Management of the Colorado River: Water
March 1, 2019
Allocation, Drought, and the Federal Role
Charles V. Stern
The Colorado River Basin covers more than 246,000 square miles in seven U.S. states
Specialist in Natural
(Wyoming, Colorado, Utah, New Mexico, Arizona, Nevada, and California) and
Resources Policy
Mexico. Pursuant to federal law, the Bureau of Reclamation (part of the Department of

the Interior) manages much of the basin’s water supplies. Colorado River water is used
Pervaze A. Sheikh
primarily for agricultural irrigation and municipal and industrial (M&I) uses, but it also
Specialist in Natural
is important for power production, fish and wildlife, and recreational uses.
Resources Policy

In recent years, consumptive uses of Colorado River water have exceeded natural flows.
This causes an imbalance in the basin’s available supplies and competing demands. A

drought in the basin dating to 2000 has raised the prospect of water delivery curtailments and decreased
hydropower production, among other things. In the future, observers expect that increasing demand for supplies,
coupled with the effects of climate change, will further increase the strain on the basin’s limited water supplies.
River Management
The Law of the River is the commonly used shorthand for the multiple laws, court decisions, and other documents
governing Colorado River operations. The foundational document of the Law of the River is the Colorado River
Compact of 1922. Pursuant to the compact, the basin states established a framework to apportion the water
supplies between the Upper and Lower Basins of the Colorado River, with the dividing line between the two
basins at Lee Ferry, AZ (near the Utah border). The Upper and Lower Basins each were allocated 7.5 million acre-
feet (maf) annually under the Colorado River Compact; an additional 1.5 maf in annual flows was made available
to Mexico under a 1944 treaty. Future agreements and court decisions addressed numerous other issues (including
intrastate allocations of flows), and subsequent federal legislation provided authority and funding for federal
facilities that allowed users to develop their allocations. A Supreme Court ruling also confirmed that Congress
designated the Secretary of the Interior as the water master for the Lower Basin, a role in which the federal
government manages the delivery of all water below Hoover Dam.
Reclamation and basin stakeholders closely track the status of two large reservoirs—Lake Powell in the Upper
Basin and Lake Mead in the Lower Basin—as an indicator of basin storage conditions. Under recent guidelines,
dam releases from these facilities are tied to specific water storage levels. For Lake Mead, the first tier of
“shortage,” under which Arizona’s and Nevada’s allocations would be decreased, would be triggered if Lake
Mead’s January 1 elevation is expected to fall below 1,075 feet above mean sea level. As of early 2019,
Reclamation projected that there is an almost 70% chance of a shortage condition at Lake Mead beginning in
2020; there is also a lesser chance of Lake Powell reaching critically low levels in the next five years.
Drought Contingency Plans
Despite previous efforts to alleviate shortages in the basin, the possibility of water delivery curtailments for basin
users has increased. After several years of negotiations, Reclamation and the basin states in 2018 announced draft
drought contingency plans (DCPs) for the Upper and Lower Basins. These plans would commit states to water
supply cutbacks tied to reservoir storage levels (i.e., cutbacks in excess of previous cutback commitments), among
other things. For the DCPs to be finalized, states and stakeholders must approve intrastate commitments (the
agreements that make it possible for the states to realize their responsibilities in the DCPs). Federal
implementation of the agreements also requires congressional authorization. DOI has stated that if the relevant
entities do not approve the DCPs in a timely manner, then it may implement additional curtailments.
Congressional Research Service




Congressional Role
Congress plays a multifaceted role in federal management of the Colorado River basin. Congress funds and
oversees management of basin facilities, including operations and programs to protect and restore endangered
species. It also has enacted and continues to consider Indian water rights settlements involving Colorado River
waters and development of new water storage facilities in the basin. In addition, Congress has authorized and
approved funding to mitigate water shortages and conserve basin water supplies and has considered enacting new
authorities to combat drought and its effects on basin water users.
Congressional Research Service

link to page 6 link to page 8 link to page 9 link to page 10 link to page 10 link to page 11 link to page 11 link to page 14 link to page 14 link to page 15 link to page 15 link to page 16 link to page 16 link to page 16 link to page 17 link to page 17 link to page 18 link to page 19 link to page 21 link to page 21 link to page 22 link to page 22 link to page 23 link to page 24 link to page 25 link to page 25 link to page 25 link to page 26 link to page 28 link to page 28 link to page 28 link to page 29 link to page 29 link to page 8 link to page 13 link to page 20 link to page 24 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Contents
Introduction ..................................................................................................................................... 1
The Law of the River: Foundational Documents and Programs .................................................... 3
Colorado River Compact ........................................................................................................... 4
Boulder Canyon Project Act ...................................................................................................... 5
Arizona Ratification and Arizona v. California Decision ......................................................... 5
1944 U.S.-Mexico Water Treaty ................................................................................................ 6
Upper Basin Compact and Colorado River Storage Project Authorizations ............................. 6

Water Storage and Operations ......................................................................................................... 9
Annual Operating Plans ............................................................................................................ 9
Mitigating the Environmental Effects of Colorado River Basin Development ............................. 10
Salinity Control ....................................................................................................................... 10
Endangered Species Efforts and Habitat Improvements .......................................................... 11
Upper Colorado Endangered Fish Recovery Program ....................................................... 11
San Juan River Basin Recovery Implementation Program ................................................ 11
Glen Canyon Dam Adaptive Management Program ......................................................... 12
Lower Colorado Multi-Species Conservation Program (MSCP) ...................................... 12

Tribal Water Rights ........................................................................................................................ 13
Drought and the Supply/Demand Imbalance in the Colorado River Basin ................................... 14
2012 Reclamation Study ......................................................................................................... 16
Developments and Agreements Since 2000 .................................................................................. 16
2003 Quantitative Settlement Agreement ............................................................................... 17
2004 Arizona Water Settlements Act ....................................................................................... 17
2007 Interim Guidelines/Coordinated Operations for Lake Powell and Lake Mead .............. 18
Pilot System Conservation Program ....................................................................................... 19
Minute 319 and Minute 323 Agreements with Mexico ........................................................... 20
Proposed Drought Contingency Plans ........................................................................................... 20
Upper Basin Drought Contingency Plan ................................................................................. 20
Lower Basin Drought Contingency Plan ................................................................................ 21
Drought Contingency Plan Approval ...................................................................................... 23
Issues for Congress ........................................................................................................................ 23
Funding and Oversight of Existing Facilities and Programs ................................................... 23
Indian Water Rights Settlements and Plans for New and Augmented Water Storage ............. 24
Drought Contingency Plans .................................................................................................... 24


Figures
Figure 1. Colorado River Basin and Areas That Import Colorado River Water .............................. 3
Figure 2. U.S. State Apportionments of Colorado River Flows ...................................................... 8
Figure 3. Lake Powell and Lake Mead Storage and Inflows ......................................................... 15
Figure 4. U.S. Lower Basin States Intentionally Created Surplus Balance, 2010-2017 ............... 19

Congressional Research Service

link to page 12 link to page 19 link to page 27 link to page 27 link to page 30 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Tables
Table 1. Colorado River Apportionments: U.S. States .................................................................... 7
Table 2. 10 Tribes Study: Tribal Water Rights and Diversions ..................................................... 14
Table 3. Lower Basin Water Curtailment Volumes Under Existing and Proposed
Agreements................................................................................................................................. 22

Contacts
Author Information ........................................................................................................................ 25

Congressional Research Service

link to page 8 link to page 8 link to page 8 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Introduction
From its headwaters in Colorado and Wyoming to its terminus in the Gulf of California, the Colorado
River Basin covers more than 246,000 square miles.1 The river runs through seven U.S. states (Wyoming,
Colorado, Utah, New Mexico, Arizona, Nevada, and California) and Mexico. Pursuant to federal law, the
Bureau of Reclamation (Reclamation, part of the Department of the Interior [DOI]) plays a prominent role
in the management of the basin’s waters. In the Lower Basin (i.e., Arizona, Nevada, and California),
Reclamation also serves as water master on behalf of the Secretary of the Interior, a role that elevates the
status of the federal government in basin water management.2 The federal role in the management of
Colorado River water is magnified by the multiple federally owned and operated water storage and
conveyance facilities in the basin, which provide low-cost water and hydropower supplies to water users.
Colorado River water is used primarily for agricultural irrigation and municipal and industrial (M&I)
purposes. The river’s flow and stored water also are important for power production, fish and wildlife,
and recreation, among other uses. A majority (70%) of basin water supplies are used to irrigate 5.5 million
acres of land; basin waters also provide M&I water supplies to nearly 40 million people.3 Much of the
area that depends on the river for water supplies is outside of the drainage area for the Colorado River
Basin. Storage and conveyance facilities on the Colorado River provide trans-basin diversions that serve
areas such as Cheyenne, WY; multiple cities in Colorado’s Front Range (e.g., Fort Collins, Denver,
Boulder, and Colorado Springs, CO); Provo, UT; Albuquerque and Santa Fe, NM; and Los Angeles, San
Diego, and the Imperial Valley in Southern California (Figure 1). Colorado River hydropower facilities
can provide up to 42 gigawatts of electrical power per year. The river also provides habitat for a wide
range of species, including several federally endangered species. It flows through 7 national wildlife
refuges and 11 National Park Service (NPS) units; these and other areas of the river support important
recreational opportunities.
Precipitation and runoff in the basin are highly variable. Water conditions on the river depend largely on
snowmelt in the basin’s northern areas. Observed data (1906-2018) show that natural flows in the
Colorado River Basin in the 20th century averaged about 14.8 million acre-feet (maf) annually.4 Flows
have dipped significantly during the current drought, which dates to 2000; natural flows from 2000 to
2018 averaged approximately 12.4 maf per year.5 In 2018, Reclamation estimated that the 19-year period
from 2000 to 2018 was the driest period in more than 100 years of record keeping.6 The dry conditions

