< Back to Current Version

The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

Changes from January 6, 2014 to March 11, 2014

This page shows textual changes in the document between the two versions indicated in the dates above. Textual matter removed in the later version is indicated with red strikethrough and textual matter added in the later version is indicated with blue.


The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Andrew Feickert Specialist in Military Ground Forces January 6March 11, 2014 Congressional Research Service 7-5700 www.crs.gov R43240 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Summary The Armored Multi-Purpose Vehicle (AMPV) is the Army’s proposed replacement for the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs). While M-113s no longer serve as infantry fighting vehicles, five variants of the M-113 are used as command and control vehicles, general purpose vehicles, mortar carriers, and medical treatment and evacuation vehicles. An estimated 3,000 of these M-113 variants are currently in service with the Army. The AMPV is intended to be a “vehicle integration” or non-developmental program (candidate vehicles will be either existing vehicles or modified existing vehicles—not vehicles that are specially designed and not currently in service). Some suggest that a non-developmental vehicle might make it easier for the Army to eventually field this system to the force, as most of the Army’s most recent developmental programs, such as the Future Combat System (FCS), the Crusader self-propelled artillery system, and the Comanche helicopter were cancelled before they could be fully developed and fielded. On November 26, 2013, the Army issued a new draft Request for Proposal (RFP) for the AMPV. This latest RFP stipulates that the Army plans to award a five-year EMD contract in May 2014 worth $458 million to a single contractor for 29 prototypes. While the March 2013 RFP established an Average Unit Manufacturing Cost Ceiling for each AMPV at $1.8 million, this was rescinded to permit vendors greater flexibility. The EMD phase is scheduled to run between FY2015-FY2019, followed by three years of low-rate initial production (LRIP) starting in 2020. The Army’s decision to provide BAE System’s Bradley Fighting Vehicle to other vendors to use as they develop their own AMPV design proposals as a means of cutting program costs has resulted in claims of unfairness from General Dynamics Land Systems, which is developing its proposal based on the Stryker Combat Vehicle. General Dynamics has reportedly protested to the Army Material Command as well as approached Congress to limit funding until the Army devises what they believe is a more competitive program. The Administration’s FY2014 AMPV Budget Request was $116.298 million in Research, Development, Test & Evaluation (RDT&E) funding. The FY2014 National Defense Authorization Act recommended fully funding the FY2014 AMPV Budget Request. The House Appropriations Committee recommended $86.298 Consolidated Appropriations Act for FY2014 recommended $28.3 million in RDT&E funding, cutting $30 87.998 million from the FY2014 Budget AMPV Request due to schedule slip. This is due to the Army’s decision to move the AMPV’s delay and an Army requested program decrease, likely related to the Army’s decision to slip the AMPV’s Request for Proposal from June 2013 to mid-September 2013. The Senate Appropriations Committee has recommended fully funding the FY2014 AMPV Budget Request. A potential issue for Congress is should the AMPV be the Army’s number one combat vehicle acquisition priority? The Congressional Budget Office (CBO) noted in a report that it might be advisable to make the replacement of M-113s with AMPVs the Army’s first acquisition priority as opposed to developing the Ground Combat Vehicle (GCV). Other defense officials and analysts suggest, given current and anticipated future defense budgetary constraints, the Army’s emphasis on the GCV might be unrealistic. They instead suggest a more appropriate course of action might be for the Army to shift its emphasis to the non-developmental AMPV. This report will be The FY2015 President’s budget request for the AMPV is $92.4 million in RDT&E funding. This $64 million increase from FY2014 provides for one Engineering, Manufacturing, and Development (EMD) contract, as well as program management support. Potential issues for Congress include: Did the Army’s decision to use the Bradley for design proposals create an unfair advantage?, and What are the programmatic measures in the AMPV program to ensure that the vehicle is deployable? This report will be updated. Congressional Research Service The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Contents Background ...................................................................................................................................... 