Order Code RL32665
CRS Report for Congress
Received through the CRS Web
Potential Navy Force Structure
and Shipbuilding
Plans:
Background and Issues for Congress
November 8, 2004Updated March 30, 2005
Ronald O’Rourke
Specialist in National Defense
Foreign Affairs, Defense, and Trade Division
Congressional Research Service ˜ The Library of Congress
Potential Navy Force Structure and Shipbuilding Plans:
Background and Issues for Congress
Summary
Navy and Department of Defense (DOD) officials reportedly are considering
reducing at least some parts of Navy force structure from current levels. In addition,
the Navy reportedly submitted to the Office of the Secretary of Defense a draft
FY2006-FY2011 budget plan that would delay or reduce a number of planned Navy
shipbuilding programs. These developments have caused concern among Members
of Congress and others about potential DOD plans for the Navy and the effect these
plans might have on the shipbuilding industrial base.
The current absence of an officially approved, consensus plan for the size and
structure of the Navy may make it difficult, if not impossible, for Congress to
conduct effective oversight by reconciling desired Navy capabilities with planned
Navy force structure, and planned Navy force structure with supporting Navy
programs and budgets. It may also cause business-planning uncertainty for industry.
Statements from Navy officials suggest that the next Navy force structure plan
may call for a fleet of roughly 250 to 330 ships. Historical figures for the total
number of ships in the Navy are not necessarily a reliable yardstick for assessing the
adequacy of today’s Navy or a future planned Navy that includes a certain number
of ships. Similarly, trends over time in the total number of ships in the Navy are not
necessarily a reliable indicator of the direction of change over time in the fleet’s
In February 2005, the Navy testified that the Navy in future years may require
a total of 260 to 325 ships, or possibly 243 to 302 ships, depending on how much the
Navy uses new technologies and a new ship crewing and deployment method called
Sea Swap. In March 2005, the Navy provided a report to Congress showing the
notional compositions of 260- and 325-ship fleets in FY2035.
Navy ambiguity regarding required numbers of ships, together with proposed
reductions and delays in Navy ship-procurement programs in the FY2006-FY2011
Future Years Defense Plan (FYDP), have caused concern among Members of
Congress and others about future Navy capabilities and the shipbuilding industrial
base. Ambiguity regarding required numbers of Navy ships may cause businessplanning uncertainty for companies that own shipyards, and may make it difficult, if
not impossible, for Congress to conduct effective oversight of the Navy budget and
ship-procurement programs.
Historical figures for the total number of ships in the Navy are not necessarily
a reliable yardstick for assessing the adequacy of today’s Navy or a future planned
Navy that includes a certain number of ships. Similarly, trends over time in the total
number of ships in the Navy are not necessarily a reliable indicator of the direction
of change over time in the fleet’s ability to perform its stated missions.
Current force-planning issues that Congress may consider in assessing how large
a Navy the United States needs include new technologies that may affect U.S. Navy
ship capabilities; Navy ship homeporting arrangements and deployment methods;
sea-based missile defense; the sea basing
concept for conducting expeditionary
operations ashore; naval requirements for the
global war on terrorism and irregular
conflicts; the possible emergence over the next
10 to 25 years of significantly more
capable Chinese maritime military forces; new
technologies that may affect U.S. Navy ship capabilities; Navy ship homeporting
arrangements and deployment methods; DOD’s increased emphasis on achieving full
full jointness in U.S. military operations; and potential tradeoffs between funding Navy
Navy requirements and funding competing defense requirements.
Candidate shipyards for building Navy ships in coming years include the six
yards that have built the Navy’s major warships in recent years and three additional
yards that are competing to build Littoral Combat Ships (LCSs). In assessing how
In assessing how many shipyards should be regularly involved in Navy
shipbuilding in coming years,
Congress may consider a number of factors, including the
shipyard production capacities of
these nine yards, the potential shipbuilding rate for a fleet of 250 to 330260 to
325 ships, the
potential need to surge to a higher rate of production, the potential for
creating new
shipyards or reopening closed ones, shipyard fixed overhead costs, costs associated
associated with split learning curves and government supervision of Navy
shipbuilding work,
competition in design and construction of Navy ships, regional
labor markets,
potential shipyard work other than Navy shipbuilding, the geographic
base of support
for Navy shipbuilding, and the distribution of the economic benefits
of shipbuilding
around the country. This report will be updated as events warrant.
Contents
Introduction and Issue for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
No Current, Officially Approved, Force Structure Plan . .2
Ambiguity In Navy Requirements For Numbers Of Ships . . . . . . . . . . . . . . 32
310-Ship Plan From 2001 QDR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Navy 375-Ship Proposal Of 2002-2004 . . . . . . . . . . . . . . . . . . . . . . . . . 3
2005 Navy Testimony On Fleet Of 260 To 325 Ships . . . . . . . . . . . . . . 4
Reasons For Planning UncertaintyCapabilities-Based Planning and Numbers of Ships . . . . . . . . . . . . . . . . . . . 7
Independent Studies on Navy Force Structure . . . . . . . . . . 4
Capabilities-Based Planning. . . . . . . . . . . . . . 8
Implications Of Ambiguity In Navy Force-Structure Plans . . . . . . . . . . . . . . 8
For the Navy . . . . . . . . . . . . . . . . . . .. . . . . . . 6
Implications of Not Having A Current Plan . . . . . . . . . . . . . . . . . . . . . . . . . 6. . 8
For Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
For Industry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Potential Features of Next Navy Force Structure Plan . . . . . . . . . . . . . . . . . 8
Potential Navy Plans for Shipbuilding Programs9
Potential Oversight Questions Arising From This Ambiguity . . . . . . . . . . . 10
Navy FY2006-FY2011 Ship-Procurement Plan . . . . . . . . . . . . . . . . . . . . . 11
Overall Ship Procurement Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1211
Individual Shipbuilding Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Issues for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1615
Number of Ships in the Navy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1615
Capabilities-Based Planning and Numbers of Ships . . . . . . . . . . . . . . 1615
Historical Fleet Numbers As A Yardstick . . . . . . . . . . . . . . . . . . . . . . 1615
Previous Force Structure Plans As A Yardstick . . . . . . . . . . . . . . . . . 17
Current Force-Planning Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Potential Oversight Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Number of Yards Involved in Navy Shipbuilding . . . . . . . . . . . . . . . . . . . . 23
Candidate Yards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Factors to Consider . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2423
Potential Oversight Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Legislative Activity in 2004the 109th Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
FY2005 Defense Authorization Bill (H.R 4200/P.L. 108-375) . . . . . . . . . . 35
List of Tables
Table 1.
Table 2.
Table 3.
Table 4.
Notional Possibilities for the Next Navy Force Structure Plan . . . . . . 10
Draft Navy Shipbuilding Plan for FY2006-FY2011 . . . . . . . . . . . . . . . 11
Annual Shipyard Production Capacities . . . . . . . . . . . . . . . . . . . . . . . . 25
Steady-State Ship Procurement Rate for Fleet of 250 to 330 Ships . . . 26
Potential Navy Force Structure and
Shipbuilding Plans: Background and Issues
for Congress
Introduction and Issue for Congress
Navy and Department of Defense (DOD) officials reportedly are considering
reducing at least some parts of Navy force structure from current levels.1 In addition,
the Navy in the summer of 2004 reportedly submitted to the Office of the Secretary
of Defense a draft FY2006-FY2011 budget plan that would delay or reduce a number
of planned Navy shipbuilding programs.2 These developments, together with the
current absence of an officially approved, consensus plan for the size and structure
of the Navy, have caused concern among Members of Congress and others about
potential DOD plans for the Navy and the effect these plans might have on the
shipbuilding industrial base.3
1
Navy officials, for example, are reportedly considering reducing the force-level goals for
attack submarines and amphibious ships. For discussions, see CRS Report RL32418, Navy
Attack Submarine Force-Level Goal and Procurement Rate: Background and Issues for
Congress, by Ronald O’Rourke, and CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.
2
Christopher J. Castelli, “Navy Proposes Shipbuilding Cuts, Plans Appeal To Bush For
Reforms,” Inside the Navy, August 9, 2004; Christopher J. Castelli, “Collins Warns Navy
Not To ‘Squander’ Shipbuilding Budget Progress,” Inside the Navy, August 16, 2004;
Renae Merle. “Navy Plans To Buy Fewer Ships,” Washington Post, September 7, 2004: E1.
3
See, for example, Shipbuilding Industrial Base Survey and Report. Washington, American
Shipbuilding Association, 2004. (August 2004) 8 pp.; Christopher J. Castelli, “Warner
Concerned About Possible Carrier Delay In Navy Budget,” Inside the Navy, August 23,
2004; Christopher J. Castelli, “Navy’s Latest Proposals To Slash Shipbuilding Seen As
Budget Tactics,” Inside the Navy, August 23, 2004: 1; Kathy Gambrell, “Official: DD(X)
Delay A Possible ‘Cry For Help,’” Aerospace Daily & Defense Report, August 23, 2004:
4-5; Dave Ahearn, “Sen. Warner Concerned Navy May Not Build Enough Ships,” Defense
Today, August 26, 2004: 1; Dave Ahearn, “Fiscal 2006 Navy Shipbuilding Pace Would
Yield A 120-Vessel Fleet,” Defense Today, August 27, 2004: 1; Jason Sherman, “U.S.
Navy Plan Could Cut Swing-State Jobs,” Defense News, August 30, 2004: 4; Christopher
J. Castelli, “President Receives Defense Briefings, But Cambone’s Not Among Them,”
Inside the Navy, August 30, 2004: 1; Dale Eisman and Allison Connolly, “Shipbuilding
Lobby Raises Concerns Over Navy Cuts,” Norfolk Virginian-Pilot, September 2, 2004;
Amy Klamper, “Ships At Sea,” National Journal’s CongressDailyAM, September 8, 2004;
Kathy Gambrell, “Potential Navy Cuts ‘Foolish,’ Lott Says,” Aerospace Daily & Defense
Report, September 17, 2004; Lorenzo Cortes. “Maine Senator Raises Concerns To Navy
(continued...)
CRS-2
The issue for Congress is how to respond to the current uncertainty regarding
the planned size and structure of the Navy, the possibility of reductions in Navy ship
force structure, and the possibility of reductions or delays in planned Navy
shipbuilding programs. Decisions that Congress makes regarding Navy force
structure and shipbuilding programs could significantly affect future U.S. military
capabilities, Navy funding requirements, and the shipbuilding industrial base.
The next section of the report discusses the following background questions:
!
Why is there no current, officially approved, consensus plan for the
future size and structure of the Navy?
!
What are the potential implications of not having an officially
approved, consensus plan for the future size and structure of the
Navy?
!
Based on press reports, what might the next Navy ship force
structure plan look like?
!
Based on press reports, what might be the Navy’s new plans for
individual shipbuilding programs?
The section that follows discusses two potential issues for Congress:
!
In terms of numbers of ships, how large a Navy does the United
States need, and what current force-planning issues may affect these
numbers?
!
How many shipyards should be regularly involved in Navy
shipbuilding?
The final section of the report presents recent legislative activity on these issues.
3
(...continued)
Secretary Regarding FY ‘06 Budget,” Defense Daily, September 24, 2004; Dave Ahearn,
“Lieberman Sees Fighter Planes Cut, Not Canceled; Seeks More Ships,” Defense Today,
September 24, 2004: 1-2; Sharon Weinberger, “Acquisition Reductions Likely, But No
Cancellations, Lieberman Says,” Defense Daily, September 24, 2004: 1; Christopher J.
Castelli, “Lieberman Concerned About Navy’s Proposed Shipbuilding Cuts,” Inside the
Navy, September 27, 2004; Kathy Gambrell, “Lawmakers Call On Bush To Aid Navy
Shipbuilding,” Aerospace Daily & Defense Report, September 29, 2004. See also the text
of a September 20, 2004 letter from Senator Collins to Secretary of the Navy England,
reprinted in Inside the Navy (Collins Letter To Navy Secretary On DD(X). Inside the Navy,
September 27, 2004); the text of a September 27, 2004, letter from seven Senators to
President Bush, reprinted in Inside the Navy (Senate Letter on Shipbuilding Budget, Inside
the Navy, October 4, 2004).
CRS-3
Background
No Current, Officially Approved, Force Structure Plan
Why is there no current, officially approved, consensus plan for the future size
and structure of the Navy?
310-Ship Plan From 2001 QDR. The last force structure plan for the Navy
that was officially approved and published by the Office of the Secretary of Defense
(OSD) appeared in the report on the 2001 Quadrennial Defense Review (QDR). This
plan, like the one approved in the 1997 QDR, included 12 aircraft carriers, 116
surface combatants, 55 nuclear-powered attack submarines (SSNs),4 and 36
amphibious ships organized into 12 amphibious ready groups (ARGs) with a
combined capability to lift the assault echelons of 2.5 Marine Expeditionary Brigades
(MEBs).5 Although the 2001 QDR report did not mention a total number of ships,
this fleet was generally understood to include a total of about 310 battle force ships.6
The 2001 QDR report also stated that as DOD’s “transformation effort matures —
and as it produces significantly higher output of military value from each element of
the force — DOD will explore additional opportunities to restructure and reorganize
the Armed Forces.”735
National Naval Force Structure Policy Act (H.R. 375) . . . . . . . . . . . . . . . . 35
H.R. 304/S. 145 On Aircraft Carrier Force Levels . . . . . . . . . . . . . . . . . . . 35
Legislative Activity in the 108th Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
FY2004 Defense Authorization Bill (H.R. 1588/P.L. 108-136) . . . . . . . . . 35
FY2005 Defense Authorization Bill (H.R 4200/P.L. 108-375) . . . . . . . . . . 36
Appendix A: Independent Studies On Navy Force Structure . . . . . . . . . . . . . . . 39
CNA Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
OFT Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
CSBA Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Appendix B: Size of Navy and Navy Shipbuilding Rate . . . . . . . . . . . . . . . . . . . 58
List of Tables
Table 1. Navy Ship Force Structure Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Table 2. Navy FY2006-FY2011 Ship-Procurement Plan . . . . . . . . . . . . . . . . . . 11
Table 3. Annual Shipyard Production Capacities . . . . . . . . . . . . . . . . . . . . . . . . 24
Table 4. Steady-State Ship Procurement Rate for Fleet of 260 to 325 Ships . . . 26
Table 5. CNA-Recommended Force and 375-Ship Proposal . . . . . . . . . . . . . . . 40
Table 6. Alternative fleet structures from OFT report . . . . . . . . . . . . . . . . . . . . 45
Table 7. CSBA-Recommended Force and 375-Ship Proposal . . . . . . . . . . . . . . 51
Table 8. Battle force ships procured (FY1982-FY2005) or projected
(FY2006-FY2011) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Potential Navy Force Structure and
Shipbuilding Plans: Background and Issues
for Congress
Introduction and Issue for Congress
In February 2005, the Navy testified that the Navy in future years may require
a total of 260 to 325 ships, or possibly 243 to 302 ships, depending on how much the
Navy uses new technologies and a new ship crewing and deployment method called
Sea Swap.1 In March 2005, the Navy provided a report to Congress showing the
notional compositions of 260- and 325-ship fleets in FY2035.
Navy ambiguity regarding required numbers of ships, together with proposed
reductions and delays in Navy ship-procurement programs in the FY2006-FY2011
Future Years Defense Plan (FYDP), have caused concern among Members of
Congress and others about future Navy capabilities and the shipbuilding industrial
base.
The issue for Congress is how to respond to Navy ambiguity regarding required
numbers of ships and proposed reductions and delays in planned Navy shipbuilding
programs. Decisions that Congress makes regarding Navy force structure and
shipbuilding programs could significantly affect future U.S. military capabilities,
Navy funding requirements, and the Navy shipbuilding industrial base.
The next section of the report discusses the following background questions:
1
!
Why is there ambiguity regarding required numbers of Navy ships?
!
How does capabilities-based planning relate to required numbers of
Navy ships?
!
What independent studies are available concerning required numbers
of Navy ships?
Sea Swap is the Navy’s term for the concept of deploying Navy ships for extended lengths
of time (e.g., 12, 18, or 24 months, rather than the standard six months) and rotating
successive crews to the ship, with each crew serving aboard the ship for six months. The
concept reduces the number of ships needed to maintain day-to-day forward deployments
of Navy ships by reducing the number of times that ships need to transit between their home
port and overseas operating areas. For more on Sea Swap and other new approaches for
deploying Navy ships, see CRS Report RS21338, Navy Ship Deployments: New Approaches
— Background and Issues for Congress, by Ronald O’Rourke.
CRS-2
!
What are the potential implications for the Navy, Congress, and
industry of Navy ambiguity regarding required numbers of ships?
!
What potential oversight questions for Congress arise from this
ambiguity?
!
How does the Navy’s newly proposed FY2006-FY2011 shipprocurement plan compare to previous plans?
The section that follows discusses two potential issues for Congress:
!
In terms of numbers of ships, how large a Navy does the United
States need, and what current force-planning issues may affect these
numbers?
!
How many shipyards should be regularly involved in Navy
shipbuilding?
The final section of the report presents recent legislative activity on these issues.
Background
Ambiguity In Navy Requirements For Numbers Of Ships
Why is there ambiguity regarding required numbers of Navy ships?
310-Ship Plan From 2001 QDR. The last unambiguous ship force structure
plan for the Navy that was officially approved and published by the Office of the
Secretary of Defense (OSD) appeared in the September 2001 report on the 2001
Quadrennial Defense Review (QDR). This plan, like the one approved in the 1997
QDR, included 12 aircraft carriers, 116 surface combatants, 55 nuclear-powered
attack submarines (SSNs),2 and 36 amphibious ships organized into 12 amphibious
ready groups (ARGs) with a combined capability to lift the assault echelons of 2.5
Marine Expeditionary Brigades (MEBs).3 Although the 2001 QDR report did not
mention a total number of ships, this fleet was generally understood to include a total
of about 310 battle force ships.4 The 2001 QDR report also stated that as DOD’s
2
The plan approved in the 1997 QDR originally included 50 SSNs but was subsequently
amended to include 55 SSNs.
3
U.S. Department of Defense, Quadrennial Defense Review Report, Washington, 2001, p.
22.
4
Since the beginning of the Reagan Administration, the total number of ships in the Navy
has been calculated using the battle force method of counting ships. Battle force ships are
ships that are readily deployable and which contribute directly or indirectly to the deployed
combat capability of the Navy. Battle force ships include active-duty Navy ships, Naval
Reserve Force ships, and ships operated by the Military Sealift Command that meet this
(continued...)
CRS-3
“transformation effort matures — and as it produces significantly higher output of
military value from each element of the force — DOD will explore additional
opportunities to restructure and reorganize the Armed Forces.”5
Following the publication of the 2001 QDR report, the Navy took steps which
had the effect of calling into question the status of the 310-ship plan. In November
2001, the Navy announced a plan for procuring a new kind of small surface
combatant, called the Littoral Combat Ship (LCS), that the Navy had not previously
planned to procure, and which was not mentioned in the 2001 QDR report.8 And in
4
The plan approved in the 1997 QDR originally included 50 SSNs but was subsequently
amended to include 55 SSNs.
5
U.S. Department of Defense, Quadrennial Defense Review Report, Washington, 2001,
(September 30, 2001) p. 22.
6
Since the beginning of the Reagan Administration, the total number of ships in the Navy
has been calculated using the battle force method of counting ships. Battle force ships are
ships that are readily deployable and which contribute directly or indirectly to the deployed
combat capability of the Navy. Battle force ships include active-duty Navy ships, Naval
Reserve Force ships, and ships operated by the Military Sealift Command that meet this6 And in
February 2003, in submitting its proposed FY2004-FY2009 Future Years Defense
Plan (FYDP) to Congress, DOD announced that it had initiated studies on undersea
warfare requirements and forcible entry options for the U.S. military. These studies
could affect, among the other things, the required numbers of SSNs and amphibious
ships. The 310-ship plan is now rarely mentioned by Navy and DOD officials.
Navy 375-Ship Proposal Of 2002-2004. Navy leaders in early 2002 began
to mention an alternative proposal for a 375-ship Navy that initially included12
aircraft carriers, 55 SSNs, 4 converted Trident cruise-missile-carrying submarines
(SSGNs), 160 surface combatants (including 104 cruisers, destroyers, frigates, and
56 LCSs), 37 amphibious ships, and additional mine warfare and support ships.7
Although Navy leaders routinely referred to the 375-ship proposal from about
February 2002 through about February 2004, Secretary of Defense Donald Rumsfeld,
at a February 5, 2003, hearing before the House Armed Services Committee,
explicitly declined to endorse it as an official DOD goal, leaving it a Navy proposal
only.
In April 2004, Navy leaders began to back away from the 375-ship proposal,
stating that 375 was an approximate figure, that the ships making up the total of 375
were subject to change, and perhaps most important, that the 375-ship figure
4
(...continued)
standard. The total number of battle force ships includes not only combat ships but also
auxiliary and support ships — such as oilers, ammunition ships, and general stores ships —
that transport supplies to deployed Navy ships operating at sea. The total number of battle
force ships does not include ships in reduced readiness status that are not readily deployable,
ships and craft that are not generally intended for making distant deployments,
oceanographic ships operated by the National Oceanic and Atmospheric Administration
(NOAA), and DoDDOD sealift and prepositioning ships that transport equipment and supplies
(usually for the benefit of the Army or Air Force) from one land mass to another.
7
85
Quadrennial Defense Review Report, op. cit., p. 23.
6
For more on the LCS program, see CRS Report RS21305, Navy Littoral Combat Ship
(LCS): Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
(continued...)
CRS-4
February 2003, in submitting its proposed FY2004-FY2009 Future Years Defense
Plan (FYDP) to Congress, DOD announced that it had initiated studies on undersea
warfare requirements and forcible entry options for the U.S. military. These studies
could affect, among the other things, the required numbers of SSNs and amphibious
ships. The 310-ship plan is now rarely mentioned by Navy and DOD officials.
Navy 375-Ship Proposal. Navy leaders in 2002 began to mention an
alternative proposal for a 375-ship Navy that includes several dozen LCSs not
included in the 310-ship plan. The 375-ship proposal includes 12 aircraft carriers,
55 SSNs, 4 converted Trident cruise-missile-carrying submarines (SSGNs), 160
surface combatants (including 104 cruisers, destroyers, frigates, and 56 LCSs), 37
amphibious ships, and additional mine warfare and support ships.
Although Navy leaders in 2002 and 2003 routinely referred to the 375-ship
proposal, Secretary of Defense Donald Rumsfeld, at a February 5, 2003 hearing
before the House Armed Services Committee, explicitly declined to endorse it as an
official DOD goal, leaving it a Navy proposal only. In recent months, moreover,
Navy leaders have backed away from the 375-ship proposal, stating that 375 is an
approximate figure, that the ships making up the total of 375 are subject to change,
and perhaps most important, that the 375-ship figure reflected traditional concepts
for deploying Navy ships, rather than new concepts (such as the Sea Swap concept
for long deployments with crew rotation) that could significantly reduce future
requirements for Navy ships.9 Navy officials now mention the 375-ship goal less
frequently.
