new class of 12 next-generation SSBNs. For further discussion, see CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. c. Although the Navy plans to continue operating its four SSGNs until they reach retirement age in the late 2020s, the Navy does not plan to replace these ships when they retire. This situation can be expressed in a table like this one with either a 4 or a zero. d. The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s proposed FY2001 DOD budget requested funding to support the conversion of two available Trident SSBNs into SSGNs, and the retirement of two other Trident SSBNs. Congress, in marking up this request, supported a plan to convert all four available SSBNs into SSGNs. e. With congressional approval, the goal has been temporarily be reduced to 10 carriers for the period between the retirement of the carrier Enterprise (CVN-65) in December 2012 and entry into service of the carrier Gerald R. Ford (CVN-78), currently scheduled for September 2015. f. For a time, the Navy characterized the goal as 11 carriers in the nearer term, and eventually 12 carriers. g. The 94-ship goal was announced by the Navy in an April 2011 report to Congress on naval force structure and missile defense. Congressional Research Service 2 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress h. The Navy acknowledged that meeting a requirement for being able to lift the assault echelons of 2.0 Marine Expeditionary Brigades (MEBs) would require a minimum of 33 amphibious ships rather than the 31 ships shown in the February 2006 plan. For further discussion, see CRS Report RL34476, Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress, by Ronald O'Rourke. i. Today’s Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine Corps operations ashore, rather than Navy combat operations, and thus are not counted as Navy battle force ships. The planned MPF (Future) ships, however, would have contributed to Navy combat capabilities (for example, by supporting Navy aircraft operations). For this reason, the ships in the planned MPF(F) squadron were counted by the Navy as battle force ships. The planned MPF(F) squadron was subsequently restructured into a different set of initiatives for enhancing the existing MPF squadrons; the Navy no longer plans to acquire an MPF(F) squadron. j. The Navy no longer plans to acquire an MPF(F) squadron. The Navy, however, has procured or plans to procure some of the ships that were previously planned for the squadron—specifically, TAKE-1 class cargo ships, and Mobile Landing Platform (MLP)/Afloat Forward Staging Base (AFSB) ships. These ships are included in the total shown for “Other” ships. k. The figure of 26 dedicated mine warfare ships included 10 ships maintained in a reduced mobilization status called Mobilization Category B. Ships in this status are not readily deployable and thus do not count as battle force ships. The 375-ship proposal thus implied transferring these 10 ships to a higher readiness status. l. Totals shown include 5 ships transferred from the Army to the Navy and operated by the Navy primarily for the performance of Army missions. m. This category includes, among other things, command ships and support ships. n. The increase in this category from 17 ships under the February 2006 313-ship plan to 24 ships under the apparent 328-ship goal included the addition of one TAGOS ocean surveillance ship and the transfer into this category of six ships—three modified TAKE-1 class cargo ships, and three Mobile Landing Platform (MLP) ships—that were previously intended for the planned (but now canceled) MPF(F) squadron. February 2015 Navy Testimony Referring to Goal for Fleet of 308 Ships At a February 25, 2015, hearing on Department of the Navy acquisition programs before the Seapower and Projection Forces subcommittee of the House Armed Services Committee, Department of the Navy officials testified that “the FY 2014 update to the 2012 Force Structure Assessment (FSA) to meet the Department of the Navy’s required missions in support of the DSG [Defense Strategic Guidance document of January 2012], has increased the objective to 308-ships to account for evolving force structure decisions and real-world changes to assumptions made in 2012.”3 The testimony did not detail the composition of this new 308-ship force-level goal, but one of the officials at the hearing, discussing the anticipated procurement of a 12th LPD-17 class amphibious ship, referred to the amphibious ship force level goal as having been increased from 33 ships to 34 ships.4 At a February 26, 2015, hearing on the Department of the Navy’s proposed FY2016 budget before the Defense subcommittee of the House Appropriations Committee, Admiral Jonathan Greenert, the Chief of Naval Operations, testified that 3 Statement of the Honorable Sean J. Stackley, Assistant Secretary of the Navy (Research, Development and Acquisition) and Vice Admiral Joseph P. Mulloy, Deputy Chief of Naval Operations for Integration of Capabilities and Resources and Lieutenant General Kenneth J. Glueck, Jr., Deputy Commandant, Combat Development and Integration & Commanding General, Marine Corps Combat Development Command, Before the Subcommittee on Seapower and Projection Forces of the House Armed Services Committee on Department of the Navy Seapower and Projection Forces Capabilities, February 25, 2015, p. 3. 4 Source: Spoken testimony of Vice Admiral Mulloy, as reflected in hearing transcript. Congressional Research Service 3 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The 2014 update to the “2012 Force Structure Assessment” (FSA) and other Navy analysis describe the baseline of ships needed to support meeting each mission.... According to the FSA, the Navy has a requirement for a force of 11 CVN, 88 large surface combatants (DDG and CG), 48 attack submarines (SSN), 12 SSBN, 11 large amphibious assault ships (LHA/D), 11 amphibious transport docks (LPD), 11 dock landing ships (LSD), 52 small surface combatants, 10 JHSV, 29 combat logistics force (CLF) ships, and 24 command and support ships.5 The list of ships in the above passage totals 307, and is the same in composition as the 306-ship goal except that it includes one more ship in the “other” category (i.e., 24 ships rather than 23). (The “other” category includes, among other things, command and support ships.) Together, the Navy’s February 25 and 26 testimony suggests that the Navy has a new 308-ship force-level goal that, compared to the 306-ship goal, includes one additional amphibious ship and one additional ship in the “other” category. Navy’s Five-Year and 30-Year Shipbuilding Plans Five-Year (FY2015-FY2019) Shipbuilding Plan Table 2 shows the Navy’s FY2015 five-year (FY2015-FY2019) shipbuilding plan. Table 2. Navy FY2016 Five-Year (FY2016-FY2020Navy’s Five-Year and 30-Year Shipbuilding Plans Five-Year (FY2015-FY2019) Shipbuilding Plan Table 2 shows the Navy’s FY2015 five-year (FY2015-FY2019) shipbuilding plan. Table 2. Navy FY2014 Five-Year (FY2015-FY2019) Shipbuilding Plan (Battle force ships—i.e., ships that count against 306-ship goal) Ship type FY15 FY16 FY17 Ford (CVN-78) class aircraft carrier FY18 FY19 FY20 1 Total 1 Virginia (SSN-774) class attack submarine 2 2 2 2 2 10 Arleigh Burke (DDG-51) class destroyer 2 2 2 2 2 10 Littoral Combat Ship (LCS) 3 3 3 3 22 3 14 LHA(R) amphibious assault ship 1 Fleet tug (TATF) 2 LPD-17 class amphibious ship 1 1 1 1 LX(R) amphibious ship Fleet tug/salvage ship (TATS) 1 Mobile Landing Platform (MLP)/Afloat Forward Staging Base (AFSB) 1 TAO(X) oiler TOTAL 1 7 8 11 1 1 1 4 1 1 1 3 10 8 44 Source: FY2015 Navy budget submission. Congressional Research Service 3 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 1 TOTAL 9 10 1 2 1 1 1 5 1 1 1 1 4 10 9 10 48 Source: FY2016 Navy budget submission. Notes: The MLP/AFSB is a variant of the MLP with additional features permitting it to serve in the role of an AFSB. The Navy proposes to fund the TATFs and TAO(X)s through the National Defense Sealift Fund (NDSF) 5 Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the House Subcommittee on Defense, Committee on Appropriations, on FY 2016 Department of the Navy Posture, February 26, 2015, pp. 9 and 11. Congressional Research Service 4 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress and the other ships through the Navy’s shipbuilding account, known formally as the Shipbuilding and Conversion, Navy (SCN) appropriation account. Observations that can be made about the Navy’s proposed FY2015 five-year (FY2015-FY2019) shipbuilding plan include the following: • Total of 4448 ships. The plan includes a total of 4448 ships, compared to a total of 4144 ships in the FY2014-FY2018FY2015-FY2019 five-year shipbuilding plan. • Average of 8.8 ships per year. The plan includes an average of 8.89.6 battle force ships per year. The steady-state replacement rate for a fleet of 306 ships with an average service life of 35 years is about 8.7 ships per year. In light of how the average shipbuilding rate since FY1993 has been substantially below 8.7 ships per year (see Appendix D), shipbuilding supporters for some time have wanted to increase the shipbuilding rate to a steady rate of 10 or more battle force ships per year. • DDG-51 destroyers and Virginia-class submarines being procured under MYP arrangements. The 10 DDG-51 destroyers to be procured in FY2013FY2017 and the 10 Virginia-class attack submarines to be procured in FY2014FY2018 are being procured under multiyear procurement (MYP) contracts.3 • Navy is requesting three rather than four LCSs for FY2015. LCSs are being procured under a pair of block buy contracts covering the years FY2010-FY2015. These two contracts call for a total of four LCSs in FY2015. The Navy, however, is requesting funding for the procurement of three LCSs in FY2015. If three LCSs are funded in FY2015, one of the two LCS block buy contracts would not be fully implemented in its final year. • Start of LX(R) amphibious ship procurement deferred to FY2020. The FY2015-FY2019 five-year shipbuilding plan defers the procurement of the first LX(R) amphibious ship to FY2020, compared to FY2019 in the FY2014-FY2018 plan, FY2018 in the FY2013-FY2017 plan, and FY2017 in the FY2012-FY2016 plan. In each of these five-year plans, the lead LX(R) ship was scheduled one year beyond the end of the five-year period. • MLP/AFSB ship added to FY2017. The FY2015-FY2019 five-year shipbuilding plan adds an MLP/AFSB (Mobile Landing Platform/Afloat Forward Staging Base) ship in FY2017. This ship, not previously planned, would likely be built by General Dynamics/National Steel and Shipbuilding Company (GD/NASSCO), the builder of prior MLP/AFSB ships. In addition to providing a platform that would help the Navy meet certain operational needs, adding this ship to the shipbuilding plan might help the Navy ensure strong competition for two other Navy ship programs—the TAO(X) oiler program, the first ship of which is to be procured in FY2016, and the LX(R) amphibious ship program, the first ship of which is to be procured in FY2020.4 3 For more on MYP contracting, see CRS Report R41909, Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress, by Ronald O'Rourke and Moshe Schwartz. 4 NASSCO could be a bidder for either or both of the TAO(X) and LX(R) programs. From a competition perspective, the added FY2017 MLP/AFSB ship might be viewed as a Navy signal to NASSCO that the Navy would not necessarily (continued...) Congressional Research Service 4 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 30-Year (FY2015-FY2044) Shipbuilding Plan Table 3 shows the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan. 6 • Flight III DDG-51 to begin with second ship in FY2016. The second of the two DDG-51s requested for FY2016 is to be the first Flight III variant of the DDG-51. The Flight III variant is to carry a new and more capable radar called the Air and Missile Defense Radar (AMDR). • Modified LCS/Frigate to start in FY2019. The LCS program was restructured in 2014 at the direction of the Secretary of Defense. As a result of the restructuring, LCSs to be procured in FY2019 and beyond are to be built to a more heavily armed design. The Navy has stated that it will refer to these modified LCSs as frigates. • 12th LPD-17 class ship added to FY2016. The LPD-17 class ship requested for FY2016 is to be the 12th ship in the class. The Navy had planned on procuring no more than 11 LPD-17s, but Congress has supported the procurement of a 12th LPD-17 by providing unrequested funding for a 12th ship in FY2013 and FY2015. Responding to these two funding actions, the Navy, as a part of its FY2016 budget submission, has inserted a 12th LPD-17 into its shipbuilding plan, and is requesting in FY2016 the remainder of the funding needed to fully fund the ship. • TAO(X) procurement to begin FY2016. The TAO(X) oiler requested for procurement in FY2016 is to be the first in a new class of 17 ships. 6 For more on MYP contracting, see CRS Report R41909, Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress, by Ronald O'Rourke and Moshe Schwartz. Congressional Research Service 5 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 30-Year (FY2015-FY2044) Shipbuilding Plan FY2016 30-Year Plan Not Submitted as Of February 24, 2015 The Navy as of February 24, 2015, had not yet submitted its FY2016 (FY2016-FY2045) 30-year shipbuilding plan. Discussion below and elsewhere in this report of the Navy’s 30-year shipbuilding consequently is keyed to the Navy’s FY2015 (FY2015-FY2044) 30-year shipbuilding plan. FY2015 30-Year Plan Reflected Proposed Changes in Ship Counting Rules The Navy’s FY2015 30-year shipbuilding plan incorporated a proposed change in the rules for how to count battle force ships. Congress, as part of its markup of the Navy’s FY2015 budget, provided direction to the Navy on how the counting rules were to be changed. The discussion below of the Navy’s FY2015 30-year shipbuilding plan makes multiple references to the old counting rules and the Navy’s proposed counting rules. When the Navy’s FY2016 30-year shipbuilding plan is submitted, it will presumably reflect the direction on counting rules that congress provided in marking up the Navy’s proposed FY2015 budget. The effect of the congressional direction is to modify the counting rules somewhat, but not as much as the Navy had proposed. Table 3 shows the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan. Congressional Research Service 6 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table 3. Navy FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan FY 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CVN 1 1 1 1 1 1 LSC 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 2 2 SSC 3 3 3 3 2 3 3 3 3 3 3 1 1 1 1 4 4 4 4 4 4 4 2 SSN 2 2 2 2 2 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 SSBN AWS CLF Supt 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 3 1 1 2 2 3 2 1 1 1 2 2 3 2 2 Total 7 8 11 10 8 11 8 11 11 13 8 7 5 10 7 10 8 12 9 9 5 5 7 10 8 11 8 10 9 8 Source: FY2015 30-year (FY2015-FY2044) shipbuilding plan. (...continued) award NASSCO the TAO(X) program merely to provide a source work for NASSCO until the LX(R) competition (because NASSCO would likely receive the FY2017 MLP/AFSB), and consequently that NASSCO would need to submit a competitive bid for the TAO(X) program. By the same token, the added FY2017 MLP/AFSB ship might be viewed as a Navy signal to potential bidders for the LX(R) program other than NASSCO that if NASSCO were not awarded the TAO(X) program, NASSCO would still have enough work to be a strong bidder for the LX(R) program (again because NASSCO would likely receive the FY2017 MLP/AFSB), and consequently that LX(R) bidders other than NASSCO would face strong competition from NASSCO. Another potential implication from this perspective is that if NASSCO wins the TAO(X) competition, the Navy, other things held equal, might see less reason to retain the FY2017 MLP/AFSB in the shipbuilding plan. Congressional Research Service 5 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC = small surface combatants (i.e., Littoral Combat Ships [LCSs]); SSN = attack submarines; SSGN = cruise missile submarines; SSBN = ballistic missile submarines; AWS = amphibious warfare ships; CLF = combat logistics force (i.e., resupply) ships; Supt = support ships. In devising a 30-year shipbuilding plan to move the Navy toward its ship force-structure goal, key assumptions and planning factors include but are not limited to the following: • ship service lives; • estimated ship procurement costs; • projected shipbuilding funding levels; and • industrial-base considerations. Congressional Research Service 7 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Navy’s Projected Force Levels Under 30-Year Shipbuilding Plan Table 4 shows the Navy’s projection of ship force levels for FY2015-FY2044 that would result from implementing the FY2015 30-year (FY2015-FY2044) shipbuilding plan shown in Table 3. As part of its FY2015 budget submission, the Navy is proposing to modify the rules for what ships to include in the count of the number of battle force ships in the Navy. In its FY2015 budget submission, the Navy has presented figures for projected Navy ship force levels using both the existing rules and the proposed modified rules. Table 4 and Table 6 show figures using both the existing rules and the proposed modified rules. Congressional Research Service 68 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table 4. Projected Force Levels Resulting from FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan Where two figures are shown, the first is the figure using existing rules for counting battle force ships, and the second is the figure using the Navy’s proposed modified rules for counting battle force ships. 306 ship plan CVN LSC SSC SSN SSGN SSBN AWS CLF Supt Total 11 88 52 48 0 12 33 29 33 306 FY15 10 85 19/26 54 4 14 30 29 29/32 274/284 FY16 11 88 23/30 53 4 14 31 29 27/30 280/290 FY17 11 90 27/34 50 4 14 32 29 29/32 286/296 FY18 11 91 31/38 52 4 14 33 29 29/32 295/304 FY19 11 93 35/40 51 4 14 33 29 31/34 301/309 FY20 11 95 36/37 49 4 14 33 29 33/36 304/308 FY21 11 96 36/33 49 4 14 33 29 32/35 304 FY22 11 97 38/36 48 4 14 33 29 32/35 306/307 FY23 12 98 39 49 4 14 33 29 33/36 311/314 FY24 12 98 41/40 48 4 14 34 29 33/36 313/315 FY25 11 98 43 47 4 14 34 29 34/37 314/317 FY26 11 97 46 45 2 14 36 29 34/37 314/317 FY27 11 99 49 44 1 13 35 29 34/37 315/318 FY28 11 100 52 41 0 13 36 29 34/37 316/319 FY29 11 98 52 41 0 12 35 29 34/37 312/315 FY30 11 95 52 41 0 11 35 29 34/37 308/311 FY31 11 91 52 43 0 11 34 29 34/36 305/307 FY32 11 89 52 43 0 10 34 29 35/37 303/305 FY33 11 88 52 45 0 10 35 29 35/37 305/307 FY34 11 86 52 46 0 10 34 29 35/37 303/305 FY35 11 87 52 48 0 10 32 29 35/37 304/306 FY36 11 88 52 49 0 10 32 29 35 306 FY37 11 90 52 51 0 10 33 29 34 310 FY38 11 91 52 50 0 10 33 29 35 311 FY39 11 92 52 51 0 10 33 29 34 312 FY40 10 90 52 51 0 10 32 29 34 308 FY41 10 89 52 51 0 11 33 29 34 309 FY42 10 87 52 52 0 12 32 29 34 308 FY43 10 84 52 52 0 12 31 29 34 304 FY44 10 83 52 52 0 12 31 29 34 303 Source: FY2015 30-year (FY2015-FY2044) shipbuilding plan. Note: Figures for support ships include five JHSVs transferred from the Army to the Navy and operated by the Navy primarily for the performance of Army missions. Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC = small surface combatants (i.e., frigates, Littoral Combat Ships [LCSs], and mine warfare ships); SSN = attack submarines; SSGN = cruise missile submarines; SSBN = ballistic missile submarines; AWS = amphibious warfare ships; CLF = combat logistics force (i.e., resupply) ships; Supt = support ships. Congressional Research Service 79 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Observations that can be made about the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan and resulting projected force levels included the following: • Total of 264 ships; average of about 8.8 per year. The plan includes a total of 264 ships to be procured, two less than the number in the FY2014 30-year (FY2014-FY2043) shipbuilding plan. The total of 264 ships equates to an average of about 8.8 ships per year, which is slightly higher than the approximate average procurement rate (sometimes called the steady-state replacement rate) of about 8.7 ships per year that would be needed over the long run to achieve and maintain a fleet of 306 ships, assuming an average life of 35 years for Navy ships. • Proposed modified counting rules affect small surface combatants and support ships. As can be seen in Table 4, the Navy’s proposed modified rules for what ships to include in the count of the number of battle force ships (see “Proposal to Modify What Ships Are Included in the Count of Battle Force Ships” in “Oversight Issues for Congress for FY2015FY201”) would affect the reported figures for small surface combatants during the period FY2015-FY2024 and the reported reported figures for support ships during the period FY2015-FY2035. • Eleven cruisers proposed for some form of reduced operating status included in count. As part of its FY2015 budget submission, the Navy is proposing to put 11 of its 22 Aegis cruisers into some form of reduced operating status starting in FY2015, and then return them to service years from now. The 11 cruisers proposed for some form of reduced operating status are included in the count of battle force ships shown in Table 4 and Table 6 during the years that they are in reduced operating status. • Projected shortfalls in amphibious ships, small surface combatants, and attack submarines. The FY2015 30-year shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough ships to fully support all elements of the Navy’s 306-ship goal over the entire 30-year period. In particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027, and a shortfall in attack submarines from FY2025 through FY2034. • Ballistic missile submarine force to be reduced temporarily to 10 boats. As a result of a decision in the FY2013 budget to defer the scheduled procurement of the first Ohio replacement (SSBN[X]) ballistic missile submarine by two years, from FY2019 to FY2021, the ballistic missile submarine force is projected to drop to a total of 10 or 11 boats—one or two boats below the 12-boat SSBN force-level goal—during the period FY2029-FY2041. The Navy says this reduction is acceptable for meeting current strategic nuclear deterrence mission requirements, because none of the 10 or 11 boats during these years will be encumbered by long-term maintenance.5 57 7 For further discussion of this issue, see CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. Congressional Research Service 810 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Comparison of First 10 Years of 30-Year Plans Table 5 and Table 6 below show the first 10 years of planned annual ship procurement quantities and projected Navy force sizes in 30-year shipbuilding plans dating back to the first such plan, which was submitted in 2000 in conjunction with the FY2001 budget. By reading vertically down each column, one can see how the ship procurement quantity or Navy force size projected for a given fiscal year changed as that year drew closer to becoming the current budget year. Congressional Research Service 911 Table 5. Ship Procurement Quantities in First 10 Years of 30-Year Shipbuilding Plans Years shown are fiscal years FY of 30-year plan (year submitted) 01 02 03 04 05 06 07 08 09 10 FY01 plan (2000) 8 8 8 8 7 5 6 6 6 7 6 n/a n/a n/a n/a n/a n/a n/a n/a n/a 5 5 7 7 11 n/a n/a n/a n/a n/a 7 8 7 7 9 14 15 13 14 15 9 6 8 9 17 14 15 14 16 15 4 7 7 9 10 12 n/a n/a n/a n/a 7 7 11 12 14 13 12 11 11 10 7 11 12 13 12 12 10 12 11 6 7 8 8 12 12 13 13 12 12 13 8 n/a n/a n/a n/a n/a n/a n/a n/a n/a 9 8 12 9 12 9 12 9 13 9 10 13 11 12 9 12 10 12 8 9 10 7 8 9 7 11 8 12 9 12 8 8 7 9 9 10 10 10 11 14 7 8 11 10 8 11 8 11 11 FY02 plan (2001) FY03 plan (2002) FY04 plan (2003) FY05 plan (2004) FY06 plan (2005) FY07 plan (2006) FY08 plan (2007) FY09 plan (2008) FY10 plan (2009) FY11 plan (2010) FY12 plan (2011) FY13 plan (2012) FY14 plan (2013) FY15 plan (2014) 11 12 13 14 15 16 17 18 19 20 21 22 23 24 13 Source: Navy 30-year shipbuilding plans supplemented by annual Navy budget submissions (including 5-year shipbuilding plans) for fiscal years shown. n/a means not available—see notes below. Notes: The FY2001 30-year plan submitted in 2000 was submitted under a one-time-only legislative provision, Section 1013 of the FY2000 National Defense Authorization Act (S. 1059/P.L. 106-65 of October 5, 1999). No provision required DOD to submit a 30-year shipbuilding plan in 2001 or 2002, when Congress considered DOD’s proposed FY2002 and FY2003 DOD budgets. (In addition, no FYDP was submitted in 2001, the first year of the George W. Bush Administration.) Section 1022 of the FY2003 Bob Stump National Defense Authorization Act (H.R. 4546/P.L. 107-314 of December 2, 2002) created a requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget. This provision was codified at 10 U.S.C. 231. The first 30-year plan submitted under this provision was the one submitted in 2003, in conjunction with the proposed FY2004 DOD budget. For the next several years, 30-year shipbuilding plans were submitted each year, in conjunction with each year’s proposed DOD budget. An exception occurred in 2009, the first year of the Obama Administration, when DOD submitted a CRS-1012 proposed budget for FY2010 with no accompanying FYDP or 30-year Navy shipbuilding plan. Section 1023 of the FY2011 Ike Skelton National Defense Authorization Act (H.R. 6523/P.L. 111-383 of January 7, 2011) amended 10 U.S.C. 231 to require DOD to submit a 30-year shipbuilding plan once every four years, in the same year that DOD submits a Quadrennial Defense Review (QDR). Consistent with Section 1023, DOD did not submit a new 30-year shipbuilding plan at the time that it submitted the proposed FY2012 DOD budget. At the request of the House Armed Services Committee, the Navy submitted the FY2012 30-year (FY2012-FY2041) shipbuilding plan in late-May 2011. Section 1011 of the FY2012 National Defense Authorization Act (H.R. 1540/P.L. 112-81 of December 31, 2011) amended 10 U.S.C. 231 to reinstate the requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget. Table 6. Projected Navy Force Sizes in First 10 years of 30-Year Shipbuilding Plans Years shown are fiscal years; where two figures are shown, the first is the figure using existing rules for counting battle force ships, and the second is the figure using the Navy’s proposed modified rules for counting battle force ships. FY of 30-year plan (year submitted) 01 02 03 04 05 06 07 08 09 10 FY01 plan (2000) 316 315 313 313 313 311 311 304 305 305 316 n/a n/a n/a n/a n/a n/a n/a n/a n/a 314 n/a