U.S. Rail Transportation of Crude Oil:
Background and Issues for Congress
John Frittelli
Specialist in Transportation Policy
Paul W. Parfomak
Specialist in Energy and Infrastructure Policy
Jonathan L. Ramseur
Specialist in Environmental Policy
Anthony Andrews
Specialist in Energy Policy
Robert Pirog
Specialist in Energy Economics
Michael Ratner
Specialist in Energy Policy
May 5, 2014
Congressional Research Service
7-5700
www.crs.gov
R43390
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Summary
North America is experiencing a boom in crude oil supply, primarily due to growing production
in the Canadian oil sands and the recent expansion of shale oil production from the Bakken fields
in North Dakota and Montana as well as the Eagle Ford and Permian Basins in Texas. Taken
together, these new supplies are fundamentally changing the U.S. oil supply-demand balance. The
United States now meets 66% of its crude oil demand from production in North America,
displacing imports from overseas and positioning the United States to have excess oil and refined
products supplies in some regions.
The rapid expansion of North American oil production has led to significant challenges in
transporting crudes efficiently and safely to domestic markets—principally refineries—using the
nation’s legacy pipeline infrastructure. In the face of continued uncertainty about the prospects for
additional pipeline capacity, and as a quicker, more flexible alternative to new pipeline projects,
North American crude oil producers are increasingly turning to rail as a means of transporting
crude supplies to U.S. markets. According to rail industry officials, U.S. freight railroads are
estimated to have carried 434,000 carloads of crude oil in 2013 (roughly equivalent to 300 million
barrels), compared to 9,500 carloads in 2008. In 2014, 650,000 carloads of crude oil are expected
to be carried. Crude imports by rail from Canada have increased more than 20-fold since 2011.
The amount of oil transported by rail may also be influenced by a tight market for U.S.-built
tankers.
While oil by rail has demonstrated benefits with respect to the efficient movement of oil from
producing regions to market hubs, it has also raised significant concerns about transportation
safety and potential impacts to the environment. The most recent data available indicate that
railroads consistently spill less crude oil per ton-mile transported than other modes of land
transportation. Nonetheless, safety and environmental concerns have been underscored by a series
of major accidents across North America involving crude oil transportation by rail—including a
catastrophic fire that caused numerous fatalities and destroyed much of Lac Mégantic, Quebec, in
2013. Following that event, the U.S. Department of Transportation issued a safety alert warning
that the type of crude oil being transported from the Bakken region may be more flammable than
traditional heavy crude oil.
Legislation introduced in Congress following the Lac Mégantic disaster would require railroads
to have at least two crew members aboard all trains. In addition, policy makers are discussing
regulatory changes involving tank car design, prevention of derailments, and selection of
preferred routes for transporting oil by rail. Congress may evaluate these changes in the
reauthorization of the Rail Safety Improvement Act of 2008 (P.L. 110-432).
Congressional Research Service
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Contents
Introduction ...................................................................................................................................... 1
Why Is Oil Moving by Rail?............................................................................................................ 2
The Economics of Oil by Rail ................................................................................................... 4
The Role of Barges and Ships in Domestic Crude Transportation ............................................ 7
The Jones Act ...................................................................................................................... 9
The Role of Tank Trucks ......................................................................................................... 10
Oil Spill Concerns .......................................................................................................................... 10
Special Concerns About Canadian Dilbit ................................................................................ 13
Special Concerns About Bakken Crude ................................................................................... 14
Federal Oversight of Oil Transport by Rail ................................................................................... 14
Issues for Congress ........................................................................................................................ 16
Railroad Safety and Incident Response ................................................................................... 16
Tank Car Safety Design ..................................................................................................... 17
Preventing Derailments ..................................................................................................... 19
Railroad Operations........................................................................................................... 20
Incident and Oil Spill Response ........................................................................................ 22
Rail vs. Pipeline Development ................................................................................................ 22
Rail vs. Waterborne Transport ................................................................................................. 24
Rail Transport and Crude Oil Exports ..................................................................................... 25
Figures
Figure 1. U.S. Refinery Capacity by PADD in 2012 ....................................................................... 3
Figure 2. U.S. Refinery Receipts of Crude Oil by Mode of Transportation .................................... 4
Figure 3. Oil Spill Volume per Billion-Ton-Miles ......................................................................... 11
Figure 4. Non-jacketed, Non-pressure Tank Car ........................................................................... 18
Contacts
Author Contact Information........................................................................................................... 25
Acknowledgments ......................................................................................................................... 25
Congressional Research Service
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Introduction
North America is experiencing a boom in crude oil supply, primarily due to the growth of heavy
crude production in the Canadian oil sands1 and the recent expansion of shale oil production in
North Dakota, Montana, and Texas. North American production now supplies 66% of U.S. crude
oil demand, displacing crude from Latin America, Africa, and the Middle East.
This shift has led to significant challenges in transportation, as refineries that once received crude
oil principally from oceangoing tankers are now seeing increasing deliveries by domestic
transport. Existing pipeline capacity is, in some cases, insufficient to carry growing crude oil
from some production areas, or does not link to the refineries needing the oil. The domestic barge
network does not serve some key production regions located far from navigable waterways. As a
quicker, more flexible alternative to new pipeline projects, North American crude oil producers
are increasingly turning to rail as a means of transporting crude supplies to U.S. markets.
Increased exports of refined products—and, if Congress changes the law, of crude oil—could lead
to even larger volumes of oil being transported by rail. According to rail industry officials, U.S.
freight railroads are estimated to have carried 434,000 carloads of crude oil in 2013, or roughly
300 million barrels, compared to 9,500 carloads in 2008.2 In 2014, 650,000 carloads of crude oil
are expected.3 Crude imports by rail from Canada have increased more than 20-fold since 2011.
The rapid increase in crude oil shipments by rail will likely increase the number of oil spills from
rail transportation. However, the most recent data available indicate that railroads consistently
spill less crude oil per ton-mile transported than other modes of land transportation. The amount
of crude spilled per ton-mile of rail transport declined significantly between the early 1990s and
the 2002-2007 period, the most recent years for which data are available.4
Nonetheless, the increase in rail shipments of crude has raised safety and environmental concerns.
These concerns have been underscored by a series of major incidents involving crude oil
transportation by rail, including a catastrophic fire and explosion in Lac Mégantic, Quebec, in
July 2013 and a derailment in Casselton, ND, in December 2013 that led to a mass evacuation.
Consequently, government agencies in the United States and Canada have issued new regulations
and are considering others related to oil transport by rail, and some Members of Congress have
called for tighter rules governing crude oil railcars as well as a broader reconsideration of the role
of rail in the nation’s oil transportation infrastructure.5
1 The terms “oil sands” and “tar sands” are often used interchangeably to describe a particular type of nonconventional
oil deposit. Opponents of the resource’s development often use the term “tar sands,” which arguably carries a negative
connotation; proponents typically refer to the material as oil sands. The use of this term is not intended to reflect a point
of view, but to adopt the term most commonly used by the primary executive-branch agencies involved in recent oil
sands policy issues.
2 Edward R. Hamberger and Andrew J. Black, “Freight Rail and Pipelines Deliver Energy for America,” The Hill,
Congress Blog, November 5, 2013, http://thehill.com/blogs/congress-blog/energy-environment/189187-freight-rail-
and-pipelines-deliver-energy-for-america.
3 Oilgram Price Report, “North American Crude By Rail Rising: BNSF,” v. 92, no. 58, March 26, 2014, p. 1.
4 Estimates by CRS based on data from Dagmar Etkin, Analysis of U.S. Oil Spillage, API Publication 356, August
2009, and Association of Oil Pipelines, Report on Shifts in Petroleum Transportation: 1990-2009, February 2012.
5 See, for example, Office of Senator John Hoeven, “Hoeven to Meet Saturday with BNSF Railway President and CEO
to Address Railroad Safety,” press release, January 3, 2014.
Congressional Research Service
1
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Why Is Oil Moving by Rail?
In 2013, the United States produced 2.72 billion barrels of crude oil and imported another 2.82
billion barrels.6 Canada has become the United States’ leading foreign supplier, thanks to its
increasing production from oil sands.7 However, U.S. oil output has been increasing rapidly. In
October 2013, U.S crude oil production exceeded imports for the first time since February 1995.8
The location of U.S. crude oil production has been changing rapidly. In particular, production in
Alaska and from offshore sites has been declining, while production in Texas and North Dakota
has been rising. The U.S. Geological Survey recently estimated that 2.7 billion barrels of light
sweet crude oil remain in overlooked producing formations,9 including the Eagle Ford shale, a
prolific source of very light sweet crude oil in Texas, and the Bakken formation in North Dakota,
a source of light sweet crude oil that rivals West Texas crude in quality.10
Almost all oil produced domestically, as well as some Canadian production, flows to one of the
115 U.S. refineries (Figure 1).11 Nearly 45% of the country’s refining capacity is located in the
Gulf Coast, where 43 refineries process more than 9 million barrels of oil per day (bpd).
However, the Midwest and the West Coast also have significant refining capacity.
6 Energy Information Administration, U.S. Crude Oil Supply & Disposition, http://www.eia.gov/dnav/pet/
pet_sum_crdsnd_k_a.htm. A barrel of oil is equal to 42 gallons.
7 CRS Report R43128, Oil Sands and the Oil Spill Liability Trust Fund: The Definition of "Oil" and Related Issues for
Congress, by Jonathan L. Ramseur.
8 “US Crude Production Tops Imports For The First Time Since 1995,” Oil Daily, November 14, 2013.
9 M. Tennyson et al., Assessment of Remaining Recoverable Oil in Selected Major Oil Fields of the Permian Basin,
Texas and New Mexico, 2012, USGS, http://pubs.usgs.gov/fs/2012/3051/.