1 The Armored Multi-Purpose Vehicle (AMPV) ................................................................................ 1 The Army’s AMPV Requirements ................................................................................................... 1 Program Overview ........................................................................................................................... 2 Department of Defense (DOD) Approves AMPV Program............................................................. 3 Army Issues AMPV Request for Proposal (RFP) ............................................................................ 3 Projected AMPV Production Quantities .......................................................................................... 3 Potential VendorsRecent Program Activities ............................................................................................................... 4 Army Extends Request for Proposal (RFP) Response Date ...................................................... 4 General Dynamics Protests AMPV RFP ................................................................................... 4 General Dynamics Appeals to Congress ................................................................................... 5 4 Budgetary Issues .............................................................................................................................. 45 FY2014 AMPV Budget Request ............................................................................................... 45 FY2014 National Defense Authorization Act (H.R. 1960)..P.L. 113-66) ...................................................... 4 Department of Defense Appropriations Bill 2014 (H.R. 2397) 5 Consolidated Appropriations Act for FY2014 (P.L. 113-76) ..................................................... 5 FY2015 President’s Budget Request ....... 5 Department of Defense Appropriations Bill 2014 (S. 1429) ..................................................... 5 Potential Issue............................. 6 Potential Issues for Congress ............................................................................................................ 5 Should the AMPV Be the Army’s Number One Combat Vehicle Acquisition Priority? ........... 5 6 Has the Army’s Decision to Use Bradley Fighting Vehicles for AMPV’s Optional Exchange Vehicle Created an Unfair Advantage? .................................................................. 6 The AMPV and the Army’s Emphasis on Deployability ........................................................... 6 Tables Table 1. M-113 Distribution in ABCTs, by Variant ......................................................................... 2 Table 2. Projected AMPV Production, by Variant ........................................................................... 3 Contacts Author Contact Information............................................................................................................. 7 Congressional Research Service The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Background In early 1956, the Army began the development of an air-transportable, armored multi-purpose vehicle family intended to provide a lightweight, amphibious armored personnel carrier for armor and mechanized infantry units.1 Known as the M-113, it entered production in 1960 and saw extensive wartime service in Vietnam. Considered a reliable and versatile vehicle, a number of different variations of the M-113 were produced to fulfill such roles as a command and control vehicle, mortar carrier, and armored ambulance, to name but a few. The Army began replacing the M-113 infantry carrier version in the early 1980s with the M-2 Bradley Infantry Fighting Vehicle, but many non-infantry carrier versions of the M-113 were retained in service. According to reports, about 3,000 M-113 variants are currently still in use.2 The Armored Multi-Purpose Vehicle (AMPV)3 According to the Army: The Armored Multi-Purpose Vehicle (AMPV) is the proposed United States Army program for replacement of the M113 Family of Vehicles (FOV) to mitigate current and future capability gaps in force protection, mobility, reliability, and interoperability by mission role variant within the Heavy Brigade Combat Team (HBCT) [now known as the Armored Brigade Combat TeamABCT]. The AMPV will have multiple variants tailored to specific mission roles within HBCT. Mission roles are as follows: General Purpose, Medical Evacuation, Medical Treatment, Mortar Carrier, and Mission Command. AMPV is a vehicle integration program. The Army’s AMPV Requirements4 Regarding the decision to replace remaining M-113s, the Army notes: • The M-113 lacks the force protection and mobility needed to operate as part of combined arms teams within complex operational environments. For example, “commanders will not allow them to leave Forward Operating Bases (FOBs) or enter contested areas without extensive mission protection and route clearance.”5 • The use of other vehicles for M-113 mission sets (casualty evacuations, for example) reduces unit combat effectiveness. 