< Back to Current Version

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Changes from August 17, 2010 to September 28, 2010

This page shows textual changes in the document between the two versions indicated in the dates above. Textual matter removed in the later version is indicated with red strikethrough and textual matter added in the later version is indicated with blue.


Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs August 17September 28, 2010 Congressional Research Service 7-5700 www.crs.gov RL32665 CRS Report for Congress Prepared for Members and Committees of Congress Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Summary The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy’s shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy’s FY2011 budget submission retains, for the time being at least, the goal of achieving and maintaining a 313-ship fleet that the Navy first presented to Congress in February 2006. Although the 313-ship goal remains in place, some elements of Navy ship force planning that have emerged since 2006 appear to diverge from elements of the 313-ship plan. The Navy’s report on its FY2011 30-year (FY2011-FY2040) shipbuilding plan refers to a forthcoming force structure assessment (FSA). Such an assessment could produce a replacement for the 313-ship plan. It is not clear when the FSA might be conducted, or when a replacement for the 313-ship plan might be issued. The Navy’s proposed FY2011 budget requests funding for the procurement of nine new battle force ships (i.e., ships that count against the 313-ship goal). The nine ships include two attack submarines, two destroyers, two Littoral Combat Ships (LCSs), one amphibious assault ship, one Mobile Landing Platform (MLP) ship (i.e., a maritime prepositioning ship), and one Joint High Speed Vessel (JHSV). The Navy’s five-year (FY2011-FY2015) shipbuilding plan includes a total of 50 new battle force ships, or an average of 10 per year. Of the 50 ships in the plan, half are relatively inexpensive LCSs or JHSVs. The Navy’s FY2011 30-year (FY2011-FY2040) shipbuilding plan includes 276 ships. The plan does not include enough ships to fully support all elements of the 313-ship plan over the long run. The Navy projects that implementing the 30-year plan would result in a fleet that grows from 284 ships in FY2011 to 315 ships in FY2020, reaches a peak of 320 ships in FY2024, drops below 313 ships in FY2027, declines to 288 ships in FY2032-FY2033, and then increases to 301 ships in FY2039-FY2040. The Navy projects that the attack submarine and cruiser-destroyer forces will drop substantially below required levels in the latter years of the 30-year plan. The Navy estimates that executing the 30-year shipbuilding plan would require an average of $15.9 billion per year in constant FY2010 dollars. A May 2010 Congressional Budget Office (CBO) report estimates that the plan would require an average of $19.0 billion per year in constant FY2010 dollars, or about 19% more than the Navy estimates. The CBO report states: “If the Navy receives the same amount of funding for ship construction in the next 30 years as it has over the past three decades—an average of about $15 billion a year in 2010 dollars—it will not be able to afford all of the purchases in the 2011 plan.” Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Contents Introduction ................................................................................................................................1 Background ................................................................................................................................2 313-Ship Force-Level Objective of 2006 ...............................................................................2 Five-Year (FY2011-FY2015) Shipbuilding Plan ....................................................................4 30-Year (FY2011-FY2040) Shipbuilding Plan.......................................................................6 Resulting Projected Force Levels for FY2011-FY2040..........................................................7 Oversight Issues for Congress .....................................................................................................8 Status of Navy’s 313-Ship Goal.............................................................................................8 Sufficiency of 30-Year Shipbuilding Plan ..............................................................................9 Affordability and Executability of 30-Year Shipbuilding Plan................................................9 Scheduled Retirements of Older Ships................................................................................. 11 Legislative Activity for FY2011 ................................................................................................ 11 FY2011 Defense Authorization Bill (H.R. 5136/S. 3454)..................................................... 11 House ........................................................................................................................... 11 Senate........................................................................................................................... 17 FY2011 DOD Appropriations Bill (S. 3800)........................................................................ 20 Senate........................................................................................................................... 20 National Shipbuilding Budget Policy Act (H.R. 5035) ......................................................... 2021 CRS Reports Tracking Legislation on Specific Navy Shipbuilding Programs....................... 21 Tables Table 1. Navy Ship Force Structure Proposals Since 2001 ...........................................................2 Table 2. Navy Five-Year (FY2011-FY2015) Shipbuilding Plan ...................................................4 Table 3. Navy 30-Year (FY2011-FY2040) Shipbuilding Plan ......................................................6 Table 4. Projected Force Levels Resulting from 30-Year Plan......................................................7 Table 5. Navy and CBO Estimates of Cost of 30-Year Shipbuilding Plan................................... 10 Table B-1. Recent Proposed Alternatives to Navy’s 313-Ship Plan............................................. 2425 Table C-1. Comparison of 1993 BUR Report, 313-Ship Plan, and Independent Panel Assessment of 2010 QDR ...................................................................................................... 2829 Table D-1. Total Number of Ships in the Navy Since FY1948 ................................................... 3132 Table D-2. Battle Force Ships Procured or Requested, FY1982-FY2015.................................... 3233 Appendixes Appendix A. Comparing Past Ship Force Levels to Proposed 313-Ship Force Level .................. 2223 Appendix B. Recent Proposed Alternatives to Navy’s 313-Ship Plan ......................................... 2425 Appendix C. Independent Panel Assessment of 2010 QDR........................................................ 2627 Appendix D. Size of the Navy and Navy Shipbuilding Rate....................................................... 3031 Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Contacts Author Contact Information ...................................................................................................... 3233 Congressional Research Service Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Introduction The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy’s shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy’s FY2011 budget submission retains, for the time being at least, the goal of achieving and maintaining a 313-ship fleet that the Navy first presented to Congress in February 2006. Although the 313-ship goal remains in place, some elements of Navy ship force planning that have emerged since 2006 appear to diverge from elements of the 313-ship plan. The Navy’s report on its FY2011 30-year (FY2011-FY2040) shipbuilding plan refers to a forthcoming force structure assessment (FSA). Such an assessment could produce a replacement for the 313-ship plan. It is not clear when the FSA might be conducted, or when a replacement for the 313-ship plan might be issued. The Navy’s proposed FY2011 budget requests funding for the procurement of nine new battle force ships (i.e., ships that count against the 313-ship goal). The nine ships include two attack submarines, two destroyers, two Littoral Combat Ships (LCSs), one amphibious assault ship, one Mobile Landing Platform (MLP) ship (i.e., a maritime prepositioning ship), and one Joint High Speed Vessel (JHSV). 1 The Navy’s five-year (FY2011-FY2015) shipbuilding plan includes a total of 50 new battle force ships, or an average of 10 per year.2 Of the 50 ships in the plan, half are relatively inexpensive LCSs or JHSVs. The Navy’s FY2011 30-year (FY2011-FY2040) shipbuilding plan includes 276 ships. The plan does not include enough ships to fully support all elements of the 313-ship plan over the long run. The Navy projects that implementing the 30-year plan would result in a fleet that grows from 284 ships in FY2011 to 315 ships in FY2020, reaches a peak of 320 ships in FY2024, drops below 313 ships in FY2027, declines to 288 ships in FY2032-FY2033, and then increases to 301 ships in FY2039-FY2040. The Navy projects that the attack submarine and cruiser-destroyer forces will drop substantially below required levels in the latter years of the 30-year plan. The Navy estimates that executing the 30-year shipbuilding plan would require an average of $15.9 billion per year in constant FY2010 dollars. A May 2010 Congressional Budget Office (CBO) report estimates that the plan would require an average of $19.0 billion per year in constant FY2010 dollars, or about 19% more than the Navy estimates. 3 The CBO report states: “If the Navy receives the same amount of funding for ship construction in the next 30 years as it has over the past three decades—an average of about $15 billion a year in 2010 dollars—it will not be able to afford all of the purchases in the 2011 plan.”4 1 The proposed FY2011 budget also requests funding for the procurement of an oceanographic ship that does not count against the 313-ship goal. 2 The five-year plan also includes two oceanographic ships (one in FY2011 and one in FY2012) that do not count against the 313-ship goal. 3 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2011 Shipbuilding Plan, May 2010, Table 2 (page 9). 