1 J. C. Kammerer, “Largest Rivers in the United States,” USGS Fact Sheet, May 1990, at https://pubs.usgs.gov/of/1987/ofr87-
242/pdf/ofr87242.pdf.
2 As discussed in the below section, “The Law of the River:
Foundational Documents and Programs,”
the Boulder Canyon Project Act of 1928 made the Secretary of the Interior responsible
for the distribution (via contract) of all Colorado River water delivered below Hoover Dam, and authorized such regulations as
necessary to enter into these contracts. Subsequent court decisions confirmed the Secretary’s power to apportion surpluses and
shortages among and within Lower Basin states.
3 U.S. Bureau of Reclamation, Colorado River Basin Water Supply and Demand Study, p. 4, December 2012, at
https://www.usbr.gov/lc/region/programs/crbstudy/finalreport/index.html. Hereinafter “Reclamation 2012 Supply/Demand
Study.”
4 Department of the Interior, Open Water Data Initiative, Drought in the Colorado River Basin, accessed November 1, 2018, at
https://www.doi.gov/water/owdi.cr.drought/en/#SupplyDemand.
5 U.S. Bureau of Reclamation, Lower Colorado Region, “Colorado River Basin Natural Flow and Salt Data-Current Natural Flow
Data 1906-2016,” at http://www.usbr.gov/lc/region/g4000/NaturalFlow/current.html. Provisional natural flow measurements for
2017 and 2018 by U.S. Bureau of Reclamation, Lower Colorado River Operations, at https://www.usbr.gov/lc/region/g4000/
riverops/model-info.html. Documentation for the natural flow calculation methods is available at http://www.usbr.gov/lc/region/
g4000/NaturalFlow/NaturalFlowAndSaltComptMethodsNov05.pdf. Hereinafter “Bureau of Reclamation Flow Data, 1906-2018.”
6 U.S. Bureau of Reclamation, Annual Operating Plan for Colorado River Reservoirs, 2019, September 10, 2018, p. 8.
Hereinafter “Reclamation 2019 Draft AOP.”
Congressional Research Service

1

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

are consistent with prior droughts in the basin that were identified through tree ring studies; some of these
droughts lasted for decades.7 Climate change impacts, including warmer temperatures and altered
precipitation patterns, may further increase the likelihood of prolonged drought in the basin.
Pursuant to the multiple compacts, federal laws, court decisions and decrees, contracts, and regulatory
guidelines governing Colorado River operations (collectively known as the Law of the River), Congress
and the federal government play a prominent role in the management of the Colorado River. Specifically,
Congress funds and oversees Reclamation’s management of Colorado River Basin facilities, including
facility operations and programs to protect and restore endangered species. Congress also has approved
and continues to actively consider Indian water rights settlements involving Colorado River waters, and
development of new and expanded water storage in the basin. In addition, Congress has approved funding
to mitigate drought and stretch basin water supplies and has considered new authorities for Reclamation
to combat drought and enter into agreements with states and Colorado River contractors.
This report provides background on management of the Colorado River, including a discussion of trends
and agreements since 2000. It also discusses the congressional role in the management of basin waters.


7 For additional discussion on historic drought in the Colorado River, see CRS Report R43407, Drought in the United States:
Causes and Current Understanding
, by Peter Folger.
Congressional Research Service

2


Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Figure 1. Colorado River Basin and Areas That Import Colorado River Water

Source: Bureau of Reclamation, Colorado River Basin Water Supply and Demand Study, 2012.
The Law of the River:
Foundational Documents and Programs
In the latter part of the 19th century, interested parties in the Colorado River Basin began to recognize that
local interests alone could not solve the challenges associated with development of the Colorado River.
Congressional Research Service

3

link to page 10 link to page 10 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Plans conceived by parties in California’s Imperial Valley to divert water from the mainstream of the
Colorado River were thwarted because these proposals were subject to the sovereignty of both the United
States and Mexico.8 The river also presented engineering challenges, such as deep canyons and erratic
water flows, and economic hurdles that prevented local or state groups from building the necessary
storage facilities and canals to provide an adequate water supply. Because local or state groups could not
resolve these “national problems,” Congress considered ideas to control the Colorado River and resolve
potential conflicts between the states.9 Thus, in an effort to resolve these conflicts and prevent litigation,
Congress gave its consent for the states and Reclamation to enter into an agreement to apportion Colorado
River water supplies in 1921.10
The below sections discuss the resulting agreement, the Colorado River Compact, and other documents
and agreements that form the basis of the Law of the River, which governs Colorado River operations.11
Colorado River Compact
The Colorado River Compact of 1922, negotiated by the seven basin states and the federal government,
was signed by all but one basin state (Arizona).12 Under the compact, the states established a framework
to apportion the water supplies between the Upper Basin and the Lower Basin, with the dividing line
between the two basins at Lee Ferry, AZ,13 near the Utah border.14 Each basin was apportioned 7.5 maf
annually for beneficial consumptive use, and the Lower Basin was given the right to increase its
beneficial consumptive use by an additional 1 maf annually. The agreement also required Upper Basin
states to deliver to the Lower Basin a total of 75 million acre-feet (maf) over each 10-year period, thus
allowing for averaging over time to make up for low-flow years.15 The compact did not address inter- or
intrastate allocations of water (which it left to future agreements and legislation), nor did it address water
to be made available to Mexico, the river’s natural terminus; this matter was addressed in subsequent
international agreements. The compact was not to become binding until it had been approved by the
legislatures of each of the signatory states and by Congress.

8 Arizona v. California, 373 U.S. 546 (1963). Hereinafter “Arizona v. California.”
9 S. Doc. No. 67-142 (1922). For example, the states in the Upper Basin (Colorado, Wyoming, Utah, and New Mexico), where
the majority of the river’s runoff originates, feared that a storage facility making water available downstream might form a basis
for claims by Lower Basin states (California, Arizona, and Nevada) under prior appropriation doctrine before Upper Basin states
could develop means to access their share.
10 Ch. 72, 42 Stat. 171 (1921). In lieu of litigation, interstate compacts have historically been a preferred means of allocating
water among competing uses. Pursuant to the U.S. Constitution, Article I, Section 10, Clause 3, no such compacts can be entered
into without the consent of Congress.
11 The Law of the River is the commonly used shorthand for the multiple compacts, federal laws, court decisions and decrees,
contracts, and regulatory guidelines collectively known under this heading.
12 Because the Colorado River Compact of 1922 did not specify the apportionments for individual states, Arizona initially refused
to sign and ratify the agreement out of concern that rapidly growing California would lay claim to most of the Lower Basin’s
share of water. Arizona eventually signed and ratified the compact in 1944. See below section on “Arizona Ratification and
Arizona v. California Decision.”

13 Although the compact names the point as “Lee Ferry,” it is also commonly referred to as “Lees Ferry,” or “Lees Ferry.”
14 Arizona receives water under both the Upper and the Lower Basin apportionments, since parts of the state are in both basins.
15 As a result, in some years in which Upper Basin inflows are less than 7.5 maf, less than 7.5 maf may be available to Lower
Basin states.
Congressional Research Service

4

link to page 12 link to page 13 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Boulder Canyon Project Act
Congress approved and modified the Colorado River Compact in the Boulder Canyon Project Act (BCPA)
of 1928.16 The act ratified the 1922 compact, authorized the construction of a federal facility to impound
water in the Lower Basin (Boulder Dam, later renamed Hoover Dam) and related facilities to deliver
water in Southern California (e.g., the All-American Canal, which delivers Colorado River water to
California’s Imperial Valley), and apportioned the Lower Basin’s 7.5 maf per year among the three Lower
Basin states (Table 1, Figure 2). It provided 4.4 maf per year to California, 2.8 maf to Arizona, and
300,000 acre-feet (af) to Nevada, with the states to divide any surplus waters among them. It also directed
the Secretary of the Interior to serve as the sole contracting authority for Colorado River water use in the
Lower Basin and authorized several storage projects for study in the Upper Basin.
Congress’s approval of the compact in the BCPA was conditioned on a number of factors, including
ratification by California and five other states (thereby allowing the compact to become effective without
Arizona’s concurrence), and California agreeing by act of its legislature to limit its water use to 4.4 maf
per year and not more than half of any surplus waters. California met this requirement by passing the
California Limitation Act of March 4, 1929.17
Arizona Ratification and Arizona v. California Decision
Arizona did not ratify the Colorado River Compact until 1944, at which time the state began to pursue a
federal project to bring Colorado River water to its primary population centers in Phoenix and Tucson.
California opposed the project, arguing that under the doctrine of prior appropriation,18 California’s
historical use of the river trumped Arizona’s rights to the Arizona allotment.19 California also argued that
Colorado River apportionments under the BCPA included water developed on Colorado River tributaries,
whereas Arizona claimed, among other things, that these apportionments included the river’s mainstream
waters only.
In 1952, Arizona filed suit in the U.S. Supreme Court to settle the issue. Eleven years later, in the 1963
Arizona v. California decision,20 the Supreme Court ruled in favor of Arizona, finding that Congress had
intended to apportion the mainstream of the Colorado River and that California and Arizona each would
receive one-half of surplus flows.21 The same Supreme Court decision held that Section 5 of the BCPA
controlled the apportionment of waters among Lower Basin States, and that the BCPA (and not the law of
prior appropriation) controlled the apportionment of water among Lower Basin states.22 The ruling was
notable for its directive to forgo traditional Reclamation deference to state law under the Reclamation Act
of 1902, and formed the basis for the Secretary of the Interior’s unique role as water master for the Lower

