Coast Guard Polar Security Cutter (Polar
Icebreaker) Program: Background and Issues
for Congress

Updated April 24, 2019
Congressional Research Service
https://crsreports.congress.gov
RL34391




Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Summary
The Coast Guard Polar Security Cutter (PSC) program is a program to acquire three new heavy
polar icebreakers, to be followed years from now by the acquisition of up to three new medium
polar icebreakers. On April 23, 2019, the Coast Guard-Navy Integrated Program Office for the
PSC program awarded a $745.9 million fixed-price, incentive-firm contract for the detail design
and construction (DD&C) of the first PSC to VT Halter Marine of Pascagoula, MS, a shipyard
owned by Singapore Technologies (ST) Engineering. VT Halter was the leader of one of three
industry teams that competed for the DD&C contract. The first PSC is scheduled to begin
construction in 2021 and be delivered in 2024, though the DD&C contract includes financial
incentives for earlier delivery.
The DD&C contract includes options for building the second and third PSCs. If these options are
exercised, the total value of the contract would increase to $1,942.8 million (i.e., about $1.9
billion). The figures of $745.9 million and $1,942.8 million cover only the shipbuilder’s costs;
they do not include the cost of government-furnished equipment (GFE), which is equipment for
the ships that the government purchases and then provides to the shipbuilder for incorporation
into the ship, or government program-management costs. When GFE and government program-
management costs are included, the total estimated procurement cost of the first PSC is between
$925 million and $940 million, and the total estimated procurement cost of the three-ship PSC
program is about $2.95 billion.
The PSC program has received a total of $1,034.6 million (i.e., about $1.0 billion) in procurement
funding through FY2019, including $300 million provided through the Navy’s shipbuilding
account in FY2017 and FY2018. The Coast Guard’s proposed FY2020 budget requests $35
million in procurement funding for the PSC program, which is enough to cover the PSC
program’s FY2020 government program-management costs. The Coast Guard’s FY2019 budget
submission had projected that a total of $125 million in procurement funding would be requested
for the PSC program in FY2020.
The operational U.S. polar icebreaking fleet currently consists of one heavy polar icebreaker,
Polar Star, and one medium polar icebreaker, Healy. In addition to Polar Star, the Coast Guard
has a second heavy polar icebreaker, Polar Sea. Polar Sea, however, suffered an engine casualty
in June 2010 and has been nonoperational since then. Polar Star and Polar Sea entered service in
1976 and 1978, respectively, and are now well beyond their originally intended 30-year service
lives. The Coast Guard is using Polar Sea as a source of spare parts for keeping Polar Star
operational.
Issues for Congress for the PSC program include, inter alia, whether to approve, reject, or modify
the Coast Guard’s FY2020 procurement funding request for the program; whether to use a
contract with options or a block buy contract to procure the ships; whether to continue providing
at least some of the procurement funding for the PSC program through the Navy’s shipbuilding
account; technical, schedule, and cost risk in the PSC program; and whether to procure heavy and
medium polar icebreakers to a common basic design.
Congressional Research Service

link to page 5 link to page 5 link to page 5 link to page 5 link to page 6 link to page 6 link to page 7 link to page 7 link to page 7 link to page 7 link to page 8 link to page 8 link to page 8 link to page 8 link to page 8 link to page 8 link to page 9 link to page 9 link to page 9 link to page 10 link to page 11 link to page 13 link to page 14 link to page 17 link to page 17 link to page 17 link to page 19 link to page 23 link to page 23 link to page 20 link to page 25 link to page 26 link to page 27 link to page 23 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Contents
Introduction ..................................................................................................................................... 1
Background ..................................................................................................................................... 1

Missions of U.S. Polar Icebreakers ........................................................................................... 1
Statutory Duties and Missions ............................................................................................ 1
Multiple Missions (Not Just Icebreaking) ........................................................................... 2
Polar (Not Just Arctic) Operations ...................................................................................... 2

Current U.S. Polar Icebreakers .................................................................................................. 3
Required Numbers of U.S. Polar Icebreakers ........................................................................... 3
Coast Guard Polar Security Cutter (PSC) Program .................................................................. 3

Overview ............................................................................................................................. 3
Program Name .................................................................................................................... 4
Coast Guard-Navy Integrated Program Office (IPO) ......................................................... 4
Parent Design Approach ..................................................................................................... 4
Program Schedule ............................................................................................................... 4
Procurement Cost ................................................................................................................ 4
Program Funding ................................................................................................................ 4
Contract Award ................................................................................................................... 5
Issues for Congress .......................................................................................................................... 5
FY2020 Funding ....................................................................................................................... 5
Contract with Options vs. Block Buy Contract ......................................................................... 6
Funding Coast Guard Polar Icebreakers through Navy’s Shipbuilding Account ...................... 7
Technical, Schedule, and Cost Risk for PSC Program .............................................................. 9
Common Design for Heavy and Medium Polar Icebreakers .................................................. 10
Short-Term Bridge to One or More New Polar Icebreakers ................................................... 13
Overview: Two Basic Options .......................................................................................... 13
Coast Guard Plan is to Further Extend Life of Polar Star ................................................. 13
Another Option: Chartering an Icebreaker ........................................................................ 15
Legislative Activity for FY2020 .................................................................................................... 19
Summary of Appropriation Action on FY2020 Funding Request ........................................... 19

Figures
Figure 1. Aiviq ............................................................................................................................... 16

Figure A-1. Polar Star and Polar Sea ........................................................................................... 21
Figure A-2. Polar Sea .................................................................................................................... 22
Figure A-3. Healy .......................................................................................................................... 23

Tables
Table 1. Summary of Congressional Appropriations Action on FY2030 Funding Request .......... 19

Congressional Research Service

link to page 28 link to page 32 link to page 46 link to page 46 link to page 47 link to page 47 link to page 24 link to page 29 link to page 46 link to page 51 link to page 55 link to page 58 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Table A-1. Coast Guard and NSF Polar Ships ............................................................................... 24
Table B-1. Major Icebreakers of the World as of May 1, 2017 ..................................................... 28
Table C-1. Funding for Acquisition of New Polar Icebreaker Under FY2013-FY2020
Budget Submissions ................................................................................................................... 42
Table C-2. Funding in Procurement, Construction, and Improvements (PC&I) Account in
FY2013-FY2020 Budgets .......................................................................................................... 43

Appendixes
Appendix A. Current U.S. Polar Icebreakers and Polar Research Ships ....................................... 20
Appendix B. Required Numbers of U.S. Polar Icebreakers .......................................................... 25
Appendix C. PSC Program Funding ............................................................................................. 42
Appendix D. Funding Level in PC&I Account ............................................................................. 47
Appendix E. Great Lakes Icebreakers ........................................................................................... 51

Contacts
Author Information ........................................................................................................................ 54

Congressional Research Service

link to page 55 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Introduction
This report provides background information and issues for Congress on the Polar Security Cutter
(PSC) program—the Coast Guard’s program for acquiring new polar icebreakers. The PSC
program has received a total of $1,034.6 million (i.e., about $1.0 billion) in procurement funding
through FY2019. The Coast Guard’s proposed FY2020 budget requests $35 million in
procurement funding for the PSC program, which is enough to cover FY2020 program-
management costs.
The issue for Congress is whether to approve, reject, or modify the Administration’s FY2020
procurement funding request for the PSC program, and, more generally, whether to approve,
reject, or modify the Coast Guard’s overall plan for procuring new polar icebreakers. Congress’s
decisions on this issue could affect Coast Guard funding requirements, the Coast Guard’s ability
to perform its polar missions, and the U.S. shipbuilding industrial base.
For a brief discussion of the Coast Guard’s Great Lakes icebreakers, see Appendix E. A separate
CRS report covers acquisition of general-purpose cutters for the Coast Guard.1 Another CRS
report provides an overview of various issues relating to the Arctic.2
Background
Missions of U.S. Polar Icebreakers
Statutory Duties and Missions
The permanent statute that sets forth the Coast Guard’s primary duties—14 U.S.C. 102—states
that among other things, the Coast Guard shall (emphasis added) “develop, establish, maintain,
and operate, with due regard to the requirements of national defense, aids to maritime navigation,
icebreaking facilities, and rescue facilities for the promotion of safety on, under, and over the
high seas and waters subject to the jurisdiction of the United States,” and “pursuant to
international agreements, develop, establish, maintain, and operate icebreaking facilities on,
under, and over waters other than the high seas and waters subject to the jurisdiction of the United
States....”3
In addition, Section 888(a) of the Homeland Security Act of 2002 (H.R. 5005/P.L. 107-296 of
November 25, 2002)—the law that established the Department of Homeland Security (DHS) and
transferred the Coast Guard from the Department of Transportation to DHS—sets forth 11
specific missions for the Coast Guard (often referred to as the Coast Guard’s 11 statutory
missions), including the mission of “ice operations.”4

1 CRS Report R42567, Coast Guard Cutter Procurement: Background and Issues for Congress, by Ronald O'Rourke.
2 CRS Report R41153, Changes in the Arctic: Background and Issues for Congress, coordinated by Ronald O'Rourke.
3 14 U.S.C. 102(4) and 102(5), respectively. This statute was previously 14 U.S.C. 2; it was renumbered as 14 U.S.C.
102 by Section 103 of the Frank LoBiondo Coast Guard Authorization Act of 2018 (S. 140/P.L. 115-282 of December
4, 2018). (Title I of P.L. 115-282, consisting of Sections 101-124, specified a general reorganization of Title 14.)
4 The 11 missions set forth in Section 888(a) are marine safety; search and rescue; aids to navigation; living marine
resources (fisheries law enforcement); marine environmental protection; ice operations; ports, waterways and coastal
security; drug interdiction; migrant interdiction; defense readiness; other law enforcement.
Congressional Research Service

1

link to page 5 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Multiple Missions (Not Just Icebreaking)
The Coast Guard’s polar icebreakers do not simply break ice—they are multimission cutters5 that
conduct a variety of other operations that are conducted in lower-latitude waters by the Coast
Guard’s general-purpose cutters. U.S. polar ice operations conducted in large part by the Coast
Guard’s polar icebreakers support 9 of the Coast Guard’s 11 statutory missions.6 The roles of U.S.
polar icebreakers can be summarized as follows:
 conducting and supporting scientific research in the Arctic and Antarctic;
 defending U.S. sovereignty in the Arctic by helping to maintain a U.S. presence
in U.S. territorial waters in the region;
 defending other U.S. interests in polar regions, including economic interests in
waters that are within the U.S. exclusive economic zone (EEZ) north of Alaska;
 monitoring sea traffic in the Arctic, including ships bound for the United States;
and
 conducting other typical Coast Guard missions (such as search and rescue, law
enforcement, and protection of marine resources) in Arctic waters, including U.S.
territorial waters north of Alaska.7
Polar (Not Just Arctic) Operations
The Coast Guard’s large icebreakers are called polar icebreakers rather than Arctic icebreakers
because they perform missions in both the Arctic and Antarctic. Operations to support National
Science Foundation (NSF) research activities in both polar regions account for a significant
portion of U.S. polar icebreaker operations.
Supporting NSF research in the Antarctic focuses on performing an annual mission, called
Operation Deep Freeze (ODF), to break through Antarctic sea ice so as to reach and resupply
McMurdo Station, the large U.S. Antarctic research station located on the shore of McMurdo
Sound, near the Ross Ice Shelf. The Coast Guard states that Polar Star, the Coast Guard’s only
currently operational heavy polar icebreaker, “spends the [northern hemisphere] winter [i.e., the
southern hemisphere summer] breaking ice near Antarctica in order to refuel and resupply
McMurdo Station. When the mission is complete, the Polar Star returns to dry dock [in Seattle]
in order to complete critical maintenance and prepare it for the next ODF mission. Once out of
dry dock, it’s back to Antarctica, and the cycle repeats itself.”8 In terms of the maximum
thickness of the ice to be broken, the annual McMurdo resupply mission generally poses the
greatest icebreaking challenge for U.S. polar icebreakers, though Arctic ice can frequently pose
its own significant icebreaking challenges for U.S. polar icebreakers. The Coast Guard’s medium

5 Cutters are commissioned Coast Guard vessels greater than 65 feet in length.
6 For a list of the 11 missions, see footnote 4. The two statutory missions not supported by polar ice operations are
illegal drug interdiction and undocumented migrant interdiction. (Department of Homeland Security, Polar Icebreaking
Recapitalization Project Mission Need Statement, Version 1.0
, approved by DHS June 28, 2013, p. 10.)
7 This passage, beginning with “The roles of...”, originated in an earlier iteration of this CRS report and was later
transferred by the Government Accountability Office (GAO) with minor changes to Government Accountability
Office, Coast Guard[:]Efforts to Identify Arctic Requirements Are Ongoing, but More Communication about Agency
Planning Efforts Would Be Beneficial
, GAO-10-870, September 2010, p. 53.
8 NyxoLyno Cangemi, “Coast Guard Icebreaker Crew Completes Second Arctic Mission; U.S. Interests in Arctic
Domain Depends [sic] on Fleet Recapitalization,” DVIDS (Defense Visual Information Distribution System), October
19, 2018.
Congressional Research Service

2

link to page 24 link to page 29 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

polar icebreaker, Healy, spends most of its operational time in the Arctic supporting NSF research
activities and performing other operations.
Although polar ice is diminishing due to climate change, observers generally expect that this
development will not eliminate the need for U.S. polar icebreakers, and in some respects might
increase mission demands for them. Even with the diminishment of polar ice, there are still
significant ice-covered areas in the polar regions, and diminishment of polar ice could lead in
coming years to increased commercial ship, cruise ship, and naval surface ship operations, as well
as increased exploration for oil and other resources, in the Arctic—activities that could require
increased levels of support from polar icebreakers, particularly since waters described as “ice
free” can actually still have some amount of ice.9 Changing ice conditions in Antarctic waters
have made the McMurdo resupply mission more challenging since 2000.10
The Coast Guard’s strategy document for the Arctic region, released on May 21, 2013, states that
“The United States must have adequate icebreaking capability to support research that advances
fundamental understanding of the region and its evolution,” and that “The Nation must also make
a strategic investment in icebreaking capability to enable access to the high latitudes over the
long-term.”11
Current U.S. Polar Icebreakers
The operational U.S. polar icebreaking fleet currently consists of one heavy polar icebreaker,
Polar Star, and one medium polar icebreaker, Healy. In addition to Polar Star, the Coast Guard
has a second heavy polar icebreaker, Polar Sea. Polar Sea, however, suffered an engine casualty
in June 2010 and has been nonoperational since then. Polar Star and Polar Sea entered service in
1976 and 1978, respectively, and are now well beyond their originally intended 30-year service
lives. The Coast Guard is using Polar Sea as a source of spare parts for keeping Polar Star
operational.
For additional background information on current U.S. polar icebreakers and polar research ships,
see Appendix A.
Required Numbers of U.S. Polar Icebreakers
For background information on required numbers of U.S. polar icebreakers, see Appendix B.
Coast Guard Polar Security Cutter (PSC) Program
Overview
The PSC program was initiated in the Coast Guard’s FY2013 budget submission, and envisages
the acquisition of three new heavy polar icebreakers, to be followed years from now by the

9 For more on changes in the Arctic due to diminishment of Arctic ice, see CRS Report R41153, Changes in the Arctic:
Background and Issues for Congress
, coordinated by Ronald O'Rourke.
10 National Research Council, Polar Icebreakers in a Changing World, An Assessment of U.S. Needs, Washington,
2007, pp. 6-7, 14, 63.
11 United States Coast Guard Arctic Strategy, Washington, May 2013, p. 35; accessed May 24, 2013, at
http://www.uscg.mil/seniorleadership/DOCS/CG_Arctic_Strategy.pdf.
Congressional Research Service

3

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

acquisition of up to three new medium polar icebreakers. The Coast Guard wants to begin
construction of the first new heavy polar icebreaker in 2021 and have it enter service in 2024.
Program Name
The PSC program was previously known as the polar icebreaker (PIB) program. Changing the
program’s name to the PSC program is intended to call attention to the fact that the Coast Guard’s
polar icebreakers perform a variety of missions relating to national security, not just
icebreaking.12 Although it is now called the PSC program, many observers, as a matter of
convenience, may continue to refer to it as the polar icebreaker program.
Coast Guard-Navy Integrated Program Office (IPO)
The PSC program is managed by a Coast Guard-Navy Integrated Program Office (IPO). A key
aim in establishing the IPO was to permit the Navy to share its ship-procurement best practices
with the Coast Guard so as to help the Coast Guard reduce the time and cost needed to design and
procure the PSCs.
Parent Design Approach
The PSC program is using the parent design approach, meaning that the design of the PSC will be
based on an existing icebreaker design. A key aim in using the parent design approach is to reduce
cost, schedule, and technical risk in the PSC program.
Program Schedule
The PSC program’s schedule calls for delivering the three PSCs at 12-month intervals, at the end
of the third quarters of FY2024, FY2025, and FY2026, respectively.
Procurement Cost
The Coast Guard and Navy estimate the procurement cost of the first PSC at $925million to $940
million,13 and the total estimated procurement cost of the three-ship PSC program at about $2.95
billion. These figures include the shipbuilder’s cost; the cost of government-furnished equipment
(GFE), which is equipment for the ships that the government purchases and then provides to the
shipbuilder for incorporation into the ship; and government program-management costs. Within
these figures, the shipbuilder’s contract-award cost for the first ship is $745.9 million, with
options for the second and third ships that, if exercised, would increase the total value of the
contract to $1,942.8 million (i.e., about $1.9 billion).
Program Funding
The PSC program received about $359.6 million in procurement funding through FY2018,
including $300 million provided through the Navy’s shipbuilding account (which is part of
DOD’s budget) and $59.6 million provided through the Coast Guard’s procurement account
(which is part of the Department of Homeland Security’s [DHS’s] budget). The FY2019 DHS

12 See, for example, Ben Werner and Sam LaGrone, “Coast Guard Renames New Icebreaker Program ‘Polar Security
Cutter,’” USNI News, September 27, 2018. See also Sydney J. Freedberg Jr., “With Funding In Peril, Coast Guard
Pushes Icebreaker As ‘Polar Security Cutter,’” Breaking Defense, October 29, 2018.
13 See, for example, Calvin Biesecker, “Schultz Expects First Polar Security Cutter To Cost About $925 Million,”
Defense Daily, March 29, 2019.
Congressional Research Service

4

link to page 47 link to page 46 link to page 47 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appropriations Act (Division A of H.J.Res. 31/P.L. 116-6 of February 15, 2019) provided an
additional $675 million for the PSC program through the Coast Guard’s procurement account,
including $20 million for the procurement of long leadtime materials (LLTM) for the second ship
in the program. The PSC program has thus received a total of $1,034.6 million (i.e., about $1.0
billion) in procurement funding through FY2019. The Coast Guard’s proposed FY2020 budget
requests $35 million in procurement funding for the PSC program, which is enough to cover the
PSC program’s FY2020 government program-management costs. As shown in Table C-2, the
Coast Guard’s FY2019 budget submission had projected that a total of $125 million in
procurement funding would be requested for the PSC program in FY2020.
For additional background information on funding for the PSC program, see Appendix C.
Contract Award
On April 23, 2019, the Coast Guard-Navy Integrated Program Office for the PSC program
awarded a $745.9 million fixed-price, incentive-firm contract for the detail design and
construction (DD&C) of the first PSC to VT Halter Marine of Pascagoula, MS, a shipyard owned
by Singapore Technologies (ST) Engineering. VT Halter was the leader of one of three industry
teams that competed for the DD&C contract. The first PSC is scheduled to begin construction in
2021 and be delivered in 2024, though the DD&C contract includes financial incentives for
earlier delivery.14
The DD&C contract includes options for building the second and third PSCs. If these options are
exercised, the total value of the contract would increase to $1,942.8 million (i.e., about $1.9
billion). The figures of $745.9 million and $1,942.8 million cover the shipbuilder’s costs; they do
not include the cost of government-furnished equipment (GFE), which is equipment for the ships
that the government purchases and then provides to the shipbuilder for incorporation into the
ship, or government program-management costs.
Issues for Congress
FY2020 Funding
One issue for Congress is whether to approve, reject, or modify the Coast Guard’s FY2020
procurement funding request for the PSC program. In considering this issue, Congress may
consider, among other things, whether the Coast Guard has accurately priced the work it is
proposing to do each year in the program, and whether the procurement of the second and/or third
PSCs should be deferred or accelerated.
As noted earlier, the $35 million in procurement funding that the Coast Guard has requested for
the PSC program for FY2020 is enough to cover the program’s FY2020 government program-
management costs. As shown in Table C-2, the Coast Guard’s FY2019 budget submission had
projected that a total of $125 million in procurement funding would be requested for the PSC
program in FY2020. Additional FY2020 procurement funding that was to be provided beyond the
$35 million requested could be used to purchase long leadtime materials (LLTM) for the second
and third PSCs, which might permit the Coast Guard to reduce the cost of the second and third