4 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2011 Shipbuilding Plan, May 2010, p. vii. Congressional Research Service 1 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Background 313-Ship Force-Level Objective of 2006 The Navy’s FY2011 budget submission retains, for the time being at least, the goal of achieving and maintaining a 313-ship fleet that the Navy first presented to Congress in February 2006. Table 1 shows the composition of the Navy’s planned 313-ship fleet and compares it to previous Navy ship force structure proposals. Table 1. Navy Ship Force Structure Proposals Since 2001 Ship type February 2006 Navy proposal for 313ship fleet Early-2005 Navy proposal for fleet of 260-325 ships 260-ships 325-ships 2002-2004 Navy proposal for 375ship Navya 2001 QDR plan for 310ship Navy 14 Ballistic missile submarines (SSBNs) 14 14 14 14 Cruise missile submarines (SSGNs) 4 4 4 4 Attack submarines (SSNs) 48 37 41 55 55 Aircraft carriers 11c 10 11 12 12 Cruisers, destroyers, frigates 88 67 92 104 116 Littoral Combat Ships (LCSs) 55 63 82 56 0 Amphibious ships 31 17 24 37 36 12d 14d 20d 0d 0d Combat logistics (resupply) ships 30 24 26 42 34 Dedicated mine warfare ships 0 0 0 26e 16 Otherf 20 10 11 25 25 313 260 325 375 310 or 312 MPF(F) shipsd Total battle force ships 2 or 4b Sources: U.S. Navy data. Note: QDR is Quadrennial Defense Review. a. Initial composition. Composition was subsequently modified. b. The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s proposed FY2001 Department of Defense (DOD) budget requested funding to support the conversion of two available Trident SSBNs into SSGNs, and the retirement of two other Trident SSBNs. Congress, in marking up this request, supported a plan to convert all four available SSBNs into SSGNs. c. For a time, the Navy characterized the goal as 11 carriers in the nearer term, and eventually 12 carriers. Congressional Research Service 2 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress d. Today’s Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine Corps operations ashore, rather than Navy combat operations, and thus are not counted as Navy battle force ships. The MPF (Future) ships, however, would contribute to Navy combat capabilities (for example, by supporting Navy aircraft operations). For this reason, MPF(F) ships are counted by the Navy as battle force ships. e. The figure of 26 dedicated mine warfare ships includes 10 ships maintained in a reduced mobilization status called Mobilization Category B. Ships in this status are not readily deployable and thus do not count as battle force ships. The 375-ship proposal thus implied transferring these 10 ships to a higher readiness status. f. Includes, among other things, command ships and support ships. Although the 313-ship goal remains in place as a Navy goal, some elements of Navy ship force planning that have emerged since 2006 appear to diverge from elements of the 313-ship plan. For example: • The Navy is planning to replace its 14 existing ballistic missile submarines (SSBNs) with a new class of 12 next-generation SSBNs.5 • The planned composition of the Navy’s cruiser-destroyer force has changed considerably since 2006 due to the truncation of the Zumwalt (DDG-1000) destroyer program to three ships, the restart of Arleigh Burke (DDG-51) class destroyer procurement, and the Navy’s proposed cancellation of the CG(X) cruiser program. 6 The Navy’s new mission of ballistic missile defense (BMD) operations in Europe may also put upward pressure on the cruiser-destroyer force-level goal.7 • The Navy acknowledges that meeting a requirement for being able to lift the assault echelons of 2.0 Marine Expeditionary Brigades (MEBs) would require a minimum of 33 amphibious ships rather than 31.8 • Within the category of support ships, the original 313-ship plan included 3 Joint High Speed Vessels (JHSVs), but the Navy now plans to build and maintain a force of about 23 JHSVs.9 • Navy shipbuilding plans no longer call for building a 12-ship squadron of nextgeneration Maritime Prepositioning Force (Future), or MPF(F), ships; they now call for building six new maritime prepositioning ships—three Lewis and Clark (TAKE-1) class dry cargo ships (which have already been funded) and three Mobile Landing Platform (MLP) ships—that are to augment the three existing squadrons of maritime prepositioning ships. 5 For further discussion, see CRS Report R41129, Navy SSBN(X) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. 6 For further discussion, see CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress, by Ronald O'Rourke, and CRS Report RL34179, Navy CG(X) Cruiser Program: Background for Congress, by Ronald O'Rourke. 7 For further discussion, CRS Report RL33745, Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress, by Ronald O'Rourke. 8 For further discussion, see CRS Report RL34476, Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress, by Ronald O'Rourke. 9 Source: Navy briefing to CRS and Congressional Budget Office (CBO) on FY2011 30-year shipbuilding plan, March 17, 2010. Congressional Research Service 3 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The Navy’s report on its FY2011 30-year (FY2011-FY2040) shipbuilding plan refers to a forthcoming force structure assessment (FSA).10 Such an assessment could produce a replacement for the 313-ship plan. It is not clear when the FSA might be conducted, or when a replacement for the 313-ship plan might be issued. Five-Year (FY2011-FY2015) Shipbuilding Plan Table 2 shows the Navy’s proposed five-year (FY2011-FY2015) shipbuilding plan. Table 2. Navy Five-Year (FY2011-FY2015) Shipbuilding Plan (Battle force ships—i.e., ships that count against 313-ship goal) Ship type FY11 FY12 Ford (CVN-78) class aircraft carrier FY13 FY14 FY15 Total 1 1 Virginia (SSN-774) class attack submarine 2 2 2 2 2 10 Arleigh Burke (DDG-51) class destroyer 2 1 2 1 2 8 Littoral Combat Ship (LCS) 2 3 4 4 4 17 San Antonio (LPD-17) class amphibious ship Large-deck amphibious assault ship (LHA[R]) 1 1 1 1 Fleet tug (TATF) 1 1 1 1 3 Mobile Landing Platform (MLP) ship 1 Joint High Speed Vessel (JHSV) 1 1 2 2 2 8 TOTAL 9 8 12 9 12 50 Source: FY2011 Navy budget submission. Note: The FY2011-FY2015 shipbuilding plan also includes two oceanographic ships (one in FY2011 and one in FY2012) that do not count against the 313-ship goal. Observations that can be made about the Navy’s proposed five-year (FY2011-FY2015) shipbuilding plan include the following: • The plan includes a total of 50 new battle force ships, or an average of 10 per year.11 This is an increase from the single-digit numbers of battle force ships that have been funded each year since FY1993. Shipbuilding supporters for some time have wanted to increase the shipbuilding rate to 10 or more ships per year. A rate of 10 ships per year is above the steady-state replacement rate for a fleet of 313 ships with an average service life of 35 years, which is about 8.9 ships per year. The average shipbuilding rate since FY1993 has been substantially below 8.9 ships per year (see Appendix D). 10 U.S. Navy, Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels for FY 2011, February 2010, pp. 14, 19, 25. 11 The five-year plan also includes two oceanographic ships (one in FY2011 and one in FY2012) that do not count against the 313-ship goal. Congressional Research Service 4 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • Although LCSs and JHSVs account for about 25% of the 313-ship requirement, they account for 50% of the ships in the five-year plan. In this sense, these relatively inexpensive ships are overrepresented in the five-year shipbuilding plan relative to their portion of the 313-ship requirement, making it easier to procure an average of 10 ships per year within available resources. Starting a few years from now, when the LCS and JHSV programs are no longer overrepresented in the shipbuilding plan, and particularly when procurement of next-generation SSBN(X) ballistic missile submarines begins, procuring an average of 10 ships per year will become a considerably more expensive proposition. In this sense, the FY2011-FY2015 shipbuilding program’s average of 10 ships per year does not necessarily imply that the Navy has solved the challenge it faces concerning the long-term affordability of its shipbuilding plans. • The FY2010 budget shifted the procurement of the next aircraft carrier from FY2012 to FY2013. • The planned procurement rate of Virginia (SSN-774) class submarines is consistent with Navy planning since the submission of the FY2009 budget to increase the procurement rate of these ships to two per year starting in FY2011. Virginia-class submarines were procured in FY2010 and previous years at a rate of about one per year.12 • The planned procurement rate for DDG-51 class destroyers reflects the Navy’s proposal, approved by Congress as part of its action on the FY2010 defense budget, to stop procurement of DDG-1000 class destroyers and restart procurement of DDG-51s. • The planned procurement rate of Littoral Combat Ships (LCSs) does not rise above four per year. Previous Navy plans called for building as many as six LCSs per year. The new planned maximum rate of four ships per year reflects a new acquisition strategy for LCSs announced by the Navy in September 2009.13 • The San Antonio (LPD-17) class amphibious ship planned for FY2012 would be the 11th ship in the class. The 33-ship goal for amphibious ships includes 11 LPD17s. • The FY2011-FY2015 plan contains no amphibious ships in FY2013-FY2015. This could result in a dip in workload starting in FY2013 at the yards that build amphibious ships—Northrop Grumman Shipbuilding’s (NGSB’s) Gulf Coast yards (the Avondale yard upriver from New Orleans, LA, and the Ingalls yard at Pascagoula, MS). (On July 13, 2010, Northrop announced that it intends to wind down shipbuilding operations at Avondale in 2013 and consolidate its Gulf Coast shipbuilding operations at the Ingalls yard.) • The three Mobile Landing Platform (MLP) ships in the plan reflect the Navy’s decision to cancel the planned MPF(F) squadron and instead build six new ships, 12 For further discussion, see CRS Report RL32418, Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress, by Ronald O'Rourke. 13 For further discussion, see CRS Report RL33741, Navy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress, by Ronald O'Rourke. Congressional Research Service 5 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress including three MLPs, to augment the three existing squadrons of maritime prepositioning ships. 30-Year (FY2011-FY2040) Shipbuilding Plan Table 3 shows the Navy’s FY2011 30-year (FY2011-FY2040) shipbuilding plan. The plan includes a total of 276 ships. Table 3. Navy 30-Year (FY2011-FY2040) Shipbuilding Plan FY 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 CVN 1 1 1 1 1 1 LSC SSC SSN 2 1 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 2 1 2 2 2 2 2 2 2 2 2 2 2 3 4 4 4 3 3 3 3 2 2 2 2 2 1 2 1 2 1 2 1 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2 1 2 1 SSBN AWS CLF 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2 1 2 1 1 1 1 1 1 Supt Total 2 1 3 2 4 2 3 3 3 4 2 3 3 2 1 9 8 12 9 12 9 12 9 13 9 11 10 11 8 8 7 7 8 8 8 8 8 11 8 10 7 10 9 10 7 1 2 1 1 2 2 2 2 2 2 2 2 Source: Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels for FY2009. Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC = small surface combatants (i.e., Littoral Combat Ships [LCSs]); SSN = attack submarines; SSGN = cruise missile submarines; SSBN = ballistic missile submarines; AWS = amphibious warfare ships; CLF = combat logistics force (i.e., resupply) ships; MPF(F) = Maritime Prepositioning Force (Future) ships; Supt = support ships. Congressional Research Service 6 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Resulting Projected Force Levels for FY2011-FY2040 Table 4 shows the Navy’s projection of force levels for FY2011-FY2040 that would result from implementing the 30-year shipbuilding plan shown in Table 3. Table 4. Projected Force Levels Resulting from 30-Year Plan FY CVN LSC SSC SSN SSGN SSBN AWS CLF Supt Total Goal in 313-ship plan 11 88 55 48 4 14 31 30 20 313a 11 11 84 42 53 4 14 29 29 18 284 12 11 84 41 54 4 14 30 29 20 287 13 10 85 37 55 4 14 30 29 23 287 14 10 86 32 55 4 14 30 30 24 285 15 11 88 28 54 4 14 31 30 25 285 16 11 90 32 51 4 14 33 30 27 292 17 11 91 33 51 4 14 33 30 31 298 18 11 93 37 50 4 14 33 30 33 305 19 11 94 37 51 4 14 33 30 37 311 20 12 96 39 49 4 14 33 30 38 315 21 12 96 39 49 4 14 34 31 39 318 22 12 95 41 48 4 14 34 29 41 318 23 11 94 39 48 4 14 35 29 45 319 24 11 94 40 46 4 14 36 28 47 320 25 12 92 41 45 4 14 35 28 46 317 26 12 89 43 44 4 14 36 28 45 313 27 12 87 45 43 2 13 35 26 46 308 28 11 85 46 41 1 13 36 26 46 304 29 11 81 48 40 0 13 34 25 44 296 30 12 77 49 39 0 12 33 25 44 291 31 12 73 51 41 0 12 33 24 44 290 32 11 71 52 41 0 12 32 25 44 288 33 11 69 53 42 0 12 31 26 44 288 34 11 67 54 43 0 12 33 26 44 290 35 12 68 55 44 0 12 30 25 44 290 36 11 70 56 45 0 12 30 26 44 294 37 11 72 56 46 0 12 29 27 44 297 38 11 74 56 45 0 12 29 27 44 298 39 11 76 56 45 0 12 29 28 44 301 40 11 76 55 45 0 12 30 28 44 301 Congressional Research Service 7 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Source: Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels for FY2009. Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC = small surface combatants (i.e., frigates, Littoral Combat Ships [LCSs], and mine warfare ships); SSN = attack submarines; SSGN = cruise missile submarines; SSBN = ballistic missile submarines; AWS = amphibious warfare ships; CLF = combat logistics force (i.e., resupply) ships; MPF(F) = Maritime Prepositioning Force (Future) ships; Supt = support ships. a. The 313-ship plan also includes a 12-ship Maritime Prepositioning Force (Future), or MPF(F), squadron. The Navy’s FY2011 30-year shipbuilding plan does not contemplate building a 12-ship MPF(F) squadron. Observations that can be made about the above force-level projections include the following: • The Navy projects that implementing its 30-year shipbuilding plan would result in a fleet that grows from 284 ships in FY2011 to 315 ships in FY2020, reaches a peak of 320 ships in FY2024, drops below 313 ships in FY2027, declines to 288 ships in FY2032-FY2033, and then increases to 301 ships in FY2039-FY2040. • The Navy projects that the attack submarine and cruiser-destroyer forces will drop substantially below required levels in the latter years of the 30-year plan. The projected number of attack submarines drops below the required level of 48 boats in FY2022, reaches a minimum of 39 boats in FY2030, and remains below 48 boats through 2040. The projected number of cruisers and destroyers drops below the required level of 88 ships in 2027, reaches a minimum of 67 ships in FY2034, and remains below 88 ships through FY2040. • The Navy projects a force of more than 40 support ships in FY2022 and beyond, compared to a goal of 20 support ships in the 313-ship plan. The 20 support ships in the 313-ship plan include three JHSVs, but the Navy now plans to build and maintain a force of about 23 JHSVs. Oversight Issues for Congress Status of Navy’s 313-Ship Goal One potential oversight issue for Congress concerns the status of the Navy’s 313-ship goal. Potential questions for Congress include the following: 14 • Does the Office of the Secretary of Defense (OSD) endorse the Navy’s 313-ship goal? The Department of Defense’s (DOD’s) final report on the 2010 Quadrennial Defense Review (QDR) states the levels of Navy and other forces that are expected to be in place for the years FY2011-FY2015, but does not explicitly establish force-level requirements for Navy or other forces for either FY2011-FY2015 or subsequent years.14 • What is the Navy’s schedule for performing the new force structure assessment (FSA) mentioned in the Navy’s report on its 30-year shipbuilding plan? Will this FSA result in a new force-level goal to replace the 313-ship plan? If so, when does the Navy intend to issue the replacement plan? Why has the Navy decided to retain, the for time being at least, the 313-ship plan, when certain elements of Department of Defense, Quadrennial Defense Review Report, February 20o1, pp. 45-47. Congressional Research Service 8 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Navy ship force planning that have emerged since 2006 appear to diverge from that plan? • Given the Administration’s September 2009 announcement of its new plan for ballistic missile defense (BMD) in Europe, which includes a significant use of BMD-capable cruisers and destroyers, would the 88-ship force of cruisers and destroyers called for in the 313-ship plan be adequate? The law that requires DOD to perform QDRs (10 U.S.C. 118) states that the results of each QDR shall be assessed by an independent panel. The report of the independent panel that assessed the 2010 QDR was released on July 29, 2010. The independent panel’s report recommends a Navy of 346 ships (about 10% more than the Navy’s planned 313-ship fleet), including 11 aircraft carriers (the same number as in the Navy’s 313-ship plan) and 55 attack submarines (compared to 48 in the Navy’s 313-ship plan).15 For additional discussion of the independent panel’s report, see Appendix C. Sufficiency of 30-Year Shipbuilding Plan A second potential oversight issue for Congress concerns the sufficiency of the 30-year shipbuilding plan. As shown in Table 4, the plan does not include enough ships to fully support all elements of the 313-ship plan over the long run. The Navy projects that implementing the 30year plan would result in a fleet that grows from 284 ships in FY2011 to 315 ships in FY2020, reaches a peak of 320 ships in FY2024, drops below 313 ships in FY2027, declines to 288 ships in FY2032-FY2033, and then increases to 301 ships in FY2039-FY2040. The Navy projects that the attack submarine and cruiser-destroyer forces will drop substantially below required levels in the latter years of the 30-year plan. Affordability and Executability of 30-Year Shipbuilding Plan A third potential oversight issue for Congress concerns the affordability and executability of the 30-year shipbuilding plan. The Navy estimates that executing the 30-year shipbuilding plan would require an average of $15.9 billion per year in constant FY2010 dollars for newconstruction ships. A May 2010 Congressional Budget Office (CBO) report estimates that the plan would require an average of $19.0 billion per year in constant FY2010 dollars for newconstruction ships, or about 19% more than the Navy estimates. The CBO report states: “If the Navy receives the same amount of funding for ship construction in the next 30 years as it has over the past three decades—an average of about $15 billion a year in 2010 dollars—it will not be able to afford all of the purchases in the 2011 plan.” 15 Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on page 58. Congressional Research Service 9 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table 5. Navy and CBO Estimates of Cost of 30-Year Shipbuilding Plan Funding for new-construction ships, in billions of constant FY2010 dollars First 10 years (FY2011-FY2020) Next 10 years (FY2021-2030) Final 10- years (FY2031-FY2040) Entire 30 years (FY2011-FY2040) Navy estimate 14.5 17.9 15.3 15.9 CBO estimate 15.2 20.4 21.4 19.0 % difference between Navy and CBO estimates 5% 14% 40% 19% Source: Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2011 Shipbuilding Plan, May 2010, Table 2 (page 9). The CBO report calculates the percent difference between the Navy and CBO estimates for the entire 30-year period as 20% rather than 19%. $19.0 billion is 19.497% greater than $15.9 billion. As mentioned earlier, the Navy was able to assemble a five-year (FY2011-FY2015) shipbuilding plan with a total of 50 ships, or an average of 10 per year, within available resources in part because half of those ships are relatively inexpensive LCSs and JHSVs. Starting a few years from now, when the LCS and JHSV programs are no longer overrepresented in the shipbuilding plan, and particularly when procurement of next-generation SSBN(X) ballistic missile submarines begins, procuring an average of 10 ships per year will become a considerably more expensive proposition. The Navy wants to procure 12 SSBN(X)s, and preliminarily estimates the procurement cost of each SSBN(X) at $6 billion to $7 billion in FY2010 dollars—a figure equivalent to almost onehalf of the Navy’s budget each year for procuring new ships. The May 2010 CBO report estimates that a class of 12 SSBN(X)s would have an average unit procurement cost of $8.2 billion in constant FY2010 dollars.16 To help pay for the SSBN(X)s without reducing other shipbuilding programs, the shipbuilding funding profile in the Navy’s 30-year shipbuilding plan includes a “hump” of approximately $2 billion per year in constant FY2010 dollars during the years (FY2019-FY2033) when the 12 SSBN(X)s are to be procured. The Navy’s report on the 30year plan, however, contains little explanation of how this $2-billion-per-year hump in shipbuilding funding will be realized, particularly if the Navy’s budget experiences little or no real growth in coming years, as some observers, including some Navy leaders,17 expect. If the $2billion-per-year hump is not realized, the total number of ships of various kinds procured in FY2019-FY2033 could be less than the figures shown in the 30-year plan. Attack submarines and destroyers planned for those years could be among the ships that would not be procured. If so, the shortfalls for these two categories of ships could be even deeper than the projections shown in Table 4. 16 For more on the SSBN(X) program, see CRS Report R41129, Navy SSBN(X) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. 17 For example, Secretary of the Navy Ray Mabus reportedly told a group of defense reporters on April 21, 2010, that “We [in the Navy] are looking at a [sic] no substantial growth and realistically no growth at all, in terms of the amount of money we are allocated to spend.” As quoted in Geoff Fein, “Diminishing Budgets Forcing Navy To Closely Examine Contracts, Navy Secretary Says,” Defense Daily, April 22, 1010: 4-5. Congressional Research Service 10 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Scheduled Retirements of Older Ships A fourth oversight issue for Congress concerns current Navy plans for retiring certain older ships, including several frigates and two amphibious assault ships, over the next few years. Some Members of Congress have expressed interest in deferring the retirements of at least some of these ships, so as to increase the total number of Navy ships over the next few years. The Navy has resisted proposals for deferring the retirements of the older ships, arguing that they Navy can perform its expected missions with acceptable risk without these ships, and that the operation and support costs of keeping these ships in service beyond their currently scheduled retirement dates would reduce funding available for procuring new platforms and equipment, including new ships. Legislative Activity for FY2011 FY2011 Defense Authorization Bill (H.R. 5136/S. 3454) House The House Armed Services Committee, in its report (H.Rept. 111-491 of May 21, 2010) on the FY2011 defense authorization bill (H.R. 5136), recommends approval of the Navy’s request for procurement and advance procurement funding for all of its shipbuilding programs (pages 73-74). The report states: “Demonstrating the committee’s commitment to reverse the decline in the size of the Navy fleet, the committee authorizes 9 new ships, including 2 Virginia-class submarines, 2 DDG 51 destroyers, and 2 Littoral Combat Ships.” (Page 20) Section 121 of the bill as reported by the committee would broaden the Navy’s authority for using incremental funding for procuring Navy ships.18 Section 123 would require the Navy to submit a report on, among other things, required numbers of cruisers and destroyers, particularly in light of demands for these ships for ballistic missile defense operations. 19 Section 1021 would amend the current law (10 U.S.C. 231) that requires DOD to annually submit a 30-year shipbuilding plan. Section 1022 states that the Secretary of the Navy may not decommission any battle force vessel of the active fleet of the Navy unless the Secretary provides to the congressional defense committees written notification of such decommissioning in accordance with established procedures. 