1 Information in this section is taken from Christopher F. Foss, Jane’s Armour and Artillery, 2011-2012, 32nd Edition, pp. 470-478. 2 Tony Bertuca, “Optimism Emerges for the AMPV Program, Though Pre-RFP Work Remains,” InsideDefense.com, August 16, 2013. 3 From the Army’s AMPV Program website, https://contracting.tacom.army.mil/majorsys/ampv/ampv.htm, accessed September September 13, 2013. 4 Information in this section is taken from an Army briefing: “AMPV Industry Day,” April 23, 2013. 5 Ibid., p. 13. Congressional Research Service 1 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress M-113s are found in Armored Brigade Combat Teams (ABCTs), where they comprise 32% of the tracked armored vehicles organic to that organization. The 114 M-113 variants in the ABCT are distributed as follows: Table 1. M-113 Distribution in ABCTs, by Variant M-113 Variant Type Number of M-113s M-113A3 General Purpose (GP) 19 M-1068A3 Mission Command (MCmd) 41 M-1064 Mortar Carrier (MC) 15 M-113A3 Medical Evacuation (ME) 31 M-577 Medical Treatment (MT) 8 Source: Information in this table is taken from an Army briefing: “AMPV Industry Day,” April 23, 2013, p. 13. Program Overview6 According to the Government Accountability Office (GAO), in March 2012, the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD, AT&L) approved a materiel development decision for AMPV and authorized the Army’s entry into the materiel solution analysis phase. The Army completed the AMPV analysis of alternatives (AoA) in July 2012 and proposed a non-developmental vehicle (the candidate vehicle will be either an existing vehicle or a modified existing vehicle—not a vehicle that is specially designed and not in current service). Because the AMPV is to be a non-developmental vehicle, DOD has decided that the program will start at Milestone B, Engineering and Manufacturing Development (EMD) Phase and skip the Milestone A, Technology Development Phase. The Army plans for a full and open competition and will award one industry bidder a 42-month EMD contract to develop all five AMPV variants. A draft Request for Proposal (RFP) released in March 2013 stated that the EMD contract would be worth $1.46 billion, including $388 million for 29 EMD prototypes for testing between 2014 and 2017 and $1.08 billion for 289 low-rate initial production (LRIP) models between 2018 and 2020. The Army had planned on releasing the formal RFP in June 2013 but instead slipped the date until mid-September 2013, citing a delayed Defense Acquisition Board review attributed in part to Department of Defense civilian furloughs.7 Currently, the EMD contract award is planned for May 2014. The Army is also planning for an average unit manufacturing cost (AUMC) of $1.8 million per vehicle. With projected production quantities of 2,897 AMPVs, the overall AMPV program could exceed $5 billion, particularly if requirements for additional force protection are added by the Army. 6 Information in this section is taken from the United States Government Accountability Office, Defense Acquisitions: Assessments of Selected Weapon Programs, GAO-13-294SP, March 2013, p. 133, and an Army briefing: “AMPV Industry Day,” April 23, 2013 and Tony Bertuca, “Optimism Emerges for AMPV Program Though Pre-RFP Work Remains,” InsideDefense.com, August 16, 2013. 7 Tony Bertuca, “Army’s Armored Multi-Purpose Vehicle RFP Scheduled for Mid-September,” InsideDefense.com, August 9, 2013. Congressional Research Service 2 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Department of Defense (DOD) Approves AMPV AMPV Program8 On November 26, 2013, DOD issued an acquisition decision memorandum (ADM) officially approving the Army’s entry into the Milestone B, Engineering and Manufacturing Development (EMD) Phase. The ADM directed the Army to impose an Average Procurement Unit Cost less than or equal to $3.2 million at a production rate of not less than 180 vehicles per year. In addition, operations and sustainment costs are to be less than or equal to $400,000 per vehicle per year. The Army is also directed