14 See Naval Sea Systems Command, “Polar Security Cutter Contract Awarded to Recapitalize Nation’s Arctic
Capabilities,” April 23, 2019; Department of Defense, “Contracts for April 23, 2019” (Release No. CR-076-19); Sam
LaGrone, “VT Halter Marine to Build New Coast Guard Icebreaker,” USNI News, April 23, 2019; Maria Armental,
“U.S. Orders First heavy Icebreaking Vessel in Decades, as Rivals Expand Arctic Presence,” Wall Street Journal, April
23, 2019; “Mississippi Shipyard Gets $746M Contract for Icebreaker,” Associated Press, April 23, 2019.
Congressional Research Service

5

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

PSCs by pursuing a combined purchase of LLTM for multiple PSCs. An April 15, 2019, press
report states:
The Coast Guard’s fiscal year 2020 budget request of $35 million for its new heavy
icebreaker is insufficient for the purchase of long-lead time materials to maintain the
program schedule, Rep. Lou Correa (D-Calif.) said April 9th in his opening remarks at a
House Homeland Security Transportation and Maritime Security Subcommittee hearing
with the heads of the Coast Guard and Transportation Security Administration. Correa,
chairman of the subcommittee, was referring to the advance purchase of materials for the
second Polar Security Cutter (PSC). The Coast Guard is expected to award a contract for
the detailed design and construction of the first PSC within a month and already has the
funding. House staffers say the Coast Guard has told them it needs $100 million for long-
lead materials for the second PSC or the ship’s schedule will be a risk.15
Contract with Options vs. Block Buy Contract
Another potential issue for Congress is whether to use a contract with options or a block buy
contract to acquire the ships. As noted earlier, the baseline plan for the PSC program calls for
acquiring ships using a contract with options, but Coast Guard and Navy officials are open to the
idea of instead using a block buy contract to acquire the ships, and have requested information on
this possibility as part of the request for proposals (RFP) for the PSC program that was released
on March 2, 2018. Section 311 of the Frank LoBiondo Coast Guard Authorization Act of 2018 (S.
140/P.L. 115-282 of December 4, 2018) provides permanent authority for the Coast Guard to use
block buy contracting with economic order quantity (EOQ) purchases (i.e., up-front batch
purchases) of components in its major acquisition programs. The authority is now codified at 14
U.S.C. 1137.
Although a contract with options covers multiple years, it operates more like a form of annual
contracting, and it does not generate the kinds of savings that are possible with a block buy
contract. Compared to a contract with options, a block buy contract would reduce the
government’s flexibility regarding whether and when to acquire the second and third ships, and
what design to build them to,16 and in return reduce the combined acquisition cost of the ships
covered by the contract. The Navy has used block buy contracts to reduce procurement costs of
Virginia-class attack submarines and (in more recent years) Littoral Combat Ships (LCSs) and
John Lewis (TAO-205) class oilers.17 CRS estimates that compared to costs using a contract with

15 “Icebreaker Concerns,” Defense Daily, April 15, 2019.
16 Stated more fully, from a congressional perspective, trade-offs in using block buy contracting include the following:
-- reduced congressional control over year-to-year spending, and tying the hands of future Congresses;
-- reduced flexibility for making changes in Coast Guard acquisition programs in response to unforeseen changes
in strategic or budgetary circumstances (which can cause any needed funding reductions to fall more heavily on
acquisition programs not covered by multiyear contracts);
-- a potential need to shift funding from later fiscal years to earlier fiscal years to fund economic order quantity
(EOQ) purchases (i.e., up-front batch purchases) of components;
-- the risk of having to make penalty payments to shipbuilders if multiyear contracts need to be terminated due to
unavailability of funds needed to the continue the contracts; and
-- the risk that materials and components purchased for ships to be acquired in future years might go to waste if
those ships are not eventually acquired.
17 See CRS Report R41909, Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition:
Background and Issues for Congress
, by Ronald O'Rourke and Moshe Schwartz; CRS Report RL33741, Navy Littoral
Combat Ship (LCS) Program: Background and Issues for Congress
, by Ronald O'Rourke; and CRS Report R43546,
Navy John Lewis (TAO-205) Class Oiler Shipbuilding Program: Background and Issues for Congress, by Ronald
O'Rourke.
Congressional Research Service

6

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

options, using a block buy contract that included economic order quantity (EOQ) purchases (i.e.,
up-front batch purchases) of materials and components for three heavy polar icebreakers would
reduce the combined acquisition cost of the three ships by upwards of 7%, which could equate to
a savings of upwards of $150 million.
A congressionally mandated July 2017 National Academies of Sciences, Engineering, and
Medicine (NASEM) report on acquisition and operation of polar icebreakers states the following
(emphasis as in original):
3. Recommendation: USCG should follow an acquisition strategy that includes block
buy contracting with a fixed price incentive fee contract and take other measures to
ensure best value for investment of public funds.

Icebreaker design and construction costs can be clearly defined, and a fixed price incentive
fee construction contract is the most reliable mechanism for controlling costs for a program
of this complexity. This technique is widely used by the U.S. Navy. To help ensure best
long-term value, the criteria for evaluating shipyard proposals should incorporate explicitly
defined lifecycle cost metrics....
A block buy authority for this program will need to contain specific language for economic
order quantity purchases for materials, advanced design, and construction activities. A
block buy contracting program with economic order quantity purchases enables series
construction, motivates competitive bidding, and allows for volume purchase and for the
timely acquisition of material with long lead times. It would enable continuous production,
give the program the maximum benefit from the learning curve, and thus reduce labor hours
on subsequent vessels....
If advantage is taken of learning and quantity discounts available through the
recommended block buy contracting acquisition strategy, the average cost per heavy
icebreaker is approximately $791 million, on the basis of the acquisition of four ships.18
Funding Coast Guard Polar Icebreakers through Navy’s
Shipbuilding Account
Another potential issue for Congress is whether to continue providing at least some of the
procurement funding for the PSC program through the Navy’s shipbuilding account, known
formally as the Shipbuilding and Conversion Navy (SCN) appropriation account. A May 2018
GAO report states that agreements between DHS, the Coast Guard, and the Navy that were made
following the establishment of the Coast Guard-Navy integrated program office for the PSC
program “state that the program’s contracting actions could be funded by either USCG or Navy
appropriations, and the source of the appropriations will award the contract.”19 As noted earlier,
of the $300 million of the procurement funding that has provided for the PSC program was
provided through the SCN account—$150 million in FY2017, and another $150 million in
FY2018.
Although providing funding for Coast Guard ships through the SCN account creates some
complexity in tracking and executing funding for Coast Guard ship acquisition, and can raise a

18 National Academies of Sciences, Engineering, and Medicine, Division on Earth and Life Studies and Transportation
Research Board, Acquisition and Operation of Polar Icebreakers: Fulfilling the Nation’s Needs, Letter Report, with
cover letter dated July 11, 2017, pp. 14, 15.
19 Government Accountability Office, Homeland Security Acquisitions[:] Leveraging Programs’ Results Could Further
DHS’s Progress to Improve Portfolio Management
, GAO-18-339SP, May 2018, p. 86.
Congressional Research Service

7

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

question as to whether that funding would otherwise go toward the acquisition of Navy ships, it
has been used in the past for funding Coast Guard ships other than heavy polar icebreakers:
Healy was funded largely (about 89%) through the SCN account.20
 Thirty-three of the Coast Guard’s 49 Island-class 110-foot patrol boats (i.e.,
about 67% of the boats) were procured under a Navy contract. The contract was
for the construction of 21 of the boats, and included FY1990 SCN funds and
prior year DOD nonexpiring funding. During the construction phase of the
contract, the Navy exercised options under the contract for the construction 12
additional boats using FY1990 SCN funding.21
Subsections (a), (b), and (c) of Section 122 of the FY2018 National Defense Authorization Act
(H.R. 2810/P.L. 115-91 of December 12, 2017) state the following:
SEC. 122. Icebreaker vessel.
(a) Authority to procure one polar-class heavy icebreaker.—
(1) IN GENERAL.—There is authorized to be procured for the Coast Guard one polar-
class heavy icebreaker vessel.
(2) CONDITION FOR OUT-YEAR CONTRACT PAYMENTS.—A contract entered into
under paragraph (1) shall provide that any obligation of the United States to make a
payment under the contract for a fiscal year after fiscal year 2018 is subject to the
availability of appropriations or funds for that purpose for such later fiscal year.
(b) Limitation on availability of funds for procurement of icebreaker vessels.—None of the
funds authorized to be appropriated by this Act or otherwise made available for the
Department of Defense for any fiscal year that are unobligated as of the date of the
enactment of this Act may be obligated or expended for the procurement of an icebreaker
vessel other than the one polar-class heavy icebreaker vessel authorized to be procured
under subsection (a)(1).
(c) Contracting authority.—
(1) COAST GUARD.—If funds are appropriated to the department in which the Coast
Guard is operating to carry out subsection (a)(1), the head of contracting activity for the
Coast Guard shall be responsible for contracting actions carried out using such funds.

20 The somewhat complicated funding history for the ship is as follows: The Coast Guard’s proposed FY1990 budget
requested $244 million for the acquisition of an icebreaker. The FY1990 DOD appropriations act (H.R. 3072/P.L. 101-
165 of November 21, 1989) provided $329 million for the ship in the SCN account. (See pages 77 and 78 of H.Rept.
101-345 of November 13, 1989.) This figure was then reduced by $4.2 million by a sequester carried out under the
Balanced Budget And Emergency Deficit Control Act of 1985, also known as the Gramm-Rudman-Hollings Act
(H.J.Res. 372/P.L. 99-177 of December 12, 1985). Another $50 million was rescinded by the Dire Emergency
Supplemental Appropriations for Disaster Assistance, Food Stamps, Unemployment Compensation Administration,
and Other Urgent Needs, and Transfers, and Reducing Funds Budgeted for Military Spending Act of 1990 (H.R.
4404/P.L. 101-302 of May 25, 1990). An additional $59 million for the ship was then appropriated in the FY1992 DOD
Appropriations Act (H.R. 2521/P.L. 102-172 of November 26, 1991). Also, an additional $40.4 million in procurement
funding for the ship was provided through a series of annual appropriations in the Coast Guard’s Acquisition,
Construction, and Improvements (AC&I) account (as it was known prior to FY2019) from FY1988 through FY2001.
The resulting net funding for the ship was thus $374.2 million, of which $333.8 million, or 89.2%, was DOD funding,
and $40.4 million, or 10.8%, was Coast Guard procurement funding. (Source: Undated Coast Guard information paper
provided to CRS by Coast Guard legislative liaison office, March 3, 2016.)
21 Source: Navy information paper dated August 15, 2017, provided to CRS by Navy Office of Legislative Affairs on
August 23, 2017.
Congressional Research Service

8

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

(2) NAVY.—If funds are appropriated to the Department of Defense to carry out
subsection (a)(1), the head of contracting activity for the Navy, Naval Sea Systems
Command shall be responsible for contracting actions carried out using such funds.
(3) INTERAGENCY ACQUISITION.—Notwithstanding paragraphs (1) and (2), the head
of contracting activity for the Coast Guard or head of contracting activity for the Navy,
Naval Sea Systems Command (as the case may be) may authorize interagency acquisitions
that are within the authority of such head of contracting activity.22
Regarding Section 122, the conference report (H.Rept. 115-404 of November 9, 2017) on H.R.
2810/P.L. 115-91 states the following:
Icebreaker vessel (sec. 122)
The House bill contained provisions (sec. 122, 123, and 1012) that would authorize the
Secretary of the Navy to act as a general agent for the Secretary of the Department in which
the Coast Guard is operating and enter into a contract for icebreaker vessels; prohibit funds
for the Department of Defense from being used for the procurement of an icebreaker vessel;
and amend section 2218 of title 10, United States Code, to authorize funds associated with
the National Defense Sealift Fund for the construction of icebreaker vessels.
The Senate amendment contained a similar provision (sec. 1048).
The Senate recedes with an amendment that would authorize one polar-class heavy
icebreaker vessel, prohibit funds for the Department of Defense from being used for the
procurement of an icebreaker vessel other than this one polar-class heavy icebreaker vessel,
clarify contracting authorities, and require a Comptroller General report.
The conferees recognize the national importance of recapitalizing the U.S. icebreaker fleet
and the extraordinary circumstances that necessitated use of Department of Defense
funding to procure the first polar-class heavy icebreaker, as partially provided in the
Department of Defense Appropriations Act for Fiscal Year 2017. Accordingly, the
conferees support the authorization of this icebreaker in this Act.
The conferees note the Undersecretary of Management in the Department of Homeland
Security (DHS) serves as the Acquisition Decision Authority for the Polar Icebreaker
Program and that this program is governed in accordance with DHS Acquisition
Management Directive 102–01 and Instruction 102–01–001.
The conferees believe maintaining clear lines of authority, responsibility, accountability,
and resources with the Secretary and Acquisition Decision Authority of the department in
which the U.S. Coast Guard is operating are essential to delivering icebreakers on cost and
schedule.
Accordingly, the conferees believe the Secretary of the Department of Homeland Security
and the Undersecretary of Management in the DHS should be the officials provided with
authorities and resources related to the Polar Icebreaker Program.
Therefore, the conferees expect subsequent icebreakers to be authorized by the
congressional committees with jurisdiction over the Coast Guard and funded using Coast
Guard appropriations. (Pages 765-766)
Technical, Schedule, and Cost Risk for PSC Program
Another potential issue for Congress concerns technical, schedule, and cost risk in the PSC
program. A September 2018 GAO report on the PSC program states that the Coast Guard

22 Section 122 also includes a subsection (d) that requires a GAO report assessing the cost of, and schedule for, the
procurement of new icebreakers.
Congressional Research Service

9

link to page 28 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

did not have a sound business case in March 2018, when it established the cost, schedule,
and performance baselines for its heavy polar icebreaker acquisition program, because of
risks in four key areas:
Design. The Coast Guard set program baselines before conducting a preliminary design
review, which puts the program at risk of having an unstable design, thereby increasing the
program’s cost and schedule risks. While setting baselines without a preliminary design
review is consistent with DHS’s current acquisition policy, it is inconsistent with
acquisition best practices. Based on GAO’s prior recommendation, DHS is currently
evaluating its policy to better align technical reviews and acquisition decisions.
Technology. The Coast Guard intends to use proven technologies for the program, but did
not conduct a technology readiness assessment to determine the maturity of key
technologies prior to setting baselines. Coast Guard officials indicated such an assessment
was not necessary because the technologies the program plans to employ have been proven
on other icebreaker ships. However, according to best practices, such technologies can still
pose risks when applied to a different program or operational environment, as in this case.
Without such an assessment, the program’s technical risk is underrepresented.
Cost. The lifecycle cost estimate that informed the program’s $9.8 billion cost baseline
substantially met GAO’s best practices for being comprehensive, well-documented, and
accurate, but only partially met best practices for being credible. The cost estimate did not
quantify the range of possible costs over the entire life of the program. As a result, the cost
estimate was not fully reliable and may underestimate the total funding needed for the
program.
Schedule. The Coast Guard’s planned delivery dates were not informed by a realistic
assessment of shipbuilding activities, but rather driven by the potential gap in icebreaking
capabilities once the Coast Guard’s only operating heavy polar icebreaker—the Polar
Star—reaches the end of its service life....
GAO’s analysis of selected lead ships for other shipbuilding programs found the icebreaker
program’s estimated construction time of 3 years is optimistic. As a result, the Coast Guard
is at risk of not delivering the icebreakers when promised and the potential gap in
icebreaking capabilities could widen.23
Common Design for Heavy and Medium Polar Icebreakers
Another potential issue for Congress is whether to procure heavy and medium polar icebreakers
to a common basic design. As noted earlier, the DHS polar icebreaker mission need statement
(MNS) states that “current requirements and future projections ... indicate the Coast Guard will
need to expand its icebreaking capacity, potentially requiring a fleet of up to six icebreakers (3
heavy and 3 medium) to adequately meet mission demands in the high latitudes....” Consistent
with this statement, the Coast Guard envisages procuring up to three new medium icebreakers
after it procures three new heavy polar icebreakers. The question is whether to develop a separate
design for the medium polar icebreakers, or instead build the medium polar icebreakers to the
same basic design as the heavy polar icebreakers.
A congressionally mandated July 2017 report from the National Academies of Sciences,
Engineering, and Medicine (NASEM) on the acquisition and operation of polar icebreakers
concluded that notional operational requirements for new medium polar icebreakers would result
in ships that would not be too different in size from new heavy polar icebreakers. (As shown in
Table A-1, the Coast Guard’s current medium polar icebreaker, Healy, is actually somewhat

23 Government Accountability Office, Coast Guard Acquisitions[:] Polar Icebreaker Program Needs to Address Risks
before Committing Resources
, GAO-18-600, summary page.
Congressional Research Service

10

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

larger than the Coast Guard’s heavy polar icebreaker, Polar Star.) Given what it concluded as the
probable similarity in size between future U.S. heavy and medium polar icebreakers, the NASEM
report recommended building a single medium polar icebreaker to the same common design as
three new heavy polar icebreakers. This approach, the report concluded, would reduce the cost of
the medium icebreaker by avoiding the cost of developing a new design and by making the
medium polar icebreaker the fourth ship on an existing production learning curve rather than the
first ship on a new production learning curve. The NASEM report stated the following (emphasis
as in original):
2. Recommendation: The United States Congress should fund the construction of four
polar icebreakers of common design that would be owned and operated by the United
States Coast Guard (USCG).

The current Department of Homeland Security (DHS) Mission Need Statement...
contemplates a combination of medium and heavy icebreakers. The committee’s
recommendation is for a single class of polar icebreaker with heavy icebreaking capability.
Proceeding with a single class means that only one design will be needed, which will
provide cost savings. The committee has found that the fourth heavy icebreaker could be
built for a lower cost than the lead ship of a medium icebreaker class....
The DHS Mission Need Statement contemplated a total fleet of “potentially” up to six ships
of two classes—three heavy and three medium icebreakers. Details appear in the High
Latitude Mission Analysis Report. The Mission Need Statement indicated that to fulfill its
statutory missions, USCG required three heavy and three medium icebreakers; each vessel
would have a single crew and would homeport in Seattle. The committee’s analysis
indicated that four heavy icebreakers will meet the statutory mission needs gap identified
by DHS for the lowest cost....
4. Finding: In developing its independent concept designs and cost estimates, the
committee determined that the costs estimated by USCG for the heavy icebreaker are
reasonable. However, the committee believes that the costs of medium icebreakers
identified in the High Latitude Mission Analysis Report are significantly
underestimated
....
Although USCG has not yet developed the operational requirements document for a
medium polar icebreaker, the committee was able to apply the known principal
characteristics of the USCG Cutter Healy to estimate the scope of work and cost of a similar
medium icebreaker. The committee estimates that a first-of-class medium icebreaker will
cost approximately $786 million. The fourth ship of the heavy icebreaker series is
estimated to cost $692 million. Designing a medium-class polar icebreaker in a second
shipyard would incur the estimated engineering, design, and planning costs of $126 million
and would forgo learning from the first three ships; the learning curve would be restarted
with the first medium design. Costs of building the fourth heavy icebreaker would be less
than the costs of designing and building a first-of-class medium icebreaker....
6. Recommendation: USCG should ensure that the common polar icebreaker design
is science-ready and that one of the ships has full science capability.