In summary, neither the 310-ship plan from the 2001 QDR or the Navy’s 375ship proposal appear to qualify as a current, officially approved, consensus plan for
the size and structure of the Navy. Navy and DOD officials, moreover, have given
only limited indication of when they might issue such a plan as an official
replacement for the 310-ship plan from the 2001 QDR.10
Reasons For Planning Uncertainty. One potential reason why Navy and
DOD officials have not announced a new force structure plan is that they are
8
(...continued)
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
9
For more on Sea Swap and other new approaches for deploying Navy ships, see CRS
Report RS21338, Navy Ship Deployments: New Approaches — Background and Issues for
Congress, by Ronald O’Rourke.
10
An August 2004 article stated:
Asked when he will reach a decision on a new fleet size figure, [Chief of Naval
Operations Vernon] Clark said, “It will evolve over the course of the next year,
because this is embedded in the campaign analysis” from two wars in the past
three years and a major naval exercise.
(Dave Ahearn, “Clark Says Fleet Size Decision May Take Another Year,” Defense Today,
August 6, 2004: 1, 4.)
CRS-5
currently working to define more precisely certain new capabilities they want the
Navy to have. Examples of such capabilities include sea-based ballistic missile
defense and the new sea basing concept for conducting expeditionary operations
ashore. The current vision for missile defense includes a role for Navy forces, but
the exact nature of that role is not yet well defined.11 Similarly, Navy and DOD
officials are supportive of the new sea basing concept for conducting expeditionary
operations ashore, but are still working to define the concept in greater detail.12
A second potential reason why Navy and DOD officials have not announced a
new force structure plan is that, once a desired collection of Navy capabilities is
defined, the metrics for translating those capabilities into numbers of ships and
aircraft are shifting due to new concepts such as network-centric warfare (NCW) and
Sea Swap. NCW refers to using computer networking technology to link individual
military units into a series of local- and wide-area networks for rapidly transmitting
critical data. Although implementing NCW is expected to improve, perhaps
dramatically, the warfighting ability of U.S. forces, the implications of NCW for the
design and capability of individual U.S. military platforms (such as ships) are not yet
fully understood.13 Sea Swap refers to the Navy’s new plan for sending ships on
long-duration deployments during which the ships are operated by multiple crews
that are sent out to the ships on a rotational basis. Although Sea Swap is understood
to have the potential for reducing the total number of ships of a given kind that are
needed to keep a certain number of that kind forward deployed in an overseas
operating area, the kinds of Navy ships for which Sea Swap might be suitable, and
the exact extent of the resulting reduction in required numbers of ships, is not yet
clear.14
A third potential reason why Navy and DOD officials have not announced a new
force structure plan is that Navy and DOD officials may find it convenient for their
own purposes to not announce such a plan. In the absence of a current, officially
approved, consensus plan for the size and structure of the Navy, Navy and DOD
officials are free to speak broadly about individual Navy acquisition programs
without offering many quantitative details about them — details which they might
11
For more discussion, see CRS Report RL31111, Missile Defense: The Current Debate,
Coordinated by Steven A. Hildreth.
12
For more on the sea basing concept, see CRS Report RS20851, Naval Transformation:
Background and Issues for Congress, by Ronald O’Rourke, and CRS Report RL32513,
Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background
and Oversight Issues for Congress, by Ronald O’Rourke.
13
For more on NCW in general, see CRS Report RL32411, Network Centric Warfare:
Background and Issues for Congress, by Clay Wilson, CRS Report RL32238, Background
and Oversight Issues for Congress, by Ronald O’Rourke. For more on naval programs
involved in NCW, see CRS Report RS20557, Navy Network-Centric Warfare Concept: Key
Programs and Issues for Congress, by Ronald O’Rourke.
14
For more on Sea Swap, see CRS Report RS21338, Navy Ship Deployments: New
Approaches — Background and Issues for Congress, by Ronald O’Rourke. For an article
discussing Sea Swap and other issues the Navy is examining to work toward a new forcestructure plan, see Dave Ahearn, “Clark Says Fleet Size Decision May Take Another Year,”
Defense Today, August 6, 2004: 1, 4.
CRS-6
be held accountable to later, or which, if revealed now, might disappoint Members
of Congress or industry officials. If this is a reason why Navy and DOD officials
have not announced a new force structure plan for the Navy, then such a plan might
not be issued until Congress directs DOD to do so.
Capabilities-Based Planning. DOD in recent years has altered the basis of
its force planning, shifting from threat-based planning to capabilities-based planning.
Under threat-based planning, DOD planned its forces based on what would be needed
for conflict scenarios that were defined fairly specifically. During the Cold War, for
example, DOD planned forces that would be sufficient, in conjunction with allied
NATO forces, for fighting a multi-theater conflict with the Soviet Union and its
Warsaw Pact allies. Similarly, in the first few years of the post-Cold War era, DOD
planned forces that would be sufficient for, among other things, fighting two nearly
simultaneous regional conflicts, one in the Persian Gulf region, the other on the
Korean peninsula.
Under capabilities-based planning, DOD is now planning for U.S. military
forces to have a variety of abilities, so that they will be better able to respond to a
wide array of possible conflict scenarios. DOD officials have explained that the shift
to capabilities-based planning responds to the difficulty of predicting, in today’s
security environment, specific future threats and warfighting scenarios.
When asked in recent months about required numbers of Navy ships and
aircraft, Navy and DoD officials have sometimes argued that under capabilities-based
planning, numbers of ships and aircraft per se are not as important as the total amount
of capability represented in the fleet. That may be correct insofar as the policy
objective is to have a Navy with a certain desired set of capabilities, and not simply
one that happens to include a certain number of ships and aircraft. But that is not the
same as saying that a Navy with a desired set of capabilities cannot in turn be
described as one having certain numbers of ships and aircraft of certain types.
Although the force-planning implications of issues such as sea-based missile
defense, the sea basing concept, network-centric warfare, and Sea Swap are not
currently understood in all their details, with further study of these issues, it arguably
should become possible at some point to define a set of desired Navy capabilities
with some clarity, and to translate those desired capabilities into desired numbers of
ships and aircraft. Those numbers might be expressed as ranges rather than specific
figures, and they may change over time as missions and technologies change. But
to argue indefinitely that desired naval capabilities cannot be translated into desired
numbers of ships and aircraft would be to suggest that the Navy cannot measure and
understand the capabilities of its own ships and aircraft. In this sense, the shift to
capability-based planning does not in itself constitute a rationale for permanently
setting aside the question of the planned size and structure of the fleet.
Implications of Not Having A Current Plan
What are the potential implications of not having an officially approved,
consensus plan for the future size and structure of the Navy?
CRS-7
The absence of a current, officially approved, consensus plan for the future size
and structure of the Navy has potential implications for both Congress and industry.
For Congress. The absence of such a plan may make it difficult, if not
impossible, for Congress to conduct effective oversight by reconciling desired Navy
capabilities with planned Navy force structure, and planned Navy force structure with
supporting Navy programs and budgets. With the middle element of this oversight
chain missing, Congress may find it difficult to understand whether proposed
programs and budgets will produce a Navy with DOD’s desired capabilities. The
defense oversight committees in recent years have criticized the Navy for presenting
a confused and changing picture of Navy ship requirements and procurement plans.15
For Industry. In the absence of a current, officially approved, consensus force
structure plan, industry officials might be tempted to pour into broad remarks from
DOD or the Navy their own hopes and dreams for individual programs. This could
lead to excessive industry optimism about those programs. Uncertainty in Navy
planning can also cause business-planning uncertainty in areas such as production
15RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
7
The composition of the plan was subsequently modified to include 12 aircraft carriers, 52
SSNs, 4 SSGNs, 165 surface combatants (109 cruisers and destroyers and 56 LCSs), 36
amphibious ships, 18 Maritime Prepositioning Force (Future) ships, and additional mine
warfare and support ships.
CRS-4
reflected traditional concepts for crewing and deploying Navy ships, rather than new
concepts — such as Sea Swap — that could significantly reduce future requirements
for Navy ships.
2005 Navy Testimony On Fleet Of 260 To 325 Ships. At a February 10,
2005, hearing before the Senate Armed Services Committee on the proposed FY2006
DOD budget and FY2006-FY2011 FYDP, Admiral Vernon Clark, the Chief of Naval
Operations, testified that the Navy in future years may require a total of 260 to 325
ships, or possibly 243 to 302 ships, depending on how much the Navy uses new
technologies and Sea Swap. Specifically, Clark stated:
As we evolve advanced concepts for employment of forces, we will also refine
analyses and requirements, to include the appropriate number of ships, aircraft,
and submarines....
In a sensor-rich construct, the numbers of platforms are no longer a meaningful
measure of combat capability. And just as the number of people is no longer the
primary yardstick by which we measure the strength or productivity of an
organization in an age of increasing capital-for-labor substitutions, the number
of ships is no longer adequate to gauge the health or combat capability of the
Navy. The capabilities posture of the Fleet is what is most important. In fact,
your Navy can deliver much more combat power, more quickly now than we
could twenty years ago when we had twice as many ships and half again as many
people....
Further, I believe that the current low rate of ship construction and the resultant
escalation of platform cost will constrain the future size of the Fleet. As I have
previously testified, I don’t believe that it’s all about numbers; numbers have a
quality all their own, there’s no question about that. But, it is more important
that we buy the right kinds of capabilities in the ships that we’re procuring in the
future, and that we properly posture our force to provide the speed and agility for
seizing and retaining the initiative in any fight.
The ultimate requirement for shipbuilding, however, will be shaped by the
potential of emerging technologies, the amount of forward basing, and innovative
manning concepts such as Sea Swap. Additional variables range from
operational availability and force posture to survivability and war plan timelines.
CRS-5
The notional diagram [above] illustrates how manning concepts and anticipated
technological adaptation will modify the number of ships required. The [upper
and lower] lines represent levels of combat capability and the ships required to
achieve that capability. For example, the left side of the diagram shows our
current number of ships (290) and the current projection of ships required to
fully meet Global War on Terror requirements (375) in the future. The right side
of the diagram shows a projection that provides the same combat capability but
fully leverages technological advances with maximum use of Sea Swap. It is a
range of numbers because the degree of technological adaptation is a variable,
as is the degree to which we can implement Sea Swap. The middle portion of the
curve [in the ellipse] shows a projected range that assumes a less extensive
projection of technological adaptation and use of Sea swap. Although simplified,
this diagram shows how the application of transformational new technologies
coupled with new manning concepts will enable us to attain the desired future
combat capability with a force posture between 260 and 325 ships.8
Admiral Clark’s testimony did not detail the compositions of these fleets by ship
type or make clear whether any of these potential total ship figures have been
endorsed by the Secretary of Defense as official DOD force-structure planning goals.
In March 2005, the Navy provided a report to Congress showing the notional
compositions of 260- and 325-ship fleets in FY2035.9 Table 1 below compares the
310-ship plan from the 2001 QDR and the Navy’s 375-ship proposal of 2002-2004
with the notional 260- and 325-ship fleets from the March 2005 Navy report to
Congress.
8
Source for quoted text and associated diagram: Statement of Admiral Vernon Clark, USN,
Chief of Naval Operations, Before the Senate Armed Services Committee, Feb. 10, 2005,
pp. 17-19.
9
U.S. Department of the Navy, An Interim Report to Congress on Annual Long-Range Plan
For The Construction Of Naval Vessels For FY 2006. Washington, 2005. 5 pp. The report
was delivered to the House and Senate Armed Services Committees on March 23, 2005.
Copies of the report were obtained by defense trade publications, and at least one of these
publications posted the report on its website.
CRS-6
Table 1. Navy Ship Force Structure Plans
Ship type
Ballistic missile submarines (SSBNs)
310-ship
plan from
2001 QDR
Navy 375ship Navy
proposal of
2002-2004a
March 2005 Navy
report to Congress
260-ship
fleet
(FY2035)
325-ship
fleet
(FY2035)
14
14
14
14
2 or 4b
4
4
4
Attack submarines (SSNs)
55
55
37
41
Aircraft carriers
12
12
10
11
116
104
67
92
0
56
63
82
Amphibious ships
36
37
17
24
Maritime prepositioning shipsc
0c
0c
14c
20c
Combat logistics (resupply) ships
34
42
24
26
Dedicated mine warfare ships
16
26d
0
0
Othere
25
25
10
11
310 or 312
375
260
325
Cruise missile submarines (SSGNs)
Cruisers, destroyers, frigates
Littoral Combat Ships (LCSs)
TOTAL battle force ships
Sources: 2001 QDR report and U.S. Navy data.
a Initial composition. Composition was subsequently modified; see the text of this report for
discussion.
b The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s
proposed FY2001 DOD budget requested funding to support the conversion of two available Trident
SSBNs into SSGNs, and the retirement of two other Trident SSBNs. Congress, in marking up this
request, supported a plan to convert all four available SSBNs into SSGNs.
c Today’s 16 Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine
Corps operations ashore, rather than Navy combat operations, and thus are not counted as Navy battle
force ships. The Navy’s planned MPF(Future) ships, however, may be capable of contributing to
Navy combat capabilities (for example, by supporting Navy aircraft operations). For this reason,
MPF(F) ships are counted here as battle force ships.
d The figure of 26 dedicated mine warfare ships includes 10 ships maintained in a reduced
mobilization status called Mobilization Category B. Ships in this status are not readily deployable and
thus do not count as battle force ships. The 375-ship proposal thus implied transferring these 10 ships
to a higher readiness status.
e Includes command ships, support ships, and sea basing connector ships.
Using the 260-ship fleet as a baseline, the range of 260 to 325 ships equates to
a 25% range of variability in the potential total number of ships. For some ship
categories — such as SSBNs and SSGNs — there is little or no difference between
the 260- and 325-ship fleets. For other categories of ships, there are substantial
percentage ranges of variability — 37% for cruisers, destroyers and frigates, 30% for
LCSs; 41% for amphibious ships; and 43% for maritime prepositioning ships. For
the remaining categories of ships — attack submarines, aircraft carriers, combat
logistics ships, and other ships — the ranges of variability are 10% or less. In the
CRS-7
case of aircraft carriers, the one-ship difference under two fleet plans can translate
into a substantial difference in Navy funding requirements and shipbuilding work.
When asked why the Navy hasn’t expressed its force-level requirements as a
single figure, as it has in the past, or as a more tightly focused range, Navy officials
have stated that additional analyses need to be performed to tighten the range, that
some of the variability is due to the Navy’s inability to predict the future with
precision, and that the Navy needs to work to refine these figures further to establish
a more stable set of requirements for ships.10
Capabilities-Based Planning and Numbers of Ships
How does capabilities-based planning relate to required numbers of Navy
ships?
As suggested in Admiral Clark’s above-cited February 2005 testimony, DOD
in recent years has altered the basis of its force planning, shifting from threat-based
planning to capabilities-based planning. Under threat-based planning, DOD planned
its forces based on what would be needed for conflict scenarios that were defined
fairly specifically. During the Cold War, for example, DOD planned forces that
would be sufficient, in conjunction with allied NATO forces, for fighting a multitheater conflict with the Soviet Union and its Warsaw Pact allies. Similarly, in the
first few years of the post-Cold War era, DOD planned forces that would be
sufficient for, among other things, fighting two nearly simultaneous regional
conflicts, one in the Persian Gulf region, the other on the Korean peninsula.
Under capabilities-based planning, DOD is now planning for U.S. military
forces to have a variety of abilities, so that they will be better able to respond to a
wide array of possible conflict scenarios. DOD officials have explained that the shift
to capabilities-based planning responds to the difficulty of predicting, in today’s
security environment, specific future threats and warfighting scenarios.
When asked about required numbers of Navy ships and aircraft, Navy and DoD
officials have argued, as Admiral Clark does in the above-cited testimony, that under
capabilities-based planning, numbers of ships and aircraft per se are not as important
as the total amount of capability represented in the fleet. That may be correct insofar
as the policy objective is to have a Navy with a certain desired set of capabilities, and
not simply one that happens to include a certain number of ships and aircraft. But
that is not the same as saying that a Navy with a desired set of capabilities cannot in
turn be described as one having certain numbers of ships and aircraft of certain types.
Although the Navy is currently working to resolve uncertainties concerning the
applicability of new technologies the Sea Swap concept, it arguably should become
possible at some point to translate a set of desired Navy into desired numbers of ships
and aircraft. Those numbers might be expressed as focused ranges rather than
10
See, for example, Geoff Fein, “Navy Needs To Better Refine Shipbuilding Numbers, Says
Sestak,” Defense Daily, Mar. 30, 2005 and Dave Ahearn, “Adm. Sestak Says Future
Shipbuilding Needs Must Be Flexible,” Defense Today, Mar. 30, 2005.
CRS-8
specific figures, and these focused ranges may change over time as missions,
technologies, and crewing concepts change. But to argue indefinitely that desired
naval capabilities cannot be translated into desired numbers of ships and aircraft
would be to suggest that the Navy cannot measure and understand the capabilities of
its own ships and aircraft. In this sense, the shift to capability-based planning does
not in itself constitute a rationale for permanently setting aside the question of the
planned size and structure of the fleet.
Independent Studies on Navy Force Structure
What independent studies are available concerning required numbers of Navy
ships?
Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) required the Secretary of Defense to provide for two independently performed
studies on potential future fleet platform architectures (i.e., potential force structure
plans) for the Navy. The two studies, which were conducted by the Center for Naval
Analyses (CNA) and the Office of Force Transformation (OFT, a part of the Office
of the Secretary of Defense), were submitted to the congressional defense committees
in February 2005.11
A third independent study on potential future fleet platform architectures, which
was conducted by the Center for Strategic and Budgetary Assessments (CSBA) on
its own initiative, was made available to congressional and other audiences in March
2005.
Appendix A summarizes these three studies.
Implications Of Ambiguity In Navy Force-Structure Plans
What are the potential implications for the Navy, Congress, and industry of
Navy ambiguity regarding required numbers of ships?
For the Navy. For the Navy, ambiguity concerning required numbers of Navy
ships provides time to resolve uncertainties concerning the applicability of new
technologies and the Sea Swap concept to various kinds of Navy ships. Navy (and
DOD) officials may also find this ambiguity convenient because it permits them to
speak broadly about individual Navy ship-acquisition programs without offering
many quantitative details about them — details which they might be held accountable
to later, or which, if revealed now, might disappoint Members of Congress or
industry officials.
This ambiguity may also, however, make it difficult for Navy officials, in
conversations with the Office of the Secretary of Defense (OSD), to defend programs
11
Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See pages 28-29 and 612-613 of H.Rept. 108-354, and pages 255-256
of the House report (H.Rept. 108-106 of May 16, 2003) on H.R. 1588.
CRS-9
for procuring Navy ships in certain total numbers or at certain annual rates because
OSD officials might view alternative total numbers or annual rates as sufficient for
maintaining a Navy that falls somewhere within the broad ranges of total numbers
of ships that Navy officials have presented in their testimony.
For Congress. Ambiguity concerning required numbers of Navy ships may
make it difficult, if not impossible, for Congress to conduct effective oversight by
reconciling desired Navy capabilities with planned Navy force structure, and planned
Navy force structure with supporting Navy programs and budgets. With the middle
element of this oversight chain expressed in only general terms, Congress may find
it difficult to understand whether proposed programs and budgets will produce a
Navy with DOD’s desired capabilities. The defense oversight committees in recent
years have criticized the Navy for presenting a confused and changing picture of
Navy ship requirements and procurement plans.12
For Industry. Ambiguity concerning required numbers of Navy ships may
make it easier for industry officials to pour into broad remarks from the Navy or
DOD their own hopes and dreams for individual programs. This could lead to
excessive industry optimism about those programs. Ambiguity concerning required
12
For example, the conference report (H.Rept. 107-772 of November 12, 2002) on the
FY2003 defense authorization act (P.L. 107-314/H.R. 4546) stated
In many instances, the overall Department of Defense ship acquisition
message is confused.... The conferees also believe that the DON shares blame
for this confusion because it has been inconsistent in its description of force
structure requirements. This situation makes it appear as if the Navy has not
fully evaluated the long-term implications of its annual budget requests....
The conferees perceive that DOD lacks a commitment to buy the number and
type of ships required to carry out the full range of Navy missions without
redundancy. The DON has proposed to buy more ships than the stated
requirement in some classes, while not requesting sufficient new hulls in other
classes that fall short of the stated requirement. Additionally, the conferees
believe that the cost of ships will not be reduced by continually changing the
number of ships in acquisition programs or by frequently changing the
configuration and capability of those ships, all frequent attributes of recent DON
shipbuilding plans. (Pages 449 and 450)
The House Appropriations Committee, in its report (H.Rept. 108-553 of June 18, 2004)
on the FY2005 DOD appropriations bill (H.R. 4613), stated:
The Committee remains deeply troubled by the lack of stability in the Navy’s
shipbuilding program. Often both the current year and out year ship construction
profile is dramatically altered with the submission of the next budget request.
Programs justified to Congress in terms of mission requirements in one year’s
budget are removed from the next. This continued shifting of the shipbuilding
program promotes confusion and frustration throughout both the public and
private sectors. Moreover, the Committee is concerned that this continual
shifting of priorities within the Navy’s shipbuilding account indicates uncertainty
with respect to the validity of requirements and budget requests in support of
shipbuilding proposals. (Page 164)
CRS-8
10
numbers of Navy ships can also cause business-planning uncertainty in areas such as
production planning, workforce management, facilities investment, companysponsored research and development, and potential mergers and
acquisitions.16
Potential Features of Next Navy Force Structure Plan
Based on press reports, what might the next Navy ship force structure plan look
like?
According to press reports, Navy and DOD officials are considering reducing
the attack submarine force level goal from 55 down to something in the low to mid40s, or perhaps as low as 37, and the planned number of expeditionary strike groups
(ESGs) from 12 down to 10, 9, or 8 Since each ESG currently includes three
amphibious ships, this suggests that the total number of amphibius ships might be
reduced from 36 down to 30, 27, or 24. In conjunction with its plans for amphibious
ships, the Navy reportedly is leaning toward building two Maritime Prepositioning
Force (Future), or MPF(F), squadrons, each with perhaps 5 to 8 ships, for a total of
10 to 16 MPF(F) ships.17 It has also been reported that the number of aircraft carriers
may be reduced, at least temporarily, from 12 to 11.18
1613
Potential Oversight Questions Arising From This Ambiguity
What potential oversight questions for Congress arise from the current
ambiguity regarding required numbers of Navy ships?
Potential oversight questions for Congress that arise from the current ambiguity
regarding required numbers of Navy ships include the following:
13
!
For each of the three ranges shown in the Navy’s 2005 testimony —
290 to 275 ships, 260 to 325 ships, and 243 to 302 ships — what
factors explain the difference between the low and high end of the
range?
!
Does the Navy anticipate narrowing the difference between the low
and high end of each range? If so, when? If not, why not?
!
What is the Navy’s view regarding the prospective affordability of
a Navy of 300 or more ships (i.e., as shown in the high ends of the
three ranges from the Navy’s 2005 testimony) as opposed to a Navy
of roughly 240 to 290 ships (as shown in the low ends of the three
ranges)?
A July 2004 press article, for example, states that
Philip Dur, chief executive officer of Northrop Grumman’s Shipbuilding
Systems, argued that the Navy’s concept of “capabilities versus numbers” not
only would hurt the service’s operations, but decimate the industry.
If the Navy decides it cannot afford 300 ships, it should come up with a
smaller number and set new ship construction plans based on that number, Dur
said.
