Navy Force Structure and Shipbuilding Plans:
Background and Issues for Congress

Ronald O'Rourke
Specialist in Naval Affairs
April 7, 2014
Congressional Research Service
7-5700
www.crs.gov
RL32665


Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Summary
The Navy’s proposed FY2015 budget requests funding for the procurement of seven new battle
force ships (i.e., ships that count against the Navy’s goal for achieving and maintaining a fleet of
306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class
Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy’s proposed FY2015-
FY2019 five-year shipbuilding plan includes a total of 44 ships, compared to a total of 41 ships in
the FY2014-FY2018 five-year shipbuilding plan.
The planned size of the Navy, the rate of Navy ship procurement, and the prospective
affordability of the Navy’s shipbuilding plans have been matters of concern for the congressional
defense committees for the past several years. The Navy’s FY2015 30-year (FY2014-FY2044)
shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough
ships to fully support all elements of the Navy’s 306-ship goal over the entire 30-year period. In
particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from
FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027,
and a shortfall in attack submarines in from FY2025 through FY2034.
In its October 2013 report on the cost of the FY2014 30-year shipbuilding plan, the Congressional
Budget Office (CBO) estimates that the plan would cost an average of $19.3 billion per year in
constant FY2013 dollars to implement, or about 15% more than the Navy estimates. CBO’s
estimate is about 6% higher than the Navy’s estimate for the first 10 years of the plan, about 14%
higher than the Navy’s estimate for the second 10 years of the plan, and about 26% higher than
the Navy’s estimate for the final 10 years of the plan. Some of the difference between CBO’s
estimate and the Navy’s estimate, particularly in the latter years of the plan, is due to a difference
between CBO and the Navy in how to treat inflation in Navy shipbuilding.
Potential issues for Congress in reviewing the Navy’s proposed FY2015 shipbuilding budget, its
proposed FY2015-FY2019 five-year shipbuilding plan, and its FY2015 30-year (FY2015-
FY2044) shipbuilding plan include the following:
• the Navy’s proposal to defer until FY2016 a decision on whether to proceed with
the mid-life nuclear refueling overhaul of the aircraft carrier George Washington
(CVN-73);
• the Navy’s proposal to put 11 of its 22 Aegis cruisers into some form of reduced
operating status starting in FY2015, and then return them to service years from
now;
• the Navy’s proposal to retire all 10 of its remaining Oliver Hazard Perry (FFG-7)
class frigates in FY2015;
• the Navy’s proposal to modify the rules for what ships to include in the count of
the number of battle force ships in the Navy;
• the potential impact on the size of the Navy of limiting DOD spending in
FY2013-FY2021 to the levels set forth in the Budget Control Act of 2011, as
amended;
• the appropriate future size and structure of the Navy in light of budgetary and
strategic considerations; and
Congressional Research Service

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• the affordability of the 30-year shipbuilding plan.
Funding levels and legislative activity on individual Navy shipbuilding programs are tracked in
detail in other CRS reports.

Congressional Research Service

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Contents
Introduction ...................................................................................................................................... 1
Background ...................................................................................................................................... 1
Navy’s Ship Force Structure Goal ............................................................................................. 1
January 2013 Goal for Fleet of 306 Ships ........................................................................... 1
306-Ship Goal Reflects 2012 Strategic Guidance and Projected DOD Spending
Shown in FY2013 and FY2014 Budget Submissions ...................................................... 1
Goal for Fleet of 306 Ships Compared to Earlier Goals ..................................................... 1
Navy’s Five-Year and 30-Year Shipbuilding Plans ................................................................... 3
Five-Year (FY2015-FY2019) Shipbuilding Plan ................................................................ 3
30-Year (FY2015-FY2044) Shipbuilding Plan ................................................................... 5
Navy’s Projected Force Levels Under 30-Year Shipbuilding Plan ............................................ 6
Comparison of First 10 Years of 30-Year Plans ......................................................................... 9
Oversight Issues for Congress for FY2015 .................................................................................... 13
Mid-Life Refueling Overhaul of Aircraft Carrier George Washington (CVN-73) .................. 13
Proposal to Put 11 Cruisers into Reduced Operating Status .................................................... 15
Proposal to Retire All 10 Remaining FFG-7 Frigates in FY2015 ........................................... 16
Proposal to Modify What Ships Are Included in the Count of Battle Force Ships ................. 16
Potential Impact on Size of Navy of Limiting DOD Spending to BCA Caps Through
FY2021 ................................................................................................................................. 17
Appropriate Future Size and Structure of Navy in Light of Strategic and Budgetary
Changes ................................................................................................................................ 21
Affordability of 30-Year Shipbuilding Plan ............................................................................ 25
Estimated Ship Procurement Costs ................................................................................... 25
Future Shipbuilding Funding Levels ................................................................................. 26
Legislative Activity for FY2015 .................................................................................................... 30
FY2015 Funding Request ........................................................................................................ 30
CRS Reports Tracking Legislation on Specific Navy Shipbuilding Programs ....................... 30