All four proposed ships would be designed as “science-ready,” which will be more cost-
effective when one of the four ships—most likely the fourth—is made fully science
capable. Including science readiness in the common polar icebreaker design is the most
cost-effective way of fulfilling both the USCG’s polar missions and the nation’s scientific
research polar icebreaker needs.... The incremental costs of a science-ready design for each
of the four ships ($10 million to $20 million per ship) and of full science capability for one
of the ships at the initial build (an additional $20 million to $30 million) are less than the
independent design and build cost of a dedicated research medium icebreaker.... In
briefings at its first meeting, the committee learned that the National Science Foundation
and other agencies do not have budgets to support full-time heavy icebreaker access or the
Congressional Research Service

11

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

incremental cost of design, even though their science programs may require this capability.
Given the small incremental cost, the committee believes that the science capability cited
above should be included in the acquisition costs.
Science-ready design includes critical elements that cannot be retrofitted cost-effectively
into an existing ship and that should be incorporated in the initial design and build. Among
these elements are structural supports, appropriate interior and exterior spaces, flexible
accommodation spaces that can embark up to 50 science personnel, a hull design that
accommodates multiple transducers and minimizes bubble sweep while optimizing
icebreaking capability, machinery arrangements and noise dampening to mitigate
interference with sonar transducers, and weight and stability latitudes to allow installation
of scientific equipment. Such a design will enable any of the ships to be retrofitted for full
science capability in the future, if necessary....
Within the time frame of the recommended build sequence, the United States will require
a science-capable polar icebreaker to replace the science capabilities of the Healy upon her
retirement. To fulfill this need, one of the heavy polar icebreakers would be procured at the
initial build with full science capability; the ability to fulfill other USCG missions would
be retained. The ship would be outfitted with oceanographic overboarding equipment and
instrumentation and facilities comparable with those of modern oceanographic research
vessels. Some basic scientific capability, such as hydrographic mapping sonar, should be
acquired at the time of the build of each ship so that environmental data that are essential
in fulfilling USCG polar missions can be collected.24
If policymakers decide to procure a second new medium polar icebreaker or a third new medium
polar icebreaker, the same general approach recommended by the NASEM report could be
followed—a second medium polar icebreaker and third medium polar icebreaker could be built to
the same common design used for the three new heavy polar icebreakers and the first new
medium polar icebreaker.
An April 12, 2018, press report states the following:
As the Coast Guard prepares to review industry bids for a new heavy polar icebreaker, the
service is keeping its options open for the right number and mix of polar icebreakers it will
need in the future, Adm. Paul Zukunft, the [then-]commandant of the Coast Guard, said on
Wednesday [April 11].
The Coast Guard’s program of record is for three heavy and three medium polar icebreakers
but Zukunft said the “jury is still out” whether that will remain so. Right now, the service
is aiming toward building three new heavy icebreakers, but it might make sense just to
keep building these ships, he told reporters at a Defense Writers Group breakfast in
Washington, D.C.
Zukunft said that “when you start looking at the business case after you build three, and
then you need to look at what is the economy of scale when you start building heavy
icebreakers, and would it be less expensive to continue to build heavies and not mediums.”
He added that the heavy icebreakers provide more capability, and if the price is
“affordable” and in “the same range” as building medium icebreakers, then “maybe you
end up with one class of heavy icebreakers.”
Building only one class of ships has a number of advantages in terms of maintenance, crew
familiarity, configuration management, and more, he said. A decision on what the future

24 National Academies of Sciences, Engineering, and Medicine, Division on Earth and Life Studies and Transportation
Research Board, Acquisition and Operation of Polar Icebreakers: Fulfilling the Nation’s Needs, Letter Report, with
cover letter dated July 11, 2017, pp. 2, 4-6.
Congressional Research Service

12

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

icebreaker fleet will consist of is “still probably several years out .... but that’s one option
that we want to keep open going forward,” Zukunft said.25
Short-Term Bridge to One or More New Polar Icebreakers
Overview: Two Basic Options
As mentioned earlier, a new heavy polar icebreaker that begins construction in FY2019 might
enter service in 2023, while Polar Star was refurbished and reentered service in December 2012
for an intended period of 7 to 10 years—a period that will end between December 2019 and
December 2022.26 Consequently, another potential issue for Congress concerns how to bridge a
potential gap in time between the end of Polar Star’s current intended service life and the entry
into service of one or more new heavy polar icebreakers.
As testified by CRS on July 21, 2016,27 there are at least two options for bridging this time
period: One would be to further extend the service life of Polar Star. The other would be to
charter (i.e., lease) one or more other icebreakers (perhaps foreign-owned ones), if such ships are
available for charter and have capabilities for performing missions performed by U.S. heavy polar
icebreakers. The United States has used both of these approaches in the past to mitigate polar
icebreaking capacity gaps.28
Coast Guard Plan is to Further Extend Life of Polar Star
The Coast Guard plans to pursue the first of the two options outlined above—further extend the
service life of Polar Star—and has requested funding in its FY2019 budget for service life
extension work on Polar Star. A September 25, 2017, GAO report on polar icebreakers states the
following:
While the Coast Guard considered various options to bridge this potential heavy icebreaker
gap, in a January 2017 study the Coast Guard reported that it was planning for a limited
service life extension of the Polar Star to keep it operational until fiscal year 2025, at an
initial cost estimate of $75 million. However, the Coast Guard has not completed a formal

25 Calvin Biesecker, “Coast Guard Leaving Options Open For Future Polar Icebreaker Fleet Type,” Defense Daily,
April 12, 2018. Ellipse as in original.
26 The September 25, 2017, GAO report on polar icebreakers states the following: “According to Coast Guard planning
documents, the Polar Star’s useful service life will end between fiscal years 2020 and 2023.” (Government
Accountability Office, Coast Guard: Status of Polar Icebreaking Fleet Capability and Recapitalization Plan, GAO-17-
698R, September 25, 2017, p. 6.
27 See CRS Testimony TE10012, Coast Guard Arctic Implementation Capabilities, by Ronald O'Rourke.
28 Regarding the first option, the Coast Guard, in addition to the work done to extend the service life of Polar Star by
an additional 7 to 10 years, also mitigated a polar icebreaking capacity gap in the 1970s by putting two of its older
Wind-class icebreakers through a vessel rehabilitation and modernization (VRAM) program. (See National Research
Council, Polar Icebreakers in a Changing World: An Assessment of U.S. Needs, Washington, 2007, p. 55. See also
Donald L. Canney, “Icebreakers and the U.S. Coast Guard,” accessed June 28, 2016, at http://www.uscg.mil/history/
webcutters/Icebreakers.asp.)
Regarding the second option, since 2005, the National Science Foundation (NSF) has occasionally chartered foreign
polar icebreakers—specifically, the Russian icebreakers Krasin and Vladimir Ignatyuk, and the Swedish icebreaker
Oden—to help perform icebreaking missions in polar waters. (Regarding the charters of Krasin and Oden, see National
Research Council, Polar Icebreakers in a Changing World: An Assessment of U.S. Needs, Washington, 2007, pp. 6, 14,
63, 80, 97, 111, and U.S. Coast Guard Research & Development Center and ABS Consulting, Polar Icebreaker
Options, Paths Forward to Accomplish U.S. Coast Guard Missions and Contribute to Mission Critical National
Science Needs
, May 17, 2011, pp. 9, 14.)
Congressional Research Service

13

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

cost estimate for this effort and we have previously reported that the $75 million estimate
may be unrealistic....
The Coast Guard’s Capital Investment Plan for fiscal years 2018-2022 includes $60 million
of a planned $75 million for polar icebreaker sustainment, which officials reported as being
the rough estimate for the Polar Star’s limited service life extension. Coast Guard officials
stated that the $75 million rough estimate is based on the cost of the Polar Star’s prior 7-
10 year service life extension which was completed in fiscal year 2013. However, in July
2017 we reported that the Coast Guard has not completed a cost estimate for this effort,
and that the $75 million estimate may be unrealistic based on the assumptions the Coast
Guard used, such as continuing to use parts from the Polar Sea as has been done in previous
maintenance events.29
A July 2018 GAO report states the following:
The Coast Guard is planning a SLEP on the Polar Star to keep it operational until the first
and second new heavy polar icebreakers are delivered (planned for 2023 and 2025,
according to current acquisition plans) in order to bridge a potential operational gap. This
approach would allow the Coast Guard to operate a minimum of two heavy icebreakers
once the first polar icebreaker is delivered. The approach would also provide the Coast
Guard with a self-rescue capability—the ability for one icebreaker to rescue the other if it
became incapacitated while performing icebreaking operations.
The Coast Guard’s plan to conduct the Polar Star SLEP during its existing annual depot-
level maintenance periods may not be feasible given the amount of maintenance already
required on the cutter. The Polar Star’s mission capable rating has been decreasing in recent
years and reached a low point of 29 percent—well below the target of 41 percent—from
October 2016 to September 2017. Based on mission capable data, we found this is mostly
due to additional time spent in depot-level maintenance, which has increased in recent
years from about 6 months in 2015 to more than 8 months in 2017.
Additionally, the Polar Star has required extensions of about 3 months for its annual dry
dock periods—the period of time when a cutter is removed from the water so that
maintenance can be conducted—in 2016 and 2017 to complete required maintenance
activities. These dry docks were originally planned to last between 2-1/2 months and 4
months. These extensions also compressed the amount of time that the crew had to prepare
for its annual mission to Antarctica, which, according to members of the Polar Star crew,
placed a large stress on the crew, risked the quality of work, and reduced or eliminated the
crews’ planned rest and personal preparation for their roughly 4-month deployment. Based
on our analysis, these delays and extensions are likely to continue as the cutter ages.
According to Coast Guard officials, the Polar Star’s SLEP work will be conducted during
the annual dry dock periods by adding an additional 1 or 2 months to the annual dry docks.
However, if the work is unable to be completed during this time frame, it could force the
Coast Guard to miss its commitment to conduct the annual Antarctica mission. Coast Guard
maintenance officials stated that until the Polar Star completes the SLEP, its repairs will
likely continue to get more expensive and time consuming. We will continue to monitor
the Polar Star’s SLEP through our annual review of DHS programs.
As we found in July 2017, the Polar Star SLEP effort has a rough order cost estimate of
$75 million, which is based on the reactivation work completed in 2013.41 However, this
estimate may be unrealistic based on assumptions the Coast Guard used, such as that it
would continue to use parts from the Coast Guard’s other heavy polar icebreaker, the Polar
Sea, which has been inactive since 2010.42 The Coast Guard’s recent assessment of the
Polar Star’s material condition—the physical condition of the cutter, which includes the
hull structure, habitability, major equipment systems, and spare parts availability—was

29 Government Accountability Office, Coast Guard: Status of Polar Icebreaking Fleet Capability and Recapitalization
Plan
, GAO-17-698R, September 25, 2017, pp. 3, 8.
Congressional Research Service

14

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

completed in January 2018.43 The material assessment stated that many of the available
parts from the Polar Sea have already been removed and installed on the Polar Star. As a
result of the finite parts available from the Polar Sea, the Coast Guard may have to acquire
new parts for the Polar Star that could increase the $75 million SLEP estimate. The Polar
Star’s recent material assessment will form the basis to determine which systems will be
overhauled during the SLEP and for a more detailed cost estimate. The Coast Guard
expects the program to reach the obtain phase of the acquisition life cycle by December
2019, at which time the Polar Star could reach the end of its current useful service life
(currently projected to be between 2020 to 2023). This timeline contains risk that the Polar
Star could be rendered inoperable before the cutter is able to undergo a SLEP.30
Another Option: Chartering an Icebreaker
Overview
The feasibility of the second of the two options outlined above—charter (i.e., lease) one or more
other icebreakers—would depend on whether an icebreaker was available for charter at the time
of the year when the United States would need it to perform desired missions in the Arctic or
Antarctic. Foreign polar icebreakers are used by their own countries for icebreaking operations,
and may not always be available for charter when the United States might want to use them. If an
icebreaker were available for charter, the potential cost effectiveness of this option would then
depend on the cost of the charter, the ability of the ship to perform U.S. polar icebreaker missions,
and how these costs and capabilities compare to the option of extending the service life of Polar
Star
.
The Coast Guard stated in July 2016 that
NSF leased the icebreaker KRASIN from Russia from 2005-2006, ODEN from the
Swedish government from 2007-2010, and VLADIMIR IGNATYUK from Russia in 2012
to support the McMurdo resupply mission. All leases were time charters, and crews were
supplied with the leases. As a contingency measure, NSF obtained assurances of assistance
from other vessels in the area, such as the Chinese flagged [icebreaking] vessel XUE
LONG, in the event they encountered difficulty. They also hired icebreaker captains with
previous McMurdo experience to supplement the crew. NSF acquired these leases through
a RFP process, and had no assurances that icebreakers would be available to perform the
mission, or what price would be quoted.
This process came with risks, as there was no way to gauge icebreaker availability until
NSF received responses to their RFP. Additionally, a foreign-flagged commercial or state
vessel can become unavailable for a variety of environmental and political reasons. For
example, the Swedish government abruptly terminated their contract during the
spring/summer of 2011, and NSF was left without a platform to conduct its mission. NSF
requested support from CGC [Coast Guard cutter] HEALY, but it was employed in the
Arctic. NSF ultimately leased the Russian icebreaker VLADIMIR IGNATYUK. After that
incident, NSF decided to utilize CGC POLAR STAR to support the McMurdo mission,
which it has been doing since 2013.31

30 Government Accountability Office, Coast Guard Acquisitions[:] Actions Needed to Address Longstanding Portfolio
Management Challenges
, GAO-18-454, July 2018, pp. 29-31.
31 Source: Email from Guard Office of Congressional Affairs to CRS, July 8, 2016.
Congressional Research Service

15

link to page 20
Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Aiviq Being Offered for Lease
One ship that is being offered for lease to the Coast Guard as an interim polar icebreaker is Aiviq
(Figure 1), an Arctic oil-exploration support ship owned by Edison Chouest Offshore (ECO). The
361-foot-long ship was ordered in 2009, completed in 2012, and chartered by Royal Dutch Shell
to support that company’s effort (now ended) to explore for oil in Arctic waters. Following
Shell’s decision to end that effort, alternative uses for Aiviq have been sought. The ship has been
modified to serve as a polar icebreaker, and it is being offered to the Coast Guard for lease as an
interim polar icebreaker. It reportedly has also been offered for use as an icebreaker to the
Canadian government.32
Figure 1. Aiviq

Source: “Arctic Supply Vessel Aiviq,” accessed September 14, 2017, at http://www.mascoat.com/arctic-supply-
vessel-aiviq1.html.
The possibility of leasing Aiviq as an interim polar icebreaker has been discussed at certain recent
hearings about the Coast Guard. For example, at a July 25, 2017, hearing on Coast Guard
capabilities before the Coast Guard and Maritime transportation subcommittee of the House
Transportation and Infrastructure Committee, the following exchange occurred:
REPRESENTATIVE DON YOUNG (continuing):
Have you looked at, Admiral, I know this has been an ongoing battle with me and the Coast
Guard over the years, the other possibility of getting an ice breaker into the arena quicker
than having one constructed like leasing from another outfit? You know, I've been talking
about this a long time. Have you analyzed this again?

32 See for example, “More Sparks Fly in Canada Shipbuilding Controversy,” Marine Log, March 18, 2016; Pierre
Leblanc, “An Out-of-the-Blue Icebreaker Opportunity,” Maritime Executive, January 2, 2018.
Congressional Research Service

16

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

I know the last time we had a study, it was 1980. That's a long time ago. So is there a way
we can put metal on the water, especially for the new shipping through and the—and the
cruise ships, because that Healy is old, and—is—have you looked at that at all?
ADMIRAL PAUL ZUKUNFT, [THEN-]COMMANDANT, U.S. COAST GUARD:
We have. In fact, one potential vendor, we’ve had multiple interactions. They have a
platform that has yet to complete ice trials. We—we would not want to lease something
they can't demonstrate its ability to actually operate in the ice that—that Healy sees. Healy
was actually beset in ice for 36 hours last year, so it's not ice free up there, and that's a
medium ice breaker. This particular platform doesn’t have the capability of Healy.
But we would at least want to make sure that ice trials were completed. That we could
actually be a good steward of taxpayer dollars, so at least a platform that would meet our
requirements. So we’ve had multiple interactions, the last one was probably in May, and
the issue of ice trials is still on the table right now.33
Later in the same hearing, the following exchange occurred:
REPRESENATIVE DUNCAN HUNTER, CHAIRMAN:
Going back to Mr. Young's question. too, about leasing. You said you—you’re—you’re
waiting for—I’m—I’m guessing money for ice trials. That's what you said.
ZUKUNFT:
No real dollars have been negotiated in any of this. So...
HUNTER:
But in—in real terms, you’re only paying for gas? I mean what—what does it cost to do
ice trials. It’s gas, right? You're not going to hire more Coast Guardsmen to come in and—
and do it. I mean so that’s a figure—your—your overhead’s fixed. So what is the cost to—
to go do ice trials with the (inaudible)?
ZUKUNFT:
That would really be for the...
HUNTER:
The ice—once again the only...
ZUKUNFT:
... vendor to decide.
HUNTER:
... existing U.S. made ice breaker in America.
ZUKUNFT:
Yeah. So this—this is a ship that is built with direct drive diesel. Ice breakers are typically
diesel electric, which means the generators push the shaft, and they absorb that shock load
every time you collide with ice.
A reduction gear, fixed gear is going to that—that gear box is going to absorb all that shock.
So if you're going to do ice trials, there's a likelihood you might have to replace a reduction
gear. There might be real hidden costs of doing ice trials. So if I'm a vendor, I might want
to protect myself from some of that risk.