It also would be helpful, he added, if both the Navy and the Coast Guard
jointly planned their long-term shipbuilding buys. “I do not know that either
service takes the other service’s capabilities into account,” he said. If both
services set their shipbuilding goals collectively, “then the shipbuilders can lay
out an investment plan, a hiring plan [and] a training plan that was predicated on
the assumption that we would competing for an X-number of platforms per year
on a going-forward basis,” Dur said....
If the Department of Defense can frame a requirement for ships and defend
it, the industry would make the necessary adjustments to either scale down or
ramp up, Dur told reporters during a recent tour of the company’s shipyards in
Louisiana and Mississippi.
(Roxana Tiron, “Lack of Specificity in Navy Shipbuilding Plans Irks the Industry,”
National Defense, July 2004.)
17
For discussions, see CRS Report RL32418, Navy Attack Submarine Force-Level Goal and
Procurement Rate: Background and Issues for Congress, by Ronald O’Rourke, and CRS
Report RL32513, Navy-Marine Corps Amphibious and Maritime Prepositioning Ship
Programs: Background and Oversight Issues for Congress, by Ronald O’Rourke.
18
Jason Sherman, “Memorandum Outlines Services’ Funding Plans,” Air Force Times,
August 23, 2004: 12; Dave Ahearn, “Sen. Warner Concerned Navy May Not Build Enough
(continued...)
CRS-9
There has been less reporting on possible Navy plans for surface combatants,
but there are at least two indications that Navy and DOD officials may be considering
reducing planned force levels for these ships as well. First, although the precise
effect of the Sea Swap concept on reducing force-level requirements has yet to be
determined, the Navy began experimenting with Sea Swap on surface combatants and
appears to view these ships as among those most suitable for the concept. Second,
the long-term Navy shipbuilding plan that the Navy submitted to Congress in 2003
showed a production rate of about two DD(X) destroyers or CG(X) cruisers per year
extending through FY2030, the final year covered in the plan. Assuming an average
35-year life for destroyers and cruisers, a two-per-year procurement rate, if
maintained over the long run, would eventually result in a force of about 70 larger
surface combatants, which is less than the 116 surface combatants in the 310-ship
plan from the 2001 QDR, the 104 larger surface combatants included in the Navy’s
375-ship proposal, and 103 surface combatants in service at the end of FY2004.
Since submarines, aircraft carriers, surface combatants, and amphibious ships
are the four major categories of combat ships that traditionally have helped to define
the size and structure of the Navy, potential reductions in force levels among these
ships can be used to prepare notional estimates of what the next Navy force structure
plan might look like. As shown in Table 1 below, for total fleet size, those estimates
range from about 250 ships to about 330 ships. The figure of about 250 ships results
from using lower potential numbers for various force structure elements, while the
figure of about 330 ships results from using higher potential numbers for various
elements.
Table 1 on the next page compares notional fleets of about 250 and 330 ships
to the 310-ship plan from the 2001 QDR and the Navy’s 375-ship proposal. It should
be emphasized that the two notional plans are meant to be illustrative. The next
officially approved Navy force structure plan will likely differ from the 250- and 330ship plans shown here. In addition, these notional plans are not an estimate of the
size of the fleet that the Navy might be able to afford in coming years, but of what
the Navy and DOD might state is required to produce a fleet with desired capabilities.
18
(...continued)
Ships,” Defense Today, August 26, 2004: 1. See also “Rumsfeld Says Navy Can Operate
With Fewer Carrier Groups,” Defense Today, September 24, 2004: 1.
CRS-10
Table 1. Notional Possibilities for the Next Navy Force
Structure Plan
(compared to 310-ship plan and 375-ship proposal)
Ship type
Ballistic missile submarines (SSBNs)
Cruise missile submarines (SSGNs)
Attack submarines (SSNs)
Aircraft carriers
Cruisers, destroyers, frigates
Littoral Combat Ships (LCSs)
Amphibious ships
Maritime prepositioning ships
Combat logistics ships
Command and support ships
Dedicated mine warfare ships
TOTAL battle force ships
310-ship
plan from
2001 QDR
Navy
375-ship
proposal
14
2 or 4a
55
12
116
0
36
0f
34
25
16
310 or 312
14
4
55
12
104
56
37
0f
42
25
26g
375
Notional future
plans
About
250
ships
14
4
37
11
70b
30d
24
10f
30
20
0h
250
About
330
ships
14
4
50
12
84c
45e
36
16f
34
25
8h
328
Source: Press reports, except as otherwise noted in footnotes below.
a The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s
proposed FY2001 DOD budget requested funding to support the conversion of two available Trident
SSBNs into SSGNs, and the retirement of two other Trident SSBNs. Congress, in marking up this
request, supported a plan to convert all four available SSBNs into SSGNs.
b The two-per-year procurement rate for DD(X) destroyers and CG(X) cruisers shown in the Navy
long-range shipbuilding plan delivered to Congress in 2003 would, if maintained over the long run,
eventually result in a force of 70 larger surface combatants.
c Replacing the 62 DDG-51 class Aegis destroyers procured through FY2005 and the final 22 CG-47
class Aegis cruisers on a one-for-one basis (while retiring the first 5 Aegis cruisers, as planned by the
Navy) would maintain a force of 84 larger combatants.
d This is the lower end of the range of about 30 to 60 ships that Navy officials have sometimes
mentioned as the potential total procurement quantity for the LCS program.
e This is half-way between the lower and higher ends of the range of about 30 to 60 ships that Navy
officials have sometimes mentioned as the potential total procurement quantity for the LCS program.
The higher end was associated with the Navy’s 375-ship proposal.
f Today’s 16 Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine
Corps operations ashore, rather than Navy combat operations, and thus are not counted as Navy battle
force ships. The Navy’s planned MPF(Future) ships, however, may be capable of contributing to
Navy combat capabilities (for example, by supporting Navy aircraft operations). For this reason, the
10 to 16 MPF(F) ships that may be built in coming years are counted here as battle force ships.
g The figure of 26 dedicated mine warfare ships appears to include 10 ships maintained in a reduced
mobilization status called Mobilization Category B. Ships in this status are not readily deployable and
thus do not count as battle force ships. The 375-ship proposal thus implied transferring these 10 ships
to a higher readiness status.
h The figure of 0 dedicated mine warfare ships assumes that mine warfare duties are completely taken
over by the 30 LCSs (for whom mine warfare is one of three primary stated missions) and by other
ships (such as six DDG-51 destroyers) equipped with so-called organic (i.e., built-in) mine warfare
systems. The figure of 8 mine warfare ships (which is half-way between 0 and the 16 in the 310-ship
plan) assumes that, even with 45 LCSs and some other ships equipped with organic mine warfare
capability, a few dedicated mine warfare ships are determined to be needed.
CRS-11
Potential Navy Plans for Shipbuilding Programs
Based on press reports, what might be the Navy’s new plans for individual
shipbuilding programs?
Table 2 below shows the draft FY2006-FY2011 shipbuilding plan that the Navy
reportedly submitted to OSD during the summer of 2004.19 Differences between this
draft plan and the Navy’s previous (FY2005-FY2009) shipbuilding plan, which the
Navy submitted to Congress in February 2004, are indicated by showing figures from
the previous plan in parentheses.20 The FY2005 column is included to show how
congressional action on the DD(X) destroyer program in FY2005 changed the
nominal profile for that program. The table also includes a line providing the total
number of ships other than LCSs. LCSs are scheduled to be built in shipyards other
than the six shipyards that have built the Navy’s major warships in recent years.
Table 2. Draft Navy Shipbuilding Plan for FY2006-FY2011
(Figures from previous plan shown in parentheses; FY2005 shown for reference)
Total
FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2006FY2011
CVN-21
0
0
(1) 0
(0) 1
0
0
(1) 0
(2) 1
SSN-774
1
1
1
1
2
2
2
9
CG(X)
0
0
0
0
0
0
(0) 1
(0) 1
DDG-51
3
0
0
0
0
0
0
0
(1) 0
0
(2) 1
(2) 1
(3) 2
2
(2) 1
(11) 7
LCS
1
(2) 1
(1) 2
3
(6) 5
5
5
(22) 21
LPD-17
1
1
1
1
(1) 0
(1) 0
(1) 0
(6) 3
LHA(R)
0
0
(0) 1
(1) 0
0
1
0
2
TAKE
2
(2) 1
1
(0) 1
0
0
0
3
TAOE(X)
0
0
0
0
(2) 1
(2) 1
(0) 2
4
DD(X)
19
Table entitled “Navy’s Proposed FY-05 Shipbuilding Plan (Compared to president’s FY05 budget request),” as printed in Inside the Navy, August 16, 2004: 5. The table as printed
in the magazine also included line items for additional items such as high-speed connectors
(or HSCs — a new term for fast transport ships), aircraft carrier refueling complex
overhauls (RCOHs), attack submarine (SSN) engineering refueling overhauls (EROs),
ballistic missile submarine (SSBN) EROs, a new type of amphibious landing craft called the
LCH(X), and a new type of air-cushioned landing craft (LCAC) called the LCAC(X).
20
Although the FY2005-FY2009 plan did not cover FY2010 and FY2011, the table as
printed in Inside the Navy includes figures for these years. These figures might reflect
previous internal Navy planning for those years.
CRS-12
Total
FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2006FY2011
MPF(F)
0
0
(1) 0
0
(2) 1
(2) 1
2
(7) 4
MPF(A)
0
0
0
0
(1) 0
0
0
(1) 0
TOTAL
(9) 8
(6) 4
(8) 7
(9) 8
(17) 11
(15) 12
13
(68) 55
TOTAL
less LCSs
(8) 7
(4) 3
(7) 5
(6) 5
(11) 6
(10) 7
8
(46) 34
Source: Inside the Navy, August 16, 2004: 5.
The following discusses the changes between this reported draft shipbuilding
plan and the previous shipbuilding plan.
Overall Ship Procurement Rate. Under the draft Navy plan, for the period
FY2006-FY2011, the total number of ships to be procured would be reduced from
68, or an average of about 11.3 ships per year, to 55, or an average of about 9.2 ships
per year. Assuming an average Navy ship life of 30 to 35 years, an average
procurement rate of about 11.3 ships per year would, over the long run, maintain a
fleet of 340 to 397 ships, while an average procurement rate of about 9.2 ships per
year would, over the long run, maintain a fleet of 275 to 321 ships.
Excluding LCSs so as to focus on ships that would likely be built by the six
yards that have built the Navy’s major warships in recent years,21 the total number of
ships to be built would be reduced from 46, or an average of about 7.7 ships per year,
to 34 under the draft plan, or an average of about 5.7 ships per year. Assuming an
average Navy ship life of 30 to 35 years, an average procurement rate of about 7.7
ships per year other than LCSs would, over the long run, maintain a fleet that
included 230 to 268 ships other than LCSs, while an average procurement rate of
about 5.7 ships per year other than LCSs would, over the long run, maintain a fleet
that included 170 to 198 ships other than LCSs.
Individual Shipbuilding Programs.
CVN-21 Aircraft Carrier Program. The draft Navy plan defers the
procurement of the next aircraft carrier, called CVN-21, by a year, to FY2008. This
may have been due to need to finance the procurement in FY2007 of the lead DD(X)
destroyer and the LHA(R) amphibious assault ship. The draft Navy plan also defers
21
These six yards include Bath Iron Works (BIW) of Bath, ME, the Electric Boat Division
of Groton, CT, and Quonset Point, RI, and National Steel and Shipbuilding Company
(NASSCO) of San Diego, CA, all of which are owned by General Dynamics Corporation;
and Avondale Shipyards near New Orleans, LA, Ingalls Shipbuilding of Pascagoula, MS,
and Newport News Shipbuilding of Newport News, VA, all of which are owned by
Northrop Grumman Corporation.
CRS-13
the procurement of the carrier after CVN-21 from FY2011 to some future fiscal
year.22
SSN-774 Attack Submarine Program. The draft Navy plan does not
change the procurement profile for the Virginia (SSN-774) class attack submarine
program.23
CG(X) Cruiser Program. The draft Navy plan would accelerate the
procurement of the first CG(X) cruiser to FY2011. The long-range shipbuilding plan
that the Navy submitted to Congress in 2003 showed the first CG(X) cruiser being
procured in FY2018.24
DDG-51 Destroyer Program. The draft Navy plan does not change the
procurement profile for the Arleigh Burke (DDG-51) class Aegis destroyer program.
This profile calls for the three DDG-51s procured in FY2005 to be the last ships in
the program.
DD(X) Destroyer Program. The table suggests that the draft Navy plan
defers the procurement of the lead DD(X) destroyer by two years, to FY2007. The
actual effect of the draft Navy plan on the schedule for building this ship, however,
may be less dramatic. The Navy’s FY2005 budget submission proposed funding the
construction of the lead DD(X) in the Navy’s research and development account
through a stream of annual funding increments stretching out to FY2011 — an
approach commonly known as incremental funding. Under this proposed scheme,
the Navy had some flexibility to choose which year to record as the nominal year of
procurement for the lead DD(X). The Navy chose FY2005, the year of the first
scheduled increment, even though the amount of funding requested for the FY2005
increment equated to only about 8% of the ship’s total cost, leaving the remaining
92% of the ship’s cost to be provided in
CRS-11
Navy FY2006-FY2011 Ship-Procurement Plan
What are the Navy’s plans for procuring ships under the proposed FY2006
budget and FY2006-FY2011 FYDP?
Table 2 below shows the Navy’s FY2006-FY2011 ship-procurement plan.
Table 2. Navy FY2006-FY2011 Ship-Procurement Plan
(Ships fully funded in FY2005 shown for reference)
FY05
FY06
FY07
FY08
FY09
FY10
1
CVN-21
SSN-774
1
DDG-51
3
1
1
1
1
1
1
1
1
1
1
CG(X)
LCS
1
1
2
LPD-17
1
1
1
3
5
1
6
1
1
5
1
5
1
1
5
21
2
1
LHA(R)
2
Total
FY06FY11
0
DD(X)
TAKE
FY11
1
2
1
3
TAOE(X)
1
1
2
4
MPF(F)
1
1
2
4
0
MPF(A)
TOTAL
8
4
7
7
9
10
12
49
TOTAL
less LCSs
7
3
5
4
4
5
7
28
Source: Department of the Navy, Highlights of the Department of the Navy FY 2006 Budget, Chart
14 (p. 5-1).
The following discusses this ship-procurement plan in terms of overall shipprocurement rate and individual ship-procurement programs.
Overall Ship Procurement Rate. The FY2006-FY2011 plan would procure
a total of 49 ships, or an average of about 8.2 ships per year. Assuming an average
Navy ship life of 30 to 35 years, an average procurement rate of about 8.2 ships per
year would, over the long run, maintain a fleet of 245 to 286 ships.
CRS-12
The relatively small Littoral Combat Ships (LCSs) shown in the table are to be
built by yards other than the six yards that have built the Navy’s major warships in
recent years.14 Excluding LCSs so as to focus on larger ships that would likely be
built by these six yards, the total number of larger ships to be 28, or an average of
about 4.7 ships per year. Assuming an average Navy ship life of 30 to 35 years, an
average procurement rate of about larger 4.7 ships per year other than LCSs, if
maintained over the long run, would maintain a fleet that included 140 to 163 ships
other than LCSs.
Individual Shipbuilding Programs.
CVN-21 Aircraft Carrier Program. Compared to the FY2005-FY2009 shipprocurement plan submitted to Congress in February 2004, the FY2006-FY2011 plan
would defer the procurement of the next aircraft carrier, called CVN-21, by a year,
to FY2008. This may have been due to need to finance the procurement in FY2007
of other ships, including the lead DD(X) destroyer and the LHA(R) amphibious
assault ship. The FY2006-FY2011 plan would also defer the procurement of the
carrier after CVN-21 from FY2011 to some future fiscal year.15
SSN-774 Attack Submarine Program. The FY2006-FY2011 plan would
maintain the procurement rate for Virginia (SSN-774) class attack submarines at one
per year through FY2011. The FY2005-FY2009 plan had called for increasing
Virginia-class procurement to two per year starting in FY2009.16
DDG-51 Destroyer Program. The FY2006-FY2011 plan leaves unchanged
the previous procurement profile for the Arleigh Burke (DDG-51) class Aegis
destroyer program. This profile calls for the three DDG-51s procured in FY2005 to
be the last ships in the program.
DD(X) Destroyer Program. The FY2006-FY2011 plan would reduce
procurement of DD(X) destroyers to one ship per year for the period FY2007FY2011. The FY2005-FY2009 plan had called for procuring a total of eight ships
through FY2009 — one in FY2005, two in FY2007, another two in FY2008, and
three in FY2009.
A comparison of the FY2006-FY2011 plan to the FY2005-FY2009 plan
suggests at first that the FY2006-FY2011 plan has deferred the procurement of the
14
These six yards include Bath Iron Works (BIW) of Bath, ME, the Electric Boat Division
of Groton, CT, and Quonset Point, RI, and National Steel and Shipbuilding Company
(NASSCO) of San Diego, CA, all of which are owned by General Dynamics Corporation;
and Avondale Shipyards near New Orleans, LA, Ingalls Shipbuilding of Pascagoula, MS,
and Newport News Shipbuilding of Newport News, VA, all of which are owned by
Northrop Grumman Corporation.
15
For more on the CVN-21 program, see CRS Report RS20643, Navy CVN-21 Aircraft
Carrier Program: Background and Issues for Congress, by Ronald O’Rourke.
16
For more on the SSN-774 program, see CRS Report RL32418, Navy Attack Submarine
Force-Level Goal and Procurement Rate: Background and Issues for Congress, by Ronald
O’Rourke.
CRS-13
lead DD(X) destroyer by two years, to FY2007. The actual effect of the FY2006FY2011 plan on the schedule for building this ship, however, may be less dramatic.
The Navy’s FY2005-FY2009 plan proposed funding the construction of the lead
DD(X) in the Navy’s research and development account through a stream of annual
funding increments stretching out to FY2011 — an approach commonly known as
incremental funding. Under this proposed scheme, the Navy had some flexibility to
choose which year to record as the nominal year of procurement for the lead DD(X).
The Navy chose FY2005, the year of the first scheduled increment, even though the
amount of funding requested for the FY2005 increment equated to only about 8% of
the ship’s total cost, leaving the remaining 92% of the ship’s cost to be provided in
future years.
Congress, in acting on the Navy’s proposed FY2005 budget, approved the
Navy’s FY2005 funding request for the lead DD(X) but directed that the ship be
procured the traditional way, through the Navy’s shipbuilding account (known
formally as the Shipbuilding and Conversion, Navy, or SCN, account), and that the
ship be it be
funded the traditional way, in accordance with the full funding policy, which
requires requires
that items acquired through the procurement title of the DOD appropriation
act be
fully funded in the year they are procured.25 Consistent with this direction, the
22
For more on the CVN-21 program, see CRS Report RS20643, Navy CVN-21 Aircraft
Carrier Program: Background and Issues for Congress, by Ronald O’Rourke.
23
For more on the SSN-774 program, see CRS Report RL32418, Navy Attack Submarine
Force-Level Goal and Procurement Rate: Background and Issues for Congress, by Ronald
O’Rourke.
24
For more on the CG(X) program, see CRS Report RL32109, Navy DD(X) and LCS Ship
Acquisition Programs: Oversight Issues and Options for Congress, by Ronald O’Rourke.
25
For more on the full funding policy, see CRS Report RL31404, Defense Procurement:
Full Funding Policy — Background, Issues, and Options for Congress, by Ronald O’Rourke
(continued...)
CRS-1417 Consistent with this direction, the
FY2005 funding increment was designated as advance procurement (AP) funding for
a shiplead DD(X) to be procured in some future fiscal year.
Abiding by this direction will requirerequired the Navy to alter its funding profile for the
lead DD(X) to one that fully funds the ship in a particular year. The draft Navy plan
FY2006FY2011 plan suggests that the Navy, after examining its options, selected FY2007
as the year in
which the ship would be fully funded. It is not clear, however, whether
the actual
schedule for building the lead ship will be significantly affected by this
change in
funding profile and nominal year of procurement. Consequently, although the
the nominal year of procurement for the lead DD(X) appears to have been deferred two
two years, this may overstate the actual amount of change in the schedule for the lead
ship.
The draftFY2006-FY2011 Navy plan does, however, deferdefers the procurement of the second
DD(X)
by a year, to FY2008, and reduces to sevenfive the total number of DD(X)s to be
procured through FY2011.
Under previous plans, the Navy envisioned stopping
DD(X) procurement at
about the time that it started CG(X) procurement. If the lead
CG(X) is procured in
FY2011, as shown in the draft NavyFY2006-FY2011 plan, and there is a gap
year in FY2012
between the procurement of the lead CG(X) and follow-on CG(X)s
starting in
FY2013, then twoa final DD(X)s might be procured in FY2012. If so, then
the total
procurement quantity for the DD(X) program would be nine ships, which
could be viewed as consistent with a plan to provide one DD(X) for each of nine
ESGs.26
Littoral Combat Ship (LCS) Program. The draft Navy plan defers
six ships.18
17
For more on the full funding policy, see CRS Report RL31404, Defense Procurement:
Full Funding Policy — Background, Issues, and Options for Congress, by Ronald O’Rourke
and Stephen Daggett.
18
For more on the DD(X) program, see CRS Report RS21059, Navy DD(X) Destroyer
Program: Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
(continued...)
CRS-14
CG(X) Cruiser Program. The FY2006-FY2011 plan would accelerate the
procurement of the first CG(X) cruiser to FY2011. The long-range shipbuilding plan
that the Navy submitted to Congress in 2003 showed the first CG(X) cruiser being
procured in FY2018.19
Littoral Combat Ship (LCS) Program. The FY2006-FY2011 plan would
defer procurement of the third LCS by a year, to FY2007. This is consistent with
Congress’ direction, in acting on the Navy’s FY2005 budget request, to fully fund a
lead LCS in FY2005 but require a gap year between the procurement of a lead LCS
and any follow-on LCSs built to that same design. The Navy plans to procure two
lead LCSs to different designs developed by two competing industry teams. Under
the Navy’s draftFY2006-FY2011 plan, the single ship now planned for FY2006 would
presumably be
the second lead LCS, and the two LCSs now planned for FY2007
would presumably
be follow-on ships built to the same design as the lead LCS
procured in FY2005.
The draft The FY2006-FY2011 plan would also reduce the number of
LCSs procured in FY2009 from six
ships to five. This can be viewed as consistent
with the Navy’s longer-range
projection for the LCS program, which has envisioned
a sustaining procurement rate
of five ships per year through the end of the program,
as shown by the figures for
FY2010 and FY2011.27
25
(...continued)
and Stephen Daggett.
26
For more on the DD(X) program, see CRS Report RS21059, Navy DD(X) Destroyer
Program: Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
27
For more on the LCS program, see CRS Report RS21305, Navy Littoral Combat Ship
(LCS): Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
(continued...)
CRS-15
LPD-17 Amphibious Ship Program. The draft Navy plan shows the
elimination of three San Antonio (LPD-17) class amphibious ships from the period
FY2009-FY2011. This is somewhat confusing, since procuring these three ships
would result in a total procurement of 13 LPD-17s, whereas previous Navy plans
called for procuring a total of 12 LPD-17s, with the final LPD-17 being procured in
FY2010. Either way, if the final LPD-17 is procured in FY2008, as shown in the
draft plan, a total of 10 LPD-17s would be procured. A figure of 10 LPD-17s could
be viewed as consistent with a plan to provide one LPD-17 for each of 10 ESGs.28
According to a September, 2004 press article, Secretary of the Navy Gordon England
expressed a firm commitment to procure nine LPD-17s but was noncommittal about
building any additional LPD-17s beyond that.29
LHA(R) Amphibious Ship Program. The draft Navy plan would accelerate
the procurement of LHA(R), an amphibious assault ship, by one year, to FY2007.