n/a n/a n/a n/a n/a n/a n/a n/a 292 292 291 296 301 305 308 313 317 321 290 290 298 303 308 307 314 320 328 326 289 293 297 301 301 306 n/a n/a 305 n/a 285 294 299 301 306 315 317 315 314 317 286 289 293 302 310 311 307 311 314 322 286 287 289 290 293 287 288 291 301 309 287 n/a n/a n/a n/a n/a n/a n/a n/a n/a 284 287 287 285 285 292 298 305 311 315 290 287 286 286 297 301 311 316 322 324 285 279 276 284 285 292 300 295 296 298 282 270 280 283 291 300 295 296 297 297 274/ 284 280/ 290 286/ 296 295/ 304 301/ 309 304/ 308 304 306/ 307 311/ 314 FY02 plan (2001) FY03 plan (2002) FY04 plan (2003) FY05 plan (2004) FY06 plan (2005) FY07 plan (2006) FY08 plan (2007) FY09 plan (2008) FY10 plan (2009) FY11 plan (2010) FY12 plan (2011) FY13 plan (2012) FY14 plan (2013) FY15 plan (2014) CRS-1113 11 12 13 14 15 16 17 18 19 20 21 22 23 24 313/ 315 Source: Navy 30-year shipbuilding plans supplemented by annual Navy budget submissions (including 5-year shipbuilding plans) for fiscal years shown. n/a means not available—see notes below. Notes: The FY2001 30-year plan submitted in 2000 was submitted under a one-time-only legislative provision, Section 1013 of the FY2000 National Defense Authorization Act (S. 1059/P.L. 106-65 of October 5, 1999). No provision required DOD to submit a 30-year shipbuilding plan in 2001 or 2002, when Congress considered DOD’s proposed FY2002 and FY2003 DOD budgets. Section 1022 of the FY2003 Bob Stump National Defense Authorization Act (H.R. 4546/P.L. 107-314 of December 2, 2002) created a requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget. This provision was codified at 10 U.S.C. 231. The first 30-year plan submitted under this provision was the one submitted in 2003, in conjunction with the proposed FY2004 DOD budget. For the next several years, 30-year shipbuilding plans were submitted each year, in conjunction with each year’s proposed DOD budget. An exception occurred in 2009, the first year of the Obama Administration, when DOD submitted a proposed budget for FY2010 with no accompanying FYDP or 30-year Navy shipbuilding plan. The FY2006 plan included data for only selected years beyond FY2011. Section 1023 of the FY2011 Ike Skelton National Defense Authorization Act (H.R. 6523/P.L. 111-383 of January 7, 2011) amended 10 U.S.C. 231 to require DOD to submit a 30-year shipbuilding plan once every four years, in the same year that DOD submits a Quadrennial Defense Review (QDR). Consistent with Section 1023, DOD did not submit a new 30-year shipbuilding plan at the time that it submitted the proposed FY2012 DOD budget. At the request of the House Armed Services Committee, the Navy submitted the FY2012 30-year (FY2012-FY2041) shipbuilding plan in late-May 2011. Section 1011 of the FY2012 National Defense Authorization Act (H.R. 1540/P.L. 112-81 of December 31, 2011) amended 10 U.S.C. 231 to reinstate the requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget. CRS-12 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Oversight Issues for Congress for FY2015 Mid-Life Refueling Overhaul of Aircraft Carrier George Washington (CVN-73) One potential oversight issue for Congress concerns the Navy’s proposal to defer until FY2016 a decision on whether to proceed with the mid-life nuclear refueling overhaul of the aircraft carrier George Washington (CVN-73). To operate for a full 50-year life, existing Nimitz (CVN-68) class nuclear-powered carriers are given a mid-life nuclear refueling overhaul, called a refueling complex overhaul (RCOH), when they are 20 to 25 years old, which is when their original nuclear fuel core has been exhausted. The RCOH gives the ship a new nuclear fuel core sufficient to power the ship for the remainder of its 50-year life. The RCOH also involves a significant amount of other overhaul, repair, and modernization work on the ship. An RCOH requires about 44 months from contract award to delivery. RCOHs are funded through the Navy’s shipbuilding account (the Shipbuilding and Conversion, Navy [SCN] appropriation account). RCOHs are done primarily at Huntington Ingalls Industries/Newport News Shipbuilding (HII/NNS) in Newport News, VA, and form a significant part of HII/NNS’s business base, along with construction of new nuclear-powered aircraft carriers and construction of new nuclearpowered submarines. RCOHs in recent years have been scheduled in a more or less heel-to-toe fashion at HII/NNS—when one RCOH is done, the next one is scheduled to begin soon thereafter. RCOHs are done in a particular dry dock at HII/NNS, so a carrier undergoing an RCOH in that dry dock must have its work finished and depart the dry dock before the following carrier can be moved into the dry dock for its RCOH. The next carrier scheduled for an RCOH is the George Washington (CVN-73). The total estimated cost of the CVN-73 RCOH in the Navy’s FY2014 budget submission was $4,738.2 million (i.e., about $4.7 billion). Until the FY2015 budget submission, the CVN-73 RCOH was scheduled for FY2016. The CVN73 RCOH received $12 million in advance procurement (AP) funding in FY2012, $69.9 million in AP funding in FY2013, and $245.8 million in AP funding in FY2014. Under the Navy’s FY2014 budget submission, another $491.1 million in AP funding was projected for FY2015, and the balance of the RCOH’s estimated cost of $4,738.2 million was to be provided in FY2016 and FY2017. As part of its FY2015 budget submission, DOD removed funding for the CVN-73 RCOH from the FY2015-FY2019 Future Years Defense Plan (FYDP) and is proposing to defer the question of whether to proceed with the CVN-73 RCOH until next year, when Congress will consider the FY2016 defense budget. The Navy’s proposed FY2015 budget includes about $46 million in funding in the Operation and Maintenance, Navy (OMN) appropriation account to defuel CVN73. Defueling the ship (i.e., removing the original nuclear fuel core) is an initial step to be performed on the ship at NNS, regardless of whether the ship is to undergo an RCOH or be inactivated. DOD and Navy officials state that if Congress provides an indication this year that it supports the defense spending levels in the FY2015-FY2019 FYDP, which are higher than those called for in Congressional Research Service 13 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress the Budget Control Act of 2011 as amended, then the FYDP would be reformulated for FY2016 and subsequent years to include the roughly $7.0 billion in additional funding that would be needed over the FYDP to fund the CVN-73 RCOH and keep the ship and its associated carrier air wing in service.6 Of this $7.0 billion in additional funding, $796.2 million would be required in FY2015.7 DOD and Navy officials state that if Congress does not provide an indication this year that it supports the defense spending levels in the FYDP, CVN-73 would instead be inactivated (i.e., permanently retired from service), and its associated air wing would be disestablished. Other things held equal, inactivating CVN-73 would reduce the Navy’s carrier force to 10 ships for the next 25 years or so (i.e., the period of time that CVN-73 would have remained in service if it had received an RCOH). The Navy states that, of the funding for the CVN-73 RCOH that was provided in FY2012 and FY2013, $20.6 million represent sunk costs that would not be recoverable if CVN-73 were not to receive an RCOH. The Navy states that this $20.6 million “primarily supported prime contractor and government initial planning efforts for the refueling overhaul as well as some initial modernization GFI [government-furnished information] development efforts.”8 Navy officials state that deferring until next year the decision on whether to proceed with the CVN-73 RCOH would mean that the RCOH, if were to occur, would be delayed some number of months from the schedule shown in the Navy’s FY2014 budget submission, and consequently would likely become an FY2017 action rather than an FY2016 action. Navy officials state that if the delay in the start of the RCOH were not more than a certain number of months, it would not cause a cascading delay in the schedule for the following RCOH (to be done on CVN-74), because there is currently some slack time on the back end of the CVN-73 RCOH period to absorb some delay in the CVN-73 RCOH without affecting the schedule for the CVN-74 RCOH. 10 U.S.C. 5062(b) states, “The naval combat forces of the Navy shall include not less than 11 operational aircraft carriers.” The requirement as stated in this statute is not contingent on the DOD budget being at a certain level in coming years. To the contrary, the central purpose of 10 U.S.C. 5062(b) is to act as a mandate to the executive branch to support force of not less than 11 carriers in executive branch planning, regardless of budgetary or other circumstances. DOD has not, as part of its FY2015 budget submission, requested that 10 U.S.C. 5062(b) be amended or repealed. Potential oversight questions for Congress include the following: 6 The estimated total cost to perform the CVN-73 RCOH and retain the carrier and its associated air wing is about $8.1 billion. (This figure includes about $5.9 to perform the RCOH and keep the ship in service, about $1.4 billion to retain the air wing, and about $800 million for associated logistics, manpower, and training costs.) The FY2015-FY2019 FYDP currently includes about $1.1 billion to support the inactivation of CVN-73. Reprogramming this $1.1 billion in inactivation funding to support the RCOH would leave a requirement for about $7.0 billion in additional funding. Source: Navy information paper provided to CRS by Navy Office of Legislative Affairs on April 7, 2014. 7 The total estimated requirement for FY2015 is $842.2 million. This figure includes the $46 million currently in the budget for the ship’s defueling, leaving a net requirement of $796.2 million in additional funding for FY2015. Source: Navy information paper provided to CRS by Navy Office of Legislative Affairs on April 7, 2014. 8 Source: Navy information paper dated March 13, 2014, and provided to CRS by the Navy Office of Legislative Affairs on April 17, 2014. Congressional Research Service 14 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • Is DOD’s proposal to treat the issue of whether to proceed with the CVN-73 RCOH (and consequently whether there are to be 10 or 11 carriers for the next 25 years or so) as a question to be decided next year, depending on indications of congressional support for a certain DOD budget level in coming years, consistent with 10 U.S.C. 5062(b)? Does DOD’s proposal in effect treat the 11-carrier requirement in 10 U.S.C. 5062(b) as an optional matter rather than a mandate? If so, would this create a precedent for the executive branch to treat similar provisions in the U.S. Code as optional matters rather than mandates? For example, would it create a precedent for DOD, if it so desired, to begin treating as an optional matter the long-standing requirement in 10 U.S.C. 5063(a) that the Marine Corps “shall be so organized as to include not less than three combat divisions and three air wings, and such other land combat, aviation, and other services as may be organic therein?” If the executive branch were to begin treating statutory provisions like 10 U.S.C. 5062(b) as optional matters rather than mandates, what implications might this have for policy and program execution, and for Congress’s power to legislatively establish policy and program goals? • What would be the operational impact for the Navy of reducing the carrier force to 10 ships for the next 25 years or so (and also eliminating its associated carrier air wing)? What impact would it have on the Navy’s ability to fulfill its missions? • If the FDYP were reformulated to include the $7 billion in additional funding needed to keep CVN-73 and its associated air wing, what other defense programs would have their funding reduced, and what would be the impact of these reductions on DOD’s ability to fulfill its missions? • What would be the impact on HII/NNS and the other parts of the aircraft carrier industrial base if CVN-73 were inactivated rather than given an RCOH? What impact, if any, would this have on the cost of other work performed at NNS during these years, and on the eventual cost of the CVN-74 RCOH?9 Proposal to Put 11 Cruisers into Reduced Operating Status A total of 27 Ticonderoga (CG-47) class Aegis cruisers (CGs 47 through 73) were procured for the Navy between FY1978 and FY1988; the ships entered service between 1983 and 1994. The first five ships in the class (CGs 47 through 51), which were built to an earlier technical standard in certain respects, were judged by the Navy to be too expensive to modernize and were removed from service in 2004-2005, leaving 22 ships in operation (CGs 52 through 73). As a cost-saving measure, the Navy’s FY2015 budget proposes putting the 11 youngest Aegis cruisers (CGs 63 through 73) into some form of reduced operating status starting in FY2015. While in reduced operating status, the ships would be modernized in preparation for their eventual return to full operational status. The ships would be returned to full operational status 9 For press reports discussing the industrial-base aspects of the issue, see Lara Seligman, “Shipbuilder: Navy’s Timeline For CVN-73 ‘Not In Accordance With Our Plan,’” Inside the Navy, March 24, 2014; Olga Belogolova, “PEO Carriers: A Cut From 11 To 10 Carriers Would Impact Industrial Base,” Inside the Navy, February 24, 2014; Michael Fabey, “Foregoing Carrier RCOH Won’t Disrupt Future Work, HII CEO Says,” Aerospace Daily & Defense Report, March 25, 2014: 4; Rick Giannini and Darrell Grow, “Why Aircraft Carrier Workers Deserve a Better Plan from the Pentagon,” Defense One (www.defenseone.com), March 23, 2014. Congressional Research Service 15 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress years from now, as one-for-one replacements for the 11 older Aegis cruisers that are to remain in full operational status (CGs 52 through 62), as each of those 11 older cruisers reaches the end of its service life. Among the 11 Aegis cruisers that are proposed for reduced operating status are four that are capable of ballistic missile defense (BMD) operations.10 Under a reported preliminary version of the Navy’s plan, the 11 cruisers put into reduced operating status would return to service between FY2019 and FY2026, and the ships would operate into the 2030s and (in some cases) the 2040s.11 Potential oversight questions for Congress include the following: • What are the comparative costs to keep the 11 cruisers in operation vs. putting them into reduced operating status? • What are the potential operational impacts of putting the 11 cruisers into reduced operating status? How would it affect the Navy’s ability to perform its missions? • The 11 cruisers have limited remaining growth potential. Will that growth potential be enough for the ships to support the combat system equipment that would be needed to keep the ships mission effective into the 2030s and 2040s? • The CG-47s have crews of 300 or more personnel. By the 2030s and 2040s, the Navy will include some number of newer-design surface combatants that incorporate technologies for reducing crew size so as to reduce annual operating and support (O&S) costs. Assuming the 11 CG-47s could be made mission effective (see previous question), would they be considered mission cost effective, given their crew-related costs, by future Navy leaders compared to other Navy surface combatants in the 2030s and 2040s? • In light of the two previous questions, can current Navy leaders guarantee that future Navy leaders years from now will follow-through on the plan to bring these 11 cruisers back into service and operate them into the 2030s and 2040s? If Navy leaders cannot guarantee this, how does that affect the balance of potential costs and benefits of the Navy’s plan? • Given that the 11 cruisers would be assigned minimal caretaker crews rather than full crews during the time they are in reduced operating status, how many of these 11 cruisers could be quickly returned to full operational status and deployed in response to a contingency that might require these ships? If the answer is less than 11, then should all 11 continue to be included in the count of battle force ships, as the Navy is doing in its FY2015 30-year shipbuilding plan? A May 22, 2014, press report states: It would not be a “bad thing” if Congress ultimately blocks the Navy from taking half its cruisers out of service next year as long as lawmakers follow a historical pattern of providing the funds to keep the ships operating, Chief of Naval Operations Adm. Jonathan Greenert said Wednesday [May 21]. 10 These four ships are CG-67 (Shiloh), CG-70 (Lake Erie), CG-72 (Vella Gulf), and CG-73 (Port Royal). For more on the Aegis BMD program, see CRS Report RL33745, Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress, by Ronald O'Rourke. 11 See USNI News Editor, “Navy’s New ‘Battle Force’ Tally To Include Hospital Ships and Small Patrol Craft,” USNI News (http://news.usni.org), March 11, 2014. Congressional Research Service 16 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Greenert told reporters the Navy’s 2015 budget proposal that includes sidelining 11 of the 22 cruisers for long-term modernization was not an ideal solution but instead driven by spending constraints. If Congress can pay to operate the ships, the Navy will keep active, he said. “It’s not a good idea to put into a modernization availability a ship before it really needs to go in and that is not something we wanted to do but felt we were compelled to do,” Greenert said at a breakfast hosted by the Defense Writers Group. “So if the decision is ‘no, I don’t want you do that, here’s the money, continue to operate those ships,’ that’s not a bad thing.” “We need ships,” he added.... “What would be optimal is that we continue to operate (the ships) and then when the time comes bring them in for modernization,” he said. “But I need operating money to do that, personnel money, and we don’t have that in the funds given to us.”12 Proposal to Retire All 10 Remaining FFG-7 Frigates in FY2015 As another cost-saving measure, the Navy as part of its FY2015 budget submission is proposing to retire all 10 of its remaining Oliver Hazard Perry (FFG-7) class frigates in FY2015. By comparison, under the Navy’s FY2014 budget submission, the Navy planned to retire seven of the ships in FY2015, two more in FY2017, and the final ship in FY2020. The proposed retirements of these frigates contribute to the projected shortfall in small surface combatants shown in the earlier years of Table 4. Potential oversight questions for Congress include the following: • What are the comparative costs to keep some or all of these 10 frigates in service vs. retiring them in FY2015? • What are the potential operational impacts of retiring all 10 of these frigates in FY2015? How would it affect the Navy’s ability to perform its missions? • Retired FFG-7 class frigates in some cases have been transferred to foreign navies. What are the Navy’s plans regarding the post-retirement disposition of the 10 remaining FFG-7 frigates? Proposal to Modify What Ships Are Included in the Count of Battle Force Ships As mentioned earlier, the Navy as part of its FY2015 budget submission is proposing to modify the rules for what ships to include in the count of the total number of battle force ships in the Navy. The current counting rules date back to an agreement between the Navy and the Office of the Secretary of Defense in 1981. The Navy’s proposed changes would: • include certain ships in the count that have been routinely requested by a U.S. regional combatant commander (COCOM) and allocated among requesting COCOMs via DOD’s Global Force Management Allocation Plan (GFMAP)— such ships would be included in the count on a case-by-case basis as 12 Mike McCarthy, “‘Not A Bad Thing’ If Congress Blocks Attempt To Sideline Cruisers, Navy Chief Says,” Defense Daily, May 22, 2014: 2-3. Congressional Research Service 17 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress recommended by the Chief of Naval Operations (CNO) with the approval of the Secretary of the Navy, as a temporary authorization that would remain in effect if the ships were no longer requested or were retired; and • exclude ships from the count that are not self-deployable, unless they are forward deployed (i.e., forward homeported or forward stationed) and approved for inclusion in the count by the Secretary of the Navy. The effect of these changes would be to include in the count the Navy’s 10 Cyclone (PC-1) class patrol craft, which are currently operating in the Persian Gulf region, the Navy’s two hospital ships (TAHs), and one high-speed transport (HST) ship, while excluding from the count three mine countermeasures (MCM) ships. As discussed earlier in connection with Table 4, these proposed changes would affect the reported figures for small surface combatants during the period FY2015-FY2024 and the reported figures for support ships during the period FY2015FY2035. In proposing the changes, the Navy argues that the current counting rules “do not capture special situations, such as regional demand [for ships], where non-battle force ships should be counted on a temporary basis.” The Navy argues that the proposed new rules are “more flexible in response to Global Force Management Plans and COCOM demand signals.”13 They could also argue that the largest single proposed modification—the inclusion of the Navy’s 10 Cyclone (PC-1) class patrol boats in the count—is consistent with the inclusion of certain patrol craft of the day (then designated PGs and PHMs) in the original 1981 definition of the types of ships to be counted as battle force ships. Skeptics could argue that the proposed changes, if implemented, would make it harder to compare total numbers of battle force ships over time on an apples-to-apples basis, and that they would complicate congressional oversight by making the rules less transparent to outsiders, particularly in terms of reconstructing or auditing figures for prior years, since doing so would require access to records of where individual ships were homeported in a given year and which Secretary of the Navy approvals were in effect in a given year. Skeptics might also argue that these changes are being proposed at a time that the Navy is proposing to remove ships from service as a cost-saving measure, and that the changes, if implemented, would have the effect of obscuring the resulting reduction in the size of the Navy.14 Potential Impact on Size of Navy of Limiting DOD Spending to BCA Caps Through FY2021 Another potential issue for Congress concerns the potential impact on the size of the Navy of limiting DOD spending through FY2021 to levels at or near the caps established in the Budget 13 Source: Navy briefing charts on FY2015 30-year shipbuilding plan. See also letter from Secretary of the Navy Ray Mabus to The Honorable Richard J. Durbin, March 7, 2014, posted at USNI News (http://news.usni.org), March 11, 2014. 