Updated July 10, 2024
Navy Light Replenishment Oiler (TAOL) Program:
Background and Issues for Congress

Introduction
Expeditionary Advanced Base Operations (EABO). DMO
The Navy’s Light Replenishment Oiler (TAOL) program,
aims at avoiding a situation in which an adversary could
previously called the Next-Generation Logistics Ship
defeat U.S. naval forces by concentrating its attacks on a
(NGLS) program, envisages procuring a new class of
relatively small number of large, high-value U.S. Navy
potentially 13 at-sea resupply ships for the Navy. The
ships. Under EABO, relatively small Marine Corps units
Navy’s proposed FY2025 budget requests $7.7 million in
armed with anti-ship cruise missiles and other weapons
research and development funding for the program.
would hop on and off islands in the Western Pacific to
conduct “shoot-and-scoot” operations against adversary
The Navy’s FY2024 five-year (FY2024-FY2028)
ships. For more on DMO, EABO, and the Navy’s more
shipbuilding plan programmed the procurement of the first
distributed fleet architecture, see CRS In Focus IF12599,
TAOL in FY2026 at a cost of $150.0 million, the second in
Defense Primer: Navy Distributed Maritime Operations
FY2027 at a cost of $156.0 million, and the third in
(DMO) Concept, by Ronald O'Rourke.
FY2028 at a cost of $159.0 million. Compared to the
Navy’s FY2024 five-year shipbuilding plan, the Navy’s
Logistics Ships Currently Being Procured
FY2025 five-year (FY2025-FY2029) shipbuilding plan
The Navy is currently procuring new John Lewis (TAO-
defers the programmed start of TAOL procurement by one
205) class oilers, which are large CLF ships. TAO-205s
year and roughly triples the estimated procurement cost of
have a currently estimated procurement cost of more than
each ship—the plan programs the procurement of the first
$800 million per ship. For more on the TAO-205 program,
TAOL in FY2027, the second in FY2028, and the third in
see CRS Report R43546, Navy John Lewis (TAO-205)
FY2029, each at a cost of $453 million.
Class Oiler Shipbuilding Program: Background and Issues
for Congress
,
by Ronald O'Rourke.
Terminology
The Navy’s Combat Logistics Force (CLF) ships, also
TAOL Program
called underway replenishment (UNREP) ships, are
logistics ships that resupply the Navy’s combatant ships
Basic Concept for Ship
(e.g., aircraft carriers, surface combatants, and amphibious
The TAOL program (referred to in some documents as the
ships) at sea, so that the combatant ships can continue
NGLS or Next-Generation Medium Logistics Ship
operating at sea without having to return to port.
program) was initiated in the Navy’s FY2021 budget
submission. The program envisages building a new class of
The Navy’s current CLF ships include oilers (TAOs), dry
CLF ships (or a family of CLF ship designs) that would be
cargo and ammunition ships (TAKEs), and fast combat
smaller and individually less expensive to procure than the
support ships (TAOEs). In these designations, T means the
Navy’s current CLF ships. Figure 1 shows a sketch of a
ship is operated by the Military Sealift Command (MSC)
Navy notional TAOL design concept. The Navy states that
with a mostly civilian crew, A means auxiliary ship, O
the TAOL
means oiler, K means cargo, and E means ammunition (i.e.,
explosives). (TAO, TAKE, etc. are also typed as T-AO, T-
is planned to be a new class of ships to augment the
AKE, etc.) These CLF ships are large auxiliary ships. In the
traditional Combat Logistics Force (CLF) to enable
designation TAOL (also typed as T-AOL), the L means
refueling, rearming, and resupply of Naval assets—
light, meaning a smaller version of such a ship. TAOL thus
afloat and ashore—near contested environments via
means an oiler that is smaller than a full-sized oiler.
ship-to-ship operations and ship-to port operations
New Fleet Architecture and
in support of Distributed Maritime Operations
Operational Concepts
(DMO), Littoral Operations in a Contested
Environment
(LOCE),
and
Expeditionary
To more effectively counter the improving A2/AD
Advanced Base Operations (EABO). Augmenting
capabilities (i.e., capabilities that aim to create a defended
the traditional CLF, NGLS will provide a flexible,
area around a country that in time of conflict would be a
“no
responsive platform to move fuel, personnel,
-go zone” for opposing military forces) of China in
equipment, and supplies between ships, advanced
particular, the Navy wants to begin shifting to a new, more
distributed fleet architecture (i.e., mix of ships) that is
bases, ports, and dispersed nodes of the seabase;
intended to support a new Navy and Marine Corps
sustaining afloat (Surface Action Group) and ashore
operational concept (i.e., a general approach for using
(Expeditionary Advanced Base) requirements.
forces) called Distributed Maritime Operations (DMO), and
an associated new Marine Corps operational concept called
https://crsreports.congress.gov