Although the Navy’s FY2005-FY2009 shipbuilding plan scheduled procurement of
LHA(R) for FY2008, its previous (i.e., FY2004-FY2009) shipbuilding plan, which
the Navy submitted to Congress in February 2003, showed LHA(R) in FY2007.
Accelerating procurement of LHA(R) to FY2007 can thus be viewed as restoring the
year of procurement shown in the plan submitted to Congress in 2003.30
TAKE Auxiliary Cargo Ship Program. The draft Navy plan effectively
defers one of the two Lewis and Clark (TAKE-1) class auxiliary cargo ships
previously planned for FY2006 to FY2008.
TAOE(X) Replenishment Ship Program. The draft Navy plan would
reduce procurement of new TAOE(X) auxiliary underway replenishment ships to one
ship per year in FY2009 and FY2010, deferring the two additional ships previously
planned for these years to FY2011.
MPF(F) Maritime Prepositioning Ship (Future) Program. The draft
Navy plan would defer procurement of the first Maritime Prepositioning Force
(Future) ship by two years, to FY2009, and reduce the total number of MPF(F)s
procured through FY2011 from seven (plus one additional MPF(A) ship; see next
item below) to four.31
27
(...continued)
for Congress, by Ronald O’Rourke.
28 FY2010 and FY2011.20
LPD-17 Amphibious Ship Program. The FY2006-FY2011 plan would end
procurement of San Antonio (LPD-17) class amphibious ships after procuring the
ninth ship in the class in FY2007. Previous plans had generally called for building
a total of 12 LPD-17s.21
LHA(R) Amphibious Ship Program. Compared to the FY2005-FY2009
plan, the FY2006-FY2011 plan would accelerate the procurement of LHA(R), an
amphibious assault ship, by one year, to FY2007. The FY2004-FY2009 shipbuilding
plan that the Navy submitted to Congress in February 2003 showed LHA(R) in
FY2007. Accelerating procurement of LHA(R) to FY2007 can thus be viewed as
restoring the year of procurement shown in the plan submitted to Congress in 2003.22
18
(...continued)
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
19
For more on the CG(X) program, see CRS Report RL32109, Navy DD(X) and LCS Ship
Acquisition Programs: Oversight Issues and Options for Congress, by Ronald O’Rourke.
20
For more on the LCS program, see CRS Report RS21305, Navy Littoral Combat Ship
(LCS): Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
21
For more on the LPD-17 program, see CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.
29
Keith Darce, “Navy Commits To Building 9 Warships,” New Orleans Times-Pacayune,
September 11, 2004.
30
22
For more on the LHA(R) program, see CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.
31
For more on the MPF(F) program, see CRS Report RL32513, op cit.
CRS-16
CRS-15
TAKE Auxiliary Cargo Ship Program. Compared to the FY2005-FY2009
plan, the FY2006-FY2011 plan would effectively defer one of the two Lewis and
Clark (TAKE-1) class auxiliary cargo ships previously planned for FY2006 to
FY2008.
TAOE(X) Replenishment Ship Program. The FY2005-FY2009 plan
called for procuring the first two TAOE(X) ships in FY2009. The FY2006-FY2011
plan reduces the FY2009 procurement to one ship.
MPF(F) Maritime Prepositioning Ship (Future) Program. Compared
to the FY2005-FY2009 plan, the FY2006-FY2011 plan would defer procurement of
the first Maritime Prepositioning Force (Future) ship by two years, to FY2009.23
MPF(A) Maritime Prepositioning Ship (Aviation) Program. Previous
Navy plans distinguished between the basic MPF(F) ship and an aviation variant
called MPF(A). The draft Navy plan either cancelsFY2006-FY2011 plan would either cancel the MPF(A) effort or ends the
or end the distinction by folding the MPF(A) back into the MPF(F) program.
Issues for Congress
Number of Ships in the Navy
In terms of numbers of ships, how large a Navy does the United States need,
and what current force-planning issues may affect these numbers?
Capabilities-Based Planning and Numbers of Ships. As a result of the
shift to capabilities-based planning, Navy and DOD officials are seeking to acquire
a Navy with a certain set of desired capabilities, rather than a Navy that happens to
have a certain number of ships and aircraft. As discussed in the Background section,
however, once the Navy and DOD identify a desired set of capabilities for the Navy,
it should become possible at some point to translate those desired capabilities into
a force structure plan for a Navy that includes numbers of ships and aircraft, although
those numbers might be expressed as ranges rather than discrete figures. In this
sense, even under capabilities-based planning, it is legitimate to ask Navy and DOD
officials how large a Navy they are planning in terms of numbers of ships. When the
Navy and DOD provide a force structure plan with these numbers, Congress will
have an opportunity to assess its adequacy.
Historical Fleet Numbers As A Yardstick. Historical figures for the total
number of ships in the Navy are not necessarily a reliable yardstick for assessing the
adequacy of today’s Navy or a future planned Navy that includes a certain number
of ships, particularly if the historical figures are more than a few years old, because
the missions to be performed by the Navy, the mix of ships that make up the Navy,
and the technologies that are available to Navy ships for performing missions all
change over time. Due to changes in these variables, the historical number of ships
in the fleet is at best a partial guide, and at worst a potentially misleading guide, to
23
For more on the MPF(F) program, see CRS Report RL32513, op. cit.
CRS-16
whether today’s Navy is adequate, or a future Navy that includes a certain number
of ships would be adequate, for performing its required missions.
The Navy, for example, reached a late-Cold War peak of 568 battle force ships
at the end of FY1987,3224 and as of October 21, 2004 had declined to a total of 289
32
Some publications, such as those of the American Shipbuilding Association, state that the
Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total
number of active ships in the fleet, which is not the same as the total number of battle force
ships. In recent years, the total number of active ships has been larger than the total number
of battle force ships. For example, the Naval Historical Center states that as of November
16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of
November 19, 2001, the Navy included a total of 317 battle force ships. Although the total
number of battle force ships as of October 6, 2004 was 290, the total number of active ships
(continued...)
CRS-17February 16, 2005 had declined to a total of 290
battle force ships. The FY1987 fleet, however, was intended to meet a set of mission
requirements that focused on countering Soviet naval forces at sea during a potential
multi-theater NATO-Warsaw Pact conflict, while the October 2004 fleet is intended
to meet a considerably different set of mission requirements centered on influencing
events ashore by countering both land- and sea-based military forces of potential
regional threats other than Russia, including non-state terrorist organizations. In
addition, the Navy of FY1987 differed substantially from the October 2004 fleet in
areas such as profusion of precision-guided air-delivered weapons, numbers of
Tomahawk-capable ships, and sophistication of C4ISR systems.3325
Fifteen or so years from now, Navy missions may have shifted again, to include,
as a possible example, a greater emphasis on being able to counter Chinese maritime
military capabilities. In addition, the capabilities of Navy ships will likely have
changed further by that time due to developments such as more comprehensive
implementation of networking technology and increased use of ship-based unmanned
vehicles.
The 568-ship fleet of FY1987 may or may not have been capable of performing
its stated missions; the 289290-ship fleet of October 2004February 2005 may or nor may not be capable
capable of performing its stated missions; and a fleet 15 or so years from now with
a certain
number of ships may or may not be capable of performing its stated
missions. Given
changes over time in mission requirements, ship mixes, and
technologies, however,
these three issues are to a substantial degree independent of
one another.
For similar reasons, trends over time in the total number of ships in the Navy are
not necessarily a reliable indicator of the direction of change in the fleet’s ability to
perform its stated missions. An increasing number of ships in the fleet might not
necessarily mean that the fleet’s ability to perform its stated missions is increasing,
because the fleet’s mission requirements might be increasing more rapidly than ship
numbers and average ship capability. Similarly, a decreasing number of ships in the
fleet might not necessarily mean that the fleet’s ability to perform stated missions is
decreasing, because the fleet’s mission requirements might be declining more rapidly
than numbers of ships, or because average ship capability and the percentage of time
that ships are in deployed locations might be increasing quickly enough to more than
offset reductions in total ship numbers.
Previous Force Structure Plans As A Yardstick. Previous Navy force
structure plans might provide some insight into the potential adequacy of a proposed
new force-structure plan, but changes over time in mission requirements,
32
(...continued)
24
Some publications, such as those of the American Shipbuilding Association, state that the
Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total
number of active ships in the fleet, which is not the same as the total number of battle force
ships. In recent years, the total number of active ships has been larger than the total number
of battle force ships. For example, the Naval Historical Center states that as of November
16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of
November 19, 2001, the Navy included a total of 317 battle force ships. Although the total
number of battle force ships as of October 6, 2004, was 290, the total number of active ships
as of this date was likely more than 300. Comparing the total number of active ships in one
year to the total number of battle force ships in another year is thus an apple-to-oranges
comparison that in this case overstates the decline since FY1987 in the number of ships in
the Navy. As a general rule to avoid potential statistical distortions, comparisons of the
number of ships in the Navy over time should use, whenever possible, a single counting
method.
3325
C4ISR stands for command and control, communications, computers, intelligence,
surveillance, and reconnaissance.
CRS-1817
necessarily mean that the fleet’s ability to perform its stated missions is increasing,
because the fleet’s mission requirements might be increasing more rapidly than ship
numbers and average ship capability. Similarly, a decreasing number of ships in the
fleet might not necessarily mean that the fleet’s ability to perform stated missions is
decreasing, because the fleet’s mission requirements might be declining more rapidly
than numbers of ships, or because average ship capability and the percentage of time
that ships are in deployed locations might be increasing quickly enough to more than
offset reductions in total ship numbers.
Previous Force Structure Plans As A Yardstick. Previous Navy force
structure plans might provide some insight into the potential adequacy of a proposed
new force-structure plan, but changes over time in mission requirements,
technologies available to ships for performing missions, and other force-planning
factors suggest that some caution should be applied in using past force structure plans
for this purpose. The Reagan-era plan for a 600-ship Navy was designed for a Cold
War set of missions focusing on countering Soviet naval forces at sea, which is not
an appropriate basis for planning the Navy today, while more recent Navy forcestructure plans, including the Navy’s 375-ship proposal of 2002-2004, do not appear
to reflect
potential changes now being discussed by Navy officials, such as additional forward
forward homeporting of ships, widespread application of the Sea Swap concept, and
implementation of the new sea basing concept for conducting expeditionary
operations ashore.34
Current Force-Planning Issues. Current force-planning issues that
Congress may consider in assessing how large a Navy the United States needs
include the following:
!
!
sea-based missile defense;
the sea basing concept for conducting expeditionary operations
ashore;
3426
26
Recent Navy force structure plans include the Reagan-era 600-ship plan of the 1980s, the
Base Force fleet of more than 400 ships planned during the final two years of the George
H. W. Bush Administration, the 346-ship fleet from the Clinton Administration’s 1993
Bottom-Up Review (or BUR, sometimes also called Base Force II), the 310-ship fleets of
the Clinton Administration’s 1997 QDR and the George W. Bush Administration’s 2001
QDR, and the Navy’s 375-ship proposal. The table below summarizes some key features
of these plans.
Features of Recent Navy Force Structure Plans
375-ship
proposal
1997 QDR 2001 QDR
(20022004)
600-ship
Base Force
1993
BUR
TOTAL ships
~600
~450/416a
346
~305/310b
~310
375
Attack submarines
100
80/~55c
45-55
50/55d
55e
55e
Aircraft carriers
15f
12
11+1g
11+1g
12
12
242/228h
~150
~124
116
116
160i
Plan
Surface combatants
1997 QDR 2001 QDR
375-ship
proposal
51k
36k
36k
36k
37
~75j~75j
51k
36k
36k
36k
37
Plan
Surface combatants
Amphibious ships
Source: Prepared by CRS based on DOD and U.S. Navy data.
a Commonly referred to as 450-ship plan, but called for decreasing to 416 ships by end of FY1999.
b Original total of about 305 ships was increased to about 310 due to increase in number of attack
submarines to 55 from 50.
c Plan originally included 80 attack submarines, but this was later reduced to about 55.
d Plan originally included 50 attack submarines but this was later increased to 55.
e Plus 2 or 4 additional converted Trident cruise missile submarines (SSGNs) for the 2001 QDR plan
and 4 additional SSGNs for the 375-ship proposal.
f Plus one additional aircraft carrier in the service life extension program (SLEP).
g 11 active carriers plus 1 operational reserve carrier.
h Plan originally included 242 surface combatants but this was later reduced to 228.
i Figure includes 56 LCSs. Other plans shown include no LCSs.
j Number needed to lift assault echelons of 1 Marine Expeditionary Force (MEF) plus 1 Marine
Expeditionary Brigade (MEB).
k Number needed to lift assault echelons of 2.5 MEBs. Note how number needed to meet this goal
changed from Base Force plan to the BUR plan — a result of new, larger amphibious ship designs.
CRS-19
!
!
!
!
!
!
naval requirements for the global war on terrorism and for irregular
conflicts such as insurgencies;
naval requirements to address the possible emergence over the next
10 to 25 years of significantly more capable Chinese maritime
military forces;
new technologies that may affect U.S. Navy ship capabilities;
additional forward homeporting and the Sea Swap concept;
DOD’s increased emphasis on achieving full jointness in U.S.
military plans and operations; and
potential tradeoffs between funding Navy requirements and funding
competing defense requirements.
Sea-based Missile Defense. The Navy would likely play a role in any
future U.S. missile defense system, but the nature of that role is not yet well defined,
because the Missile Defense Agency (MDA) is only in the early stages of defining
its preferred eventual overall missile-defense architecture.
(continued...)
CRS-18
Current Force-Planning Issues. Current force-planning issues that
Congress may consider in assessing how large a Navy the United States needs
include the following:
!
!
!
!
!
!
!
!
new technologies that may affect U.S. Navy ship capabilities;
additional forward homeporting and the Sea Swap concept;
sea-based missile defense;
the sea basing concept for conducting expeditionary operations
ashore;
naval requirements for the global war on terrorism and for irregular
conflicts such as insurgencies;
naval requirements to address the possible emergence over the next
10 to 25 years of significantly more capable Chinese maritime
military forces;
DOD’s increased emphasis on achieving full jointness in U.S.
military plans and operations; and
potential tradeoffs between funding Navy requirements and funding
competing defense requirements.
Each of these is discussed briefly below.
New Technologies. New technologies that will likely affect the capabilities
of Navy ships in coming years, and consequently the number of ships that may be
needed to perform a given set of missions, include improved radars and other sensors
(including miniaturized sensors), improved computers and networking systems,
unmanned vehicles, reduced-size, precision-guided, air-delivered weapons, rail guns,
directed-energy weapons, and integrated electric drive propulsion technology, to
name just a few. Although the effect of improving technology historically has often
been to increase the capability of individual Navy ships and thereby permit a
reduction in the number of Navy ships needed to perform a stated set of missions,
some analysts believe that networking technology and reduced-sized sensors may
argue in favor of a more distributed force structure that includes a larger number of
smaller ships such as the LCS.
Forward Homeporting and Sea Swap. Other things held equal,
homeporting additional Navy ships in forward locations such as Guam and Hawaii,
and applying the Sea Swap concept to a significant portion of the fleet, could reduce,
perhaps substantially, the total number of Navy ships needed to maintain a certain
number of Navy ships in overseas operating areas on a day-to-day basis.
26
(...continued)
and 4 additional SSGNs for the 375-ship proposal.
f Plus one additional aircraft carrier in the service life extension program (SLEP).
g 11 active carriers plus 1 operational reserve carrier.
h Plan originally included 242 surface combatants but this was later reduced to 228.
i Figure includes 56 LCSs. Other plans shown include no LCSs.
j Number needed to lift assault echelons of 1 Marine Expeditionary Force (MEF) plus 1 Marine
Expeditionary Brigade (MEB).
k Number needed to lift assault echelons of 2.5 MEBs. Note how number needed to meet this goal
changed from Base Force plan to the BUR plan — a result of new, larger amphibious ship designs.
CRS-19
Navy officials, for example, have stated that in terms of resulting operating days
in the Pacific, a Guam-homeported attack submarine is the equivalent of an average
of about 2.3 attack submarines homeported in the Third Fleet (i.e., in San Diego or
Pearl Harbor).27 The Congressional Budget Office, in a March 2002 report on the
attack submarine force, stated that the ratio might be higher, with a
Guam-homeported attack submarine equivalent in operating days to about three
attack submarines homeported elsewhere.28
Recent experiments with the Sea Swap concept on surface combatants sent on
long deployments to the Indian Ocean/Persian Gulf region suggest that the concept,
if widely applied, might reduce the total number of surface combatants needed to
maintain a certain number in forward-deployed locations by 20% or more.29 The
Navy reportedly is considering increasing the number of attack submarines
homeported at Guam and transferring one of its continental-U.S.-homeported aircraft
carriers to either Hawaii or Guam.
A key planning consideration is the potential difference between the number of
Navy ships required for maintaining day-to-day forward deployments and the number
required for fighting conflicts. Forward homeporting and Sea Swap affect primarily
the former rather than the latter. As a consequence, for some types of ships,
additional forward homeporting and use of Sea Swap might reduce the number
needed for maintaining day-to-day forward deployments below the number needed
for fighting conflicts. In such cases, fully implementing the force-level economies
suggested by forward homeporting and Sea Swap could leave the Navy with
inadequate forces for fighting conflicts.
Sea-based Missile Defense. The Navy would likely play a role in any U.S.
missile defense system, but the nature of that role is not yet well defined, because the
United States Strategic Command (Stratcom) and the Missile Defense Agency
(MDA) are only in the early stages of defining its preferred eventual overall missiledefense architecture.
27
In a “memorandum for interested members of Congress” on the homeporting of attack
submarines in Guam dated Jan. 22, 2001, the Navy stated: “Three attack submarines
homeported in Guam will provide a total of 300 days (on average) of operations and
engagement per year. Those submarines would provide 130 days of operations and
engagement per year if they were homeported in [the] Third Fleet [i.e., Eastern Atlantic] and
deployed to [the] Seventh Fleet [i.e., Western Pacific] in accordance with current
guidelines,” 300 divided by 130 is about 2.3. The text of the memo was reprinted in the Feb.
12, 2001, issue of Inside the Navy under the headline, “Text: Navy Memo on Subs in
Guam,” For the accompanying news story, see Christian Bohmfalk, “Basing Attack Subs On
Guam Expected To Increase Fleet’s Presence,” Inside the Navy, Feb. 12, 2001. For
additional discussion, see CRS Report RL32418, Navy Attack Submarine Force-Level Goal
and Procurement Rate: Background and Issues for Congress, by Ronald O’Rourke, pp. 3033.
28
Congressional Budget Office, Increasing the Mission Capability of the Attack Submarine
Force, Mar. 2002, p. 11.
29
For additional discussion, see CRS Report RS21338, Navy Ship Deployments: New
Approaches — Background and Issues for Congress, by Ronald O’Rourke. pp. 4-5.
CRS-20
Navy ships could contribute to a U.S. missile defense system by acting as
platforms for both radars and interceptor missiles. Sea-based radars could be placed
on surface combatants or on non-combatant platforms such as auxiliary ships or
floating structures resembling offshore oil platforms. Several U.S. Navy surface
combatants have recently been designated to operate on a rotational basis in the Sea
of Japan as forward radar platforms for detecting potential ballistic missile launches
from North Korea. Sea-based interceptor missiles could be based on either
submarines, surface combatants, or noncombatant platforms. Submarines might be
particularly suitable as boost-phase interceptor platforms, while noncombatant
platforms might be particularly suitable as midcourse radar or interceptor platforms.
Surface combatants might be suitable as either.
Eventual decisions on the overall missile defense architecture consequently
could affect Navy requirements for submarines, surface combatants, and auxiliary
ships. A new Navy force structure plan that errs badly in anticipating the Navy’s
eventual role in the overall missile defense architecture could leave the country with
a surplus or shortfall of ships in one or more of these categories. A shortfall could
create a tension between performing sea-based missile defense and performing other
Navy missions, while a surplus would suggest that the funds used to build some ships
might have been better used for other purposes. If Stratcom and MDA can take steps
to better
define the Navy’s role in the overall missile-defense architecture, this could reduce
reduce the potential for the next Navy force structure plan to result in such a surplus or
or shortfall.
Sea Basing Concept. Implementing the sea basing concept would affect
requirements for numbers and types of amphibious ships and MPF(F) ships. It might
also affect requirements for surface combatants such as the DD(X) and the LCS.
Exactly how implementing sea basing would affect these requirements, however, is
not yet clear because the number of sea basing squadrons, and their composition, is
still being examined.
Global War on Terrorism and Irregular Warfare. The potential effects
of the global war on terrorism and irregular conflicts such as insurgencies on
CRS-20
requirements for U.S. ground forces have received much attention in recent months.
The potential effects of these factors on requirements for U.S. naval forces, in
contrast, has received less attention. PossibleIn terms of ships, possible effects on
requirements for U.S. naval
forces include an increased emphasis on one or more of
the following:
!
ships (such as attack submarines, surface combatants, or aircraft
carriers) that can conduct offshore surveillance of suspected
terrorists and irregular military forces using either built-in sensors or
embarked unmanned vehicles;
!
ships (such as surface combatants, and perhaps particularly smaller
and less heavily armed combatants like the LCS) for conducting
CRS-21
coastal patrol and intercept operations, including countering small
boats and craft and countering pirate-like operations;35
30
!
ships (such as attack submarines) for covertly inserting and
recovering Navy special operations forces, known as SEALs;3631
!
ships (such as amphibious ships) for supporting smaller-scale
Marine Corps operations ashore; and
!
ships (such as aircraft carriers or large-deck amphibious assault
ships) that can launch strike-fighters armed with smaller-scale
precision guided weapons.
Chinese Maritime Military Forces. Some analysts are concerned that DOD
in coming years may structure U.S. forces, including the Navy, too closely around
near-term requirements associated with the global war on terrorism, irregular
conflicts, and conflicts against countries like Iraq and Afghanistan, and not enough
around requirements associated with countering significantly more capable Chinese
military forces, including maritime forces, that might emerge over the next 10 to 25
years.
Views among analysts differ concerning the possible scale or composition of
China’s military modernization efforts. Most, however, appear to agree that a
growing Chinese economy would be able to finance a significant military
modernization effort, should Chinese leaders decide to embark upon one, and that
improved naval forces capable of operating in blue waters (i.e., waters further away
from China’s coast) could be a significant component of such an effort.3732
Structuring the U.S. Navy primarily to match the near-term requirements
mentioned above could lead to a fleet that is strongly oriented toward operating in
35
Coast Guard cutters may also be well suited for such operations.
36
SEAL stands for SEa, Air, and Land.
37
For more on China’s current and potential future military capabilities, and Chinese
strategic thinking, see U.S. Department of Defense, Annual Report on The Military Power
of The People’s Republic of China, Washington, 2004. (FY2004 Report To Congress on
PRC Military Power, Pursuant to the FY2000 National Defense Authorization Act) 54 pp.