18 For more on incremental funding, particularly in the procurement of Navy ships, see CRS Report RL32776, Navy Ship Procurement: Alternative Funding Approaches—Background and Options for Congress, by Ronald O'Rourke, and CRS Report RL31404, Defense Procurement: Full Funding Policy—Background, Issues, and Options for Congress, by Ronald O'Rourke and Stephen Daggett. 19 For further discussion of this issue, see CRS Report RL33745, Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress, by Ronald O'Rourke. Congressional Research Service 11 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Section 1023 states that until the number of vessels in the battle force fleet of the Navy reaches 313 vessels, the Secretary of the Navy shall not decommission, in FY2011 or any subsequent fiscal year, more than two-thirds of the number of vessels slated for commissioning into the battle force fleet for that fiscal year. Section 1024 states that the Secretary of the Navy shall retain the amphibious assault ships Nassau (LHA-4) and Peleliu (LHA-5) in a commissioned and operational status until the delivery to the Navy of the new amphibious assault ships America (LHA-6) and LHA-7, respectively. The text of Section 121 is as follows: SEC. 121. INCREMENTAL FUNDING FOR PROCUREMENT OF LARGE NAVAL VESSELS. (a) Incremental Funding of Large Naval Vessels- Except as provided in subsection (b), the Secretary of the Navy may use incremental funding for the procurement of a large naval vessel over a period not to exceed the number of years equal to three-fourths of the total period of planned ship construction of such vessel. (b) LPD 26- With respect to the vessel designated LPD 26, the Secretary may use incremental funding for the procurement of such vessel through fiscal year 2012 if the Secretary determines that such incremental funding— (1) is in the best interest of the overall shipbuilding efforts of the Navy; (2) is needed to provide the Secretary with the ability to facilitate changes to the shipbuilding industrial base of the Navy; and (3) will provide the Secretary with the ability to award a contract for construction of the vessel that provides the best value to the United States. (c) Condition for Out-year Contract Payments- A contract entered into under subsection (a) or (b) shall provide that any obligation of the United States to make a payment under the contract for a fiscal year after the fiscal year the vessel was authorized is subject to the availability of appropriations for that purpose for that later fiscal year. (d) Definitions- In this section: (1) The term `large naval vessel’ means a vessel— (A) that is— (i) an aircraft carrier designated a CVN; (ii) an amphibious assault ship designated LPD, LHA, LHD, or LSD; or (iii) an auxiliary vessel; and (B) that has a light ship displacement of 17,000 tons or more. (2) The term `total period of planned ship construction’ means the period of years beginning on the date of the first authorization of funding (not including funding requested for advance procurement) and ending on the date that is projected on the date of the first authorization of funding to be the delivery date of the vessel to the Navy. Congressional Research Service 12 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The text of Section 123 is as follows: SEC. 123. REPORT ON NAVAL FORCE STRUCTURE AND MISSILE DEFENSE. (a) Report- Not later than March 1, 2011, the Secretary of the Navy, in coordination with the Chief of Naval Operations, shall submit to the congressional defense committees a report on the requirements of the major combatant surface vessels with respect to missile defense. (b) Matters Included- The report shall include the following: (1) An analysis of whether the requirement for sea-based missile defense can be accommodated by upgrading Aegis ships that exist as of the date of the report or by procuring additional combatant surface vessels. (2) Whether such sea-based missile defense will require increasing the overall number of combatant surface vessels beyond the requirement of 88 cruisers and destroyers in the 313ship fleet plan of the Navy. (3) The number of Aegis ships needed by each combatant commander to fulfill ballistic missile defense requirements, including (in consultation with the Chairman of the Joints Chiefs of Staff) the number of such ships needed to support the phased, adaptive approach to ballistic missile defense in Europe. (4) A discussion of the potential effect of ballistic missile defense operations on the ability of the Navy to meet surface fleet demands in each geographic area and for each mission set. (5) An evaluation of how the Aegis ballistic missile defense program can succeed as part of a balanced fleet of adequate size and strength to meet the security needs of the United States. (6) A description of both the shortfalls and the benefits of expected technological advancements in the sea-based missile defense program. (7) A description of the anticipated plan for deployment of Aegis ballistic missile ships within the context of the fleet response plan. The text of Section 1021 is as follows: SEC. 1021. REQUIREMENTS FOR LONG-RANGE PLAN FOR CONSTRUCTION OF NAVAL VESSELS. (a) In General- Section 231 of title 10, United States Code, is amended to read as follows: `Sec. 231. Long-range plan for construction of naval vessels `(a) Quadrennial Naval Vessel Construction Plan- At the same time that the budget of the President is submitted under section 1105(a) of title 31 during each year in which the Secretary of Defense submits a quadrennial defense review, the Secretary of the Navy shall submit to the congressional defense committees a long-range plan for the construction of combatant and support vessels for the Navy that supports the force structure recommendations of the quadrennial defense review. `(b) Matters Included- The plan under subsection (a) shall include the following: Congressional Research Service 13 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress `(1) A detailed construction schedule of naval vessels for the ten-year period beginning on the date on which the plan is submitted, including a certification by the Secretary that the budget for the fiscal year in which the plan is submitted and the budget for the future-years defense program submitted under section 221 of this title are sufficient for funding such schedule. `(2) A probable construction schedule for the ten-year period beginning on the date that is 10 years after the date on which the plan is submitted. `(3) A notional construction schedule for the ten-year period beginning on the date that is 20 years after the date on which the plan is submitted. `(4) The estimated levels of annual funding necessary to carry out the construction schedules under paragraphs (1), (2), and (3). `(5) For the construction schedules under paragraphs (1) and (2)— `(A) a determination by the Director of Cost Assessment and Program Evaluation of the level of funding necessary to execute such schedules; and `(B) an evaluation by the Director of the potential risk associated with such schedules, including detailed effects on operational plans, missions, deployment schedules, and fulfillment of the requirements of the combatant commanders. `(c) Naval Composition- In submitting the plan under subsection (a), the Secretary shall ensure that such plan— `(1) is in accordance with section 5062(b) of this title; and `(2) phases the construction of new aircraft carriers during the periods covered by such plan in a manner that minimizes the total cost for procurement for such vessels. `(d) Assessment When Budget Is Insufficient- If the budget for a fiscal year provides for funding of the construction of naval vessels at a level that is less than the level determined necessary by the Director of Cost Assessment and Program Evaluation under subsection (b)(5), the Secretary of the Navy shall include with the defense budget materials for that fiscal year an assessment that describes and discusses the risks associated with the budget, including the risk associated with a reduced force structure that may result from funding naval vessel construction at such a level. `(e) CBO Evaluation- Not later than 60 days after the date on which the congressional defense committees receive the plan under subsection (a), the Director of the Congressional Budget Office shall submit to such committees a report assessing the sufficiency of the construction schedules and the estimated levels of annual funding included in such plan with respect to the budget submitted during the year in which the plan is submitted and the futureyears defense program submitted under section 221 of this title. `(f) Changes to the Construction Plan- In any year in which a quadrennial defense review is not submitted, the Secretary of the Navy may not modify the construction schedules submitted in the plan under subsection (a) unless— `(1) the modification is an increase in planned ship construction; Congressional Research Service 14 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress `(2) the modification is a realignment of less than one year of construction start dates in the future-years defense plan submitted under section 221 of this title and the Secretary submits to the congressional defense committees a report on such modification, including— `(A) the reasons for realignment; `(B) any increased cost that will be incurred by the Navy because of the realignment; and `(C) an assessment of the effects that the realignment will have on the shipbuilding industrial base, including the secondary supply base; or `(3) the modification is a decrease in the number or type of combatant and support vessels of the Navy and the Secretary submits to the congressional defense committees a report on such modification, including— `(A) an addendum to the most recent quadrennial defense review that fully explains and justifies the decrease with respect to the national security strategy of the United States as set forth in the most recent national security strategy report of the President under section 108 of the National Security Act of 1947 (50 U.S.C. 404a); and `(B) a description of the additional reviews and analyses considered by the Secretary after the previous quadrennial defense review was submitted that justify the decrease. `(g) Definitions- In this section: `(1) The term `budget’, with respect to a fiscal year, means the budget for that fiscal year that is submitted to Congress by the President under section 1105(a) of title 31. `(2) The term `defense budget materials’, with respect to a fiscal year, means the materials submitted to Congress by the Secretary of Defense in support of the budget for that fiscal year. `(3) The term `quadrennial defense review’ means the review of the defense programs and policies of the United States that is carried out every four years under section 118 of this title.’. (b) Clerical Amendment- The table of sections at the beginning of chapter 9 of such title is amended by striking the item relating to section 231 and inserting the following new item: `231. Long-range plan for construction of naval vessels.’