link to page 1 

Updated December 23, 2022
The Army’s Optionally Manned Fighting Vehicle (OMFV)
Background
OMFV Capabilities
The Army’s Optionally Manned Fighting Vehicle (OMFV)
The Army notes four planned OMFV capabilities:
is being designed to replace the M-2 Bradley Infantry
Enable command and control at the platoon level and
Fighting Vehicle (IFV) (see Figure 1 for a notional
higher by rapidly generating, receiving, and passing
example). Optionally manned means the OMFV is to have
information to dismounted elements, other vehicles, and
the ability to conduct remotely controlled operations while
command nodes.
a crew is not in the vehicle. The M-2 Bradley, which has
been in service since 1981, transports infantry on the
Detect, engage, and destroy enemy infantry fighting
battlefield, provides fire support to dismounted troops, and
vehicles beyond the range of the enemy’s primary
can destroy enemy fighting vehicles. Updated numerous
weapon system, and rapidly defeat dismounted enemy
times since its introduction, the M-2 Bradley is widely
infantry threats. The OMFV would also enhance unit-
considered to have reached the technological limits of its
level lethality by providing target acquisition data,
capacity to accommodate new electronics, armor, and
shared situational understanding, and the lethal effects
defensive systems. Two past efforts to replace the M-2
required to protect and orient friendly dismounted
Bradley—the Future Combat System (FCS) Program and
infantry.
the Ground Combat Vehicle (GCV) Program—were
cancelled for programmatic and cost-associated reasons.
Improve organizational effectiveness by reducing the
logistics burden on the Armored Brigade Combat Team
Figure 1. Notional Example—OMFV
(ABCT) through enhanced reliability and on-board
diagnostics and prognostics; ease of maintenance; and
reduced burdens on the supply chain in terms of spare
parts, fuel, and munitions.
Allow rapid adaptation by the means of growth margins
that allow for the insertion and integration of future
technologies.
OMFV Acquisition Approach
OMFV is to be Army’s first ground combat vehicle
designed using state-of-the-art digital engineering tools and
techniques. It is to be designed from the onset as a Modular
Open Systems Architected (MOSA) platform based on an
Army-defined and -owned open standard. As technology
and software evolve, MOSA could potentially facilitate
rapid OMFV modernization at a reduced cost. The open
Source: U.S. Naval Institute (USNI), https://news.usni.org/2021/12/
architecture of the OMFV could also offer more
30/report-to-congress-on-armys-optional y manned-fighting-vehicle,
opportunities for industry competition and innovations as
accessed April 18, 2022.
the OMFV is upgraded.
Note: This is a notional example; the Army’s OMFV selected for
The Army is conducting a five-phase acquisition approach
production may differ from this example.
to design, prototype, test, and produce the OMFV:
Role of the OMFV
Phase 1 consists of Market Research and
According to OMFV Program Information released by the
Requirement Development.
Army on February 28, 2022:
Phase 2, the Concept Design Phase, includes modeling,
The Optionally Manned Fighting Vehicle (OMFV)
simulation, and analysis (MS&A) to inform
will serve as the Army’s Infantry Fighting Vehicle
requirements and support initial design activities.
(IFV) tasked to maneuver through the enemy’s
security zone as part of a combined arms team for
Phase 3, the Detailed Design Phase, includes detailed
design activities to mature OMFV designs and
the purpose of creating an advantageous position,
concludes with a Critical Design Review (CDR). A
relative to the enemy, and providing protection and
CDR is a technical review to ensure the initial product
direct fire lethality while manned or remotely
baseline is established. Successful completion of CDR
operated. In the close fight, the OMFV enables the
provides the technical basis for proceeding into
ability of dismounted elements to maneuver by
fabrication, integration, development, test, and
detecting and destroying targets at a range beyond
evaluation of a system.
the enemy’s capability.
https://crsreports.congress.gov
The Army’s Optionally Manned Fighting Vehicle (OMFV)
Phase 4, the Prototype Build and Test Phase, verifies
Table 2. FY2023 OMFV Authorizations and
prototype performance against performance
Appropriations
specifications. Late in this phase, a Limited User Test
Total
(LUT) is to be conducted.
Funding
Authorized Appropriated Request
Phase 5, the Production and Fielding Phase, is to
Category
($M)
($M)
(Qty.)
result in a single Low-Rate Initial Production (LRIP)
RDT&E
$577.8
$554.9
—
contract for production, testing, and initial fielding.