CRS-21
near-shore areas, attacking land targets, and countering land-based military forces.
Preserving an ability to counter significantly more capable Chinese maritime military
forces in the future could involve preserving different kinds of capabilities (or the
foundations in technology and operational experience for building up such
capabilities), particularly open-ocean antisubmarine warfare, air-to-air combat,
defense against large-scale antiship cruise missile attacks, defense against
sophisticated electronic warfare techniques and cyberwar attacks, and capabilities for
attacking larger enemy ships at sea.
New Technologies. New technologies that will likely affect the capabilities
of Navy ships in coming years, and consequently the number of ships that may be
needed to perform a given set of missions, include improved radars and other sensors
(including miniaturized sensors), improved computers and networking systems,
unmanned vehicles, reduced-size, precision-guided, air-delivered weapons, rail guns,
directed-energy weapons, and integrated electric drive propulsion technology, to
name just a few. Although the effect of improving technology historically has often
been to increase the capability of individual Navy ships and thereby permit a
reduction in the number of Navy ships needed to perform a stated set of missions,
some analysts believe that networking technology and reduced-sized sensors may
argue in favor of a more distributed force structure that includes a larger number of
smaller ships such as the LCS.
Forward Homeporting and Sea Swap. Other things held equal,
homeporting additional Navy ships in forward locations such as Guam and Hawaii,
and applying the Sea Swap concept to a significant portion of the fleet, could reduce,
perhaps substantially, the total number of Navy ships needed to maintain a certain
number of Navy ships in overseas operating areas on a day-to-day basis.
Navy officials, for example, have stated that in terms of resulting operating days
in the Pacific, a Guam-homeported attack submarine is the equivalent of an average
of about 2.3 attack submarines homeported in the Third Fleet (i.e., in San Diego or
Pearl Harbor).38 The Congressional Budget Office, in a March 2002 report on the
attack submarine force, stated that the ratio might be higher, with a
Guam-homeported attack submarine equivalent in operating days to about three
38
In a “memorandum for interested members of Congress” on the homeporting of attack
submarines in Guam dated January 22, 2001, the Navy stated: “Three attack submarines
homeported in Guam will provide a total of 300 days (on average) of operations and
engagement per year. Those submarines would provide 130 days of operations and
engagement per year if they were homeported in [the] Third Fleet [i.e., Eastern Atlantic] and
deployed to [the] Seventh Fleet [i.e., Western Pacific] in accordance with current
guidelines,” 300 divided by 130 is about 2.3. The text of the memo was reprinted in the
February 12, 2001 issue of Inside the Navy under the headline, “Text: Navy Memo on Subs
in Guam,” For the accompanying news story, see Christian Bohmfalk, “Basing Attack Subs
On Guam Expected To Increase Fleet’s Presence,” Inside the Navy, Feb. 12, 2001. For
additional discussion, see CRS Report RL32418, Navy Attack Submarine Force-Level Goal
and Procurement Rate: Background and Issues for Congress, by Ronald O’Rourke. pp. 3033.
CRS-22
attack submarines homeported elsewhere.39 Recent experiments with the Sea Swap
concept on surface combatants sent on long deployments to the Indian Ocean/Persian
Gulf region suggest that the concept, if widely applied, might reduce the total number
of surface combatants needed to maintain a certain number in forward-deployed
locations by 20% or more.40 The Navy reportedly is considering increasing the
number of attack submarines homeported at Guam and transferring one of its
continental-U.S.-homeported aircraft carriers to either Hawaii or Guam.
A key planning consideration is the potential difference between the number of
Navy ships required for maintaining day-to-day forward deployments and the number
required for fighting conflicts. Forward homeporting and Sea Swap affect primarily
the former rather than the latter. As a consequence, for some types of ships,
additional forward homeporting and use of Sea Swap might reduce the number
needed for maintaining day-to-day forward deployments below the number needed
for fighting conflicts. In such cases, fully implementing the force-level economies
suggested by forward homeporting and Sea Swap could leave the Navy with
inadequate forces for fighting conflicts.
Jointness. DOD’s increased emphasis on achieving increased jointness (i.e.,
coordination and integration of the military services) in U.S. military plans and
operations could lead to reassessments of requirements for Navy capabilities thatJointness. DOD’s increased emphasis on achieving increased jointness (i.e.,
coordination and integration of the military services) in U.S. military plans and
operations could lead to reassessments of requirements for Navy capabilities that
30
Coast Guard cutters may also be well suited for such operations.
31
SEAL stands for Sea, Air, and Land.
32
For more on China’s current and potential future military capabilities, and Chinese
strategic thinking, see U.S. Department of Defense, Annual Report on The Military Power
of The People’s Republic of China, Washington, 2004. (FY2004 Report To Congress on
PRC Military Power, Pursuant to the FY2000 National Defense Authorization Act) 54 pp.
CRS-22
were originally determined in a less-joint setting. Areas where U.S. Navy capabilities
overlap with the those of the Air Force or Army, and where total U.S. capabilities
across the services exceed DOD requirements, might be viewed as candidates for
such reassessments, while capabilities that are unique to the Navy might be viewed
as less suitable for such reassessments. An example of a broad area shared by the
Navy, Air Force, and Army is tactical aviation, while an example of an area that is
usually regarded as unique to the Navy is antisubmarine warfare.
Competing Defense Priorities. A final issue to consider are the funding
needs of other defense programs. In a situation of finite defense resources, funding
certain Navy requirements may require not funding certain other defense priorities.
If so, then the issue could become how to allocate finite resources so as to limit
operational risk over the various missions involving both Navy and non-Navy
mission requirements.
Potential Oversight Questions. Potential oversight questions for Congress
regarding the planned size of the Navy and its relationship to ship procurement plans
and budgets include the following:
!
Desired Navy capabilities. Have DOD and the Navy defined the
set of capabilities the Navy should have? If not, when do DOD and
the Navy anticipate completing this task? Should Congress establish
a deadline for completing it? If DOD and the Navy have completed
39
U.S. Congressional Budget Office, Increasing the Mission Capability of the Attack
Submarine Force, March 2002, p. 11.
40
For additional discussion, see CRS Report RS21338, Navy Ship Deployments: New
Approaches — Background and Issues for Congress, by Ronald O’Rourke. pp. 4-5.
CRS-23
the task, have they defined this set of capabilities accurately, taking
into account factors like those discussed in the previous section?
!
Translating desired capabilities into planned force structure.
Have DOD and the Navy translated desired Navy capabilities into
new Navy force-structure goals? If not, when do DOD and the Navy
anticipate completing this task? Should Congress establish a
deadline for DOD and the Navy to complete this task and issue a
new Navy force structure plan? To the extent that DOD and the
Navy have translated desired Navy capabilities into Navy force
structure goals, have they done so accurately, taking into account
factors like those discussed in the previous section?
!
Procurement plan. If DOD and the Navy have accurately
translated desired capabilities into force-structure goals, would
implementing the associated Navy procurement plan achieve a fleet
with such a force structure in a timely manner?
!
Budget plan. If the procurement plan would achieve the desired
force structure in a timely manner, have DOD and the Navy
programmed the correct amount of funding to implement this
procurement plan? If the Navy’s procurement plan is fully funded,
what other defense priorities might not be fully funded, and what
are the resulting potential operational risks?
CRS-23
Number of Yards Involved in Navy Shipbuilding
How many shipyards should be regularly involved in Navy shipbuilding?
Questions about the Navy shipbuilding industrial base, including the number of
yards that should be regularly involved in Navy shipbuilding, have been debated in
Congress for many years, and particularly since the early 1990s, when the rate of
Navy ship procurement dropped to a relatively low level as a consequence of the end
of the Cold War and the dissolution of the Soviet Union. This section reviews the
question of the number of yards that might be regularly involved in Navy
shipbuilding in light of the possibility that the next Navy force structure plan might
call for a fleet of roughly 250 to 330 ships, including 30 to 45 LCSs, as shown in
Table 1using the Navy’s 260- and 325-ship fleets.
Candidate Yards. Candidate shipyards for building Navy ships in coming
years include the six yards that have built the Navy’s major warships in recent years
and three additional yards that are competing to build LCSs. The six yards that have
built the Navy’s major warships in recent years are:
!
!
!
!
!
!
General Dynamics(GD)/Bath Iron Works (BIW) of Bath, ME;
GD/Electric Boat (EB) of Groton, CT, and Quonset Point, RI;
GD/National Steel and Shipbuilding Company (NASSCO) of San
Diego, CA;
CRS-24
!
!
!
Northrop Grumman (NOCNG)/Avondale Shipyards, located near New
Orleans, LA;
NOCNG/Ingalls Shipbuilding of Pascagoula, MS;4133 and
NOCNG/Newport News Shipbuilding (NGNN) or Newport News, VA.
The three yards competing to build LCSs are:
!
!
!
Austal USA of Mobile, AL, which is the production shipyard on the
LCS industry team led by General Dynamics;4234
Bollinger Shipyards of Louisiana and Texas, which is one of two
production shipyards on the LCS industry team led by Lockheed
Martin;4335 and
Marinette Marine of Marinette, WI, which is the other production
shipyard on the Lockheed-led LCS industry team.
Factors to Consider. In assessing how many shipyards should be regularly
involved in Navy shipbuilding in coming years, Congress may consider a number of
factors, including factors relating to shipyard capacity, factors relating to cost and
acquisition strategy, and factors relating to other issues.
Capacity-Related Factors.
Yard Capacities. Table 3 on the next page, taken from a 1996 CRS report,44
shows the maximum annual production capacities of the first group of six yards,
measured in the principal kinds of ships that they were building for the Navy in 1996,
which are broadly similar to the kinds of ships they are building for the Navy today.
As can be seen in the table, most of the yards in 1996 could build 3 to 5 ships per
year of the kinds they were producing at that time, while Ingalls could build more.45
The maximum capacities of the yards today would be roughly similar, and in some
4133
The Avondale and Ingalls yards, together with a fabrication facility at Gulfport, MS, form
Northrop Grumman Ship Systems (NGSS) division.
4234
Austal USA was created in 1999 as a joint venture between Austal Limited of Henderson,
Western Australia and Bender Shipbuilding & Repair Company of Mobile, AL. The
Lockheed LCS team also includes GD/BIW as prime contractor, to provide program
management and planning, to provide technical management, and to serve as “LCS system
production lead,”
4335
Bollinger operates about 15 shipyards and ship-related facilities in Louisiana and Texas,
of which three, located in Lockport, LA, Gretna, LA, and Amelia, LA, are for building new
ships.
44
CRS Report 96-785 F, Navy Major Shipbuilding Programs and Shipbuilders: Issues and
Options for Congress, by Ronald O’Rourke. (1996, archived; available from the author at
202-707-7610.) Table 2 on page 28; see also text on page 27.
45
As noted in the 1996 CRS report, caution should be exercised in using the figures in this
table to judge the comparative capacities of the yards, because these figures do not adjust
for the differing sizes and levels of complexity of the various types of ships listed. A
shipyard that is listed as being able to build a given number of large, complex ships may
have more capacity than a yard that is listed as being able to build a larger number of smaller
or less complex ships.
CRS-25
cases perhaps a bit higher due to yard modernization efforts since 1996 that have
increased
CRS-24
factors, including factors relating to shipyard capacity, factors relating to cost and
acquisition strategy, and factors relating to other issues.
Capacity-Related Factors.
Yard Capacities. Table 3 below, taken from a 1996 CRS report,36 shows the
maximum annual production capacities of the first group of six yards, measured in
the principal kinds of ships that they were building for the Navy in 1996, which are
broadly similar to the kinds of ships they are building for the Navy today. As can be
seen in the table, most of the yards in 1996 could build 3 to 5 ships per year of the
kinds they were producing at that time, while Ingalls could build more.37 The
maximum capacities of the yards today would be roughly similar, and in some cases
perhaps a bit higher due to yard modernization efforts since 1996 that have increased
throughput capacities.
Table 3. Annual Shipyard Production Capacities
Yard
GD/BIW
GD/EB
GD/NASSCO
NOCNG/Avondale
NOCNG/Ingalls
NOC/NGNN
Maximum capacity: Number of ships completed per year
3.5 Arleigh Burke (DDG-51) class destroyers
3 nuclear-powered attack submarines (SSNs)a
4 or 5 Supply (AOE-6) class underway replenishment ships or 5 or
6 Watson (TAKR-310) class sealift shipsb
4 Harpers Ferry (LSD-49) class amphibious ships
11 DDG-51 class destroyers
or
8 DDG-51 class destroyers + 1 Wasp (LHD-1) class amphibious
ship
4 SSNsc + 1 nuclear-powered aircraft carrier (CVN)
Source: CRS Report 96-785 F, Navy Major Shipbuilding Programs and Shipbuilders: Issues and
Options for Congress, op. cit. Table 2 on page 28. GD = General Dynamics, NG = Northrop
Grumman.
a Capacity of EB’s Land-Level Submarine Construction Facility (LLSCF). Additional submarines
could be built in EB’s older inclined building ways.
b These ships are also known as Large, Medium-Speed Ro/Ro (Roll-on/Roll-off) ships (LMSRs).
c Capacity of NGNN’s Modular Outfitting Facility (MOF). Additional submarines could be built in
NGNN’s graving docks.
36
CRS Report 96-785 F, Navy Major Shipbuilding Programs and Shipbuilders: Issues and
Options for Congress, by Ronald O’Rourke. (Archived; available from the author at 202707-7610.) Table 2 on page 28; see also text on p. 27.
37
As noted in the 1996 CRS report, caution should be exercised in using the figures in this
table to judge the comparative capacities of the yards, because these figures do not adjust
for the differing sizes and levels of complexity of the various types of ships listed. A
shipyard that is listed as being able to build a given number of large, complex ships may
have more capacity than a yard that is listed as being able to build a larger number of smaller
or less complex ships.
CRS-25
The annual rates in this table add up to roughly 30 ships per year. Adding in the
capacities of one or more of the three yards now competing to build LCSs would
increase this figure. As noted in the 1996 CRS report, achieving and sustaining the
rates shown in Table 3 could require at least some of the yards to curtail or eliminate
other forms of work, such as overhaul and repair of Navy and commercial ships and
construction of commercial ships. It could also result in levels of employment at the
yards that could strain the managerial and supervisory capacities of the yards.4638
Potential Shipbuilding Rate for Fleet of 250 to 330 Ships. If the next Navy
force structure plan calls for a fleet of about 250 to about 330 ships, including 30 to
45 LCSs, then asAs shown in
Table 4 on the next page, the steady-state procurement
rate for Navy ships — the average annual procurement rate that, if maintained over
the long run, would support a fleet of that size over the long run — rate for a Navy of 260 to 325
ships could be roughly
7 8 to 10 ships per year, including LCSs, and roughly 6 to 8 9
ships per year other than
LCSs.47
4639
38
These maximum rates also do not take into account possible capacity limitations in critical
supporting supplier industries that could prevent these high rates from being achieved.
Limits on supporting supplier industries, however, may be independent of the number of
shipyards involved in the building effort. If supplier industries, for example, could only
support a combined production rate of 10 ships per year, that limit might apply regardless
of whether those 10 ships were being built by 6 yards or some other number of yards.
4739
The steady state replacement rate for an item is equal to the force-level goal divided by
(continued...)the service life. For example, a force-level goal of 70 cruisers, destroyer, and frigates
divided by a service life of 35 years for such ships equals a steady state procurement rate of
2 such ships per year.
CRS-26
Table 4. Steady-State Ship Procurement Rate for Fleet of 250 to
330260 to
325 Ships
(average annual procurement rates)
Ship type
Notional fleets
Expected
service
life
(years)
Notional fleets
~250 ships
Number
~330 ships
Steady-state Number
rate
Steady-state
rateNumber
SSBNs
42
14
0.33
14
0.33
SSGNs
42
4
0.10
4
0.10
SSNs
33
37
1.12
5041
1.5224
Aircraft carriers
50
11
0.22
12
0.24
Crus/Des/Friga
35
70
2.0
84
2.4
LCSs
25
30
1.2
45
1.8
Amphibious
35
24
0.69
36
1.03
MPF(F)s
35
10
0.29
16
0.46
CLFb
35
30
0.86
34
0.97
Cmd/supportc
35
20
0.57
25
0.71
Dedicated MIWd
25
0
0
8
0.32
TOTAL
250
7.37
328
9.88
TOTAL other than
LCSs
220
6.17
283
8.0810
0.20
11
0.22
Cruisers, destroyers
35
67
1.91
92
2.63
LCSs
25
63
2.52
82
3.28
Amphibious
35
17
0.49
24
0.69
MPF(F)s
35
14
0.40
20
0.57
CLFa
35
24
0.69
26
0.74
Dedicated MIWb
25
0
0.00
0
0.00
Otherc
35
10
0.29
11
0.31
260
8.05
325
10.11
Ship type
TOTAL
TOTAL other than
LCSs
260 ships
325 ships
Steady-state
rate
Number
5.53
Steady-state
rate
6.83
Source: Prepared by CRS based on U.S. Navy data for ship expected service lives.
a Cruisers, destroyers, and frigates.
b Combat Logistics Force ships (i.e., ships that resupply Navy combat ships).
c Command and support ships.
d Dedicated mine warfareb Dedicated mine warfare ships.
c Includes command ships, support ships, and sea basing connector ships.
The planned ship service lives shown in this table are based on Navy planning
data. If actual ship service lives turn out to be shorter than shown in the table, as
some observers believe they might be based on historical evidence with previous
classes of Navy ships, then the steady-state replacement rate figures would be higher
than those shown in the table.
47
(...continued)
the service life. For example, a force-level goal of 70 cruisers, destroyer, and frigates
divided by a service life of 35 years for such ships equals a steady state procurement rate of
2 such ships per year.
CRS-27
To compensate for the relatively low rate of Navy ship procurement since the
early 1990s (see Appendix B), maintaining a fleet of about 250 to 330260 to 325 ships,
including 30 to 45 LCSs,
will require an average procurement rate in coming years
somewhat higher than the
steady-state rate. Assuming an average 35-year life for
Navy ships, the required rate
might be about 89 to 12 ships per year including LCSs,
CRS-27
and about 76 to 108 ships per
year other than LCSs.4840 If average ship life is assumed to
be closer to 30 years, which
some observers believe is a more realistic figure, then
the required shipbuilding rate
might be closer to about 1011 to 15 ships per year
including LCSs, and about 97 to 12
10 ships per year other than LCSs.4941
Even if the maximum production capacities shown in Table 3 are reduced discounted
significantly to
avoid a risk of straining the yards’ managerial and supervisory
abilities and to allow
for the yards to do things other than build new Navy ships, it
would appear that the
nine candidate yards collectively have more than enough
capacity to build the ships
associated with maintaining a fleet of about 250 to 330
ships, including 30 to 45
LCSs. If, for example, each yard involved in Navy
shipbuilding builds an average
of two Navy ships per year, then of the total of nine
candidate yards, fourfive to six might
be sufficient to build 89 to 12 ships per year,
including LCSs, while of the first group
of six yards, four or fivethree or four might be sufficient
to build a total of 76 to 108 ships per year
other than LCSs. An average rate of two ships
per year for each yard is between onethirdone-third and two-thirds of most of the maximum
annual rates shown in Table 3, and is
similar to rates executed at times in the 1980s,
during the final years of the Cold War.
Potential Need to Surge to Higher-Rate Production. Advocates of keeping
a larger number of shipyards involved in Navy shipbuilding could argue that in light
of the difficulties of predicting future potential threats to U.S. interests, and the
possibility that China may choose to build a significant maritime military capability
over the next 10 to 25 years, it is possible that the Navy and DOD might decide years
from now that the United States needs to build a Navy substantially larger than one
of about 250 to 330260 to 325 ships, in which case there may be a sudden need for building
substantially more than 89 to 12 ships per year. Keeping a larger number of yards
involved in Navy shipbuilding, they could argue, would make it easier to shift to
higher-rate production in a timely manner without straining yard capabilities.
Advocates of keeping a smaller number of yards involved in Navy shipbuilding
could argue that in light of the capacity figures shown in Table 3, even a smaller
48number of yards could still have enough excess capacity to shift to a higher rate of
production in a timely manner without straining yard capabilities.
40
The decline in the rate of Navy ship procurement to relatively low levels began about
FY1993. During the 1213-year period FY1993-FY2004FY2005, a total of 6472 battle force ships (none
of them LCSs
(including 1 LCS) were procured, or an average of about 5.35 ships per year. Subtracting these
64
these 72 ships from a total fleet of 250 to 330260 to 325 ships would leave a total of 186 to 266 ships
(including all 30 to 45 LCSs) 188 to 253 ships
to be procured during the remaining 2322 years of a 35-year
procurement period for replacing
the entire fleet. Procuring these 186 to 266188 to 253 ships over a
23 22-year period would require an
average procurement rate of about 8.16 to 11.65 ships per
year. A total of 156 to 221 ships other than LCSs126 to 172 ships
other than LCSs (197 to 243 ships other than LCSs required minus 71 ships other than LCSs
procured during FY1993-FY2005) would need to be procured over these 23
22 years, or an
average of 6.8 to 9.6 ships per year.
495.7 to 7.8 ships other than LCSs per year.
41
Extending the analysis in the previous footnote, a total of 186 to 266188 to 253 ships of all kinds
divided by the 1817 remaining years in a 30-year procurement period equates to an average
rate of about 10.311.1 to 14.89 ships per year, while a total of 156 to 221126 to 172 ships other than LCSs
divided by 1817 years equates to an average rate of about 8.7 to 12.3 ships per year.
CRS-28
number of yards could still have enough excess capacity to shift to a higher rate of
production in a timely manner without straining yard capabilities.7.4 to 10.1 ships other than LCSs per
year.
CRS-28
Potential For Creating New Yards or Reopening Closed Yards.
Depending on other forms of work available to various shipyards (see discussion
below), a decision to keep a smaller number of yards involved in Navy shipbuilding
could lead to the end of shipbuilding activities at, or the complete closure of, yards
that are not involved in Navy shipbuilding. As a result of this possibility, a potential
additional factor to consider is the potential for creating new shipyards or reopening
closed ones to respond a need at some point in the future for additional shipbuilding
capacity. Factors to consider in assessing this potential include availability of
suitable waterfront property, regulatory issues, cost and time for facilities, and cost
and time for the workforce:
5042
!
Waterfront property. If a shipyard is closed but the property is not
sold off and developed for other uses (such as conversion into
waterside residential units), then it might remain available for
eventual reuse as a shipyard. Part of the former governmentoperated U.S. naval shipyard in Philadelphia, for example, has been
converted by the Kvaerner Corporation into a new facility for
building commercial ships. If, however, a closed yard’s waterfront
property is sold off and developed for other uses, it may be difficult
to find other suitable waterfront property to establish a new yard, at
least in the same immediate area.
!
Regulatory issues. Since shipyards are major industrial facilities,
gaining regulatory approval for establishing a shipyard on a parcel
of waterfront property may involve a number of regulatory issues.