10 “Light” refers to oils with low specific gravity. “Sweet” refers to oils with low sulfur content. Light, sweet crudes are
more valuable than heavier or sourer crude oils.
11 For further information on the petroleum refining industry, refer to CRS Report R41478, The U.S. Oil Refining
Industry: Background in Changing Markets and Fuel Policies, by Anthony Andrews et al.
Congressional Research Service
2

U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Figure 1. U.S. Refinery Capacity by PADD in 2012
Sources: Congressional Research Service; Energy Information Administration.
Note: PADD = Petroleum Administration for Defense Districts, five districts established by executive order
during World War II for gasoline rationing.
The last entirely new petroleum refinery in the United States opened in 1976. The number of
refineries in operation has steadily declined since then as refining capacity has become
concentrated in ever larger refineries. A quarter of U.S. capacity is concentrated in 11 refineries
with capacities exceeding 300,000 bpd. The largest, Shell/Motiva’s Baytown, TX, refinery, was
recently expanded to 600,000 bpd. Operable U.S. refining capacity has actually increased from
16.5 million to nearly 18 million bpd over the last decade. Refineries representing approximately
75% of domestic capacity (13.3 million bpd) have the ability to process heavy crude oils, but
many smaller refineries can process only light to intermediate crude oil.
Each refinery depends upon a certain grade or blend of crude oils to operate efficiently,
depending upon its custom-designed processing equipment. A refinery designed to run light crude
oil could not switch to heavy crude oil without adding a coking unit, for example. However some
refineries that process heavy sour crude could switch to lighter sweet crude by bypassing their
coking units, if the economics of doing so are favorable. Until quite recently, the supply of light
sweet crude oil was diminishing, but newly available light sweet crudes from North Dakota’s
Bakken formation are changing refining dynamics in some regions of the United States,
especially as refineries seek supplies that cannot be delivered economically by tanker ships or
pipelines.
Traditionally, pipelines and oceangoing tankers have delivered the vast majority of crude to U.S.
refineries, accounting for approximately 93% of total receipts (in barrels) in 2012. Although other
modes of transportation—rail, barge, and truck—have accounted for a relatively minor portion of
Congressional Research Service
3

U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
crude oil shipments, volumes have been rising very rapidly. The volume of crude oil carried by
rail increased 423% between 2011 and 2012, and the volume moving by barge, on inland
waterways as well as along intracoastal routes, increased by 53%. The volume of crude oil
shipped by truck rose 38% between 2011 and 2012. Figure 2 shows the change in transportation
by mode between 2008 and 2012.
Figure 2. U.S. Refinery Receipts of Crude Oil by Mode of Transportation
Source: Prepared by CRS; data from EIA, Refinery Capacity Report, Table 9, June 2013.
Notes: Some shipments may involve multiple modes, such as rail to barge. This figure indicates only the mode
used for the last leg of such shipments.
Rail is a relatively high-cost method of transporting oil. Although crude oil transportation costs
are typically not a major driver of refiner profitability, refiners are typically wary of incurring any
costs that are higher than those faced by their competitors, as all refined petroleum products sold
in a region tend to command the same price independent of the refinery that produced them.
The Economics of Oil by Rail
In the short run, rapid expansion of oil production in the Bakken—production volumes increased
nearly ten-fold between 2005 and 201312—strained the capacity of existing pipelines and of
refiners able to process the oil. Finding ready buyers was difficult, resulting in discounted prices
compared to other crude oil traded in the U.S. market. With Bakken crude selling for
approximately $4 to $28 per barrel less than West Texas Intermediate (WTI) crude, the U.S.
reference price for crude grade, refiners found it profitable to utilize the North Dakota oil
delivered by rail even though the rail transportation cost is perhaps $5 to $10 per barrel higher
than pipeline costs.
Rail has also been critical to development of Canadian oil sands. Although the vast majority of
crude oil imports from Canada are delivered via existing pipeline, imports by rail are estimated to
have increased from 1.6 million barrels in 2011 to 40 million barrels in 2013. Construction of the
12 Energy Information Administration crude oil production data, by state, available at http://www.eia.doe.gov.
Congressional Research Service
4
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
proposed Keystone XL pipeline could move a significant proportion of these shipments off the
rails, as pipeline transportation is likely to cost less per barrel.13
For certain refiners, the economics of using rail to transport Bakken oil supplies are even more
attractive. In 2012, several refineries in the Philadelphia area were scheduled for closure. The
refineries were using imported crudes, largely sourced from West Africa, which sold at a premium
to WTI,14 making their refined products, notably gasoline, uncompetitive against similar products
produced by Gulf Coast refineries that used cheaper heavy crudes. By using supplies from the
Bakken, these refineries have lowered their costs and have become more competitive. New
owners are now investing in the refineries, including installation of high-speed rail unloaders that
would allow them to use 230,000 barrels per day of Bakken crude oil by early 2014.15 These
innovations would also reduce the cost of rail transportation per barrel.
The attractiveness of rail transportation of oil may be temporary. Transporting Bakken crude by
rail became cost-effective because of the price discounts created by pipeline bottlenecks. If
additional oil pipeline capacity were constructed, say from North Dakota to the East Coast
market, refiners would likely prefer lower-cost pipeline transportation. And if the refineries could
obtain Bakken crude by pipeline, demand would increase, likely reducing or eliminating the
current price discount. Without the price discount, Bakken oil would not be competitive in
refining when transported by rail. On the other hand, a rising Bakken crude oil price would likely
lead to greater drilling activity in the Bakken fields. Given the uncertainty about the future value
of the oil and the longevity of the deposits, it is not certain that investors will undertake
construction of pipelines from the Bakken fields to the East Coast. In that case, large volumes of
crude could be transported by rail well into the future.
Railroads are a viable alternative to pipeline transportation largely because they offer greater
flexibility. The nation’s railroad network is more geographically extensive than the oil pipeline
network, and better able to ship crude oil from new areas of production to North American
refineries. While there are about 57,000 miles of crude oil pipeline in the United States, there are
nearly 140,000 miles of railroad.16
13 For more information about the Keystone XL pipeline, see CRS Report R41668, Keystone XL Pipeline Project: Key
Issues, by Paul W. Parfomak et al.
14 Energy Information Administration price data available at http://www.eia.doe.gov.
15 Matthew Phillips, “North Dakota’s Bakken Oil Finally Hits the East Coast,” Bloomberg Businessweek, February 6,
2013.
16 Pipeline data from PHMSA, railroad mileage from Association of American Railroads (includes shortline rail
mileage, does not include parallel trackage).
Congressional Research Service
5
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
The U.S. Railroad Industry in Brief
The U.S. rail network comprises seven large (Class I) railroads, which focus on moving products between North
American regions. These railroads generally market to large volume, long-distance shippers. There are also roughly
500 “shortline” (Class II or III) railroads that sometimes serve as the first or final leg of a Class I rail shipment.
Shortlines were often spun-off from Class I railroads because of insufficient business over the line. Class I railroads
account for about 70% of system mileage, 90% of railroad employees, and about 95% of freight railroad revenue. Since
crude oil movements involve non-traditional rail origins (drilling sites) and destinations (refineries), shortlines are
often involved in these movements.
Railroad track is categorized into classes that determine the allowable speeds over the track.17 Most track with the
lowest speed limits is the property of shortlines. If track needs maintenance work, a railroad wil issue a “slow order”
on that section of track, reducing train speeds. Class I railroads have transitioned to using bigger and heavier cars,
raising the maximum weight on many track sections from 263,000 lbs. to 286,000 lbs. Shortline railroads that
interchange traffic with Class I railroads have had to improve their roadbeds to accommodate the heavier cars.
The railroad industry, since 1980, is mostly economically deregulated. The Surface Transportation Board can review
the reasonableness of railroad rates and service in situations where the railroad is determined to have “market
dominance,” generally where a shipper is served by only one railroad and cannot ship economically by other means.
As “common carriers,” railroads are required to provide rail service upon reasonable request. Railroads do not
require a special federal permit to transport crude oil. Federal railroad law preempts state and local authority, which
is generally restricted to a state or local government’s “police powers.”
The geographic flexibility of the railroad network compared to the oil pipeline network can be
especially beneficial for a domestic market in flux. Railroads can increase capacity relatively
cheaply and quickly by upgrading tracks and roadbeds to accommodate higher train speeds,
building passing sidings or parallel tracks, increasing the frequency of switchovers from one track
to the other, and upgrading signal systems to reduce the headway needed between trains.
Although railroads need approval from the federal Surface Transportation Board (STB) to build
new lines, they do not require STB approval to make improvements to existing lines. And even
without capacity improvements, railroads can offer routings not served by pipelines.
A significant fall-off in railroad coal movements has increased railroads’ capacity to transport oil
over some routes. In 2013, railroads carried about 395,000 more tank cars of crude than in 2005,
but about 1.3 million fewer cars of coal. To put the increase in crude traffic in perspective, crude
oil represented less than 1% of total rail carloads in 2012. In the first three quarters of 2013, crude
carloads increased to 1.4% of total rail car loadings. While, on a national scale, increased rail car
loadings of crude oil represent a relatively small percentage of total traffic, significant increases
in traffic in a specific area can cause bottlenecks that can reverberate across the entire rail
network. The STB held a hearing in April 2014 to hear complaints from non-oil shippers
concerning poor rail service in the upper Midwest due to oil traffic and the severe winter
weather.18 The STB ordered BNSF and CP railroads to report how they intended to ensure
delivery of fertilizer to farmers in spring 2014. At the hearing, BNSF (the railroad most directly
serving the Bakken region) noted that its car loadings in North Dakota had more than doubled
from 2009 to 2013, and that in October 2013, crude oil and agricultural car loadings surged by
more than it could manage. Past experience has shown that railroad bottlenecks are not quickly
resolved.