. In summarizing Section 1021, the committee’s report states: This section would amend section 231 of title 10, United States Code, to require the Secretary of the Navy to submit a long-range plan for the construction of naval vessels with each submission of the Quadrennial Defense Review (QDR). The long-range plan would be required to have 3 distinct sections each spanning a period of 10 years. The first section would be a detailed construction plan for the first 10 years, the second a probable construction plan for the second 10 years, and the third a notional construction plan for the last 10 years. This section would require that during the intervening years between submissions of the QDR, the plan may not be modified unless the change is accompanied by an addendum to the QDR which explains and justifies the decrease with respect to the national security of the United States. This section would further require that the plan fully comply with section 5062(b) of title 10, United States Code, to maintain a minimum of 11 Congressional Research Service 15 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress operational aircraft carriers and to phase the construction of such carriers as to minimize the total cost of procurement. (Page 363) The text of Section 1022 is as follows: SEC. 1022. REQUIREMENTS FOR THE DECOMMISSIONING OF NAVAL VESSELS. (a) Notice of Decommissioning- The Secretary of the Navy may not decommission any battle force vessel of the active fleet of the Navy unless the Secretary provides to the congressional defense committees written notification of such decommissioning in accordance with established procedures. (b) Content of Notification- Any notification provided under subsection (a) shall include each of the following: (1) The reasons for the proposed decommissioning of the vessel. (2) An analysis of the effect the decommissioning would be likely to have on the deployment schedules of other vessels in the same class as the vessel proposed to be decommissioned. (3) A certification from the Chairman of the Joint Chiefs of Staff that the decommissioning of the vessel will not adversely affect the requirements of the combatant commanders to fulfill missions critical to national security. (4) Any budgetary implications associated with retaining the vessel in commission, expressed for each applicable appropriation account. The text of Section 1023 is as follows: SEC. 1023. REQUIREMENTS FOR THE SIZE OF THE NAVY BATTLE FORCE FLEET. (a) Limitation on Decommissioning- Until the number of vessels in the battle force fleet of the Navy reaches 313 vessels, the Secretary of the Navy shall not decommission, in fiscal year 2011 or any subsequent fiscal year, more than two-thirds of the number of vessels slated for commissioning into the battle force fleet for that fiscal year. (b) Treatment of Submarines- For purposes of subsection (a), submarines of the battle force fleet slated for decommissioning for any fiscal year shall not count against the number of vessels the Secretary of the Navy is required to maintain for that fiscal year. The text of Section 1024 is as follows: SEC. 1024. RETENTION AND STATUS OF CERTAIN NAVAL VESSELS. The Secretary of the Navy shall retain the vessels the U.S.S. Nassau (LHA 4) and the U.S.S. Peleliu (LHA 5), in a commissioned and operational status, until the delivery to the Navy of the vessels the U.S.S. America (LHA 6) and the vessel designated as LHA 7, respectively. The committee’s report also states: The committee notes that the Long-Range Plan for the Construction of Naval Vessels, known as the 30–year shipbuilding plan, submitted in accordance with section 231 of title 10, United States Code, proposes an average of 10 new vessels per year during the 5-year period of the Future Years Defense Plan (FYDP). While this is a positive step in shipbuilding Congressional Research Service 16 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress procurement, the total number of battle force vessels remains essentially constant during the FYDP due to the high rate of ship retirements planned during the period. Only after the FYDP, do the battle force levels begin to increase in real terms and the stated goal of a 313ship Navy is not achieved until fiscal year 2018. The committee further notes that a short term solution to the stagnant number of battle force ships through the FYDP is to delay retirement of vessels with useful service life and that a planned approach to retire no more ships in any one fiscal year than are being delivered to the Navy would accomplish this goal. (Page 75) The report also states: U.S. shipbuilding industrial base The committee has reservations as to the continued health of the shipbuilding industrial base and its ability to remain viable in its current form. The shipbuilding industrial base currently serving the needs of Navy and the nation is a legacy from the cold war when the size of the Navy fleet, and the construction required to maintain that fleet, was significantly higher than today. The committee is concerned that the relatively low orders for new ships as proposed in the 30-year shipbuilding plan are not sufficient to maintain all shipyards currently constructing naval vessels. This is a very difficult situation for the Navy since reducing the number of shipyards constructing vessels could have the unintended consequence of driving up cost due to limited or no competition for particular classes of ships, yet the current industrial base adds increased costs due to the significant overhead rates that must be charged to each vessel. Perhaps even more significant than shipyard over-capacity for the current shipbuilding plan is the reduction in vendors willing to provide equipment and materiel necessary for the shipbuilding industry. Low orders coupled with significant government requirements for testing, traceability, and financial controls have driven many former suppliers out of the market altogether. The committee received testimony that the vendor supply base is currently 60 to 70 percent sole source. While this almost total lack of competition may be manageable in terms of maintaining the ability to construct vessels, it is not a condition that is bringing the best value to the taxpayer. The committee understands that the Secretary of the Navy has embarked on a comprehensive review of the industrial base, including the supply base. The committee requests the Secretary of the Navy to inform the committee when the comprehensive review is complete and to make available to the committee those officials who participated in the review to testify before the committee at a hearing in open session aimed at oversight of this potential threat to national security. (Page 78) Senate The FY2011 defense authorization bill (S. 3454) as reported by the Senate Armed Services Committee (S.Rept. 111-201 of June 4, 2010) recommends approval of the Navy’s request for procurement and advance procurement funding for all of its shipbuilding programs (see pages 677-678 of the printed version of S. 3454). Section 124 of the bill states: SEC. 124. INCLUSION OF BASIC AND FUNCTIONAL DESIGN IN ASSESSMENTS REQUIRED PRIOR TO START OF CONSTRUCTION OF FIRST SHIP OF A SHIPBUILDING PROGRAM. Congressional Research Service 17 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (a) Inclusion in Assessments- Subsection (b)(1) of section 124 of the National Defense Authorization Act for Fiscal Year 2008 (P.L. 110-181; 122 Stat. 28; 10 U.S.C. 7291 note) is amended by inserting `(and in particular completion of basic and functional design)’ after `completion of detail design’. (b) Basic and Functional Design Defined- Subsection (d) of such section is amended by adding at the end the following new paragraph: `(5) BASIC AND FUNCTION DESIGN- The term `basic and functional design’, for a ship, means design, whether in the form of two-dimensional drawings, three-dimensional models, or computer-aided models, that fixes the hull structure of the ship, sets the hydrodynamics of the ship, routes all major distributive systems (including electricity, water, and other utilities) of the ship, and identifies the exact positioning of piping and other outfitting within each block of the ship.’. Regarding Section 124, the committee’s report states: Inclusion of basic and functional design in assessments required prior to start of construction of first ship of a shipbuilding program (sec. 124) The committee recommends a provision that would amend section 124 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110–181) to tighten the requirements under which the Secretary of the Navy is required to certify that a new shipbuilding program has achieved sufficient design maturity at the time the Navy begins construction on the first ship of any major shipbuilding program. The Government Accountability Office, in its May 2009 report, “Best Practices: High Levels of Knowledge at Key Points Differentiate Commercial Shipbuilding from Navy Shipbuilding (GAO–09–322),” identified key steps that leading commercial shipbuilders and ship buyers follow to ensure their vessels deliver on-time, within planned costs, and with a high degree of innovation. One critical step in this process is achieving design stability before start of fabrication. Leading commercial firms assess a ship design as stable once all basic and functional design activities have been completed (usually in the form of a complete 3D product model). Section 124 as currently written does not specifically require that the assessment of design maturity directly address the completeness of the 3D modeling or completion of the activities that make up basic and functional design. This provision would add that requirement. (Page 13) The committee’s report also states: Surface ship construction and industrial base issues The committee recognizes that the Navy’s most recent Long-Range Plan for the Construction of Naval Vessels continues the Navy’s long stated goal of a minimum fleet of 313 battle force ships. The committee notes that this plan is based on a 2005 Force Structure Assessment and a new Force Structure Assessment is required to address expanded requirements identified in the 2009 Quadrennial Defense Review for irregular warfare support, ballistic missile defense, intratheater lift, and humanitarian missions. The committee encourages the Navy to complete this review as expeditiously as possible so the results can be incorporated in the next Long-Range Plan. Congressional Research Service 18 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress The committee continues to have significant concerns regarding the implications of the plan for the non-nuclear surface ship industrial base. If the Navy and industry, working together, are unable to control requirement driven cost growth and deliver the ships in the plan for the projected costs, the inevitable reductions in quantity will likely impact the Navy’s ability to reach the required fleet size and further jeopardize the industrial base. The committee notes that the current shipbuilding plan includes the cost of the SSBN (X) program and the committee encourages the Navy to closely scrutinize requirements for this program in order to minimize its impact on the recapitalization of the Navy’s battle force. Furthermore, the committee urges the Navy and the contractors to negotiate as expeditiously as possible fair and reasonable construction contracts for ships previously authorized in order to reduce uncertainty and maintain and foster affordability in the procurement of large surface combatants and other naval vessels. In reviewing the Long-Range Plan for the Construction of Naval Vessels in conjunction with recent program performance highlights, the committee notes the following observations and expectations: The stated requirement for amphibious ships is 38 vessels; however, the Long-Range Plan projects accepting moderate risk by having 33 ships by 2016, but then declining to 29 or 30 ships after 2034. Although there have been improvements in recently delivered ships, cost and quality issues have been all too common in the procurement of large and medium amphibious ships, making an already constrained shipbuilding budget more difficult to execute. A new dock landing ship class, LSD(X), is important to the recapitalization of the amphibious force. The requirements for this ship must be closely validated to ensure affordability. The