A special set of regulatory issues would apply in the case of a
proposal to establish or reopen a shipyard capable of building
nuclear-powered ships. Although the Navy maintains extremely
high safety standards in its program for building, operating, and
maintaining its nuclear-powered ships, the challenges involved
gaining regulatory approval (and local popular support) for
establishing a shipyard that would work with radioactive fuel as part
of the process for building nuclear-powered ships are viewed as
potentially significant, particularly if the area in which the shipyard
is to be located has not hosted such a facility previously or for some
number of years. The potential challenges associated with creating
a new nuclear-capable shipyard, or reopening and recertifying a
closed one, are a reason why some observers have argued that
particular caution should be applied when considering actions that
may have the effect of leading to the closure of either of General
Dynamics/Electric Boat or Northrop Grumman/Newport News,
which are the only two yards that have built nuclear-powered ships
in recent years.5042
In theory, nuclear-powered warships could be built at one or more of the country’s four
government-operated naval shipyards, which are located at Portsmouth, NH/Kittery, ME,
Norfolk, VA, Bremerton, WA, and Pearl Harbor, HI. Government-operated naval shipyards,
however, have not built new ships for the Navy since the 1970s (they have been used since
(continued...)
CRS-29
!
Cost and time for facilities. Building the facilities for a new
shipyard capable of building larger ships for the Navy could easily
involve an investment of several hundred million dollars, or possibly
more than a billion dollars, and a number of years of construction
time. Reopening a closed shipyard could cost less and require less
time, if some portion of the yard’s old facilities were left in place
and preserved.
!
Cost and time for workforce. Hiring and training the workforce of
a yard capable of building large and complex Navy ships, and
putting together a team of capable managers and supervisors for
such a facility, could take considerable time and resources if skilled
production workers and experienced managers and supervisors were
not readily available from other yards. Some observers believe that
establishing a skilled workforce can be the most time-consuming
component of an effort to create or reopen a shipyard.
Factors Related to Cost and Acquisition Strategy.
Shipyard Fixed Overhead Costs. Other things held equal, keeping a higher
number of yards involved in building Navy ships could increase the total cost of
Navy ships by increasing the amount of shipyard fixed overhead costs included in
that cost.5143 A 1996 CRS report estimated that a smaller shipyard capable of building
major Navy ships (i.e., one whose facilities are adjusted to support a total
employment of a few thousand people) might have fixed costs ranging from a few to
several tens of millions of dollars per year, while a larger shipyard capable of
building major Navy ships (i.e., one whose facilities are adjusted to support a total
employment ranging from several thousand people to more than 10,000 people)
might have fixed costs ranging from several tens of millions of dollars per year to
50
(...continued)
government-operated naval shipyards, which are located at Portsmouth, NH/Kittery, ME,
Norfolk, VA, Bremerton, WA, and Pearl Harbor, HI. Government-operated naval shipyards,
however, have not built new ships for the Navy since the 1970s (they have been used since
more than $100 million per year.44 Given inflation since 1996, those figures might
be higher today.
42
(...continued)
that time only to overhaul, repair, and modernize Navy ships), so considerable investment
would be needed to improve their facilities so as to support new-construction work.
5143
As explained in a 1996 CRS report , a manufacturing facility’s fixed overhead costs are
those that are relatively insensitive (i.e., do not change very much in response) to changes
in the level of production, particularly over the shorter run. Some fixed costs would
continue to be incurred even if the level of production at the facility falls to zero. A
manufacturing facility’s other main type of costs are its variable costs, which are those
incurred in proportion to the level of production. Variable costs include expenses for labor
and materials. A firm’s fixed costs are spread over — that is, charged to and thereby
incorporated into the cost of — the various work projects that make up the total workload
underway at the facility. (CRS Report 96-785 F, Navy Major Shipbuilding Programs and
Shipbuilders: Issues and Options for Congress, by Ronald O’Rourke. 1996, archived;
available from the author. Pages 83-84.)
CRS-30
more than $100 million per year.52 Given inflation since 1996, those figures might
be somewhat higher today., pp.83-84. Archived;
available from the author.)
44
CRS Report 96-785 F, Navy Major Shipbuilding Programs and Shipbuilders: Issues and
Options for Congress, op. cit., p. 84.
CRS-30
On this basis, keeping a higher rather than lower number of yards involved in
building Navy ships might increase the fixed overhead costs associated with building
these ships by perhaps a few hundred million, or possibly several hundred million,
dollars a year. Given current and projected procurement costs for Navy ships,
building a total of 89 to 12 ships per year including LCSs could cost an average of
more (perhaps much more) than $10 billion per year, in which case a figure of a few
or possibly several hundred million dollars in additional fixed overhead costs would
increase the collective cost of those ships by a few or possibly several percent. The
decision to produce Virginia-class submarines jointly between two yards rather than
at a single yard, for example, may have increased the cost of these submarines by
somewhere between about $70 million and about $200 million per boat, which
equates to about 3% to 9% of the cost of each boat. Some (but not all) of this
additional cost is due to the additional fixed overhead costs of maintaining the
combined equivalent of more than one complete submarine production line between
the two yards.5345
Advocates of keeping a smaller number of yards involved in Navy shipbuilding
could argue that a sum of a few or possibly several hundred million dollars per year
in additional shipyard fixed overhead costs is significant in an absolute sense and that
being good stewards of taxpayer dollars requires reducing Navy ship construction
costs wherever possible, including the area of shipyard fixed overhead costs.
Advocates of keeping a larger number of yards involved in Navy shipbuilding could
argue that, as a percentage of the total cost of the ships being built, this sum is not
very significant and is worth the benefits of keeping more yards involved.
Cost Associated With Split Learning Curves. Other things held equal, if
keeping a higher number of shipyards involved in Navy shipbuilding results in
producing a given class of ship at two yards rather than at one yard, the resulting
“splitting of the learning curve” between the two yards might increase the cost of
producing that class of ship by roughly 1% to 4%.5446 Navy officials, for example,
52
CRS Report 96-785 F, Navy Major Shipbuilding Programs and Shipbuilders: Issues and
Options for Congress, op cit., p. 84.
53
estimated that the 2002 agreement between the Navy, Northrop Grumman, and
General Dynamics to consolidate production of the 12 planned LPD-17 amphibious
ships at Northrop’s Avondale and Ingalls shipyards rather than divide the class on
two-for-one basis between the Northrop yards and GD/BIW, respectively, would
45
For a discussion, see CRS Report RL32418, Navy Attack Submarine Force-Level Goal
and Procurement Rate: Background and Issues for Congress, by Ronald O’Rourke, pp. 4850.
5446
The concept of the production learning curve refers to the reduction in labor hours needed
to produce each item in a series as the workers at the facility learn (i.e., become more
familiar with and experienced in building) the design. If an item is produced at two
facilities rather than one, the workforce at each facility must travel down the learning curve,
increasing average labor costs for the combined lot of items being built at both facilities.
Given typical learning curves (i.e., rates of learning) for Navy ships and potential production
runs ranging from a few ships to perhaps about 20 ships, splitting a learning curve for a class
of Navy ships can increase shipyard labor costs for building the class by perhaps 3% to 13%.
If shipyard labor costs account for roughly 20% to 40% of the total construction cost of a
(continued...)
CRS-31
estimated that the 2002 agreement between the Navy, Northrop Grumman, and
General Dynamics to consolidate production of the 12 planned LPD-17 amphibious
ships at Northrop’s Avondale and Ingalls shipyards rather than divide the class on
two-for-one basis between the Northrop yards and GD/BIW, respectively, wouldNavy ship, then this would equate to an increase in the total construction cost of the ship of
0.6% to 4.2%. For a discussion, see CRS Report 96-785 F, Navy Major Shipbuilding
Programs and Shipbuilders: Issues and Options for Congress, op. cit., pp. 95-101.
CRS-31
reduce construction costs for the program by at least $437 million dollars.5547 This
would equate to a savings of roughly 3% for a class of 12 LPD-17s costing an
average of $1.2 billion each. Much of this savings was due to avoiding a split
learning curve for the class. Keeping a higher number of yards involved in Navy
shipbuilding, however, might not necessarily result in any instances of splitting the
learning curve, in which case there would be no additional cost due to this factor.
As with the issue of shipyard fixed overhead costs, advocates of keeping a
smaller number of yards involved in Navy shipbuilding could argue that the potential
additional costs resulting from split learning curves are significant in an absolute
sense, while advocates of keeping a larger number of yards involved in Navy
shipbuilding could argue that even if this results in additional instances of split
learning curves, the resulting additional costs would not be very significant as a
percentage of the total cost of the ships being built and are worth the benefits of
keeping more yards involved.
Cost of Government Supervision. Other things held equal, keeping a higher
number of shipyards involved in Navy shipbuilding may result in higher costs to the
Navy for supervising the work done at those yards. Additional personnel-related
costs for supervising a larger number of sites might total millions of dollars a year.
Competition in Ship Design. Advocates of keeping a larger number of yards
involved in Navy shipbuilding could argue that doing so would increase the
likelihood of having two yards with recent experience in designing a given kind of
ship, thus improving the government’s ability to use competition in the design stage
of ship acquisition programs to spur design innovation and achieve the best possible
design. Recent experience in building a given category of ship, they could argue,
could be particularly important in strengthening a yard’s understanding of design
producibility (i.e., designing a ship so that it can not only perform its missions well,
but also be produced in the shipyard easily and at lower cost).
Advocates of keeping a smaller number of yards involved in Navy shipbuilding
could argue that doing so could involve having individual yards building multiple
types of ships, in which case the Navy might be no less likely to have at least two
yards with recent experience in designing and building a given type of ship. Yards
involved in building multiple types of ships, they could argue, might be better able
54
(...continued)
Navy ship, then this would equate to an increase in the total construction cost of the ship of
0.6% to 4.2%. For a discussion, see CRS Report 96-785 F, Navy Major Shipbuilding
Programs and Shipbuilders: Issues and Options for Congress, op cit, pp. 95-101.
55
Kerry Gildea, “Navy Evaluating Option For Building Added LPD-17 Earlier Than
Planned,” Defense Daily, April 4, 2003. The Navy earlier estimated that the savings would
be at least $400 million. See David Rogers, “Pentagon’s Revised Budget Nears Agreement
In House And Senate,” Wall Street Journal, October 9, 2002.
CRS-32
to transfer design innovations from one type of ship to another and take maximum
advantage of the potential for exploiting commonality in systems and components
across ship types so as to reduce cost.
Competition in (or Benchmarking of) Ship Construction. Competition in
the awarding of contracts for building follow-on ships in Navy shipbuilding programs
(i.e. the ships that follow the lead ship in each class) was a common feature in Navy
shipbuilding programs in the 1980s but became less common in the 1990s and is rare
47
Kerry Gildea, “Navy Evaluating Option For Building Added LPD-17 Earlier Than
Planned,” Defense Daily, Apr. 4, 2003. The Navy earlier estimated that the savings would
be at least $400 million. See David Rogers, “Pentagon’s Revised Budget Nears Agreement
In House And Senate,” Wall Street Journal, Oct. 9, 2002.
CRS-32
today, primarily because of the decrease in Navy shipbuilding rates since the end of
the Cold War. Some policymakers believe that competition in the awarding of
contracts for building follow-on ships can be advantageous for the government in
terms of constraining production costs, maintaining adherence to delivery schedules,
and maintaining high production quality standards. Results in constraining costs can
offset the additional costs (such as additional shipyard fixed overhead costs) of
keeping a larger number of yards involved in building Navy ships.
Advocates of keeping a larger number of yards involved in Navy shipbuilding
could argue that doing so increases the chances of having two yards with recent
experience in building various kinds of Navy ships, thus preserving a potential for
resuming effective competition in the awarding of contracts for building these ships,
should shipbuilding rates in the future increase to levels that can support a
resumption of competition. Even if procurement rates do not increase enough to
support a resumption of competition, they could argue, keeping at least two yards
involved in building a given kind of ship permits the government to use one yard’s
performance in that program to benchmark the performance of the other yard
involved in that program. In August 2004, for example, the Navy criticized Newport
News’ performance in its portion of the Virginia-class submarine program, noting
that cost growth on Electric Boat’s portion of the program was much smaller.5648
Advocates of keeping a smaller number of yards involved in Navy shipbuilding
could argue that it is unlikely that shipbuilding rates will rise in coming years to
levels that would permit the government to resume meaningful competition in the
awarding of contracts to build follow-on ships, but that having a smaller number of
yards that each build multiple kinds of ships could in any event preserve at least two
yards with recent experience in building various kinds of ships, preserving a potential
for resuming competition or for using one yard’s performance on a program to
benchmark another yard’s performance. In instances where a certain kind of ship is
being built by only one yard, they could argue, the performance of other yards in
building other kinds of ships could still be used to indirectly benchmark the
performance of the first yard using performance measures that are common to
multiple types of Navy shipbuilding efforts.
56Labor Markets. Advocates of keeping a larger number of yards involved in
Navy shipbuilding could argue that this would increase the number of local or
regional labor markets from which shipyard workers could be recruited and trained,
increasing the likelihood that yards could hire and train high-quality workers and
making it potentially easier to rapidly increase the number of workers involved in
Navy shipbuilding, should a sudden increase in required shipbuilding rates call for
such an expansion.
48
See Christopher J. Castelli, “Virginia-Class Program Delivers Lead Sub, But Cost
Concerns Lom,” Inside the Navy, OctoberOct. 18, 2004; Christopher J. Castelli, “Young
Suggests Suggests
Changing Work Distribution For Submarine Program,” Inside the Navy, October
Oct. 4, 2004; Tony
Capaccio, “General Dynamics, Northrop Review Of Sub Work Sought,”
Bloomberg.com, September
Sept. 29, 2004; Bloomberg News. “Northrop’s Submarine Work
Draws Criticism From
Navy,” Baltimore Sun, SeptemberSept. 16, 2004; Tony Capaccio,
“Northrop Sub Work Has Cost
Growth, Delays, Navy Says,” Bloomberg News, September
15, 2004.
CRS-33
Labor Markets. Advocates of keeping a larger number of yards involved in
Navy shipbuilding could argue that this would increase the number of local or
regional labor markets from which shipyard workers could be recruited and trained,
increasing the likelihood that yards could hire and train high-quality workers and
making it potentially easier to rapidly increase the number of workers involved in
Navy shipbuilding, should a sudden increase in required shipbuilding rates call for
such an expansion.
Sept. 15, 2004.
CRS-33
Advocates of keeping a smaller number of yards involved in Navy shipbuilding
could argue that a sufficient number of labor markets would still be involved to
support the hiring and training of new workers, and that attracting new workers when
needed will not be difficult because jobs building Navy ships are relatively wellpaying manufacturing jobs that are highly sought after due to recent declines in the
number of such jobs available in certain other sectors of the economy.
Potential Work Other Than Navy Shipbuilding. Building ships for the Navy
is the primary business for most of the nine candidate yards. Other forms of work,
however, contribute to the workloads and revenues of these yards and can thus
become a consideration in discussions of which yards should be involved in Navy
shipbuilding programs. These other forms of work traditionally have included
repairing and modernizing Navy ships and building and repairing commercial ships.
An additional form of work that has not been available to a significant degree
in past years, but which is currently available, is construction of new Coast Guard
cutters under the Coast Guard’s Deepwater program (a major program for replacing
the Coast Guard’s aging cutters and aircraft). Accelerating the procurement of these
cutters from more distant years into the near term, and expanding the total number
of cutters to be procured under the program, could provide a significant amount of
support over the next several years to the Navy shipbuilding industrial base,
particularly for the shipyards that have been involved in building surface combatants
(Northrop Grumman/Ingalls and General Dynamics/BIW). As discussed in other
CRS reports, accelerating and expanding procurement of cutters under the Deepwater
program could reduce their unit procurement costs by improving production
economies of scale, more quickly reduce operation and maintenance costs associated
with keeping older Coast Guard cutters in service, and more quickly improve the
Coast Guard’s abilities to fully perform all of its post-9/11 missions.5749
Factors Relating to Other Issues.
Geographic Base of Support for Navy Shipbuilding. Advocates of keeping
a larger number of yards involved in Navy shipbuilding could argue that doing so
increases the number of locations around the country where Navy ships are built, thus
broadening the geographic base of support for Navy shipbuilding, which can be
important when supporters of Navy shipbuilding compete against supporters of other
57
For a discussion, see CRS Report RL32109, Navy DD(X) and LCS Ship Acquisition
Programs: Oversight Issues and Options for Congress, by Ronald O’Rourke. pp. 78-81.
See also CRS Report RS21019, Coast Guard Deepwater Program: Background and Issues
for Congress, by Ronald O’Rourke.
CRS-34
DOD procurement programs, such as aircraft programs, for scarce DOD procurement
dollars.
Supporters of keeping a small number of yards involved in Navy shipbuilding
could argue that doing so could reduce shipbuilding costs and thereby make Navy
shipbuilding more cost-competitive against other areas of DOD procurement for
scarce DOD procurement dollars. They could also argue that the firms that own most
of these yards — General Dynamics and Northrop Grumman — will defend these
49
For a discussion, see CRS Report RL32109, Navy DD(X) and LCS Ship Acquisition
Programs: Oversight Issues and Options for Congress, by Ronald O’Rourke, pp. 78-81. See
also CRS Report RS21019, Coast Guard Deepwater Program: Background and Issues for
Congress, by Ronald O’Rourke.
CRS-34
programs adequately in the competition for DOD procurement dollars so long as the
Navy ensures that the firms’ rates of return on investment for Navy shipbuilding are
comparable to their rates of return for their other lines of defense work.
Distribution of Economic Benefits of Navy Shipbuilding. Advocates of
keeping a larger number of yards involved in Navy shipbuilding could argue that the
economic benefits of Navy shipbuilding (particularly in terms of providing relatively
well paying manufacturing jobs) should be distributed to as large a number of areas
around the country as possible, since Navy shipbuilding is financed with money
collected from taxpayers around the country. Supporters of keeping a smaller
number of yards involved in Navy shipbuilding could argue that DOD procurement
programs often benefit some areas of the country more than others, and that being
good stewards of the taxpayers’ money means building ships at the lowest possible
cost, even if that means building them in a smaller number of locations.
Potential Oversight Questions. Potential oversight questions for Congress
regarding the number of shipyards that should be regularly involved in Navy
shipbuilding in coming years include the following:
!
What are the positions of the Navy, DOD, and the Administration
regarding the number of shipyards that should be regularly involved
in Navy shipbuilding in coming years? What are the Navy’s,
DOD’s, and the Administration’s views regarding the relative
advantages and disadvantages of keeping a larger or smaller number
of yards involved?
!
Are the Navy, DOD, and the Administration committed to keeping
all six of the yards that have built the Navy’s major ships in recent
years involved in Navy shipbuilding?
!
If so, what steps is the Administration prepared to take to ensure this
result? What are the positions of the Navy, DOD, and the
Administration regarding the possibility of accelerating and
expanding the procurement of larger cutters under the Coast Guard
Deepwater program as a means of providing additional work for the
shipbuilding industrial base over the next several years?
!
If the Navy, DOD, and the Administration are not committed to
keeping all six of the yards that have built the Navy’s major ships in
recent years involved in Navy shipbuilding, which yard or yards
CRS-35
does the Administration believe are most likely to not remain
involved in Navy shipbuilding?
!
Is the current plan to build LCSs at yards other than six yards that
have built the Navy’s major ships in recent years motivated in part
by a desire by the Navy, DOD, or the Administration to encourage
one or more of the six yards that have built the Navy’s major ships
in recent years to withdraw from Navy shipbuilding?
Legislative Activity in 2004
CRS-35
Recent statements from Navy officials suggest that the Navy’s position is that
the industrial base must adjust to the needs of the Navy, not the other way around,
and that it is up to industry officials to determine, through their own decisions as
business leaders, what the future structure of the industry should be. Statements from
Navy officials also suggest that the Navy is not necessarily wedded to maintaining
a particular number of shipyards.50
Legislative Activity in the 109th Congress
National Naval Force Structure Policy Act (H.R. 375)
This identical bills would establish it as “the policy of the United States to
rebuild as soon as possible the size of the fleet of the United States Navy to no fewer
than 375 vessels in active service, to include 15 aircraft carrier battle groups and 15
amphibious ready groups....” This 375-ship fleet would differ in structure from the
Navy’s 375-ship proposal of 2002-2004, which included 12 carriers and about 12
amphibious ready groups. Similar legislation was introduced in the 108th Congress
(H.R. 375/S. 902).
H.R. 304/S. 145 On Aircraft Carrier Force Levels
These identical bills would amend Section 5062 of title 10 of the U.S. Code to
state that “The naval combat forces of the Navy shall include not less than 12
operational aircraft carriers. For the purposes of this subsection, an operational
aircraft carrier includes an aircraft carrier that is temporarily unavailable for
worldwide deployment due to routine or scheduled maintenance or repair.”
Legislative Activity in the 108th Congress
FY2004 Defense Authorization Bill (H.R. 1588/P.L. 108-136)
Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) requires the Secretary of Defense to provide for two independently performed
studies on potential future fleet platform architectures (i.e., potential force structure
plans) for the Navy. The two studies, which are being conducted by the Center for
Naval Analyses (CNA) and the Office of Force Transformation (or OFT, a part of the
Office of the Secretary of Defense), are to be submitted to the congressional defense
50
Dave Ahearn, “England, Admirals Say Industry Decides If, Where Shipyards Close,”
Defense Today, Jan. 14, 2005; Amy Klamper, “Navy Officials Suggest Cuts Will Reshape
Shipbuilders,” GovExec.com Daily Briefing, Jan. 13, 2005; Richard C. Barnard, “England
Charts A Careful Course Through Political Fire,” Sea Power, Nov. 2004.
CRS-36
committees by January 15, 2005. (See pages 28-29 and 612-613 of H.Rept. 108354.)51
FY2005 Defense Authorization Bill (H.R 4200/P.L. 108-375)
Section 1014 of the conference report (H.Rept. 108-767 of October 8, 2004) on
H.R. 4200/P.L. 108-375 of October 28, 2004) states:
SEC. 1014. INDEPENDENT STUDY TO ASSESS COST EFFECTIVENESS
OF THE NAVY SHIP CONSTRUCTION PROGRAM.
(a) STUDY. — The Secretary of Defense shall provide for a study of the cost
effectiveness of the ship construction program of the Navy. The study shall be
conducted by a group of industrial experts independent of the Department of
Defense. The study shall examine both —
(1) a variety of approaches by which the Navy ship construction program
could be made more efficient in the near term; and
(2) a variety of approaches by which, with a nationally integrated effort
over the next decade, the United States shipbuilding industry might enhance its
health and viability.
(b) NEAR-TERM IMPROVEMENTS IN EFFICIENCY. — With respect to the
examination under subsection (a)(1) of approaches by which the Navy ship
construction program could be made more efficient in the near term, the
Secretary shall provide for the persons conducting the study to —
(1) determine the potential cost savings on an annual basis, with an estimate
of return on investment, from implementation of each approach examined; and
(2) establish priorities for potential implementation of the approaches
examined.
(c) UNITED STATES SHIPBUILDING INFRASTRUCTURE
MODERNIZATION PLAN. — With respect to the examination under
subsection (a)(2) of approaches by which the United States shipbuilding industry
might enhance its health and viability through a nationally integrated effort over
the next decade, the Secretary shall provide for the persons conducting the study
to —
(1) propose a plan incorporating a variety of approaches that would
modernize the United States shipbuilding infrastructure within the next decade,
resulting in a healthier and more viable shipbuilding industrial base;
(2) establish priorities for potential implementation of the approaches
examined; and
(3) estimate the resources required to implement each of the approaches
examined.