This experience illustrates that pipelines can generally provide more reliable service than
railroads. Among other differences, rail shipments are more affected by weather. In addition,
17 See 49 C.F.R. §213.9.
18 STB, Docket no. EP 724, April 10, 2004.
Congressional Research Service
6
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
railroads generally experience peak demand during the fall due to the grain harvest and retailers’
holiday shipments. This may cause locomotives and track capacity to be in shorter supply at
certain times of the year.
Railroad transport reportedly costs in the neighborhood of $10 to $15 per barrel compared with
$5 per barrel for pipeline. In return, railroads offer oil producers certain advantages. Heated
railroad tank cars improve the viscosity of oil sands crude so that less diluent needs to be added
than if the product were being moved by pipeline. Generally, railroads are more willing to enter
into shorter-term contracts with shippers than pipelines (1 to 2 years versus 10 to 15 years),
offering more flexibility in a rapidly changing oil market. Moving oil by train from North Dakota
to the Gulf Coast or Atlantic Coast requires about 5 to 7 days’ transit, versus about 40 days for oil
moving by pipeline, reducing producers’ need for working capital to cover the cost of oil in
transit.19
Crude oil often moves by unit train, a train that carries just one type of cargo in a single type of
car and serving a single destination. Unit trains do not need to be switched or shunted in rail
yards, saving time and reducing costs, and return to their point of origin as soon as they have been
unloaded. A train consisting of 70 to 120 tank cars can carry in the neighborhood of 50,000 to
90,000 barrels of oil, depending on the type of crude.
One hindrance to the expansion of crude-by-rail has been the lack of tank cars and loading and
unloading infrastructure. Much of this investment is being made by the oil industry or by rail
equipment leasing companies, not railroads. As of April 2014, manufacturers had 50,000 crude oil
tank cars on order, on top of an existing fleet of 43,000. (This is in addition to 30,000 tank cars
that carry ethanol and 27,000 that carry other flammable liquids.) In 2013, over 28,000 tank cars
of all types were built, up from over 17,000 in 2012.20 Facilities for building tank cars are unique
because the process involves baking the entire car in an oven. One manufacturer believes the tank
car builders are capable of increasing production each year by 7,000 to 10,000 cars.
Rail terminal capacity is expected to increase fourfold from 2012 to 2015.21 Matching the daily
throughput volume of a pipeline requires several trains per day, with each train taking 13 to 24
hours to unload; oil rail terminals therefore require large areas for parallel loop tracks where
multiple trains can await unloading.
The Role of Barges and Ships in Domestic Crude Transportation
Many refineries traditionally have received crude from overseas and thus are located near the
coastline with access to dock facilities. Some are not equipped to receive crude by rail. Hence,
some railroads are transferring oil to barges for the last leg of the trip to refineries. Locations
where railroads transfer crude oil to barges include St. Louis and Hayti, MO; Osceola, AR;
Hennepin, IL; Albany, NY; Yorktown, VA; and Anacortes and Vancouver, WA. In addition, crude
produced at Eagle Ford, TX, which is located near ports, is being moved along the coast by either
barge or ship.
19 BB&T Capital Markets, “Examining The Crude By Barge Opportunity,” June 10, 2013, p. 15.
20 Tank car numbers from presentations by panel on tank car safety (panel 1), NTSB forum, Rail Safety: Transportation
of Crude Oil and Ethanol, April 22-23, 2014.
21 E. Russell Braziel, RBN Energy Inc. presentation at CSIS conference, North American Oil and Gas Infrastructure,
Shale Changes Everything,” November 14, 2013.
Congressional Research Service
7
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
One river barge can hold 10,000 to 30,000 barrels of oil. Two to three river barges are typically
tied together in a single tow that carries 20,000 to 90,000 barrels, about the same load as a unit
train. Coastal tank barges designed for open seas, known as articulated tug-barges, or ATBs,22 can
hold 50,000 to 185,000 barrels, although newer ATBs can carry as much as 340,000 barrels,
comparable to the capacity of coastal tankers. ATBs are slower, less fuel-efficient, and more
restricted by sea conditions, but nevertheless may have an economic advantage over tankers
because Coast Guard crewing regulations allow them to sail with one-third to half the crew
required on a tanker. Crude oil tankers used to move Alaska oil to West Coast refineries have
capacities of 800,000 to over 1 million barrels.
An advantage of tankers over railroads is the greater amount of oil they can carry in a single
voyage, which better matches the daily consumption rate of refineries. With the median capacity
for U.S. refineries at about 160,000 barrels per day, a coastal tanker can carry a two-day supply of
oil. In addition, while railroads must build and maintain tracks and pay property taxes on their
rights-of-way, the ocean is free, and harbor channels are largely provided by the federal
government. For these reasons, tankers can be much cheaper than railroads in moving oil, even
though the railroad route may be much more direct. For instance, the distance between the
Bakken region in North Dakota and refineries in the Northeast is approximately 1,800 miles, and
the cost of railroad transport is $14 per barrel.23 The distance from Texas ports near the Eagle
Ford region to the same refineries is about 2,100 miles, and tanker rates are $5 to $6 per barrel.24
Similarly, the overland distance from the Eagle Ford region to Los Angeles-area refineries is
about 1,400 miles, and the estimated cost of railroad transport is $15 per barrel, while the water
route through the Panama Canal is 5,200 miles and is estimated to cost $10 per barrel.25
Although seemingly a circuitous route compared to rail, it is not inconceivable that tankers could
play a role in moving Bakken oil to East or West Coast refineries. Significant amounts of Bakken
oil are moved to Gulf Coast terminals by pipeline, railroad, barge, or combinations of these
modes for refining within that region. From a Gulf Coast port, tankers could transport the oil to
either East or West Coast refineries. Via existing rail and pipeline connections to Great Lakes
ports, tankers could also move Bakken oil from there to Northeast refineries. However, the
economic viability of these routes, in particular, and routes involving domestic coastal transport
in general, is heavily influenced by the Jones Act.26
22 The bow of the tug fits into a notch in the stern of the barge and the tug is hinged to the barge on both sides of its
hull, allowing fore and aft (pitch) movement, such as over sea swells.
23 Platts, Oilgram Price Report, January through April 2014 issues. Railroad distance approximated using Rand
McNally Road Atlas.
24 Platts, Oilgram News, September 9, 2013; Bloomberg Businessweek, “U.S. Law Restricting Foreign Ships Leads to
Higher Gas Prices,” December 12, 2013. The sailing distance is 1,900 nautical miles (one nautical mile equals 1.151
statute miles); National Oceanic and Atmospheric Administration, Distances Between United States Ports, 2012.
25 En*Vantage, Inc., “The Surge in U.S. Crude Oil Production,” Presentation to PFAA 20th Annual Conference,
October 24, 2013; Bloomberg, “Texas Vies with Saudi Arabian Oil in California Shipments,” January 29, 2014. When
expansion of the locks through the Panama Canal is completed in 2015, the capacity of tankers able to pass through
will increase from 380,000 barrels to 600,000 barrels.
26 Grain and feed producers in the upper Midwest contend that while they can move product economically by barge to
New Orleans or by rail to a Great Lakes port, from there, because of the Jones Act, they have no economic access to
dry bulk ships that could deliver the feed to eastern North Carolina hog and poultry farms. These farms import their
feed from Canada and South America.
Congressional Research Service
8
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
The Jones Act
The Jones Act may have a profound impact on where crude oil is sourced and how it is
transported. The Jones Act requires that vessels transporting cargo between two U.S. points be
built in the United States, as well as crewed and at least 75% owned by U.S. citizens.27 The
domestic build requirement for tanker ships, in particular, has been identified as contributing to
higher costs in moving domestic crude oil along the coasts.28 Domestically built tankers are about
four times the price of foreign-built tankers,29 and there is limited capacity in U.S. shipyards to
build them. Much of the existing crude oil tanker fleet was built since 2000 to meet Oil Pollution
Act of 1990 (P.L. 101-380) requirements that tankers calling at U.S. ports have double hulls. Two
crude carriers are expected to be delivered in 2014 to replace two vessels in Alaska trade.
As of June 2013, the Jones Act-eligible fleet of crude oil tankers consisted of 10 ships, all
employed in moving Alaska crude oil to the U.S. West Coast or to a refinery in Alaska.30 Since
annual Alaska oil production has fallen by about 46% over the last decade, the Jones Act crude oil
fleet has been in decline. About 30 Jones Act-eligible tankers carry chemicals or refined
petroleum products, such as gasoline or jet fuel, but these ships do not readily alternate between
carrying dirty oil (crude oil, residual fuel oil, asphalt) and refined (clean) petroleum products
because the tanks would have to be extensively washed after carrying dirty product, a time-
consuming and costly process. Some product vessels have fundamentally different designs from
crude carriers and would require a layup in a shipyard to be converted to move crude oil.
Phillips 66 has chartered two Jones Act tankers to move crude oil from Eagle Ford, TX, to a
refinery in Linden, NJ (in proximity to New York Harbor).31 Phillips 66 has stated that if more
Jones Act-eligible tankers were available, it would like to receive 100,000 barrels a day of Eagle
Ford oil at this refinery (it would need several tankers to accomplish this, the exact number
depending on the size of the tankers).32 EIA data (which specify oil movement only between
regions, not to individual refineries) indicate that over 13 months from January 2013 to the end of
January 2014, an average of 22,000 barrels a day of Texas oil (8.5 million barrels total) were
shipped by vessel to all U.S. Northeast refineries.33 Meanwhile, over the same 13 months, twice
as much Texas oil (17.1 million barrels) was shipped to refineries in eastern Canada, in foreign-
flag tankers. The oil shipments from Texas to Canada cost approximately $2 per barrel, compared
with $5 to $6 per barrel for shipments from Texas to U.S. Northeast refineries in Jones Act-
qualified tankers. The cost difference for a 300,000-barrel tanker amounts to around $1 million,
meaning that a Texas oil producer receives $1 million less for its oil when shipping to U.S.
