On December 18, 2019, the Federal Energy Regulatory Commission (FERC) issued an order directing the
PJM regional transmission organization (RTO) to expand its Minimum Offer Price Rule (MOPR) as a
move to address subsidies to electric power generation resources by states, with certain exemptions.
FERC stated that it acted “to protect the competitive capacity market administered by PJM” by requiring
PJM to expand its MOPR to apply to any new or existing power generation resource that receives, or is
entitled to receive, a state subsidy, unless a FERC-determined exemption applies. FERC stated that
resources that do not otherwise qualify for an exemption may seek a unit-specific exemption. FERC also
clarified that the MOPR applies to state-subsidized resources (and not resources with federal subsidies).
In April 2020, FERC denied requests for rehearing.
Background
RTOs and independent system operators (ISOs) manage the electric transmission systems and the
competitive wholesale electric energy markets, under FERC’s oversight. RTOs essentially operate as a
broker between generation companies that offer to sell power into the wholesale markets, and distribution
companies that submit bids to buy power from the markets. RTOs generally run several markets
(including a capacity market) to ensure that enough generation is available to reliably meet peak power
demands. Some RTOs use forward capacity markets to ensure that sufficient generation will be available
years in the future. As RTO developed these markets, some participants and observers raised concerns
that new generators could undermine competitiveness by submitting artificially low offers. In response,
some RTOs, including PJM, added the regulatory concept of “Cost of New Entry” (CONE) to represent
the estimated cost of building and connecting a reference power plant (typically, a natural gas-fired
combustion turbine serving peak loads) to the grid in a particular location.
CONE values can help provide a screen for possible exercise of “buyer-side” market power under an RTO
MOPR. MOPRs provide a process for RTOs to determine whether low offers from new projects are
consistent with a project’s costs, and are not, therefore, anticompetitive. MOPRs require new resources to
offer at, or above, a floor price (equal to the net CONE for the asset generator type and location), and
therefore prevent an artificial depression of capacity market prices.
Congressional Research Service
https://crsreports.congress.gov
IN11412
CRS INSIGHT
Prepared for Members and
Committees of Congress




Congressional Research Service
2
In recent years, several states have criticized various aspects of the performance of the competitive
markets, especially in areas with transmission congestion (i.e., “load pockets”) where high prices for
electricity persist. Proposals from New Jersey and Maryland to subsidize generation in these load pockets
were challenged in courts. In 2016, the Supreme Court issued a decision that Maryland’s program to
encourage development of in-state generation was preempted
by FERC’s exclusive jurisdiction over
interstate wholesale electricity rates under 16 U.S.C. §824.
FERC’s PJM MOPR Order
In 2017, several generators filed a complaint with FERC arguing that PJM’s market rules essentially
allowed state nuclear subsidies and renewable portfolio standard requirements to suppress capacity
market prices. Alternatively, some observers argued that the real problem for PJM’s capacity market was
oversupply.
In response to the generator complaint, PJM filed market reform proposals. FERC rejected
PJM’s proposals, finding that the out-of-market payments threatened the competitiveness of PJM’s
capacity market. FE
RC directed PJM to expand the MOPR to apply to all new or existing resources that
can or do receive a state subsidy, unless an exemption applies. Existing resources are largely exempted
from FERC’s order, including those with state subsidies. FERC’s order could require future state-
subsidized resources to use the MOPR, thus limiting the resource’s ability to submit lower-priced offers.
Current Expectations and Concerns
Several states, including Maryland, New Jersey, and Illinois, have reportedly contemplated leaving PJM’s
forward capacity market due to concerns that the FERC MOPR decision could undermine their clean
energy goals.
These states could use an existing provision in PJM’s rules for a Fixed Resource
Requirement to determine their own power needs outside of the capacity market, and still participate in
PJM’s real-time and day-ahead electricity markets (so long as they meet PJM’s reliability requirements).
Some are concerned that by mostly affecting new resources, the MOPR would exclude new offshore wind
from the capacity market and negatively impact development of the offshore wind industry. The capacity
market accounts for about 20% of the wholesale price of electricity in PJM, meaning that the loss of
capacity market revenues may lead new renewable developers to increase their prices.
The United States has one 30 MW offshore wind farm in operation, with over 25,000 MW in the
development pipeline
as identified by the Department of Energy in 2018. Opinions differ on whether the
loss of revenue from participation in the capacity markets would be a “deal-breaker” for the offshore
industry. Some states within PJM, including Maryland, New Jersey, and Virginia, have installation
commitments or established goals for offshore wind development. It is unclear how states within PJM
intend to meet their offshore wind goals and commitments while meeting the requirements of the MOPR.
In March 2020, PJM filed its MOPR compliance filing with FERC. PJM’s interpretation of FERC’s
direction could reportedly alleviate some of the concerns for future renewable development. PJM’s
compliance proposal would allow “unit-specific reviews” to allow energy projects to justify a lower
clearing price based on specific attributes of the project. PJM argues that voluntary renewable energy
credits are not state subsidies and would allow an asset life of up to 35 years. Together, such allowances
could potentially enable new renewable projects to offer below the default MOPR floor values and be
available for the market. It remains to be seen if FERC will accept PJM’s proposals in the filing.
Arguably, at the heart of the debate is a state’s authority under the Federal Power Act over in-state
generation facilities (16 U.S.C. §§791a–825r), as opposed to FERC’s exclusive authority over sales in
interstate wholesale electricity markets (16 U.S.C. §824). Congress may consider whether the MOPR
follows that divide. Congress may also consider whether the MOPR presents a barrier to the adoption of
newer technologies with lower greenhouse gas emissions.


Congressional Research Service
3


Author Information

Richard J. Campbell
Corrie E. Clark
Specialist in Energy Policy
Analyst in Energy Policy





Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff
to congressional committees and Members of Congress. It operates solely at the behest of and under the direction of
Congress. Information in a CRS Report should not be relied upon for purposes other than public understanding of
information that has been provided by CRS to Members of Congress in connection with CRS’s institutional role.
CRS Reports, as a work of the United States Government, are not subject to copyright protection in the United
States. Any CRS Report may be reproduced and distributed in its entirety without permission from CRS. However,
as a CRS Report may include copyrighted images or material from a third party, you may need to obtain the
permission of the copyright holder if you wish to copy or otherwise use copyrighted material.

IN11412 · VERSION 2 · NEW