committee notes the Navy’s plan to have a gap year following the lead ship of the class and believes that this may help alleviate cost, schedule, and performance issues. Overall, the committee remains concerned with the Navy’s management of the amphibious ship accounts and expects continued close scrutiny of these programs by Navy leadership. In large surface combatants, the Navy’s last official report stated that the industrial base can only be effectively sustained if naval ship yards were building the equivalent of three DDG– 51 destroyers per year, with additional work assumed at one of the yards. Even if the Navy fully executes both of the large surface combatant programs of record in the near-term, the President’s fiscal year 2011 budget request and future-years defense program propose to buy an average of 1.5 large surface combatants per year. Even at projected procurement rates, the number of cruisers and destroyers falls below the required level of 88 ships in 2027 and remains below that level for the following 13 years. At its worst, the number of large surface combatants is 21 ships below the expected requirement in 2034. The Navy has testified that continued demand for large surface combatants to meet forward presence and strike operations requirements coupled with emerging ballistic missile defense requirements drives the Navy to consider abandoning lesser priority missions for more recent, higher priority ones. In light of the current pressure on the large surface combatant force, the committee is concerned that the Navy’s projected rate of production is insufficient, and anticipates that the Navy will closely assess future demand for large surface combatants, and operational and additional risk to the industrial base of maintaining relatively low rates of procurement for large surface combatants. The committee remains concerned with the Navy’s ability to execute what it believes is an overly optimistic procurement strategy for large surface combatants. The truncation of the DDG–1000, the restart of the DDG–51 class and the proposed Flight III variant of the DDG– 51 inject a great deal of instability into the SCN accounts. The Navy’s testimony before Congress has led this committee to identify six risk areas in the Navy’s plan for DDG–51s: Congressional Research Service 19 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress (1) the availability of the Air and Missile Defense Radar; (2) the extent and cost of modifications to the underlying ship’s design package to support proposed changes to the ship; (3) increased limitation on service life margins of the early restart ships; (4) combat system software integration; (5) the overall complexity of various separate programs that need to converge for successful completion of the restart and Flight III programs; and (6) cost and schedule growth for the Aegis Combat System Modernization. The committee expects the Navy to keep it closely apprised of developments in these risk areas so that it can monitor appropriate risk mitigation efforts. The Littoral Combat Ship (LCS) program has made progress during the past year and the recent decision to move to a single design should improve affordability. The LCS fleet is expected to comprise 55 vessels of the Navy’s 313–ship fleet force structure. Even modest cost growth in this large component of the fleet magnifies the problem of achieving that objective. The committee notes that the Navy’s acquisition strategy for the LCS program introduces competition for this class of ships and is therefore cautiously optimistic that this program is making progress. In summary, the committee considers the specialized shipbuilding industrial base for large surface combatants, amphibious ships, Navy auxiliary ships, and littoral vessels as a critical component of national security and expects the Department of Defense to appropriately sustain this industrial base. The committee expects the Department of the Navy to include these considerations as it incorporates the updated force structure assessment in the upcoming Long-Range Plan for the Construction of Naval Vessels. The committee understands that the Navy is conducting a comprehensive review of the shipbuilding industrial base and calls upon the Navy to update the committee on the scope and timeline for such a study. The committee understands the objective of the study is to identify the challenges facing the Navy and the associated shipbuilding industrial base and the strategies for mitigating the effects of those challenges. The committee expects that this study will inform its deliberations in connection with the fiscal year 2012 budget. As a general proposition, the committee expects that the Department of Defense will provide the Navy with the support it needs to focus on the matters referred to above. (Pages 40-42) FY2011 DOD Appropriations Bill (S. 3800) Senate The Senate Appropriations Committee, in its report (S.Rept. 111-295 of September 16, 2010) on S. 3800, recommends approval of the Navy’s FY2011 requests for procurement and advance procurement funding for new ships, with two exceptions: • For the Littoral Combat Ship (LCS) program, the report recommends $615.5 million for the procurement of one LCS, a reduction of $615.5 million and one ship from the Navy’s request (pages 7, 86, and 87). For the text of the report’s discussion of the LCS, see the CRS report on the LCS program. 20 • For the Mobile Landing Platform (MLP) program, which is funded through the National Defense Sealift Fund (NDSF), the report recommends an increase of 20 CRS Report RL33741, Navy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress, by Ronald O'Rourke. Congressional Research Service 20 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress $100 million for advance procurement and advance construction activities (page 181). National Shipbuilding Budget Policy Act (H.R. 5035) H.R. 5035, which was introduced on April 15, 2010, and referred to the Seapower and Expeditionary Forces subcommittee of the House Armed Services Committee on April 28, 2010, would authorize $20 billion per year for the period FY2011-FY2015 for the construction of Navy ships to meet the ship force structure requirements presented in the Navy’s report on its 30-year shipbuilding plan. (It would also authorize $60 million per year for the period FY2011-FY2015 for loan guarantees for the construction of commercial ships.) The text of H.R. 5035 states: A BILL To authorize appropriations for the construction of vessels for the Navy and to authorize appropriations for loan guarantees for commercial vessels. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE. This Act may be cited as the `National Shipbuilding Budget Policy Act’. Congressional Research Service 20 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress SEC. 2. NATIONAL SHIPBUILDING AUTHORIZATIONS OF APPROPRIATIONS. (a) Navy- Funds are hereby authorized to be appropriated for each of fiscal years 2011 through 2015 for the construction of vessels for the Navy to meet the force requirements of the Navy (as described in the annual naval vessel construction plan required by section 231 of title 10, United States Code) in the amount of $20,000,000,000. (b) The Merchant Marine- Funds are hereby authorized to be appropriated for each of fiscal years 2011 through 2015 for loan guarantees and commitments authorized under chapter 537 of title 46, United States Code, for the construction of new vessels to replace and expand the domestic fleet of commercial vessels (as that term is defined in that chapter) in the amount of $60,000,000. CRS Reports Tracking Legislation on Specific Navy Shipbuilding Programs For legislative activity on individual Navy shipbuilding, conversion, and modernization programs, see the following CRS reports: • CRS Report RS20643, Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report R41129, Navy SSBN(X) Ballistic Missile Submarine Program: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL32418, Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress, by Ronald O'Rourke. Congressional Research Service 21 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress • CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress, by Ronald O'Rourke. • CRS Report RL33741, Navy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress, by Ronald O'Rourke. • CRS Report RL34476, Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress, by Ronald O'Rourke. Congressional Research Service 2122 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix A. Comparing Past Ship Force Levels to Proposed 313-Ship Force Level One possible method for assessing the Navy’s proposed 313-ship force level is to compare it to historical figures for total Navy fleet size. Historical figures for total fleet size, however, might not be a reliable yardstick for assessing the appropriateness of the Navy’s proposed 313-ship fleet, particularly if the historical figures are more than a few years old, because the missions to be performed by the Navy, the mix of ships that make up the Navy, and the technologies that are available to Navy ships for performing missions all change over time. The Navy, for example, reached a late-cold war peak of 568 battle force ships at the end of FY1987,2021 and as of July 16, 2010, had declined to a total of 289 battle force ships. The FY1987 fleet, however, was intended to meet a set of mission requirements that focused on countering Soviet naval forces at sea during a potential multi-theater NATO-Warsaw Pact conflict, while the September 2009 fleet is intended to meet a considerably different set of mission requirements centered on influencing events ashore by countering both land- and sea-based military forces of potential regional threats other than Russia, including non-state terrorist organizations. In addition, the Navy of FY1987 differed substantially from the September 2009 fleet in areas such as profusion of precision-guided air-delivered weapons, numbers of Tomahawk-capable ships, and sophistication of C4ISR systems.2122 In coming years, Navy missions may shift again, to include, as a possible example, a greater emphasis on being able to counter improved Chinese maritime military capabilities. 2223 In addition, the capabilities of Navy ships will likely have changed further by that time due to developments such as more comprehensive implementation of networking technology and increased use of shipbased unmanned vehicles. The 568-ship fleet of FY1987 may or may not have been capable of performing its stated missions; the 289-ship fleet of July 2010 may or may not be capable of performing its stated missions; and a fleet years from now with a certain number of ships may or may not be capable of performing its stated missions. Given changes over time in mission requirements, ship mixes, and technologies, however, these three issues are to a substantial degree independent of one another. For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An 2021 Some publications, such as those of the American Shipbuilding Association, have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total number of active ships has been larger than the total number of battle force ships. For example, the Naval Historical Center states that as of November 16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another year is thus an apple-to-oranges comparison that in this case overstates the decline since FY1987 in the number of ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the Navy over time should use, whenever possible, a single counting method. 2122 C4ISR stands for command and control, communications, computers, intelligence, surveillance, and reconnaissance. 