16 Boulder Canyon Project Act (BCPA), Ch. 42, 45 Stat. 1057 (1928), codified as amended at 43 U.S.C. 617.
17 The Department of the Interior also requested that California prioritize its Colorado River rights among users before the
Colorado River Compact became effective; the state established priority among these users for water in both “normal” and
“surplus” years in the California Seven-Party Agreement, signed in August 1931.
18 Historically, water in the western United States has been governed by some form of the rule of prior appropriation. Under this
rule, the party that first appropriates water and puts it to beneficial use thereby acquires a vested right to continue to divert and
use that quantity of water against claimants junior in time.
19 Under the BCPA, Arizona and California also were to divide any excess, or surplus, supplies (i.e., amounts exceeding the 7.5
maf basic apportionment). What was meant by the term surplus—and how much water California could claim under this
authority—was significant to the arguments in the case.
20 Arizona v. California, 373 U.S. 546 (1963).
21 Id. at 546, 573.
22 Id. at 585-586. This decision gave the Secretary the power to apportion surpluses and shortages among and within Lower Basin
states.
Congressional Research Service

5

link to page 12 link to page 13 link to page 18 link to page 25 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Basin.23 The decision also held that Native American reservations on the Colorado River were entitled to
priority under the BCPA.24 Later decrees by the Supreme Court in 1964 and 1979 supplemented the 1963
decision.25
Following the Arizona v. California decision, Congress eventually authorized Arizona’s conveyance
project for Colorado River water, the Central Arizona Project (CAP), in the Colorado River Basin Project
Act of 1968 (CRBPA).26 As a condition for California’s support of the project, Arizona agreed that, in the
event of shortage conditions, California’s 4.4 maf has priority over CAP water supplies.
1944 U.S.-Mexico Water Treaty27
In 1944, the United States signed a water treaty with Mexico (1944 U.S.-Mexico Water Treaty) to guide
how the two countries share the waters of the Colorado River and the Rio Grande. The treaty established
water allocations for the two countries and created a governance framework (the International Boundary
and Water Commission) to resolve disputes arising from the treaty’s execution.28 The treaty requires the
United States to provide Mexico with 1.5 maf of water annually, plus an additional 200,000 af when a
surplus is declared. During drought, the United States may reduce deliveries to Mexico in similar
proportion to reductions of U.S. consumptive uses. The treaty has been supplemented by additional
agreements between the United States and Mexico, known as minutes.29
Upper Basin Compact and Colorado River Storage Project Authorizations
Projects originally authorized for study in the Upper Basin under BCPA were not allowed to move
forward until the Upper Basin states determined their individual water allocations, which they did under
the Upper Colorado River Basin Compact of 1948 (Table 1, Figure 2). The Upper Basin Compact
established Colorado (where the largest share of runoff to the river originates) as the largest entitlement
holder in the Upper Basin, with rights to 51.75% of any Upper Basin flows after Colorado River Compact
obligations to the Lower Basin have been met. Other states also received percentage-based allocations,
including Wyoming (14%), New Mexico (11.25%), and Utah (23%). Arizona was allocated 50,000 af in

23 Pursuant to Section 8 of the Reclamation Act of 1902 (32 Stat. 388), Reclamation is not to interfere with state laws, “relating to
the control, appropriation, use, or distribution of water used in irrigation” and that “the Secretary of the Interior, in carrying out
provisions of the Act, shall proceed in conformance with such laws.”
24 Indian reserved water rights were first recognized by the Supreme Court in Winters v. United States in 1908. Winters v. United
States
, 207 U.S. 564, 575-77 (1908). Under the Winters doctrine, when Congress reserves land (i.e., for an Indian reservation), it
implicitly reserves water sufficient to fulfill the purpose of the reservation. Because the establishment of Indian reservations (and,
therefore, of Indian water rights) generally predated large-scale development of water resources for non-Indian users, the water
rights of tribes often are senior to those of non-Indian water rights. For more information on the resulting settlements, see below
section on “Tribal Water Rights” and CRS Report R44148, Indian Water Rights Settlements, by Charles V. Stern.
25 Arizona v. California, 376 U.S. 340, 341 (1964). The 1964 decree determined, among other things, that all water in the
mainstream of the Colorado River below Lee Ferry and within the United States would be “water controlled by the United
States” and that the Secretary would release water under only three types of designations for a year: “normal, surplus, and
shortage.” The 1979 supplemental decree determined the present perfected rights of various parties in the Lower Basin.
26 Colorado River Basin Project Act of 1968, P.L. 90-537.
27 For more information on the 1994 U.S.-Mexico Water Treaty and Colorado River water sharing issues with Mexico, see CRS
Report R45430, Sharing the Colorado River and the Rio Grande: Cooperation and Conflict with Mexico, by Nicole T. Carter,
Stephen P. Mulligan, and Charles V. Stern.
28 Treaty Between the United States of America and Mexico Respecting Utilization of Waters of the Colorado and Tijuana Rivers
and of the Rio Grande, U.S.-Mex., February 3, 1944, 59 State. 1219, at https://www.ibwc.gov/Treaties_Minutes/treaties.html.
The United States ratified the treaty on November 1, 1945, and Mexico ratified it on October 16, 1945. It became effective on
November 8, 1945.
29 The complete list of minutes is available at https://www.ibwc.gov/Treaties_Minutes/Minutes.html. For more information on
recent minutes, see below section, “Minute 319 and Minute 323 Agreements with Mexico.”
Congressional Research Service

6

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

addition to its Lower Basin apportionment, in recognition of the small portion of the state in the Upper
Basin. The Upper Basin Compact also established the Upper Colorado River Commission, which
coordinates operations and positions among Upper Basin states.
Table 1. Colorado River Apportionments: U.S. States
(apportionments assuming 15 million acre-feet in available natural flows annually)
Annual Apportionment
Annual
(% of Sub-basin
Apportionment
Sub-basin/States
Apportionment)
(acre-feet)
Upper Basin States



Colorado
51.75%
[3,855,000]

Wyoming
14.00%
[1,043,000]

New Mexico
11.25%
[838,000]

Utah
23.00%
[1,714,000]

Arizona (Upper Basin portion)
Approx. 0.60%
50,000
Lower Basin States



Arizona (Lower Basin portion)
37.33%
2,800,000

California
58.67%
4,400,000

Nevada
4.00%
300,000
Sources: Colorado River Compact of 1922, Boulder Canyon Project Act (43 U.S.C. §617), Upper Colorado River Basin
Compact of 1948, and 1944 U.S.-Mexico Water Treaty.
Notes: Allocations in table assume annual total flows of 15 million acre-feet (maf). Table does not reflect 1.5 maf to
Mexico pursuant to the 1944 U.S.-Mexico Water Treaty. Deliveries under the treaty are shared equally between the
amounts available in the Upper and Lower Basins. The Upper Basin Compact (other than amounts provided to Arizona)
provides its apportionments in terms of percentage of the overall Upper Basin allocation, since there was uncertainty
about how much water would remain after Colorado River Compact obligations to Lower Basin states were fulfilled.
Congressional Research Service

7


Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Figure 2. U.S. State Apportionments of Colorado River Flows
(apportionments assuming 15 million acre-feet in available natural flows annually)

Sources: Colorado River Compact of 1922, Boulder Canyon Project Act (43 U.S.C. 617), Upper Colorado River Basin
Compact of 1948, and 1994 U.S.-Mexico Water Treaty.
Notes: Figure depicts allocations based on total flows of 15 million acre-feet (maf). Figure does not reflect 1.5 maf to
Mexico pursuant to the 1944 U.S.-Mexico Water Treaty, which is shared equally between the Upper and Lower Basin.
The Colorado River Storage Project (CRSP) Act of 1956 authorized storage reservoirs and dams in the
Upper Basin, including the Glen Canyon, Flaming Gorge, Navajo, and Curecanti Dams. The act also
established the Upper Colorado River Basin Fund, which receives revenues collected in connection with
the projects, to be made available for defraying the project’s costs of operation, maintenance, and
emergency expenditures.
In addition to the aforementioned authorization of CAP in Arizona, the 1968 CRBPA amended CRSP to
authorize several additional Upper Basin projects (e.g., the Animas La Plata and Central Utah projects) as
CRSP participating projects. It also directed that the Secretary of the Interior propose operational criteria
for Colorado River Storage Project units (including the releases of water from Lake Powell) that prioritize
(1) Treaty Obligations to Mexico, (2) the Colorado River Compact requirement for the Upper Basin to
deliver 75 maf to Lower Basin states over any 10-year period, and (3) carryover storage to meet these
needs. The CRBPA also established the Upper Colorado River Basin Fund and the Lower Colorado River
Basin Development Fund, both of which were authorized to utilize revenues from hydropower generation
from relevant Upper and Lower Basin facilities to fund certain expenses in the sub-basins.30

30 Basin-wide operational commitments on the Colorado River were established in the 1970 Criteria for Coordinated Long-Range
Operation of Colorado River Reservoirs, which coordinated the operation of reservoirs in the Upper and Lower Basins, including
releases from Lake Powell and Lake Mead. These operating instructions have been modified by more recent operational
agreements intended to mitigate the effects of long-term drought.
Congressional Research Service