33 Source: Transcript of hearing.
Congressional Research Service

17

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Now I'm not the vendor but those would be some of my thoughts of, OK, if you're really
serious about this and I do ice trials and now I've just caused X number of dollars that I am
now going to have to fit. And oh, by the way, you're not going to lease it because it didn't
meet your requirements. I think those are some of the issues that we still have to negotiate.34
At a June 14, 2016, hearing on Coast Guard mission needs and resource allocation before the
Coast Guard and Maritime Transportation subcommittee of the House Transportation and
Infrastructure Committee, the following exchange occurred:
REPRESENTATIVE HUNTER (Chairman):
How do you plan on—on filling the capability gap until you get a heavy icebreaker, which
is 10 years at the least based on the best projections of Congress and everybody working
together? You still haven't answered that one.
ADMIRAL MICHEL:
Well, right—the alternatives now, since we'll provide the answer to that, and it's probably
going to be either a rolling recapitalization of the Polar Star or to try to bring—let Polar
Star
taper off and then try to bring Polar Sea back on and bridge out to the new icebreaker.
I do not know which one at this point, which path we would want to take. I'm not aware of
any other—we've looked out there for vessels to lease for heavy icebreaking capabilities.
There's nothing out there on planet earth that you can lease in the heavy icebreaking area.
So that's kind of where we are, sir.
HUNTER:
Was it the—the Finns that came into my office?
(UNKNOWN)
Mm-hmm.
HUNTER:
Can't remember whether we had the Norwegians or the Finns. I mean, they—have you—
you've obviously looked at that, right?
MICHEL:
Yes. As a matter of fact I—I traveled to Sweden and Finland...
HUNTER:
Yeah.
MICHEL:
... and talked to them. And they do not have heavy icebreaking capability that will meet the
needs as in the FedBizOpps. As a matter of fact, in—when I'm talking FedBizOpps [I
mean] there's a technical package that the Coast Guard put out for our [new] heavy
icebreaker [i.e., the one that the Obama Administration wanted to begin building in 2020].
It kind of lays out our basic requirements including the long pole in the tent which is the
icebreaking requirement, which is six foot minimum at three knots, desirable eight-foot
minimum at three knots and then 21 feet backing and ramming.
When I talked to the shipbuilders over there, they said there is not a vessel like that that
currently exists that will meet those requirements in the—in the FedBizOpps technical

34 Source: Transcript of hearing.
Congressional Research Service

18

link to page 23 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

package. So you'd have to build a vessel like that. And that's the type of vessel that we're
looking for.35
Legislative Activity for FY2020
Summary of Appropriation Action on FY2020 Funding Request
The Coast Guard’s proposed FY2020 budget requests $35 million in Coast Guard procurement
funding for the PSC program. Table 1 summarizes congressional appropriation action on the
program’s FY2019 funding request.
Table 1. Summary of Congressional Appropriations Action on
FY2030 Funding Request
(millions of dollars)
Polar icebreaker
Request
HAC
SAC
Conf.
New polar icebreaker
Coast Guard acquisition account
35



Navy shipbuilding account
0



Subtotal
35



Polar sustainment (service life extension of Polar Star)
Coast Guard acquisition account
15



Total
15



Source: Table prepared by CRS, based on Coast Guard’s FY2020 budget submission and HAC committee
report, SAC chairman’s recommendation and explanatory statement on FY2020 DHS Appropriations Act and
FY2020 DOD Appropriations Act, joint explanatory statement for H.J.Res. 31, and committee and conference
reports on the FY2019 DOD appropriations act. HAC is House Appropriations Committee; SAC is Senate
Appropriations Committee; Conf. is conference agreement.

35 Transcript of hearing.
Congressional Research Service

19

link to page 25 link to page 26 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appendix A. Current U.S. Polar Icebreakers and
Polar Research Ships
This appendix provides background information on current U.S. polar icebreakers and polar
research ships.
Three Coast Guard Polar Icebreakers
Two Heavy Polar Icebreakers—Polar Star and Polar Sea
Polar Star (WAGB-10) and Polar Sea (WAGB-11),36 sister ships built to the same general design
(Figure A-1 and Figure A-2), were acquired in the early 1970s as replacements for earlier U.S.
icebreakers. They were designed for 30-year service lives, and were built by Lockheed
Shipbuilding of Seattle, WA, a division of Lockheed that also built ships for the U.S. Navy, but
which exited the shipbuilding business in the late 1980s.
The ships are 399 feet long and displace about 13,200 tons.37 They are among the world’s most
powerful nonnuclear-powered icebreakers, with a capability to break through ice up to 6 feet
thick at a speed of 3 knots. Because of their icebreaking capability, they are considered (in U.S.
parlance) heavy polar icebreakers. In addition to a crew of 134, each ship can embark a scientific
research staff of 32 people.
Polar Star was commissioned into service on January 19, 1976, and consequently is now more
than 10 years beyond its originally intended 30-year service life. Due to worn-out electric motors
and other problems, the Coast Guard placed the ship in caretaker status on July 1, 2006.38
Congress in FY2009 and FY2010 provided funding to repair Polar Star and return it to service
for 7 to 10 years; the repair work, which reportedly cost about $57 million, was completed, and
the ship was reactivated on December 14, 2012.39
Polar Sea was commissioned into service on February 23, 1978, and consequently is also more
than 10 years beyond its originally intended 30-year service life. In 2006, the Coast Guard
completed a rehabilitation project that extended the ship’s expected service life to 2014. On June
25, 2010, however, the Coast Guard announced that Polar Sea had suffered an engine casualty,
and the ship was unavailable for operation after that.40 The Coast Guard placed Polar Sea in
commissioned, inactive status on October 14, 2011. The Coast Guard transferred certain major

36 The designation WAGB means Coast Guard icebreaker. More specifically, W means Coast Guard ship, A means
auxiliary, G means miscellaneous purpose, and B means icebreaker.
37 By comparison, the Coast Guard’s new National Security Cutters—its new high-endurance cutters—are about 418
feet long and displace roughly 4,000 tons.
38 Source for July 1, 2006, date: U.S. Coast Guard email to CRS on February 22, 2008. The Coast Guard’s official term
for caretaker status is “In Commission, Special.”
39 See, for example, Kyung M. Song, “Icebreaker Polar Star Gets $57 Million Overhaul,” Seattle Times, December 14,
2012.
40 “Icebreaker POLAR SEA Sidelined By Engine Troubles,” Coast Guard Compass (Official Blog of the U.S. Coast
Guard)
, June 25, 2010. See also “USCG Cancels Polar Icebreaker’s Fall Deployment,” DefenseNews.com, June 25,
2010; Andrew C. Revkin, “America’s Heavy Icebreakers Are Both Broken Down,” Dot Earth (New York Times blog),
June 25, 2010.
Congressional Research Service

20

link to page 27 link to page 29
Coast Guard Polar Security Cutter (Polar Icebreaker) Program

equipment from Polar Sea to Polar Star to facilitate Polar Star’s return to service,41 and
continues to use Polar Sea as a source of spare parts for Polar Star.
Figure A-1. Polar Star and Polar Sea
(Side by side in McMurdo Sound, Antarctica)

Source: Coast Guard photo accessed at http://www.uscg.mil/pacarea/cgcpolarsea/history.asp on April 21, 2011.
One Medium Polar Icebreaker—Healy
Healy (WAGB-20) (Figure A-3) was funded in the early 1990s as a complement to Polar Star
and Polar Sea, and was commissioned into service on August 21, 2000. The ship was built by
Avondale Industries, a shipyard located near New Orleans, LA, that built numerous Coast Guard
and Navy ships, and which eventually became part of Huntington Ingalls Industries (HII). (HII
subsequently wound down shipbuilding activities at Avondale, and the facility is no longer
building ships.)

41 Source: October 17, 2011, email to CRS from Coast Guard Congressional Affairs office. Section 222 of the Coast
Guard and Maritime Transportation Act of 2012 (H.R. 2838/P.L. 112-213 of December 20, 2012) prohibited the Coast
Guard from removing any part of Polar Sea and from transferring, relinquishing ownership of, dismantling, or
recycling the ship until it submitted a business case analysis of the options for and costs of reactivating the ship and
extending its service life to at least September 30, 2022, so as to maintain U.S. polar icebreaking capabilities and fulfill
the Coast Guard’s high latitude mission needs, as identified in the Coast Guard’s July 2010 High Latitude Study. The
business case analysis was submitted to Congress with a cover date of November 7, 2013. For more on the High
Latitude Study, see Appendix B.
Congressional Research Service

21


Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Figure A-2. Polar Sea

Source: Coast Guard photo accessed at http://www.uscg.mil/pacarea/cgcpolarsea/img/PSEApics/Ful Ship2.jpg on
April 21, 2011.
Although it is referred to (in U.S. parlance) as a medium polar icebreaker, Healy is actually larger
than Polar Star and Polar Sea—it is 420 feet long and displaces about 16,000 tons. Compared to
Polar Star and Polar Sea, Healy has less icebreaking capability (which is why it is referred to as
a medium polar icebreaker rather than a heavy polar icebreaker), but more capability for
supporting scientific research. The ship can break through ice up to 4½ feet thick at a speed of 3
knots, and embark a scientific research staff of 35 (with room for another 15 surge personnel and
2 visitors). The ship is used primarily for supporting scientific research and conducting other
operations in the Arctic.
Three National Science Foundation (NSF) Polar Research Ships
Nathaniel B. Palmer
Nathaniel B. Palmer was built for the NSF in 1992 by North American Shipbuilding, of Larose,
LA. Called Palmer for short, it is operated for NSF by Edison Chouest Offshore (ECO) of
Galliano, LA, a firm that owns and operates research ships and offshore deepwater service
ships.42 Palmer is 308 feet long and has a displacement of about 6,500 tons. It has a crew of 22
and can embark a scientific staff of 27 to 37.43 It was purpose-built as a single-mission ship for
conducting and supporting scientific research in the Antarctic. It is capable of breaking ice up to 3
feet thick at speeds of 3 knots, which is sufficient for breaking through the ice conditions found in
the vicinity of the Antarctic Peninsula, so as to resupply Palmer Station, a U.S. research station on

42 For more on ECO, see the firm’s website at http://www.chouest.com/.
43 Sources vary on the exact number of scientific staff that can be embarked on the ship. For some basic information on
the ship, see http://www.nsf.gov/od/opp/support/nathpalm.jsp;
http://www.usap.gov/vesselScienceAndOperations/documents/prvnews_june03.pdfprvnews_june03.pdf;
http://nsf.gov/od/opp/antarct/treaty/pdf/plans0607/15plan07.pdf;
http://www.nsf.gov/pubs/1996/nsf9693/fls.htm; and
http://www.hazegray.org/worldnav/usa/nsf.htm.
Congressional Research Service

22


Coast Guard Polar Security Cutter (Polar Icebreaker) Program

the peninsula. The ship might be considered less an icebreaker than an oceanographic research
ship with enough icebreaking capability for the Antarctic Peninsula. Palmer’s icebreaking
capability is not considered sufficient to perform the McMurdo resupply mission.
Figure A-3. Healy

Source: Coast Guard photo accessed at http://www.uscg.mil/history/webcutters/Healy_CGC_1_300.jpg on
April 21, 2011.
Laurence M. Gould
Like Palmer, the polar research and supply ship Laurence M. Gould was built for NSF by North
American Shipping. It was completed in 1997 and is operated for NSF on a long-term charter
from ECO. It is 230 feet long and has a displacement of about 3,800 tons. It has a crew of 16 and
can embark a scientific staff of 26 to 28 (with a capacity for 9 more in a berthing van). It can
break ice up to 1 foot thick with continuous forward motion. Like Palmer, it was built to support
NSF operations in the Antarctic, particularly operations at Palmer Station on the Antarctic
Peninsula.
Sikuliaq
Sikuliaq (see-KOO-lee-auk), which is used for scientific research in polar areas, was built by
Marinette Marine of Marinette, WI, and entered service in 2015. It is operated for NSF by the
College of Fisheries and Ocean Sciences at the University of Alaska Fairbanks as part of the U.S.
academic research fleet through the University National Oceanographic Laboratory System
(UNOLS). Sikuliaq is 261 feet long and has a displacement of about 3,600 tons. It has a crew of
22 and can embark an additional 26 scientists and students. The ship can break ice 2½ or 3 feet
thick at speeds of 2 knots. The ship is considered less an icebreaker than an ice-capable research
ship.
Congressional Research Service

23

link to page 28 link to page 28 link to page 28 link to page 28 link to page 28 link to page 28 link to page 28 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Summary
Table A-1
summarizes the above six ships. In addition to the ships shown in Table A-1, another
U.S.-registered polar ship with icebreaking capability— the Arctic oil-exploration support ship
Aiviq—was used by Royal Dutch Shell oil company to support an oil exploration and drilling
effort (now ended) in Arctic waters off Alaska. The ship, which completed construction in 2012,
is owned by ECO and chartered by Royal Dutch Shell. It was used primarily for towing and
laying anchors for drilling rigs, but is also equipped for responding to oil spills.
Table A-1. Coast Guard and NSF Polar Ships

Coast Guard
NSF
Laurence

Polar Star
Polar Sea
Healy
Palmer
M. Gould
Sikuliaq
Currently operational?
Yes
No
Yes
Yes
Yes
Yes
Entered service
1976
1978
2000
1992
1997
2015
Length (feet)
399
399
420
308
230
261
Displacement (tons)
13,200
13,200
16,000
6,500
3,780
3,665
Icebreaking capability
6 feet
6 feet
4.5 feet
3 feet
1 foot at
2.5 or 3
(ice thickness in feet) at
continuous
feet at 2
3 knots or other speed
forward
knots
motion
Icebreaking capability
21 feet
21 feet
8 feet
n/a
n/a
n/a
using back and ram (ice
thickness in feet)
Operating temperature

-60o Fahrenheit
-60o
-50o
n/a
n/a
n/a
Fahrenheit
Fahrenheit
Crew (when operational)
155a
155a
85b
22
16
22
Additional scientific staff
32
32
35c
27-37
26 to 28d
26
Sources: Prepared by CRS using data from U.S. Coast Guard, National Research Council, National Science
Foundation, DHS Office of Inspector General, and (for Palmer) additional online reference sources. n/a is not
available.
a. Includes 24 officers, 20 chief petty officers, 102 enlisted, and 9 in the aviation detachment.
b. Includes 19 officers, 12 chief petty officers, and 54 enlisted.
c. In addition to 85 crew members 85 and 35 scientists, the ship can accommodate another 15 surge
personnel and 2 visitors.
d. Plus 9 more in a berthing van.
Congressional Research Service

24

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appendix B. Required Numbers of U.S. Polar
Icebreakers
This appendix provides background information on required numbers of U.S. polar icebreakers.
June 2013 DHS Polar Icebreaker Mission Need Statement
DHS in June 2013 approved a Mission Need Statement (MNS) for the polar icebreaker
recapitalization project. The MNS states the following (emphasis added):
This Mission Need Statement (MNS) establishes the need for polar icebreaker capabilities
provided by the Coast Guard, to ensure that it can meet current and future mission
requirements in the polar regions....
Current requirements and future projections based upon cutter demand modeling, as
detailed in the HLMAR [High Latitude Mission Analysis Report], indicate the Coast
Guard will need to expand its icebreaking capacity, potentially requiring a fleet of up
to six icebreakers (3 heavy and 3 medium) to adequately meet mission demands in the
high latitudes
.... The analysis took into account both the Coast Guard statutory mission
requirements and additional requirements for year-round presence in both polar regions
detailed in the Naval Operations Concept (NOC) 2010.... The analysis also evaluated
employing single and multi-crewing concepts.... Strategic home porting analysis based
upon existing infrastructure and distance to operational areas provided the final input to
determine icebreaker capacity demand.44
While the MNS can be viewed as an authoritative U.S. government statement regarding required
numbers of U.S. polar icebreakers, it can be noted that the key sentence in the above-quoted
passage from the MNS (i.e., the sentence in bold) includes the terms “potentially” and “up to.”
These terms, which are often overlooked in discussions of required numbers of U.S. polar
icebreakers, make the key sentence less ironclad as a requirements statement than it would have
been if the terms had not been included, and could be interpreted as an acknowledgment that the
requirement might amount to something less than three heavy and three medium polar
icebreakers.
It can also be noted, as stated in the above-quoted passage from the MNS, that the MNS was
informed by the High Latitude Mission Analysis Report (HILMAR), and that the HLMAR took
into account not only Coast Guard statutory mission requirements, but additional Department of
Defense (DOD) requirements for year-round presence in both polar regions as detailed in the
2010 Naval Operations Concept (NOC). This is potentially significant, because DOD appears to
have subsequently dropped its 2010 requirement for year-round presence in the polar regions.45

44 Department of Homeland Security, Polar Icebreaking Recapitalization Project Mission Need Statement, Version 1.0,
approved by DHS June 28, 2013, pp. 1, 2, 9, 10, 11, 12.
45 A September 25, 2017, GAO report on polar icebreakers states the following (emphasis added):
In December 2016, DOD reported to Congress that it had no specific defense requirement for
icebreaking capability because Navy Arctic requirements are met by undersea and air assets which
can provide year-round presence.
-- DOD reported in April 2017 that its only potential defense requirement—for the Thule Air Force
Base resupply [mission] in Greenland—is met by the Canadian Coast Guard through a
Memorandum of Understanding with USCG.
-- USCG’s 2013 Polar Icebreaker Mission Needs Statement identified polar icebreaker capacity
Congressional Research Service

25

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

The use in the MNS of the terms “potentially” and “up to,” combined with DOD’s decision to
drop its requirement for year-round presence in the polar regions, together raise a question, other
things held equal, as to whether required numbers of U.S. polar icebreakers might be something
less than three heavy and three medium polar icebreakers. It is also possible, however, that there
have been other changes since the MNS was issued in 2013 that would have the effect, other
things held equal, of increasing U.S. requirements for polar icebreakers. The net result of this
situation appears uncertain.
In recent years, Coast Guard officials have tended to refer simply to a total Coast Guard
requirement for three heavy and three medium polar icebreakers. For example, in the October 25,
2016, summary of a request for information (RFI) that the Coast Guard released the next day to
receive industry feedback on its notional polar icebreaker acquisition approach and schedule, the
Coast Guard states that “the United States Coast Guard has a need for three Heavy Polar
Icebreakers and three Medium Polar Icebreakers with the priority being Heavy Polar
Icebreakers.”46 A requirement for three heavy and three medium polar icebreakers is often
abbreviated as 3+3.
Short of a 3+3 requirement, Coast Guard officials in the past have sometimes stated that, as a bare
minimum number of heavy polar icebreakers, the Coast Guard needs two such ships. For
example, at a November 17, 2015, hearing before the Europe, Eurasia, and Emerging Threats
subcommittee and the Western Hemisphere subcommittee of the House Foreign Affairs
Committee, then-Vice Admiral Charles Michel, the Vice Commandant of the Coast Guard, stated
during the discussion portion of the hearing that the “Coast Guard needs at least two heavy
icebreakers to provide year-round assured access and self-rescueability in the polar regions.”47
Similarly, at a June 14, 2016, hearing before the Coast Guard and Maritime Transportation
subcommittee of the House Transportation and Infrastructure Committee, Admiral Michel
testified that “our commandant also testified that we need self-rescue capability for our heavy
icebreaker and that includes the existing Polar Star that we have out there now. So that means at
least two [ships], [and] the High Latitude study says three heavy polar icebreakers is what the
Coast Guard's requirement is. So that's kind of where we’re talking about for heavy
icebreakers.”48
A September 25, 2017, Government Accountability Office (GAO) report on polar icebreakers
states that
the Coast Guard has been unable to address all polar icebreaking requests since 2010. For
example, the Coast Guard reported fulfilling 78 percent (25 of 32) of U.S. government

needs as partly based on the 2010 Naval Operations Concept—[a document that provides] joint
maritime security strategy implementation guidance for the Navy, Marine Corps, and USCG—
which stated that U.S. naval forces had a demand for year-round polar icebreaking presence in the
Arctic and Antarctic.
-- In April 2017, DOD joint staff officials confirmed that DOD and Naval defense strategy had
been updated and does not include icebreaking requirements. DOD officials in charge of operations
in the Pacific said that although they do not have a requirement for a heavy icebreaker, icebreakers
play a key role in aiding the icebreaking mission to McMurdo.
(Government Accountability Office, Coast Guard: Status of Polar Icebreaking Fleet Capability
and Recapitalization Plan
, GAO-17-698R, September 25, 2017, p. 20 (briefing slide 11).)
46 Summary of RFI, October 25, 2016, page 2, accessed November 10, 2016, at https://www.uscg.mil/acquisition/
icebreaker/pdf/Acquisition-Strategy-RFI.pdf.
47 Transcript of hearing.
48 Transcript of hearing.
Congressional Research Service

26

link to page 32 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

agency requests for polar icebreaking services during fiscal year 2010 through 2016. Coast
Guard officials cited various factors affecting the Coast Guard’s ability to meet all requests,
particularly the unavailability of its heavy polar icebreakers.49
A July 2018 GAO report stated that
the Coast Guard operates one medium icebreaker, the Healy, which has an expected end of
service life in 2029. Despite the requirement for three medium icebreakers, Coast Guard
officials said they are not currently assessing acquisition of the medium polar icebreakers
because they are focusing on the heavy icebreaker acquisition and plan to assess the costs
and benefits of acquiring medium polar icebreakers at a later time.50
In addition to the HILMAR, a number of other studies have been conducted in recent years to
assess U.S. requirements for polar icebreakers and options for sustaining and modernizing the
Coast Guard’s polar icebreaker fleet.
Polar Icebreakers Operated by Other Countries
In discussions of U.S. polar icebreakers, observers sometimes note the size of the polar
icebreaking fleets operated by other countries. Table B-1 shows a Coast Guard summary of major
icebreakers around the world; the figures in the table include some icebreakers designed for use
in the Baltic Sea.
Observers sometimes highlight the difference between the number of U.S. polar icebreakers and
the much larger number of Russian polar icebreakers. In considering these relative numbers, it
can be noted that Russia’s Arctic coastline is much longer than the U.S. Arctic coastline, that
many more people live in Russia’s Arctic (about roughly 2 million) than in the U.S. Arctic (fewer
than 68,000 as of July 1, 2017),51 and that maritime transportation along Russia’s Arctic coast is
critical for supporting numerous Russian Arctic communities. Countries with interests in the polar
regions have differing requirements for polar icebreakers, depending on the nature and extent of
their polar interests and activities.