to down select to a single prime contractor at the completion of Milestone B. Army Issues AMPV Request for Proposal (RFP)9 Also on November 26, 2013, the Army issued a new draft Request for Proposal (RFP) for the AMPV. This latest RFP stipulates that the Army plans to award a five-year EMD contract in May 2014 worth $458 million to a single contractor for 29 prototypes. While the March 2013 RFP established an Average Unit Manufacturing Cost Ceiling for each AMPV at $1.8 million, this was rescinded to permit vendors greater flexibility. The EMD phase is scheduled to run between FY2015-FY2019, followed by three years of low-rate initial production (LRIP) starting in 2020. Projected AMPV Production Quantities10 Under current plans and projected force structure, the Army plans to start full rate production of the AMPV in FY2020 at the rate of two to three ABCTs per year. Total vehicle production by variant is depicted in the following table: Table 2. Projected AMPV Production, by Variant ABCT Total Training and Doctrine Command and Testing (See Notes) Total Vehicles by Quantity M-113A3 General Purpose (GP) 462 58 520 M-1068A3 Mission Command (MCmd) 899 92 991 Variant to Be Replaced 8 Information in this section is taken from Department of Defense, “Armored Multi-Purpose Vehicle Pre-Engineering and Manufacturing Development Request for Proposals Acquisition Decision Memorandum,” November 26, 2013 and Tony Bertuca, “DOD Officially OKs Army’s Armored Multi-Purpose Vehicle Program; RFP Hits the Street,” InsideDefense.com, November 26, 2013. 9 Information in this section is taken from Solicitation, Offer, and Award: Armored Multi-Purpose Vehicle, Number: W56HZV-13-R-0022, November 26, 2013 and Tony Bertuca, “DOD Officially OKs Army’s Armored Multi-Purpose Vehicle Program; RFP Hits the Street,” InsideDefense.com, November 26, 2013. 10 Information in this section is taken from an Army briefing: “AMPV Industry Day,” April 23, 2013. Congressional Research Service 3 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress ABCT Total Training and Doctrine Command and Testing (See Notes) Total Vehicles by Quantity M-1064 Mortar Carrier (MC) 348 36 384 M-113A3 Medical Evacuation (ME) 736 52 788 M-577 Medical Treatment (MT) 194 20 214 2,639 258 2,897 Variant to Be Replaced Totals Source: Information in this table is taken from an Army briefing: “AMPV Industry Day,” April 23, 2013, p. 23. Notes: Training and Doctrine Command (TRADOC), the Army command responsible for training the force, would use AMPVs at its various schools and courses for training soldiers. Testing AMPV quantities would be allocated to various Army and Department of Defense organizations responsible for testing vehicles. Potential Vendors11 Reports suggest the two top potential competitors for the AMPV contract are BAE Systems and General Dynamics Land Systems (GDLS). BAE is said to be offering a turretless Bradley Fighting Vehicle design and GDLS, a tracked Stryker Fighting Vehicle or a wheeled Stryker Double V-Hull Vehicle. It is not publically known if any other foreign or domestic vendors plan to compete for the AMPV contract. Budgetary Issues FY2014 AMPV Budget Request12 The FY2014 AMPV Budget Request was $116.298 million in Research, Development, Test & Evaluation (RDT&E) funding. FY2014 National Defense Authorization Act (H.R. 1960)13 Congress recommended fully funding the FY2014 AMPV Budget Request. 11 Tony Bertuca, “Optimism Emerges for AMPV Program Though Pre-RFP Work Remains,” InsideDefense.com, August 16, 2013. 12 Department of Defense Fiscal Year (FY) 2014 President’s Budget Request, Justification Book, RDT&E – Volume II, Budget Activity 54, April 2013, p. 6. 13 FY2014 National Defense Authorization Act, Joint Explanatory Statement, http://armedservices.house.gov/ index.cfm/files/serve?File_id=8A5E9112-80EF-43E1-A4E9-9AB0C0C107D8, accessed January 2, 2014. Congressional Research Service 4 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Department of Defense Appropriations Bill 2014 (H.R. 2397)14 The House Appropriations Committee recommended $86.298 million in RDT&E funding, cutting $30 million from the FY2014 Budget AMPV Request due to schedule slip. This is due to the Army’s decision to slip the AMPV’s Request for Proposal from June 2013 to mid-September 2013. Department of Defense Appropriations Bill 2014 (S. 1429)15 The Senate Appropriations Committee recommended fully funding the FY2014 AMPV Budget Request. Potential Issue for Congress Should the AMPV Be the Army’s Number One Combat Vehicle Acquisition Priority? The Ground Combat Vehicle (GCV) Program16 is the Army’s proposed replacement combat vehicle for the Bradley Infantry Fighting Vehicle