CRS-36
(d) REPORT. — Not later than October 1, 2005, the Secretary of Defense shall
submit a report to the congressional defense committees providing the results of
the study under subsection (a). The report shall include the matters specified in
subsections (b) and (c).
51
Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See pages 255-256 of the House report (H.Rept. 108-106 of May 16,
2003) on H.R. 1588.
CRS-37
In discussing this provision, the conference report stated:
The House bill contained a provision (sec. 1012) that would require the
Secretary of Defense to have a study conducted by an entity independent of the
Department of Defense on the cost-effectiveness of the ship construction
program of the Navy. The study would examine various approaches for how the
Navy ship construction program could be made more cost-effective in the
near-term, and how the United States shipbuilding industry might be made
globally competitive through a nationally integrated effort over the next decade.
The Senate amendment contained no similar provision.
The Senate recedes with an amendment that would require the Secretary of
Defense to provide for a group of industrial experts to assess priorities for
potential implementation of the various approaches in the near-term study, with
an assessment of the return on investment. It would also require an assessment
of priorities for potential implementation of the various approaches for the
nationally, integrated effort, with the objective being to create a healthier and
more viable U.S. shipbuilding industrial base.
The conferees believe the group chosen for this study should be five to ten
industrial experts who represent an array of industrial sectors, not just the
shipbuilding industry. Many sectors of the U.S. industrial base have had to retool
processes and equipment to become more competitive. Since the rate of
shipbuilding is much lower, competitiveness has not provided the same incentive
for this sector. The conferees are aware of and support the work of the National
Shipbuilding Research Program-Advanced Shipbuilding Enterprise (NSRP —
ASE), including its lean shipbuilding initiative. The conferees would expect the
group of industrial experts chosen for this study to become familiar with this
work, and to consider the potential for using the NSRP — ASE to implement
some of the various approaches. (Pages 755-756)
In its discussion of a proposed ballistic missile defense interceptor called the
kinetic energy interceptor (KEI), which could be both ground- and sea-based, the
conference report stated:
The conferees remain convinced that the KEI could be an important aspect
of the overall ballistic missile defense architecture, potentially contributing
intercept capabilities in boost, midcourse, and terminal phases of the threat
missile flight. The conferees are concerned, however, with the lack of progress
in defining basing modes. The conferees note that:
(1) Recent justifications for the KEI ground-based variant suggest that it
might serve as the basis for midcourse intercept capability in Europe. At the
same time, however, the budget request included $35.0 million for additional
ground-based interceptors (GBI) for the ground-based midcourse defense
element that could be deployed in Europe; and
CRS-37
(2) Consideration of sea-based concepts of operations and platforms do not
appear to be progressing.
The conferees direct the Director of the Missile Defense Agency to provide
a report to the congressional defense committees by February 1, 2005 that
CRS-38
includes planned ground- and sea-basing modes for KEI (including specific
sea-based platforms) and the concept of operations for each basing mode; how
KEI will enhance ballistic missile defense system capabilities; the role KEI may
play in European missile defense and how that role relates to the fielding of
additional GBIs ground-based interceptors); and a comparison of anticipated
sea-based KEI capabilities with other sea-based missile defense options. (Pages
579-580)
CRS-39
Appendix A: Independent Studies On Navy Force
Structure
Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) required the Secretary of Defense to provide for two independently performed
studies on potential future fleet platform architectures (i.e., potential force structure
plans) for the Navy. The two studies, which were conducted by the Center for Naval
Analyses (CNA) and the Office of Force Transformation (OFT, a part of the Office
of the Secretary of Defense), were submitted to the congressional defense committees
in February 2005.52
A third independent study on potential future fleet platform architectures, which
was conducted by the Center for Strategic and Budgetary Assessments (CSBA) on
its own initiative, was made available to congressional and other audiences in March
2005.
This appendix summarizes these three studies.53
CNA Report54
The CNA report presents a fairly traditional approach to naval force planning
in which capability requirements for warfighting and for maintaining day-to-day
naval forward deployments are calculated and then integrated. The report’s
discussion of how crew rotation may alter force-level requirements for maintaining
day-to-day forward deployments is somewhat detailed and may have been adapted
from other work that CNA has done on the topic for the Navy.
The report recommends a Navy force structure of 256 to 380 ships. The
difference between the low and high ends of the CNA range is that the low end
assumes a greater use of crew rotation and overseas homeporting of Navy ships.
Table 5 below compares the CNA-recommended force range to the 375-ship
fleet proposal mentioned by Navy officials from early 2002 through early 2004.
52
Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See pages 28-29 and 612-613 of H.Rept. 108-354, and pages 255-256
of the House report (H.Rept. 108-106 of May 16, 2003) on H.R. 1588.
53
This appendix essentially reprints a Mar. 18, 2005 memorandum to the office of
Representative Roscoe Bartlett, and is incorporated here with the permission of that office.
54
Delwyn Gilmore, with contributions by Mark Lewellyn et al, Report to Congress
Regarding Naval Force Architecture. Alexandria (VA), Center for Naval Analyses, 2005.
(CRM D0011303.A2/1Rev, Jan. 2005) 60 pp.
CRS-40
Table 5. CNA-Recommended Force and 375-Ship Proposal
Ship type
Ballistic missile submarines (SSBNs)
CNArecommended
force
Navy
375-ship
proposala
14
14
4
4
Attack submarines (SSNs)
38 to 62
52
Aircraft carriers
10 to 12
12
66 to 112
109
Littoral combat ships (LCSs)
40 to 70
56
Amphibious ships
18 to 30
36
Maritime Prepositioning Force (Future) ships
19 to 21
18
Combat logistics (resupply) ships
25 to 33
33
22
41
256 to 380
375
Cruise missile submarines (SSGNs)
Cruisers and destroyers
Otherb
Total battle force ships
Source: Table prepared by CRS based on figures in CNA report.
a Composition as shown in CNA report as the program of record for the year 2022. A somewhat
different composition is shown earlier in this report.
b Includes command ships, support ships (such as salvage ships and submarine tenders), dedicated
mine warfare ships, and high-speed sealift ships.
As can be seen in the table, the 380-ship fleet at the high end of the CNA range
is similar in size and composition to the Navy’s 375-ship fleet proposal. The 256ship fleet at the low end of the CNA range is a more-or-less scaled-down version of
the 380-ship fleet. The 256-ship fleet’s reduced numbers for aircraft carriers,
amphibious ships, and attack submarines are similar to figures reported in the defense
trade press since early 2004 about possible reductions in planned numbers of those
kinds of ships. The 256-ship fleet also includes reduced numbers for ships such as
larger surface combatants and combat logistics (resupply) ships.
The CNA range of 256 to 380 ships overlaps with ranges of 290 to 375 ships,
260 to 325 ships, and 243 to 302 ships presented in the Navy’s February testimony
An additional comparison is that the mid-point of the
to Congress.55
CNA-recommended range (318 ships) is similar in terms of total numbers of ships
to the 310-ship fleet from the 2001 Quadrennial Defense Review (QDR). Unlike the
55
See Statement of Admiral Vernon Clark, USN, Chief of Naval Operations, Before the
House Armed Services Committee, Feb. 17, 2005, pp. 19-20 and Statement of Admiral
Vernon Clark, USN, Chief of Naval Operations, Before the Senate Armed Services
Committee, Feb. 10, 2005, pp. 18-19.
CRS-41
2001 QDR fleet, however, the CNA-recommended force includes several dozen
Littoral Combat Ships (LCSs) and smaller numbers of other kinds of ships.
The CNA-recommended fleet platform architecture uses essentially the same
kinds of ships as those currently in the fleet, under construction, or planned for
procurement. It also uses essentially the same kinds of naval formations as those in
use today or planned by the Navy. If an alternative fleet platform architecture is
defined as one that uses ship types or naval formations that differ in some significant
way from those currently used or planned, then the CNA-recommended force
arguably would not qualify as an alternative fleet platform architecture.
In summary, the CNA-recommended force parallels fairly closely current Navy
thinking on the size and composition of the fleet. This is perhaps not surprising,
given that much of CNA’s analytical work is done at the Navy’s request.
OFT Report56
The OFT report differs significantly (some might say diametrically) from the
CNA report. The OFT report “calls into question the viability of the longstanding
logic of naval force building”57 and presents an essentially clean-sheet proposal for
a future Navy that would be radically different from the currently planned fleet.
The OFT report was prepared under the direction of retired Navy admiral Arthur
Cebrowski, who was the director of OFT from October 29, 2001 until January 31,
2005. The report is generally consistent with Cebrowski’s ideas on network-centric
warfare and distributed force architectures, which he has developed and articulated
since his tenure as President of the Naval War College (from July 24, 1998 to August
22, 2001).
The OFT-recommended fleet would include large numbers of manned ships
(about three-quarters of them small, fast surface combatants), about the same number
of carrier-based manned aircraft as in the Navy’s planned fleet, and large numbers
of unmanned systems.
The OFT architecture employs eight new ship designs that differ substantially
from the designs of most ships currently in the fleet, under construction, or planned
for procurement. Among the eight new ship designs are four types of large surface
ships that would be built from a common, relatively inexpensive, merchant-like hull
design developed in 2004 for the Navy’s Maritime Prepositioning Force (Future)
analysis of alternatives. These four types of ships, which would all displace 57,000
tons, include:
!
An aircraft carrier that would embark a notional air wing of 30
Joint Strike Fighters (JSFs), 6 MV-22 Osprey tilt-rotor aircraft, and
56
U.S. Department of Defense, Office of the Secretary of Defense, Alternative Fleet
Architecture Design. Washington, 2005. (Report for the Congressional Defense
Committees, Office of Force Transformation). 101 pp.
57
Ibid., p. 1
CRS-42
15 unmanned air vehicles (UAVs). The total of 36 manned aircraft
is about half as many as in today’s carrier air wings, and the OFT
architecture envisages substituting two of these new carriers for each
of today’s carriers. This new carrier would also have support spaces
for unmanned underwater vehicles (UUVs), unmanned surface
vehicles (USVs), and mission modules for the 1,000-ton surface
combatant described below. In displacement terms, this ship would
be roughly the same size as a new aircraft carrier design that the
United Kingdom plans to procure, and somewhat larger than the
U.S. Navy’s 40,000-ton LHA/LHD-type amphibious assault ships.
Compared to the U.S. Navy’s aircraft carriers, which displace 81,000
to 102,000 tons, this ship could be considered a medium-size carrier.
!
A missile-and-rocket ship that would be quipped with 360 vertical
launch system (VLS) missile tubes and four trainable rocket
launchers. Additional spaces on this ship could be used to support
UUVs, USVs, and mission modules for the 1,000-ton surface
combatant. Alternatively, these spaces could be used to provide
limited stowage and working space for the 100-ton surface
combatant described below, and mission modules for these 100-ton
ships. This ship could be considered similar in some respects to the
Navy/DARPA arsenal ship concept of 1996-1997, which would have
been a large, relatively simple surface ship equipped with about 500
VLS tubes.58
!
An amphibious assault ship that would embark a notional air wing
of either 30 CH-46 equivalents or 6 JSFs, 18 MV-22s, and 3
gyrocopter heavy-lift helicopters. It would also have spaces for
Marine Corps equipment, unmanned vehicles, and mission modules
for the 1,000-ton surface combatant.
!
A “mother ship” for small combatants that would contain stowage
and support spaces for the 100-ton surface combatant described
below.
The four other new-design ships in the OFT architecture are:
!
58
A 13,500-ton aircraft carrier based on a conceptual surface effect
ship (SES)/catamaran hull design developed in 2001 by a team at the
Naval Postgraduate School. This ship would embark a notional air
wing of 8 JSFs, 2 MV-22s, and 8 UAVs. The total of 10 manned
aircraft is roughly one-eighth as many as in today’s carrier air wings,
and the OFT architecture envisages substituting eight of these new
For more on the arsenal ship, see CRS Report 97-455 F, Navy/DARPA Arsenal Ship
Program: Issues and Options for Congress, by Ronald O’Rourke. 133 pp.; and CRS Report
97-1044 F, Navy/DARPA Maritime Fire Support Demonstrator (Arsenal Ship) Program:
Issues Arising From Its Termination, by Ronald O’Rourke. 6 pp. Both reports are out of
print and are available directly from the author.
CRS-43
carriers for each of today’s carriers. This new ship would have a
maximum speed of 50 to 60 knots. In displacement terms, the ship
would be slightly larger than Thailand’s aircraft carrier, which was
commissioned in 1997, and somewhat smaller than Spain’s aircraft
carrier, which was based on a U.S. design and was commissioned in
1988. Due to its SES/catamaran hull design, this 13,500-ton ship
would be much faster than the Thai and Spanish carriers (or any
other aircraft carrier now in operation), and might have a larger
flight deck. This ship could be considered a small, high-speed
aircraft carrier.
!
A 1,000-ton surface combatant with a maximum speed of 40 to 50
knots and standard interfaces for accepting various modular mission
packages. These ships would self-deploy to the theater and would
be supported in theater by one or more of the 57,000-ton ships
described above. This design could be viewed as similar to, but
smaller than, the 2,500- to 3,000-ton Littoral Combat Ship (LCS).
Compared to the LCS, it would be closer in size to the Streetfighter
concept (a precursor to the LCS) that was proposed by retired
admiral Cebrowski during his time at the Naval War College.
!
A 100-ton surface combatant with a maximum speed of 60 knots
and standard interfaces for accepting various modular mission
packages. These ships would be transported to the theater by the
57,000-ton mother ship and would be supported in theater by that
ship and possibly also the 57,000-ton missile-and-rocket ship.
Compared to the LCS, this ship, like the 1,000-ton surface
combatant, would be closer in size to the Streetfighter concept.
!
A non-nuclear-powered submarine equipped with an airindependent propulsion (AIP) system.59 These AIP submarines
would be lower-cost supplements to the Navy’s nuclear-powered
submarines (SSNs) and would be transported from home port to the
theater of operations by transport ships. The OFT architecture
envisages substituting four of these submarines for the SSN in each
carrier strike group.60
59
An AIP system such as a fuel-cell or closed-cycle diesel engine extends the stationary or
low-speed submerged endurance of a non-nuclear-powered submarine. A conventional
diesel-electric submarine has a stationary or low-speed submerged endurance of a few days,
while an AIP-equipped submarine may have a stationary or low-speed submerged endurance
of up to two or three weeks. An AIP system does not significantly increase the high-speed
submerged endurance of a non-nuclear-powered submarine. A non-nuclear-powered
submarine, whether equipped with a conventional diesel-electric propulsion system or an
AIP system, has a high-speed submerged endurance of perhaps 1 to 3 hours, a performance
limited by the electrical storage capacity of the boat’s batteries, which are exhausted quickly
at high speed.
60
The report states that “Alternatives to the SSNs in formations were diesel Air Independent
Propulsion (AIP) submarines and unmanned undersea vehicles (UUVs). The AIP
(continued...)
CRS-44
The 1,000- and 100-ton surface combatants would be built as relatively
inexpensive sea frames, like the LCS.
The OFT architecture is similar in certain ways to a fleet architecture proposed
by the Naval Surface Warfare Center (NSWC) between 1989 and 1992. The NSWC
architecture, like the OFT architecture, employed a common hull design for a large
ship that could be built in several variants for various missions, including aviation,
missile launching and fire support, amphibious warfare, logistics support, and
mother-ship support of small, fast, surface combatants. The small, fast surface
combatants in the NSWC architecture were called scout fighters and were in the same
general size range as the 100- and 1,000-ton surface combatants in the OFT
architecture.61
The OFT report combines the eight above-described types of ships, plus the
Navy’s currently planned TAOE-class resupply ship, into three alternative force
structures (Alternatives A, B, and C) that the report calculates would be equal in cost
to the equivalent parts of the Navy’s proposed 375-ship fleet. The report states that
each of these alternative force structures, like the equivalent parts of the Navy’s
proposed 375-ship fleet, would be organized into 12 carrier strike groups (CSGs), 12
expeditionary strike groups (ESGs), and 9 surface strike groups (SSGs). The three
alternative force structures are shown in Table 6 on the next page.
60
(...continued)
submarines were substituted for Virginia class SSNs on a cost basis of roughly four to one.
These submarines could be nuclear-powered if they are designed and built based upon a
competitive, cost suppressing business model.” (Page 60) The strategy of transporting the
AIP submarines to the theater using transport ships is not mentioned in the report but was
explained at a Feb. 18, 2005 meeting between CRS and analysts who contributed to the OFT
report.
61
For more on this proposed fleet architecture, see Norman Polmar, “Carrying Large
Objects,” U.S. Naval Institute Proceedings, December 1990: 121-122; Michael L. Bosworth
et al, “Multimission Ship Design for an Alternative Fleet Concept,” Naval Engineers
Journal, May 1991: 91-106; Michael L. Bosworth, “Fleet Versatility by Distributed
Aviation,” U.S. Naval Institute Proceedings, Jan. 1992: 99-102; and Victor A. Meyer,
“Naval Surface Warfighting Vision 2030,” Naval Engineers Journal, May 1992: 74-88. See
also “USN’s ‘2030’ Plan For Future Fleet,” Sea Power, Apr. 1992: 79, 82; Edward J. Walsh,
“‘Alternative Battle Force’ Stresses Commonality, Capability,” Sea Power, Feb. 1991: 3335; Robert Holzer, “Navy Floats Revolutionary Ship Design for Future Fleet,” Defense
News, May 14, 1990: 4, 52; and Anne Rumsey, “Navy Plans Ship Look-A-Likes,” Defense
Week, Mar. 13, 1989: 3.
CRS-45
Table 6. Alternative fleet structures from OFT report
Ship type
Alternative
A
B
C
57,000-ton aircraft carrier
24
24
0
57,000-ton missile-and-rocket
ship
33
33
33
57,000-ton amphibious assault
ship
24
24
24
57,000-ton mother ship
0
24
24
13,500-ton aircraft carrier
0
0
96
417
0
0
0
609
609
AIP submarine
48
48
48
TAOE-class resupply ship
12
12
12
Subtotal 1,000- and 100-ton
ships
417
609
609
Subtotal other ships
141
165
237
Total shipsa
558a
774a
846a
1,000-ton surface combatant
100-ton surface combatant
Source: Table prepared by CRS based on figures in OFT report.
a The totals shown in earlier copies of the OFT report are 36 ships lower in each case due to an error
in those copies in calculating the numbers of ships in the 12 carrier strike groups.
The totals shown in the table do not include SSNs, cruise missile submarines
(SSGNs), and ballistic missile submarines (SSBNs) operating independently of the
12 CSGs, 12 ESGs, and 9 SSGs. The totals also do not include combat logistics
ships other than the TAOEs (e.g., oilers, ammunition ships, and general stores ships)
and fleet support ships. The Navy’s 375-ship proposal, by comparison, includes all
these kinds of ships.
As can be seen from the shaded cells in the table, the difference between
Alternatives A and B is that the former uses 1,000-ton surface combatants while the
latter uses 100-ton surface combatants that are transported into the theater by mother
ships, and the difference between Alternatives B and C is that the former uses
57,000-ton aircraft carriers while the latter substitutes 13,500-ton carriers.
As can also be seen in the table, all three fleets are dominated numerically by
the small surface combatants. These ships account for about 75% of the ships in
Alternative A, about 79% of the ships in Alternative B, and about 72% of the ships
CRS-46
in Alternative C. In the Navy’s currently planned architecture, by contrast, the LCS
might account for roughly 15% to 20% of the total number of ships.
The OFT report contains a fairly detailed discussion of the Navy’s budget
situation that calls into question, on several grounds, the Navy’s prospective ability
to afford its 375-ship proposal. The report concludes that funding for Navy shipprocurement in future years may fall as much as 40% short of what would be needed
to achieve the Navy’s 375-ship fleet proposal. If the shortfall is 40%, the report
estimates, the Navy could maintain a force of 270 to 315 ships, which is comparable
in number to today’s force of 290 ships, except that the future force would include
a substantial number of relatively inexpensive LCSs. If proportionate reductions are
applied to the force structures shown in Table 6, Alternative A would include 402
to 469 ships, Alternative B would include 557 to 650 ships, and Alternative C would
include 609 to 711 ships. Again, these totals would not include certain kinds of ships
(independently operating SSNs, etc.) that are included in the total of 270 to 315 ships
associated with the Navy’s currently planned architecture.
In terms of how the OFT architecture would compare in capability with the
currently planned architecture, the report states:
Alternative fleet formations consisting of small fast and relatively
inexpensive craft combining knowledge and attaining flexibility through
networking appear superior to the programmed fleet for non-traditional warfare
in a variety of settings. This is due to increasing the complexity the enemy faces
and increasing U.S. fleet options that in turn reduce enemy options. The speed
and complexity of the alternative fleets can provide them with the capability to
complicate and possibly defeat the attempts of non-traditional adversaries to
elude surveillance. The enemy could have difficulty determining what to expect
and how to defeat them all. The superior speed and more numerous participants
than in the programmed fleet provide a stronger intelligence base and more
numerous platforms from which to conduct strikes and interceptions. This
appears to be true even if the smaller craft are individually somewhat less
capable and less able to sustain a hit than the larger ships in the programmed
fleet.
If these circumstances are not achieved, and the enemy can continue to
elude and deceive, the programmed fleet often is as good as the alternatives,
sometimes even better. It is not necessarily better in cases in which individual
ship survivability dominates, a perhaps counterintuitive result until we realize
that fleet survivability not individual ship survivability is what dominates.
An area in which programmed fleets might have an advantage would be
when the long loiter time or deep reach of CTOL [conventional takeoff and
landing] aircraft on programmed big-deck CVNs [nuclear-powered aircraft
carriers] is needed. That said, there need be no great sacrifice. With airborne
tanking, the VSTOL [very short takeoff and landing] aircraft in the alternatives
could meet the deep strike and long loiter demands. Also, as mentioned earlier,
a combination of advances in EMALS [electromagnetic aircraft launch system]
and modifications to the JSF will make it possible to launch the JSF with only
a marginal range-payload capability penalty. Moreover, trends in technology are
CRS-47
providing unmanned aircraft greater capability, including greater loiter time and
sensor capability.62
At other points, the OFT report argues that its recommended fleet architecture
would:
62
!
“provide a quantum leap ahead in capabilities against a spectrum of
enemies ranging from large, highly developed competitors to small
but determined asymmetric adversaries”63 and be adaptable, in a
dynamic and less-predictable security environment, to changing
strategic or operational challenges;
!
be capable of both participating in joint expeditionary operations and
maintaining “the strategic advantage the Navy has developed in the
global commons,” avoiding a need to choose between optimizing the
fleet for “performance against asymmetric challenges at the expense
of its ability to confront a potential adversary capable of traditional
high intensity conflict,” such as China;64
!
pose significant challenges to adversaries seeking to counter U.S.
naval forces due to the “large numbers of combat entities that the
enemy must deal with; a great variety of platforms with which the
enemy must contend; speed; different combinations of forces;
distribution of forces across large areas; and [adversary] uncertainty
as to the mission and capabilities of a given platform;”65
!
reduce unit shipbuilding costs, and thereby permit an increase in
total ship numbers, by shifting the fleet away from complex, highly
integrated ship designs that are inherently expensive to build and
toward less-complex merchant-like hulls and small sea frames that
are inherently less expensive to build;
!
increase shipbuilding options for the Navy by shifting the fleet away
from complex, highly integrated ship designs that can be built only
by a limited number of U.S. shipyards and toward less-complex
merchant-like hulls and small sea frames that can be built by a
broader array of shipyards;
!
make it easier and less expensive to modernize ships over their long
lives, and thereby take better advantage of rapid developments in
technology, by shifting from highly integrated ship designs to
merchant-like hulls and sea frames;
Alternative Fleet Architecture Design, op. cit., pp. 75-76. Italics as in the original.
