CRS INSIGHT
The Department of the Interior's Final Rule on Offshore
 Well Control
June 16, 2016 (IN10484)
 |
 Related Author
Laura B. Comay
 |
Laura B. Comay, Analyst in Natural Resources Policy (lcomay@crs.loc.gov, 7-6036)
On April 29, 2016, the Department of the Interior's Bureau of Safety and Environmental Enforcement (BSEE) released
 final regulations concerning blowout preventer systems and well control for oil and gas operations on the U.S. outer
 continental shelf (81 Fed. Reg. 25887). The regulations aim to reduce the risk of an offshore oil or gas blowout that
 could jeopardize human safety and harm the environment.
The regulations draw on findings about the causes of the 2010 Deepwater Horizon oil spill in the Gulf of Mexico.
 Building on previous regulatory reforms implemented after the 2010 spill, the well-control rule contains new
 requirements for the design, manufacture, repair, maintenance, and testing of offshore well-control equipment,
 particularly blowout preventers (BOPs), the assemblies of specialized valves installed on a well that are designed to
 close in the event of an uncontrolled release of oil or gas. A BSEE fact sheet summarizes the rule's requirements.
BSEE released a proposed rule in April 2015 and received more than 175 comments expressing mixed perspectives on
 the rule. Industry commenters such as the American Petroleum Institute (API), as well as some Members of Congress,
 stated that the rule was overly prescriptive and could have unintended consequences that would impede rather than
 enhance safety. Additionally, industry representatives criticized BSEE's initial cost estimate for the rule, which
 projected considerably lower costs of implementation ($883 million over 10 years) than were projected by an industry
 study ($32 billion over 10 years). Almost all of the rule's implementation costs would be borne by industry. By contrast,
 environmental organizations expressed support for many aspects of the proposed rule but asserted that it did not
 provide enough assurance of offshore drilling safety.
BSEE's final rule reflects changes that the agency made based on some feedback on the proposed rule. The agency
 elected not to make other suggested changes, as described in Section VI of the final rule. BSEE's revised cost estimate
 for the final rule shows an implementation cost of $890 million over 10 years. The agency rejected some of the cost
 assumptions of industry commenters, as discussed in Section VI(B)(6) of the final rule.
The final rule modifies regulatory provisions related to the following issues. (Other BSEE revisions are discussed in
 Sections V(B)(5), V(B)(6), and 5(C) of the final rule.)
Drilling Margins
The proposed rule contained requirements for the drilling margin that operators must maintain to ensure that the
 pressure exerted by drilling fluids does not fracture the formation. The rule defined a safe drilling margin as 0.5 pounds
 per gallon (ppg) between the weight of drilling fluids and the amount of pressure a formation can withstand before
 fracturing. The API and other industry commenters asserted that this definition was arbitrary and economically
 infeasible. The API cited assessments showing that many safely drilled wells used margins that would violate the new
 criteria. Environmental organizations did not directly comment on the provisions for drilling margins. For the final rule,
 BSEE kept 0.5 ppg as a default requirement but allowed an alternative drilling margin if the operator submits adequate
 justification and documentation.
Accumulator Systems
The proposed rule contained expanded capacity requirements for BOP accumulators, which store pressurized hydraulic
 fluid and provide the energy to operate a BOP independent of another power source. Industry commenters stated that
 the requirements would necessitate larger and heavier BOP assemblies, which could cause structural problems.
 Environmental advocacy organizations did not directly comment on the provisions. In the final rule, BSEE deleted its
 accumulator volume requirement and instead required that accumulator systems meet the volume specifications of an
 existing industry standard. The final rule also extended the compliance date for the accumulator requirements and made
 other changes as described in Section V(B)(2) of the final rule.
Inspection Frequency
The proposed rule required a complete, third-party-approved breakdown and inspection of a BOP and its associated
 components once every five years. Environmental organizations expressed support for this requirement, but industry
 raised concerns that the comprehensive inspections would put rigs out of service, with negative economic impacts.
 BSEE revised the final rule to allow staggered inspections of different BOP components, as long as each component is
 inspected once every five years.
Real-Time Monitoring
The proposed rule required real-time monitoring of offshore drilling operations by technical experts onshore. Industry
 commenters contended that these requirements would undermine the situational awareness and rapid decisionmaking of
 the offshore personnel. Environmental advocacy groups supported the real-time monitoring requirements but requested
 a shorter compliance timeline. A National Academy of Sciences report recommended a performance-based approach.
 BSEE revised the final rule to provide for a more flexible, performance-based approach to real-time monitoring and
 retained its three-year compliance requirement. Details are in Section V(B)(4) of the final rule.
Compliance Dates
BSEE's final rule extended the compliance dates for several equipment requirements, based on feedback about the
 availability of the required technologies and the time needed for operators to install new equipment. Industry
 commenters had found timelines in the proposed rule to be unrealistically short, whereas environmental organizations
 had stated that compliance periods for some key aspects of the rule were too long. The extended timelines include those
 for certain equipment described in Section III of the final rule.
Additionally, BSEE extended the timeline by which operators must begin using BSEE-approved verification
 organizations (BAVOs) to verify certain activities. The date was changed from three months after publication of the
 final rule to one year after BSEE publishes a list of approved BAVOs.
Congressional Action
Members of Congress and congressional committees submitted comments to BSEE on the proposed rule, and both the
 House and the Senate held hearings on the rule. After the final rule's release, the Senate passed S. 2012, the Energy
 Policy Modernization Act, which would require BSEE to review the final rule and determine its economic impact on
 small entities in the oil and gas supply chain. (The House passed a version of S. 2012 that did not contain this
 provision.) Some Members also have sought language in the FY2017 Interior appropriations bill to prohibit BSEE from
 using funds to implement the rule. Other Members have expressed support for the rule.