Tables
Table 1. Current 306 Ship Force Structure Goal Compared to Earlier Goals .................................. 2
Table 2. Navy FY2014 Five-Year (FY2015-FY2019) Shipbuilding Plan ....................................... 3
Table 3. Navy FY2015 30-Year (FY2015-FY2045) Shipbuilding Plan .......................................... 5
Table 4. Projected Force Levels Resulting from FY2015 30-Year (FY2015-FY2044)
Shipbuilding Plan ......................................................................................................................... 7
Table 5. Ship Procurement Quantities in First 10 Years of 30-Year Shipbuilding Plans ............... 10
Table 6. Projected Navy Force Sizes in First 10 years of 30-Year Shipbuilding Plans ................. 11
Table 7. Recent Study Group Proposals for Navy Ship Force Structure ....................................... 23
Table 8. Navy and CBO Estimates of Cost of FY2014 30-Year (FY2014-FY2043)
Shipbuilding Plans ...................................................................................................................... 26
Table B-1. Comparison of Navy’s 306-ship goal, Navy Plan from 1993 BUR, and Navy
Plan from 2010 QDR Review Panel ........................................................................................... 36
Congressional Research Service

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table C-1. Total Number of Ships in the Navy Since FY1948 ...................................................... 39
Table C-2. Battle Force Ships Procured or Requested/Programmed, FY1982-FY2019 ................ 40

Appendixes
Appendix A. Comparing Past Ship Force Levels to Current or Potential Future Ship Force
Levels.......................................................................................................................................... 32
Appendix B. Independent Panel Assessment of 2010 QDR .......................................................... 34
Appendix C. Size of the Navy and Navy Shipbuilding Rate ......................................................... 38

Contacts
Author Contact Information........................................................................................................... 40

Congressional Research Service

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Introduction
This report provides background information and presents potential issues for Congress
concerning the Navy’s ship force-structure goals and shipbuilding plans. The planned size of the
Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy’s
shipbuilding plans have been matters of concern for the congressional defense committees for the
past several years. Decisions that Congress makes on Navy shipbuilding programs can
substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding
industrial base.
Background
Navy’s Ship Force Structure Goal
January 2013 Goal for Fleet of 306 Ships
On January 31, 2013, in response to Section 1015 of the FY2013 National Defense Authorization
Act (H.R. 4310/P.L. 112-239 of January 2, 2013), the Navy submitted to Congress a report
presenting a goal for achieving and maintaining a fleet of 306 ships, consisting of certain types
and quantities of ships.1 The goal for a 306-ship fleet is the result of a force structure assessment
(FSA) that the Navy completed in 2012.
306-Ship Goal Reflects 2012 Strategic Guidance and Projected DOD Spending
Shown in FY2013 and FY2014 Budget Submissions

The 2012 FSA and the resulting 306-ship plan reflect the defense strategic guidance document
that the Administration presented in January 20122 and the associated projected levels of
Department of Defense (DOD) spending shown in the FY2013 and FY2014 budget submissions.
DOD officials have stated that if planned levels of DOD spending are reduced below what is
shown in these budget submissions, the defense strategy set forth in the January 2012 strategic
guidance document might need to be changed. Such a change, Navy officials have indicated,
could lead to the replacement of the 306-ship plan of January 2013 with a new plan.
Goal for Fleet of 306 Ships Compared to Earlier Goals
Table 1 compares the 306-ship goal to earlier Navy ship force structure plans.