2223 For a discussion, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy Capabilities— Background and Issues for Congress, by Ronald O’Rourke. Congressional Research Service 2223 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform its stated missions is increasing, because the fleet’s mission requirements might be increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated missions is decreasing, because the fleet’s mission requirements might be declining more rapidly than numbers of ships, or because average ship capability and the percentage of time that ships are in deployed locations might be increasing quickly enough to more than offset reductions in total ship numbers. Previous Navy force structure plans, such as those shown in Table 1, might provide some insight into the potential adequacy of a proposed new force-structure plan, but changes over time in mission requirements, technologies available to ships for performing missions, and other forceplanning factors suggest that some caution should be applied in using past force structure plans for this purpose, particularly if those past force structure plans are more than a few years old. The Reagan-era plan for a 600-ship Navy, for example, was designed for a cold war set of missions focusing on countering Soviet naval forces at sea, which is not an appropriate basis for planning the Navy today.23 2324 24 Navy force structure plans that predate those shown in Table 1 include the Reagan-era 600-ship plan of the 1980s, the Base Force fleet of more than 400 ships planned during the final two years of the George H. W. Bush Administration, the 346-ship fleet from the Clinton Administration’s 1993 Bottom-Up Review (or BUR, sometimes also called Base Force II), and the 310-ship fleet of the Clinton Administration’s 1997 QDR. The table below summarizes some key features of these plans. Features of Recent Navy Force Structure Plans Plan 600-ship Base Force 1993 BUR 1997 QDR a 346 ~305/310b ~600 ~450/416 Total ships c 45-55 50/55d 100 80/~55 Attack submarines 12 11+1f 11+1f 15e Aircraft carriers g ~150 ~124 116 242/228 Surface combatants 51i 41i 36i ~75h Amphibious ships Source: Prepared by CRS based on DOD and U.S. Navy data. a. Commonly referred to as 450-ship plan, but called for decreasing to 416 ships by end of FY1999. b. Original total of about 305 ships was increased to about 310 due to increase in number of attack submarines to 55 from 50. c. Plan originally included 80 attack submarines, but this was later reduced to about 55. d. Plan originally included 50 attack submarines but this was later increased to 55. e. Plus one additional aircraft carrier in the service life extension program (SLEP). f. Eleven active carriers plus one operational reserve carrier. g. Plan originally included 242 surface combatants but this was later reduced to 228. h. Number needed to lift assault echelons of one Marine Expeditionary Force (MEF) plus one Marine Expeditionary Brigade (MEB). i. Number needed to lift assault echelons of 2.5 MEBs. Changing numbers needed to meet this goal reflect in part changes in the design and capabilities of amphibious ships. Congressional Research Service 2324 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix B. Recent Proposed Alternatives to Navy’s 313-Ship Plan Table B-1 summarizes some alternatives to the Navy’s 313-ship plan that have been proposed by various study groups. These proposals reflect differing views about factors such as U.S. interests and potential threats to those interests, potential future levels of defense spending, the kinds of missions that the Navy will be required to perform in the future, and the relative cost effectiveness of various ship types for performing various missions. Table B-1. Recent Proposed Alternatives to Navy’s 313-Ship Plan Independent Panel Assessment of 2010 Cato Institute (September 2010)a Independent Panel Assessment of 2010 QDR (July 2010) Sustainable Defense Task Force (June 2010) Heritage Foundation (January 2009) Center for a New American Security (CNAS) (November 2008) Center for Strategic and Budgetary Assessments (CSBA) (2008)ab SSBN 6 14 7 n/a 14 12 SSGN 0 4 4 n/a 0 2 SSN 40 55 37 at least 60 40 41 CVN 8 11 9 13 8 11 CVE 0 0 0 n/a 0 4 Cruiser 22 n/a 14 65 n/a 100 18 Destroyer 85 56 73 Frigate 14 n/a 0 n/a 0 9c LCS 4 n/a 25 20 48 55 SSC 0 n/a 0 n/a 40 0d Ship type Submarines Aircraft carriers Surface combatantsn/a 0 4 85 100 18 14 56 73 Ship type Submarines Aircraft carriers Surface combatants Cruiser n/a Destroyer n/a Frigate n/a 0 n/a 0 9b LCS n/a 25 20 48 55 SSC n/a 0 n/a 40 0c Amphibious and Maritime Prepositioning Force (Future) (MPF[F]) ships Amphibious ships ships 23 n/a 27 n/a 36 33 MPF(F) ships 0 n/a n/a n/a 0 3d3e LSD station ships 0 n/a n/a n/a n/a 7e 7f Other: Mine warfare (MIW) ships; Combat logistics force (CLF) ships (i.e., at-sea resupply ships), and support ships MIW 11 0 CLF ships 21 n/a Support ships 27 n/a 36 n/a 40 31 TOTAL ships 241 346 230 n/a 300 326g Congressional Research Service 0 0 0 n/a 0 31 25 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Source: Table prepared by CRS based on the following sources: For Cato Institute: Benjamin H. Friedman and Christopher Preble, Budgetary Savings from Military Restraint, Washington, Cato Institute, September 23, 2010 (Policy Analysis No. 667), pp. 6, 8-10, and additional information provided by Cato Institute to CRS by email on September 22, 2010. For Independent Panel Assessmentn/a TOTAL ships 346 36 230 n/a n/a n/a 40 300 31 31 326f Source: Table prepared by CRS. Sources: Stephen J. Hadley and William J. Perry, co-chairmencochairmen, et al., The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on pages 58-59;. For Sustainable Defense Task Force: Debt, Deficits, and Defense, A Way Forward[:] Report of the Sustainable Defense Task Force, June 11, 2010, pp. 19-20;. For Heritage Foundation: Baker Spring and Mackenzie M. Eaglen, Quadrennial Defense Review: Building Blocks for National Defense. Washington, Heritage Foundation, January Congressional Research Service 24 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress 28, 2009. (Backgrounder, revised and updated February 9, 2009) p. 15;. For CNAS: Frank Hoffman, From Preponderance to Partnership: American Maritime Power in the 21st Century. Washington, Center for a New American Security, November 2008. p. 19 (Table 2); and. For CSBA: Robert O. Work, The US Navy[:] Charting a Course for Tomorrow’s Fleet. Washington, Center for Strategic and Budgetary Assessments, 2008. p. 81 (Figure 5). Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack submarine; CVN is large nuclear-powered aircraft carrier; CVE is medium-sized aircraft carrier; LCS is Littoral Combat Ship; SSC (an acronym created by CRS for this table) is small surface combatant of 1,000+ tons displacement—a ship similar to late-1990s Streetfighter concept; MPF(F) is Maritime Prepositioning Force (Future) ship; LSD is LSD-41/49 class amphibious ship operating as a station ship for a formation like a Global Fleet Station (GFS); MIW is mine warfare ship; CLF is combat logistics force (i.e., resupply) ship. a. Figures shown are for the year 2028. b2020; for subsequent years, reductions from these figures would be considered. b. Figures shown are for the year 2028. c. Maritime Security Frigates. cd. Plan includes 28 patrol craft (PCs) of a few hundred tons displacement each, as well as 29 boat detachments and seven riverine squadrons. de. Plan shows three Mobile Landing Platform (MLP) ships that the Navy currently plans for the MPF(F) squadron, plus 16 existing current-generation maritime prepositioning force (MPF) ships and 17 existing prepositioning ships for Army and other service/agency equipment. Plan also shows 67 other DOD sealift ships. ef. T-LSDs, meaning LSDs operated by the Military Sealift Command (MSC) with a partly civilian crew. fg. The CSBA report shows a total of 488 units by including 162 additional force units that do not count toward the 313-ship goal under the battle force ships counting method that has been used since the early 1980s for public policy discussions of the size of the Navy. These 162 additional force units include 16 existing current-generation maritime prepositioning force (MPF) ships and 17 existing prepositioning ships for Army and other service/agency equipment, 67 other DOD sealift ships, 28 PCs, 29 boat detachments, and certain other small-scale units. The CSBA report proposes a new counting method for naval/maritime forces that includes units such as these in the total count. Congressional Research Service 2526 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix C. Independent Panel Assessment of 2010 QDR The law that requires DOD to perform QDRs (10 U.S.C. 118) states that the results of each QDR shall be assessed by an independent panel. The report of the independent panel that assessed the 2010 QDR was released on July 29, 2010. The independent panel’s report recommends a Navy of 346 ships (about 10% more than the Navy’s planned 313-ship fleet), including 11 aircraft carriers (the same number as in the Navy’s 313-ship plan) and 55 attack submarines (compared to 48 in the Navy’s 313-ship plan).2425 The report states the following, among other things: • “The QDR should reflect current commitments, but it must also plan effectively for potential threats that could arise over the next 20 years.… we believe the 2010 QDR did not accord sufficient priority to the need to counter anti-access challenges, strengthen homeland defense (including our defense against cyber threats), and conduct post-conflict stabilization missions.” (Page 54) • “In this remarkable period of change, global security will still depend upon an American presence capable of unimpeded access to all international areas of the Pacific region. In an environment of ‘anti-access strategies,’ and assertions to create unique ‘economic and security zones of influence,’ America‘s rightful and historic presence will be critical. To preserve our interests, the United States will need to retain the ability to transit freely the areas of the Western Pacific for security and economic reasons. Our allies also depend on us to be fully present in the Asia-Pacific as a promoter of stability and to ensure the free flow of commerce. A robust U.S. force structure, largely rooted in maritime strategy but including other necessary capabilities, will be essential.” (Page 51) • “The United States will need agile forces capable of operating against the full range of potential contingencies. However, the need to deal with irregular and hybrid threats will tend to drive the size and shape of ground forces for years to come, whereas the need to continue to be fully present in Asia and the Pacific and other areas of interest will do the same for naval and air forces.” (Page 55) • “The force structure in the Asia-Pacific needs to be increased. In order to preserve U.S. interests, the United States will need to retain the ability to transit freely the areas of the Western Pacific for security and economic reasons. The United States must be fully present in the Asia-Pacific region to protect American lives and territory, ensure the free flow of commerce, maintain stability, and defend our allies in the region. A robust U.S. force structure, one that is largely rooted in maritime strategy and includes other necessary capabilities, will be essential.” (Page 66) • “Force structure must be strengthened in a number of areas to address the need to counter anti-access challenges, strengthen homeland defense (including defense against cyber threats), and conduct post-conflict stabilization missions: First, as a Pacific power, the U.S. presence in Asia has underwritten the regional