8

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Water Storage and Operations
Due to the basin’s large water storage projects, basin water users are able to store as much as 60 maf, or
about four times the Colorado River’s annual flows. Thus, storage and operations in the basin receive
considerable attention, particularly at the basin’s two largest dams and their storage reservoirs: Glen
Canyon Dam/Lake Powell in the Upper Basin (26.2 maf of storage capacity) and Hoover Dam/Lake
Mead in the Lower Basin (26.1 maf). The status of these projects is of interest to basin stakeholders and
observers and is monitored closely by Reclamation.
Glen Canyon Dam, completed in 1963, provides the linchpin for Upper Basin storage and regulates flows
from the Upper Basin to the Lower Basin, pursuant to the Colorado River Compact. It also generates
approximately 5 billion kilowatt hours (KWh) of electricity per year, which the Western Area Power
Administration (WAPA) supplies to 5.8 million customers in Upper Basin States.31 Other significant
storage in the Upper Basin includes the initial “units” of the CRSP: the Aspinall Unit in Colorado
(including Blue Mesa, Crystal, and Morrow Point dams on the Gunnison River, with combined storage
capacity of more than 1 maf),32 the Flaming Gorge Unit in Utah (including Flaming Gorge Dam on the
Green River, with a capacity of 3.78 maf), and the Navajo Unit in New Mexico (including Navajo Dam
on the San Juan River, with a capacity of 1 maf). The Upper Basin is also home to 16 “participating”
projects which are authorized to use water for irrigation, municipal and industrial uses, and other
purposes.33
In the Lower Basin, Hoover Dam, completed in 1936, provides the majority of the Lower Basin’s storage
and generates about 4.2 billion KWh of electricity per year for customers in California, Arizona, and
Nevada.34 Also important for Lower Basin Operations are Davis Dam/Lake Mohave, which regulates
flows to Mexico under the 1944 Treaty, and Parker Dam/Lake Havasu, which impounds water for
diversion into the Colorado River Aqueduct (thereby allowing for deliveries to urban areas in southern
California) and CAP (allowing for diversion to users in Arizona). Further downstream on the
Arizona/California border, Imperial Dam (a diversion dam) diverts Colorado River water to the All-
American Canal for use in California’s Imperial and Coachella Valleys.
Annual Operating Plans
Reclamation monitors Colorado River reservoir levels and projects them 24 months into the future in
monthly studies (called 24-month studies). The studies take into account forecasted hydrology, reservoir
operations, and diversion and consumptive use schedules to model a single scenario of reservoir
conditions. The studies inform operating decisions by Reclamation looking one to two years into the
future. They express water storage conditions at Lake Mead and Lake Powell in terms of elevation, as feet
above mean sea level (ft).
In addition to the 24-month studies, the CRBPA requires the Secretary to transmit to Congress and the
governors of the basin states, by January 1 of each year, a report describing the actual operation for the
preceding water year and the projected operation for the coming year. This report is commonly referred to

31 Bureau of Reclamation, Upper Colorado Region, “Glen Canyon Unit,” accessed February 21, 2019, https://www.usbr.gov/uc/
rm/crsp/gc/.
32 The Curecanti Unit was renamed the Aspinall Unit in 1980 in honor of U.S. Representative Wayne N. Aspinall of Colorado.
33 In total, 16 of the 22 Upper Basin projects authorized as part of CRSP have been developed. (The five remaining projects were
determined by Reclamation to be infeasible.) For a complete list of projects, see https://www.usbr.gov/uc/rm/crsp/index.html.
34 Bureau of Reclamation, “Hoover Dam Frequently Asked Questions and Answers,” accessed February 21, 2019, Bureau of
Reclamation, Upper Colorado Region, Glen Canyon Unit, accessed February 21, 2019, https://www.usbr.gov/uc/rm/crsp/gc/.
Congressional Research Service

9

link to page 23 link to page 23 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

as the annual operating plan (AOP). The AOP’s projected January 1 water conditions for the upcoming
calendar year establish a baseline for future annual operations.35
Since the adoption of guidelines by Reclamation and basin states in 2007 (see below section, “2007
Interim Guidelines”),
operations of the Hoover and Glen Canyon Dams have been tied to specific pool
elevations at Lake Mead and Lake Powell. For Lake Mead, the first level of shortage (1st Tier Shortage
Condition), under which Arizona and Nevada’s allocations would be decreased, would be triggered if
Lake Mead falls below 1,075 ft. For Lake Powell, releases under tiered operations are based on storage
levels in both Lake Powell and Lake Mead (specific delivery curtailments based on lake levels similar to
Lake Mead have not been adopted).
As of January 2019, Reclamation predicted that Lake Mead’s 2019 elevation would remain above 1,075 ft
(approximately 9.6 maf of storage) and that Lake Powell would remain at its prior year level (i.e., the
Upper Elevation Balancing Tier) during 2019. However, Reclamation also projected that there was a 69%
chance of a 1st Tier Shortage Condition at Lake Mead beginning in January 2020.36 Reclamation predicted
a small (3%) chance of Lake Powell dropping to 3,490 feet, or minimum power pool (i.e. a level beyond
which hydropower could not be generated) by 2020; the chance of this occurring by 2022 was greater
(15%).37
Mitigating the Environmental Effects of Colorado River
Basin Development
Construction of most of the Colorado River’s water supply infrastructure predated major federal
environmental protection statutes, such as the National Environmental Policy Act (42 U.S.C. §§4321 et
seq.) and the Endangered Species Act (ESA; 87 Stat. 884, 16 U.S.C. §§1531-1544). Thus, many of the
environmental impacts associated with the development of basin resources were not originally taken into
account. Over time, multiple efforts have been initiated to mitigate these effects. Some of the highest-
profile efforts have been associated with water quality (in particular, salinity control) and the effects of
facility operations on endangered species.
Salinity Control
Salinity and water quality are long-standing issues in the Colorado River Basin. Parts of the Upper Basin
are covered by salt-bearing shale (which increases salt content in water inflows), and salinity content
increases as the river flows downstream due to both natural leaching and return flows from agricultural
irrigation. The 1944 U.S.-Mexico Water Treaty did not set water quality or salinity standards in the
Colorado River Basin. However, after years of dispute between the United States and Mexico regarding
the salinity of the water reaching Mexico’s border, the two countries reached an agreement on August 30,
1973, with the signing of Minute 242 of the International Boundary and Water Commission.38 The
agreement guarantees Mexico that the average salinity of its treaty deliveries will be no more than 115

35 Current and historical AOPs are available at https://www.usbr.gov/uc/water/rsvrs/ops/aop/.
36 Bureau of Reclamation, Colorado River System 5-Year Projected Future Conditions, accessed November 1, 2018, at
https://www.usbr.gov/lc/region/g4000/riverops/crss-5year-projections.html.
37 The potential for Glen Canyon Dam being unable to generate hydropower is significant in part because of the importance of
hydropower revenues (which fund operation and maintenance of CRSP facilities and environmental programs) to the Upper
Basin.
38 See International Boundary and Water Commission, Minute 242, Permanent and Definitive Solution to the International
Problem of the Salinity of the Colorado River
, August 30, 1973, at https://www.ibwc.gov/Treaties_Minutes/Minutes.html.
Congressional Research Service

10

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

parts per million higher than the salt content of the water diverted to the All-American Canal at Imperial
Dam in Southern California. To control the salinity of Colorado River water in accordance with this
agreement, Congress passed the Colorado River Basin Salinity Control Act of 1974 (P.L. 93-220), which
authorized desalting and salinity control facilities to improve Colorado River water quality. The most
prominent of these facilities is the Yuma Desalting Plant, which was largely completed in 1992 but has
never operated at capacity.39 In 1974, the seven basin states also established water quality standards for
salinity through the Colorado River Basin Salinity Control Forum.40
Endangered Species Efforts and Habitat Improvements
Congress enacted the ESA in 1973.41 As basin species became listed in accordance with the act,42 federal
agencies and nonfederal stakeholders consulted with the U.S. Fish and Wildlife Service (FWS) to address
the conservation of the listed species. As a result of these consultations, several major programs have been
developed to protect and restore fish species on the Colorado River and its tributaries. Summaries of some
of the key programs are below.
Upper Colorado Endangered Fish Recovery Program
The Upper Colorado Endangered Fish Recovery Program was established in 1988 to assist in the recovery
of four species of endangered fish in the Upper Colorado River Basin.43 Congress authorized this program
in P.L. 106-392. The program is implemented through several stakeholders under a cooperative agreement
signed by the governors of Colorado, Utah, and Wyoming; DOI; and the Administrator of WAPA. The
recovery goals of the program are to reduce threats to species and improve their status so they are
eventually delisted from the ESA. Some of the actions taken in the past include providing adequate
instream flows for fish and their habitat, restoring habitat, reducing nonnative fish, augmenting fish
populations with stocked fish, and conducting research and monitoring. Reclamation is the lead federal
agency for the program and provides the majority of federal funds for implementation. It is also funded
through a portion of Upper Basin hydropower revenues from WAPA; FWS; the states of Colorado,
Wyoming, and Utah; and water users, among others.
San Juan River Basin Recovery Implementation Program
The San Juan River Basin Recovery Implementation Program was established in 1992 to assist in the
recovery of ESA-listed fish species on the San Juan River, the Colorado’s largest tributary.44 The program

39 The Yuma Desalting Plant’s limited operations have been due in part to the cost of its operations (desalination can require
considerable electricity to operate) and surplus flows in the Colorado River during some years compared to what was expected.
In lieu of operating the plant, high-salinity irrigation water has been separated from the United States’ required deliveries to
Mexico and disposed of through a canal that enters Mexico and discharges into wetlands called the Ciénega de Santa Clara, near
the Gulf of California. Whether and how the plant should be operated, and how the impacts on the Ciénega de Santa Clara from
the untreated irrigation runoff should be managed, remain topics of some debate in the basin and between Mexico and the United
States.
40 Additional information about the forum and related salinity control efforts is available at Colorado River Basin, Salinity
Control Forum, at https://www.coloradoriversalinity.org/.
41 For more information on the ESA, see CRS Report RL31654, The Endangered Species Act: A Primer, by Pervaze A. Sheikh.
42 There are several endangered species throughout the Colorado River Basin and some that are specifically found in the
Colorado River, such as the Razorback sucker (Xyrauchen texanus), Bonytail chub (Gila elegans), Colorado pikeminnow
(Ptychocheilus Lucius), and Humpback chub (Gila cypha).
43 For more information, see Upper Colorado River Endangered Fish Recovery Program at
http://www.coloradoriverrecovery.org/.
44 For more information, see San Juan River Basin Recovery Implementation Program at https://www.fws.gov/southwest/sjrip/.
Congressional Research Service