1 Department of the Navy, Report to Congress [on] Navy Combatant Vessel Force Structure Requirement, January
2013, 3 pp. The cover letters for the report were dated January 31, 2013.
2 For more on this document, see CRS Report R42146, Assessing the January 2012 Defense Strategic Guidance
(DSG): In Brief
, by Catherine Dale and Pat Towell.
Congressional Research Service
1

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table 1. Current 306 Ship Force Structure Goal Compared to Earlier Goals
Changes
Early-2005
2002-
to
Navy plan
2004
2001
Revised
February
February
for fleet of
Navy QDR
306-
~310-
313-ship
2006 313-
2006
260-325
plan
plan
ship
316 ship
plan of
ship plan
Navy
ships
for
for
plan of
plan of
Septem-
announced
plan for
375-
310-
January
March
ber
through
313-ship
260-
325-
ship
ship
Ship type
2013
2012
2011
mid-2011
fleet
ships ships Navya Navy
Ballistic missile submarines
12b
12-14b 12b 12b 14
14
14
14
14
(SSBNs)
Cruise missile submarines
0c
0-4c
4c
0c 4
4
4
4
2
or
(SSGNs)
4d
Attack submarines (SSNs)
48
~48 48 48 48 37
41
55
55
Aircraft carriers
11e
11e 11e 11e 11f 10
11
12
12
Cruisers and destroyers
88
~90 94 94g 88
67
92
104
116
Frigates
0
0 0 0 0
0
0
0
Littoral Combat Ships (LCSs)
52
~55 55 55 55 63
82
56
0
Amphibious ships
33
~32 33 33h 31
17
24
37
36
MPF(F) shipsi
0j
0j
0j
0j 12i 14i 20i
0i
0i
Combat logistics (resupply) ships
29
~29 30 30 30 24
26
42
34
Dedicated mine warfare ships
0
0 0 0 0
0
0
26k 16
Joint High Speed Vessels (JHSVs)
10l
10l 10l 21l 3
0
0
0
0
Otherm
23
~23 16 24n 17
10
11
25
25
Total battle force ships
306
~310-
313
328
313
260
325
375
310
316
or
312
Sources: Table prepared by CRS based on U.S. Navy data.
Note: QDR is Quadrennial Defense Review. The “~” symbol means approximately and signals that the number
in question may be refined as a result of the Naval Force Structure Assessment currently in progress.
a. Initial composition. Composition was subsequently modified.
b. The Navy plans to replace the 14 current Ohio-class SSBNs with a new class of 12 next-generation SSBNs.
For further discussion, see CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine
Program: Background and Issues for Congress
, by Ronald O'Rourke.
c. Although the Navy plans to continue operating its four SSGNs until they reach retirement age in the late
2020s, the Navy does not plan to replace these ships when they retire. This situation can be expressed in a
table like this one with either a 4 or a zero.
d. The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s proposed
FY2001 DOD budget requested funding to support the conversion of two available Trident SSBNs into
SSGNs, and the retirement of two other Trident SSBNs. Congress, in marking up this request, supported a
plan to convert all four available SSBNs into SSGNs.
e. With congressional approval, the goal has been temporarily be reduced to 10 carriers for the period
between the retirement of the carrier Enterprise (CVN-65) in December 2012 and entry into service of the
carrier Gerald R. Ford (CVN-78), currently scheduled for September 2015.
f.
For a time, the Navy characterized the goal as 11 carriers in the nearer term, and eventually 12 carriers.
g. The 94-ship goal was announced by the Navy in an April 2011 report to Congress on naval force structure
and missile defense.
Congressional Research Service
2