stability 2425 Stephen J. Hadley and William J. Perry, co-chairmen, et al, The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on page 58. Congressional Research Service 2627 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress that has enabled India and China to emerge as rising economic powers. The United States should plan on continuing that role for the indefinite future. The Panel remains concerned that the QDR force structure may not be sufficient to assure others that the United States can meet its treaty commitments in the face of China’s increased military capabilities. Therefore, we recommend an increased priority on defeating anti-access and area-denial threats. This will involve acquiring new capabilities, and, as Secretary Gates has urged, developing innovative concepts for their use. Specifically, we believe the United States must fully fund the modernization of its surface fleet. We also believe the United States must be able to deny an adversary sanctuary by providing persistent surveillance, tracking, and rapid engagement with high-volume precision strike. That is why the Panel supports an increase in investment in long-range strike systems and their associated sensors. In addition, U.S. forces must develop and demonstrate the ability to operate in an information-denied environment.” (Pages 59-60) • “To compete effectively, the U.S. military must continue to develop new conceptual approaches to dealing with operational challenges, like the Capstone Concept for Joint Operations (CCJO). The Navy and Air Force‘s effort to develop an Air-Sea Battle concept is one example of an approach to deal with the growing anti-access challenge. It will be necessary to invest in modernized capabilities to make this happen. The Chief of Naval Operations and Chief of Staff of the Air Force deserve support in this effort, and the Panel recommends the other military services be brought into the concept when appropriate.” (Page 51; a similar passage appears on page 67) In recommending a Navy of 346 ships, the independent panel’s report cited the 1993 Bottom-Up Review (BUR) of U.S. defense plans and policies. Table C-1 compares the 346-ship Navy recommended in the 1993 BUR (as detailed partly in subsequent Navy testimony and publications), the Navy’s 313-ship plan, and the ship force levels recommended in the independent panel report. Congressional Research Service 2728 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table C-1. Comparison of 1993 BUR Report, 313-Ship Plan, and Independent Panel Assessment of 2010 QDR Ship Type Bottom-Up Review (BUR) (1993) Navy’s 313-Ship Plan (2006) Independent Panel Assessment of 2010 QDR (July 2010) 18 14 14 4 4 48 55 11 active + 1 operational/reserve 11 active 11 active 124 143 n/a SSBNs (SSBN force was later reduced to 14 as a result of the 1994 Nuclear Posture Review) SSGNs 0 (SSGN program did not yet exist) SSNs 45 to 55 (55 in FY99, with a long-term goal of about 45) Aircraft carriers Surface combatants (114 active + 10 frigates in Naval Reserve Force; a total of 110-116 active ships was also cited) Cruisers and destroyers n/a 88 n/a Frigates n/a 0 n/a (to be replaced by LCSs) LCSs 0 55 n/a 41 31 n/a (Enough to lift 2.5 MEBs) (33 needed to lift 2.0 MEBs) 0 12 n/a 26 0 n/a (LCS program did not exist) (to be replaced by LCSs) CLF ships 43 30 n/a Support ships 22 20 n/a 346 313 346 (LCS program did not exist) Amphibious ships MPF(F) ships (MPF(F) program did not exist) Dedicated mine warfare ships TOTAL ships (numbers above add to 331341; Navy testified in 1994 that the planned number was adjusted from 346 to 330 to reflect reductions in numbers of tenders and early retirements of some older amphibious ships) Source: Table prepared by CRS. Sources for 1993 Bottom-Up Review: Department of Defense, Report on the Bottom-Up Review, October 1993, Figure 7 on page 28; Department of the Navy, Highlights of the FY 1995 Department of the Navy Budget, February 1994, p. 1; Department of the Navy, Force 2001, A Program Guide to the U.S. Navy, 1994 edition, p. 15; Statement of VADM T. Joseph Lopez, U.S. Navy, Deputy Chief of Naval Congressional Research Service 2829 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Operations (Resources, Warfare Requirements & Assessments), Testimony to the Military Forces and Personnel Subcommittee of the House Armed Services Committee, March 22, 1994, pp. 2-5. Source for independent panel report: Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel, Washington, 2010, Figure 3-2 on pages 58-59. Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack submarine; LCS is Littoral Combat Ship; MPF(F) is Maritime Prepositioning Force (Future) ship; CLF is combat logistics force (i.e., resupply) ship; MEB is Marine Expeditionary Brigade. In a letter dated August 11, 2010, Secretary of Defense Robert Gates provided his comments on the independent panel’s report. The letter stated in part: I completely agree with the Panel that a strong navy is essential; however, I disagree with the Panel’s recommendation that DoD should establish the 1993 Bottom Up Review’s (BUR’s) fleet of 346 ships as the objective target. That number was a simple projection of the then-planned size of [the] Navy in FY 1999, not a reflection of 21st century, steady-state requirements. The fleet described in the 2010 QDR report, with its overall target of 313 to 323 ships, has roughly the same number of aircraft carriers, nuclear-powered attack submarines, surface combatants, mine warfare vessels, and amphibious ships as the larger BUR fleet. The main difference between the two fleets is in the numbers of combat logistics, mobile logistics, and support ships. Although it is true that the 2010 fleet includes fewer of these ships, they are all now more efficiently manned and operated by the Military Sealift Command and meet all of DoD’s requirements…. I agree with the Panel’s general conclusion that DoD ought to enhance its overall posture and capabilities in the Asia-Pacific region. As I outlined in my speech at the Naval War College in April 2009, “to carry out the missions we may face in the future… we will need numbers, speed, and the ability to operate in shallow waters.” So as the Air-Sea battle concept development reaches maturation, and as DoD’s review of global defense posture continues, I will be looking for ways to meet plausible security threats while emphasizing sustained forward presence – particularly in the Pacific.25 2526 26 Letter dated August 11, 2010, from Secretary of Defense Robert Gates to the chairmen of the House and Senate Armed Services and Appropriations Committees, pp. 3 and 4. The ellipsis in the second paragraph appears in the letter. Congressional Research Service 2930 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Appendix D. Size of the Navy and Navy Shipbuilding Rate Size of the Navy Table D-1 shows the size of the Navy in terms of total number of ships since FY1948; the numbers shown in the table reflect changes over time in the rules specifying which ships count toward the total. Differing counting rules result in differing totals, and for certain years, figures reflecting more than one set of counting rules are available. Figures in the table for FY1978 and subsequent years reflect the battle force ships counting method, which is the set of counting rules established in the early 1980s for public policy discussions of the size of the Navy. As shown in the table, the total number of battle force ships in the Navy reached a late-cold war peak of 568 at the end of FY1987 and began declining thereafter.2627 The Navy fell below 300 battle force ships in August 2003 and included 285 battle force ships as of September 30, 2009. As discussed in Appendix A, historical figures for total fleet size might not be a reliable yardstick for assessing the appropriateness of the Navy’s proposed 313-ship fleet, particularly if the historical figures are more than a few years old, because the missions to be performed by the Navy, the mix of ships that make up the Navy, and the technologies that are available to Navy ships for performing missions all change over time. For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform its stated missions is increasing, because the fleet’s mission requirements might be increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated missions is decreasing, because the fleet’s mission requirements might be declining more rapidly than numbers of ships, or because average ship capability and the percentage of time that ships are in deployed locations might be increasing quickly enough to more than offset reductions in total ship numbers. 2627 Some publications have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total number of active ships has been larger than the total number of battle force ships. For example, the Naval Historical Center states that as of November 16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another year is thus an apple-to-oranges comparison that in this case overstates the decline since FY1987 in the number of ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the Navy over time should use, whenever possible, a single counting method. Congressional Research Service 3031 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table D-1.Total Number of Ships in the Navy Since FY1948 FYa Number FYa Number FYa Number 1948 737 1969 926 1990 547 1949 690 1970 769 1991 526 1950 634 1971 702 1992 466 1951 980 1972 654 1993 435 1952 1,097 1973 584 1994 391 1953 1,122 1974 512 1995 373 1954 1,113 1975 496 1996 356 1955 1,030 1976 476 1997 354 1956 973 1977 464 1998 333 1957 967 1978 468 1999 317 1958 890 1979 471 2000 318 1959 860 1980 477 2001 316 1960 812 1981 490 2002 313 1961 897 1982 513 2003 297 1962 959 1983 514 2004 291 1963 916 1984 524 2005 282 1964 917 1985 541 2006 281 1965 936 1986 556 2007 279 1966 947 1987 568 2008 282 1967 973 1988 565 2009 285 1968 976 1989 566 2010 Source: Compiled by CRS using U.S. Navy data. Numbers shown reflect changes over time in the rules specifying which ships count toward the total. Figures for FY1978 and subsequent years reflect the battle force ships counting method, which is the set of counting rules established in the early 1980s for public policy discussions of the size of the Navy. a. Data for earlier years in the table may be for the end of the calendar year (or for some other point during the year), rather than for the end of the fiscal year. Shipbuilding Rate Table D-2 shows past (FY1982-FY2010) and requested (FY2011-FY2015) rates of Navy ship procurement. Congressional Research Service 3132 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Table D-2. Battle Force Ships Procured or Requested, FY1982-FY2015 (Procured FY1982-FY2010; requested FY2011-FY2015) 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 17 14 16 19 20 17 15 19 15 11 11 7 4 4 5 4 5 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 5 6 6 6 5 7 8 4a 5a 3a 8 7 9 8 12 9 12 Source: CRS compilation based on examination of defense authorization and appropriation committee and conference reports for each fiscal year. The table excludes non-battle force ships that do not count toward the 313-ship goal, such as certain sealift and prepositioning ships operated by the Military Sealift Command and oceanographic ships operated by agencies such as the National Oceanic and Atmospheric Administration (NOAA). a. The totals shown for FY2006, FY2007, and FY2008, have been adjusted downward to reflect the cancellation two LCSs funded in FY2006, another two LCSs funded in FY2007, and an LCS funded in FY2008. Author Contact Information Ronald O'Rourke Specialist in Naval Affairs rorourke@crs.loc.gov, 7-7610 Congressional Research Service 3233