Northeast refineries than when shipping to Canadian refineries.34 The Bayway refinery also
27 The law is codified at chapters 81, 121, and 551 of Title 46, United States Code.
28 See for instance, “Oil and the Ghost of 1920,” Wall Street Journal, September 13, 2012; Senate Committee on
Energy and Natural Resources, Testimony of Faisel Khan, Managing Director, Integrated Oil and Gas Research,
Citigroup. Hearing to Explore the Effects of Ongoing Changes in Domestic Oil Production, Refining and Distribution
on U.S. Gasoline and Fuel Prices, July 16, 2013.
29 U.S. Maritime Administration, Title XI Ship Financing Guarantees, Pending and Approved Loan Applications;
American Petroleum Tankers S-1 SEC Filing; RS Platou Economic Research, annual and monthly reports; press
releases from Teekay Tankers, Scorpio Tankers, and Euronav.
30 U.S. Maritime Administration, U.S. Flag Privately Owned Merchant Fleet, Oceangoing Self-propelled Vessels.
31 “Phillips 66 Charters Tankers To Bring Shale Oil To Bayway,” Argus Media, December 13, 2012.
32 Phillips 66 presentation at Bank of America Merrill Lynch Refining Conference, March 6, 2014.
33 U.S. Northeast refineries are clustered around New York Harbor and the Delaware River.
34 This situation is somewhat similar to the Pacific Northwest lumber industry in the 1960s and 1970s, which asserted it
(continued...)
Congressional Research Service
9
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
receives 50,000 barrels of Bakken oil per day by rail, and is finishing construction of a rail
unloading terminal with capacity of 75,000 barrels per day. The refinery has a capacity of
238,000 barrels per day. Its remaining sources of oil may be offshore oil from eastern Canada
(with shipping rates fluctuating around $1.20 per barrel) and Nigeria (with shipping rates around
$1.60 per barrel), as EIA data indicate these were the top two sources of foreign oil for Northeast
refineries in 2013.35
The Role of Tank Trucks
Tank trucks operating on U.S. roadways have been an important link in moving crude oil from
domestic drilling sites to pipelines and rail terminals. A typical tank truck can hold 200 to 250
barrels of crude oil. Trucks readily serve the need for gathering product, as the hydraulic
fracturing method of drilling employed in tight oil production involves multiple drilling sites in
an area and the location of active wells is constantly in flux. A large volume of crude oil is being
transported by truck between production areas and refineries in Texas because of the close
proximity of the two.
Oil Spill Concerns
Each mode of oil transportation—pipelines, vessels, rail, and tanker trucks—involves some risk
of oil spills. Over the period 1996-2007, railroads consistently spilled less crude oil per ton-mile
than trucks or pipelines. Barges and domestic tanker ships have much lower spillage rates than
trains (Figure 3). However, the data in Figure 3 precede the recent dramatic increase in oil
transportation by rail.
(...continued)
could not compete with western Canadian lumber because the Canadians could ship at lower international freight rates
to the U.S. East Coast. Washington and Oregon still load significant amounts of wood products on ships, but they all
sail to foreign destinations.
35 Shipping rates from Platts, Oilgram Price Report, January through April 2014 issues.
Congressional Research Service
10
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Figure 3. Oil Spill Volume per Billion-Ton-Miles
Crude Oil and Petroleum Products during Domestic Transportation
350
iles 300
-M
n
-To 250
n
illio 200
r B
Pe 150
d
ille
p 100
S
ls
50
arre
B
-
1990-1995
1996-2001
2002-2007
Pipelines
Tank Vessels/Barges
Tanker Trucks
Rail
Sources: Prepared by CRS; oil spill volume data from Dagmar Etkin, Analysis of U.S. Oil Spillage, API Publication
356, August 2009; ton-mile data from Association of Oil Pipelines, Report on Shifts in Petroleum Transportation:
1990-2009, February 2012.
Notes: Pipelines include onshore and offshore pipelines. The time periods were chosen based on the available
annual data for both spill volume and ton-miles. The values for each time period are averages of annual data for
each six-year period.
Given the comparatively small capacity of a rail tank car, around 700 barrels, the total amount
spilled from even a major derailment is likely to be small compared to the 260,000 barrels
discharged in the 1989 grounding of the Exxon Valdez in Prince William Sound, AK, or the
approximately 40,000 barrels discharged in the largest U.S. pipeline oil spill CRS can document,
which occurred in 1991 near Grand Rapids, MN.36 Nonetheless, spill volume is arguably a
relatively unimportant factor in terms of impacts and cleanup costs. Location matters more: a
major spill away from shore will likely cost considerably less to abate than a minor spill in a
populated location or sensitive ecosystem. Depending on timing and location, even a small spill
can cause significant harm to individual organisms and entire populations.37
Although spillage per ton-mile of oil transported by rail declined over time, a recent series of
major accidents (see the text box) has heightened concern about the risks involved in shipping
crude by rail.
36 Sources consulted include NOAA, Oil Spill Case Histories, 1967-1991, Summaries of Significant U.S. and
International Spills, 1992; U.S. Coast Guard, Notable Spills in U.S. Waters, Calendar Years 1989-2008, 2009; Dagmar
Etkin, Analysis of U.S. Oil Spillage, API Publication 356, August 2009; NOAA, Incident News, at
http://incidentnews.gov; EPA, Enforcement and Compliance History Online (ECHO), at http://www.epa-echo.gov/
echo/index.html.
37 National Research Council, Oil in the Sea III: Inputs, Fates, and Effects (Washington, DC: National Academies of
Science, February 2003).
Congressional Research Service
11
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Oil by Rail Derailments in 2013 and 2014
Lac Mégantic, Quebec—On July 5, 2013, a train with 72 loaded tank cars of crude oil from North Dakota moving
from Montreal, Quebec, to St. John, New Brunswick, stopped at Nantes, Quebec, at 11:00 pm. The operator and sole
railroad employee aboard the train secured it and departed, leaving the train on shortline track with a descending
grade of about 1.2%. At about 1:00 AM, it appears the train began rolling down the descending grade toward the
town of Lac-Mégantic, about 30 miles from the U.S. border. Near the center of town, 63 tank cars derailed, resulting
in multiple explosions and subsequent fires. There were 47 fatalities and extensive damage to the town. 2,000 people
were evacuated. The initial determination was that the braking force applied to the train was insufficient to hold it on
the 1.2% grade and that the crude oil released was more volatile than expected.
Gainford, Alberta—On October 19, 2013, nine tank cars of propane and four tank cars of crude oil from Canada
derailed as a Canadian National train was entering a siding at 22 miles per hour. About 100 residents were evacuated.
Three of the propane cars burned, but the tank cars carrying oil were pushed away and did not burn. No one was
injured or killed. The cause of the derailment is under investigation.
Aliceville, Alabama—On November 8, 2013, a train hauling 90 cars of crude oil from North Dakota to a refinery
near Mobile, AL, derailed on a section of track through a wetland near Aliceville, AL. Thirty tank cars derailed and
some dozen of these burned. No one was injured or killed. The derailment occurred on a shortline railroad’s track
that had been inspected a few days earlier. The train was travelling under the speed limit for this track. The cause of
the derailment is under investigation.
Casselton, North Dakota—On December 30, 2013, an eastbound BNSF Railway train hauling 106 tank cars of
crude oil struck a westbound train carrying grain that shortly before had derailed onto the eastbound track. Some 34
cars from both trains derailed, including 20 cars carrying crude, which exploded and burned for over 24 hours. About
1,400 residents of Casselton were evacuated but no injuries were reported. The cause of the derailments and
subsequent fire is under investigation.
Plaster Rock, New Brunswick—On January 7, 2014, 17 cars of a mixed train hauling crude oil, propane, and other
goods derailed likely due to a sudden wheel or axle failure. Five tank cars carrying crude oil caught fire and exploded.
The train reportedly was delivering crude from Manitoba and Alberta to the Irving Oil refinery in Saint John, New
Brunswick. About 45 homes were evacuated but no injuries were reported.
Philadelphia, Pennsylvania—On January 20, 2014, 7 cars of a 101-car CSX train, including 6 carrying crude oil,
derailed on a bridge over the Schuylkill River. No injuries and no leakage were reported, but press photographs
showed two cars, one a tanker, leaning over the river.
Vandergrift, Pennsylvania—On February 13, 2014, 21 tank cars of a 120-car train derailed outside Pittsburgh.
Nineteen of the derailed cars were carrying crude oil from western Canada, and four of them released product.
There was no fire or injuries.
Lynchburg, Virginia—On April 30, 2014, 15 cars in a crude oil train derailed in the downtown area of this city.
Three cars caught fire, and some cars derailed into a river along the tracks. The immediate area surrounding the
derailment was evacuated. No injuries were reported.
In March and April 2013, there were two derailments of Canadian Pacific trains, one in western Minnesota and the
other in Ontario, Canada; less than a tank car of oil leaked in each derailment and neither incident caused a fire.