11

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

is concerned with the recovery of the Razorback sucker (Xyrauchen texanus) and Colorado pikeminnow
(Ptychocheilus Lucius). Congress authorized this program in P.L. 106-392 with the aim to protect the
genetic integrity and population of listed species, conserve and restore habitat (including water quality),
reduce nonnative species, and monitor species. The Recovery Program is coordinated by FWS.
Reclamation is responsible for operating the Animas-La Plata Project and Navajo Dam on the San Juan
River in a way that reduces effects on the fish populations. The program is funded by a portion of
revenues from power generation, Reclamation, participating states, and the Bureau of Indian Affairs.
Recovery efforts for listed fish are coordinated with the Upper Colorado River Program discussed above.
Glen Canyon Dam Adaptive Management Program
The Glen Canyon Dam Adaptive Management Program was established in 1997 in response to a directive
from Congress under the Grand Canyon Protection Act of 1992 (P.L. 102-575) to operate Glen Canyon
Dam “in such a manner as to protect, mitigate adverse impacts to, and improve the values for which
Grand Canyon National Park and Glen Canyon National Recreation Area were established.”45 This
program uses experiments to determine how water flows affect natural resources south of the dam.
Reclamation is in charge of modifying flows for experiments, and the U.S. Geological Survey conducts
monitoring and other studies to evaluate the effects of the flows. The results are expected to better inform
managers how to provide water deliveries and conserve species. The majority of program funding comes
from hydropower revenues generated at Glen Canyon Dam.
Lower Colorado Multi-Species Conservation Program (MSCP)
The MSCP is a multi-stakeholder initiative to conserve 27 species (8 listed under ESA) along the Lower
Colorado River while maintaining water and power supplies for farmers, tribes, industries and urban
residents.46 The MSCP began in 2005 and is planned to last for at least 50 years.47 The MSCP was created
through consultation under ESA. To achieve compliance under ESA, federal entities involved in
managing water supplies in the Lower Colorado River met with resource agencies from Arizona,
California, and Nevada; Native American Tribes; environmental groups; and recreation interests to
develop a program to conserve species along a portion of the Colorado River. A biological opinion (BiOp)
issued by the FWS in 1997 served as a basis for the program. Modifications to the 1997 BiOp were made
in 2002, and in 2005, the BiOp was renewed for 50 years. Nonfederal entities received an incidental take
permit under Section 10(a) of the ESA for their activities in 2005 and shortly thereafter implemented a
habitat conservation plan.
The objective of the MSCP is to create habitat for listed species, augment the populations of species listed
under ESA, maintain current and future water diversions and power production, and abide by the
incidental take authorizations for listed species under the ESA. The estimated total cost of the program
over its lifetime is approximately $626 million in 2003 dollars ($882 million in 2018 dollars) and is to be
split evenly between Reclamation (50%) and the states of California, Nevada, and Arizona (who
collectively fund the remaining 50%).48 The management and implementation of the MSCP is the
responsibility of Reclamation, in consultation with a steering committee of stakeholders.

45 For more information, see Bureau of Reclamation, Glen Canyon Dam Adaptive Management Program, “Glen Canyon Dam
High Flow Experimental Release,” at https://www.usbr.gov/uc/rm/gcdHFE/.
46 The stakeholders include six federal and state agencies, six tribes, and 36 cities and water and power authorities. Stakeholders
serve more than 20 million residents in the region, and irrigate two million acres of farmland. For more information, see Lower
Colorado River Multi-Species Conservation Program at https://www.lcrmscp.gov/.
47 The program was formally authorized by Congress under Subtitle E of Title IX of P.L. 111-11.
48 As of the end of 2018, more than $295 million had been spent on program implementation. Lower Colorado River Multi-
Congressional Research Service

12

link to page 19 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Hydropower Revenues Funding Colorado River Basin Activities
Hydropower revenues are used to finance a number of activities throughout the Colorado River Basin. In the Lower Basin,
the Lower Colorado River Basin Development Fund collects revenues from the CAP, as well as certain revenues from the
Boulder Canyon and Parker-Davis Projects. These revenues are available without further appropriation toward defraying
CAP operation and maintenance costs, salinity control efforts, and funding for Indian water rights settlements identified
under the Arizona Water Settlements Act of 2004 (i.e., funding for water systems of the Gila River Indian Community and
the Tohono O’odham Nation, among others). The Colorado River Dam fund takes utilizes power revenues generated by
the Boulder Canyon Project (i.e., Hoover Dam) to fund operational and construction costs associated with that facility. In
the Upper Basin, the Upper Colorado River Basin Fund collects revenues from the initial units of CRSP and funds operation
and maintenance expenses, salinity control, the Glen Canyon Dam Adaptive Management Program, and endangered fish
studies on the Colorado and San Juan rivers.
Tribal Water Rights
Twenty-two federally recognized tribes in the Colorado River Basin have quantified water diversion
rights that have been confirmed by court decree or final settlement. These tribes collectively possess
rights to 2.9 maf per year of Colorado River water.49 However, as of 2015, these tribes typically were
using just over half of their quantified rights.50 Additionally, 13 other basin tribes have reserved water
rights claims that have yet to be resolved.51 Increased water use by tribes with existing water rights,
and/or future settlement of claims and additional consumptive use of basin waters by other tribes, is likely
to exacerbate the competition for basin water resources.
The potential for increased use of tribal water rights (which, once ratified, are counted toward state-
specific allocations where the tribal reservation is located) has been studied in recent years. In 2014,
Reclamation, working with a group of 10 tribes with significant reserved water rights claims on the
Colorado River, initiated a study known as the 10 Tribes Study.52 The study, published in 2018, estimated
that, cumulatively, the 10 tribes could have reserved water rights (including unresolved claims) to divert
nearly 2.8 maf per year.53 Of these water rights, approximately 2 maf per year were decreed and an
additional 785,273 af (mostly in the Upper Basin) remained unresolved.54 The report estimated that,
overall, the 10 tribes are diverting (i.e., making use of) almost 1.5 maf of their 2.8 maf in resolved and
unresolved claims. Table 2 shows these figures at the basin and sub-basin levels.55 According to the study,
the majority of unresolved claims in the Upper Basin are associated with the Ute Tribe in Utah (370,370

Species Conservation Program, “Funding,” https://www.lcrmscp.gov/steer_committee/funding.html. Accessed February 22,
2019.
49 Reclamation 2012 Supply/Demand Study, Technical Report C, Appendix C9, p. C9-4.
50 Colorado River Research Group, Tribes and Water in the Colorado River Basin, June 2016, at
https://www.coloradoriverresearchgroup.org/uploads/4/2/3/6/42362959/crrg_tribal_water_rights.pdf. According to this study,
tribal consumptive use in 2015 (including leasing of tribal water to non-tribal entities) totaled 1.7 maf of the 2.9 maf in diversion
rights.
51 Colorado River Research Group, Tribes and Water in the Colorado River Basin, June 2016, at
https://www.coloradoriverresearchgroup.org/uploads/4/2/3/6/42362959/crrg_tribal_water_rights.pdf.
52 The tribes are the Chemehuevi Indian Tribe, Cocopah Indian Tribe, Colorado River Indian Tribes, Fort Mojave Indian Tribe,
Jicarilla Apache Nation, Navajo Nation, Quechan Indian Tribe, Southern Ute Indian Tribe, Ute Indian Tribe, and Ute Mountain
Ute Tribe.
53 U.S. Bureau of Reclamation, Colorado River Ten Tribes Partnership, Colorado River Basin Ten Tribes Partnership Tribal
Water Study,
Study Report, December 2018, p. 5.11-1, at https://www.usbr.gov/lc/region/programs/crbstudy/tws/finalreport.html.
Hereinafter “Ten Tribes Study, 2018.”
54 Ten Tribes Study, 2018, pp. 5.11-1-5.11-2.
55 Ten Tribes Study, 2018, p. 5.11-4.
Congressional Research Service

13

link to page 20 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

af per year), the Navajo Nation in Utah (314,926 af), and the Navajo Nation in the Upper Basin in
Arizona (77,049 af).
Table 2. 10 Tribes Study: Tribal Water Rights and Diversions
(values in terms of acre-feet per year)
Current Use

Reserved/Settled
Unresolved Water
Total Estimated

Diversions
Water Rights
Rights
Tribal Water Rights
Upper Basin
672,964

1,060,781
762,345
1,823,125
Lower Basin
800,392

952,190
22,928
975,119
Total Basin
1,473,356

2,012,971
785,273
2,798,244
Source: U.S. Bureau of Reclamation, Colorado River Ten Tribes Partnership, Colorado River Basin Ten Tribes Partnership
Tribal Water Study,
Study Report, December 2018.
Note: Unresolved water rights include claims for potential water rights that have yet to be resolved.
Drought and the Supply/Demand Imbalance in the
Colorado River Basin
When the Colorado River Compact was originally approved, it was assumed based on the historical
record that average annual flows on the river were 16.4 maf per year.56 According to Reclamation data,
from 1906 to 2018, observed natural flows on the river at Lee Ferry, AZ—the common point of
measurement for observed basin flows—averaged 14.8 maf annually.57 Natural flows from 2000 to 2018
(i.e., during the ongoing drought) averaged considerably less than that—12.4 maf annually.58 While
natural flows have trended down, consumptive use in the basin has grown and has regularly exceeded
natural flows since 2000. From 1971 to 2015, average total consumptive use grew from 13 maf to over 15
maf annually.59 Combined, the two trends have caused a significant drawdown of basin storage levels
(Figure 3).