49 Government Accountability Office, Coast Guard: Status of Polar Icebreaking Fleet Capability and Recapitalization
Plan
, GAO-17-698R, September 25, 2017, pp. 2-3. A similar statement appears on page 4.
50 Government Accountability Office, Coast Guard Acquisitions[:] Actions Needed to Address Longstanding Portfolio
Management Challenges
, GAO-18-454, July 2018, p. 13.
51 For additional discussion, see the Background section of CRS Report R41153, Changes in the Arctic: Background
and Issues for Congress
, coordinated by Ronald O'Rourke.
Congressional Research Service

27

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Table B-1. Major Icebreakers of the World as of May 1, 2017
(Includes some icebreakers designed for Baltic use)
Total all
In inventory, government owned or
In inventory, privately owned and
types, in
operated
operated
inventory (+
under
45,000 or
20,000 to
10,000 to
construction
45,000 or
20,000 to
10,000 to
more
44,999
19,999

+ planned)
more BHP
44,999 BHP
19,999 BHP
BHP
BHP
BHP
Russia
46 (+11 + 4)
6 (all nuclear
16 (1 nuclear
7

9
8
powered; 2
powered; 5
not
designed for
operational)
Baltic use)
Finland
10

7 (4 designed
1


2
for Baltic
use)
Canada
7 (+2 +5)

2
5



Sweden
7 (+0 +3)

4 (3 designed



3
for Baltic
use)
United States
5 (+0 +3)
2 (Polar Star
1 (Healy)


1 (Aiviq)
1 (Palmer)
and Polar
Sea; Polar
Sea not
operational)
Denmark
4





4 (all 4
designed for
Baltic use)
China
3 (+1 +0)


3



Estonia
2


2 (both



designed for
Baltic use)
Norway
1 (+1 +0)


1



Germany
1 (+0 +1)





1
Chile
1 (+0 +1)


1



Australia
1 (+0 +1)


1



Latvia
1


1 (designed



for Baltic use)
Japan
1

1




South Korea
1


1



South Africa
1


1



Argentina
1


1 (not



operational)
United
0 (+1 +0)






Kingdom
Source: Table prepared by CRS based on U.S. Coast Guard chart showing data compiled by the Coast Guard as
of May 1, 2017, accessed September 14, 2017, at http://www.dco.uscg.mil/Portals/9/DCO%20Documents/
Office%20of%20Waterways%20and%20Ocean%20Policy/20170501%20major%20icebreaker%20chart.pdf?ver=
2017-06-08-091723-907.
Notes: BHP = the brake horsepower of the ship’s power plant. A ship with 45,000 or more BHP might be
considered a heavy polar icebreaker, a ship with 20,000 to 44,999 BHP might be considered a medium polar
icebreaker, and a ship with 10,000 to 19,999 BHP might be considered a light polar icebreaker or an ice-capable
polar ship.

Congressional Research Service

28

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

July 2017 National Academies (NASEM) Report
A July 2017 report on the acquisition and operation of polar icebreakers by the National
Academies of Sciences, Engineering, and Medicine (NASEM) that was directed by Congress in
Section 604 of the Coast Guard Authorization Act of 2015 (H.R. 4188/P.L. 114-120 of February
8, 2016) concluded the following:
INTRODUCTION
The United States has strategic national interests in the polar regions. In the Arctic, the
nation must protect its citizens, natural resources, and economic interests; assure
sovereignty, defense readiness, and maritime mobility; and engage in discovery and
research. In the Antarctic, the United States must maintain an active presence that includes
access to its research stations for the peaceful conduct of science and the ability to
participate in inspections as specified in the Antarctic Treaty. The committee’s charge...
was to advise the U.S. House of Representatives and the U.S. Senate on an assessment of
the costs incurred by the federal government in carrying out polar icebreaking missions
and on options that could minimize lifecycle costs. The committee’s consensus findings
and recommendations are presented below. Unless otherwise specified, all estimated costs
and prices for the future U.S. icebreakers are expressed in 2019 dollars, since that is the
year in which the contracts are scheduled to be made. Supporting material is found in the
appendices.
FINDINGS AND RECOMMENDATIONS
1. Finding: The United States has insufficient assets to protect its interests, implement
U.S. policy, execute its laws, and meet its obligations in the Arctic and Antarctic
because it lacks adequate icebreaking capability.

For more than 30 years, studies have emphasized the need for U.S. icebreakers to maintain
presence, sovereignty, leadership, and research capacity—but the nation has failed to
respond....The strong warming and related environmental changes occurring in both the
Arctic and the Antarctic have made this failure more critical. In the Arctic, changing sea
ice conditions will create greater navigation hazards for much of the year, and expanding
human industrial and economic activity will magnify the need for national presence in the
region. In the Antarctic, sea ice trends have varied greatly from year to year, but the annual
requirements for access into McMurdo Station have not changed. The nation is ill-equipped
to protect its interests and maintain leadership in these regions and has fallen behind other
Arctic nations, which have mobilized to expand their access to ice-covered regions. The
United States now has the opportunity to move forward and acquire the capability to fulfill
these needs....
2. Recommendation: The United States Congress should fund the construction of four
polar icebreakers of common design that would be owned and operated by the United
States Coast Guard (USCG).

The current Department of Homeland Security (DHS) Mission Need Statement (DHS
2013) contemplates a combination of medium and heavy icebreakers. The committee’s
recommendation is for a single class of polar icebreaker with heavy icebreaking capability.
Proceeding with a single class means that only one design will be needed, which will
provide cost savings. The committee has found that the fourth heavy icebreaker could be
built for a lower cost than the lead ship of a medium icebreaker class....
The DHS Mission Need Statement contemplated a total fleet of “potentially” up to six ships
of two classes—three heavy and three medium icebreakers. Details appear in the High
Latitude Mission Analysis Report. The Mission Need Statement indicated that to fulfill its
statutory missions, USCG required three heavy and three medium icebreakers; each vessel
would have a single crew and would homeport in Seattle. The committee’s analysis
Congressional Research Service

29

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

indicated that four heavy icebreakers will meet the statutory mission needs gap identified
by DHS for the lowest cost. Three of the ships would allow continuous presence in the
Arctic, and one would service the Antarctic.
As noted in the High Latitude Report, USCG’s employment standard is 185 days away
from home port (DAFHP) for a single crew. Three heavy icebreakers in the Arctic provide
555 DAFHP, sufficient for continuous presence. In addition, the medium icebreaker USCG
Cutter Healy’s design service life runs through 2030. If greater capacity is required, USCG
could consider operating three ships with four crews, which would provide 740 DAFHP.
The use of multiple crews in the Arctic could require fewer ships while providing a
comparable number of DAFHP. For example, two ships (instead of the recommended
three) operating in the Arctic with multiple crews could provide a similar number of annual
operating days at a lower cost, but such an arrangement may not permit simultaneous
operations in both polar regions and may not provide adequate redundancy in capability.
More important, an arrangement under which fewer boats are operated more often would
require more major maintenance during shorter time in port, often at increasing cost. In
addition, if further military presence is desired in the Arctic, USCG could consider ice-
strengthening the ninth national security cutter.
One heavy icebreaker servicing the Antarctic provides for the McMurdo breakout and
international treaty verification. The availability of the vessel could be extended by
homeporting in the Southern Hemisphere. If the single vessel dedicated to the Antarctic is
rendered inoperable, USCG could redirect an icebreaker from the Arctic, or it could rely
on support from other nations. The committee considers both options to be viable and
believes it difficult to justify a standby (fifth) vessel for the Antarctic mission when the
total acquisition and lifetime operating costs of a single icebreaker are projected to exceed
$1.6 billion. Once the four new icebreakers are operational, USCG can reasonably be
expected to plan for more distant time horizons. USCG could assess the performance of
the early ships once they are operational and determine whether additional capacity is
needed.
USCG is the only agency of the U.S. government that is simultaneously a military service,
a law enforcement agency, a marine safety and rescue agency, and an environmental
protection agency. All of these roles are required in the mission need statement for a polar
icebreaker. USCG, in contrast to a civilian company, has the authorities, mandates, and
competencies to conduct the missions contemplated for the polar icebreakers. Having one
agency with a multimission capability performing the range of services needed would be
more efficient than potentially duplicating effort by splitting polar icebreaker operations
among other agencies.
The requirement for national presence is best accomplished with a military vessel. In
addition, USCG is fully interoperable with the U.S. Navy and the nation’s North Atlantic
Treaty Organization partners. USCG is already mandated to operate the nation’s domestic
and polar icebreakers. Continuing to focus this expertise in one agency remains the logical
approach....
Government ownership of new polar icebreakers would be less costly than the use of lease
financing (see Appendix C). The government has a lower borrowing cost than any U.S.-
based leasing firm or lessor. In addition, the lessor would use higher-cost equity (on which
it would expect to make a profit) to cover a portion of the lease financing. The committee’s
analysis shows that direct purchase by the government would cost, at a minimum, 19
percent less than leasing on a net present value basis (after tax). There is also the risk of
the lessor going bankrupt and compromising the availability of the polar icebreaker to
USCG. For its analysis, the committee not only relied on its extensive experience with
leveraged lease financing but also reviewed available Government Accountability Office
reports and Office of Management and Budget rules, examined commercial leasing
Congressional Research Service

30

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

economics and current interest rates, and validated its analysis by consulting an outside
expert on the issue....
Chartering (an operating lease) is not a viable option.... The availability of polar icebreakers
on the open market is extremely limited. (The committee is aware of the sale of only one
heavy icebreaker since 2010.) U.S. experience with chartering a polar icebreaker for the
McMurdo resupply mission has been problematic on two prior charter attempts. Chartering
is workable only if the need is short term and mission specific. The committee notes that
chartering may preclude USCG from performing its multiple missions....
In the committee’s judgment, an enlarged icebreaker fleet will provide opportunities for
USCG to strengthen its icebreaking program and mission. Although the number of billets
that require an expert is small compared with the overall number of billets assigned to these
icebreakers, more people performing this mission will increase the pool of experienced
candidates. This will provide personnel assignment officers with a larger pool of candidates
when the more senior positions aboard icebreakers are designated, which will make
icebreaking more attractive as a career path and increase the overall level of icebreaking
expertise within USCG. Importantly, the commonality of design of the four recommended
heavy icebreakers will reduce operating and maintenance costs over the service life of these
vessels through efficiencies in supporting and crewing them. Having vessels of common
design will likely improve continuity of service, build icebreaking competency, improve
operational effectiveness, and be more cost-efficient....
3. Recommendation: USCG should follow an acquisition strategy that includes block
buy contracting with a fixed price incentive fee contract and take other measures to
ensure best value for investment of public funds.

Icebreaker design and construction costs can be clearly defined, and a fixed price incentive
fee construction contract is the most reliable mechanism for controlling costs for a program
of this complexity. This technique is widely used by the U.S. Navy. To help ensure best
long-term value, the criteria for evaluating shipyard proposals should incorporate explicitly
defined lifecycle cost metrics....
A block buy authority for this program will need to contain specific language for economic
order quantity purchases for materials, advanced design, and construction activities. A
block buy contracting program with economic order quantity purchases enables series
construction, motivates competitive bidding, and allows for volume purchase and for the
timely acquisition of material with long lead times. It would enable continuous production,
give the program the maximum benefit from the learning curve, and thus reduce labor hours
on subsequent vessels.
The acquisition strategy would incorporate (a) technology transfer from icebreaker
designers and builders with recent experience, including international expertise in design,
construction, and equipment manufacture; (b) a design that maximizes use of commercial
off-the-shelf (COTS) equipment, applies Polar Codes and international standards, and only
applies military specifications (MIL-SPEC) to the armament, aviation, communications,
and navigation equipment; (c) reduction of any “buy American” provisions to allow the
sourcing of the most
suitable and reliable machinery available on the market; and (d) a program schedule that
allows for completion of design and planning before the start of construction. These
strategies will allow for optimization of design, reduce construction costs, and enhance
reliability and maintainability....
4. Finding: In developing its independent concept designs and cost estimates, the
committee determined that the costs estimated by USCG for the heavy icebreaker are
reasonable. However, the committee believes that the costs of medium icebreakers
identified in the High Latitude Mission Analysis Report are significantly
underestimated.

Congressional Research Service

31

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

The committee estimates the rough order-of-magnitude (ROM) cost of the first heavy
icebreaker to be $983 million. (See Appendix D, Table D-6.) Of these all-in costs, 75 to 80
percent are shipyard design and construction costs; the remaining 20 to 25 percent cover
government-incurred costs such as government-furnished equipment and government-
incurred program expenses. If advantage is taken of learning and quantity discounts
available through the recommended block buy contracting acquisition strategy, the average
cost per heavy icebreaker is approximately $791 million, on the basis of the acquisition of
four ships. The committee’s analysis of the ship size to incorporate the required
components (stack-up length) suggests an overall length of 132 meters (433 feet) and a
beam of 27 meters (89 feet). This is consistent with USCG concepts for the vessel.
Costs can be significantly reduced by following the committee’s recommendations.
Reduction of MIL-SPEC requirements can lower costs by up to $100 million per ship with
no loss of mission capability.... The other recommended acquisition, design, and
construction strategies will control possible cost overruns and provide significant savings
in overall life-cycle costs for the program.
Although USCG has not yet developed the operational requirements document for a
medium polar icebreaker, the committee was able to apply the known principal
characteristics of the USCG Cutter Healy to estimate the scope of work and cost of a similar
medium icebreaker. The committee estimates that a first-of-class medium icebreaker will
cost approximately $786 million. The fourth ship of the heavy icebreaker series is
estimated to cost $692 million. Designing a medium-class polar icebreaker in a second
shipyard would incur the estimated engineering, design, and planning costs of $126 million
and would forgo learning from the first three ships; the learning curve would be restarted
with the first medium design. Costs of building the fourth heavy icebreaker would be less
than the costs of designing and building a first-of-class medium icebreaker... . In
developing its ROM cost estimate, the committee agreed on a common notional design and
basic assumptions.... Two committee members then independently developed cost
estimating models, which were validated internally by other committee members. These
analyses were then used to establish the committee’s primary cost estimate....
5. Finding: Operating costs of new polar icebreakers are expected to be lower than
those of the vessels they replace.

The committee expects the operating costs for the new heavy polar icebreakers to be lower
than those of USCG’s Polar Star. While USCG’s previous experience is that operating
costs of new cutters are significantly higher than those of the vessels they replace, the
committee does not believe this historical experience applies in this case. There is good
reason to believe that operating costs for new ships using commercially available modern
technology will be lower than costs for existing ships.... The more efficient hull forms and
modern engines will reduce fuel consumption, and a well-designed automation plant will
require fewer operation and maintenance personnel, which will allow manning to be
reduced or freed up for alternative tasks. The use of COTS technology and the
minimization of MIL-SPEC, as recommended, will also reduce long-term maintenance
costs, since use of customized equipment to meet MIL-SPEC requirements can reduce
reliability and increase costs. A new vessel, especially over the first 10 years, typically has
significantly reduced major repair and overhaul costs, particularly during dry-dock periods,
compared with existing icebreakers—such as the Polar Star—that are near or at the end of
their service life.... The Polar Star has many age-related issues that require it to be
extensively repaired at an annual dry-docking. These issues will be avoided in the early
years of a new ship. However, the committee recognizes that new ship operating costs can
be higher than those of older ships if the new ship has more complexity to afford more
capabilities. Therefore, any direct comparisons of operating costs of newer versus older
ships would need to take into account the benefits of the additional capabilities provided
by the newer ship.
Congressional Research Service

32

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

USCG will have an opportunity to evaluate the manning levels of the icebreaker in light of
the benefits of modern technology to identify reductions that can be made in operating
costs....
6. Recommendation: USCG should ensure that the common polar icebreaker design
is science-ready and that one of the ships has full science capability.

All four proposed ships would be designed as “science-ready,” which will be more cost-
effective when one of the four ships—most likely the fourth—is made fully science
capable. Including science readiness in the common polar icebreaker design is the most
cost-effective way of fulfilling both the USCG’s polar missions and the nation’s scientific
research polar icebreaker needs.... The incremental costs of a science-ready design for each
of the four ships ($10 million to $20 million per ship) and of full science capability for one
of the ships at the initial build (an additional $20 million to $30 million) are less than the
independent design and build cost of a dedicated research medium icebreaker.... In
briefings at its first meeting, the committee learned that the National Science Foundation
and other agencies do not have budgets to support full-time heavy icebreaker access or the
incremental cost of design, even though their science programs may require this capability.
Given the small incremental cost, the committee believes that the science capability cited
above should be included in the acquisition costs.
Science-ready design includes critical elements that cannot be retrofitted cost-effectively
into an existing ship and that should be incorporated in the initial design and build. Among
these elements are structural supports, appropriate interior and exterior spaces, flexible
accommodation spaces that can embark up to 50 science personnel, a hull design that
accommodates multiple transducers and minimizes bubble sweep while optimizing
icebreaking capability, machinery arrangements and noise dampening to mitigate
interference with sonar transducers, and weight and stability latitudes to allow installation
of scientific equipment. Such a design will enable any of the ships to be retrofitted for full
science capability in the future, if necessary....
Within the time frame of the recommended build sequence, the United States will require
a science-capable polar icebreaker to replace the science capabilities of the Healy upon her
retirement. To fulfill this need, one of the heavy polar icebreakers would be procured at the
initial build with full science capability; the ability to fulfill other USCG missions would
be retained. The ship would be outfitted with oceanographic overboarding equipment and
instrumentation and facilities comparable with those of modern oceanographic research
vessels. Some basic scientific capability, such as hydrographic mapping sonar, should be
acquired at the time of the build of each ship so that environmental data that are essential
in fulfilling USCG polar missions can be collected.
7. Finding: The nation is at risk of losing its heavy polar icebreaking capability—
experiencing a critical capacity gap—as the Polar Star approaches the end of its
extended service life, currently estimated at 3 to 7 years.