The increasing deployment of unit trains changes the risks involved in shipping oil by rail in two
ways. Unit trains of crude oil concentrate a large amount of potentially environmentally harmful
and flammable material, increasing the probability that, should an accident occur, large fires and
explosions could result. This risk is similar to that of unit trains carrying ethanol, and maybe
greater than that of mixed freight trains in which various hazardous materials, such as explosives
and toxic-by-inhalation materials, are sequenced among other cars according to federal
regulations.38 On the other hand, while unit trains concentrate a voluminous quantity of
potentially dangerous material, they may offer safety benefits from avoiding the decoupling and
38 These requirements are codified at 49 CFR §174.85.
Congressional Research Service
12
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
re-coupling of cars in rail yards, which involve high-impact forces and introduce opportunity for
human error.
Special Concerns About Canadian Dilbit
Oil companies generate substantial quantities of crude oil and related substances from the natural
bitumen in oil sands, particularly deposits in Alberta, Canada. In 2012, the United States imported
438 million barrels of oil sands-derived crude oils, 125% more than in 2005.39 Because bitumen is
highly viscous, it is transported mostly in the form of diluted bitumen, or dilbit, containing naptha
or other materials that make it flow more easily.
Some commenters have argued that due to its physical characteristics, dilbit presents greater risks
of oil spills than conventional crude, with potentially greater impacts to the environment.40 Other
stakeholders and organizations have questioned these conclusions.41 A study released by the
National Research Council in 2013, conducted at the direction of Congress,42 found that the
characteristics of dilbit do not increase the likelihood of spills.43 The extent to which these
findings are applicable to rail transport of crude is open to debate, as rail tanker cars may have
different operating parameters (e.g., temperature) and physical standards (e.g., wall thickness), or
may transport different forms of oil sands-derived crude oil, decreasing the relevance of the NRC
findings.
However, observations in the aftermath of a 2010 pipeline spill are consistent with the assertion
that dilbit may pose different hazards, and possibly different risks, than other forms of crude oil.
On July 26, 2010, a pipeline owned by Enbridge Inc. released approximately 850,000 gallons of
dilbit into Talmadge Creek, a waterway that flows into the Kalamazoo River in Michigan.44 Three
years after the spill, response activities continued,45 because, according to EPA, the oil sands
crude “will not appreciably biodegrade.”46 The dilbit sank to the river bottom, where it mixed
with sediment, and EPA has ordered Enbridge to dredge the river to remove the oiled sediment.47
As a result of this order, Enbridge estimated in September 2013 its response costs would be
approximately $1.035 billion,48 which is substantially higher than the average cost of cleaning up
a similar amount of conventional oil.49
39 Data from Canada's National Energy Board. See also CRS Report R43128, Oil Sands and the Oil Spill Liability Trust
Fund: The Definition of "Oil" and Related Issues for Congress, by Jonathan L. Ramseur.
40 The primary vehicle for these arguments was a 2011 report from several environmental groups. See Anthony Swift et
al., Tar Sands Pipelines Safety Risks, Joint Report by Natural Resources Defense Council, National Wildlife
Federation, Pipeline Safety Trust, and Sierra Club, February 2011.
41 See, e.g., Crude Quality Inc., Report regarding the U.S. Department of State Supplementary Draft Environmental
Impact Statement, May 2011; and Energy Resources Conservation Board, Press Release, “ERCB Addresses Statements
in Natural Resources Defense Council Pipeline Safety Report,” February 2011.
42 P.L. 112-90, §16.
43 National Research Council, Effects of Diluted Bitumen on Crude Oil Transmission Pipelines, 2013.
44 National Transportation Safety Board, Accident Report: Enbridge Incorporated Hazardous Liquid Pipeline Rupture
and Release- Marshall, Michigan, July 25, 2010, July 2012, at http://www.ntsb.gov/.
45 For more up-to-date information, see EPA’s Enbridge oil spill website at http://www.epa.gov/enbridgespill/
index.html.
46 Letter from Cynthia Giles, Environmental Protection Agency, to U.S. Department of State, April 22, 2013.
47 EPA Removal Order, March 14, 2013, at http://www.epa.gov/enbridgespill/ar/enbridge-AR-1720.pdf.
48 See Enbridge Inc., Third Quarter Financial Report, 2013, at http://enbridge.com/InvestorRelations/
(continued...)
Congressional Research Service
13
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Special Concerns About Bakken Crude
The properties of Bakken shale oil are highly variable, even within the same oil field. In general,
however, Bakken crude oil is much more volatile than other types of crude.50 Its higher volatility
may have important safety implications.
In January 2014, the Pipeline and Hazardous Materials Safety Administration (PHMSA) within
the U.S. Department of Transportation (DOT) issued a safety alert warning that recent
derailments and resulting fires indicate that crude oil being transported from the Bakken region
may be more flammable than traditional heavy crude oil.51 PHMSA, whose rules are enforced by
the Federal Railroad Administration with respect to railroads, reinforced the requirement to
properly test, characterize, classify, and where appropriate sufficiently degasify hazardous
materials prior to and during transportation. Under its initiative “Operation Classification,”
PHMSA is to continue to collect samples and measure the characteristics of Bakken crude as well
as oil from other locations.
Federal Oversight of Oil Transport by Rail
The Federal Railroad Administration (FRA) has jurisdiction over railroad safety. It has about 400
federal inspectors throughout the country and also utilizes state railroad safety inspectors. State
inspectors predominantly enforce federal requirements because federal rail safety law preempts
state law, and federal law is pervasive. The FRA uses past incident data to determine where its
inspection activity should be targeted, although the FRA Administrator stated that in light of the
growth of crude-by-rail transportation, the agency also must look for “pockets of risk.”52 FRA
regulations cover the safety of track, grade crossings, rail equipment, operating practices, and
movement of hazardous materials (hazmat). The Pipeline and Hazardous Materials Safety
Administration within DOT (PHMSA) issues requirements for the safe transport of hazmat by all
modes of transportation, which the FRA enforces with respect to railroads.53
Rail incidents are investigated by the National Transportation Safety Board (NTSB), an
independent federal agency. The NTSB makes recommendations toward preventing future
incidents based on its findings.54 Unlike the FRA, the NTSB is not required to weigh the costs
(...continued)
FinancialInformation/InvestorDocumentsandFilings.aspx.
49 Based on cost estimates prepared in 2004. See Dagmar Etkin, Modeling Oil Spill Response and Damages Costs,
Proceedings of the 5th Biennial Freshwater Spills Symposium, 2004, at http://www.environmental-research.com.
50 Bryden, K. J., Grace Catalysts Technologies, Columbia, Maryland; Habib Jr., E. T., Grace Catalysts Technologies,
Columbia, Maryland; Topete, O. A., Grace Catalysts Technologies, Houston, Texas, Processing shale oils in FCC:
Challenges and opportunities 09.01.2013 http://www.hydrocarbonprocessing.com/Article/3250397/Processing-shale-
oils-in-FCC-Challenges-and-opportunities.html.
51 Pipeline and Hazardous Materials Safety Administration, Safety Alert—January 2, 2014, Preliminary Guidance from
OPERATION CLASSIFICATION. This advisory is a follow-up to the PHMSA and Federal Railroad Administration
(FRA) joint safety advisory published November 20, 2013 [78 FR 69745].
52 FRA Administrator Szabo, Opening Remarks to RSAC Meeting, October. 31, 2013; http://www.fra.dot.gov/eLib/
Details/L04852.
53 FRA and PHMSA are agencies within DOT, which has the emergency authority to restrict or prohibit transportation
that poses a hazard of death, personal injury, or significant harm to the environment. See 49 U.S.C. §20104.
54 The NTSB held a forum on the safety of crude oil and ethanol transport by rail April 22 and 23, 2014;
(continued...)
Congressional Research Service
14
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
against the benefits when considering additional safety measures and it has no regulatory
authority. Many of the NTSB’s recommendations concerning oil transport by rail are identical to
those it previously issued for transporting ethanol by rail. While the FRA has largely agreed with
NTSB’s recommendations, its rulemaking process involves consultation with industry advisory
committees, and it must determine which of the many rail safety measures under evaluation
deserve priority. Implementing a change in FRA regulations can take years.
U.S. safety requirements apply to any train operating in the United States, regardless of its origin
or destination. Canadian safety regulations are very similar but do not exactly mirror U.S.
requirements. Cross-border shipments must meet the requirements of both countries. Safety
standards established by the rail industry, which often exceed government requirements, apply to
both U.S. and Canadian railroads.
When a rail incident results in the release of oil, state, territorial, or local officials are typically the
first government representatives to arrive at the scene and initiate immediate safety measures to
protect the public. The National Oil and Hazardous Substances Pollution Contingency Plan, often
referred to as the National Contingency Plan (NCP), indicates that state, territorial, or local
officials may be responsible for conducting evacuations of affected populations. These first
responders also may notify the National Response Center to elevate an incident for federal
involvement, at which point the coordinating framework of the NCP would be applied.
Unlike most federal emergency response plans, which are administrative mechanisms, the NCP is
codified in federal regulation and is binding and enforceable.55 The NCP regulations apply to
applicable spills from vessels, pipelines, onshore facilities, and offshore facilities. The definition
of “onshore facility” includes, but is not limited to “motor vehicles and rolling stock.”56
If an oil discharge affects navigable waterways, shorelines, or “natural resources belonging to,
appertaining to, or under the exclusive management authority of the United States,”57 Section 311
of the Clean Water Act, as amended by the Oil Pollution Act of 1990, Section 311(c), provides
explicit federal authority to respond.58 The term “discharge” is defined broadly and is not linked
to specific sources of oil. The President has the authority to perform cleanup immediately using
federal resources, monitor the response efforts of the spiller, or direct the spiller’s cleanup
activities.59 Several executive orders have delegated the President’s response authority to the
Environmental Protection Agency (EPA) within the “inland zone” and to the U.S. Coast Guard
(...continued)
http://www.ntsb.gov/news/events/2014/railsafetyforum/.