Program Activities
Sources: Authorized: Rules Committee Print 117–70 Text of the
House Amendment to the Senate Amendment to H.R. 7776
Phase Two Contracts Awarded
[Showing the text of the James M. Inhofe National Defense
The Army announced the award of five firm-fixed price
Authorization Act for Fiscal Year 2023], December 6, 2022, p. 1810.
contracts for OMFV Phase 2 Concept Design Phase using
Appropriated: Fiscal Year 2023 Omnibus Appropriations Bil , H.R.
full and open competitive procedures on July 23, 2021. The
2617, Division C - Department of Defense Appropriations Act, 2023,
contracts were awarded to Point Blank Enterprises, Inc.
December 19, 2022, p. 89N.
(Miami Lakes, FL); Oshkosh Defense, LLC (Oshkosh, WI);
Potential Issues for Congress
BAE Systems Land and Armaments L.P. (Sterling Heights,
MI); General Dynamics Land Systems, Inc. (Sterling
The Army’s Plans for OMFV Fielding
Heights, MI); and American Rheinmetall Vehicles, LLC
The Army has, at present, 11 Active ABCTs and 5 Army
(Sterling Heights, MI). The total award value for all five
National Guard ABCTs. There are around 150 M-2
contracts was approximately $299.4 million. During this
Bradleys in each ABCT, for a total of 2,400 M-2s dedicated
phase, competing firms were asked to develop digital
to ABCTs.
designs. On November 1, 2022, it was reported that all five
Will OMFVs replace M-2s in ABCTS on a one-for-one
firms had submitted their OMFV digital designs prior to the
basis? If not, how many OMFVs are planned for each
November 1 deadline. All five proposals reportedly were
ABCT?
hybrid electric vehicles. It is not known if other companies
submitted OMFV digital designs by the November 1
How many additional OMFVs will be required over and
deadline.
above those needed for ABCTs? How many OMFVs
will be required for Army Prepositioned Stocks?
Planned Future Acquisition Phases
Upon successful completion of the Concept Design Phase,
In the past, the Army has fielded new systems as a
the Army intends to have another full and open competition
brigade set. Does the Army intend to field OMFVs as a
for Phase 3, the Detailed Design Phase, and plans to call for
brigade set? If so, how many ABCTs per year are
an award of up to three contracts in the second quarter of
planned to be equipped with OMFVs?
FY2023. The awardees are then to transition into Phase 4,
Lessons Learned from the Ukraine Conflict
the Prototype Build and Test Phase, in order to build and
There are a number of military observations emerging from
test actual prototypes. The Army then intends to select one
the current Ukraine conflict. One observation is that
vendor for Low-Rate Initial Production near the end of
Russian armored vehicles have allegedly proven highly
FY2027.
vulnerable to anti-tank guided missiles (ATGMs) such as
FY2023 OMFV Budgetary Information
the Javelin ATGM. Reports suggest the Russians have lost
significant numbers of armored vehicles to ATGM systems.
Table 1. FY2023 OMFV Budget Request
Given this observation and its possible implications for
Total
armored fighting vehicles in general, what are some of the
Total Request
Request
lessons learned about armored fighting vehicle vulnerability
Funding Category
($M)
(Qty.)
to ATGMs? Does the Army have plans to incorporate
Ukraine lessons learned into OMFV design? If so, what are
RDT&E
$589.7
—
some of the potential design changes/new capabilities
Source: Department of Defense Fiscal Year (FY) 2023 Budget
planned for incorporation into final OMFV design? Are
Estimates, Army Justification Book Volume 2e of 2 Research,
there cost implications associated with potential OMFV
Development, Test & Evaluation, Army RDT&E − Volume II, Budget
design changes/new capabilities?
Activity 5D, April, 2022, p. 259.
Notes: RDT&E = Research, Development, Test & Evaluation: $M =
Related CRS Products
U.S. dollars in mil ions; Qty. = FY2023 procurement quantities.
CRS Report R45519, The Army’s Optionally Manned
Fighting Vehicle (OMFV) Program: Background and Issues
for Congress, by Andrew Feickert.
CRS In Focus IF11876, The Army’s Robotic Combat
Vehicle (RCV) Program, by Andrew Feickert.
Andrew Feickert, Specialist in Military Ground Forces
IF12094
https://crsreports.congress.gov
The Army’s Optionally Manned Fighting Vehicle (OMFV)
Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
wish to copy or otherwise use copyrighted material.
https://crsreports.congress.gov | IF12094 · VERSION 4 · UPDATED