56 National Research Council, Committee on the Scientific Bases of Colorado River Basin Water Management, Water Science
and Technology Board, Colorado River Basin Water Management: Evaluating and Adjusting to Hydroclimatic Variability, 2007,
at https://www.nap.edu/read/11857/chapter/1.
57 For dataset on natural flows and more information, see Bureau of Reclamation, Lower Colorado River Operations, “General
Modeling Information,” accessed January 17, 2018, at https://www.usbr.gov/lc/region/g4000/riverops/model-info.html.
58 Bureau of Reclamation Flow Data, 1906-2018.
59 1971-2008 consumptive use data based on data in Reclamation 2012 Supply/Demand Study, Technical Report C, p. C-6.
Analysis of 2009-2015 Upper Basin consumptive use data by CRS, based on data in Provisional Bureau of Reclamation
Consumptive Uses and Losses Reports for 2006-2010 and 2011-2015. Analysis of 2009-2015 Lower Basin consumptive use data
by CRS, based on Bureau of Reclamation Colorado River Water Accounting and Use Reports for 2009-2015. Hereinafter,
references to consumptive use data analysis based on these four reports are referred to collectively as “CRS Analysis of Colorado
River Consumptive Use Data.”
Congressional Research Service

14


Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Figure 3. Lake Powell and Lake Mead Storage and Inflows
(as of fall 2018)

Source: Bureau of Reclamation, 2018 Congressional Presentation on Drought Contingency Plans.
Notes: Water year 2018 values represent projections as of September 2018. Percent of average annual unregulated inflow
into Lake Powell is based on the period of record from 1981-2010, and is generally seen as a measure of basin hydrologic
conditions.
From 2009 to 2015, the largest consumptive water use occurred in the Lower Basin (7.5 maf per year),
while Upper Basin consumptive use averaged about 3.8 maf annually.60 Use of Treaty water by Mexico
(1.5 maf per year) and evaporative loss from reservoirs (approximately 2 maf per year) in both basins also
factored significantly into total basin consumptive use.61 Notably, consumptive use in the Lower Basin,
combined with mandatory releases to Mexico, regularly exceeds the mandatory 8.23 maf per year that
must be released from the Upper Basin to the Lower Basin and Mexico pursuant to Reclamation
requirements.62 This imbalance between Lower Basin inflows and use, known as the structural deficit,
causes additional stress on basin storage.
The current drought in the basin has included some of the lowest flows on record.63 According to
Reclamation, the 19-year period from 2000 to 2018 was the driest period in more than 100 years of record
keeping.64 Observers have pointed out that flows in some recent years have been lower than would be
expected given the amount of precipitation that has occurred, and have noted that warmer temperatures

60 CRS Analysis of Colorado River Consumptive Use Data.
61 CRS Analysis of Colorado River Consumptive Use Data.
62 The minimum average annual volume that the Upper Basin must release is 8.23 maf; this includes Upper Basin releases of 75
maf over any 10-year period (i.e., an average of 7.5 maf per year), plus half of the water due to Mexico (i.e., 0.75 maf).
63 The 2000-2018 period included the second, third, fourth, and fifth lowest years on record.
64 U.S. Bureau of Reclamation, Annual Operating Plan for Colorado River Reservoirs, 2019, September 10, 2018, p. 8.
Hereinafter “Reclamation 2019 Draft AOP.”
Congressional Research Service

15

link to page 23 link to page 23 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

appear to be a significant contributor to these diminished flows.65 Based on these and other observations,
some have argued that Colorado River flows are unlikely to return to 20th century averages, and that
future water supply risk is high.66
2012 Reclamation Study
A 2012 study by Reclamation projected a long-term imbalance in supply and demand in the Colorado
River Basin.67 In the study, Reclamation noted that the basin had thus far avoided serious impacts on
water supplies due to the significant storage within the system, coupled with the fact that some Upper
Basin states have yet to fully develop the use of their allocations.68 However, Reclamation projected that
in the coming half century, flows would decrease by an average of 9% at Lee Ferry and drought would
increase in frequency and duration.69 At the same time, Reclamation projected that demand for basin
water supplies would increase, with annual consumptive use projected to rise from 15 maf to 18.1-20.4
maf by 2050, depending on population growth.70 A range of 64%-76% of the growth in demand was
expected to come from increased M&I demand.71
Reclamation’s 2012 study also posited several potential ways to alleviate future shortages in the basin,
such as alternative water supplies, demand management, drought action plans, water banking, and water
transfer/markets. Some of these options already are being pursued. In particular, some states have become
increasingly active in banking unused Colorado River surface water supplies, including through
groundwater banks or storage of unused surface waters in Lake Mead (see below section, “2007 Interim
Guidelines”).

Developments and Agreements Since 2000
Drought conditions throughout the basin have raised concerns about potential negative impacts on water
supplies. Concerns center on uncertainty that might result if the Secretary of the Interior were to
determine that a shortage condition exists in the Lower Basin, and that related curtailments were
warranted. Some in Upper Basin States are also concerned about the potential for a compact call of Lower
Basin states on Upper Basin states.72 Drought and other uncertainties related to water rights priorities
(e.g., potential tribal water rights claims) spurred the development of several efforts that generally
attempted to relieve pressure on basin water supplies, stabilize storage levels, and provide assurances of
available water supplies. Some of the most prominent developments since the year 2000 (i.e., the
beginning of the current drought) are discussed below.

65 Woodhouse, C.A., G.T. Pederson, and K. Horino, et al., “Increasing influence of air temperature on upper Colorado River
streamflow,” Geophysical Research Letters, vol. 43 (2016), pp. 2174-2181.
66 Udall, B. and J. Overpeck, “The twenty-first century Colorado River hot drought and implications for the future,” Water
Resources Research
, vol. 53 (February 17, 2017), pp. 2404-2418.
67 Reclamation 2012 Supply/Demand Study.
68 This is largely due to a lack of development in Wyoming (which uses approximately 500,000 acre-feet of its 1 maf in Colorado
River supplies) and Utah (which uses approximately 800,000 acre-feet of its 1.7 maf in supplies).
69 Reclamation 2012 Supply/Demand Study, p. 7.
70 Reclamation 2012 Supply/Demand Study, p. 8. Population growth in central Arizona and on the Front Range of Colorado is
expected to comprise the majority of basin population increases.
71 Reclamation 2012 Supply/Demand Study, Technical Report C, p. C-22. The majority of this demand increase was assumed to
come from Central Arizona and the Front Range in Colorado.
72 A compact call is the commonly used term for the Lower Basin states’ hypothetical attempt to force deliveries of Colorado
River water under the Compact.
Congressional Research Service

16

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

2003 Quantitative Settlement Agreement
Prior to the 2003 QSA, California had been using approximately 5.2 maf of Colorado River on average
each year (with most of its excess water use attributed to urban areas). Under the QSA, an agreement
between several California water districts and DOI, California agreed to reduce its use to the required 4.4
maf under the Law of the River.73 It sought to accomplish this aim by quantifying Colorado River
entitlement levels of several water contractors; authorizing efforts to conserve additional water supplies
(e.g., the lining of the All-American Canal); and providing for several large-scale, long-term agriculture-
to-urban water transfers. The QSA also committed the state to a path for restoration and mitigation related
to the Salton Sea, a water body in Southern California that was historically sustained by Colorado River
irrigation runoff from the Imperial and Coachella Valleys.74
A related agreement between Reclamation and the Lower Basin states, the Inadvertent Overrun and
Payback Policy (IOPP), went into effect concurrently with the QSA in 2004.75 IOPP is an administrative
mechanism that provides an accounting of inadvertent overruns in consumptive use compared to the
annual entitlements of water users in the Lower Basin. These overruns must be “paid back” in the
calendar year following the overruns, and the paybacks must be made only from “extraordinary
conservation measures” above and beyond normal consumptive use.76
2004 Arizona Water Settlements Act
The 2004 Arizona Water Settlements Act (P.L. 108-451, AWSA) significantly altered the allocation of
CAP water in Arizona and set the stage for some of the cutbacks in the state that are currently under
discussion.77 It ratified three water rights settlements (one in each title) between the federal government
and the State of Arizona, the Gila River Indian Community (GRIC), and the Tohono O’odham Nation,
respectively.78 For the state and its CAP water users, the settlement resolved a final repayment cost for
CAP by reducing the water users’ reimbursable repayment obligation from about $2.3 billion to $1.65
billion. Additionally, Arizona agreed to new tribal and non-tribal allocations of CAP water so that
approximately half of CAP’s annual allotment would be available to Indian tribes in Arizona, at a higher
priority than most other uses. The tribal communities were authorized to lease the water so long as the
water remains within the state via the state’s water banking authority. The act also authorized funds to
cover the cost of infrastructure required to deliver the water to the Indian communities, much of it derived
from hydropower receipts accruing to the Lower Colorado River Basin Development Fund.