The Polar Star, built in 1976, is well past its 30-year design life. Its reliability will continue
to decline, and its maintenance costs will continue to escalate. Although the ship went
through an extensive life-extending refit in 2011–2012, the Polar Star’s useful life is
estimated to end between 2020 and 2024. As USCG has recognized, the evaluation of
alternative arrangements to secure polar icebreaking capacity is important, given the
growing risks of the Polar Star losing its capability to fulfill its mission....
8. Recommendation: USCG should keep the Polar Star operational by implementing
an enhanced maintenance program (EMP) until at least two new polar icebreakers
are commissioned.

Even if the committee’s notional schedule for new polar icebreakers is met, the second
polar icebreaker would not be ready until July 2025.... The committee’s proposed EMP
could be designed with planned—and targeted—upgrades that allow the Polar Star to
Congressional Research Service

33

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

operate every year for its Antarctic mission. The necessary repairs could be performed in
conjunction with the ship’s current yearly dry-docking schedule within existing annual
expenditures, estimated to average $5 million. In particular, the EMP would require
improvements in the ship’s operating systems, sanitary system, evaporators, main
propulsion systems, and controllable pitch propellers. In the committee’s judgment, the
EMP could be accomplished within USCG’s average annual repair expenditures for the
Polar Star, which currently range between $2 million and $9 million.52
Coast Guard High Latitude Study Provided to Congress in
July 2011
In July 2011, the Coast Guard provided to Congress a study on the Coast Guard’s missions and
capabilities for operations in high-latitude (i.e., polar) areas. The study, commonly known as the
High Latitude Study, is dated July 2010 on its cover. The High Latitude Study concluded the
following:
[The study] concludes that future capability and capacity gaps will significantly impact
four [Coast Guard] mission areas in the Arctic: Defense Readiness, Ice Operations, Marine
Environmental Protection, and Ports, Waterways, and Coastal Security. These mission
areas address the protection of important national interests in a geographic area where other
nations are actively pursuing their own national goals....
The common and dominant contributor to these significant mission impacts is the gap in
polar icebreaking capability. The increasing obsolescence of the Coast Guard’s icebreaker
fleet will further exacerbate mission performance gaps in the coming years....
The gap in polar icebreaking capacity has resulted in a lack of at-sea time for crews and
senior personnel and a corresponding gap in training and leadership. In addition to
providing multi-mission capability and intrinsic mobility, a helicopter-capable surface unit
would eliminate the need for acquiring an expensive shore-based infrastructure that may
only be needed on a seasonal or occasional basis. The most capable surface unit would be
a polar icebreaker. Polar icebreakers can transit safely in a variety of ice conditions and
have the endurance to operate far from logistics bases. The Coast Guard’s polar icebreakers
have conducted a wide range of planned and unscheduled Coast Guard missions in the past.
Polar icebreakers possess the ability to carry large numbers of passengers, cargo, boats,
and helicopters. Polar icebreakers also have substantial command, control, and
communications capabilities. The flexibility and mobility of polar icebreakers would assist
the Coast Guard in closing future mission performance gaps effectively....
Existing capability and capacity gaps are expected to significantly impact future Coast
Guard performance in two Antarctic mission areas: Defense Readiness and Ice Operations.
Future gaps may involve an inability to carry out probable and easily projected mission
requirements, such as the McMurdo resupply, or readiness to respond to less-predictable
events. By their nature, contingencies requiring the use of military capabilities often occur
quickly. As is the case in the Arctic, the deterioration of the Coast Guard’s icebreaker fleet
is the primary driver for this significant mission impact. This will further widen mission
performance gaps in the coming years. The recently issued Naval Operations Concept 2010
requires a surface presence in both the Arctic and Antarctic. This further exacerbates the
capability gap left by the deterioration of the icebreaker fleet....

52 National Academies of Sciences, Engineering, and Medicine, Division on Earth and Life Studies and Transportation
Research Board, Acquisition and Operation of Polar Icebreakers: Fulfilling the Nation’s Needs, Letter Report, with
cover letter dated July 11, 2017, pp. 9-20.
Congressional Research Service

34

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

The significant deterioration of the Coast Guard icebreaker fleet and the emerging mission
demands to meet future functional requirements in the high latitude regions dictate that the
Coast Guard acquire material solutions to close the capability gaps....
To meet the Coast Guard mission functional requirement, the Coast Guard icebreaking
fleet must be capable of supporting the following missions:
Arctic North Patrol. Continuous multimission icebreaker presence in the Arctic.
Arctic West Science. Spring and summer science support in the Arctic.
Antarctic, McMurdo Station resupply. Planned deployment for break-in, supply
ship escort, and science support. This mission, conducted in the Antarctic summer,
also requires standby icebreaker support for backup in the event the primary vessel
cannot complete the mission.
Thule Air Base Resupply and Polar Region Freedom of Navigation Transits.
Provide vessel escort operations in support of the Military Sealift Command’s
Operation Pacer Goose; then complete any Freedom of Navigation exercises in the
region.
In addition, the joint Naval Operations Concept establishes the following mission
requirements:
Assured access and assertion of U.S. policy in the Polar Regions. The current
demand for this mission requires continuous icebreaker presence in both Polar
Regions.
Considering these missions, the analysis yields the following findings:
The Coast Guard requires three heavy and three medium icebreakers to fulfill
its statutory missions. These icebreakers are necessary to (1) satisfy Arctic winter
and transition season demands and (2) provide sufficient capacity to also execute
summer missions. Single-crewed icebreakers have sufficient capacity for all current
and expected statutory missions. Multiple crewing provides no advantage because the
number of icebreakers required is driven by winter and shoulder season requirements.
Future use of multiple or augmented crews could provide additional capacity needed
to absorb mission growth.
The Coast Guard requires six heavy and four medium icebreakers to fulfill its
statutory missions and maintain the continuous presence requirements of the
Naval Operations Concept.
Consistent with current practice, these icebreakers are
single-crewed and homeported in Seattle Washington.
Applying crewing and home porting alternatives reduces the overall requirement
to four heavy and two medium icebreakers. This assessment of non-material
solutions shows that the reduced number of icebreakers can be achieved by having all
vessels operate with multiple crews and two of the heavy icebreakers homeporting in
the Southern Hemisphere.
Leasing was also considered as a nonmaterial solution. While there is no dispute that the
Coast Guard’s polar icebreaker fleet is in need of recapitalization, the decision to acquire
this capability through purchase of new vessels, reconstruction of existing ships, or
commercial lease of suitable vessels must be resolved to provide the best value to the
taxpayer. The multi-mission nature of the Coast Guard may provide opportunities to
conduct some subset of its missions with non government-owned vessels. However,
serious consideration must be given to the fact that the inherently governmental missions
of the Coast Guard must be performed using government-owned and operated vessels. An
interpretation of the national policy is needed to determine the resource level that best
supports the nation’s interests....
Congressional Research Service

35

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

The existing icebreaker capacity, two inoperative heavy icebreakers and an operational
medium icebreaker, does not represent a viable capability to the federal government. The
time needed to augment this capability is on the order of 10 years. At that point, around
2020, the heavy icebreaking capability bridging strategy expires.53
At a July 27, 2011, hearing on U.S. economic interests in the Arctic before the Oceans,
Atmosphere, Fisheries, and Coast Guard subcommittee of the Senate Commerce, Science, and
Transportation Committee, the following exchange occurred:
SENATOR OLYMPIA J. SNOWE: On the high latitude study, do you agree with—and
those—I would like to also hear from you, Admiral Titley, as well, on these requirements
in terms of Coast Guard vessels as I understand it, they want to have—I guess, it was a
three medium ice breakers. Am in correct in saying that? Three medium ice breakers.
ADMIRAL ROBERT PAPP, COMMANDANT OF THE COAST GUARD: I agree with
the mission analysis and as you look at the requirements for the things that we might do up
there, if it is in the nation’s interest, it identifies a minimum requirement for three heavy
ice breakers and three medium ice breakers and then if you want a persistent presence up
there, it would require—and also doing things such as breaking out (inaudible) and other
responsibilities, then it would take up to a maximum six heavy and four medium.
SNOWE: Right. Do you agree with that?
PAPP: If we were to be charged with carrying out those full responsibilities, yes, ma’am.
Those are the numbers that you would need to do it.
SNOWE: Admiral Titley, how would you respond to the high latitude study and has the
Navy conducted its own assessment of its capability?
REAR ADMIRAL DAVID TITLEY, OCEANORGRAPHER AND NAVIGATOR OF
THE NAVY: Ma’am, we are in the process right now of conducting what we call a
capabilities based assessment that will be out in the summer of this year.
We are getting ready to finish that—the Coast Guard has been a key component of the
Navy’s task force on climate change, literally since day one when the Chief of Naval
Operations set this up, that morning, we had the Coast Guard invited as a member of our
executive steering committee.
So we have been working very closely with the Coast Guard, with the Department of
Homeland Security, and I think Admiral Papp—said it best as far as the specific comments
on the high latitude study but we have been working very closely with the Coast Guard.54
January 2011 DHS Office of Inspector General Report
A January 2011 report on the Coast Guard’s polar icebreakers from the DHS Office of the
Inspector General stated the following:
The Coast Guard does not have the necessary budgetary control over its [polar] icebreakers,
nor does it have a sufficient number of icebreakers to accomplish its missions in the Polar
Regions. Currently, the Coast Guard has only one operational [polar] icebreaker [i.e.,
Healy], making it necessary for the United States to contract with foreign nations to
perform scientific, logistical, and supply activities. Without the necessary budgetary
control and a sufficient number of icebreaking assets, the Coast Guard will not have the
capability to perform all of its missions, will lose critical icebreaking expertise, and may

53 United States Coast Guard High Latitude Region Mission Analysis Capstone Summary, July 2010, pp. 10-13, 15.
54 Source: Transcript of hearing.
Congressional Research Service

36

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

be beholden to foreign nations to perform its statutory missions. The Coast Guard should
improve its strategic approach to ensure that it has the long-term icebreaker capabilities
needed to support Coast Guard missions and other national interests in the Arctic and
Antarctic regions.55
Regarding current polar icebreaking capabilities for performing Arctic missions, the report states
the following:
The Coast Guard’s icebreaking resources are unlikely to meet future demands. [The table
below] outlines the missions that Coast Guard is unable to meet in the Arctic with its
current icebreaking resources.
Arctic Missions Not Being Met
Requesting Agency
Missions Not Being Met
United States Coast Guard
—Fisheries enforcement in Bering Sea
to prevent foreign fishing in U.S.
waters and overfishing
—Capability to conduct search and
rescue in Beaufort Sea for cruise line
and natural resource exploration ships
—Future missions not anticipated to
be met: 2010 Arctic Winter Science
Deployment
NASA
Winter access to the Arctic to conduct
oceanography and study Arctic
currents and how they relate to
regional ice cover, climate, and
biology
NOAA and NSF
Winter research
Department of Defense
Assured access to ice-impacted waters
through a persistent icebreaker
presence in the Arctic and Antarctic56
The report also states the following:
Should the Coast Guard not obtain funding for new icebreakers or major service life
extensions for its existing icebreakers with sufficient lead-time, the United States will have
no heavy icebreaking capability beyond 2020 and no polar icebreaking capability of any
kind by 2029. Without the continued use of icebreakers, the United States will lose its
ability to maintain a presence in the Polar Regions, the Coast Guard’s expertise to perform
ice operations will continue to diminish, and missions will continue to go unmet.57

55 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, p. 1 (Executive Summary). Report accessed September
21, 2011, at https://www.oig.dhs.gov/assets/Mgmt/OIG_11-31_Jan11.pdf.
56 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, p. 9.
57 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, p. 10.
Congressional Research Service

37

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Regarding current polar icebreaking capabilities for performing Antarctic missions, the report
states the following:
The Coast Guard needs additional icebreakers to accomplish its missions in the Antarctic.
The Coast Guard has performed the McMurdo Station resupply in Antarctica for decades,
but with increasing difficulty in recent years. The Coast Guard’s two heavy-duty
icebreakers [i.e., Polar Star and Polar Sea] are at the end of their service lives, and have
become less reliable and increasingly costly to keep in service....
In recent years, the Coast Guard has found that ice conditions in the Antarctic have become
more challenging for the resupply of McMurdo Station. The extreme ice conditions have
necessitated the use of foreign vessels to perform the McMurdo break-in....
As ice conditions continue to change around the Antarctic, two icebreakers are needed for
the McMurdo break-in and resupply mission. Typically, one icebreaker performs the break-
in and the other remains on standby. Should the first ship become stuck in the ice or should
the ice be too thick for one icebreaker to complete the mission, the Coast Guard deploys
the ship on standby. Since the Polar Sea and Polar Star are not currently in service, the
Coast Guard has no icebreakers capable of performing this mission. [The table below]
outlines the missions that will not be met without operational heavy-duty icebreakers.
Arctic Missions Not Being Met
Requesting Agency
Missions Not Being Met
NSF
Missions not anticipated to be met: 2010-2011
Operation Deep Freeze – McMurdo Station
Resupply
Department of State
Additional inspections of foreign facilities in
Antarctica to enforce the Antarctic Treaty and
ensure facilities’ environment compliance58
The report’s conclusion and recommendations were as follows:
Conclusion
With an aging fleet of three icebreakers, one operational and two beyond their intended 30-
year service life, the Coast Guard is at a critical crossroads in its Polar Icebreaker
Maintenance, Upgrade, and Acquisition Program. It must clarify its mission requirements,
and if the current mission requirements remain, the Coast Guard must determine the best
method for meeting these requirements in the short and long term.
Recommendations
We recommend that the Assistant Commandant for Marine Safety, Security, and
Stewardship:
Recommendation #1: Request budgetary authority for the operation, maintenance, and
upgrade of its icebreakers.
Recommendation #2: In coordination with the Department of Homeland Security, request
clarification from Congress to determine whether Arctic missions should be performed by
Coast Guard assets or contracted vessels.

58 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, pp. 10-11.
Congressional Research Service

38

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Recommendation #3: In coordination with the Department of Homeland Security, request
clarification from Congress to determine whether Antarctic missions should be performed
by Coast Guard assets or contracted vessels.
Recommendation #4: Conduct the necessary analysis to determine whether the Coast
Guard should replace or perform service-life extensions on its two existing heavy-duty
icebreaking ships.
Recommendation #5: Request appropriations necessary to meet mission requirements in
the Arctic and Antarctic.59
The report states that
The Coast Guard concurred with all five of the recommendations and is initiating corrective
actions. We consider the recommendations open and unresolved. The Coast Guard
provided information on some of its ongoing projects that will address the program needs
identified in the report.60
2010 U.S. Arctic Research Commission Report
A May 2010 report from the U.S. Arctic Research Commission (USARC) on goals and objectives
for Arctic research for 2009-2010 stated the following:
To have an effective Arctic research program, the United States must invest in human
capital, research platforms, and infrastructure, including new polar class icebreakers, and
sustained sea, air, land, space, and social observing systems.... The Commission urges the
President and Congress to commit to replacing the nation’s two polar class icebreakers.61
2007 National Research Council Report
A 2007 National Research Council (NRC) report, Polar Icebreakers in a Changing World: An
Assessment of U.S. Needs
, assessed roles and future needs for Coast Guard polar icebreakers.62
The study was required by report language accompanying the FY2005 DHS appropriations act
(H.R. 4567/P.L. 108-334).63 The study was completed in 2006 and published in 2007. Some

59 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, p. 12.
60 Department of Homeland Security, Office of Inspector General, The Coast Guard’s Polar Icebreaker Maintenance,
Upgrade, and Acquisition Program
, OIG-11-31, January 2011, p. 13.
61 U.S. Arctic Research Commission, Report on Goals and Objectives for Arctic Research 2009-2010, May 2010, p. 4.
Accessed online December 5, 2011, at https://storage.googleapis.com/arcticgov-static/publications/goals/
usarc_goals_2009-10.pdf.
62 National Research Council, Polar Icebreakers in a Changing World, An Assessment of U.S. Needs, Washington,
2007, 122 pp.
63 H.R. 4567/P.L. 108-334 of October 18, 2004. The related Senate bill was S. 2537. The Senate report on S. 2537
(S.Rept. 108-280 of June 17, 2004) stated the following:
The Committee expects the Commandant to enter into an arrangement with the National Academy
of Sciences to conduct a comprehensive study of the role of Coast Guard icebreakers in supporting
United States operations in the Antarctic and the Arctic. The study should include different
scenarios for continuing those operations including service life extension or replacement of existing
Coast Guard icebreakers and alternative methods that do not use Coast Guard icebreakers. The
study should also address changes in the roles and missions of Coast Guard icebreakers in support
of future marine operations in the Arctic that may develop due to environmental change, including
the amount and kind of icebreaking support that may be required in the future to support marine
operations in the Northern Sea Route and the Northwest Passage; the suitability of the Polar Class
icebreakers for these new roles; and appropriate changes in existing laws governing Coast Guard
Congressional Research Service

39

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

sources refer to the study as the 2006 NRC report. The report made the following conclusions and
recommendations:
Based on the current and future needs for icebreaking capabilities, the [study] committee
concludes that the nation continues to require a polar icebreaking fleet that includes a
minimum of three multimission ships [like the Coast Guard’s three current polar
icebreakers] and one single-mission [research] ship [like Palmer]. The committee finds that
although the demand for icebreaking capability is predicted to increase, a fleet of three
multimission and one single-mission icebreakers can meet the nation’s future polar
icebreaking needs through the application of the latest technology, creative crewing
models, wise management of ice conditions, and more efficient use of the icebreaker fleet
and other assets. The nation should immediately begin to program, design, and construct
two new polar icebreakers to replace the POLAR STAR and POLAR SEA.
Building only one new polar icebreaker is insufficient for several reasons. First, a single
ship cannot be in more than one location at a time. No matter how technologically advanced
or efficiently operated, a single polar icebreaker can operate in the polar regions for only a
portion of any year. An icebreaker requires regular maintenance and technical support from
shipyards and industrial facilities, must reprovision regularly, and has to effect periodic
crew changeouts. A single icebreaker, therefore, could not meet any reasonable standard
of active and influential presence and reliable, at-will access throughout the polar regions.
A second consideration is the potential risk of failure in the harsh conditions of polar
operations. Despite their intrinsic robustness, damage and system failure are always a risk
and the U.S. fleet must have enough depth to provide backup assistance. Having only a
single icebreaker would necessarily require the ship to accept a more conservative
operating profile, avoiding more challenging ice conditions because reliable assistance
would not be available. A second capable icebreaker, either operating elsewhere or in
homeport, would provide ensured backup assistance and allow for more robust operations
by the other ship.
From a strategic, longer-term perspective, two new Polar class icebreakers will far better
position the nation for the increasing challenges emerging in both polar regions. A second
new ship would allow the U.S. Coast Guard to reestablish an active patrol presence in U.S.
waters north of Alaska to meet statutory responsibilities that will inevitably derive from
increased human activity, economic development, and environmental change. It would
allow response to emergencies such as search-and-rescue cases, pollution incidents, and
assistance to ships threatened with grounding or damage by ice. Moreover, a second new
ship will leverage the possibilities for simultaneous operations in widely disparate
geographic areas (e.g., concurrent operations in the Arctic and Antarctic), provide more
flexibility for conducting Antarctic logistics (as either the primary or the secondary ship
for the McMurdo break-in), allow safer multiple-ship operations in the most demanding
ice conditions, and increase opportunities for international expeditions. Finally, an up-front
decision to build two new polar icebreakers will allow economies in the design and
construction process and provide a predictable cost reduction for the second ship....
The [study] committee finds that both operations and maintenance of the polar icebreaker
fleet have been underfunded for many years, and the capabilities of the nation’s icebreaking

icebreaking operations and the potential for new operating regimes. The study should be submitted
to the Committee no later than September 30, 2005.
The conference report on H.R. 4567 (H.Rept. 108-774 of October 9, 2004) stated the following:
As discussed in the Senate report and the Coast Guard authorization bill for fiscal year 2005, the
conferees require the National Academy of Sciences to study the role of Coast Guard icebreakers.
The earlier House report on H.R. 4567 (H.Rept. 108-541 of June 15, 2004) contained language directing a similar
report from the Coast Guard rather than the National Academies. (See the passage in the House report under the header
“Icebreaking.”)
Congressional Research Service