55 40 C.F.R. Part 112.
56 40 C.F.R. §300.5. This definition is also found in the Clean Water Act and OPA.
57 The Oil Pollution Act of 1990 expanded and clarified the President's authorities under Section 311 of the Clean
Water Act (33 U.S.C. §2701 et. seq.). For a more in-depth discussion of the Oil Pollution Act, see CRS Report
RL33705, Oil Spills in U.S. Coastal Waters: Background and Governance, by Jonathan L. Ramseur.
58 33 U.S.C. §1321. In addition, the Comprehensive Environmental Response, Compensation, and Liability Act
(CERCLA) of 1980 expanded the authorities of the President to respond to releases of hazardous substances into the
environment more broadly than CWA Section 311. See CRS Report R41039, Comprehensive Environmental Response,
Compensation, and Liability Act: A Summary of Superfund Cleanup Authorities and Related Provisions of the Act, by
David M. Bearden. For further details, see CRS Report R43251, Oil and Chemical Spills: Federal Emergency
Response Framework, by David M. Bearden and Jonathan L. Ramseur.
59 33 U.S.C. §1321(c).
Congressional Research Service
15
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
within the coastal zone, unless the two agencies agree otherwise.60 The lead federal agency serves
as the On-Scene Coordinator to direct the federal resources used in a federal response.
Regulations require that railroads have either a so-called “basic” response plan or a more
“comprehensive” response plan, depending on the volume capacity of the rail car transporting the
oil.61 Comprehensive plans are subject to FRA approval, and must ensure by contract or other
means that personnel and equipment are able to handle a worst-case discharge.62 However, the
regulatory threshold for the comprehensive response plan is a tank car holding more than 1,000
barrels, so does not apply to the DOT-111 tank cars used today, which hold around 700 barrels of
oil apiece. For these smaller tank cars, railroads must prepare only “basic” response plans, which
are not subject to FRA approval.
This threshold was established in 1996,63 before the advent of oil unit trains, each of which may
transport, in aggregate, approximately 70,000 barrels (almost 3 million gallons) of oil. The NTSB
recently recommended that the threshold for comprehensive plans be lowered to take into account
the use of unit trains.64
Issues for Congress
While oil by rail has demonstrated benefits with respect to the efficient movement of oil from
producing regions to market hubs, the dramatic increase in oil by rail shipments has generated
interest in several related issues. These include railroad safety,65 environmental concerns, and
trade-offs over rail versus pipeline development.
Railroad Safety and Incident Response
Prior to the Lac Mégantic derailment, the FRA had increased its inspection activity with regard to
trains carrying crude oil. After the derailment, the FRA and PHMSA (along with Transport
Canada) initiated a comprehensive review of safety requirements.66 Three areas of active
discussion involve tank car design, prevention of derailments, and railroad operations. Railroads
are an integrated system of fixed infrastructure, rolling equipment, and workers. Railroad safety
60 Executive Order 12777, “Implementation of Section 311 of the Federal Water Pollution Control Act of October 18,
1972, as amended, and the Oil Pollution Act of 1990,” 56 Federal Register 54757, October 22, 1991.
61 49 C.F.R. Part 130.
62 See 49 C.F.R. §130.31(a) with 49 C.F.R. §130.31(b).
63 61 Federal Register 30541 (June 17, 1996).
64 NTSB, Safety Recommendation R-14-4 through -6, directed to PHMSA, January 21, 2014.
65 U.S. Congress, House Committee on Transportation and Infrastructure, Subcommittee on Railroads, Pipelines, and
Hazardous Materials, Oversight of Passenger and Freight Rail Safety, 113th Cong., 2nd sess., February 26, 2014; U.S.
Congress, Senate Committee on Commerce, Science, and Transportation, Subcommittee on Surface Transportation and
Merchant Marine Infrastructure, Safety, and Security, Enhancing Our Rail Safety: Current Challenges for Passenger
and Freight Rail, 113th Cong., 2nd sess., March 6, 2014; U.S. Congress, Senate Committee on Appropriations,
Subcommittee on Transportation and Housing and Urban Development, and Related Agencies, Rail Safety, 113th
Cong., 2nd sess., April 9, 2014.
66 See FRA’s Emergency Order No. 28 (78 Federal Register 48218), the agencies’ Joint Safety Advisory published
August 7, 2013 (78 Federal Register 48224), referral of safety issues to FRA’s Railroad Safety Advisory Committee
(78 Federal Register 48931), and a NPRM related to rail hazmat (78 Federal Register 54849).
Congressional Research Service
16
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
experts note that improving safety performance requires recognition of the parameters and
interactive effects among these components, and thus approaching railroad safety as an
optimization problem is appropriate.67 For instance, each additional safety feature on tank cars
may increase their weight. This reduces the amount of product carried in each car due to track and
bridge weight limits, potentially requiring additional tank cars to carry the same amount of
product, and thus increasing the expected number of accidents.
In February 2014, the U.S. DOT reached an agreement with railroads under which they would
voluntarily take measures to improve the safety of oil trains.68 These measures include adding
braking power; reducing train speeds to 40 mph through urban areas starting July 1 for trains with
at least 20 tank cars of crude oil and at least one tank car of the older DOT-111 standard;
installing additional wayside wheel bearing detectors by July 1; and other actions. Some of the
measures the railroads agreed to are similar to those that the industry already takes for trains
carrying “toxic-by-inhalation” hazardous materials. Reducing train speed can reduce the number
of cars that derail, as well as the likelihood that product will be released from those tank cars.69
Tank Car Safety Design
The U.S. DOT establishes construction standards for tank cars.70 A tank car used for oil transport
is roughly 60 feet long, about 11 feet wide, and 16 feet high (see Figure 4). It weighs 80,000
pounds empty and 286,000 pounds when full. It can hold about 30,000 gallons or 715 barrels of
oil, depending on the oil’s density. The tank is made of steel plate, 7/16 of an inch thick (see 49
C.F.R. §179.201).71 An oil tank car is typically loaded from the top valve and unloaded from the
bottom valve. Loading or unloading each car may take several hours, but multiple cars in a train
can be loaded or unloaded simultaneously.
67 Xiang Liu, M. Rapik Saat, Christopher P.L. Barkan, Safety Effectiveness of Integrated Risk Reduction Strategies for
the Transportation of Hazardous Materials by Rail, paper presented at the Transportation Research Board, Annual
Meeting 2013, paper no. 13-1811.
68 AAR, “Freight Railroads Join U.S. Transportation Secretary Foxx in Announcing Industry Crude By Rail Safety
Initiative,” February 21, 2014.
69 Athaphon Kawprasert and Christopher P.L. Barkan, “Effect of Train Speed on Risk Analysis of Transporting
Hazardous Materials by Rail,” Transportation Research Record, No. 2159, 2010, pp. 59-68.
70 The tank cars used to transport crude oil fall under DOT specification 111. See 49 C.F.R. §179.
71 49 C.F.R. §179.201.
Congressional Research Service
17

U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Figure 4. Non-jacketed, Non-pressure Tank Car
In some incidents, oil has been released from tank cars because the coupler from a neighboring
car punctured the tank during derailment. Valves at the top and bottom of the cars have also been
sheared off or otherwise opened during derailment. Efforts to improve crashworthiness have
focused on reinforcing the shells of tank cars at both ends and/or along the sides with a “jacket”
of steel, adding protective head shields at both ends, modifying couplers to prevent decoupling,
adding skid protection or diversion shields to protruding valves and modifying pressure relief
valves, eliminating or modifying bottom valves so that handles break off rather than opening the
valve during derailment, and increasing insulation for fire protection.72
The FRA and PHMSA have questioned whether Bakken crude oil, given its characteristics, would
more properly be carried in tank cars that have additional safety features, such as those found on
pressurized tank cars used for hauling explosive liquids.73 The railroad industry established
additional standards in October 2011 for newly built cars that address some but not all of the
safety features that the FRA and PHMSA are considering.
Rail cars have an economic life of 30 to 40 years, so conversion of the fleet to a new car standard
could take some time. DOT has asked for further information on the costs and benefits of
retrofitting the existing fleet.74 In November 2013, the Association of American Railroads stated it
supports either retrofitting or phasing out oil tank cars built before October 2011 (a fleet of about
78,000 cars) and modifying those built after October 2011 (about 14,000 cars).75 Some Members
of Congress have urged DOT to expedite the rulemaking process concerning new tank car safety
requirements.76
72 For a discussion of NTSB’s recommendations concerning DOT-111 tank cars, in reference to the derailment of an
ethanol unit train in Cherry Valley, IL, see NTSB Safety Recommendation R-12-5 through -8, March 2, 2012.
73 Pressurized tank cars (DOT specification 105 and 112) have thicker shells and heads, metal jackets, strong protective
housings for top fittings, and no bottom valves.
74 78 FR 54849 - 54861, September 6, 2013.
75 For comments filed on this rulemaking see http://www.regulations.gov and search under docket no. PHMSA-2012-
0082.
76 See letter from Senator Schumer to PHMSA and FRA dated July 22, 2013 and news release by Senator Hoeven on
January 15, 2013 indicating that a DOT final rule on tank cars would not be issued until after January 2015.
Congressional Research Service
18
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
In February 2014, BNSF announced that it would purchase 5,000 tank cars with safety features
that surpass those specified in the October 2011 industry standard (shell thickness would be 9/16
of an inch thick, and they would be jacketed). In April 2014, Transport Canada announced that
the oldest DOT-111 tank cars (about 5,000 that lack bottom reinforcement) would no longer be
allowed for use in transporting dangerous goods, and the remaining fleet would either be phased
out or retrofitted within three years.77 Transport Canada expects to finalize regulations by the
summer of 2014. Reportedly, the U.S. DOT submitted its proposed regulations on tank car safety
design to the Office of Management and Budget for review at the end of April 2014.78 Final U.S.
regulations are expected in the summer of 2014, and expected to be in harmony with Canadian
regulations. Railroads, shippers, and tank car builders could issue their own standard, but they
have not reached agreement on all safety features to be required.