14 For press reports discussing the Navy’s proposed changes in counting rules, see Christopher P. Cavas, “New Counting Rules Add Up To More Ships,” DefenseNews.com, March 11, 2014; USNI News Editor, “Navy’s New ‘Battle Force’ Tally to Include Hospital Ships and Small Patrol Craft,” USNI News (http://news.usni.org), March 11, 2014; Sydney J. Freedberg, Jr., “Outrage On Capitol Hill As Navy Changes Ship-Counting Rules,” Breaking Defense (http://breakingdefense.com), March 11, 2014. Congressional Research Service 18 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Control Act of 2011 (BCA) as amended. Navy officials state that a decision to reduce DOD’s budget to such levels would eventually lead to a smaller Navy. Admiral Jonathan Greenert, the Chief of Naval Operations, provided detailed testimony on this question in his prepared statements for hearings before the Senate Armed Services Committee on November 7, 2013, and the House Armed Services Committee on September 18, 2013. In his prepared statement for the November 7, 2013, hearing, which was similar to his prepared statement for the September 18, 2013, hearing, Greenert testified that Consistent with what the Deputy Secretary of Defense told this committee in August, if fiscally constrained to the revised discretionary caps, over the long term (2013-2023), the Navy of 2020 would not be able to execute the missions described in the DSG [Defense Strategic Guidance]. There are numerous ways to adjust Navy’s portfolio of programs to meet the BCA revised discretionary caps. These are currently under deliberation within the department. As requested, the following provides perspective on the level and type of adjustments that will need to be made. Any scenario to address the fiscal constraints under current law must include sufficient readiness, capability and manpower to complement the force structure capacity of ships and aircraft. This balance would need to be maintained to ensure each unit will be effective, even if the overall fleet is not able to execute the DSG. There are, however, many ways to balance between force structure, readiness, capability and manpower. One potential fiscal and programmatic scenario would result in a “2020 Fleet” of about 255260 ships, about 30 less than today, and about 40 less than Navy’s PB-14 [President’s Budget for FY2014] submission. It would include 1-2 fewer CSG [carrier strike groups], and 1-2 fewer ARG [amphibious ready groups] than today. This 2020 fleet would not meet the DSG requirements for the mission to Provide a Stabilizing Presence. As a result, Navy would be less able to reinforce deterrence, build alliances and partnerships and influence events abroad. • Navy would not increase our global deployed presence, which would remain at about 95 ships in 2020. The lethality inherent in this presence, based on ship type deployed, would be less than today’s 95-ship presence. • Navy would not increase presence in the Asia-Pacific, which would stay at about 50 ships in 2020. This would largely negate the ship force structure portion of our plan to rebalance to the Asia Pacific region directed by the DSG. • Navy would not “place a premium on U.S. military presence in—and in support of— partner nations” in the Middle East, since presence would decrease and, assuming we use the same ship deployment scheme in the future, there would be gaps in CSG presence totaling 23 months each year. • Navy would still “evolve our posture” in Europe by meeting our ballistic missile defense European Phased Adaptive Approach (EPAA) requirements with four BMD-capable DDG homeported in Rota, Spain and two land based sites in Romania and Poland. Additional presence would still be provided by forward operating JHSV, MLP, AFSB and some rotationally deployed combatants. • Navy would still provide “innovative, low-cost, and small-footprint approaches” to security in Africa and South America by deploying, on average, one JHSV and one LCS continuously to both regions and maintaining an AFSB in AFRICOM’s area of responsibility. Congressional Research Service 19 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress In order to sustain a balance of force structure (current and future), modernization and personnel within our portfolio, continued compliance with the BCA revised discretionary caps would compel us to reduce our investments in force structure and modernization, which would result in a “2020 Fleet” that would not meet DSG direction in the following mission areas: Counter Terrorism and Irregular Warfare (CT/IW). We would not have the capacity to conduct widely distributed CT/IW missions, as defined in the DSG. There would be inadequate LCS available to allocate to this non-core Navy mission, in the amount defined by the FSA and concurred upon by Special Operations Command. Deter and Defeat Aggression. We would not be able to conduct one large-scale operation and also counter aggression by an opportunistic aggressor in a second theater. In this scenario, the fleet would have 9-10 CVN/CSG and 9-10 LHA/D and ARG. We would be able to sustain about one non-deployed CSG and one non-deployed ARG fully certified and able to surge on required timelines. Together, our presence and surge forces would be sufficient to conduct all missions associated with only one large scale operation, as defined today. This overall force and associated readiness would, however, be sufficient to execute Navy elements of the DSG mission to Conduct Stability and Counterinsurgency Operations. Project Power Despite Anti-Access/Area Denial (A2/AD) Challenges. Overall, in this scenario, development of our capabilities to project power would not stay ahead of potential adversaries’ A2/AD capabilities. We will not meet the projected capability requirements to assure Joint access in a plausible operational scenario in 2020 due to shortfalls, in particular, in air and missile defense: • Some undersea capabilities will be slowed: • Attainment of the required P-8A inventory (117) would be delayed from 2019 to 2020, and transition from the P-3C to the P-8A would be delayed from 2019 to 2020. • Anti-submarine warfare combat system upgrades for DDGs and MFTA installations would not be affected. • The LCS ASW Mission Package would be delayed from 2016 to 2017. • Upgraded sonobuoys and advanced torpedo procurement would still equip all of our helicopters, SSN, and P-8A in the Western Pacific by 2018. • Virginia Payload Module (VPM) would still be fielded in 2027 to enable Virginia-class SSN to replace SSGN that begin retiring in 2026. • The LCS mine warfare mission package would still field its first increment in 2015 and the second in 2019. • Air and missile defense improvements would be slowed: • SEWIP upgraded electromagnetic sensing and upgraded jamming and deception capabilities would both be delayed one year (to 2015 and 2018, respectively). Both of these upgrades are required to counter advances in adversary anti-ship cruise missiles. • The new Air and Missile Defense Radar (AMDR) would be delivered on only four ships, as compared to seven under our PB-14 submission, between 2021 and 2024. Congressional Research Service 20 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • The Evolved Sea Sparrow Missile (ESSM) Block II would still be fielded in 2020, with 80 missiles being delivered to deployed ships. • The F-35C Lightning II, the carrier-based variant of the Joint Strike Fighter, would still field in 2019 and join our CVW forward homeported in the Western Pacific in 2020. Overall, the number of F-35 procured would decrease by about 30 aircraft in 2020. • All components of the improved air-to-air IR “kill chain” that circumvents adversary radar jamming would be delayed by two years. The Infrared Search and Track (IRST) sensor system would field in 2018 and the improved longer-range IRST would not deliver until 2021. The new longer-range AIM-9X Block III missile would not be fielded until 2023. • Improvements to the air-to-air RF “kill chain” would be slowed down as F/A-18E/F Block II Super Hornet anti-jamming upgrades would be delayed to 2020. The longer-range AIM120D missile would still field in 2014 but equipping of all Pacific carrier air wings would be delayed by two years to 2022. • The Navy Integrated Fire Control – Counter Air (NIFC-CA) network would still initially field with the E-2D Advanced Hawkeye in 2015, but only four CVW (compared to six in our PB-14 submission) would have it by 2020. Transition to the E-2D would be delayed three years to 2025. Operate Effectively in Space and Cyber Space. Plans to recruit, hire and train 976 additional cyber operators and form 40 computer operations teams by 2017 would not be impacted. This is a priority in any fiscal scenario. However, the BCA’s reduced funding levels would delay replacement of our cyber systems and decrease our ability to defend our networks. Maintain a Safe, Secure, and Effective Nuclear Deterrent. We would still be able to sustain today’s ballistic missile submarine (SSBN) force. The SSBN(X) would still deliver in 2030 to replace retiring Ohio class SSBN while meeting requirements for SSBN presence and surge. This is the top priority program for the Navy. Defend the Homeland and Provide Support to Civil Authorities. We would still meet the capacity requirements for these missions. Counter Weapons of Mass Destruction. We would still meet the presence requirements for this mission. Conduct Humanitarian, Disaster Relief, and Other Operations. We would still meet the presence requirements for this mission. The extent of the fiscal changes in the BCA, when compared to current program and budget levels, would compel Navy to request relief from several program mandates and force structure capacity limits, in order to sustain and build a fleet with a balance of ship types. For example, mandated limits govern the size of the force, minimum funding for certain activities and facilities, and changes to the number of personnel at a base.15 15 Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the Senate Armed Services Committee on the Impact of Sequestration on the National Defense, November 7, 2013, pp. 7-11. For Greenert’s statement for the September 18, 2013, hearing, see Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the House Armed Services Committee on Planning for Sequestration in FY 2014 and Perspectives of the Military Services on the Strategic Choices and Management Review, September 18, 2013, pp. 6-10. Congressional Research Service 21 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appropriate Future Size and Structure of Navy in Light of Strategic and Budgetary Changes Another potential oversight issue for Congress concerns the appropriate future size and structure of the Navy. Changes in strategic and budgetary circumstances have led to a broad debate over the future size and structure of the military, including the Navy. Changes in strategic circumstances include, among other things, the end of U.S. combat operations in Iraq, the winding down of U.S. combat operations in Afghanistan, China’s military (including naval) modernization effort,16 maritime territorial disputes involving China,17 and Russia’s seizure and annexation of Crimea. On January 5, 2012, the Administration announced that, in light of the end of U.S. combat operations in Iraq, the winding down of such operations in Afghanistan, and developments in the Asia-Pacific region, U.S. defense strategy in coming years will include a stronger focus on the Asia-Pacific region.18 Since the Asia-Pacific region is primarily a maritime and aerospace theater for the DOD, this shift in strategic focus is expected by many observers to result in a shift in the allocation of DOD resources toward the Navy and Air Force. DOD officials have indicated that if planned levels of DOD spending in future years are reduced as a result of the BCA or other legislative action, they will seek to protect efforts supporting a stronger focus on the Asia-Pacific region. The Navy’s current goal for a fleet of 306 ships reflects a number of judgments and planning factors (some of which the Navy receives from the Office of the Secretary of Defense), including but not limited to the following: • U.S. interests and the U.S. role in the world, and the U.S. military strategy for supporting those interests and that role; • current and projected Navy missions in support of U.S. military strategy, including both wartime operations and day-to-day forward-deployed operations; • current and projected capabilities of potential adversaries, including their antiaccess/area-denial (A2/AD) capabilities; • regional combatant commander (COCOM) requests for forward-deployed Navy forces; • the individual and networked capabilities of current and future Navy ships and aircraft; 16 For more on the modernization of China’s military (particularly naval) capabilities and its potential implications for required U.S. Navy capabilities, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy Capabilities—Background and Issues for Congress, by Ronald O'Rourke. 17 For a discussion of these disputes, see CRS Report R42784, Maritime Territorial and Exclusive Economic Zone (EEZ) Disputes Involving China: Issues for Congress, by Ronald O'Rourke. See also CRS Report R42930, Maritime Territorial Disputes in East Asia: Issues for Congress, by Ben Dolven, Mark E. Manyin, and Shirley A. Kan. 18 Department of Defense, Sustaining U.S. Global Leadership: Priorities for 21st Century Defense, January 2012, 8 pp. For more on this document, see CRS Report R42146, Assessing the January 2012 Defense Strategic Guidance (DSG): In Brief, by Catherine Dale and Pat Towell. See also CRS Report R42448, Pivot to the Pacific? The Obama Administration’s “Rebalancing” Toward Asia, coordinated by Mark E. Manyin. Congressional Research Service 22 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • basing arrangements for Navy ships, including numbers and locations of ships homeported in foreign countries; • maintenance and deployment cycles for Navy ships; and • fiscal constraints. With regard to the fourth point above, Navy officials testified in March 2014 that a Navy of 450 ships would be required to fully meet COCOM requests for forward-deployed Navy forces.19 The difference between a fleet of 450 ships and the current goal for a fleet of 306 ships can be viewed as one measure of the operational risk associated with the goal of a fleet of 306 ships. A goal for a fleet of 450 ships might be viewed as a fiscally unconstrained goal. Actions by China starting in November 2013 that appear aimed at achieving a greater degree of control over China’s near-seas region,20 followed by Russia’s seizure and annexation of Crimea in March 2014, have led to a discussion among observers about whether we are currently shifting from the familiar post-Cold War era of the last 20 to 25 years to a new and different strategic era characterized by, among other things, renewed great power competition and challenges to key aspects of the U.S.-led international order that has operated since World War II.21 Some observers in this discussion have used the term “post-Crimea era” or “post-Crimea world.”22 19 Spoken testimony of Admiral Jonathan Greenert at a March 12, 2014, hearing before the House Armed Services Committee on the Department of the Navy’s proposed FY2015 budget, as shown in transcript of hearing. 20 For a summary of these actions, see CRS Report R42784, Maritime Territorial and Exclusive Economic Zone (EEZ) Disputes Involving China: Issues for Congress, by Ronald O'Rourke. 21 See, for example, Anna Applebaum, “China and Russia Bring Back Cold War Tactics,” Washington Post (www.washingtonpost.com), December 25, 2013; Paul Miller, “China, the United States, and Great Power Diplomacy,” Foreign Policy (http://shadow.foreignpolicy.com), December 26 2013; Zachary Keck, “America’s Relative Decline: Should We Panic? The End of the Unipolar Era Will Create New Dangers That the World Mustn’t Overlook,” The Diplomat (http://thediplomat.com), January 24, 2013; Dan Blumenthal and Michael Mazza, “China Is Like Russia,” The Weekly Standard (www.weeklystandard.com), March 18, 2014; Paul D. Miller, “Crimea Proves that Great Power Rivalry Never Left Us,” New York Times (www.nytimes.com), March 21, 2014; March Chad Pillai, “The Return of Great Power Politics: Re-Examining the Nixon Doctrine,” War on the Rocks (http://warontherocks.com), March 27, 2014; Robert Killebrew, “Containing Russia and Restoring American Power,” War on the Rocks (http://warontherocks.com), March 27, 2014; David Roche, “West Stumbles as Autocractic Force Trumps Economics,” Reuters (www.reuters.com), April 1, 2014; David B. Rivkin Jr. and Lee A. Casey, “The Outlaw Vladimir Putin,” Wall Street Journal (http://online.wsj.com), April 8, 2014; Debidatta Aurobinda Mahapatra, “The Post-Crimea World Order,” Russia and India Report (http://in.rbth.com), April 14, 2014; Tom Rotnem, “10 Days That Shook the (PostCold War) World, Marietta Daily Journal (http://mdjonline.com), April 22, 2014; Walter Russell Mead, “The Return of Geopolitics,” Foreign Affairs (www.foreignaffairs.com), May/June 2014; Eric A. Posner, “Sorry, America, the New World Order Is Dead,” Foreign Policy (www.foreignpolicy.com), May 6, 2014; Dan Blumenthal and Michael Mazza, “China and The Age of Contempt,” Foreign Policy (http://shadow.foreignpolicy.com), May 15, 2014; Robert Kagan, “Superpowers Don’t Get to Retire,” New Republic (www.newrepublic.com), May 26, 2014; Walter Russell Mead, “Putin Did Americans a Favor,” Wall Street Journal (http://online.wsj.com), June 1, 2014; James R. Holmes, “5 Ways Europe Can Help the US Pivot,” The Diplomat (http://thediplomat.com), June 2, 2014; Walter Russell Mead, “For the U.S., a Disappointing World,” Wall Street Journal (http://online.wsj.com), June 13, 2014; James Kitfield, “The New Great Power Triangle Tilt: China, Russia Vs. U.S.,” Breaking Defense (http://breaking defense.com), June 19, 2014; Frank Hoffman, “No Strategic Success Without 21st Century Seapower: Forward Partnering,” War on the Rocks (http://warontherocks.com), July 1, 2014; David Hodges, “The Only Defense,” Commentary (www.commentarymagazine.com), July 1, 2014; Marc M. Wall, “The Great Eurasian Rebalancing Act,” PacNet (Pacific Forum CSIS), Number 52, July 7, 2014. 22 See, for example, Jim Thomas, “How to Put Military Pressure on Russia,” Wall Street Journal (http://online.wsj.com), March 9, 2014; Debidatta Aurobinda Mahapatra, “The Post-Crimea World Order,” Russia and India Report (http://in.rbth.com), April 14, 2014; Tom Rotnem, “10 Days That Shook the (Post-Cold War) World, Marietta Daily Journal (http://mdjonline.com), April 22, 2014; “Reshaping Transatlantic Defense and Security for a (continued...) Congressional Research Service 23 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress A shift in strategic eras can lead to a reassessment of assumptions and frameworks of analysis relating to defense funding levels, strategy, missions, plans, and programs. The shift from the Cold War to the post-Cold War era led to such a reassessment in the early 1990s. This reassessment led to numerous substantial changes in U.S. defense plans and programs.23 Numerous other defense programs were changed to lesser degrees or were not changed. A shift from the post-Cold War era to a new strategic era could lead to a new reassessment of assumptions and frameworks of analysis relating to defense funding levels, strategy, missions, plans, and programs. There are some indications that elements of such a reassessment may have begun. For example, some observers, including General Philip Breedlove, the Commander of U.S. European Command, have raised the issue of whether the United States should consider halting the U.S. military drawdown in Europe, so as to respond to a more assertive Russia.24 As another possible example, Secretary of Defense Chuck Hagel, in his February 2014 announcement regarding the Littoral Combat Ship (LCS) program, stated in part: The LCS was designed to perform certain missions—such as mine sweeping and antisubmarine warfare—in a relatively permissive environment. But we need to closely examine whether the LCS has the independent protection and firepower to operate and survive against (...continued) Post-Crimean World,” Panel remarks by NATO Deputy Secretary General Ambassador Alexander Vershbow at the Wrocław Global Forum (Poland), accessed July 2,2014, at http://www.nato.int/cps/en/natolive/opinions_110902.htm? selectedLocale=en; Lilia Shevtsova, “Crowning a Winner in the Post-Crimea World,” American Interest (www.theamerican-interest.com), June 16, 2014; Evan Braden Montgomery, “China’s Missile Forces Are Growing: Is It Time to Modify the INF Treaty?” The National Interest (http://nationalinterest.org), July 2, 2014. 23 The shift from the Cold War to the post-Cold War era led to a shift in the Navy’s formal planning emphasis away from the scenario of mid-ocean operations against Soviet naval forces during a NATO-Warsaw Pact conflict and toward operations in littoral waters against the land- and sea-based forces of countries other than Russia. This shift was formalized in a Navy/Marine Corps strategy document entitled ...From the Sea (the ellipse is part of the title), which was first issued in late 1992. (The text of this document is available at http://www.au.af.mil/au/awc/awcgate/navy/ fromsea/fromsea.txt.) The shift in strategic eras and in the Navy’s formal planning emphasis led to numerous changes in Navy plans and programs. In terms of overall Navy force structure, the planned size of the fleet was reduced considerably. In undersea warfare, changes included the truncation of the Seawolf (SSN-21) submarine program, the initiation of the successor Virginia-class submarine program, an increased emphasis on shallow-water antisubmarine warfare (ASW) operations (including torpedoes with improved shallow-water performance), and a reduced emphasis on blue-water ASW operations. In surface warfare, the shift in planning emphasis led to the initiation of a program for a multimission destroyer (now known as the DDG-1000) with an emphasis on operations in littoral waters and landattack operations, the initiation years later of the Littoral Combat Ship (LCS) program for addressing identified capability gaps for countering mines, small boats, and diesel-electric submarines in littoral waters. In naval aviation, changes in projected mission demands, defense spending levels and (in the case of the A-12 program) development challenges led to a broad restructuring of naval aviation acquisition programs, including the termination of the A-12 program, the halting of plans or proposals for procuring other types of carrier-based aircraft, the termination of a program to develop a new long-range air-to-air missile for carrier-based fighters, and the initiation of the F/A-18E/F program. For additional discussion of the then-emerging impact on Navy plans and programs resulting from the shift from the Cold War to the post-Cold War era, see Ronald O’Rourke, “The Future of the U.S. Navy,” in Joel J. Sokolsky and Joseph T. Jockel, editors, Fifty Years of Canada-United States Defense Cooperation, The Road From Ogdensburg, Edwin Mellen Press, 1992 (papers delivered at “The Road from Ogdensburg: Fifty Years of Canada-U.S. Defense Cooperation,” a conference held August 16-17, 1990, at St. Lawrence University, Canton, New York), pp. 289-331. 24 Philip Ewing, “General: U.S. Should Stop European Drawdown,” Poliltico Pro Defense, July 1, 2014. See also Steven Erlanger, “Europe Begins to Rethink Cuts to Military Spending,” New York Times (www.nytimes.com), March 26, 2014; Andrew Tilghman, “Spotlight Back on U.S. European Command,” Military Times (www.militarytimes.com), March 27, 2014; Peter Apps and Adrian Croft, “Crimean Pushes NATO Back to Russian Focus,” Reuters (www.reuters.com), March 19, 2014; Karen DeYoung, “As U.S. Ponders Next Moves on Crimea, Experts Rethink NATO’s Defense Posture,” Washington Post (www.washingtonpost.com), March 18, 2014; Steven Erlanger, “Russia’s Aggression in Crimea Brings NATO Into Renewed Focus,” New York Times (www.nytimes.com), March 18, 2014. Congressional Research Service 24 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress a more advanced military adversary and emerging new technologies, especially in the Asia Pacific. If we were to build out the LCS program to 52 ships, as previously planned, it would represent one- sixth of our future 300-ship Navy. Given continued fiscal restraints, we must direct shipbuilding resources toward platforms that can operate in every region and along the full spectrum of conflict.25 For additional discussion of the relationship between U.S. strategy and the size and structure of U.S. naval forces that can form part of the context for assessing the 30-year shipbuilding plan, see Appendix C. Some study groups have made their own proposals for Navy ship force structure that reflect their own perspectives on the points listed above (particularly the first three and the final one) shows some of these proposals. For purposes of comparison, Table 7 also shows the Navy’s 306-ship goal of January 2013. 25 Remarks by Secretary Hagel and Gen. Dempsey on the fiscal year 2015 budget preview in the Pentagon Briefing Room, February 24, 2014, accessed July 1, 2016, at http://www.defense.gov/transcripts/transcript.aspx?transcriptid= 5377. Congressional Research Service 2514 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Oversight Issues for Congress for FY2016 Potential Impact on Size and Capability of Navy of Limiting DOD Spending to BCA Caps Through FY2021 One potential issue for Congress concerns the potential impact on the size and capability of the Navy of limiting DOD spending through FY2021 to levels at or near the caps established in the Budget Control Act of 2011 (BCA) as amended. Navy officials state that a decision to reduce DOD’s budget to such levels would eventually lead to a smaller and less capable Navy. Admiral Jonathan Greenert, the Chief of Naval Operations, provided detailed testimony on this question in his prepared statements for hearings before the Senate Armed Services Committee on November 7, 2013, and the House Armed Services Committee on September 18, 2013.8 In further testimony on this issue to the Senate Armed Services Committee on January 28, 2015, Greenert stated: A return to sequestration in FY 2016 would necessitate a revisit and revision of the DSG [Defense Strategic Guidance document of January 2012]. Required cuts will force us to further delay critical warfighting capabilities, reduce readiness of forces needed for contingency response, forego or stretch procurement of ships and submarines, and further downsize weapons capability. We will be unable to mitigate the shortfalls like we did in FY2013 [in response to the sequester of March 1, 2013] because [unobligated] prior-year investment balances [which were included in the funds subject to the sequester] were depleted under [the] FY 2013 sequester [of March 1, 2013]. The revised discretionary caps imposed by sequestration would be a reduction of about $10 billion in our FY 2016 budget alone, as compared to PB-2015. From FY 2016-2020, the reduction would amount to approximately $36 billion. If forced to budget at this level, it would reduce every appropriation, inducing deep cuts to Navy Operation and Maintenance (O&M), investment, and modernization accounts. The Research, Development, Test and Evaluation (RDT&E) accounts would likely experience a significant decline across the FYDP, severely curtailing the Navy’s ability to develop new technologies and asymmetric capabilities. As I testified to this committee in November 2013, any scenario to address the fiscal constraints of the revised discretionary caps must include sufficient readiness, capability and manpower to complement the force structure capacity of ships and aircraft. This balance would need to be maintained to ensure each unit will be effective, even if the overall fleet is not able to execute the DSG. There are many ways to balance between force structure, readiness, capability, and manpower, but none that Navy has calculated that enable us to confidently execute the current defense strategy within dictated budget constraints. 