in ABCTs and is the self-described centerpiece of the Army’s overall combat vehicle modernization strategy. In terms of priority, the GCV is the Army’s first combat vehicle acquisition priority, while the AMPV is the Army’s second priority.17 The Government Accountability Office (GAO) estimates GCV’s total program cost at $37.923 billion.18 Some analysts suggest the Army’s emphasis on the GCV is misguided. In the Congressional Budget Office’s (CBO’s) April 2013 report “The Army’s Ground Combat Vehicle Program and Alternatives,” CBO notes: As the GCV program is now constituted, the new vehicle would replace only a fraction of the Army’s combat equipment. And some analysts assert that the vehicles slated for replacement are not those that should be first in line. Specifically, according to the Army’s current plan, the GCVs will replace the 61 Bradley vehicles that are configured as IFVs in each of the Army’s armored combat brigades. Those vehicles represent only a small portion—18 percent—of the 346 armored combat vehicles in each armored combat brigade. Moreover, armored combat brigades made up only one-third of the Army’s total combat brigades at the end of 2012. 14 H.Rept. 113-113, Department of Defense Appropriations Bill, 2014 Report of the Committee on Appropriations, June 17, 2013, p. 220. 15 S.Rept. 113-85, Department of Defense Appropriations Bill, 2014, August 1, 2013, p. 148. 16 For additional information on the GCV, see CRS Report R41597, The Army’s Ground Combat Vehicle (GCV) Program: Background and Issues for Congress, by Andrew Feickert. 17 Army Equipment Modernization Plan 2013, June 20, 2012, pp. 10-11. 18 United States Government Accountability Office, Defense Acquisitions: Assessments of Selected Weapon Programs, GAO-13-294SP, March 2013, p. 141. Congressional Research Service 5 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Furthermore, the GCVs are scheduled to replace vehicles that are far from the oldest armored vehicles in the armored combat brigades. The more numerous M113- based vehicles—which constitute more than 30 percent of the armored combat vehicles in an armored combat brigade—are far older, both in terms of age of design and chronological age. The M113 was designed in the wake of the Korean War as an armored personnel carrier intended to protect soldiers from small-arms fire, artillery fragments, and the effects of nuclear weapons. Those vehicles are not worth upgrading, in the Army’s estimation, and the service stopped doing so in 2007. As a result, the Army’s M113-based vehicles were, on average, 13 years old at the end of 2012.19 Others, noting anticipated future defense budget reductions, also question the Army’s combat vehicles acquisition priorities. One article suggests: With defense spending expected to decline, the AMPV, along with the Ground Combat Vehicles, is seen as one of the last opportunities for the Army and industry to launch a major vehicle acquisition program. The GCV, however, was dealt a setback recently when Army Chief of Staff Gen. Raymond Odierno suggested that the program might be significantly delayed or even terminated due to sequestration-driven budget cuts.20 Some defense officials have reportedly suggested that: ... the AMPV seems to be ascending at a time when the Army’s top vehicle modernization priority, the Ground Combat Vehicle, appears to be on shaky ground. “AMPV is looking like it will move along; the program is simply less aggressive than GCV,” one official said.21 There appears to be a degree of concern among some defense analysts that, given current and anticipated future defense budgetary constraints, the Army’s emphasis on the GCV might be unrealistic. They instead suggest that a more appropriate course of action might be for the Army to shift its emphasis to the non-developmental AMPV, which is intended to replace the five M113 variants that constitute 32% of ABCT’s tracked combat vehicles. Because of the level of concern expressed by both government and non-government defense analysts about the priority assigned the AMPV, Congress might choose to further examine this issue with the Army. One potential discussion could focus on a decision by the Army to replace the GCV with the AMPV as the Army’s number one ground combat vehicle acquisition priority. Would such a move affect the pace of AMPV production, currently planned to reach full rate in FY2020? If reprioritizing the AMPV speeds up its fielding to the force, how much would any increase in AMPV production costs be offset by corresponding savings in M-113 Operations and Maintenance (O&M) costs, as AMPVs would be able to replace M-113s sooner than currently envisioned? 