Preventing Derailments
An analysis of freight train derailments from 2001 to 2010 on Class I railroads’ mainline track
found that broken rails or track welds were the leading cause of derailments, by far.79 These
problems caused 670 derailments over the period, while the next leading problem (track geometry
defects) caused just over 300 derailments. Broken rails or welds also resulted in more severe
incidents, derailing an average of 13 railroad cars instead of 8.6 cars for all other causes. Broken
rails or welds accounted for 23% of total cars derailed. A separate study covering the same time
period found that track problems were the most important causes of derailments, followed by
problems with train equipment.80
In the Rail Safety Improvement Act of 2008 (P.L. 110-432, Section 403(a)), Congress requested
that the FRA study and consider revising the frequency and methods of track inspection. The FRA
conducted the study and on January 24, 2014 issued a final rule on improving rail integrity.81 The
new rule requires railroads to achieve a specified track failure rate rather than scheduling
inspections based on the calendar or traffic volume. It also allows railroads to maximize use of
rail inspection vehicle time by prioritizing remedial action when track defects are detected. While
the rule requires railroads to achieve a lower track failure rate for track that has higher speed
limits, or carries passengers or hazardous material, it does not require lower failure rates for track
travelling through populated areas or otherwise consider the affected area around the track in the
event of a derailment.82
The final rule states that it “codifies standard industry good practices,” and notes that railroads
“were already initiating and implementing the development of a performance-based risk
77 Transport Canada, “Addressing the safety of DOT-111 tank cars carrying dangerous goods,” April 23, 2014.
78 CQ News, “Oil Train Regulations Couldn’t Come Soon Enough For Some Railroads,” May 1, 2014.
79 T87.6 Task Force Summary Report, pp. 9-11; Xiang Liu, M. Rapik Saat, Christopher P.L. Barkan, “Analysis of
Causes of Major Train Derailment and Their Effect on Accident Rates,” Transportation Research Record, No. 2289,
2012, pp. 154-163.
80 Xiang Liu, M. Rapik Saat, Christopher P.L. Barkan, Safety Effectiveness of Integrated Risk Reduction Strategies for
the Transportation of Hazardous Materials by Rail, Paper presented at the Transportation Research Board, Annual
Meeting 2013, paper no. 13-1811.
81 79 Federal Register 4234, January 24, 2014.
82 This risk element has been studied by Xiang Liu, University of Illinois at Urbana-Champaign—RailTEC,
Presentation at Transportation Research Board Annual Meeting, Session 279, Broken Rail Prevention and Rail Flaw
Assessment, Washington, DC, January 13, 2014.
Congressional Research Service
19
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
management concept for determination of rail inspection frequency,” meaning that railroads
generally have been testing more frequently than required.83 Large railroads divide their network
into hundreds of segments, and determine inspection frequency for each segment based on past
inspection results, past history of undetected defects, track tonnage, climate (namely
temperature), signaling system (or absence) over segment, whether track carries toxic-by-
inhalation materials, and whether track is within 500 feet of a structure.84 They have vehicles to
detect defects within the steel of the rail, and others that detect defects in track geometry. From
1980 to 2012, railroads reduced the number of accidents releasing hazmat product per 100,000
hazmat carloads from 14 to 1.85
As part of the February 2014 agreement with DOT referenced above, railroads will perform one
additional internal-rail inspection each year than required by the FRA on routes over which trains
carrying 20 or more tank cars of crude oil travel, and will conduct at least two high-tech track
geometry inspections over these routes. Congress may want to look into research on track defect
detection technology, including the feasibility of installing equipment on locomotives to achieve
near-continuous rail testing.86
Shortline Track
It is often the case that a Class I railroad, prior to turning over the operation of a line to a
shortline, did not maintain it to the same standards as busier mainlines. Shippers using a shortline
often do not require higher-speed track because they ship infrequently or because the
commodities they ship are not time-sensitive. Thus, shortline track is frequently maintained at a
lower standard than Class I railroads’ track. The Lac Mégantic, Quebec, and Aliceville, AL, crude
oil derailments occurred on shortline track. Members of Congress have been concerned with
preserving shortline rail service, reflected in a federal loan program for track rehabilitation and
improvement and a tax credit for shortline track maintenance.87
Railroad Operations
A number of specific operational issues have been found relevant to railroad safety, in general, or
to oil by rail transportation specifically.
Terminal Operations
In September 2013, the FRA solicited public comment on whether current regulations concerning
transfer of crude oil from and to tank cars are adequate considering recent practices at transload
facilities. Its request for public comment asked for information about what entity controls trains
83 79 Federal Register 4234 and 4245, January 24, 2014.
84 Presentations of BNSF and UP Railroads, Transportation Research Board Annual Meeting, Washington, DC, January
13, 2014, Session 279, Broken Rail Prevention and Rail Flaw Assessment.
85 Christopher P.L. Barkan, M. Rapik Saat, and Francisco Gonzalez III et al., "Cooperative Research in Tank Car
Safety Design," TR News, vol. 286 (May-June 2013), pp. 12-19.
86 This topic was briefly discussed at the NTSB forum on rail safety cited above.
87 The Railroad Rehabilitation and Improvement Financing (RRIF) program and Section 45G of the tax code.
Congressional Research Service
20
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
on loop tracks at rail loading terminals and what procedures have been adopted to prevent
unintended movement during loading.88
Railroad Crew Size
Following the Lac Mégantic disaster, legislation (H.R. 3040) was introduced in Congress to
require two-person crews on all trains. In the United States, the FRA does not specify in
regulation how many persons must operate a train, but notes that the various tasks required while
a train is moving essentially necessitate at least a two-person crew. Most trains operate with an
engineer and a conductor, but some shortline railroads may operate trains with a single crew
member. The FRA has announced it intends to issue a proposed rule requiring two-person crews
while allowing for some exceptions.89 One potential trade-off is that distraction by a fellow crew
member has been found to be a factor in past accidents.90
Positive Train Control
Railroads are in the process of implementing positive train control (PTC), a system that is
designed to override human error in controlling the speed and movement of trains. Congress
required that this system be installed on routes carrying passengers or poison- or toxic-by-
inhalation hazardous materials (Section 104 of P.L. 110-432), a requirement that applies to about
60,000 miles of railroad. Current law does not require installation of PTC solely because a track
carries crude oil, but the law authorizes the FRA to expand the scope of tracks required to have
PTC. PTC is not required on track in or near rail yards. The cost and timeline for implementing
PTC are topics of current debate among policy makers and stakeholders.91
Route Selection
In the Implementing Recommendations of the 9/11 Commission Act of 2007 (P.L. 110-53,
Section 1551), Congress required railroads carrying certain kinds and quantities of potentially
dangerous commodities to assess the safest and most secure routes for trains carrying these
products and to minimize delays and storage for rail cars containing these products. These
requirements currently apply to explosive, toxic-by-inhalation, and radioactive material.92
Security regulations also require that rail cars containing these commodities not be left
unattended when being transferred from one carrier to another or between carrier and shipper.93
The law resulted from efforts by cities like Washington, DC, and Pittsburgh to ban trains carrying
hazardous materials.94 The FRA may consider whether this routing analysis should also apply to
88 “FRA/PHMSA Additional Questions for Public Comment,” Docket No. FRA-2013-0067-0016, 9/4/2013,
http://www.regulations.gov.
89 Press Release no. FRA-03-14, April 9, 2014.
90 NTSB, Collision of Two CN Freight Trains, Anding, Mississippi, July 10, 2005, Accident Report RAR-07/01, p. 31.
91 For further information, see CRS Report R42637, Positive Train Control (PTC): Overview and Policy Issues, by
John Frittelli.
92 See 49 C.F.R. §172.820; 73 Federal Register 72182, November 26, 2008.
93 See 49 C.F.R. §1580.107.
94 U.S. Rail News, June 11, 2008, pp. 1-2; “Hazmat Hazards: U.S. Cities may not wait for Washington Before Trying to
Reroute their own hazmat trains,” Journal of Commerce, December 12, 2005.
Congressional Research Service
21
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
unit trains of crude oil.95 As part of the February 2014 agreement with DOT mentioned above,
railroads agreed to perform this routing analysis for oil trains beginning July 1, 2014. Such a
requirement would be controversial because avoiding large urban areas can increase the length of
time such trains are in transit and because smaller towns and rural areas likely have less capability
to respond to emergencies than large cities. Also, it is unclear to what extent alternative routes are
available.
Incident and Oil Spill Response
The increased use of rail for crude oil shipments is likely to increase the number of incidents,
some of which may involve oil spills. As described above, the National Oil and Hazardous
Substances Contingency Plan provides a framework for federal, state and local collaboration in
response to releases of oil and hazardous substances. Considering the relative proximity of rail
shipments to population centers, a potential issue for Congress is the safety and adequacy of spill
response.
In addition, based on past history, increased frequency or severity of incidents related to
shipments of crude oil by rail could lead some local communities to seek additional funding to
ensure adequate spill response capabilities, including personnel, training, equipment, and
community notification.
The Accuracy of Train Cargo Information
Crude oil may sometimes be carried by “mixed trains”—trains carrying a variety of different
commodities. With mixed trains, it is important to first responders that they have an accurate list
of which cars contain what commodities (the train “consist”). Often the sequencing of cars
changes en route, so the consist information provided by the crew at the scene of an incident may
no longer be accurate. Although all vehicles containing hazardous materials must display placards
indicating their potential dangerous characteristics (e.g., flammable, corrosive, explosive),
responders often need more specific information about the commodities involved in an incident.