8 See Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the Senate Armed Services Committee on the Impact of Sequestration on the National Defense, November 7, 2013, pp. 7-11, and Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the House Armed Services Committee on Planning for Sequestration in FY 2014 and Perspectives of the Military Services on the Strategic Choices and Management Review, September 18, 2013, pp. 6-10. Congressional Research Service 15 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress As detailed in the Department of Defense’s April 2014 report, “Estimated Impacts of Sequestration-Level Funding,” one potential fiscal and programmatic scenario would result in a Navy of 2020 that would be unable to execute two of the ten DSG missions due to the compounding effects of sequestration on top of pre-existing FY 2013, 2014, and 2015 resource constraints. Specifically, the cuts would render us unable to sufficiently Project Power Despite Anti-Access/Area Denial Challenges and unable to Deter and Defeat Aggression. In addition, we would be forced to accept higher risk in five other DSG missions: Counter Terrorism and Irregular Warfare; Defend the Homeland and Provide Support to Civil Authorities; Provide a Stabilizing Presence; Conduct Stability and Counterinsurgency Operations; and Conduct Humanitarian, Disaster Relief, and Other Operations. (Table 2 provides more detail on mission risks.) In short, a return to sequestration in FY 2016 will require a revision of our defense strategy. Critical assumptions I have used to base my assessments and calculate risk: Navy must maintain a credible, modern, and survivable sea-based strategic deterrent Navy must man its units Units that deploy must be ready People must be given adequate training and support services Readiness for deployed forces is a higher priority than contingency response forces Capability must be protected, even at the expense of some capacity Modernized and asymmetric capabilities (advanced weapons, cyber, electronic warfare) are essential to projecting power against evolving, sophisticated adversaries The maritime industrial base is fragile—damage can be long-lasting, hard to reverse The primary benchmarks I use to gauge Navy capability and capacity are DoD Global Force Management Allocation Plan presence requirements, Combatant Commander Operation and Contingency Plans, and Defense Planning Guidance Scenarios. Navy’s ability to execute DSG missions is assessed based on capabilities and capacity resident in the force in 2020. The following section describes specific sequestration impacts to presence and readiness, force structure investments, and personnel under this fiscal and programmatic scenario: Presence and Readiness A return to sequestration would reduce our ability to deploy forces on the timeline required by Global Combatant Commands in the event of a contingency. Of the Navy’s current battle force, we maintain roughly 100 ships forward deployed, or 1/3 of our entire Navy. Included among the 100 ships are two CSG and two ARG forward at all times. CSGs and ARGs deliver a significant portion of our striking power, and we are committed to keeping, on average, three additional CSGs and three additional ARGs in a contingency response status, ready to deploy within 30 days to meet operation plans (OPLANs). However, if sequestered, we will prioritize the readiness of forces forward deployed at the expense of those in a contingency response status. We cannot do both. We will only be able to provide a response force of one CSG and one ARG. Our current OPLANs require a significantly more ready force than this reduced surge capacity could provide, because they are predicated on our ability to respond rapidly. Less contingency response capacity can mean higher casualties as Congressional Research Service 16 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress wars are prolonged by the slow arrival of naval forces into a combat zone. Without the ability to respond rapidly enough, our forces could arrive too late to affect the outcome of a fight. Our PB-2015 base budget funded ship and aviation depot maintenance to about 80 percent of the requirement in FY 2016-2019. This is insufficient in maintaining the Fleet and has forced us to rely upon Overseas Contingency Operations (OCO) funding to address the shortfall. Sequestration would further aggravate existing Navy backlogs. The impacts of these growing backlogs may not be immediately apparent, but will result in greater funding needs in the future to make up for the shortfalls each year and potentially more material casualty reports (CASREPs), impacting operations. For aviation depot maintenance, the growing backlog will result in more aircraft awaiting maintenance and fewer operational aircraft on the flight line, which would create untenable scenarios in which squadrons would only get their full complement of aircraft just prior to deployment. The situation will lead to less proficient aircrews, decreased combat effectiveness of naval air forces, and increased potential for flight and ground mishaps. Critical to mission success, our shore infrastructure provides the platforms from which our Sailors train and prepare. However, due the shortfalls over the last three years, we have been compelled to reduce funding in shore readiness since FY 2013 to preserve the operational readiness of our fleet. As a result, many of our shore facilities are degrading. At sequestration levels, this risk will be exacerbated and the condition of our shore infrastructure, including piers, runways, and mission-critical facilities, will further erode. This situation may lead to structural damage to our ships while pierside, aircraft damage from foreign object ingestion on deteriorated runways, and degraded communications within command centers. We run a greater risk of mishaps, serious injury, or health hazards to personnel. Force Structure Investments We must ensure that the Navy has the required capabilities to be effective, even if we cannot afford them in sufficient capacity to meet the DSG. The military requirements laid out in the DSG are benchmarked to the year 2020, but I am responsible for building and maintaining capabilities now for the Navy of the future. While sequestration causes significant near-term impacts, it would also create serious problems that would manifest themselves after 2020 and would be difficult to recover from. In the near term, the magnitude of the sequester cuts would compel us to consider reducing major maritime and air acquisition programs; delaying asymmetric capabilities such as advanced jammers, sensors, and weapons; further reducing weapons procurement of missiles, torpedoes, and bombs; and further deferring shore infrastructure maintenance and upgrades. Because of its irreversibility, force structure cuts represent options of last resort for the Navy. We would look elsewhere to absorb sequestration shortfalls to the greatest extent possible. Disruptions in naval ship design and construction plans are significant because of the longlead time, specialized skills, and extent of integration needed to build military ships. Because ship construction can span up to nine years, program procurement cancelled in FY 2016 will not be felt by the Combatant Commanders until several years later when the size of the battle force begins to shrink as those ships are not delivered to the fleet at the planned time. Likewise, cancelled procurement in FY 2016 will likely cause some suppliers and vendors of our shipbuilding industrial base to close their businesses. This skilled, experienced and innovative workforce cannot be easily replaced and it could take years to recover from layoffs and shutdowns; and even longer if critical infrastructure is lost. Stability and Congressional Research Service 17 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress predictability are critical to the health and sustainment of this vital sector of our Nation’s industrial capacity. Personnel In FY 2013 and 2014, the President exempted all military personnel accounts from sequestration out of national interest to safeguard the resources necessary to compensate the men and women serving to defend our Nation and to maintain the force levels required for national security. It was recognized that this action triggered a higher reduction in nonmilitary personnel accounts. If the President again exempts military personnel accounts from sequestration in FY 2016, then personnel compensation would continue to be protected. Overall, the Navy would protect personnel programs to the extent possible in order to retain the best people. As I testified in March 2014, quality of life is a critical component of the quality of service that we provide to our Sailors. Our Sailors are our most important asset and we must invest appropriately to keep a high caliber all-volunteer force. We will continue to fund Sailor support, family readiness, and education programs. While there may be some reductions to these programs if sequestered in FY 2016, I anticipate the reductions to be relatively small. However, as before, this would necessitate higher reductions to the other Navy accounts. Conclusion Navy is still recovering from the FY 2013 sequestration in terms of maintenance, training, and deployment lengths. Only 1/3 of Navy contingency response forces are ready to deploy within the required 30 days. With stable and consistent budgets, recovery is possible in 2018. However, if sequestered, we will not recover within this FYDP. For the last three years, the Navy has been operating under reduced top-lines and significant shortfalls: $9 billion in FY 2013, $5 billion in FY 2014 and $11 billion in FY 2015, for a total shortfall of about $25 billion less than the President’s budget request. Reverting to revised sequester-level BCA caps would constitute an additional $5-10 billion decrement each year to Navy’s budget. With each year of sequestration, the loss of force structure, readiness, and future investments would cause our options to become increasingly constrained and drastic. The Navy already shrank 23 ships and 63,000 personnel between 2002 and 2012. It has few options left to find more efficiencies. While Navy will do its part to help the Nation get its fiscal house in order, it is imperative we do so in a coherent and thoughtful manner to ensure appropriate readiness, warfighting capability, and forward presence—the attributes we depend upon for our Navy. Unless naval forces are properly sized, modernized at the right pace, ready to deploy with adequate training and equipment, and capable to respond in the numbers and at the speed required by Combatant Commanders, they will not be able to carry out the Nation’s defense strategy as written. We will be compelled to go to fewer places, and do fewer things. Most importantly, when facing major contingencies, our ability to fight and win will neither be quick nor decisive. Unless this Nation envisions a significantly diminished global security role for its military, we must address the growing mismatch in ends, ways, and means. The world is becoming more complex, uncertain, and turbulent. Our adversaries’ capabilities are diversifying and expanding. Naval forces are more important than ever in building global security, projecting power, deterring foes, and rapidly responding to crises that affect our national security. A Congressional Research Service 18 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress return to sequestration would seriously weaken the United States Navy’s ability to contribute to U.S. and global security.9 Greenert’s testimony concluded with the following table: Figure 1. Navy Table on Mission Impacts of Limiting Navy’s Budget to BC Levels Source: Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the Senate Armed Services Committee on the Impact of Sequestration on National Defense, January 28, 2015. Appropriate Future Size and Structure of Navy in Light of Strategic and Budgetary Changes A related oversight issue for Congress concerns the appropriate future size and structure of the Navy. Changes in strategic and budgetary circumstances have led to a broad debate over the future size and structure of the military, including the Navy. Changes in strategic circumstances include, among other things, the end of major U.S. ground combat operations in Iraq, the winding down of U.S. combat operations in Afghanistan, China’s military (including naval) modernization 9 Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the Senate Armed Services Committee on the Impact of Sequestration on National Defense, January 28, 2015, pp. 4-9. Congressional Research Service 19 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress effort,10 maritime territorial disputes involving China,11 Russia’s seizure and annexation of Crimea, and the U.S. commitment to counter the Islamic State organization. The Navy’s current goal for a fleet of 306 ships reflects a number of judgments and planning factors (some of which the Navy receives from the Office of the Secretary of Defense), including but not limited to the following: • U.S. interests and the U.S. role in the world, and the U.S. military strategy for supporting those interests and that role; • current and projected Navy missions in support of U.S. military strategy, including both wartime operations and day-to-day forward-deployed operations; • current and projected capabilities of potential adversaries, including their antiaccess/area-denial (A2/AD) capabilities; • regional combatant commander (COCOM) requests for forward-deployed Navy forces; • the individual and networked capabilities of current and future Navy ships and aircraft; • basing arrangements for Navy ships, including numbers and locations of ships homeported in foreign countries; • maintenance and deployment cycles for Navy ships; and • fiscal constraints. With regard to the fourth point above, Navy officials testified in March 2014 that a Navy of 450 ships would be required to fully meet COCOM requests for forward-deployed Navy forces.12 The difference between a fleet of 450 ships and the current goal for a fleet of 306 ships can be viewed as one measure of the operational risk associated with the goal of a fleet of 306 ships. A goal for a fleet of 450 ships might be viewed as a fiscally unconstrained goal. Actions by China starting in November 2013 that appear aimed at achieving a greater degree of control over China’s near-seas region,13 followed by Russia’s seizure and annexation of Crimea in March 2014, have led to a discussion among observers about whether we are currently shifting from the familiar post-Cold War era of the last 20 to 25 years to a new and different strategic era characterized by, among other things, renewed great power competition and challenges to key aspects of the U.S.-led international order that has operated since World War II. A shift in strategic eras can lead to a reassessment of defense funding levels, strategy, missions, plans, and programs. The shift from the Cold War to the post-Cold War era led to such a reassessment in the 10 For more on the modernization of China’s military (particularly naval) capabilities and its potential implications for required U.S. Navy capabilities, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy Capabilities—Background and Issues for Congress, by Ronald O'Rourke. 11 For a discussion of these disputes, see CRS Report R42784, Maritime Territorial and Exclusive Economic Zone (EEZ) Disputes Involving China: Issues for Congress, by Ronald O'Rourke. See also CRS Report R42930, Maritime Territorial Disputes in East Asia: Issues for Congress, by Ben Dolven, Mark E. Manyin, and Shirley A. Kan. 12 Spoken testimony of Admiral Jonathan Greenert at a March 12, 2014, hearing before the House Armed Services Committee on the Department of the Navy’s proposed FY2015 budget, as shown in transcript of hearing. 13 For a summary of these actions, see CRS Report R42784, Maritime Territorial and Exclusive Economic Zone (EEZ) Disputes Involving China: Issues for Congress, by Ronald O'Rourke. Congressional Research Service 20 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress early 1990s. A shift from the post-Cold War era to a new strategic era could lead to a new reassessment of defense funding levels, strategy, missions, plans, and programs.14 For additional discussion of the relationship between U.S. strategy and the size and structure of U.S. naval forces that can form part of the context for assessing the 30-year shipbuilding plan, see Appendix C. Some study groups have made their own proposals for Navy ship force structure that reflect their own perspectives on the points listed above (particularly the first three and the final one). For purposes of comparison, Table 7 also shows the Navy’s 306-ship goal of January 2013. 14 For a discussion, see CRS Report R43838, A Shift in the International Security Environment: Potential Implications for Defense—Issues for Congress, by Ronald O'Rourke. Congressional Research Service 21 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table 7. Recent Study Group Proposals for Navy Ship Force Structure Sustainable Defense Task Force (June 2010) Center for a New American Security (CNAS) (November 2008) Center for Strategic and Budgetary Assessments (CSBA) (2008)b 14 7 14 12 0 4 4 0 2 55 40 55 37 40 41 9 11 8 11 9 8 11 0 0 0 0 0 0 0 4 88 72-74 88 22 n/a 18 14 65 n/a 56 73 Frigate 0 2-7j 14 n/a 0 0 9e LCS 52 12j 4 n/a 25 48 55 SSC 0 j 0 n/a 0 40 0f Navy’s 306ship goal of January 2013 Project on Defense Alternatives (PDA) (November 2012) Cato Institute (September 2010)a Independent Panel Assessment of 2010 QDR (July 2010) Heritage Foundation (April 2011) SSBN 12 7 14c 6 SSGN 0 6-7 4 SSN 48 42 CVN 11 CVE Ship type Submarines Aircraft carriers Surface combatants Cruiser Destroyer 28d 0 85 Amphibious and Maritime Prepositioning Force (Future) (MPF[F]) ships Amphibious ships 33 >23 37 23 n/a 27 36 33 MPF(F) ships 0 n/a 0 0 n/a n/a 0 3g LSD station ships 0 0 0 0 0 0 0 7h 0 0 0 36 40 230 300 Other: Mine warfare (MIW) ships; Combat Logistics Force (CLF) ships (i.e., at-sea resupply ships), and support ships MIW 0 14j 14 11 0 CLF ships 29 n/a 33 21 n/a Support ships 33 n/a 25 27 n/a 306 230 309 241 346 TOTAL battle force ships 31 31 326i Source: Table prepared by CRS based on the following sources: For Heritage Foundation: A Strong National Defense[:] The Armed Forces America Needs and What They Will Cost, Heritage Foundation, April 5, 2011, pp. 2526. For Cato Institute: Benjamin H. Friedman and Christopher Preble, Budgetary Savings from Military Restraint, Washington, Cato Institute, September 23, 2010 (Policy Analysis No. 667), pp. 6, 8-10, and additional information provided by Cato Institute to CRS by email on September 22, 2010. For Independent Panel Assessment: Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on pages 58-59. For Sustainable Defense Task Force: Debt, Deficits, and Defense, A Way Forward[:] Report of the Sustainable Defense Task Force, June 11, 2010, pp. 19-20. For CNAS: Frank Hoffman, From Preponderance to Partnership: American Maritime Power in the 21st Century. Washington, Center for a New American Security, November 2008. p. 19 (Table 2). For CSBA: Robert O. Work, The US Navy[:] Charting a Course for Tomorrow’s Fleet. Washington, Center for Strategic and Budgetary Assessments, 2008. p. 81 (Figure 5). For PDA: Carl Conetta, Reasonable Defense, Project on Defense Alternatives, November 14, 2012, 31 pp. Congressional Research Service 2622 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack submarine; CVN is large nuclear-powered aircraft carrier; CVE is medium-sized aircraft carrier; LCS is Littoral Combat Ship; SSC (an acronym created by CRS for this table) is small surface combatant of 1,000+ tons displacement—a ship similar to late-1990s Streetfighter concept; MPF(F) is Maritime Prepositioning Force (Future) ship; LSD is LSD-41/49 class amphibious ship operating as a station ship for a formation like a Global Fleet Station (GFS); MIW is mine warfare ship; CLF is combat logistics force (i.e., resupply) ship. a. Figures shown are for the year 2020; for subsequent years, reductions from these figures would be considered. b. Figures shown are for the year 2028. c. The report calls for a force of 280 SLBMs, which appears to equate to a force of 14 SSBNs, each with 20 SLBM tubes. d. The report calls for a force of 28 small surface combatants, and appears to use the term small surface combatants the same way that the Navy does in the 30-year shipbuilding plan—as a way of collectively referring to frigates and LCSs. The small surface combatants (SSCs) called for in the November 2008 CNAS report are separate from and smaller than the LCS. e. Maritime Security Frigates. f. Plan includes 28 patrol craft (PCs) of a few hundred tons displacement each, as well as 29 boat detachments and seven riverine squadrons. g. Plan shows three Mobile Landing Platform (MLP) ships that the Navy currently plans for the MPF(F) squadron, plus 16 existing current-generation maritime prepositioning force (MPF) ships and 17 existing prepositioning ships for Army and other service/agency equipment. Plan also shows 67 other DOD sealift ships. h. T-LSDs, meaning LSDs operated by the Military Sealift Command (MSC) with a partly civilian crew. i. The CSBA report shows a total of 488 units by including 162 additional force units that do not count toward the 306-ship goal under the battle force ships counting method that has been used since the early 1980s for public policy discussions of the size of the Navy. These 162 additional force units include 16 existing current-generation maritime prepositioning force (MPF) ships and 17 existing prepositioning ships for Army and other service/agency equipment, 67 other DOD sealift ships, 28 PCs, 29 boat detachments, and certain other small-scale units. The CSBA report proposes a new counting method for naval/maritime forces that includes units such as these in the total count. j. The report “prescribes ending procurement of the LCS with the 12 already purchased. The Reasonable Defense model foresees a future cohort of 28 to 33 small surface combatants, including a mix of the 12 LCS that have already been procured, 14 Mine Counter Measure (MCM) ships already in the fleet, and small frigates or ocean-going corvettes. As the MCM ships age and leave the fleet, the LCS should assume their role. The would leave a post-MCM requirement for 16 to 21 additional small surface combatants. For this, the Navy needs a simpler, less expensive alternative to the LCS.” A potential key question for Congress concerns whether the U.S. Navy in coming years will be large enough to adequately counter improved Chinese maritime A2/AD forces while also adequately performing other missions of interest to U.S. policy makerspolicymakers around the world. Some observers are concerned that a combination of growing Chinese naval capabilities and budgetdriven reductions in the size of the U.S. Navy could encourage Chinese military overconfidence and demoralize U.S. allies and partners in the Pacific, and thereby make it harder for the United States to defend its interests in the region.2615 Potential oversight questions for Congress include the following: 2615 See, for example, Dan Blumenthal and Michael Mazza, “Asia Needs a Larger U.S. Defense Budget,” Wall Street Journal, July 5, 2011; J. Randy Forbes, “Defence Cuts Imperil US Asia Role,” The Diplomat (http://the-diplomat.com), October 26, 2011. See also Andrew Krepinevich, “Panetta’s Challenge,” Washington Post, July 15, 2011: 15; Dean Cheng, Sea Power and the Chinese State: China’s Maritime Ambitions, Heritage Foundation Backgrounder No. 2576, (continued...) Congressional Research Service 2723 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • Under the Administration’s plans, will the Navy in coming years be large enough to adequately counter improved Chinese maritime A2/AD forces while also adequately performing other missions of interest to U.S. policy makers around the policymakers around the world? • What might be the political and security implications in the Asia-Pacific region of a combination of growing Chinese naval capabilities and budget-driven reductions in the size of the U.S. Navy? • If the Navy is reduced in size and priority is given to maintaining Navy forces in the Pacific, what will be the impact on Navy force levels in other parts of the world, such as the Persian Gulf/Indian Ocean region or the Mediterranean Sea, and consequently on the Navy’s ability to adequately perform its missions in those parts of the world? • To what extent could the operational impacts of a reduction in Navy ship numbers be mitigated through increased use of forward homeporting, multiple crewing, and long-duration deployments with crew rotation (i.e., “Sea Swap”)? How feasible are these options, and what would be their potential costs and benefits?2716 • Particularly in a situation of constrained DOD resources, if enough funding is allocated to the Navy to permit the Navy in coming years to maintain a fleet of 306 ships including 11 aircraft carriers, how much would other DOD programs need to be reduced, and what would be the operational implications of those program reductions in terms of DOD’s overall ability to counter improved Chinese military forces and perform other missions?2817 One observer—the person who until recently was the Navy’s lead force-structure planner—stated the following regarding the Navy’s approach to fleet design: It is time to rethink how we will design the future Fleet in a way that rebalances affordability, platform capability, and deployment processes. We must build it as a whole instead of continuing to “let it happen” one platform requirements decision at a time.... Today the Navy operates about 50 different types of ships and aircraft with individual design-service lives of 20 to 50 years. On average, about two classes of ship or aircraft annually come up for a decision on replacement at the end of their service lives. Each of these decisions, a multi-year joint bureaucratic process with dozens of participating organizations, is made individually. Typically, as a starting point, the new platform must do everything the old one did, except in the more challenging threat environment of the future. All of the decision-making organizations generally advocate for the next-generation platform to have the desired capabilities unmet by the old one—particularly since any additional unit cost is not their bill. It is no surprise that this process leads to steadily increasing platform and overall Fleet cost.... (...continued) July 11, 2011, p. 10. 2716 For further discussion of these options, see CRS Report RS21338, Navy Ship Deployments: New Approaches— Background and Issues for Congress, by Ronald O'Rourke. 