19 Congressional Budget Office (CBO), “The Army’s Ground Combat Vehicle Program and Alternatives,” April 2013, p. 15. 20 Tony Bertuca, “Army’s Armored Multi-Purpose Vehicle RFP Scheduled for Mid-September,”InsideDefense.com, August 9, 2013. 21 Tony Bertuca, “Optimism Emerges for AMPV Program, Though Pre-RFP Work Remains,” InsideDefense.com, August 16, 2013. Congressional Research Service 6 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Author Contact Information Andrew Feickert Specialist in Military Ground Forces afeickert@crs.loc.gov, 7-7673Recent Program Activities Army Extends Request for Proposal (RFP) Response Date11 Reports suggest the Army extended the deadline to industry to respond to the AMPV RFP from February 24, 2014, until May 28, 2014, after General Dynamics Land Systems (GDLS)—the Stryker Combat Vehicle’s manufacturer—requested additional time. The reason why this extension was granted was to permit GDLS to study the technical specifications of excess Bradley Fighting Vehicles (designated Optional Exchange Vehicles [OEVs] by the Army), which the Army has offered to vendors to use in their final AMPV production designs to “drive down” total AMPV program costs. As the Bradley is manufactured by BAE Systems—the other manufacturer vying for the AMPV contract—some Pentagon and Capitol Hill officials have reportedly suggested because of the Army’s decision, BAE has an “edge” as its proposed design is being built around a turretless Bradley, whereas GDLS has proposed both tracked and wheeled designs based on its Stryker vehicle. General Dynamics Protests AMPV RFP12 General Dynamics Land Systems reportedly filed a protest on February 14, 2014, with the Army Material Command protesting the AMPV RFP. The basis of General Dynamic’s protest is the program’s proposed timeline as well as the use of BAE’s Bradley Fighting Vehicle as the optional exchange vehicle for design development. This type of protest supposedly should be resolved within 90 days or less. 11 Tony Bertuca, “Army’s RFP Response Date for AMPV Extended After GDLS Asks for Time,” InsideDefense.com, January 31, 2014. 12 Tony Bertuca, “General Dynamics Protests RFP for Armored Multi-Purpose Vehicle,” InsideDefense.com, February 20, 2014. Congressional Research Service 4 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress General Dynamics Appeals to Congress13 General Dynamics has reportedly been actively lobbying Congress to intervene in the AMPV program, asking that program funding be denied until a more competitive plan is put forward by the Army. GDLS contends the RFP is biased towards BAE’s Bradley Fighting Vehicle and Bradley technical data has not been provided to other potential vendors and the Army has not provided sufficient data or time for others to compete. Supposedly, GDLS is considering asking for up to a three-year program delay so they have time to process the Bradley’s technical data and then adjust its bid. A program delay would run counter to the Army’s efforts to accelerate the AMPV program, an effort that has taken on increasing importance due to the recent termination of the Army’s Ground Combat Vehicle (GCV) program.14 Budgetary Issues FY2014 AMPV Budget Request15 The FY2014 AMPV Budget Request was $116.298 million in Research, Development, Test & Evaluation (RDT&E) funding. FY2014 National Defense Authorization Act (P.L. 113-66)16 Congress recommended fully funding the FY2014 AMPV Budget Request. Consolidated Appropriations Act for FY2014 (P.L. 113-76)17 The Consolidated Appropriations Act for FY2014 recommended $28.3 million in RDT&E funding, cutting $87.998 million from the FY2014 Budget AMPV Request due to schedule delay and an Army requested program decrease, likely related to the Army’s decision to slip the AMPV’s Request for Proposal from June 2013 to mid-September 2013. 13 Tony Bertuca, “General Dynamics Lobbies Congress to Upend Army’s AMPV Program,” InsideDefense.com, February 28, 2014. 14 For additional information on the GCV see CRS Report R41597, The Army’s Ground Combat Vehicle (GCV) Program: Background and Issues for Congress, by Andrew Feickert. 15 Department of Defense Fiscal Year (FY) 2014 President’s Budget Request, Justification Book, RDT&E—Volume II, Budget Activity 54, April 2013, p. 6. 16 P.L. 113-66, National Defense Authorization Act for FY2014, December 26, 2013. 