One potential remedy under consideration is an electronic manifest system that would offer the
capability of easier updates. In MAP-21, Congress authorized PHMSA to conduct pilot projects
on paperless hazmat information sharing among carriers (of various modes including rail) and
first responders.96 A potential drawback raised by the railroads is that electronic devices at the
scene of an incident could encounter technical problems. Another remedy is greater diligence by
railroad crew in keeping the paper consist up to date. The NTSB has asked whether a copy of the
consist should also be kept at the end of a train in case the copy kept by the crew at the head of
the train is lost in an incident.
Rail vs. Pipeline Development
Certain rail routings of crude oil could be replaced by reconfiguring the existing pipeline network
and constructing additional pipeline capacity. In general, pipelines could provide safer, less
95 RSAC meeting, presentation by HAZMAT Working Group, October 31, 2013. The NTSB has recommended this
change; see Safety Recommendation R-14-1 through -3, January 23, 2014.
96 Section 33005 of P.L. 112-141.
Congressional Research Service
22
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
expensive transportation than railroads, assuming that pipeline developers are able to assure
markets for the oil they hope to carry.
Pipeline development could be particularly important for shipments of crude oil from Canada to
the United States. In light of growing Canadian exports, several proposals have been made to
expand the cross-border pipeline infrastructure. Of the five major pipelines currently linking
Canadian petroleum producing regions to markets in the United States, two (Alberta Clipper and
Keystone) began service in 2010. A permit application for a sixth pipeline, Keystone XL, a very
large project which would also transport some Bakken crude, was initially submitted in 2008 and
is in the final stages of review by the U.S. Department of State.97 Keystone XL has been the
subject of intense scrutiny and debate by Congress, the executive branch, and numerous
stakeholders. The Keystone XL review and approval process is highly contested, and the
pipeline’s approval remains uncertain.
Other proposed oil pipeline projects, such as the reversal of the Portland-Montreal oil pipeline to
enable export of Canadian oil via a marine terminal in Maine, are also encountering greater public
scrutiny and opposition. On the whole, the barriers to new oil pipeline approval in any
jurisdiction seem to have risen significantly since Alberta Clipper and Keystone were completed.
Shipment of oil by rail is, in many cases, an alternative to new pipeline development. This
involves tradeoffs in terms of both transportation capacity and safety. In its ongoing review of the
Keystone XL pipeline proposal, the State Department has argued that, if the pipeline is not
constructed, additional oil-by-rail capacity will be developed instead. As the State Department’s
2014 Final Environmental Impact Statement for the Keystone XL project states,
In the past 2 years, there has been exponential growth in the use of rail to transport crude oil
throughout North America, primarily originating from the Bakken in North Dakota and
Montana, but also increasingly utilized in other production areas, including the [Western
Canadian Sedimentary Basin]. Because of the flexibility of rail delivery points, once loaded
onto trains the crude oil could be delivered to refineries, terminals, and/or port facilities
throughout North America, including the Gulf Coast area.98
Consistent with this view, both Canadian National Railway and Canadian Pacific Railway
reportedly have been pursuing a “pipeline on rails” business strategy, including new track
investments, to move Canadian crudes to new markets throughout North America.99 Increasing
cross-border movements of crude oil by rail on existing track does not require State Department
approval, so such an approach seeks to avoid regulatory delays. While the potential volumes
associated with rail transportation of crude could be lower than pipeline volumes, they could still
be significant. Some analysts have suggested that oil-by-rail volumes could be large enough to
make a major new pipeline project like Keystone XL unnecessary.100 Similar arguments could
apply to other oil transportation corridors within North America.
Others are less certain that oil by rail can substitute so readily for pipeline capacity, as rail
expansion would require significant infrastructure development including loading and unloading
97 The construction, connection, operation, and maintenance of a pipeline connecting the United States with a foreign
country require executive permission through a Presidential Permit under Executive Orders 11423 and 13337.
98 U.S. Department of State, January 2014, Final EIS, Section 5.1, “No Action Alternatives.”
99 Nathan Vanderklippe, “CN, CP Push for a ‘Pipeline on Rails,’” Globe and Mail, February 7, 2011.
100 “Keystone Pipeline Seen as Unneeded as More Oil Moves by Rail,” CBC News, September 10, 2013.
Congressional Research Service
23
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
facilities, track capacity, and, possibly, additional tank car availability. The State Department’s
analysis finds that under certain conditions, including particular oil and oil transportation prices,
“there could be a substantial impact on oil sands production levels.”101 Other market analyses
similarly find that in the short and medium term some production could be curtailed.102
Refiner economics may ultimately favor pipelines over rail, although those investment decisions
will be determined by market forces. When it comes to safety, however, the federal government
plays a major role, and thus may have considerable influence on infrastructure expansion. Some
participants in the Keystone XL debate, for example, have asserted that recent oil-by-rail
incidents underscore the need for a new pipeline as, in their view, a safer mode of transportation
for Canadian crudes,103 while others insist that safety comparisons between the two transportation
modes are less conclusive.104 On balance, however, it seems likely that policies that raise the cost
of transporting oil by rail would increase the attractiveness of pipeline development, and, for that
matter, expansion of crude oil transportation by barges, tanker ships, and tanker trucks.
Rail vs. Waterborne Transport
As indicated above, the cost of transporting oil along the coasts in Jones Act tankers is much less
than by railroad. However, the fleet of Jones Act-qualified tankers is insufficient to take
advantage of this lower-cost shipping method. Despite the domestic oil boom, coastal refineries
continue to rely on foreign sources of oil that are shipped at rates generally ranging from less than
a dollar per barrel (Mexico to the Gulf Coast) to less than $2.50 a barrel (Saudi Arabia to the
Atlantic Coast).105 In addition to efficient transport, safety is a concern. Tankers are not a new
transport method. Tankers are double-hulled, operators are required to have resources and
equipment nearby in case of a spill, and the Coast Guard has a regulatory regime in place to
promote safe transits through harbors. While the risk of an oil spill in a marine environment
remains a grave concern, coastal transport largely avoids travel through towns and cities. The
railroads have had difficulty in dealing with the surge in oil traffic, and other rail users are
experiencing severe service disruptions in the upper Midwest. An important but open question is
whether more oil would be moving by coastwise shipping, relieving some of the safety and
capacity pressure on railroads, if tankers were available and their operating costs more
competitive. The CEO of Phillips 66 has stated, “I think our view is that because of the
limitations on Jones Act vessels, that’s going to push you to more barge and more rail, just to
evacuate the Gulf Coast.”106
101 2014 Final EIS, p. 1.4-8.
102 For example, Canadian Imperial Bank of Commerce, “Too Much of A Good Thing: A Deep Dive Into The North
American Energy Renaissance,” August 15, 2012; TD Economics, “Pipeline Expansion is a National Priority,” Special
Report, December 17, 2012; International Energy Agency," Medium-Term Oil Market Report," May 14, 2013.
103 Diana Furchtgott-Roth and Kenneth P. Green, Intermodal Safety in the Transport of Oil, Fraser Institute, October
2013, http://www.fraserinstitute.org/uploadedFiles/fraser-ca/Content/research-news/research/publications/intermodal-
safety-in-the-transport-of-oil.pdf.
104 See, for example: Rory Johnston, “Train vs. Pipeline: What's the Safest Way to Transport Oil?” Christian Science
Monitor, Energy Voices blog, October 22, 2013, http://www.csmonitor.com/Environment/Energy-Voices/2013/1022/
Train-vs.-pipeline-What-s-the-safest-way-to-transport-oil.
105 Platts, Oilgram Price Report, January through April 2014.
106 Phillips 66 Earnings Conference Call, Q2 2013, July 31, 2013.
Congressional Research Service
24
U.S. Rail Transportation of Crude Oil: Background and Issues for Congress
Rail Transport and Crude Oil Exports
The large increase in U.S. oil production has led some Members of Congress to advocate
changing the law that generally prohibits exports of crude oil.107 An increase in crude oil exports
would likely require greater use of rail transportation, as the crude oil pipeline network is not
oriented to serve export ports. Some environmental groups have stated their opposition to
construction of new rail facilities or terminals that would facilitate oil exports, as they believe
increased exports will encourage environmentally damaging production in the United States and
Canada.108
Author Contact Information
John Frittelli
Anthony Andrews
Specialist in Transportation Policy
Specialist in Energy Policy
jfrittelli@crs.loc.gov, 7-7033
aandrews@crs.loc.gov, 7-6843
Paul W. Parfomak
Robert Pirog
Specialist in Energy and Infrastructure Policy
Specialist in Energy Economics
pparfomak@crs.loc.gov, 7-0030
rpirog@crs.loc.gov, 7-6847
Jonathan L. Ramseur
Michael Ratner
Specialist in Environmental Policy
Specialist in Energy Policy
jramseur@crs.loc.gov, 7-7919
mratner@crs.loc.gov, 7-9529
Acknowledgments
John Williamson, Information Research Specialist, assisted in researching topics covered in this report.
Amber Hope Wilhelm, Graphics Specialist, helped prepare many of the figures in this report.
107 The Senate Energy and Natural Resources Committee held a hearing on this issue on January 30, 2014. For further
information and analysis on oil exports, see CRS Report R43442, U.S. Crude Oil Export Policy: Background and
Considerations, by Phillip Brown et al.
108 See, for example, the comments of Sierra Club official Michael Marx in Blake Sobczak, “Environmentalists ‘get
real creative’ to combat oil by rail,” Energy Wire, January 13, 2014.
Congressional Research Service
25