2817 For further discussion, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy Capabilities—Background and Issues for Congress, by Ronald O'Rourke. Congressional Research Service 2824 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The future Fleet is being designed ad hoc, one platform at a time, and we cannot afford this. How can we change the trend toward an ever-smaller Fleet of ever-better platforms while maintaining the capability superiority needed to execute our missions? It will take a topdown design to provide a structure in which individual platform requirements can be shaped and disciplined despite all of the pressures. We will have to consider distributing capabilities to a greater extent across a force that is securely networked, at least within line of sight, rather than putting as many as possible on each individual platform and continuing to drive up its size and cost. We will have to consider separating weapon magazines from the sensors that direct the weapons rather than putting both on the same platform. Another option is increasing reliance on deep-magazine directed energy systems, and on force-wide coordinated soft-kill and counter-targeting techniques, rather than on engaging each threat with ever-larger and more expensive kinetic weapons. We can also think about increasing reliance on penetrating highthreat areas with longer-range weapons or with preprogrammed unmanned systems rather than with manned platforms. Few of these options would rise to the top in the requirements decision-making process for any individual platform. They only start to make sense when considered and competed at a Fleet-wide level. Developing an overall fleet design to structure and discipline individual platform requirements is no small task. Simply constraining platform cost without dealing with how capabilities might be delivered differently is not sufficient. This is not a once-and-done process, as changes in threat and in our own technology options will never stop. But neither can it be a process that changes the design in some fundamental way every year or two—it will have to influence platform requirements for a long period of time to affect a significant number of new platform designs. We cannot afford to retire legacy platforms prematurely simply because they are not optimized within our new Fleet design, which will take time to implement and have to be done incrementally. Real and fundamental change in the roles, missions, and interdependencies among platform types, and in the balance between manned and unmanned and between platform and payload, is an inevitable outcome of a Fleet design process. That is the point. Change is hard, and it will have to be authorized and directed by the Navy’s leadership or risk not happening. A number of ideas for a new Fleet design have been offered recently from outside the Navy’s decision-making mainstream. However, all have had significant flaws, so they have not received serious consideration. They have assumed things such as beyond line-of-sight networking that has no survivable future in the face of adversary counter-space capability; autonomy of unmanned vehicles in executing lethal missions that is beyond the projected capability of software and U.S. rules of engagement to support; and the use of platforms too small to be capable of global deployment and sustained sea-based operations, which is how the U.S. Navy must deliver global naval power. The future Fleet design must be grounded in technical and operational reality, and it has to come from inside the Navy system.... Developing a rich list of operationally-realistic options supported by rigorous analysis of cost and feasibility is foundational. It could include: • The use of a common large aviation-ship hull for Navy sea-control/power-projection air wings and for Marine Corps vertical-raid/assault-air wings, reconfigurable between the two missions between the deployments; • Surface combatants with smaller vertical-launch magazines that can reload at sea from logistic ships or remotely fire weapons carried in supplementary magazines on logistic ships; Congressional Research Service 2925 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • Separate classes of surface combatants optimized for air defense or antisubmarine warfare within a common hull type that can self-defend in peacetime but aggregate to fight offensively in wartime; • Tactical-combat aircraft that are optimized for endurance and carriage of long-range weapons rather than for penetrating sophisticated defenses carrying short-range weapons; • Large shore-launched unmanned undersea vehicles that take the place of submarines for preprogrammed missions such as covert surveillance or mine-laying; • Use of a common hull type for all of the large non-combatant ship missions such as command ships, tenders, hospital ships, ground vehicle delivery, and logistics; and • Elimination of support models that are based on wartime reliance on reach-back access to unclassified cyber networks connected by vulnerable communications satellites or to an indefensible global internet.... The Navy’s long-term force structure requirement is a 306-ship Fleet of the currentlyplanned designs, of which about 120 (or 40 percent of the force) would be deployed day-today. It would also be able to surge an additional 75 ships (another 25 percent) within two months to meet warfighting capacity requirements. In other words, about 65 percent is employed or rapidly employable. This sounds good, but the reality is that 30 of these 120 deployed ships would be permanently homeported overseas; 26 would be LCSs that use the rotation of their small military crews to keep 50 percent of that class forward deployed; and 40 would be Military Sealift Command support ships that use rotational civilian mariner crewing to keep the ships deployed 75 percent of the time. The remaining 25 of the forward-deployed force will be large and complex multibillion dollar warships with all-military crews, supported out of a rotation base of 140 such ships. In other words, we plan to buy and operate five of our most expensive ships to keep one deployed. This is not an efficient way to operate. In times of reduced funding our design must address ways to meet our deployment goals with a smaller rotation base while preserving wartime surge capacity. Many studies and trials have been done over the years on options for reducing the total number of ships needed to sustain the Navy’s robust peacetime forward-deployed posture. Increasing forward homeporting in other nations always comes up as the first choice. While it is a good one, few countries beyond those that currently support this (Japan, Spain, Italy, and Bahrain) are willing to tolerate a permanent new U.S. shore footprint. Building new shore-support infrastructure in foreign countries to back this results in a large bill for construction jobs outside the United States, which Congress normally finds unappetizing. Using rotational crews to keep ships forward for extended periods without long deployments for their sailors is an efficient option that works for ships with small crews like LCSs, legacy mine-warfare ships, or Military Sealift Command support ships. Experiments in which this has been done with military crews on large complex warships have not turned out well. This was due both to the logistics of moving large crews overseas for turnovers and the difficulty of maintaining exact configuration commonality within ships of a class so that a crew arriving on a ship overseas has trained before deployment on an identical ship (or simulator) at home. Conversions of ships from military manning to Military Sealift Command civilian mariner crews that routinely rotate individual crewmembers to sustain ships forward are limited by the law of war concerning what military actions civilians can perform, and there are few legal options left for further expansion of this approach. Congressional Research Service 3026 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress What is left in the force-generation model of our current Fleet is a force of our most complex warships—aircraft carriers, submarines, destroyers, and amphibious ships—operating with permanently-assigned military crews in the “Fleet Readiness Program” cycle of maintaintrain-deploy with a deployed output of one in five. Future designs must address this model and find ways to get more deployed time out of these expensive ships and crews—without exceeding the current objective of having military crewmembers spend no more than 50 percent of their time away from homeport over a complete multi-year operating cycle. The current limiting factor is the period required to train the crew as a team before deployment following the inactivity and crew turnover of the shipyard maintenance period. Naval aviation is steadily moving toward the increased use of high-fidelity single and multiaircraft simulation as a means of developing and sustaining operational proficiency with reduced use of expensive live flying. These simulators are funded as part of the overall fielding plan for the aircraft and were also built for the ballistic-missile submarine force to support its Blue-Gold crew manning concept. There is no equivalent model or set of off-ship simulators for major sections of the crews of conventional surface warships (other than the LCS) for nuclear-aircraft carriers or for attack submarines. A Fleet design that bought such simulation capability as part of its ship production programs—the way that aircraft programs do—would have significant potential for improving operational output by reducing the time to train for deployment after maintenance periods. Today’s Fleet design is the product of many separate and disconnected decisions about the required capabilities of 50 different types of ships and aircraft. While not ineffective, it is definitely too expensive. The budget constraints facing the Navy for the next 20 years are not matched by a projected reduction in the quantity or capability of forces that must be delivered forward every day or surged forward in wartime. The only way to meet these demands within available resources is to develop a design that provides a structure within which the capabilities of future platforms can be shaped to meet the Fleet’s missions efficiently as an overall force. Doing this will require a systems-level approach to defining what it must be able to do, and will mean abandoning some cherished traditions of what each type of platform should do. The alternative is a Navy no longer large or capable enough to do the nation’s business.2918 Affordability of 30-Year Shipbuilding Plan Another potential oversight issue for Congress concerns the prospective affordability of the Navy’s 30-year shipbuilding plan. In assessing the prospective affordability of the 30-year plan, key factors that Congress may consider include estimated ship procurement costs and future shipbuilding funding levels. Each of these is discussed below. Estimated Ship Procurement Costs If one or more Navy ship designs turn out to be more expensive to build than the Navy estimates, then the projected funding levels shown in the 30-year shipbuilding plan will not be sufficient to procure all the ships shown in the plan. Ship designs that can be viewed as posing a risk of being more expensive to build than the Navy estimates include Gerald R. Ford (CVN-78) class aircraft carriers, Ohio-replacement (SSBNX) class ballistic missile submarines, the Flight III version of the DDG-51 destroyer, the TAO(X) oiler, and the LX(R) amphibious ship. 2918 Arthur H. Barber, “Rethinking The Future Fleet,” U.S. Naval Institute Proceedings, May 2014: 48-52. Congressional Research Service 3127 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress In recent years, the Congressional Budget Office (CBO) has estimated that certain Navy ships would be more expensive to procure than the Navy estimates, and consequently that the Navy’s 30-year shipbuilding plan would cost more to implement than the Navy has estimated. In its October 2013 report on the cost of the FY2014 30-year shipbuilding plan, the CBO estimated that the plan would cost an average of $19.3 billion per year in constant FY2013 dollars to implement, or about 15% more than the Navy estimated. CBO’s estimate is about 6% higher than the Navy’s estimate for the first 10 years of the plan, about 14% higher than the Navy’s estimate for the second 10 years of the plan, and about 26% higher than the Navy’s estimate for the final 10 years of the plan.30 Some of the difference between CBO’s estimate and the Navy’s estimate, particularly in the latter years of the plan, is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. The Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. The Navy estimates in the report that the plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement. The Congressional Budget Office (CBO) is now preparing its own estimate of the cost to implement the plan; this estimate will be made available later this year. CBO’s estimates of the cost to implement past annual versions of the Navy’s 30-year shipbuilding plan have been higher than the Navy’s estimates. Table 8 summarizes the Navy and CBO estimates of the FY2014 and FY2015 30-year shipbuilding plansThe Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. As shown in the bottom half of Table 8, the Navy estimates in the report that the FY2015 30-year plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement, including an average of about $15.7 billion per year during the first 10 years of the plan, an average of about $19.7 billion per year during the middle 10 years of the plan, and an average of about $14.6 billion per year during the final 10 years of the plan. As also shown in the bottom half of Table 8, a December 2014 Congressional Budget Office (CBO) report on the Navy’s FY2015 30-year shipbuilding plan estimates that the plan will require about 13% more funding to implement than the Navy estimates, including about 6% more than the Navy estimates during the first 10 years of the plan, about 14% more than the Navy estimates during the middle 10 years of the plan, and about 20% more than the Navy estimates during the final 10 years of the plan.19 Over the years, CBO’s estimates of the cost to implement the Navy’s 30-year shipbuilding plan have generally been higher than the Navy’s estimates. Some of the difference between CBO’s estimates and the Navy’s estimates is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. This difference compounds over time, making it increasingly important as a factor in the difference between CBO’s estimates and the Navy’s estimates the further one goes into the 30-year period. In other words, other things held equal, this factor tends to push the CBO and Navy estimates further and further apart as one proceeds from the earlier years of the plan to the later years of the plan. Table 8. Navy and CBO Estimates of Cost of FY2014 and FY2015 30-Year Shipbuilding Plans Funding for new-construction ships, in billions of constant FY2013 or FY2014 dollars First 10 years of the plan Middle 10 years of the plan Final 10 years of the plan Entire 30 years of the plan FY2014 30-year (FY2014-FY2043) plan (in constant FY2013 dollars) Navy estimate 15.4 19.8 15.2 16.8 CBO estimate 16.3 22.6 19.1 19.3 % difference between Navy and CBO estimates 6% 14% 26% 15% ~14.6 ~16.7 FY2015 30-year (FY2015-FY2044) plan (in constant FY2014 dollars) Navy estimate ~15.7 ~19.7 CBO estimate Not yet available—CBO is preparing its estimate % difference between Navy and CBO estimates Not yet available—CBO is preparing its estimate~14.6 ~16.7 CBO estimate 16.7 22.5 17.5 18.9 % difference between Navy and CBO estimates 6% 14% 20% 13% Source: For FY2014 30-year plan: Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2014 Shipbuilding Plan, October 2013, Table 3 (page 13). For FY2015 30-year plan: Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for FY2015, p. 8. 3019 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 20142015 Shipbuilding Plan, October 2013, Table 3 (page 13)December 2014, Table 3 on page 14. Congressional Research Service 32 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 28 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The shipbuilding program that contributes the most to the difference between the CBO and Navy estimates of the cost of the 30-year plan is a future destroyer, called the DDG-51 Flight IV, that appears in the final 15 years of the 30-year plan. As shown in the CBO report, this one program accounts for 38% of the total difference between CBO and the Navy on the estimated cost implement the 30-year shipbuilding plan, making it almost twice as significant as the next-largest contributor to the overall difference (the Ohio replacement program, which accounts for 20%).20 The relatively large contribution of the Flight IV destroyer to the overall difference between CBO and the Navy on the cost of the 30-year shipbuilding plan appears to be due primarily to three factors: • There are many of these Flight IV destroyers in the 30-year plan—a total of 35, or 13% of the 264 total ships in the plan. • There appears to be a basic difference between CBO and the Navy over the likely size (and thus cost) of this ship. The Navy appears to assume that the ship will use the current DDG-51 hull design, whereas CBO believes the growth potential of the current DDG-51 hull design will be exhausted by then, and that the ship will require a larger hull design (either a lengthened version of the DDG-51 hull design, or an entirely new hull design). • These destroyers occur in the final 15 years of the 30-year plan, where the effects of the difference between CBO and the Navy on how to treat inflation in Navy shipbuilding are the most pronounced. Future Shipbuilding Funding Levels It has been known for some time that implementing the 30-year shipbuilding plan would require shipbuilding budgets in coming years that are considerably greater than those of recent years, and that funding requirements for the Ohio-replacement (SSBN[X]) ballistic missile submarine program will put particular pressure on the shipbuilding budget during the middle years of the 30year plan. The Navy’s report on the FY2015 30-year plan states: Beginning in FY2020 and running through the end of the 30-year plan horizon, the plan requires an average annual investment of about $17.2B [billion] (FY14$) [i.e., in constant FY2014 dollars] to finance, which is ~$4B/year more than our historical average annual investment of ~$13B/yr. In particular, for the period while we are procuring the OHIO Replacement (OR) SSBN (essentially FY[20]25-FY[20]34), the Navy will have to provide an average of $19.7B annually with the peak year in FY[20]32 at slightly more than $24B. Even if the OHIO Replacement Program (ORP) is removed from the [required] resource total [by funding the program through a different part of the defense budget], the average funding required beginning in FY2020 is ~$14-15B/yr to build the FSA [Force Structure Assessment] force [i.e., the planned 306-ship fleet].... While the force structure presented [in this report] describes a battle force that meets the requirements of the National Security Strategy and the 2014 QDR [Quadrennial Defense Review]; it requires funding at an unsustainable level, particularly between FY[20]25 and FY[20]34... The average cost of this plan during the period in which the DON [Department 20 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2015 Shipbuilding Plan, December 2014, Table A-1 on page 31. Congressional Research Service 29 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress of the Navy] is procuring OR SSBN[s] (~$19.7B/year [during] FY2025-[FY]2034) cannot be accommodated by the Navy from existing resources—particularly if DOD is required to be funded at the BCA [Budget Control Act] levels.... The DON can only afford the SSBN procurement costs with significant increases in our [budget] top-line or by having the SSBN funded from sources that do not result in any reductions to the DON’s current resourcing level.... If the DON is unable to sustain the average annual shipbuilding budgets of $19.7 billion over the course of the mid-term planning period, which is unlikely to be the case,3121 the battle force will fall far short of meeting the QDR requirements.3222 In assessing the Navy’s ability to reach the higher annual shipbuilding funding levels described above, one perspective is to note that doing so would require the shipbuilding budget to be increased by 30% to 50% from levels in recent years. In a context of constraints on defense spending and competing demands for defense dollars, this perspective can make the goal of increasing the shipbuilding budget to these levels appear daunting. Another perspective is to note that the additional annual funding needed (roughly $4 billion to $6.7 billion) equates to roughly 0.8% to 1.3% of a defense budget of $521 billion per year (the Budget Control Act figure for defense spending FY2015). Some observers, noting the U.S. strategic rebalancing toward the Asia-Pacific region, have advocated shifting a greater share of the DOD budget to the Navy and Air Force, on the grounds that the Asia-Pacific region is 31 This can be read as a double negative—that it is unlikely the Navy will be unable to sustain average annual shipbuilding budgets at this level. The Navy’s intent appears to be to state that it is unlikely the Navy will be able to do this. 32 Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for FY2015, June 2014, pp. 5, 6, 7, 9. Congressional Research Service 33 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress primarily a maritime and aerospace theater for DOD. In discussing the idea of shifting a greater share of the DOD budget to the Navy and Air Force, some of these observers refer to breaking the so-called “one-third, one-third, one-third” division of resources among the three military departments—a shorthand term sometimes used to refer to the more-or-less stable division of resources between the three military departments that existed for the three decades between the end of U.S. participation in the Vietnam War in 1973 and the start of the Iraq War in 2003.3323 In a context of breaking the “one-third, one-third, one-third” allocation with an aim of better aligning defense spending with the strategic rebalancing, shifting 0.8% to 1.3% of the defense budget into the Navy’s shipbuilding account would appear to be quite feasible. More broadly, if defense spending were to remain constrained to the revised cap levels in the Budget Control Act, then fully funding the Department of the Navy’s total budget at the levels shown in the current Future Years Defense Plan (FYDP) would require increasing the Department of the Navy’s share of the non-Defense-Wide part of the DOD budget to about 41%, compared to about 36% in the FY2014 budget and an average of about 37% for the three-decade period between the Vietnam and Iraq wars.34 While shifting 4% or 5% of DOD’s budget to the Department of the Navy would be a more ambitious reallocation than shifting 0.8% to 1.3% of the DOD budget to the Navy’s shipbuilding account, similarly large reallocations have occurred in the past.35 Legislative Activity for FY2015 FY2015 Funding Request The Navy’s proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy’s goal for achieving and maintaining a fleet of 33 21 This can be read as a double negative—that it is unlikely the Navy will be unable to sustain average annual shipbuilding budgets at this level. The Navy’s intent appears to be to state that it is unlikely the Navy will be able to do this. 22 Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for FY2015, June 2014, pp. 5, 6, 7, 9. 23 The “one-third, one-third, one-third” terminology, though convenient, is not entirely accurate—the military departments’ shares of the DOD budget, while more or less stable during this period, were not exactly one-third each: the average share for the Department of the Army was about 26%, the average share for the Department of the Navy (which includes both the Navy and Marine Corps) was about 32%, the average share for the Department of the Air Force was about 30%, and the average share for Defense-Wide (the fourth major category of DOD spending) was about 12%. Excluding the Defense-Wide category, which has grown over time, the shares for the three military departments of the remainder of DOD’s budget during this period become about 29% for the Department of the Army, about 37% for the Department of the Navy, and about 34% for the Department of the Air Force. 34 Since the Defense-Wide portion of the budget has grown from just a few percent in the 1950s and 1960s to about 15% in more recent years, including the Defense-Wide category of spending in the calculation can lead to military department shares of the budget in the 1950s and 1960s that are somewhat more elevated compared to those in more recent years, making it more complex to compare the military departments’ shares across the entire period of time since the end of the World War II. For this reason, military department shares of the DOD budget cited in this statement are calculated after excluding the Defense-Wide category. The points made in this statement, however, can still made on the basis of a calculation that includes the Defense-Wide category. 35 For example, from the mid-1950s to the mid-1960s, reflecting a U.S. defense strategy at the time that placed a strong reliance on the deterrent value of nuclear weapons, the Department of the Air Force’s share of the non-Defense-Wide DOD budget increased by several percentage points. The Department of the Air Force’s share averaged about 45% for the 10-year period FY1956-FY1965, and peaked at more than 47% in FY1957-FY1959. As another example, for the 11-year period FY2003-FY2013, as a consequence of combat operations in Iraq and Afghanistan, the Department of the Army’s share of the non-Defense-Wide DOD budget increased by roughly 10 percentage points. The Department of the Army’s share during this period averaged about 39%, and peaked at more than 43% in FY2008. U.S. combat operations in Iraq and Afghanistan during this period reflected the implementation of U.S. national strategy as interpreted by policy makers during those years. Congressional Research Service 34 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy’s proposed FY2015 shipbuilding budget also requests funding for ships that have been procured in prior fiscal years, and ships that are to be procured in future Congressional Research Service 30 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress between the Vietnam and Iraq wars.24 While shifting 4% or 5% of DOD’s budget to the Department of the Navy would be a more ambitious reallocation than shifting 0.8% to 1.3% of the DOD budget to the Navy’s shipbuilding account, similarly large reallocations have occurred in the past.25 Legislative Activity for FY2016 FY2016 Funding Request The Navy’s proposed FY2016 budget requests funding for the procurement of nine new battle force ships (i.e., ships that count against the Navy’s goal for achieving and maintaining a fleet of 306 ships). The nine ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, three Littoral Combat Ships (LCSs), one LPD-17 class amphibious ship, and one TAO(X) class oiler. The Navy’s proposed FY2016 shipbuilding budget also requests funding for ships that have been procured in prior fiscal years, and ships that are to be procured in future fiscal years. CRS Reports Tracking Legislation on Specific Navy Shipbuilding Programs Detailed coverage of legislative activity on certain Navy shipbuilding programs (including funding levels, legislative provisions, and report language) can be found in the following CRS reports: • CRS Report RS20643, Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress, by Ronald O’Rourke. • This report also covers the issue of funding for a refueling complex overhaul (RCOH) for the aircraft carrier George Washington (CVN-73). • CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL32418, Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL33741, Navy Littoral Combat Ship (LCS) Program: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report R43543, Navy LX(R) Amphibious Ship Program: Background and Issues for Congress, by Ronald O'Rourke. • • This report also covers the issue of whether to procure an additional San Antonio (LPD-17) class amphibious ship. CRS Report R43546, Navy TAO(X) Oiler Shipbuilding Program: Background and Issues for Congress, by Ronald O'Rourke. • This report also covers the Navy’s proposal, made as part of its FY2015 budget submission, to disestablish the National Defense Sealift Fund (NDSF). Individual Navy shipbuilding programs that are not covered in detail in the above reports are covered in detail below. FY2015 National Defense Authorization Act (H.R. 4435/S. 2410) House (Committee Report) The House Armed Services Committee, in its report (H.Rept. 113-446 of May 13, 2014) on H.R. 4435, recommends the following changes to the Navy’s proposed FY2015 shipbuilding programs: Congressional Research Service 35 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • an addition of $483.6 million for a refueling complex overhaul (RCOH) of the aircraft carrier George Washington (CVN-73); • a reduction of $54 million to the amount requested for the DDG-1000 destroyer program; • a reduction of one ship and $450 million to the quantity and funding amount requested for procurement of LCSs—the recommendation is to procure two LCSs in FY2015, rather than three; • an addition of $100 million in advance procurement (AP) funding for the procurement of an LCS in a future fiscal year; • an addition of $800 million for the procurement of an additional LPD-17 class amphibious ship; and • a reduction of $220 million to the amount requested for the Moored Training Ship (MTS) program, which is a program to convert two older Los Angeles (SSN-688) class attack submarines into moored training platforms for sailors who are learning to use nuclear propulsion plants. (Pages 395-396.) Section 124 of H.R. 4435 states: SEC. 124. LIMITATION ON AVAILABILITY OF FUNDS FOR MOORED TRAINING SHIP PROGRAM. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2015 for shipbuilding and construction, Navy, for design, conversion, modification, or construction relating to the moored training ship program of the Navy, not more than 80 percent may be obligated or expended until a period of 30 days has elapsed following the date on which the Secretary of Defense certifies to the congressional defense committees that— (1) the Chairman of the Joint Requirements Oversight Council has reviewed and approved the need for two additional moored training ships; (2) the Director of Cost Assessment and Program Evaluation has reviewed and certified the cost estimates of the moored training ship program; and (3) the Under Secretary of Defense for Acquisition, Technology, and Logistics has reviewed and approved the budget, schedule, and construction plans for such two additional moored training ships. Regarding the Moored Training Ship Program addressed in the above provision, H.Rept. 113-446 states: Moored Training Ship The budget request contained $801.7 million in Shipbuilding and Conversion, Navy, for the Moored Training Ship program. The committee notes that the Moored Training Ship program is intended to convert two decommissioned nuclear attack submarines into training platforms for nuclear propulsion crew members. The committee also notes that this program has experienced a $556.8 million cost overrun for the two conversions compared to fiscal year 2014 budget projections, and Congressional Research Service 36 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress that this represents an 34 percent cost increase. The committee further notes that $229.7 million of this cost increase is included in the fiscal year 2015 budget request. While the committee understands that the Moored Training Ship program is not a formal acquisition program, the committee remains concerned that the 34 percent cost increase would be significantly over the critical cost growth threshold for major defense acquisition programs, established pursuant to section 2433, title 10, United States Code, also known as a “NunnMcCurdy breach”. As a result, elsewhere in this Act, the committee includes a provision that would require a review to be provided to Congress similar to that required for a “NunnMcCurdy breach”. The committee recommends $572.0 million, a decrease of $229.7 million, in shipbuilding and conversion, Navy, for the Moored Training Ship program. (Page 30) Section 1021 of H.R. 4435 as reported states: SEC. 1021. DEFINITION OF COMBATANT AND SUPPORT VESSEL FOR PURPOSES OF THE ANNUAL PLAN AND CERTIFICATION RELATING TO BUDGETING FOR CONSTRUCTION OF NAVAL VESSELS. Section 231(f) of title 10, United States Code, is amended by adding at the end the following new paragraph: `(4) The term `combatant and support vessel’ means any commissioned ship built or armed for naval combat or any naval ship designed to provide support to combatant ships and other naval operations. Such term does not include patrol coastal ships, non-commissioned combatant craft specifically designed for combat roles, or ships that are designated for potential mobilization.’. Section 1026 of H.R. 4435 as reported states: SEC. 1026. AVAILABILITY OF FUNDS FOR RETIREMENT OR INACTIVATION OF TICONDEROGA CLASS CRUISERS OR DOCK LANDING SHIPS. (a) Limitation on the Availability of Funds- Except as otherwise provided in this section, none of the funds authorized to be appropriated by this Act or otherwise made available for the Department of Defense for fiscal year 2015 may be obligated or expended to retire, prepare to retire, inactivate, or place in storage a cruiser or dock landing ship. (b) Cruiser Upgrades- As provided by section 8107 of the Consolidated Appropriations Act, 2014 (P.L. 113-76), the Secretary of the Navy shall begin the upgrade of two cruisers during fiscal year 2015, including— (1) hull, mechanical, and electrical upgrades; and (2) combat systems modernizations. Regarding the cruisers and amphibious ships addressed in the above provision, H.Rept. 113-446 states: Phased Modernization of Certain Navy Ships In March 2014, the Navy proposed to reduce its operational force structure of Ticonderogaclass cruisers and amphibious dock landing ships (LSD). The Navy plans to take 14 ships out of their normal deployment rotations and place them in long-term phased modernization and Congressional Research Service 37 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress maintenance to extend the expected service life of the ships. According to the Navy, this plan will allow it to retain the 11 cruisers and 3 amphibious ships through the 2030s and into the 2040s. The committee is concerned about the Navy’s plan to reduce its battle force structure by 14 ships, especially in light of shortfalls in the force structure necessary to meet the requirements of the National Military Strategy. Additionally, the committee notes that while the Navy places Military Sealift Command ships in reduced operating status, or ROS, on a regular basis, surface combatant and amphibious ships are more complex and their crews need more training before they can be certified as being ready for deployment and major combat operations. Further, the Navy states it has not reactivated any surface combatant ships from long-term protective storage since the 1980s. Therefore, the committee directs the Comptroller General of the United States to report to the congressional defense committees by March 1, 2015, on the extent to which the Navy has identified: (1) The potential costs and cost savings associated with the Navy’s phased modernization plan for the 11 cruisers and 3 LSDs; (2) The operational benefits and risks associated with this long-term plan; and (3) The costs, savings, benefits, and risks of any alternate plans that were considered before putting forth the Navy’s current plan. (Pages 210-211) H.Rept. 113-446 also states: Joint High Speed Vessel The committee is aware of the premium that the Department of Defense places on the ability of U.S. military forces to deploy quickly to a full spectrum of engagements. In addition, the Department values the ability of U.S. forces to debark and embark in a wide range of port environments, from modern to austere. The committee notes that the Joint High Speed Vessel (JHSV), crewed by Military Sealift Command mariners, has demonstrated the ability to transport military forces, as well as humanitarian relief personnel and materiel, in a manner that is responsive, deployable, agile, versatile, and sustainable. The USNS Spearhead (JHSV–1) is currently deployed to the U.S. 6th Fleet area of responsibility. The JHSV is designed to transport 600 short tons of military cargo 1,200 nautical miles at an average speed of 35 knots in sea state 3. JHSVs support Navy Expeditionary Combat Command and riverine forces, theater cooperating missions, Seabees, and Marine Corps and Army transportation. The original procurement objective for the JHSV was 18 ships. This procurement number was lowered to 10 JHSVs as part of the budget request for fiscal year 2013. The committee notes that the JHSV has the ability to support multiple branches of the military services, provide high-speed intra-theater sealift, operate in littoral environments and austere port environments, and support humanitarian and disaster relief activities. The committee also notes that the ship’s construction line is still operational. For these reasons, the committee directs the Secretary of the Navy to submit a report to the congressional defense committees by April 1, 2015, on the operational benefits and cost savings associated with continuing to procure JHSVs. The report should specifically address the costs and Congressional Research Service 38 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress benefits of buying the eight additional JHSVs that were originally part of the program. (Page 29) H.Rept. 113-446 also states: Mobile Landing Platform Afloat Forward Staging Base The committee notes that the most recent 30-year shipbuilding plan projects a requirement for a third Mobile Landing Platform (MLP) Afloat Forward Staging Base (AFSB) variant ship in fiscal year 2017. Full funding for the second MLP AFSB ship was provided in fiscal year 2014. No advance procurement funds for the third MLP AFSB ship are currently programmed in either fiscal year 2015 or fiscal year 2016. Considering the expanded requirement for the MLP AFSB variant ships and the success of the ongoing shipbuilding program, the committee is concerned that a 3-year procurement gap between ships will increase costs, impact the industrial base, and delay delivery of important capabilities. Therefore, the committee encourages the Secretary of the Navy to explore possible approaches to minimize a production break between ships, including advance procurement funding, for the third AFSB ship. (Page 30) H.Rept. 113-446 also states: Comptroller General Review of Forward Deployed Naval Forces and Associated Sustainment Issues Forward presence is critical to the Navy’s goals of building partnerships, deterring aggression without escalation, defusing threats, and containing conflict without regional disruption. Naval forces provide forward presence through a combination of rotational deployments from the United States, Forward Deployed Naval Forces (FDNF) in Japan, Guam, the Kingdom of Spain, and the Italian Republic, and forward stationing ships in places such as the Kingdom of Bahrain, the Republic of Singapore, and Diego Garcia. The Navy’s ability to implement these concepts depends on U.S. bases and strategic partnerships overseas that provide places where forces can rest, repair, refuel, and resupply. In the FDNF construct, the ships, crews and families all reside in the host nation. This construct is in contrast to forward stationing, where the ship’s families reside in the United States and the crew rotates to the ship’s overseas location for deployment. The committee seeks a more detailed understanding of the Navy’s decision-making process to designate ships to be either FDNF or forward stationed and the relative costs and benefits of each approach. The committee directs the Comptroller General of the United States to provide a report to the congressional defense committees by February 27, 2015. The report should include a review and analysis of: (1) The Navy’s process for determining the homeport locations of naval vessels, including FDNF; (2) The Navy’s process for stationing naval vessels outside the United States; (3) How the Navy calculates deployment costs of vessels homeported inside and outside the United States; (4) The extent to which the Navy has utilized rotational crewing to meet forward presence requirements; Congressional Research Service 39 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (5) The operational availability achieved by rotational crewing, the savings achieved, and the limitations associated with directed rotational crewing; (6) The operational support and sustainment effects of deploying U.S.-based vessels to a forward operating station as opposed to homeporting vessels outside the United States, including costs of complying with section 7310 of title 10, United States Code, maintenance requirements; (7) The infrastructure requirements, as well as host-nation acceptance requirements to ensure the assets are received overseas; and (8) Any other issue that the Comptroller General determines appropriate. (Pages 111-112) H.Rept. 113-446 also states: Force Structure Assessment The committee notes that the Secretary of the Navy conducted a Force Structure Assessment in 2012 that determined the proposed composition of Navy surface and subsurface vessels. This latest Force Structure Assessment determined that an overall Navy fleet of 306 ships would be necessary to support the overall defense strategy. Since the release of the 2012 Force Structure Assessment, the Secretary of Defense released the 2014 Quadrennial Defense Review which determined, in part, the requirement for 11 aircraft carriers and 92 large surface combatants. Therefore, the committee directs the Secretary of the Navy to update the most recent Force Structure Assessment and to submit it to the congressional defense committees by March 1, 2015. (Pages 205-206) House (Floor Action) On May 21, 2014, as part of its consideration of H.R. 4435, the House agreed to by voice vote H.Amdt. 682, an en bloc amendment consisting of several amendments printed in H.Rept. 113460 of May 21 (legislative day, May 20), 2014, a report providing for further consideration of H.R. 4435. One of these was amendment number 161 from H.Rept. 113-60, which increased by $20 million the amount authorized for the Defense Health Program and identified $20 million in offsets, including a $10 million reduction from the amounted authorized for the Shipbuilding and Conversion, Navy (SCN) account. Senate The Senate Armed Services Committee, in its report (S.Rept. 113-176 of June 2, 2014) on S. 2410, recommends the following changes to the Navy’s proposed FY2015 shipbuilding programs: • a transfer from the Operation and Maintenance, Navy (OMN) account to the Shipbuilding and Conversion, Navy (SCN) account of the Navy’s request for $46 million in FY2015 funding for defueling the aircraft carrier George Washington (CVN-73), so as to support a refueling complex overhaul (RCOH) for that ship; and • a transfer from the Research, Development, Test and Evaluation, Navy (RDTEN) account to the SCN account of the Navy’s request for $45 million in FY2015 funding for a service life extension program (SLEP) for the Navy’s air-cushioned landing craft (LCAC). (Pages 323-324.) Congressional Research Service 40 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Section 1022 of S. 2410 as reported states: SEC. 1022. AVAILABILITY OF FUNDS FOR RETIREMENT OR INACTIVATION OF TICONDEROGA CLASS CRUISERS OR DOCK LANDING SHIPS. (a) Limitation on Availability of Funds(1) IN GENERAL- Except as otherwise provided in this section, none of the funds authorized to be appropriated or otherwise made available for the Department of Defense by this Act or the National Defense Authorization Act for Fiscal Year 2014 (P.L. 113-66) may be obligated or expended to retire, prepare to retire, inactivate, or place in storage a cruiser or dock landing ship. (2) USE OF SMOSF FUNDS- Funds in the Ship, Modernization, Operations, and Sustainment Fund (SMOSF) may be used only for 11 Ticonderoga-class cruisers (CG 63 through CG 73) and 3 dock landing ships (LSD 41, LSD 42, and LSD 46). The Secretary of the Navy may use such funds only to man, operate, equip, sustain, and modernize such vessels. (b) Phased Modernization of Ticonderoga Class Cruisers and Dock Landing Ships- The Secretary of the Navy shall retain 22 Ticonderoga-class cruisers (CGs) and 12 Whidbey Island/Harpers Ferry-class dock landing ships (LSDs) until the end of their expected service lives, as follows: (1) OPERATIONAL FORCES- The naval combat forces of the Navy shall include not less than 11 operational cruisers (CG 52 through CG 62) and 11 operational dock landing ships (all members of the LSD 41 class, except LSD 41, LSD, 42 and LSD 46). For purposes of this paragraph, a cruiser or dock landing ship is operational if such vessel is available for worldwide deployment other than during routine or scheduled maintenance or repair. (2) PHASED MODERNIZATION- The Secretary may conduct phased modernization of the cruisers and dock landing ships for which funds in the Ship, Modernization, Operations, and Sustainment Fund are authorized to be available pursuant to subsection (a)(2). During a phased modernization period, the Secretary may reduce manning on such vessels to the minimal level necessary to ensure the safety and security of such vessels and to retain critical skills. (3) END OF SERVICE AND TRANSITION FROM PHASED MODERNIZATION TO OPERATIONAL FORCES- Cruisers covered by paragraph (1) may only be decommissioned when replaced by one of the cruisers for which the Navy has conducted a phased modernization using funds in the Ship, Modernization, Operations, and Sustainment Fund as described in paragraph (2). After being reintroduced into the operational fleet, the cruisers modernized as described in paragraph (2) may be decommissioned individually upon reaching the end of their expected service life, excluding time spent in a phased modernization status under paragraph (2). After being reintroduced into the operational fleet, the dock landing ships modernized as described in paragraph (2) may be decommissioned upon reaching the end of their expected service life, excluded time spent in a phased modernization status under paragraph (2). (c) Requirements and Limitations on Phased Modernization(1) REQUIREMENTS- During the period of phased modernization under subsection (b)(2) of the vessels specified in subsection (a)(2), the Secretary of the Navy shall— Congressional Research Service 41 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (A) continue to maintain the vessels in a manner that will ensure the ability of the vessels to reenter the operational fleet; (B) conduct planning activities to ensure scheduled and deferred maintenance and modernization work items are identified and included in maintenance availability work packages; (C) conduct hull, mechanical, and electrical (HM&E) and combat system modernization necessary to achieve a service life of 40 years; (D) in the case of the cruisers, schedule completion of maintenance and modernization, including required testing and crew training, to replace on a one-for-one basis, active cruisers that will be decommissioned upon reaching the end of their expected service life; (E) ensure adequate funds are available to execute phased modernization activities for all the vessels. (2) LIMITATIONS- During the period of phased modernization under subsection (b)(2) of the vessels specified in subsection (a)(2), the Secretary may not— (A) permit removal or cannibalization of equipment or systems to support operational vessels, other than— (i) rotatable pool equipment; and (ii) equipment or systems necessary to support urgent operational requirements (but only with the approval of the Secretary of Defense); or (B) make any irreversible modifications that will prohibit the vessel from reentering the operational fleet. (d) Authority To Enter Into Economic Order Quantity Contracts- The Secretary of the Navy may enter into a so-called `economic order quantity’ contracts with private shipyards for ship maintenance and modernization, and with private industry for equipment procurement for the phased modernization under subsection (b)(2) of the vessels specified in subsection (a)(2). (e) Reports(1) IN GENERAL- At the same time as the submittal to Congress of the budget of the President under section 1105 of title 31, United States, for each fiscal year in which activities under the phased modernization of vessels will be carried out under this section, the Secretary of the Navy shall submit to the congressional defense committees a written report on the status of the phased modernization of vessels under this section. (2) ELEMENTS- Each report under this subsection shall include the following: (A) The status of phased modernization efforts, including availability schedules, equipment procurement schedules, and by-fiscal year funding requirements. (B) The readiness, and operational and manning status of each vessel to be undergoing phased modernization under this section during the fiscal year covered by such report. (C) The current material condition assessment for each such vessel. Congressional Research Service 42 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (D) A list of rotatable pool equipment that is identified across the whole class of cruisers to support operations on a continuing basis. (E) A list of equipment, other than rotatable pool equipment and components incidental to performing maintenance, removed from each such vessel, including a justification for the removal, the disposition of the equipment, and plan for restoration of the equipment. (F) A detailed plan for obligations and expenditures by vessel for the fiscal year beginning in the year of such report, and projections of obligations by vessel by fiscal year for the remaining time a vessel is in the phased modernization program. (G) A statement of the funding required during the fiscal year beginning in the year of such report to ensure the Ship, Modernization, Operations, and Sustainment Fund account has adequate resources to execute the plan under subparagraph (F) in the execution fiscal year and the following fiscal year. (3) NOTICE ON VARIANCE FROM PLAN- Not later than 30 days before executing any material deviation from a plan under paragraph (2)(F) for a fiscal year, the Secretary shall notify the congressional defense committees in writing of such deviation from the plan. (f) Repeal of Superseded Limitation- Section 1023 of the National Defense Authorization Act for Fiscal Year 2014 (127 Stat. 846) is repealed. Regarding Section 1022, S.Rept. 113-176 states: Availability of funds for retirement or inactivation of Ticonderoga class cruisers or dock landing ships (sec. 1022) The committee recommends a provision that would establish rules under which the Navy could use resources in the Ship, Modernization, Operations, and Sustainment Fund (SMOSF) to implement a plan to: (1) Retain 11 Ticonderoga-class cruisers and 9 Whidbey Island-class and Harpers Ferry-class dock landing ships in active service; (2) Temporarily inactivate 11 Ticonderoga-class cruisers and 3 Whidbey Island-class dock landing ships; (3) Modernize the inactivated ships during the period of their inactivation; and (4) Reactivate those ships to replace cruisers and dock landing ships retiring at the end of their expected service lives. The provision would require that the Secretary of the Navy retain the cruisers and dock landing ships until the end of their ex pected service lives, and use SMOSF only to sustain and modernize the vessels. The provision would also require the Secretary of the Navy to submit an annual report with the budget request. The report would describe the status of the SMOSF, including specific financial information, such as starting and ending fiscal year corpus balances, providing a detailed obligation and expenditure plan by vessel, and including information detailing all transfers into and out of the SMOSF by appropriation account. The committee further directs the Secretary to ensure that the annual budget justification material for the SMOSF include detailed information at the vessel level. In addition, the committee directs the Defense Finance and Accounting Service to provide execution reports for the SMOSF that treats each vessel like a line item within the SMOSF. (Pages 165-166) S.Rept. 113-176 also states: Report on the Navy’s shipbuilding industrial base Congressional Research Service 43 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress In testimony before the Seapower Subcommittee of this committee, the Assistant Secretary of the Navy for Research, Development and Acquisition expressed concern about the fragility of the Navy’s shipbuilding industrial base. Other Navy officials, including the Secretary of the Navy and the Chief of Naval Operations have expressed similar concerns. The committee shares these concerns and requests the Secretary of the Navy, in conjunction with the Under Secretary of Defense for Acquisitions, Technology, and Logistics, provide a report on the state of the Navy’s shipbuilding industrial base not later than February 1, 2015. The report should contain the following: (1) A comparison of shipyard capacities and capabilities with projected shipbuilding workloads, and challenges this may produce in coming years in terms of capacity utilization and preservation of key design and construction skills. (2) Investments the shipyards have made in recent years to modernize their production facilities and to recruit, train, and retain their workers, and any challenges the shipyards may face in doing this in coming years. (3) Investments the shipyards could make to achieve cost reductions on Navy programs or to position the yards to survive a number of years on reduced Navy orders. (4) The shipyards’ construction processes and methods, and how these compare to best practices in shipyards around the world. (5) The prospects, by ship type, for using competition in the design and construction of Navy ships in coming years. (6) A comparison of supplier capacities and capabilities with projected shipbuilding workloads, and challenges this may produce in coming years in terms of capacity utilization and preservation of key suppliers. (7) A comparison of shipbuilding research and development investments with projected shipbuilding workloads, and any challenges that deficiencies in investment may produce in future years in utilizing capacity, preserving of key skills, and continuing innovation. (8) An analysis of the risks to the shipbuilding industrial base in the Navy’s shipbuilding plan in the 2015 future years defense program, and the risks to the industrial base if Congress does not amend the Budget Control Act to increase budget levels