17 H.R. 3547, Consolidated Appropriations Act for FY2014, (P.L. 113-76), January 17, 2014, Division C—Department of Defense Appropriations Act, 2014. Congressional Research Service 5 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress FY2015 President’s Budget Request18 The FY2015 President’s budget request for the AMPV is $92.4 million in RDT&E funding. This $64 million increase from FY2014 provides for one Engineering, Manufacturing, and Development (EMD) contract, as well as program management support. Potential Issues for Congress Has the Army’s Decision to Use Bradley Fighting Vehicles for AMPV’s Optional Exchange Vehicle Created an Unfair Advantage? The Army’s decision to use excess Bradley Fighting Vehicles as an “Optional Exchange Vehicle” for use in vendor’s vehicle design efforts raises a number of potential questions that Congress might chose to examine in greater detail. With both major vendors—GDLS and BAE— developing designs based on previously developed and fielded systems (the Stryker and Bradley, respectively), what program savings did the Army envision when it offered the Bradley to all vendors? Does the provision of the Bradley as an optional exchange vehicle help to accelerate the AMPV’s developmental timeline or did it instead interject another program requirement that could extend the program and perhaps increase overall program costs? While the Army might have viewed the provision of the Bradley as an optional exchange vehicle as a cost-savings measure, did Army leadership consider that such a move could also give the appearance of favoritism towards BAE’s Bradley design? If a potential vendor files a formal protest with the Government Accountability Office (GAO) based on a perception of unfairness or favoritism, what is the potential impact on the AMPV program should GAO rule in favor of the protestor(s)? These and other possible questions could help Congress better understand if the Army’s actions have created an unfair advantage and if the AMPV program, as currently envisioned by Army leadership, is sustainable under these circumstances. The AMPV and the Army’s Emphasis on Deployability On February 24, 2014, during a news conference outlining his recommendations to the President for DOD’s FY2015 budget, Secretary of Defense Hagel stated: I have also accepted the Army’s recommendation to terminate the current Ground Combat Vehicle [GCV] program and re-direct the funds toward developing a next-generation platform. I have asked the leadership of the Army and the Marine Corps to deliver new, realistic visions for vehicle modernization by the end of this year.19 18 Office of the Under Secretary of Defense (Comptroller)/Chief Financial Officer, United States Department of Defense FY2015 Budget Request, Program Acquisition Cost by Weapon System, March 2014, p. 3-3 and U.S. Army’s FY2015 Budget Briefing, March 4, 2014, p. 13. 19 Remarks by Secretary of Defense Chuck Hagel FY2015 Budget Preview, Pentagon Press Briefing Room, Monday, February 24, 2014. Congressional Research Service 6 The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress When asked to elaborate on Secretary Hagel’s comments, a DOD spokesman reportedly noted: We found that the Ground Combat Vehicle isn't the best vehicle to replace the Bradley Infantry Fighting Vehicle, both in terms of performance and cost. While it would have protected troops inside it, it would have been too heavy and too expensive.20 It was also noted that industry proposed GCV variants ranging from 60 tons to 70 tons in order to meet Army protection requirements as well as the capacity to transport a nine-soldier infantry squad.21 The Army has reportedly stated “the service needs to become a lighter and more expeditionary force in the coming decade if it is to remain relevant to America’s national security strategy” and that “the increased weight of combat vehicles is one of the areas the Army needs to address if it is to become more expeditionary.”22 While the AMPV is likely to be based on existing designs, because there are five variants planned, there is potential for the vehicle to increase in both weight and size as new features are added to the vehicles. Because the past two combat vehicles proposed by the Army—the Future Combat System’s Manned Ground Combat Vehicle and the Ground Combat Vehicle—were cancelled in large part due to what was deemed excessive weight and size, Congress might decide to examine what programmatic measures are in place to ensure that the AMPV does not fall victim to its weight and size—primary factors in the AMPV’s overall deployability. Author Contact Information Andrew Feickert Specialist in Military Ground Forces afeickert@crs.loc.gov, 7-7673 20 Sebastian Sprenger and Tony Bertuca, “Combat Vehicle Axing Adds to Army’s List of Programs That Went Nowhere,” InsideDefense.com, February 26, 2014. 21 Ibid. 22 Tony Bertuca, “Army Futurists Continue to Ponder a Lighter, More Expeditionary Force,” InsideDefense.com, January 24, 2014. Congressional Research Service 7