Navy Light Replenishment Oiler (TAOL) Program: Background and Issues for Congress
(Source: Department of Defense, Fiscal Year (FY)
TAOL in FY2026 at a cost of $150.0 million, the second in
2024
Budget
Estimates,
Navy,
Research,
FY2027 at a cost of $156.0 million, and the third in
Development, Test & Evaluation, Navy [account],
FY2028 at a cost of $159.0 million. Compared to the
Justification Book Volume 2 of 5, March 2023,
Navy’s FY2024 five-year shipbuilding plan, the Navy’s
page 421.)
FY2025 five-year (FY2025-FY2029) shipbuilding plan
defers the programmed start of TAOL procurement by one
Figure 1. Navy Notional TAOL Design Concept
year and roughly triples the estimated procurement cost of
each ship—the plan programs the procurement of the first
TAOL in FY2027, the second in FY2028, and the third in
FY2029, each at a cost of $453 million.
Contracts for Industry Studies
A January 6, 2022, press report stated that the Navy on
Source: U.S. Navy information paper, June 14, 2022, received by
December 17, 2021, awarded contracts to Austal USA of
CRS from Navy Office of Legislative Affairs, June 16, 2022. The Navy
Mobile, AL; Bollinger Shipyards of Lockport, LA; and TAI
states that the rendering “was developed by the Navy as an
Engineers, with main offices in New Orleans, LA, for
il ustration of the indicative design that supports the refuel, rearm
industry studies for the TAOL program. The contracts
and resupply missions currently contemplated by the NGLS program.
reportedly have a base value of $2 million each, with Austal
This il ustration does not represent the final NGLS design.”
USA’s contract having a potential value of up to $3.65
million, Bollinger’s up to $4.1 million, and TAI Engineers’
A February 1, 2022, report from Inside Defense stated that a
up to $3.46 million. The Navy will use studies, which are to
Navy spokesman said that the TAOL will potentially be a
last 24 months, to inform its understanding of cost-
family of vessels rather than a single class of ships. The
capability trade-offs for the TAOL.
Navy’s Fleet Readiness and Logistics office (known as the
N4 division within the Office of the Chief of Naval
Funding Request and Congressional
Operations, or OPNAV) approved the top-level
Action
requirements (i.e., major required features) for the TAOL in
The Navy’s proposed FY2025 budget requests $7.7 million
March 2020. The top-level requirements envision TAOLs
in research and development funding for the TAOL
being built in two variants: a Platform Supply Vessel (PSV)
program in Project 4045 (Next Generation Medium
variant and a Fast Supply Vessel (FSV) variant. The two
Logistics Ship) within Program Element (PE) 0603563N,
variants would perform the same missions, but the FSV
Ship Concept Advanced Design, which is line 45 in the
variant would be smaller and faster than the PSV variant.
Navy’s FY2025 research and development account.
The Navy states that commercial PSVs and FSVs are
potential design solutions for the TAOL program, but that
The House Armed Services Committee, in its report
the Navy is not limiting the potential solution to those types
(H.Rept. 118-529 of May 31, 2024, page 463) on the
of vessels.
FY2025 National Defense Authorization Act (NDAA)
(H.R. 8070), and the House Appropriations Committee, in
Procurement Quantity
its report (H.Rept. 118-557 of June 17, 2024, page 186) on
The Navy’s FY2025 30-year (FY2025-FY2054)
the FY2025 DOD Appropriations Act (H.R. 8774),
shipbuilding plan indicates that the Navy currently
recommend approving the Navy’s funding request.
envisages procuring a total of 13 TAOLs, but also indicates
that the total desired number of TAOLs is subject to further

analysis and could change.
Procurement Schedule and Procurement Cost
Ronald O'Rourke, Specialist in Naval Affairs
The Navy’s FY2024 five-year (FY2024-FY2028)
IF11674
shipbuilding plan programmed the procurement of the first


https://crsreports.congress.gov

Navy Light Replenishment Oiler (TAOL) Program: Background and Issues for Congress


Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
wish to copy or otherwise use copyrighted material.

https://crsreports.congress.gov | IF11674 · VERSION 44 · UPDATED