for the Department of Defense before fiscal year 2016. (9) A comprehensive funding section that includes: (a) An itemized listing of funds budgeted for support of the shipbuilding industrial base. This is to include all applicable Navy and Defense-wide appropriations. Detail must be by fiscal year at the Appropriation, line item/program element-project level with a description of the effort. Detail should be provided over the future years defense program and include up to 10 years of prior fiscal year actuals. This detailed listing is to specifically include funding contained in current shipbuilding programs (detail design/plans), as well as the research and development funding for preliminary and contract design program elements, and any applicable science and technology funding, as well as applicable funding from the Industrial Preparedness and Manufacturing Technology programs. (b) Any recommendations in the report for additional funding should be identified at the same level of detail as described in the subsection above. Congressional Research Service 44 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (c) The report funding summary should also provide information on applicable efforts from other related agencies, such as the Department of Transportation, the Maritime Administration, and the Coast Guard. (Pages 31-32) FY2015 DOD Appropriations Act (H.R. 4870) House The House Appropriations Committee, in its report (H.Rept. 113-473 of June 13, 2014) on H.R. 4870, recommends the following changes to the Navy’s proposed FY2015 shipbuilding programs: • a reduction of $10.6 million to the amount requested for procurement funding for the CVN-78 aircraft carrier program; • a reduction of $46.1 million to the amount requested for procurement funding for the Virginia-class attack submarine program; • a reduction of $28.5 million to the amount request for advance procurement (AP) funding for the Virginia-class attack submarine program; • an addition of $491.1 million for a refueling complex overhaul (RCOH) of the aircraft carrier George Washington (CVN-73); • a reduction of $15.5 million to the amount requested for procurement for the DDG-51 destroyer program; • a reduction of one ship and $475.7 million to the quantity and funding amount requested for procurement of LCSs—the recommendation is to procure two LCSs in FY2015, rather than three; • a reduction of $4.6 million to the amount requested for the JHSV program; and • a reduction of $54.3 million to the amount requested for outfitting of ships. (Pages 163 and 164.) Section 8105 of the bill as reported states: Sec. 8105. There is appropriated $540,000,000 for the `Ship Modernization, Operations and Sustainment Fund’, to remain available until September 30, 2021: Provided, That the Secretary of the Navy shall transfer funds from the `Ship Modernization, Operations and Sustainment Fund’ to appropriations for military personnel; operation and maintenance; research, development, test and evaluation; and procurement, only for the purposes of manning, operating, sustaining, equipping and modernizing the Ticonderoga-class guided missile cruisers CG-63, CG-64, CG-65, CG-66, CG-67, CG-68, CG-69, CG-70, CG-71, CG72, CG-73, and the Whidbey Island-class dock landing ships LSD-41, LSD-42, and LSD-46: Provided further, That funds transferred shall be merged with and be available for the same purposes and for the same time period as the appropriation to which they are transferred: Provided further, That the transfer authority provided herein shall be in addition to any other transfer authority available to the Department of Defense: Provided further, That the Secretary of the Navy shall, not less than 30 days prior to making any transfer from the `Ship Modernization, Operations and Sustainment Fund’, notify the congressional defense committees in writing of the details of such transfer: Provided further, That the Secretary of the Navy shall transfer and obligate funds from the `Ship Modernization, Operations and Sustainment Fund’ for modernization of not more than two Ticonderoga-class guided missile cruisers as detailed above in fiscal year 2015: Provided further, That no more than six Congressional Research Service 45 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ticonderoga-class guided missile cruisers shall be in a phased modernization at any time: Provided further, That the Secretary of the Navy shall contract for the required modernization equipment in the year prior to inducting a Ticonderoga-class cruiser for modernization: Provided further, That the prohibition in section 2244a(a) of title 10, United States Code, shall not apply to the use of any funds transferred pursuant to this section. Regarding Section 8105, H.Rept. 113-473 states: CRUISER MODERNIZATION The Committee is pleased that the budget request did not propose to retire seven Ticonderoga Class Guided Missile Cruisers as had been proposed for the last two years. These cruisers have many years of additional service life remaining and with the Navy struggling to reach and maintain its requisite fleet size of 306 ships, retiring these valuable assets early does not make sense. However, the Committee was disappointed that the most recent Navy proposal included a plan to lay-up eleven of these ships for an average of nine years, starting in fiscal year 2015. The Committee is concerned that this long term lay-up will lead to decommissioning some or all of these cruisers in the near future. While the Committee understands the rationale for the proposal, there is likely a more reasonable middle ground between continuing to operate the ships and decommissioning the ships. Therefore, the Committee agrees with a lay-up and modernization plan for the cruisers, with certain modifications. Instead of inducting all eleven cruisers at one time, the Secretary of the Navy is directed to induct no more than two cruisers per year into the phased modernization period, beginning with two cruisers being inducted in fiscal year 2016. Further, the Secretary of the Navy is directed to allow no more than six cruisers in lay-up at any given time. Finally, the Secretary of the Navy is directed to ensure that the duration of the lay-up period be no longer than four years and that modernization equipment be ordered and placed on contract in the year prior to the ship entering its modernization period. The Committee believes this approach will maximize the use of the Navy’s cruiser fleet while ensuring it is modernized and relevant for the duration of its service life. The Committee recognizes this approach comes with a cost and therefore adds $540,000,000 to the Ship Modernization, Operations, and Sustainment Fund, as outlined in title VIII of this bill. (Page 165) Senate The Senate Appropriations Committee, in its report (S.Rept. 113-211 of July 17, 2014) on H.R. 4870, recommends the following changes to the Navy’s proposed FY2015 shipbuilding programs: • a reduction of $70.0 million to the amount requested for procurement funding for the CVN-78 aircraft carrier program; • an addition of $483.6 million for a refueling complex overhaul (RCOH) of the aircraft carrier George Washington (CVN-73); • an increase of $80.0 million to the amount requested for procurement funding for the LCS program; • an increase of one ship and $787.4 million to the quantity and funding amount requested for procurement of San Antonio (LPD-17) class amphibious ships—the recommendation is to procure an LPD-17 class ship in FY2015, using incremental funding in FY2015 and one or more future fiscal years; Congressional Research Service 46 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • an increase of one ship and $195.4 million to the quantity and funding amount requested for procurement of JHSVs; • a reduction of $42.3 million to the amount requested for outfitting of ships; and • an increase of one craft and $61.0 million to the amount requested for the ShipTo-Shore Connector (SSC) landing craft program (a transfer the craft and its funding from the Navy’s research and development account). (Pages 138 and 139.) Section 8105 of the bill as reported states: Sec. 8105. The Secretary of the Navy shall transfer funds from the `Ship Modernization, Operations and Sustainment Fund’ to appropriations for military personnel; operation and maintenance; research, development, test and evaluation; and procurement, only for the purposes of manning, operating, sustaining, equipping and modernizing the Ticonderogaclass guided missile cruisers CG-63, CG-64, CG-65, CG-66, CG-67, CG-68, CG-69, CG-70, CG-71, CG-72, CG-73, and the Whidbey Island -class dock landing ships LSD-41, LSD-42, and LSD-46: Provided, That funds transferred shall be merged with and be available for the same purposes and for the same time period as the appropriation to which they are transferred: Provided further, That the transfer authority provided herein shall be in addition to any other transfer authority available to the Department of Defense: Provided further, That the Secretary of the Navy shall, not less than 30 days prior to making any transfer from the `Ship Modernization, Operations and Sustainment Fund’, notify the congressional defense committees in writing of the details of such transfer: Provided further, That the Secretary of the Navy shall transfer and obligate funds from the `Ship Modernization, Operations and Sustainment Fund’ for modernization of two Ticonderoga-class guided missile cruisers as detailed above in fiscal year 2015: Provided further, That no more than six Ticonderogaclass guided missile cruisers shall be in a phased modernization at any time: Provided further, That the prohibition in section 2244a(a) of title 10, United States Code, shall not apply to the use of any funds transferred pursuant to this section. S.Rept. 113-211 states: SHIP MODERNIZATION, OPERATIONS AND SUSTAINMENT FUND [SMOSF] The fiscal year 2015 budget request includes a new proposal by the Navy to remove 11 Ticonderoga-class guided missile cruisers and three amphibious dock landing ships from the operational fleet and lay them up for several years under a phased modernization plan. This proposal does not conform with direction provided in the Fiscal Year 2013 National Defense Authorization Act, the Fiscal Year 2014 National Defense Authorization Act, the Department of Defense Appropriations Act, 2013, and the Department of Defense Appropriations Act, 2014. The Committee notes that the Navy’s proposal removes more Ticonderoga-class guided missile cruisers and amphibious dock landing ships from the operational fleet than previously proposed, relies on the congressional defense committees providing additional financial management and acquisition authorities, and the Navy’s budget plan does not contain full funding in the outyears for this proposal. The Committee does not support the Navy’s proposal due to concerns over the duration of the proposed lay-up period for several of the ships, the additional authorities required, and severe doubts as to whether the Navy would execute the phased modernization plan as proposed given the volatility in Navy budgets in recent years. Further, the Committee is perturbed by the Navy’s disregard for congressional direction provided for two consecutive years. Therefore, the Committee recommendation denies the Navy’s proposal and instead recommends a modified modernization plan that conforms with the Navy’s proposal to Congressional Research Service 47 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress expand the application of SMOSF funds to four additional Ticonderoga-class guided missile cruisers and an additional amphibious dock landing ship, while modifying the induction schedule for the SMOSF ships’ modernization. The Committee notes that the SMOSF contains over $1,700,000,000, which is sufficient to fund this plan in the near-term and expects the Navy to budget for additional funds required in the mid- and long-term. (Page 11) S.Rept. 113-211 also states: Shipbuilding Industrial Base and Workload Allocation.—The Committee remains concerned generally about the overall health of the shipbuilding industrial base and specifically about the health of the non-nuclear surface combatant shipbuilding industry. The Committee reiterates its commitment to the goal of reducing costs and increasing value in the shipbuilding program and believes that cooperative workload allocation agreements between the Navy and industry may provide an alternative method to obtain efficiency and economies in Navy ship design and construction with the goals of closing the shortfalls in the fleet and retain the shipbuilding industrial base needed for future military requirements. Therefore, the Secretary of the Navy is directed to engage industry in discussions on future shipbuilding workload distribution and methods to ensure the viability of the non-nuclear shipyards over the long term. For instance, when the LPD–17 program was experiencing significant production issues, the Department of the Navy entered into a workload agreement, “Memorandum of Understanding Concerning the Reallocation of LPD–17 and DDG–51 Ship Construction Workload” (SWAP 1), with shipbuilders on June 17, 2002. The purpose of the agreement was to reallocate workload to ensure “stability at both yards, stabilize and reduce total projected shipbuilding costs for the LPD–17 Program, and maintain properly balanced sources of supply for future Navy surface combatant shipbuilding”. The agreement also requires the Navy to award a compensatory DDG–51 or equivalent workload if the Navy awards a shipbuilding contract for LPD 28. The Committee understands that the Navy considers this agreement to remain in full force and effect, and that the Navy will engage with shipbuilders involved in the agreement to discuss workload distribution. While Congress is not a party to this agreement, the Committee directs the Navy to submit a report to the congressional defense committees no later than March 1, 2015, on the Navy’s options and potential courses of action to fulfill the requirements of the SWAP 1 agreement preceding or concurrent with when LPD 28 is placed under contract. The report should also address strategies to ensure the viability and stability of the non-nuclear shipyards over the long term to preserve the defense maritime industrial base and achieve the highest level of performance and quality from the shipbuilders. (Pages 139-140) S.Rept. 113-211 also states: Joint High Speed Vessel [JHSV].—The Department of the Navy is procuring JHSVs for fast intra-theater transportation of troops, military vehicles and equipment. With submission of the fiscal year 2013 budget, the Navy assumed risk with the overall JHSV requirement and reduced the program procurement objective from 18 to 10 ships. Under this plan, the final ship would be purchased with fiscal year 2013 funding. However, based on the ability of the JHSV to support all branches of the military services, provide intra-theater sealift, operate in littoral environments and austere port environments, and support humanitarian/disaster relief activities, the Committee supports procuring additional JHSVs to address the original requirement. Further, the Committee notes that one JHSV is being used as an experimental test platform for Navy technology projects. Therefore, the Committee recommends $200,000,000 to procure one JHSV in fiscal year 2015. Congressional Research Service 48 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Polar-Class Icebreakers.—The Committee notes that since 2006, the United States has been operating a Polar-class icebreaker fleet consisting of one heavy and one medium vessel. The Committee understands that this falls short of U.S. requirements. While the United States has deferred investment in its polar fleet, other nations such as China and Russia are pressing ahead to develop robust icebreaking capability, allowing them to pursue their national interests in the polar regions. The Committee supports the interagency process to develop requirements for a new Polar-class icebreaker or similarly Arctic-capable surface vessel, recognizing the strategic importance of Arctic operations to our Nation’s future security and prosperity. Therefore, the Committee directs the Deputy Secretary of Defense, in cooperation with the Secretary of the Navy and the Commandant of the United States Coast Guard, to provide the congressional defense committees a plan to begin expanding U.S. icebreaking capacity that will result in the approval of an operational requirements document no later than 180 days after the date of enactment of this act. (Pages 141-142) S.Rept. 113-211 also states (emphasis added): Use of Research, Development, Test and Evaluation Funding for Procurement of End Items.—The fiscal year 2015 budget request includes $69,670,000 in two separate programs in the Research, Development, Test and Evaluation, Navy account for the acquisition of weapons that will be used operationally. The Committee strongly believes that these requests violate intent of section 8055 of the Department of Defense Appropriations Act, 2014, which prohibits the use of research and development funding to procure end-items for delivery to military forces for operational use. The Committee further notes that this legislative provision has been carried annually for several years, and has again been requested by the President for inclusion in the Department of Defense Appropriations Act, 2015. The Committee recommendation once again includes this restriction. In particular, the fiscal year 2015 budget request includes $25,000,000 in Research, Development, Test and Evaluation, Navy to procure two incrementally funded CH–53K helicopters.... In addition, the fiscal year 2015 budget request includes $44,670,000 in Research, Development, Test and Evaluation, Navy to incrementally fund a Ship to Shore Connector ship in addition to the previously funded test asset. All of the program’s test and training activities will be conducted with the first Ship to Shore Connector test craft. This second ship will deliver after completion of the program’s test activities and be utilized as an operational asset. Further, the Committee notes that the fiscal year 2015 budget request includes $123,233,000 in Shipbuilding and Conversion, Navy for the procurement of two operational Ship to Shore Connectors. The Committee denies the use of research and development funds for the procurement of an operational craft, and realigns funds from Research, Development, Test and Evaluation, Navy to Shipbuilding and Conversion, Navy for the procurement of a third Ship to Shore Connector in fiscal year 2015. The realignment of funds has no impact on the program’s acquisition schedule and allows the test program to proceed as scheduled. (Pages 185-186) Congressional Research Service 4924 Since the Defense-Wide portion of the budget has grown from just a few percent in the 1950s and 1960s to about 15% in more recent years, including the Defense-Wide category of spending in the calculation can lead to military department shares of the budget in the 1950s and 1960s that are somewhat more elevated compared to those in more recent years, making it more complex to compare the military departments’ shares across the entire period of time since the end of the World War II. For this reason, military department shares of the DOD budget cited in this statement are calculated after excluding the Defense-Wide category. The points made in this statement, however, can still made on the basis of a calculation that includes the Defense-Wide category. 25 For example, from the mid-1950s to the mid-1960s, reflecting a U.S. defense strategy at the time that placed a strong reliance on the deterrent value of nuclear weapons, the Department of the Air Force’s share of the non-Defense-Wide DOD budget increased by several percentage points. The Department of the Air Force’s share averaged about 45% for the 10-year period FY1956-FY1965, and peaked at more than 47% in FY1957-FY1959. As another example, for the 11-year period FY2003-FY2013, as a consequence of combat operations in Iraq and Afghanistan, the Department of the Army’s share of the non-Defense-Wide DOD budget increased by roughly 10 percentage points. The Department of the Army’s share during this period averaged about 39%, and peaked at more than 43% in FY2008. U.S. combat operations in Iraq and Afghanistan during this period reflected the implementation of U.S. national strategy as interpreted by policymakers during those years. Congressional Research Service 31 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL33741, Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report R43543, Navy LX(R) Amphibious Ship Program: Background and Issues for Congress, by Ronald O'Rourke. • • This report also covers the issue of funding for the procurement of a 12th San Antonio (LPD-17) class amphibious ship. CRS Report R43546, Navy TAO(X) Oiler Shipbuilding Program: Background and Issues for Congress, by Ronald O'Rourke. Individual Navy shipbuilding programs that are not covered in detail in the above reports are covered in this report. Congressional Research Service 32 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix A. Comparing Past Ship Force Levels to Current or Potential Future Ship Force Levels In assessing the appropriateness of the current or potential future number of ships in the Navy, observers sometimes compare that number to historical figures for total Navy fleet size. Historical figures for total fleet size, however, can be a problematic yardstick for assessing the appropriateness of the current or potential future number of ships in the Navy, particularly if the historical figures are more than a few years old, because • the missions to be performed by the Navy, the mix of ships that make up the Navy, and the technologies that are available to Navy ships for performing missions all change over time; and • the number of ships in the fleet in an earlier year might itself have been inappropriate (i.e., not enough or more than enough) for meeting the Navy’s mission requirements in that year. Regarding the first bullet point above, the Navy, for example, reached a late-Cold War peak of 568 battle force ships at the end of FY1987,3626 and as of August 1, 2014February 24, 2015, included a total of 290284 battle force ships (using the new counting rules proposed by the Navy as part of its FY2015 budget submission). The FY1987 fleet, however, was intended to meet a set of mission requirements that focused on countering Soviet naval forces at sea during a potential multi-theater NATO-Warsaw Pact conflict, while the August 2014February 2015 fleet is intended to meet a considerably different set of mission requirements centered on influencing events ashore by countering both land- and sea-based military forces of potential regional threats other than Russia, including improved Chinese military forces and non-state terrorist organizations. In addition, the Navy of FY1987 differed substantially from the August 2014February 2015 fleet in areas such as profusion of precisionguided precision-guided air-delivered weapons, numbers of Tomahawk-capable ships, and the sophistication of C4ISR systems and networking capabilities.3727 In coming years, Navy missions may shift again, and the capabilities of Navy ships will likely have changed further by that time due to developments such as more comprehensive implementation of networking technology, increased use of ship-based unmanned vehicles, and the potential fielding of new types of weapons such as lasers or electromagnetic rail guns. The 568-ship fleet of FY1987 may or may not have been capable of performing its stated missions; the 290284-ship fleet of August 2014February 2015 may or may not be capable of performing its stated missions; and a fleet years from now with a certain number of ships may or may not be capable of 3626 Some publications have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total number of active ships has been larger than the total number of battle force ships. For example, the Naval History and Heritage Command (formerly the Naval Historical Center) states that as of November 16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another year is thus an apples-to-oranges comparison that in this case overstates the decline since FY1987 in the number of ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the Navy over time should use, whenever possible, a single counting method. 