73 California Quantification Settlement Agreement by and Among Imperial Irrigation District, the Metropolitan Water District of
Southern California, and Coachella Valley Water District, October 10, 2003.
74 For more information on the Salton Sea, see CRS In Focus IF11104, Salton Sea Management and Restoration Efforts, by
Pervaze A. Sheikh and Charles V. Stern.
75 Bureau of Reclamation, Record of Decision for the Colorado River Water Delivery Agreement, October 10, 2003, pp 16-19.
Hereinafter Reclamation, Colorado River Water Delivery Agreement.
76 Reclamation, Colorado River Water Delivery Agreement.
77 P.L. 108-451.
78 Congress passed the CRBPA and authorized construction of CAP despite significant uncertainty related to tribal water rights
related to the Colorado River. The Gila River, Arizona’s largest tributary of the Colorado River, runs directly through the Gila
River Indian Community, which encompasses approximately 372,000 acres south of and adjacent to Phoenix. Additionally, the
Tohono O’odham Nation possessed reserved water rights near Tucson with the potential to disrupt that city’s water supplies.
Congressional Research Service

17

link to page 27 link to page 24 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

2007 Interim Guidelines/Coordinated Operations for Lake Powell and
Lake Mead
Another significant development in the basin was the 2007 adoption of the Colorado River Interim
Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead
(2007 Interim Guidelines). Development of the agreement began in 2005, when, in response to drought in
the Southwest and the decline in basin water storage (and a record low point in Lake Powell of 33%
active capacity), the Secretary of the Interior instructed Reclamation to develop coordinated strategies for
Colorado River reservoir operations during drought or shortages.79 The resulting guidelines included
criteria for releases from Lakes Mead and Powell determined by “trigger levels” in both reservoirs, as
well as a schedule of Lower Basin curtailments at different operational tiers (Table 3). Under the
guidelines, Arizona and Nevada, which have junior rights to California, would face reduced allocations if
Lake Mead elevations dropped below 1,075 ft. At the time, it was thought that the 2007 Guidelines would
significantly reduce the risk of Lake Mead falling to 1,025 feet. The guidelines are considered “interim”
because they were scheduled to expire in 20 years (i.e., at the end of 2026).
The 2007 agreement also included for the first time a mechanism by which parties in the Lower Basin
were able to store conserved water in Lake Mead, known as Intentionally Created Surplus (ICS).
Reclamation accounts for this water annually, and the users storing the water may access the surplus in
future years, in accordance with the Law of the River. From 2013 to 2017, the portion of Lake Mead
water in storage that was classified as ICS ranged from a low of 711,864 af in 2015 to a high of 1.261 maf
in 2017 (Figure 4).

79 Prior to this time, the Secretary of the Interior had the authority to declare a shortage, but no shortage criteria had been
developed. (Criteria for surplus operations were put in place in 2001.)
Congressional Research Service

18


Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Figure 4. U.S. Lower Basin States Intentionally Created Surplus Balance, 2010-2017

Source: Figure by CRS, based on data from Bureau of Reclamation, Colorado River Accounting and Water Use Report,
Calendar Years 2010-2017
, at https://www.usbr.gov/lc/region/g4000/wtracct.html.
Pilot System Conservation Program
In 2014, Reclamation and several major basin water supply agencies (Central Arizona Water
Conservation District, Southern Nevada Water Authority, Metropolitan Water District of Southern
California, and Denver Water) executed a memorandum of understanding to provide funding for
voluntary conservation projects and reductions of water use. These activities had the goal of developing
new system water,80 to be applied toward storage in Lake Mead, by the end of 2019.81 Congress formally
authorized federal participation in these efforts in the Energy and Water Development and Related
Agencies Appropriations Act, 2015 (P.L. 113-235, Division D), with an initial sunset date for the authority
at the end of FY2018.82 The Energy and Water Development and Related Agencies Appropriations Act,
2019 (P.L. 115-244, Division A) extended the authority through the end of FY2022, with the stipulation
that Upper Basin agreements could not proceed without the participation of the Upper Basin states

80 System water refers to water that is provided to increase water supplies as a whole, without being directed toward additional
consumptive use for specific contractors or water users.
81 Agreement Among the United States of America, Through the Department of the Interior, Bureau of Reclamation, the Central
Arizona Water Conservation District, the Metropolitan Water District of Southern California, Denver Water, and the Southern
Nevada Water Authority, for a Pilot Program for Funding the Creation of Colorado River System Water Through Voluntary
Water Conservation and Reductions in Use, Agreement No. 14-XX-30-W0574, July 30, 2014, at https://www.usbr.gov/lc/region/
programs/PilotSysConsProg/PilotSCPFundingAgreement7-30-2014.pdf.
82 P.L. 113-235, §206.
Congressional Research Service

19

link to page 25 link to page 25 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

through the Upper Colorado River Commission.83 As of mid-2018, Reclamation estimated that the
program had resulted in a total of 194,000 af of system water conserved.84 These savings were carried out
through 64 projects conserving 47,000 af in the Upper Basin and 11 projects conserving 147,000 af in the
Lower Basin.85
Minute 319 and Minute 323 Agreements with Mexico86
In 2017, the United States and Mexico signed Minute 323, which extended and replaced elements of a
previous agreement, Minute 319, signed in 2012.87 Minute 323 included, among other things, options for
Mexico to hold water in reserve in U.S. reservoirs for emergencies and water conservation efforts, as well
as U.S. commitments for flows to support the ecological health of the Colorado River Delta. It also
extended initial Mexican cutback commitments made under Minute 319 (which were similar in structure
to the 2007 cutbacks negotiated for Lower Basin states) and established a Binational Water Scarcity
Contingency Plan that included additional cutbacks that would be triggered if drought contingency plans
(DCPs) are approved by U.S. basin states (see following section, “Proposed Drought Contingency
Plans”).

Proposed Drought Contingency Plans
Ongoing drought conditions and the potential for water supply shortages have prompted renewed
discussions and negotiations focused on how to conserve additional basin water supplies. In October
2018, Reclamation and the Colorado River Basin states announced final drafts of DCPs for both the
Upper Basin and the Lower Basin. Both plans require final approval by the states and authorization by
Congress before they can be implemented. Although the DCPs include interstate allocations and
commitments, intrastate commitments by contractors and other relevant interests (i.e., agreements that
make it possible to realize state-level commitments in the DCPs) must be finalized for the DCPs to be
implemented. Each of the basin-level DCPs is discussed below in more detail.
Upper Basin Drought Contingency Plan
The Upper Basin DCP aims to protect against Lake Powell reaching critically low elevations; it also
authorizes storage of conserved water in the Upper Basin that could help establish the foundation for a
water use reduction effort (i.e., a “Demand Management Program”) that may be developed in the future.88
Under the Upper Basin DCP, the Upper Basin states agree to operate system units to keep the surface of
Lake Powell above 3,525 ft, which is 35 ft above the minimum elevation needed to run the dam’s
hydroelectric plant. Other large Upper Basin reservoirs (e.g., Navajo Reservoir, Blue Mesa Reservoir, and
Flaming Gorge Reservoir) would be operated to protect the targeted Lake Powell elevation, potentially
through drawdown of their own storage. The Upper Basin DCP Demand Management Program also

83 P.L. 115-244, §205.
84 Reclamation 2019 Draft AOP, p. 8.
85 Reclamation 2019 Draft AOP, p. 8.
86 For more information on the 1994 U.S.-Mexico Water Treaty and Colorado River water sharing issues with Mexico, see CRS
Report R45430, Sharing the Colorado River and the Rio Grande: Cooperation and Conflict with Mexico, by Nicole T. Carter,
Stephen P. Mulligan, and Charles V. Stern.
87 The text of these minutes is available from the International Boundary and Water Commission at https://www.ibwc.gov/
Treaties_Minutes/Minutes.html.
88 Prior to the drought contingency plan (DCPs), such a mechanism existed for the Lower Basin but not for the Upper Basin.
Congressional Research Service

20

link to page 27 link to page 27 Management of the Colorado River: Water Allocations, Drought, and the Federal Role

would entail willing seller/buyer agreements allowing for temporary paid reductions in water use that
would provide for more storage volume in Lake Powell.
Reclamation has stated its belief that these efforts will significantly decrease the risk of Lake Powell’s
elevation falling below 3,490 ft, an elevation at which significantly reduced hydropower generation is
possible.89
Lower Basin Drought Contingency Plan
The Lower Basin DCP is designed to require Arizona, California, and Nevada to curtail use and thereby
contribute additional water to Lake Mead storage at predetermined “trigger” elevations, while also
creating additional flexibility to incentivize voluntary conservation of water to be stored in Lake Mead,
thereby increasing lake levels. Under the DCP, Nevada and Arizona (which were already set to have their
supplies curtailed beginning at 1,075 ft under the 2007 Interim Guidelines) would contribute additional
supplies to maintain higher lake levels (i.e., beyond previous commitments). The reductions of supply
would reach their maximums when reservoir levels drop below 1,045 ft. At the same time, the Lower
Basin DCP would, for the first time, include commitments for cutbacks by California. These cutbacks
would begin with 200,000 af (4.5%) in reductions at Lake Mead elevations of 1,040-1,045 ft, and would
increase to as much as 350,000 af (7.9%) at elevations of 1,025 ft or lower.
The curtailments in the Lower Basin DCP would be in addition to those agreed to under the 2007 Interim
Guidelines and under Minute 323 with Mexico. Specific and cumulative reductions are shown in Table 3.
In addition to the state-level reductions, under the Lower Basin DCP, Reclamation also would agree to
pursue efforts to add 100,000 af or more of system water within the basin. Some of the largest and most
controversial reductions under the Lower Basin plan would occur in Arizona, where pursuant to previous
changes under the 2004 AWSA, a large group of agricultural users would face major cutbacks to their
CAP water supplies.
Reclamation notes that the Lower Basin DCP decreases the chance of Lake Mead elevations falling below
1,020 ft, which would be a critically low level.90 Some parties have pointed out that although the DCP is
unlikely to prevent a shortage from being declared at 1,075 ft, it would slow the rate at which the lake
recedes thereafter.91 Combined with the commitments from Mexico, total planned cutbacks under
shortage scenarios (i.e., all commitments to date, combined) would reduce Lower Basin consumptive use
by 241,000 af to 1.375 maf per year, depending on Lake Mead’s elevation.92


89 Bureau of Reclamation, “Presentation to Congressional Staff on Draft Drought Contingency Plans,” October 16, 2018.
Hereinafter “2018 Reclamation DCP Presentation.”
90 2018 Reclamation DCP Presentation. Currently, there are no agreed-upon curtailment levels governing operations below 1,020
ft, thus that level represents an unknown and likely more severe level of curtailment that would affect more users than those
affected under the 2007 guidelines.
91 Tom Buschatzke, Arizona Department of Water Resources Director, and Ted Cooke, Central Arizona Project General
Manager, “The DCP Makes CO River Delivery Shortfalls Less Painful, but It Doesn’t Make Them Go Away,” Arizona
Department of Water Resources, September 5, 2018, at https://new.azwater.gov/news/articles/2018-05-09.
92 For a summary of the curtailments that add up to this amount, see “1,090->1,075” row of Table 3.
Congressional Research Service