40

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

fleet have diminished substantially. Deferred long-term maintenance and failure to execute
a plan for replacement or refurbishment of the nation’s icebreaking ships have placed
national interests in the polar regions at risk. The nation needs the capability to operate in
both polar regions reliably and at will. Specifically, the committee recommends the
following:
 The United States should continue to project an active and influential presence in the
Arctic to support its interests. This requires U.S. government polar icebreaking
capability to ensure year-round access throughout the region.
 The United States should continue to project an active and influential presence in the
Antarctic to support its interests. The nation should reliably control sufficient
icebreaking capability to break a channel into and ensure the maritime resupply of
McMurdo Station.
 The United States should maintain leadership in polar research. This requires
icebreaking capability to provide access to the deep Arctic and the ice-covered waters
of the Antarctic.
 National interests in the polar regions require that the United States immediately
program, budget, design, and construct two new polar icebreakers to be operated by
the U.S. Coast Guard.
 To provide continuity of U.S. icebreaking capabilities, the POLAR SEA should remain
mission capable and the POLAR STAR should remain available for reactivation until
the new polar icebreakers enter service.
 The U.S. Coast Guard should be provided sufficient operations and maintenance
budget to support an increased, regular, and influential presence in the Arctic. Other
agencies should reimburse incremental costs associated with directed mission tasking.
 Polar icebreakers are essential instruments of U.S. national policy in the changing
polar regions. To ensure adequate national icebreaking capability into the future, a
Presidential Decision Directive should be issued to clearly align agency
responsibilities and budgetary authorities.64
The Coast Guard stated in 2008 that it “generally supports” the NRC report, and that the Coast
Guard “is working closely with interagency partners to determine a way forward with national
polar policy that identifies broad U.S. interests and priorities in the Arctic and Antarctic that will
ensure adequate maritime presence to further these interests. Identification and prioritization of
U.S. national interests in these regions should drive development of associated USCG [U.S. Coast
Guard] capability and resource requirements.” The Coast Guard also stated the following: “Until
those broad U.S. interests and priorities are identified, the current USG [U.S. Government] polar
icebreaking fleet should be maintained in an operational status.”65


64 National Research Council, Polar Icebreakers in a Changing World, An Assessment of U.S. Needs, Washington,
2007, pp. 2-3.
65 Coast Guard point paper provided to CRS on February 12, 2008, and dated with the same date, providing answers to
questions from CRS concerning polar icebreaker modernization.
Congressional Research Service

41

link to page 46 link to page 46 link to page 47 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appendix C. PSC Program Funding
This appendix presents additional background information on funding for the PSC program.
Summary of Funding in FY2013-FY2020 Budget Submissions
Table C-1
shows requested and projected funding for the PSC program in the Coast Guard’s
budget submissions from the initiation of the PSC program in the FY2013 submission through the
FY2020 submission.
Table C-1. Funding for Acquisition of New Polar Icebreaker Under FY2013-FY2020
Budget Submissions
(millions of then-year dollars)
FY
FY
FY
FY
FY
FY
FY
FY
FY
FY
FY
FY
5-year
Budget
13
14
15
16
17
18
19
20
21
22
23
24
total
FY13
8
120
380
270
82







860
FY14

2
8
100
20
100






230
FY15


6
4
100
20
100





230
FY16



4
10
2
100
50




166
FY17




150
0
50
150
430



780
FY18





19
50
150
430
300


949
FY19






750
125
385
345
200

1,805
FY20







35
n/a
n/a
n/a
n/a
n/a
Source: Table prepared by CRS based on Coast Guard FY2013-FY2020 budget submissions.
Notes: For each line in the table, the first figure shown (e.g., $8 mil ion in the case of the FY2013 budget) is the
amount of funding that was requested for that fiscal year. Actual funding figures for FY2013-FY2019 are different.
The reduction in programmed five-year funding for a new polar icebreaker during the FY2014-
FY2016 budget submissions shown in Table C-1 appears to have been related to the substantial
reduction in the annual funding levels in the Coast Guard’s Acquisition, Construction, and
Improvements (AC&I) account66 in those budget submission that is shown in Table C-2. Prior to
the release of the Administration’s September 1, 2015, fact sheet, the Coast Guard testified that if
annual funding levels in the AC&I account were not increased from the reduced levels in those
budget submissions, the icebreaker would be, essentially, an unfunded requirement. For example,
at an April 28, 2015, hearing on Coast Guard resources and priorities before the Oceans,
Atmosphere, Fisheries, and Coast Guard subcommittee of the Senate Commerce, Science, and
Transportation Committee, Admiral Paul Zukunft, the then-Commandant of the Coast Guard,
testified that
by reactivating Polar Star, we have purchased up to 10 years of decision space to
recapitalize our ice-breaking fleet. Two of those years have expired. And while I'm
exploring several options to reconstitute our nation’s fleet of icebreakers, I will need
topline relief [i.e., an increase] in my acquisition budget to make this requirement a
reality.67

66 Prior to FY2019, the PC&I account was called the Acquisition, Construction, and Improvements (AC&I) account.
67 Source: Transcript of hearing.
Congressional Research Service

42

link to page 51 link to page 46 link to page 46 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Table C-2. Funding in Procurement, Construction, and Improvements (PC&I)
Account in FY2013-FY2020 Budgets
(millions of dollars, rounded to nearest tenth)
Budget
FY13
FY14
FY15
FY16
FY17
FY18
FY19
FY20
FY21
FY22
FY23
FY24
Avg.
FY13
1,217.3
1,429.5
1,619.9
1,643.8
1,722.0






1,526.5
FY14

951.1
1,195.7
901.0
1,024.8
1,030.3





1,020.6
FY15


1,084.2
1,103.0
1,128.9
1,180.4
1,228.7




1,145.0
FY16



1,017.3
1,125.3
1,255.7
1,201.0
1,294.6



1,178.8
FY17




1,136.8
1,259.6
1,339.9
1,560.5
1,840.8


1,427.5
FY18





1,203.7
1,360.9
1,602.7
1,810.6 1,687.5


1,533.1
FY19






1,886.8
1,473.0
1,679.8 1,555.5
1,698.5

1,658.8
FY20







1,234.7
n/a
n/a
n/a
n/a
n/a
Source: Table prepared by CRS based on Coast Guard FY2013-FY2020 budget submissions. Prior to FY2019,
the PC&I account was called the Acquisition, Construction, and Improvements (AC&I) account.
For additional discussion of the issue of the funding level of the Procurement, Construction, and
Improvements (PC&I) account, see Appendix D. Below are some additional details on each of
the budget submissions since the FY2013 submission.
FY2013 Submission
The Administration’s FY2013 budget submission initiated a new project for the design and
construction of a new polar icebreaker, and included $860 million over five years for the
acquisition of the ship (Table C-1)—enough or almost enough to fully fund the acquisition of a
new polar icebreaker. (Any remaining needed funding might have been projected for FY2018 and
perhaps also FY2019, which were beyond the five-year window of the FY2013 budget
submission.) The submission stated that DHS anticipated awarding a construction contract for the
ship “within the next five years” (i.e., by FY2018) and taking delivery on the ship “within a
decade” (i.e., by 2023).68
FY2014 Submission
The Administration’s FY2014 budget submission reduced the five-year funding for a new polar
icebreaker to $230 million (Table C-1)—a 73% reduction from the figure in the FY2013 budget
submission—but still stated that DHS anticipated awarding a construction contract for the ship
“within the next four years” (i.e., by FY2018).69

68 U.S. Department of Homeland Security, Annual Performance Report, Fiscal Years 2011-2013, p. CG-AC&I-40
(PDF page 1,777 of 3,134).
69 Department of Homeland Security, United States Coast Guard, Fiscal Year 2014 Congressional Justification, p. CG-
AC&I-32 (PDF page 204 of 403).
Congressional Research Service

43

link to page 46 link to page 46 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

FY2015 Submission
The Administration’s FY2015 budget submission maintained five-year funding for a new polar
icebreaker at $230 million (Table C-1), but did not state when a construction contract for the ship
might be awarded, creating uncertainty about the timing of the project.70
FY2016 Submission
The Administration’s FY2016 budget submission, submitted to Congress in February 2015,
reduced five-year funding for a new polar icebreaker further, to $166 million (Table C-1)—an
81% reduction from the figure in the FY2013 budget submission—and again did not state when a
construction contract for the ship might be awarded, maintaining the uncertainty about the timing
of the project.71
On September 1, 2015, the White House issued a fact sheet in conjunction with a visit to Alaska
by President Obama indicating that the Administration, in its own internal planning, had at some
point over the past two years deferred acquisition of a new polar icebreaker to FY2022, but that
this had been changed to FY2020.72 The newly announced construction start date of FY2020 was
a two-year acceleration from the previously unpublicized date of FY2022, and a two-year deferral
from the FY2018 date implied in the FY2013 and FY2014 budget submissions. The fact sheet
states that the Administration will also “begin planning for construction of additional icebreakers”
beyond the one that the Obama Administration proposed to begin building in FY2020.
On January 13, 2016, the Coast Guard announced that it intended to hold an industry day for the
PSC program, followed by one-on-one meetings between the Coast Guard and prospective
shipbuilders and ship designers, as a part of the Coast Guard’s ongoing market research for the

70 Department of Homeland Security, United States Coast Guard, Fiscal Year 2015, Congressional Justification, p. CG-
AC&I-42 (PDF page 196 of 474).
71 Department of Homeland Security, United States Coast Guard, Fiscal Year 2016 Congressional Justification, p. CG-
AC&I-36 (PDF page 202 of 518).
72 The White House, “Fact Sheet: President Obama Announces New Investments to Enhance Safety and Security in the
Changing Arctic,” September 1, 2015, accessed September 2, 2015, at https://www.whitehouse.gov/the-press-office/
2015/09/01/fact-sheet-president-obama-announces-new-investments-enhance-safety-and. Regarding icebreakers, the
fact sheet states the following:
Accelerating the acquisition of new Coast Guard icebreakers. After World War II, the United
States Coast Guard had seven icebreakers in its fleet—four under the U.S. Navy and three under the
U.S. Coast Guard. Today, the United States technically has three icebreakers in its fleet—all under
the command of the U.S. Coast Guard. However, when age and reliability are taken into account,
the fleet is down to the equivalent of two fully functional icebreakers and only one heavy-duty
icebreaker. Russia, on the other hand, has forty icebreakers and another eleven planned or under
construction.
The growth of human activity in the Arctic region will require highly engaged stewardship to
maintain the open seas necessary for global commerce and scientific research, allow for search and
rescue activities, and provide for regional peace and stability. Accordingly, meeting these
challenges requires the United States to develop and maintain capacity for year-round access to
greater expanses within polar regions.
That is why the Administration will propose to accelerate acquisition of a replacement heavy
icebreaker to 2020 from 2022, begin planning for construction of additional icebreakers, and call on
Congress to work with the Administration to provide sufficient resources to fund these critical
investments. These heavy icebreakers will ensure that the United States can meet our national
interests, protect and manage our natural resources, and strengthen our international, state, local,
and tribal relationships.
Congressional Research Service

44

link to page 46 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

program.73 The industry day was held on March 18, 2016, and the one-on-one meetings between
the Coast Guard and industry officials were scheduled for March 28-31, with industry feedback to
be submitted to the Coast Guard by April 5, 2016.74
FY2017 Submission
The Coast Guard’s proposed FY2017 budget requested $150 million in procurement funding for a
new polar icebreaker. The figure of $150 million included $147.6 million in the polar icebreaker
line of the Coast Guard’s Acquisition, Construction, and Improvements (AC&I) account, and $2.4
million that was embedded in the personnel and management line in the AC&I account.75 The
Coast Guard’s FY2017-FY2021 five-year Capital Investment Plan (CIP) included a total of $780
million in procurement funding for a new polar icebreaker. As shown in Table C-1, the $150
million requested for FY2017 was the first major increment of procurement funding requested
(not just projected for a future fiscal year) for a new polar icebreaker.
FY2018 Submission
The Coast Guard’s proposed FY2018 budget requested $19 million in procurement funding for a
new polar icebreaker and includes a total of $949 million over the five-year period FY2018-
FY2022. The Coast Guard states that
This request supports activities to complete and release a Request for Proposal (RFP) for
Detail Design and Construction in FY 2018. Specifically, this funding supports program-
wide activities including open water and ice tank model testing; review of Industry Studies
contract deliverables; Integrated Program Office (IPO) and Ship Design Team (SDT)
support; logistics and integration development for government furnished information and
equipment; and additional modeling efforts to inform the evaluation and source selection
process for the Detail Design & Construction RFP....
Currently, the Program is maturing the system specification, developing the RFP for Detail
Design & Construction, and completing required documentation to transition to the
“Obtain” phase - planned for early FY 2018. In July 2016, the Coast Guard established an
Integrated Program Office with the Navy to continue efforts to accelerate the construction
timeline and leverage the expertise and best practices from shipbuilding programs in both
services. Based on this collaboration and lessons learned by the Navy, the Program was
able to significantly mature the acquisition approach with the incorporation of Industry
Studies to identify solutions to minimize cost, schedule, production and technology risks.
Industry Studies are focusing on leveraging industry perspectives, existing vessel designs,
and use of mature technology to inform the iterative development of the Heavy Polar
Icebreaker system specification. Future “Obtain” phase activities include award of a
contract for Detail Design & Construction for the heavy polar icebreaker.76

73 “USCG Polar Class Icebreaker Replacement Program,” accessed January 15, 2016, at https://www.fbo.gov/index?s=
opportunity&mode=form&id=a778c49349c443d2658666e19cc100e9&tab=core&tabmode=list&=.
74 “Heavy Polar Icebreaker Industry Engagement Activities,” accessed April 4, 2016, at http://www.uscg.mil/
ACQUISITION/icebreaker/Industry_Day_031816.asp.
75 Department of Homeland Security, United States Coast Guard, Fiscal Year 2017 Congressional Justification, pp.
CG-AC&I-28 and CG-AC&I-47 (PDF pages 170 and 189 of 407).
76 Department of Homeland Security, U.S. Coast Guard, Fiscal Year 2018 Congressional Justification, undated but
released May 2017, pp. AC&I-50 and AC&I-51.
Congressional Research Service

45

link to page 47 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

FY2019 Submission
The Coast Guard’s proposed FY2018 budget requested $750 million in procurement funding for
the PSC program and included a total of $1,805 million over the five-year period FY2019-
FY2023. The request for $750 million for the PSC program was a late change to the FY2019
budget that is not reflected in Coast Guard FY2019 budget-justification documents that were
printed prior to the change. In those earlier documents, the amount of funding requested for
FY2019 shows as $30 million rather than $750 million, and the total amount of funding requested
in the Coast Guard’s PC&I account was correspondingly $720 million less than the figure of
$1,886.8 million shown in Table C-2.
FY2020 Submission
The Coast Guard’s proposed FY2020 budget requests $35 million in procurement funding for the
PSC program, which is enough to cover the PSC program’s FY2020 government program-
management costs.

Congressional Research Service

46

link to page 47 Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appendix D. Funding Level in PC&I Account
This appendix presents additional discussion of the funding level of the Coast Guard’s
Procurement, Construction, and Improvements (PC&I) account.77
Overview
The Coast Guard has testified that funding the PC&I account at a level of about $1 billion to $1.2
billion per year—the approximate average annual funding level programmed in the FY2014,
FY2015, and FY2016 budget submissions, as shown in Table C-2would make it difficult to
fund various Coast Guard acquisition projects, including a new polar icebreaker and
improvements to Coast Guard shore installations. Coast Guard plans call for procuring Offshore
Patrol Cutters (OPCs) at an eventual rate of two per year.78 If each OPC costs roughly $400
million, procuring two OPCs per year in an PC&I account of about $1 billion to $1.2 billion per
year would leave about $200 million to $400 million per year for all other PC&I-funded
programs.
Since 2017, Coast Guard officials have been stating more regularly what they stated only
infrequently in earlier years: that executing the Coast Guard’s various acquisition programs fully
and on a timely basis would require the PC&I account to be funded in coming years at a level of
about $2 billion per year. Statements from Coast Guard officials on this issue in past years have
sometimes put this figure as high as about $2.5 billion per year.
Using Past PC&I Funding Levels as a Guide for Future PC&I
Funding Levels
In assessing future funding levels for executive branch agencies, a common practice is to assume
or predict that the figure in coming years will likely be close to where it has been in previous
years. While this method can be of analytical and planning value, for an agency like the Coast
Guard, which goes through periods with less acquisition of major platforms and periods with
more acquisition of major platforms, this approach might not always be the best approach, at least
for the PC&I account.
More important, in relation to maintaining Congress’s status as a co-equal branch of government,
including the preservation and use of congressional powers and prerogatives, an analysis that
assumes or predicts that future funding levels will resemble past funding levels can encourage an
artificially narrow view of congressional options regarding future funding levels, depriving
Congress of agency in the exercise of its constitutional power to set funding levels and determine
the composition of federal spending.
Past Coast Guard Statements About Required PC&I Funding Level
At an October 4, 2011, hearing on the Coast Guard’s major acquisition programs before the Coast
Guard and Maritime Transportation subcommittee of the House Transportation and Infrastructure
Committee, the following exchange occurred:

77 Prior to FY2019, the PC&I account was called the Acquisition, Construction, and Improvements (AC&I) account.
78 For more on the OPC program, see CRS Report R42567, Coast Guard Cutter Procurement: Background and Issues
for Congress
, by Ronald O'Rourke.
Congressional Research Service

47

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

REPRESENATIVE FRANK LOBIONDO:
Can you give us your take on what percentage of value must be invested each year to
maintain current levels of effort and to allow the Coast Guard to fully carry out its
missions?
ADMIRAL ROBERT J. PAPP, COMMANDANT OF THE COAST GUARD:
I think I can, Mr. Chairman. Actually, in discussions and looking at our budget—and I’ll
give you rough numbers here, what we do now is we have to live within the constraints
that we’ve been averaging about $1.4 billion in acquisition money each year.
If you look at our complete portfolio, the things that we’d like to do, when you look at the
shore infrastructure that needs to be taken care of, when you look at renovating our smaller
icebreakers and other ships and aircraft that we have, we’ve done some rough estimates
that it would really take close to about $2.5 billion a year, if we were to do all the things
that we would like to do to sustain our capital plant.
So I’m just like any other head of any other agency here, as that the end of the day, we’re
given a top line and we have to make choices and tradeoffs and basically, my tradeoffs boil
down to sustaining frontline operations balancing that, we’re trying to recapitalize the
Coast Guard and there’s where the break is and where we have to define our spending.79
An April 18, 2012, blog entry stated the following:
If the Coast Guard capital expenditure budget remains unchanged at less than $1.5 billion
annually in the coming years, it will result in a service in possession of only 70 percent of
the assets it possesses today, said Coast Guard Rear Adm. Mark Butt.
Butt, who spoke April 17 [2012] at [a] panel [discussion] during the Navy League Sea Air
Space conference in National Harbor, Md., echoed Coast Guard Commandant Robert Papp
in stating that the service really needs around $2.5 billion annually for procurement.80
At a May 9, 2012, hearing on the Coast Guard’s proposed FY2013 budget before the Homeland
Security subcommittee of the Senate Appropriations Committee, Admiral Papp testified, “I’ve
gone on record saying that I think the Coast Guard needs closer to $2 billion dollars a year [in
procurement funding] to recapitalize—[to] do proper recapitalization.”81
At a May 14, 2013, hearing on the Coast Guard’s proposed FY2014 budget before the Homeland
Security Subcommittee of the Senate Appropriations Committee, Admiral Papp stated the
following regarding the difference between having about $1.0 billion per year rather than about
$1.5 billion per year in the PC&I account:

