The extremely cold weather that is affecting much of the country is causing some states to experience
rolling blackouts to avoid a wider collapse of the electric power system. These weather-related impacts
have been particularly acute in Texas. The current situation in Texas has been precipitated by the extreme
cold, as noted by the Washington Post: “In the single-digit temperatures, pipelines froze up because there
was some moisture in the gas. Pumps slowed. Diesel engines to power the pumps refused to start. One
power plant after another went offline. Even a reactor at one of the state’s two nuclear plants went dark,
hobbled by frozen equipment.” Some wind turbines in Texas were frozen, impacting about 10% of the
power generated in Texas during the winter.
Texas’s power outages, many experts argue, are largely a result of policies for electricity independence
that the state has pursued for decades. Texas operates its own independent electrical grid, run by the
Electric Reliability Council of Texas (ERCOT) that serves most of the state. Texas established ERCOT in
1970 initially to manage grid reliability in accordance with federal standards, and later established
ERCOT as an independent system operator (ISO) scheduling power on an electric grid that connects
approximately 680 generation units. ERCOT remains largely independent from oversight by the Federal
Energy Regulatory Commission (FERC) because of the independent design of the electric power system
in Texas. ERCOT itself states: “FERC does not have plenary jurisdiction over ERCOT because electric
energy generated in the ERCOT Region is not transmitted in “interstate commerce,” as defined by the
[Federal Power Act], except for certain interconnections ordered by FERC that do not give rise to broader
FERC jurisdiction.”
The United States has three main electric power transmission systems, the Eastern and Western
Interconnections, and the grid run by ERCOT. While these grids largely operate independently from each
other, there are approximately 1,300 megawatts (MW) of transmission capacity connecting the three
transmission systems. Other ISOs in California and New York operate within the Eastern and Western
Interconnections, and have transmission connections with several other states. ERCOT has two
connections with 820 MW of total transmission capacity connecting it to the Eastern Interconnect, and
these are high-voltage, direct current transmission lines that operate under contract. There are also two
connections that allow power to come in from Mexico. According to ERCOT, these interconnections “do
not give rise to broader FERC jurisdiction.” The result is that ERCOT’s grid, essentially, is not connected
to the rest of the United States.
Congressional Research Service
https://crsreports.congress.gov
IN11608
CRS INSIGHT
Prepared for Members and
Committees of Congress




Congressional Research Service
2
Unlike several of the other regional transmission organizations, ERCOT does not operate a market for
electric capacity, or potential electricity supply, to exist alongside the conventional market for energy
supplied every day. Such a market would pay generators to stand by to operate in the event of an energy
shortfall. Texas chooses to rely on daily energy markets to supply the power it needs. Texas had always
enjoyed an excess of electric supply, and reportedly saw no compelling reason to expect that would
change. Its restructured market, among the most aggressive in the country, is said to have elected to face
shortages rather than paying for excess generation.
The extreme cold weather event was forecast, and many observers argue ERCOT did not prepare for the
weather and the large demand adequately. Texas usually experiences a maximum demand for electricity in
warmer months to accommodate air conditioning loads. However, this is not the first time that extremely
cold weather has caused an electricity crisis in Texas. After a historic cold weather event in 2011, FERC
and the North American Electric Reliability Corporation (NERC) studied the power outages that resulted,
and concluded that “the massive amount of generator failures that were experienced raises the question
whether it would have been helpful to increase reserve levels going into the event. This action would have
brought more units online earlier, might have prevented some of the freezing problems the generators
experienced, and could have exposed operational problems in time to implement corrections before the
units were needed to meet customer demand.” The report also provided a discussion of weatherization
best practices for cold weather preparedness.
The Department of Energy has authority to take action in the event of a grid emergency under section
202(c) of the Federal Power Act. That authority generally lasts for 15 days and may be seen as unlikely to
be able to impact the current event, especially given limited infrastructure with the ability to import
additional power into Texas. DOE has issued an emergency order allowing ERCOT to dispatch units to
meet electricity demand through February 19, even if they exceed emission limits of sulfur dioxide,
nitrogen oxide, mercury, and carbon monoxide. In addition, the current widespread cold temperatures
have extended from the Canadian border into Mexico, so additional power from other regions may not be
readily available. FERC and NERC have also announced their intention to investigate the operations of
the bulk-power system during the extreme winter weather conditions currently being experienced by the
Midwest and South central states.

Author Information

Richard J. Campbell

Specialist in Energy Policy




Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff
to congressional committees and Members of Congress. It operates solely at the behest of and under the direction of
Congress. Information in a CRS Report should not be relied upon for purposes other than public understanding of
information that has been provided by CRS to Members of Congress in connection with CRS’s institutional role.
CRS Reports, as a work of the United States Government, are not subject to copyright protection in the United
States. Any CRS Report may be reproduced and distributed in its entirety without permission from CRS. However,


Congressional Research Service
3
as a CRS Report may include copyrighted images or material from a third party, you may need to obtain the
permission of the copyright holder if you wish to copy or otherwise use copyrighted material.

IN11608 · VERSION 1 · NEW