21


Table 3. Lower Basin Water Curtailment Volumes Under Existing and Proposed Agreements
(values in thousands of acre-feet)
Binational
Minute 323
Water
2007 Interim
Delivery
Scarcity
Total Volume of Curtailment
Shortage Guidelines Reductions
DCP Curtailment
Conting. Plan
(% of Colorado River Apportionment)
Lake Mead
Elevation
Lower
(ft)
AZ
NV
Mexico
AZ
NV
CA
Mexico
AZ
NV
CA
Basin
Mexico
1,090 -
0
0
0
192
8
0
41
192 (6.8%)
8 (2.6%)
0 (0%)
200
41
>1,075
1,075 -
320
13
50
192
8
0
30
512
21 (7%)
0 (0%)
533
80
>1,050
(18.2%)
1,050 -
400
17
70
192
8
0
34
592
25 (8.3%)
0 (0%)
617
104
>1,045
(21.1%)
1,045 -
400
17
70
240
10
200
76
640
27 (9.0%)
200 (4.5%)
867
146
>1,040
(22.8%)
1,040 -
400
17
70
240
10
250
84
640
27 (9.0%)
250 (5.6%)
917
154
>1,035
(22.8%)
1,035 -
400
17
70
240
10
300
92
640
27 (9.0%)
300 (6.8%)
967
162
>1,030
(22.8%)
1,030 -
400
17
70
240
10
350
101
640
27 (9.0%)
350 (7.9%)
1,017
171
1,025
(22.8%)
<1,025
480
20
125
240
10
350
150
720
30 (10.0%)
350 (7.9%)
1,100
275
(22.8%)
Sources: Table by CRS, using data in the 2007 Interim Shortage Guidelines, Minute 323 between Mexico and the United States, the Draft Lower Basin Drought Contingency
Plan
, and the Binational Water Scarcity Contingency Plan in Minute 323 between Mexico and the United States.

CRS-22

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

Drought Contingency Plan Approval
Although the draft DCPs and the related negotiations have been widely praised, uncertainties and
concerns remain, particularly those associated with approval and implementation of the
agreements. Most of these concerns center on intrastate apportionment of reductions and related
assurances by states and the federal government. Thus, an outstanding question is whether all
basin states and users are willing to approve and participate in the DCPs and any related
implementation plans. If states and users do not approve these documents, Reclamation has
indicated that it may (in its delegated capacity as water master for the Secretary of the Interior)
have to make unilateral cutbacks to state entitlements.93
Reclamation originally called on the basin states to approve their DCPs by the end of 2018, a goal
that the seven states’ representatives reportedly endorsed.94 When this deadline was not met,
Reclamation Commissioner Brenda Burman set a January 31, 2019, deadline for approval by
relevant entities. Citing the lack of DCP approval and completion, Reclamation on February 1,
2019, issued a Federal Register notice requesting input from state governors during the 15-day
period beginning March 4 regarding recommendations for potential departmental actions in the
event the DCPs are not completed.95 If the DCPs are finalized by March 19, the notice would be
rescinded and the DCPs could be finalized with congressional authorization. If they are not
completed, DOI may use its authority to make unilateral water delivery cutbacks in the basin.
These cutbacks may be based on the aforementioned state input.
Issues for Congress
Funding and Oversight of Existing Facilities and Programs
The principal role of Congress as it relates to storage facilities on the Colorado River is funding
and management of facility operations, construction, and programs to protect and restore
endangered species (e.g., Glen Canyon Dam Adaptive Management Program and the Upper
Colorado River Endangered Fish Program). In the Upper Basin, Colorado River facilities include
the 17 active participating units in the Colorado River Storage Projects, as well as the Navajo-
Gallup Water Supply Project. In the Lower Basin, major facilities include the Salt River Project
and Theodore Roosevelt Dam, Hoover Dam and All-American Canal, Yuma and Gila Projects,
Parker-Davis Project, Central Arizona Project, and Robert B. Griffith Project (now Southern
Nevada Water System).
Congressional appropriations in support of Colorado River projects and programs typically
account for a portion of overall project budgets. For example, the Lower Colorado Region’s
FY2017 operating budget was $517 million; $119.8 million of this total was provided by

93 Although the Secretary of the Interior’s role is commonly characterized as that of the “water master,” DOI has
previously highlighted the role of the basin states in the administration of basin water entitlements. It also has
highlighted its intent to facilitate multi-state consensus in the management of basin water resources. Thus, any
curtailments implemented pursuant to DOI’s capacity as water master are likely to be informed at least in part by state
input.
94 Bureau of Reclamation, “Another Dry Year in the Colorado River Basin Increases the Need for Additional State and
Federal Actions,” May 9, 2018, at https://www.usbr.gov/newsroom/newsrelease/detail.cfm?RecordID=62170.
95 Department of the Interior, Bureau of Reclamation, “Responding to Historic Drought and Ongoing Dry Conditions in
the Colorado River Basin,” 84 Federal Register 2244-2245, February 6, 2019. Hereinafter “Reclamation 2019 FR
Drought notice.”
Congressional Research Service

23

Management of the Colorado River: Water Allocations, Drought, and the Federal Role

congressional appropriations, and the remainder of funding came from power revenues (which
are made available without further appropriation) and nonfederal partners.96 In recent years,
Congress has also authorized and appropriated funding that has targeted the Colorado River Basin
in general (i.e., the Pilot System Conservation Plan). It may choose to extend or amend these and
other authorities specific to the basin.
Indian Water Rights Settlements and Plans for New and
Augmented Water Storage
Congress has previously approved Indian water rights settlements associated with more than
2 maf of tribal diversion rights on the Colorado River. Only a portion of this water has been
developed. Congress likely will face the decision of whether to fund development of previously
authorized infrastructure associated with Indian water rights settlements in the Colorado River
Basin. For example, the ongoing Navajo-Gallup Water Supply Project is being built to serve the
Jicarilla Apache Nation, the Navajo Nation, and the City of Gallup, New Mexico.97 Congress may
also be asked to consider new settlements that may result in tribal rights to more Colorado River
water. For example, in the 116th Congress, H.R. 244 would authorize the Navajo Nation Water
Settlement in Utah.
In addition to development of new tribal water supplies, some states in the Upper Basin have
indicated their intent to further develop their Colorado River water entitlements. For example, in
the 115th Congress, Section 4310 of America’s Water Infrastructure Act (P.L. 115-270) authorized
the Secretary of the Interior to enter into an agreement with the State of Wyoming whereby the
state would fund a project to add erosion control to Fontenelle Reservoir in the Upper Basin. The
project would allow the state to potentially utilize an additional 80,000 acre-feet of water storage
on the Green River, a tributary of the Colorado River.
Drought Contingency Plans
In addition to nonfederal state and stakeholder approvals, congressional authorization is needed to
move forward with several significant parts of the DCPs. For instance, according to Reclamation,
authority is needed for contractors to access ICS volumes in Lake Mead at elevations below 1,075
feet.98 Authority is also needed to for implementation of the Upper Basin DCP’s demand
management program, which would alter requirements for Lake Powell releases to the Lower
Basin pursuant to the compact.
If the DCPs are not finalized and authorized by Congress, the 2007 Interim Guidelines will be in
effect through 2026, but the additional curtailments and programs agreed to in the DCPs and the
binational water scarcity agreement with Mexico would not be implemented under those
documents. Reclamation has warned that if the DCPs (or similar agreements) are not approved,
the Secretary may assert his or her authority as water master to mandate additional cutbacks.99
Reclamation’s 2019 Federal Register request for input from basin state governors would inform
any such actions.

96 Bureau of Reclamation, Lower Colorado Regional Report, FY2017, at https://www.usbr.gov/lc/docs/
LCRegionReportFY17.pdf.
97 This project was authorized in the Omnibus Public Land Management Act of 2009 (P.L. 111-11), Title X, Part III.
98 This authority would allow Reclamation to deliver volumes to contractors in excess of what they are allowed to
receive under current law. Email correspondence with Bureau of Reclamation, February 15, 2019.
99 Reclamation 2019 FR Drought notice.
Congressional Research Service

24

Management of the Colorado River: Water Allocations, Drought, and the Federal Role


Users in both the Upper and Lower Basins have an incentive to support negotiated curtailments in
lieu of cutbacks and other operational changes they have not planned for. In the Lower Basin,
negotiated curtailments and mutually agreed-upon conservation efforts are widely seen as
preferable to the uncertainty that would come with unilateral federal cutbacks in the Lower Basin.
They would also prevent drawdown of ICS balances that might occur in Lake Mead without
authority for contractors to access these balances and receive deliveries in excess of their annual
allotments. In the Upper Basin, if Lake Powell fell to levels such that hydropower production was
not possible, the lack of low-cost power could negatively impact the economy of Upper Basin
states. Similarly, the lack of hydropower revenues could imperil funding for infrastructure
operations and maintenance and programs to conserve species and habitat on the river, among
other things. Finally, if prolonged drought meant that Lake Powell could no longer make
Colorado River Compact-required deliveries to the Lower Basin, then the Lower Basin might
initiate a compact call on the Upper Basin. Such a scenario likely would lead to a protracted legal
battle and could result in additional mandatory curtailments.

Author Information

Charles V. Stern
Pervaze A. Sheikh
Specialist in Natural Resources Policy
Specialist in Natural Resources Policy




Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan
shared staff to congressional committees and Members of Congress. It operates solely at the behest of and
under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other
than public understanding of information that has been provided by CRS to Members of Congress in
connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not
subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in
its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or
material from a third party, you may need to obtain the permission of the copyright holder if you wish to
copy or otherwise use copyrighted material.

Congressional Research Service
R45546 · VERSION 3 · UPDATED
25