79 Source: Transcript of hearing.
80 David Perera, “The Coast Guard Is Shrinking,” FierceHomelandSecurity.com, April 18, 2012, accessed July 20,
2012, at http://www.fiercehomelandsecurity.com/story/coast-guard-shrinking/2012-04-18.
81 Source: transcript of hearing. Papp may have been referring to remarks he made to the press before giving his annual
state of the Coast Guard speech on February 23, 2012, in which reportedly stated that the Coast Guard would require
about $2 billion per year in procurement funding to fully replace its current assets. (See Adam Benson, “Coast Guard
Cutbacks Will Cost 1,000 Jobs,” Norwich Bulletin, February 23, 2012, accessed May 31, 2012, at
http://www.norwichbulletin.com/x1138492141/Coast-Guard-cutbacks-will-cost-1-000-jobs. See also “Coast Guard
Leader Calls For More Ships,” MilitaryFeed.com, February 24, 2012, accessed May 31, 2012, at
http://militaryfeed.com/coast-guard-leader-calls-for-more-ships-5/; Associated Press, “Coast Guard Commandant Calls
for New Ships,” TheLog.com, March 10, 2012, accessed May 31, 2012, at http://www.thelog.com/SNW/Article/Coast-
Guard-Commandant-Calls-for-New-Ships-to-Replace-Aging-Fleet; Mickey McCarter, “Congress Poised to Give Coast
Guard More Money Than Requested for FY 2013,” HSToday.us, May 10, 2012, accessed May 31, 2012, at
http://www.hstoday.us/focused-topics/customs-immigration/single-article-page/congress-poised-to-give-coast-guard-
more-money-than-requested-for-fy-2013.html.) See also “Interview, Adm. Robert Papp, US Coast Guard
Commandant,” Defense News, November 11, 2013: 30.
Congressional Research Service

48

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Well, Madam Chairman, $500 million—a half a billion dollars—is real money for the
Coast Guard. So, clearly, we had $1.5 billion in the [FY]13 budget. It doesn't get everything
I would like, but it—it gave us a good start, and it sustained a number of projects that are
very important to us.
When we go down to the $1 billion level this year, it gets my highest priorities in there, but
we have to either terminate or reduce to minimum order quantities for all the other projects
that we have going.
If we're going to stay with our program of record, things that have been documented that
we need for our service, we're going to have to just stretch everything out to the right. And
when we do that, you cannot order in economic order quantities. It defers the purchase.
Ship builders, aircraft companies—they have to figure in their costs, and it inevitably raises
the cost when you're ordering them in smaller quantities and pushing it off to the right.
Plus, it almost creates a death spiral for the Coast Guard because we are forced to sustain
older assets—older ships and older aircraft—which ultimately cost us more money, so it
eats into our operating funds, as well, as we try to sustain these older things.
So, we'll do the best we can within the budget. And the president and the secretary have
addressed my highest priorities, and we'll just continue to go on the—on an annual basis
seeing what we can wedge into the budget to keep the other projects going.82
At a March 12, 2014, hearing on the Coast Guard’s proposed FY2015 budget before the
Homeland Security subcommittee of the House Appropriations Committee, Admiral Papp stated
the following:
Well, that’s what we've been struggling with, as we deal with the five-year plan, the capital
investment plan, is showing how we are able to do that. And it will be a challenge,
particularly if it sticks at around $1 billion [per year]. As I've said publicly, and actually, I
said we could probably—I've stated publicly before that we could probably construct
comfortably at about 1.5 billion [dollars] a year. But if we were to take care of all the Coast
Guard’s projects that are out there, including shore infrastructure that that fleet that takes
care of the Yemen [sic: inland] waters is approaching 50 years of age, as well, but I have
no replacement plan in sight for them because we simply can't afford it. Plus, we need at
some point to build a polar icebreaker. Darn tough to do all that stuff when you're pushing
down closer to 1 billion [dollars per year], instead of 2 billion [dollars per year].
As I said, we could fit most of that in at about the 1.5 billion [dollars per year] level, but
the projections don't call for that. So we are scrubbing the numbers as best we can.83
At a March 24, 2015, hearing on the Coast Guard’s proposed FY2016 budget before the
Homeland Security subcommittee of the House Appropriations Committee, Admiral Paul
Zukunft, Admiral Papp’s successor as Commandant of the Coast Guard, stated the following:
I look back to better years in our acquisition budget when we had a—an acquisition budget
of—of $1.5 billion. That allows me to move these programs along at a much more rapid
pace and, the quicker I can build these at full-rate production, the less cost it is in the long
run as well. But there’s an urgent need for me to be able to deliver these platforms in a
timely and also in an affordable manner. But to at least have a reliable and a predictable
acquisition budget would make our work in the Coast Guard much easier. But when we
see variances of—of 30, 40% over a period of three or four years, and not knowing what
the Budget Control Act may have in store for us going on, yes, we are treading water now

82 Transcript of hearing. The remarks were made in response to a question from Sen. Mary Landrieu.
83 Transcript of hearing.
Congressional Research Service

49

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

but any further reductions, and now I am—I am beyond asking for help. We are taking on
water.84
An April 13, 2017, press report states the following (emphasis added):
[Then-]Coast Guard Commandant Adm. Paul Zukunft on Wednesday [April 12] said that
for the Coast Guard to sustain its recapitalization plans and operations the service needs a
$2 billion annual acquisition budget that grows modestly overtime to keep pace with
inflation.
The Coast Guard needs a “predictable, reliable” acquisition budget “and within that we
need 5 percent annual growth to our operations and maintenance (O&M) accounts,”
Zukunft told reporters at a Defense Writers Group breakfast. Inflation will clip 2 to 3
percent from that, but “at 5 percent or so it puts you on a moderate but positive glide slope
so you can execute, so you can build the force,” he said.85
In an interview published on June 1, 2017, Zukunft said the following (emphasis added):
We cannot be more relevant than we are now. But what we need is predictable funding.
We have been in over 16 continuing resolutions since 2010. I need stable and repeatable
funding. An acquisition budget with a floor of $2 billion. Our operating expenses as I
said, they’ve been funded below the Budget Control Act floor for the past five years. I need
5 percent annualized growth over the next five years and beyond to start growing some of
this capability back.
But more importantly, we [need] more predictable, more reliable funding so we can execute
what we need to do to carry out the business of the world’s best Coast Guard.86


84 Transcript of hearing. The remarks were made in response to a question from Rep. John Culberson.
85 Calvin Biesecker, “Zukunft Wants $2 Billion Baseline Acquisition Budget; Sustained Growth In O&M Funding,”
Defense Daily, April 13, 2017: 1.
86 Jill Aitoro, “Interview: Adm. Paul Zukunft Demands Coast Guard Respect,” Defense News, June 1, 2017.
Congressional Research Service

50

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

Appendix E. Great Lakes Icebreakers
This appendix provides a brief discussion of the Coast Guard’s Great Lakes icebreakers.87
The Coast Guard’s current Great Lakes icebreaker fleet consists of nine cutters:
 one heavy icebreaker—Mackinaw (WLBB-30), a 240-foot ship displacing 3,500
tons;
 six 140-foot Bay-class icebreaking tugs displacing 662 tons each; and
 two 225-foot Juniper-class seagoing buoy tenders displacing about 2,000 tons
each that have a light icebreaking capability.88
Although Mackinaw is referred to as a heavy icebreaker, the word heavy in this instance is being
used in the context of Great Lakes icebreaking—Mackinaw is much larger and has more
icebreaking capability than the eight other ships listed above.89 Mackinaw would not, however,
qualify as a heavy polar icebreaker, as it is much smaller and has much less icebreaking capability
than a heavy polar icebreaker.90
Coast Guard officials have stated that they do not view the procurement of additional Great Lakes
icebreakers as an urgent near-term acquisition need. In support of this assessment, they cite the
capabilities of the current Great Lakes icebreaking fleet, the relatively young age of Mackinaw
(which entered service in 2006), service life extension work being done on the ice-breaking tugs
that is designed to add 15 years to their service lives,91 and Canada’s own Great Lakes
icebreaking capabilities. A 2016 Coast Guard report to Congress on the Great Lakes icebreaking
mission stated the following:
The current mix of heavy and medium [Great Lakes] icebreakers is capable of managing
priorities and requests for icebreaking in Tier 1 and 2 waterways. When a severe ice season
stresses Coast Guard asset capabilities, the existing agreement and partnership with Canada
fills the capability gap and brings in extra heavy-icebreaking resources to manage the ice....
[T]he 2014 and 2015 ice seasons were a 20-year anomaly, consuming almost twice as many
cutter resource hours as in any other year since 2005.

87 This appendix is adapted from the section entitled “Great Lakes Icebreakers” on pages 7-10 of CRS Testimony
TE10030, Icebreaker Acquisition and the Need for a National Maritime Strategy, by Ronald O'Rourke.
88 Source: U.S. Coast Guard, “Ninth Coast Guard District Units,” accessed November 19, 2018, at
https://www.atlanticarea.uscg.mil/Atlantic-Area/Units/District-9/Ninth-District-Units/. A total of 10 cutters are
assigned to the Ninth District, which is responsible for the Great Lakes, the Saint Lawrence Seaway, and parts of the
surrounding states. The tenth cutter assigned to the Ninth District is a 100-foot inland buoy tender whose primary
missions do not include icebreaking.
89 At continuous speeds of 3 knots, Mackinaw can break ice up to 32 inches thick, the 140-foot icebreaking tugs can
break ice up to 22 inches thick, and the 225-foot seagoing buoy tenders can break ice up to 14 inches thick.
90 As discussed earlier in this report, the Coast Guard’s two heavy polar icebreakers—the operational Polar Star and
the non-operational Polar Sea, are 399 feet long and displace about 13,200 tons each. Polar Star can break ice up to six
feet (72 inches) thick at a continuous speed of 3 knots. The Coast Guard states that Mackinaw is equivalent to the
Canadian Coast Guard ship Samuel Risley, a Great Lakes-homeported icebreaker and buoy tender that Canada
classifies as a light icebreaker in a comparison conducted across its entire icebreaking fleet, including its Arctic
icebreakers. (U.S. Coast Guard, Great Lakes Icebreaking Mission Analysis, Fiscal Year 2016 Report to Congress,
August 30, 2016, p. 5.)
91 For more on this service life extension work, see U.S. Coast Guard, “In-Service Vessel Sustainment Program,”
accessed November 19, 2018, at https://www.dcms.uscg.mil/Our-Organization/Assistant-Commandant-for-
Acquisitions-CG-9/Programs/Surface-Programs/In-Service-Vessel-Sustainment-Program/.
Congressional Research Service

51

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

The Coast Guard cannot reliably predict the economic impact of maintaining a single heavy
Great Lakes icebreaker. Additionally, given the extreme conditions when ice coverage
exceeds 90 percent, it is not clear that shipping delays would be significantly mitigated by
an increase in icebreaking capability. Delays can be associated with several factors such as
slow transit speeds, availability of pilots, and simultaneous and competing demand signals
for icebreaking services across the Great Lakes.92
The Coast Guard’s position notwithstanding, some Members of Congress in recent years have
expressed interest in the possibility of bolstering the Coast Guard’s Great Lakes icebreaking fleet
by procuring a second icebreaker with capabilities generally similar to those of Mackinaw.
Interest in this option was reinforced by the winters of 2013-2014 and 2014-2015, which featured
particularly high levels of ice coverage on the Great Lakes.93 The committee report language
requiring the above-quoted Coast Guard report to Congress is one example of this interest.94
Another example is Section 820 of the Frank LoBiondo Coast Guard Authorization Act of 2018
(S. 140/P.L. 115-282 of December 4, 2018), which states the following:
SEC. 820. Great Lakes icebreaker acquisition.
(a) Icebreaking on the Great Lakes.—For fiscal years 2018 and 2019, the Commandant of
the Coast Guard may use funds made available pursuant to section 4902 of title 14, United
States Code, as amended by this Act, for the construction of an icebreaker that is at least
as capable as the Coast Guard Cutter Mackinaw to enhance icebreaking capacity on the
Great Lakes.
(b) Acquisition plan.—Not later than 45 days after the date of enactment of this Act, the
Commandant shall submit a plan to the Committee on Commerce, Science, and
Transportation of the Senate and the Committee on Transportation and Infrastructure of

92 U.S. Coast Guard, Great Lakes Icebreaking Mission Analysis, Fiscal Year 2016 Report to Congress, August 30,
2016, p. 11. The report was required by S.Rept. 114-68 of June 18, 2015, the Senate Appropriations Committee’s
report on S. 1619, the Department of Homeland Security Appropriations Bill, 2016 (see page 75).
93 Although interest in procuring a second heavy Great Lakes icebreaker was reinforced by high levels of ice coverage
in the winters of 2013-2014 and 2014-2015, interest in Congress in procuring such a ship dates back further than 2013.
See, for example, H.R. 1747 of the 111th Congress, the Great Lakes Icebreaker Replacement Act, which was introduced
on March 26, 2009, reported by the Committee on Transportation and Infrastructure on April 21, 2009 (H.Rept. 111-
81), and agreed to by the House by voice vote on April 27, 2009. A similar bill, S. 1024, was introduced in the Senate
on May 12, 2009.
94 S.Rept. 114-68 stated the following:
GREAT LAKES ICEBREAKING CAPACITY
The Coast Guard is required by law to maintain a heavy icebreaking capability on the Great Lakes
to assist in keeping channels and harbors open to navigation in response to the reasonable demands
of commerce to meet the winter shipping needs of industry. The Committee is concerned that the
Coast Guard does not possess adequate capacity to meet its statutorily required icebreaking mission
on the Great Lakes, with negative consequences to the regional and national economy as well as to
the safety of local communities. While the Committee fully supports the Coast Guard’s Service
Life Extension Project for its nine-vessel 140-foot icebreaking tugs as part of the In-Service Vessel
Sustainment Program, it notes that additional assets may be necessary to successfully operate in the
heavy ice conditions often experienced by the Great Lakes. The Committee directs the Coast Guard
to undertake an updated mission analysis study to determine the assets necessary to effectively
carry out its icebreaking requirements on the Great Lakes, including consideration of a second
heavy icebreaker for the Great Lakes, consistent with the capabilities of the Mackinaw. The
updated mission analysis should factor in recent historically high levels of ice coverage and the
economic costs of reduced Great Lakes shipping associated with maintaining only one heavy
icebreaker. The updated mission analysis shall be submitted to the Committee not later than 180
days after the date of enactment of this act. (Page 75)
Congressional Research Service

52

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

the House of Representatives for acquiring an icebreaker described in subsections (a) and
(b). Such plan shall include—
(1) the details and schedule of the acquisition activities to be completed; and
(2) a description of how the funding for Coast Guard acquisition, construction, and
improvements that was appropriated under the Consolidated Appropriations Act, 2017
(Public Law 115–31) will be allocated to support the acquisition activities referred to in
paragraph (1).95
An examination of procurement costs for Mackinaw, the National Science Foundation’s ice-
capable research ship Sikuliaq, new oceanographic research ships being procured for NOAA, and
OPCs suggests that a new Mackinaw-sized heavy Great Lakes icebreaker built in a U.S. shipyard
might have a design and construction cost between $175 million and $300 million, depending on
its exact capabilities and the acquisition strategy employed.96 The design portion of the ship’s cost

95 In addition, Section 819 of S. 140/P.L. 115-282 states the following:
SEC. 819. Acquisition plan for inland waterway and river tenders and bay-class icebreakers.
(a) Acquisition plan.—Not later than 270 days after the date of the enactment of this Act, the
Commandant of the Coast Guard shall submit to the Committee on Commerce, Science, and
Transportation of the Senate and the Committee on Transportation and Infrastructure of the House
of Representatives a plan to replace or extend the life of the Coast Guard fleet of inland waterway
and river tenders, and the Bay-class icebreakers.
(b) Contents.—The plan under subsection (a) shall include—
(1) an analysis of the work required to extend the life of vessels described in subsection (a);
(2) recommendations for which, if any, such vessels it is cost effective to undertake a ship-life
extension or enhanced maintenance program;
(3) an analysis of the aids to navigation program to determine if advances in navigation technology
may reduce the needs for physical aids to navigation;
(4) recommendations for changes to physical aids to navigation and the distribution of such aids
that reduce the need for the acquisition of vessels to replace the vessels described in subsection (a);
(5) a schedule for the acquisition of vessels to replace the vessels described in subsection (a),
including the date on which the first vessel will be delivered;
(6) the date such acquisition will be complete;
(7) a description of the order and location of replacement vessels;
(8) an estimate of the cost per vessel and of the total cost of the acquisition program of record; and
(9) an analysis of whether existing vessels can be used.
96 Source: CRS analysis of cost per weight for Mackinaw (adjusted for inflation), Sikuliaq, new NOAA oceanographic
research ships now being procured, and OPCs.
Some press reports in 2015 and 2016 cited a cost of about $200 million for a new heavy Great Lakes icebreaker. (See,
for example, Todd Spangler, “A New Icebreaker for the Great Lakes? It’s Far from Certain,” Detroit Free Press,
August 7, 2015; “Frozen Commerce: Great Lakes Businesses Need a New Icebreaker,” Pittsburgh Post-Gazette,
August 17, 2015; Todd Spangler, “Call for Arctic Icebreakers Could Hurt Great Lakes,” Detroit Free Press, September
1, 2015; Bob Gross, “Congress Authorizes New Icebreaker for Great Lakes,” Times Herald (Port Huron, MI), February
3, 2016; “Task Force Calls Anew for More Great Lakes Icebreakers, Second Poe-Sized Lock,” Professional Mariner,
February 17, 2016 [the article states that it presents the text of a news release from the Great Lakes Maritime Task
Force].) An opinion column in 2016 cited a figure of $240 million. (John Hageman, “Is Winter Great Lakes Shipping
Necessary?” Sandusky Register, February 18, 2016.)
The Great Lakes Maritime Task Force, an organization that states that it “was founded in 1992 in Toledo, Ohio, to
promote waterborne commerce and related industries on the Great Lakes” (see Great Lakes Maritime Task Force,
“About Us,” accessed November 26, 2018, at http://www.glmtf.org/about), states in its annual report for 2017 that a
second heavy Great Lakes icebreaker “is projected to cost $240 million.” (2017 Annual Report of Great Lakes
Maritime Task Force
, PDF page 3 of 6, accessed November 26, 2018, at http://www.glmtf.org/wp-
content/uploads/2018/05/2017-Annual-Report.pdf.) The same figure is cited in the organization’s annual report for
2016. The organization’s annual report for 2015 cited a figure of approximately $200 million.
Congressional Research Service

53

Coast Guard Polar Security Cutter (Polar Icebreaker) Program

might be reduced if Mackinaw’s design or the design of some other existing icebreaker were to
be used as the parent design. Depending on the capabilities and other work load of the shipyard
selected to build the ship, the construction time for a new heavy Great Lakes icebreaker might be
less than that of a new heavy polar icebreaker.


Author Information

Ronald O'Rourke

Specialist in Naval Affairs



Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan
shared staff to congressional committees and Members of Congress. It operates solely at the behest of and
under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other
than public understanding of information that has been provided by CRS to Members of Congress in
connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not
subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in
its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or
material from a third party, you may need to obtain the permission of the copyright holder if you wish to
copy or otherwise use copyrighted material.