63
Ibid., p. 6.
64
Ibid., p. 1 and 2.
65
Ibid., p. i.
CRS-48
!
permit more constant experimentation with new operational
concepts, and thereby achieve higher rates of learning about how to
evolve the fleet over time; and
!
recognize potential future constraints on Navy budgets and make the
Navy more smoothly scalable to various potential future resource
levels by shifting from a fleet composed of limited numbers of
relatively expensive ships to one composed of larger numbers of less
expensive ships.
The OFT report does not include a detailed plan for transitioning from today’s
fleet architecture to its proposed architecture,66 but such a plan could be developed
as a follow-on analysis.
The report poses a significant potential business challenge to the six shipyards
that have built the Navy’s major warships in recent years. The report’s discussion
on implementing its proposed architecture states in part:
The shipbuilding industrial base would also need to start to retool to build
different types of ships more rapidly. Smaller shipyards, which presently do
little or no work for the Navy could compete to build the smaller ships, thereby
broadening the capabilities base of ship design and construction available to the
Navy. The change to smaller, lower unit cost ships would also open up overseas
markets. With more shipyards able to build the ships and potential for a broader
overall market, the U.S. shipbuilding industry would have the chance to expand
its competence, innovation and relevance. Taken together this would sharpen the
industry’s ability to compete and provide alternatives to a ship procurement
66
On the topic of transitioning to the proposed fleet architecture, the report states:
Implementation of the alternative fleet architecture should start now and
should target option generation, short construction time, and technology
insertion. The alternative further provides an opportunity to reinvigorate the
shipbuilding industrial base. The many smaller ships, manned and unmanned, in
the alternative fleet architecture could be built in more shipyards and would be
relevant to overseas markets. The potential longevity of the existing fleet will
sustain existing shipyards as they move into building smaller ships more rapidly
in this broader market and more competitive environment. The shipyards would
develop a competence, broad relevance, and operate in an environment driven by
market imperatives instead of a framework of laws that frustrates market forces.
As the new ships enter service and the fleet has the opportunity to
experiment with new operational concepts (expanded network-centric warfare
in particular) existing ships can be retired sooner to capture operations savings.
At this point, the sooner the existing fleet is retired, the sooner the benefits of the
alternative fleet architecture design will accrue. (Page 3)
Additional general discussion of implementation is found on pp. 76-77 of the report.
CRS-49
system that is beset by laws and regulations that frustrate, even pervert, market
forces.67
The report’s concluding section lists five “dangers” that “risk the Navy’s ‘losing
the way.’” One of these, the report states, is “Shielding the shipbuilding industrial
base from global competition,” which the report states “guarantees high cost, limited
innovation, and long cycle times for building ships.”68
The OFT report proposes building ships that are substantially different from
those currently in the fleet, under construction, or planned for procurement, and
combines these ships into formations which, although similar in name to currently
planned formations (i.e., CSGs, ESGs, and SSGs), might be viewed by some
observers as substantially different in composition from the currently planned
versions of these formations. If an alternative fleet platform architecture is defined
as one that uses ship types or naval formations that differ in some significant way
from those currently used or planned, then the OFT-recommended force arguably
would qualify as an alternative fleet platform architecture.
In summary, the OFT report fundamentally challenges current Navy thinking on
the size and composition of the fleet. This is perhaps not surprising, given both
OFT’s institutional role within DOD as a leading promoter of military transformation
and Cebrowski’s views on network-centric warfare and distributed force
architectures.
CSBA Report69
The CSBA report can be viewed as falling somewhere in between the CNA and
OFT reports in terms of how far its recommendations depart from current Navy
plans. The CSBA report:
!
challenges current Navy thinking on Navy force planning more than
the CNA report, but less than the OFT report;
!
uses many of the same kinds of ships now planned by the Navy (like
the CNA report) but also recommends or suggests some new kinds
of ship designs (like the OFT report); and
!
recommends a ship force structure that differs from current Navy
plans more than CNA’s force structure, but less than OFT’s force
structure.
67
Ibid., p. 76.
68
Ibid., p. 80.
69
Robert O. Work, Winning the Race: A Naval Fleet Platform Architecture for Enduring
Maritime Supremacy. (Washington, Center for Strategic and Budgetary Assessments:
2005).
CRS-50
The CSBA report was prepared by Robert Work, CSBA’s analyst for maritime
issues. CSBA describes itself as
an independent, policy research institute established to promote innovative
thinking about defense planning and investment strategies for the 21st century.
CSBA’s analytic-based research makes clear the inextricable link between
defense strategies and budgets in fostering a more effective and efficient defense,
and the need to transform the US military in light of an emerging military
revolution.70
CSBA’s Executive Director is Dr. Andrew F. Krepinevich, Jr., whose previous
experience includes work in DOD’s Office of Net Assessment, the office directed by
Andrew Marshall. Krepinevich is generally considered a major writer on defense
transformation.
The CSBA report aims at designing a distributed, adaptable, and scalable
integrated naval battle network whose ships could be acquired for a total of about $10
billion per year in ship-acquisition funding, defined in the report as the sum of the
Shipbuilding and Conversion, Navy (SCN) appropriation account and shipconstruction funding in the National Defense Sealift Fund (NDSF). Another stated
goal of the CSBA report is to provide a practical transition road map for shifting
from today’s fleet structure to CSBA’s recommended fleet structure.
The CSBA report analyzes at length the historical missions and structure of the
U.S. Navy and other navies and uses this analysis to support its discussion of how to
structure the U.S. fleet for the future. The report argues that the structure of the U.S.
Navy has shifted over time in response to changes in technology and U.S. security
challenges, and that U.S. military forces have entered a new security era (which the
report calls the “Joint Expeditionary Era”) during which the U.S. Navy will need to
do three things:
!
contribute to the global war on terrorism (GWOT);
!
prepare for possible nuclear-armed regional competitors; and
!
hedge against the possibility of a disruptive maritime competition
with China.
To do these three things, the report argues, the Navy should be structured to
include the following:
70
!
a sea-based power-projection and regional deterrence force;
!
a global patrol, GWOT, and homeland defense force;
!
a force for prevailing over enemy anti-access/area-denial forces; and
!
a strategic deterrence and dissuasion force.
Source: CSBA’s website [http://www.csbaonline.org].
CRS-51
The report constructs these four force elements and then combines them to
arrive at an overall recommended Navy force structure. Table 7 below shows this
force structure and compares it to the Navy’s 375-ship proposal as outlined in the
CNA report.
Table 7. CSBA-Recommended Force and 375-Ship Proposal
Ship type
CSBArecommended force
Navy 375ship
proposala
Ballistic missile submarines (SSBNs)
12b
14
Cruise missile submarines (SSGNs)
6b
4
Attack submarines (SSNs)
54c
52
Large-deck aircraft carriers (CVNs)
10
12
Medium aircraft carriers (CVEs)
4
0
Afloat forward staging base (AFSB)
1
0
84 or 86
109
84
56
Amphibious ships
32d
36
Maritime Prepositioning Force ships
16e
18e
Combat logistics (resupply) ships
36f
33
Otherg
34h
41
373 or 375i
375
Cruisers and destroyers
Littoral combat ships (LCSs)
Total battle force ships
Source for CSBA force structure: Table prepared by CRS based on figures in CSBA report.
a Composition as shown in CNA report as the program of record for the year 2022. A somewhat
different composition is shown earlier in this report.
b Alternatively, 10 SSBNs and 8 SSGNs.
c Includes one special-mission submarine. Total number drops slightly over next 12 years.
d Includes 8 LHDs and 24 LPD-17s.
e In the CSBA force, these are existing MPF ships; in the Navy’s 375-ship proposal, they are
MPF(Future) ships.
f Includes 8 TAOEs, 11 TAKEs, and 17 TAOs.
g Includes command ships and support ships (such as salvage ships and submarine tenders), and (for
CNA) dedicated mine warfare ships, and high-speed sealift ships.
h Includes, among other ships, 2 TAVBs and 8 TLKAs associated with the amphibious and MPF
ships.
i In addition to these ships, the CSBA report notes that U.S. maritime forces would include 35 DOD
prepositioning and surge sealift ships used primarily by the Army and Air Force, and 91 large,
medium, and fast-response (i.e., small) cutters currently planned for procurement under the Coast
Guard Deepwater acquisition program.
CRS-52
The CSBA report makes numerous specific recommendations for ship force
structure and ship acquisition, including the following:
!
Aircraft carriers. When the George H.W. Bush (CVN-77) enters
service in 2008 or 2009, do the following:
— Retire the two remaining conventional carriers — the Kitty Hawk
(CV-63) and the Kennedy (CV-67).
— Convert the Enterprise (CVN-65) into an afloat forward staging base
(AFSB) with a mixed active/reserve/civilian crew, to be used in
peacetime for aviation testing and in crises for embarking special
operations forces, Army or Marine Corps forces, or joint air wings.
— Begin replacing the 10 Nimitz (CVN-68) class carriers on a one-forone basis with CVN-21-class carriers procured once every five years
using incremental funding.
— Redesignate the LHA(R) as a medium sized carrier (CVE) and
procure one every three years starting in FY2007 using incremental
funding.71
!
Submarines.
— Maintain Virginia-class SSN procurement at one per year for the next
several years, producing an eventual total of perhaps 20 Virginia-class
boats.
— Begin immediately to design a new “undersea superiority system”
with a procurement cost 50% to 67% that of the Virginia-class design,
with the goal of achieving a procurement rate of two or three of these
boats per year no later than FY2019.
— Study options for extending the service lives of the three Seawolf
SSNs and the 31 final Los Angeles-class SSNs to mitigate the
projected drop in SSN force levels during the 2020s.
— Reduce the SSBN force from 14 ships to 12 ships and convert an
additional two SSBNs into SSGNs, for a total of six SSGNs.
— Study the option of reducing the SSBN force further, to 10 ships,
which would permit another two SSBNs to be converted into SSGNs,
for a total of eight SSGNs.72
!
Destroyers and cruisers.
— Procure a single DD(X) in FY2007, using research and development
funding, as the first of three surface combatant technology
demonstrators.
— Start a design competition for a next generation, modular surface
combatant or family of combatants, with capabilities equal to or
greater than the DD(X)/CG(X), but with a substantially lower
procurement cost.
— Build two additional surface combatant technology demonstrators to
compete against the DD(X) design.
71
CSBA briefing, slides 154-158.
72
Ibid., slides 276, 284, 289, 297, 299.
CRS-53
— Use the results of this competition to inform the design of a new
surface combatant, called SCX, with a procurement cost perhaps onethird to one-half that of the DD(X).
— Begin procuring this new design in FY2015 as a replacement for the
DD(X)/CG(X) program.
— Consider modifying the LPD-17 design into a low-cost naval surface
fire support ship carrying the Advanced Gun System (AGS) that was
to be carried by the DD(X).
— Consider procuring two additional DDG-51s to help support the
surface combatant industrial base in the near-term.73
!
Littoral Combat Ships and Coast Guard Deepwater cutters.
— Procure six LCSs per year for a total of 84 LCSs — 42 of the
Lockheed design, and 42 of the General Dynamics design.
— Organize these 84 ships into 42 divisions, each consisting of one
Lockheed ship and one General Dynamics ship, so that each division
can benefit from the complementary strengths of the two designs.
— Ensure that mission packages for the LCS and mission packages for
the Coast Guard’s large and medium Deepwater cutters are as
mutually compatible as possible.
— Include the Coast Guard’s Deepwater cutters when counting ships that
contribute to the country’s total fleet battle network.
— Begin a research and development and experimentation program
aimed at building several competing stealth surface combatant
technology demonstrators for operations in contested or denied-access
waters.74
!
Amphibious ships.
— Complete LHD-8 to create a force of eight LHDs.
— Rather than stopping procurement of LPD-17s after the ninth ship in
FY2007, as now planned by the Navy, increase the LPD-17
procurement rate to two ships per year and use multiyear procurement
(MYP) to procure a total of 24 LPD-17s.
— Retire the 12 existing LSD-41/49 class ships, leaving a 32-ship
amphibious fleet composed of eight LHDs and 24 LPD-17s.
— Form eight “distributed expeditionary strike bases” — each of which
would include one LHD, three LPD-17s, one Aegis cruiser, three
Aegis destroyers, two LCSs, and one SSGN.75
!
MPF and other ships.
— Retain the three existing MPF squadrons over the near- to mid-term.
73
Ibid., slides 246, 249, and 251-253. Slide 249 states that possibilities for a reduced-cost
alternative to the DD(X) include a surface combatant based on the LPD-17 design, a semisubmersible ship built to commercial standards (like a ship called the “Stryker” that was
proposed several years ago), and a large or medium “carrier of large objects,” perhaps built
to relaxed commercial standards.
74
Ibid., slides 275, 277, and 283.
75
Ibid., slides 227 and 236.
CRS-54
— Reconfigure two of the squadrons for irregular warfare.
— Use the third squadron as a swing asset to either reinforce the two
irregular-warfare squadrons or to provide lift for assault follow-on
echelon amphibious landing forces.
— Develop high-speed intra-theater and ship-to-shore surface connectors.
— Design an attack cargo ship (TAKA) to help support sustained joint
operations ashore, with a target unit procurement cost of $500 million
or less, and begin procuring this ship in FY2014.
— Replace the two existing hospital ships, the four existing command
ships , and existing support tenders with new ships based on the LPD17 design.
— Initiate a joint experimental program for future sea-basing platforms
and technologies.76
The report raises several questions about the Navy’s emerging sea basing
concept for conducting expeditionary operations ashore. The report states:
The work done thus far on sea basing is intriguing, but neither the concept nor
the supporting technologies appear sufficiently mature to justify any near-term
decisions such as canceling LPD-17 [procurement] in favor of MPF(F) ships, or
removing the well deck from the big deck amphibious assault platforms, both of
which would severely curtail the [fleet’s] ability to launch surface assaults over
the longer term.
Given these large uncertainties, no major moves toward the sea basing vision
should be made without further exploring the sea basing concept itself, and
experimenting with different numbers and types of sea base platforms,
connectors, and capabilities.77
Regarding the industrial base, the report states that “Rationalizing the defense
industrial base is... a critical part of DoN’s [the Department of the Navy’s] maritime
competition strategy, and should be the subject of immediate consideration and
deliberation by the Congress, DoD, and the DoN.”78 The report states:
Numerous studies have indicated that the six Tier I yards [i.e., the six yards that
have built the Navy’s major warships in recent years] have “exorbitant excess
capacities,” which contribute to the rising costs of [Navy] warships, primarily
because of high industrial overhead costs. These capacities are the result of
“cabotage laws and fluctuating national security acquisition policies that force
shipbuilders of combatants to retain capacities to address required surges in
coming years.” This last point is especially important: the DoN contributes
greatly to the problem of “exorbitant capacities” by its consistent tendency to
protray overly optimistic ramp ups in ship production in budget “out years.”79
The report recommends the following as part of its overall transition strategy:
76
Ibid., slides 228-232, and 307.
77
Ibid., slide 212.
78
Ibid., slide 314.
79
Ibid., slide 315.
CRS-55
!
Minimize production costs for more expensive warships (defined in
the report as ships costing more than $1.4 billion each) by
consolidating production of each kind of such ship in a single
shipyard, pursuing learning curve efficiencies, and requesting use of
multiyear procurement (MYP) whenever possible.
!
Minimize production costs for warships and auxiliaries costing less
than $1.4 billion each by emphasizing competition, shifting
production to smaller “Tier II” yards, using large production runs,
and enforcing ruthless cost control.80
The report states that “the strategy developed in this report suggests that [Navy]
planners might wish to:”
!
maintain production of aircraft carriers at Newport News,
!
consolidate production of large surface combatants and amphibious
ships at Ingalls, and
!
consolidate submarine building at Electric Boat (EB), or with a new,
single submarine production company.81
The report states that the second of these possibilities is guided by the building
sequence of LPD-17s and SCXs recommended in the report, Ingalls’ ability to build
a wider variety of ships than BIW, Ingalls’ surge capacity, and the availability of
space for expanding Ingalls if needed.82
80
Ibid., slide 316. Other steps recommended as part of the report’s overall transition
strategy (see slides 124 and 125) include the following:
! Plan to a fiscally prudent steady-state shipbuilding budget of $10 billion
per year.
! Maximize current capabilities and minimize nonrecurring engineering
costs for new platforms by maintaining and pursuing hulls in service, in
production or near production that can meet near- to mid-term GWOT
requirements and that are capable of operating in defended-access
scenarios against nuclear-armed regional adversaries.
! Identify and retain or build large numbers of common hulls that have a
large amount of internal reconfigurable volume, or that can carry a variety
of modular payloads, or that can be easily modified or adapted over time
to new missions.
! Pursue increased integration of Navy and Marine warfighting capabilities
and emphasize common systems to increase operational effectiveness and
reduce operation and support (O&S) costs.
! Focus research and development efforts on meeting future disruptive
maritime challenges, particularly anti-access/area-denial networks
composed of long-range systems and possibly weapons of mass
destruction.
81
Ibid., slides 317-318.
82
Ibid., slide 318.
CRS-56
The report states that the third of these possibilities is guided by the low
probability that procurement of Virginia-class submarines will increase to two per
year, the cost savings associated with consolidating submarine production at one
yard, EB’s past experience in building SSBNs and SSNs, EB’s surge capacity, and
the fact that building submarines at EB would maintain two shipyards (EB and
Newport News) capable of designing and building nuclear-powered combatants of
some kind.83
The report acknowledges that yard consolidation would reduce the possibilities
for using competition in shipbuilding in the near term and increase risks associated
with an attack on the shipbuilding infrastructure, but notes that DOD consolidated
construction of nuclear-powered carriers in a single yard years ago, and argues that
competition might be possible in the longer run if future aircraft-carrying ships, the
SCX, and the new undersea superiority system could be built in Tier II yards.84
The report states:
Given their current small yearly build numbers, consolidating construction of
aircraft carriers, surface combatants, and submarines in one yard [for each type]
makes sense. However, the same logic does not hold true for auxiliaries and
smaller combatants. These ships can normally be built at a variety of Tier I and
Tier II yards; competition can thus be maintained in a reasonable and costeffective way. For example, competing auxiliaries and sea lift and maneuver sea
base ships between NASSCO [National Steel and Shipbuilding Company],
Avondale, and Tier II yards may help to keep the costs of these ships down.
Building multiple classes of a single ship [type] is another prudent way to
enforce costs, since the DoN can divert production of any ship class that exceeds
its cost target to another company/class that does not. Simultaneously building
both the [Lockheed] and [General Dynamics] versions of LCS, and the Northrop
Grumman National Security Cutter, Medium [i.e., the medium-sized Deepwater
cutter] gives the DoN [an] enduring capability to shift production to whatever
ship stays within its cost target....
Of course, Congress and the DoN may elect to retain industrial capacity, and to
pay the additional “insurance premium” associated with having excess
shipbuilding capacity. For example: Congress and the DoN might wish to retain
two submarine yards until the [undersea superiority system] design is clear, and
wait to rationalize the submarine building base after potential [undersea
superiority system] yearly production rates are clear....
In a similar vein, Congress and the DoN might wish to retain two surface
combatant yards until the design of the SCX is clear, and wait to rationalize the
surface combatant building base after potential SCX yearly production rates are
clear. In this regard, Congress could consider authorizing a modest additional
number of [Aegis destroyers] to keep both BIW [Bath Iron Works] and Ingalls
“hot” until the SCX is designed....
83
Ibid., slide 318. See also slide 298.
84
Ibid., slides 318-319.
CRS-57
The key point is that The US shipbuilding infrastructure must be rationally sized
for expected future austere shipbuilding budgets, and whatever fiscally prudent
[Navy] transition plan is finally developed by DoN planners.85
The CSBA report proposes building ships that in some cases are different from
those currently planned, and combines these ships into formations that are different
in composition from those currently planned. If an alternative fleet platform
architecture is defined as one that uses ship types or naval formations that differ in
some significant way from those currently used or planned, then the CSBArecommended force arguably would qualify as an alternative fleet platform
architecture, though less dramatically so than the OFT-recommended force.
In summary, the CSBA report challenges current Navy thinking on the size and
composition of the fleet more dramatically than the CNA report, and less
dramatically than the OFT report. Compared to the CNA and OFT reports, the
CSBA report contains a more detailed implementation plan and a more detailed
discussion of possibilities for restructuring the shipbuilding industrial base.
85
Ibid., slide 319.
CRS-58
Appendix B: Size of Navy and Navy Shipbuilding
Rate
The total number of battle force ships in the Navy reached a late-Cold War peak
of 568 at the end of FY1987 and began declining thereafter.86 The Navy fell below
300 battle force ships in August 2003 and included 288 battle force ships as of March
30, 2005. The FY2006-FY2011 FYDP calls for reducing the Navy to 285 battle
force ships by the end of FY2005 before building back to 289 battle force ships by
the end of FY2006, 293 by the end of FY2007, 297 by the end of FY2008, 302 by the
end of FY2009 and FY2010, and 305 by the end of FY2011.
Table 8 below shows past (FY1982-FY2005) and projected (FY2006-FY2011)
rates of Navy ship procurement.
Table 8. Battle force ships procured (FY1982-FY2005) or
projected (FY2006-FY2011)
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
17
14
16
19
20
17
15
19
15
11
11
7
4
4
5
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
4
5
5
6
6
6
5
7
8
4
7
7
9
10
12
Source: CRS compilation based on examination of defense authorization and appropriation
committee and conference reports for each fiscal year. The table excludes non-battle force ships that
do not count toward the 310- or 375- ship goal, such as sealift and prepositioning ships operated by
the Military Sealift Command and oceanographic ships operated by agencies such as the National
Oceanic and Atmospheric Administration (NOAA).
86
Some publications, such as those of the American Shipbuilding Association, state that the
Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is the total
number of active ships in the fleet, which is not the same as the total number of battle force
ships. In recent years, the total number of active ships has been larger than the total number
of battle force ships. For example, the Naval Historical Center states that as of November
16, 2001, the Navy included a total of 337 active ships, while the Navy states that as of
November 19, 2001, the Navy included a total of 317 battle force ships. Although the total
number of battle force ships as of February 16, 2005 was 290, the total number of active
ships as of this date was likely more than 300. Comparing the total number of active ships
in one year to the total number of battle force ships in another year is thus an apple-tooranges comparison that in this case overstates the decline since FY1987 in the number of
ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons
of the number of ships in the Navy over time should use, whenever possible, a single
counting method.
includes planned ground- and sea-basing modes for KEI (including specific
sea-based platforms) and the concept of operations for each basing mode; how
KEI will enhance ballistic missile defense system capabilities; the role KEI may
play in European missile defense and how that role relates to the fielding of
additional GBIs ground-based interceptors); and a comparison of anticipated
sea-based KEI capabilities with other sea-based missile defense options. (Pages
579-580