3727 C4ISR stands for command and control, communications, computers, intelligence, surveillance, and reconnaissance. Congressional Research Service 5033 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress performing its stated missions. Given changes over time in mission requirements, ship mixes, and technologies, however, these three issues are to a substantial degree independent of one another. For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform its stated missions is increasing, because the fleet’s mission requirements might be increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated missions is decreasing, because the fleet’s mission requirements might be declining more rapidly than numbers of ships, or because average ship capability and the percentage of time that ships are in deployed locations might be increasing quickly enough to more than offset reductions in total ship numbers. Regarding the second of the two bullet points above, it can be noted that comparisons of the size of the fleet today with the size of the fleet in earlier years rarely appear to consider whether the fleet was appropriately sized in those earlier years (and therefore potentially suitable as a yardstick of comparison), even though it is quite possible that the fleet in those earlier years might not have been appropriately sized, and even though there might have been differences of opinion among observers at that time regarding that question. Just as it might not be prudent for observers years from now to tacitly assume that the 290289-ship Navy of AugustSeptember 2014 was appropriately sized for meeting the mission requirements of 2014, even though there currently are differences of opinion among observers on that question (as reflected, for example, in Table 7) simply because a figure of 290289 ships appears in the historical records for 2014, so, too, might it not be prudent for observers today to tacitly assume that the number of ships of the Navy in an earlier year was appropriate for meeting the Navy’s mission requirements that year, even though there might have been differences of opinion among observers at that time regarding that question, simply because the size of the Navy in that year appears in a table like Table D-1. Previous Navy force structure plans, such as those shown in Table 1, might provide some insight into the potential adequacy of a proposed new force-structure plan, but changes over time in mission requirements, technologies available to ships for performing missions, and other forceplanning factors, as well as the possibility that earlier force-structure plans might not have been appropriate for meeting the mission demands of their times, suggest that some caution should be applied in using past force structure plans for this purpose, particularly if those past force structure plans are more than a few years old. The Reagan-era plan for a 600-ship Navy, for example, was designed for a Cold War set of missions focusing on countering Soviet naval forces at sea, which is not an appropriate basis for planning the Navy today, and there was considerable debate during those years as to the appropriateness of the 600-ship goal.38 3828 28 Navy force structure plans that predate those shown in Table 1 include the Reagan-era 600-ship plan of the 1980s, the Base Force fleet of more than 400 ships planned during the final two years of the George H. W. Bush Administration, the 346-ship fleet from the Clinton Administration’s 1993 Bottom-Up Review (or BUR, sometimes also called Base Force II), and the 310-ship fleet of the Clinton Administration’s 1997 QDR. The table below summarizes some key features of these plans. Features of Recent Navy Force Structure Plans Plan Total ships Attack submarines (continued...) Congressional Research Service 600-ship ~600 100 Base Force 1993 BUR a ~450/416 80/~55c 346 45-55 1997 QDR ~305/310b 50/55d 5134 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix B. Independent Panel Assessment of 2010 QDR The law that requires DOD to perform QDRs once every four years (10 U.S.C. 118) states that the results of each QDR shall be assessed by an independent panel. The report of the independent panel that assessed the 2010 QDR was released on July 29, 2010. The independent panel’s report recommended a Navy of 346 ships, including 11 aircraft carriers and 55 attack submarines.3929 The report stated the following, among other things: • “The QDR should reflect current commitments, but it must also plan effectively for potential threats that could arise over the next 20 years.… we believe the 2010 QDR did not accord sufficient priority to the need to counter anti-access challenges, strengthen homeland defense (including our defense against cyber threats), and conduct post-conflict stabilization missions.” (Page 54) • “In this remarkable period of change, global security will still depend upon an American presence capable of unimpeded access to all international areas of the Pacific region. In an environment of ‘anti-access strategies,’ and assertions to create unique ‘economic and security zones of influence,’ America‘s rightful and historic presence will be critical. To preserve our interests, the United States will need to retain the ability to transit freely the areas of the Western Pacific for security and economic reasons. Our allies also depend on us to be fully present in the Asia-Pacific as a promoter of stability and to ensure the free flow of commerce. A robust U.S. force structure, largely rooted in maritime strategy but including other necessary capabilities, will be essential.” (Page 51) • “The United States will need agile forces capable of operating against the full range of potential contingencies. However, the need to deal with irregular and hybrid threats will tend to drive the size and shape of ground forces for years to (...continued) Aircraft carriers Surface combatants Amphibious ships 15e 242/228g ~75h 12 ~150 51i 11+1f ~124 41i 11+1f 116 36i Source: Prepared by CRS based on DOD and U.S. Navy data. a. Commonly referred to as 450-ship plan, but called for decreasing to 416 ships by end of FY1999. b. Original total of about 305 ships was increased to about 310 due to increase in number of attack submarines to 55 from 50. c. Plan originally included 80 attack submarines, but this was later reduced to about 55. d. Plan originally included 50 attack submarines but this was later increased to 55. e. Plus one additional aircraft carrier in the service life extension program (SLEP). f. Eleven active carriers plus one operational reserve carrier. g. Plan originally included 242 surface combatants but this was later reduced to 228. h. Number needed to lift assault echelons of one Marine Expeditionary Force (MEF) plus one Marine Expeditionary Brigade (MEB). i. Number needed to lift assault echelons of 2.5 MEBs. Changing numbers needed to meet this goal reflect in part changes in the design and capabilities of amphibious ships. 3929 Stephen J. Hadley and William J. Perry, co-chairmen, et al, The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on page 58. Congressional Research Service 5235 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress come, whereas the need to continue to be fully present in Asia and the Pacific and other areas of interest will do the same for naval and air forces.” (Page 55) • “The force structure in the Asia-Pacific needs to be increased. In order to preserve U.S. interests, the United States will need to retain the ability to transit freely the areas of the Western Pacific for security and economic reasons. The United States must be fully present in the Asia-Pacific region to protect American lives and territory, ensure the free flow of commerce, maintain stability, and defend our allies in the region. A robust U.S. force structure, one that is largely rooted in maritime strategy and includes other necessary capabilities, will be essential.” (Page 66) • “Force structure must be strengthened in a number of areas to address the need to counter anti-access challenges, strengthen homeland defense (including defense against cyber threats), and conduct post-conflict stabilization missions: First, as a Pacific power, the U.S. presence in Asia has underwritten the regional stability that has enabled India and China to emerge as rising economic powers. The United States should plan on continuing that role for the indefinite future. The Panel remains concerned that the QDR force structure may not be sufficient to assure others that the United States can meet its treaty commitments in the face of China’s increased military capabilities. Therefore, we recommend an increased priority on defeating anti-access and area-denial threats. This will involve acquiring new capabilities, and, as Secretary Gates has urged, developing innovative concepts for their use. Specifically, we believe the United States must fully fund the modernization of its surface fleet. We also believe the United States must be able to deny an adversary sanctuary by providing persistent surveillance, tracking, and rapid engagement with high-volume precision strike. That is why the Panel supports an increase in investment in long-range strike systems and their associated sensors. In addition, U.S. forces must develop and demonstrate the ability to operate in an information-denied environment.” (Pages 59-60) • “To compete effectively, the U.S. military must continue to develop new conceptual approaches to dealing with operational challenges, like the Capstone Concept for Joint Operations (CCJO). The Navy and Air Force‘s effort to develop an Air-Sea Battle concept is one example of an approach to deal with the growing anti-access challenge. It will be necessary to invest in modernized capabilities to make this happen. The Chief of Naval Operations and Chief of Staff of the Air Force deserve support in this effort, and the Panel recommends the other military services be brought into the concept when appropriate.” (Page 51; a similar passage appears on page 67) In recommending a Navy of 346 ships, the independent panel’s report cited the 1993 Bottom-Up Review (BUR) of U.S. defense plans and policies. Table B-1 compares the Navy’s 306-ship goal of March 2012 to the 346-ship Navy recommended in the 1993 BUR (as detailed partly in subsequent Navy testimony and publications) and the ship force levels recommended in the independent panel report. Congressional Research Service 5336 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table B-1. Comparison of Navy’s 306-ship goal, Navy Plan from 1993 BUR, and Navy Plan from 2010 QDR Review Panel Ship Type SSBNs Navy’s 306-ship goal of March 2012 Bottom-Up Review (BUR) (1993) 2010 QDR Independent Review Panel (July 2010) 12-14 18 14 (SSBN force was later reduced to 14 as a result of the 1994 Nuclear Posture Review) SSGNs 0-4 0 4 (SSGN program did not yet exist) SSNs ~48 45 to 55 55 (55 in FY99, with a long-term goal of about 45) Aircraft carriers Surface combatants 11 active 11 active + 1 operational/reserve 11 active ~145 124 n/a (114 active + 10 frigates in Naval Reserve Force; a total of 110-116 active ships was also cited) Cruisers and destroyers Frigates ~90 n/a n/a 0 n/a n/a 0 n/a (to be replaced by LCSs) LCSs ~55 (LCS program did not exist) Amphibious ships ~32 41 (30 operational ships needed to lift 2.0 MEBs) (Enough to lift 2.5 MEBs) 0 26 (to be replaced by LCSs) (LCS program did not exist) CLF ships ~29 43 n/a Support ships ~33 22 n/a ~306 346 346 Dedicated mine warfare ships TOTAL ships n/a n/a (numbers above add to 331-341)a Source: Table prepared by CRS. Sources for 1993 Bottom-Up Review: Department of Defense, Report on the Bottom-Up Review, October 1993, Figure 7 on page 28; Department of the Navy, Highlights of the FY 1995 Department of the Navy Budget, February 1994, p. 1; Department of the Navy, Force 2001, A Program Guide to the U.S. Navy, 1994 edition, p. 15; Statement of VADM T. Joseph Lopez, U.S. Navy, Deputy Chief of Naval Operations (Resources, Warfare Requirements & Assessments), Testimony to the Military Forces and Personnel Subcommittee of the House Armed Services Committee, March 22, 1994, pp. 2-5. Source for independent panel report: Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting Congressional Research Service 5437 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on pages 58-59. Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack submarine; LCS is Littoral Combat Ship; MPF(F) is Maritime Prepositioning Force (Future) ship; CLF is combat logistics force (i.e., resupply) ship; MEB is Marine Expeditionary Brigade. a. The Navy testified in 1994 that the planned number was adjusted from 346 to 330 to reflect reductions in numbers of tenders and early retirements of some older amphibious ships. In a letter dated August 11, 2010, Secretary of Defense Robert Gates provided his comments on the independent panel’s report. The letter stated in part: I completely agree with the Panel that a strong navy is essential; however, I disagree with the Panel’s recommendation that DoD should establish the 1993 Bottom Up Review’s (BUR’s) fleet of 346 ships as the objective target. That number was a simple projection of the thenplanned size of [the] Navy in FY 1999, not a reflection of 21st century, steady-state requirements. The fleet described in the 2010 QDR report, with its overall target of 313 to 321 ships, has roughly the same number of aircraft carriers, nuclear-powered attack submarines, surface combatants, mine warfare vessels, and amphibious ships as the larger BUR fleet. The main difference between the two fleets is in the numbers of combat logistics, mobile logistics, and support ships. Although it is true that the 2010 fleet includes fewer of these ships, they are all now more efficiently manned and operated by the Military Sealift Command and meet all of DoD’s requirements…. I agree with the Panel’s general conclusion that DoD ought to enhance its overall posture and capabilities in the Asia-Pacific region. As I outlined in my speech at the Naval War College in April 2009, “to carry out the missions we may face in the future… we will need numbers, speed, and the ability to operate in shallow waters.” So as the Air-Sea battle concept development reaches maturation, and as DoD’s review of global defense posture continues, I will be looking for ways to meet plausible security threats while emphasizing sustained forward presence – particularly in the Pacific.40 4030 30 Letter dated August 11, 2010, from Secretary of Defense Robert Gates to the chairmen of the House and Senate Armed Services and Appropriations Committees, pp. 3 and 4. The ellipsis in the second paragraph appears in the letter. Congressional Research Service 5538 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix C. U.S. Strategy and the Size and Structure of U.S. Naval Forces This appendix presents some observations on the relationship between U.S. strategy and the size and structure of U.S. naval forces that can form part of the context for assessing Navy force structure goals and shipbuilding plans.4131 Strategic considerations that can be considered in assessing Navy force structure goals and shipbuilding plans include, among other things, the U.S. strategic rebalancing toward the AsiaPacific region,4232 China’s modernization of its maritime military capabilities,4333 and requests from U.S. regional combatant commanders (COCOMs) for forward-deployed U.S. naval forces that the Navy has testified would require a Navy of about 450 ships to fully meet.4434 More broadly, from a strategic perspective it can be noted that that U.S. naval forces, while not inexpensive, give the United States the ability to convert the world’s oceans—a global commons that covers more than two-thirds of the planet’s surface—into a medium of maneuver and operations for projecting U.S. power ashore and otherwise defending U.S. interests around the world. The ability to use the world’s oceans in this manner—and to deny other countries the use of the world’s oceans for taking actions against U.S. interests—constitutes an immense asymmetric advantage for the United States. This point would be less important if less of the world were covered by water, or if the oceans were carved into territorial blocks, like the land. Most of the world, however, is covered by water, and most of those waters are international waters, where naval forces can operate freely. The point, consequently, is not that U.S. naval forces are intrinsically special or privileged—it is that they have a certain value simply as a consequence of the physical and legal organization of the planet. An additional point that can be noted in relating U.S. naval forces to U.S. national strategy is that most of the world’s people, resources, and economic activity are located not in the Western Hemisphere, but in the other hemisphere, particularly Eurasia. In response to this basic feature of world geography, U.S. policy makerspolicymakers for the last several decades have chosen to pursue, as a key element of U.S. national strategy, a goal of preventing the emergence of a regional hegemon in one part of Eurasia or another, on the grounds that such a hegemon could represent a concentration of power strong enough to threaten core U.S. interests by, for example, denying the United States access to some of the other hemisphere’s resources and economic activity. Although U.S. policy makerspolicymakers do not often state this key national strategic goal explicitly in public, U.S. 4131 This appendix adapts material originally presented in Statement of Ronald O’Rourke, Specialist in Naval Affairs, Congressional Research Service, Before the House Armed Services Committee Subcommittee on Seapower and Projection Forces on the Navy’s FY2014 30-Year Shipbuilding Plan, October 23, 2013, pp. 1, 17-18. 4232 For more on the strategic rebalancing, see CRS Report R42146, Assessing the January 2012 Defense Strategic Guidance (DSG): In Brief, by Catherine Dale and Pat Towell; and CRS Report R42448, Pivot to the Pacific? The Obama Administration’s “Rebalancing” Toward Asia, coordinated by Mark E. Manyin. 4333 For more on China’s modernization of its maritime military capabilities, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy Capabilities—Background and Issues for Congress, by Ronald O'Rourke. 4434 Navy officials testified in March 2014 that a Navy of 450 ships would be required to fully meet COCOM requests for forward-deployed Navy forces. (Spoken testimony of Admiral Jonathan Greenert at a March 12, 2014, hearing before the House Armed Services Committee on the Department of the Navy’s proposed FY2015 budget, as shown in transcript of hearing.) Congressional Research Service 5639 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress military operations in recent decades—both wartime operations and day-to-day operations—have been carried out in no small part in support of this key goal. The U.S. goal of preventing the emergence of a regional hegemon in one part of Eurasia or another is a major reason why the U.S. military is structured with force elements that enable it to cross broad expanses of ocean and air space and then conduct sustained, large-scale military operations upon arrival. Force elements associated with this goal include, among other things, an Air Force with significant numbers of long-range bombers, long-range surveillance aircraft, longrange airlift aircraft, and aerial refueling tankers, and a Navy with significant numbers aircraft carriers, nuclear-powered attack submarines, large surface combatants, large amphibious ships, and underway replenishment ships. The United States is the only country in the world that designs its military to cross broad expanses of ocean and air space and then conduct sustained, large-scale military operations upon arrival. The other countries in the Western Hemisphere do not design their forces to do this because they cannot afford to, and because the United States is, in effect, doing it for them. Countries in the other hemisphere do not design their forces to do this for the very basic reason that they are already in the other hemisphere, and consequently instead spend their defense money on forces that are tailored largely for influencing events in their own local region. The fact that the United States designs its military to do something that other countries do not design their forces to do—cross broad expanses of ocean and air space and then conduct sustained, large-scale military operations upon arrival—can be important to keep in mind when comparing the U.S. military to the militaries of other nations. For example, in observing that the U.S. Navy has 11 aircraft carriers while other countries have no more than one or two, it can be noted other countries do not need a significant number of aircraft carriers because, unlike the United States, they are not designing their forces to cross broad expanses of ocean and air space and then conduct sustained, large-scale military operations upon arrival. As another example, it is sometimes noted, in assessing the adequacy of U.S. naval forces, that U.S. naval forces are equal in tonnage to the next dozen or more navies combined, and that most of those next dozen or more navies are the navies of U.S. allies. Those other fleets, however, are mostly of Eurasian countries, which do not design their forces to cross to the other side of the world and then conduct sustained, large-scale military operations upon arrival. The fact that the U.S. Navy is much bigger than allied navies does not necessarily prove that U.S. naval forces are either sufficient or excessive; it simply reflects the differing and generally more limited needs that U.S. allies have for naval forces. (It might also reflect an underinvestment by some of those allies to meet even their more limited naval needs.) Countries have differing needs for naval and other military forces. The United States, as a country located in the Western Hemisphere with a goal of preventing the emergence of a regional hegemon in one part of Eurasia or another, has defined a need for naval and other military forces that is quite different from the needs of allies that are located in Eurasia. The sufficiency of U.S. naval and other military forces consequently is best assessed not through comparison to the militaries of other countries, but against U.S. strategic goals. Congressional Research Service 5740 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix D. Size of the Navy and Navy Shipbuilding Rate Size of the Navy Table D-1 shows the size of the Navy in terms of total number of ships since FY1948; the numbers shown in the table reflect changes over time in the rules specifying which ships count toward the total. Differing counting rules result in differing totals, and for certain years, figures reflecting more than one set of counting rules are available. Figures in the table for FY1978 and subsequent years reflect the battle force ships counting method, which is the set of counting rules established in the early 1980s for public policy discussions of the size of the Navy. As shown in the table, the total number of battle force ships in the Navy reached a late-Cold War peak of 568 at the end of FY1987 and began declining thereafter.4535 The Navy fell below 300 battle force ships in August 2003 and as of August 1, 2014February 24, 2015, included 290 battle force ships (using the new counting rules proposed by the Navy as part of its FY2015 budget submission)284 battle force ships. As discussed in Appendix A, historical figures for total fleet size might not be a reliable yardstick for assessing the appropriateness of proposals for the future size and structure of the Navy, particularly if the historical figures are more than a few years old, because the missions to be performed by the Navy, the mix of ships that make up the Navy, and the technologies that are available to Navy ships for performing missions all change over time, and because the number of ships in the fleet in an earlier year might itself have been inappropriate (i.e., not enough or more than enough) for meeting the Navy’s mission requirements in that year. For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform its stated missions is increasing, because the fleet’s mission requirements might be increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated missions is decreasing, because the fleet’s mission requirements might be declining more rapidly than numbers of ships, or because average ship capability and the percentage of time that ships are in deployed locations might be increasing quickly enough to more than offset reductions in total ship numbers. 4535 Some publications have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total number of active ships has been larger than the total number of battle force ships. For example, the Naval History and Heritage Command (formerly the Naval Historical Center) states that as of November 16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another year is thus an apples-to-oranges comparison that in this case overstates the decline since FY1987 in the number of ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the Navy over time should use, whenever possible, a single counting method. Congressional Research Service 5841 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table D-1. Total Number of Ships in the Navy Since FY1948 FYa Number FYa Number FYa Number FYa Number 1948 737 1970 769 1992 466 FY2014 289 1949 690 1971 702 1993 435 1950 634 1972 654 1994 391 1951 980 1973 584 1995 373 1952 1,097 1974 512 1996 356 1953 1,122 1975 496 1997 354 1954 1,113 1976 476 1998 333 1955 1,030 1977 464 1999 317 1956 973 1978 468 2000 318 1957 967 1979 471 2001 316 1958 890 1980 477 2002 313 1959 860 1981 490 2003 297 1960 812 1982 513 2004 291 1961 897 1983 514 2005 282 1962 959 1984 524 2006 281 1963 916 1985 541 2007 279 1964 917 1986 556 2008 282 1965 936 1987 568 2009 285 1966 947 1988 565 2010 288 1967 973 1989 566 2011 284 1968 976 1990 547 2012 287 1969 926 1991 526 2013 285 Source: Compiled by CRS using U.S. Navy data. Numbers shown reflect changes over time in the rules specifying which ships count toward the total. Figures for FY1978 and subsequent years reflect the battle force ships counting method, which is the set of counting rules established in the early 1980s for public policy discussions of the size of the Navy. a. Data for earlier years in the table may be for the end of the calendar year (or for some other point during the year), rather than for the end of the fiscal year. Shipbuilding Rate Table D-2 shows past (FY1982-FY2014) and requested or programmed (FY2015-FY2019) rates of Navy ship procurement. Congressional Research Service 5942 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table D-2. Battle Force Ships Procured or Requested/Programmed, FY1982-FY2019FY2020 (Procured FY1982-FY2014FY2015; requested or programmed FY2015-FY2019FY2016-FY2020) 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 17 14 16 19 20 17 15 19 15 11 11 7 4 4 5 4 5 5 6 016 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 620 6 5 7 8 4a 5a 3a 8 7 10 11b 11c 8 7 8 118 9 10 810 9 10 Source: CRS compilation based on Navy budget data and examination of defense authorization and appropriation committee and conference reports for each fiscal year. The table excludes non-battle force ships that do not count toward the 306-ship goal, such as certain sealift and prepositioning ships operated by the Military Sealift Command and oceanographic ships operated by agencies such as the National Oceanic and Atmospheric Administration (NOAA). a. The totals shown for FY2006, FY2007, and FY2008, reflect the cancellation two LCSs funded in FY2006, another two LCSs funded in FY2007, and an LCS funded in FY2008. b. The total shown for FY2012 includes two JHSVs—one that was included in the Navy’s FY2012 budget submission, and one that was included in the Army’s FY2012 budget submission. Until FY2012, JHSVs were being procured by both the Navy and the Army. The Army was to procure its fifth and final JHSV in FY2012, and this ship was included in the Army’s FY2012 budget submission. In May 2011, the Navy and Army signed a Memorandum of Agreement (MOA) transferring the Army’s JHSVs to the Navy. In the FY2012 DOD Appropriations Act (Division A of H.R. 2055/P.L. 112-74 of December 23, 2011), the JHSV that was in the Army’s FY2012 budget submission was funded through the Shipbuilding and Conversion, Navy (SCN) appropriation account, along with the JHSV that the Navy had included in its FY0212 budget submission. The four JHSVs that were procured through the Army’s budget prior to FY2012, however, are not included in the annual totals shown in this table. c. Figure shown does not reflect potential quantity reduction resulting from March 1, 2013, sequester on FY2013 funding. Author Contact Information Ronald O'Rourke Specialist in Naval Affairs rorourke@crs.loc.gov, 7-7610 Congressional Research Service 6043