INSIGHTi
Army Corps of Engineers: Section 7001
Annual Report on Future Studies and Projects
Updated May 25, 2021
The U.S. Army Corps of Engineers (USACE), through its civil works mission, undertakes water resource
development studies and projects and other assistance activities that are specifical y authorized by
Congress. In Section 7001 of the Water Resources Reform and Development Act of 2014 (WRRDA; P.L.
113-121, 33 U.S.C. §2282d), Congress established an annual process for identifying proposals for site-
specific studies and projects within USACE’s water resource mission and authorities. The process
includes a cal for nonfederal proposals and concludes with a report by the Assistant Secretary of the
Army for Civil Works (ASACW) to USACE’s congressional authorizing committees.
Congress established the Section 7001 process while congressional earmark moratorium policies were in
place for both authorization and appropriations. Although the 117th Congress is pursuing incorporating
community project funding (see House and Senate websites) into the development of legislation, the
Section 7001 process remains active. USACE opened the nonfederal proposal submission period for the
2022 report on April 30, 2021, with an August 30, 2021, submission deadline. USACE anticipates hosting
public information sessions about the process in July and August 2021.
Congressional Authorization and Section 7001 Reports
Congress authorizes USACE studies and projects prior to appropriating funds and typical y considers
omnibus USACE water resource authorization bil s biennial y, often titled as Water Resources
Development Acts (WRDAs). Most project-specific authorizations in WRDAs fal into three categories:
feasibility studies, construction projects, or modifications to existing authorizations. (See this CRS report
about the USACE authorization process.)
Inclusion of a proposal in a Section 7001 annual report does not provide congressional authorization or
appropriation; rather, inclusion facilitates congressional consideration of the proposal’s authorization. For
example, Congress has used Section 7001 annual reports in developing WRDA 2016 (Title I of P.L. 114-
322), WRDA 2018 (Title I of P.L. 115-270), and WRDA 2020 (Division AA of P.L. 116-260).
Congressional Research Service
https://crsreports.congress.gov
IN11118
CRS INSIGHT
Prepared for Members and
Committees of Congress
Congressional Research Service
2
Section 7001 Report
Section 7001 of WRRDA 2014, as amended, directs the ASACW to submit an annual report to the House
Transportation and Infrastructure Committee and the Senate Environment and Public Works Committee.
The report may include
completed feasibility reports;
proposed feasibility studies;
proposed modifications to authorized studies and projects; and
proposed modifications to environmental infrastructure assistance projects and programs.
For proposals to be included, Section 7001 requires that they
(i) are related to the missions and authorities of the Corps of Engineers; (ii) require specific
congressional authorization, including by an Act of Congress; (iii) have not been congressionaly
authorized; (iv) have not been included in any previous annual report; and (v) if authorized, could
be carried out by the USACE.
The Section 7001 annual report includes only those proposals that the ASACW determines have met al
five criteria. Proposals that do not meet al five criteria are placed in the report’s appendix.
For most proposals listed in the appendix of reports transmitted in 2015-2020, an authority already
existed to perform the requested activity or the proposal did not fit within the USACE’s missions and
authorities (i.e., navigation, flood risk management, or aquatic ecosystem restoration). USACE adjusted
the 2021 solicitation to expand eligibility for inclusion in the report to include
proposals whose primary purpose is municipal or agricultural water supply (per direction
from §127 of WRDA 2020) and
proposals for recreation or hydropower, if undertaken in conjunction with a project or
effort within a USACE mission.
Nonfederal Proposals
The annual report is based, in part, on proposals for study authorization and modification to authorized
studies, projects, and environmental infrastructure assistance submitted by nonfederal interests. The
annual Section 7001 process begins with the publication of a notice in the Federal Register requesting
proposals from nonfederal interests. Nonfederal proposals are to include a description of the proposed
activity and its relation to USACE missions and authorities, a statement of support and financial ability
from sponsoring nonfederal interests, and federal and nonfederal shares of the proposed activity’s
estimated cost, among other requirements.
USACE encourages nonfederal interests to consult with their local USACE districts in preparation for
submission. According to USACE, nonfederal interests do not need to submit completed feasibility
reports through the Section 7001 proposal process for project authorization.
In WRDA 2020, Congress directed the ASACW to provide assistance to nonfederal interests for future
7001 report submissions (§204). It is unclear whether this assistance wil be available for this round of
proposals. As of late May 2021, USACE had not published implementation guidance for this provision.
Congressional Research Service
3
Transmitted Reports and WRDA 2020 Authorization
The ASACW transmitted Section 7001 annual reports to the authorizing committees annual y from 2015
through 2020. These reports are available at USACE, “Report to Congress on Future Water Resources
Development.” As of late May 2021, USACE had not released the 2021 report.
The Section 7001 annual reports for 2019 and 2020 collectively included 19 reports by the Chief of
Engineers (i.e., Chief’s reports), 36 nonfederal proposals in the body of the reports, information in
fulfilment of certain reporting requirements from WRRDA 2014, and 48 nonfederal proposals in the
appendixes. Congress used these reports to authorize studies, projects, and modifications to authorities in
WRDA 2020. For example, WRDA 2020
Authorized construction for 19 studies with Chief’s reports and 2 proposals listed in the
2019 and 2020 reports (§401);
Conditional y authorized construction for a nonfederal feasibility report listed in the 2019
report (§403);
Reauthorized 2 projects listed in the 2019 report (§355);
Authorized 16 studies listed in the 2019 and 2020 reports (§201, §213) and 5 studies
listed in the appendixes of the 2019 and 2020 reports (§209, §213);
Authorized 5 modifications for water supply and 2 modifications for flood risk
management listed in the 2019 and 2020 reports (§353) and in the appendixes of the 2019
and 2020 reports (§311, §337); and
Amended 14 environmental infrastructure authorities (§352), as listed in the 2019 and
2020 reports and in the appendix of the 2019 report.
In WRDA 2020, Congress directed the ASACW to expedite completion of various studies (§202) and
study modifications (§203), which included some proposals in the main bodies and in the appendixes of
various annual reports.
Author Information
Anna E. Normand
Analyst in Natural Resources Policy
Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff
to congressional committees and Members of Congress. It operates solely at the behest of and under the direction of
Congress. Information in a CRS Report should not be relied upon for purposes other than public understanding of
information that has been provided by CRS to Members of Congress in connection with CRS’s institutional role.
CRS Reports, as a work of the United States Government, are not subject to copyright protection in the United
States. Any CRS Report may be reproduced and distributed in its entirety without permission from CRS. However,
as a CRS Report may include copyrighted images or material from a third party, you may need to obtain the
permission of the copyright holder if you wish to copy or otherwise use copyrighted material.
Congressional Research Service
4