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

h. The Navy acknowledged that meeting a requirement for being able to lift the assault echelons of 2.0 Marine
Expeditionary Brigades (MEBs) would require a minimum of 33 amphibious ships rather than the 31 ships
shown in the February 2006 plan. For further discussion, see CRS Report RL34476, Navy LPD-17 Amphibious
Ship Procurement: Background, Issues, and Options for Congress
, by Ronald O'Rourke.
i.
Today’s Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine Corps
operations ashore, rather than Navy combat operations, and thus are not counted as Navy battle force
ships. The planned MPF (Future) ships, however, would have contributed to Navy combat capabilities (for
example, by supporting Navy aircraft operations). For this reason, the ships in the planned MPF(F) squadron
were counted by the Navy as battle force ships. The planned MPF(F) squadron was subsequently
restructured into a different set of initiatives for enhancing the existing MPF squadrons; the Navy no longer
plans to acquire an MPF(F) squadron.
j.
The Navy no longer plans to acquire an MPF(F) squadron. The Navy, however, has procured or plans to
procure some of the ships that were previously planned for the squadron—specifical y, TAKE-1 class cargo
ships, and Mobile Landing Platform (MLP)/Afloat Forward Staging Base (AFSB) ships. These ships are
included in the total shown for “Other” ships.
k. The figure of 26 dedicated mine warfare ships included 10 ships maintained in a reduced mobilization status
cal ed Mobilization Category B. Ships in this status are not readily deployable and thus do not count as
battle force ships. The 375-ship proposal thus implied transferring these 10 ships to a higher readiness
status.
l.
Totals shown include 5 ships transferred from the Army to the Navy and operated by the Navy primarily
for the performance of Army missions.
m. This category includes, among other things, command ships and support ships.
n. The increase in this category from 17 ships under the February 2006 313-ship plan to 24 ships under the
apparent 328-ship goal included the addition of one TAGOS ocean surveillance ship and the transfer into
this category of six ships—three modified TAKE-1 class cargo ships, and three Mobile Landing Platform
(MLP) ships—that were previously intended for the planned (but now canceled) MPF(F) squadron.
Navy’s Five-Year and 30-Year Shipbuilding Plans
Five-Year (FY2015-FY2019) Shipbuilding Plan
Table 2 shows the Navy’s FY2015 five-year (FY2015-FY2019) shipbuilding plan.
Table 2. Navy FY2014 Five-Year (FY2015-FY2019) Shipbuilding Plan
(Battle force ships—i.e., ships that count against 306-ship goal)
Ship type
FY15
FY16
FY17
FY18
FY19
Total
Ford (CVN-78) class aircraft carrier



1

1
Virginia (SSN-774) class attack submarine
2
2
2
2
2
10
Arleigh Burke (DDG-51) class destroyer
2
2
2
2
2
10
Littoral Combat Ship (LCS)
3
3
3
3
2
14
LHA(R) amphibious assault ship


1


1
Fleet tug (TATF)


2
1
1
4
Mobile Landing Platform (MLP)/Afloat Forward
1 1
Staging Base (AFSB)
TAO(X) oiler

1

1
1
3
TOTAL
7
8
11
10
8
44
Source: FY2015 Navy budget submission.
Congressional Research Service
3

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Notes: The MLP/AFSB is a variant of the MLP with additional features permitting it to serve in the role of an
AFSB. The Navy proposes to fund the TATFs and TAO(X)s through the National Defense Sealift Fund (NDSF)
and the other ships through the Navy’s shipbuilding account, known formally as the Shipbuilding and Conversion,
Navy (SCN) appropriation account.
Observations that can be made about the Navy’s proposed FY2015 five-year (FY2015-FY2019)
shipbuilding plan include the following:
Total of 44 ships. The plan includes a total of 44 ships, compared to a total of 41
ships in the FY2014-FY2018 five-year shipbuilding plan.
Average of 8.8 ships per year. The plan includes an average of 8.8 battle force
ships per year. The steady-state replacement rate for a fleet of 306 ships with an
average service life of 35 years is about 8.7 ships per year. In light of how the
average shipbuilding rate since FY1993 has been substantially below 8.7 ships
per year (see Appendix D), shipbuilding supporters for some time have wanted
to increase the shipbuilding rate to a steady rate of 10 or more battle force ships
per year.
DDG-51 destroyers and Virginia-class submarines being procured under
MYP arrangements. The 10 DDG-51 destroyers to be procured in FY2013-
FY2017 and the 10 Virginia-class attack submarines to be procured in FY2014-
FY2018 are being procured under multiyear procurement (MYP) contracts.3
Navy is requesting three rather than four LCSs for FY2015. LCSs are being
procured under a pair of block buy contracts covering the years FY2010-FY2015.
These two contracts call for a total of four LCSs in FY2015. The Navy, however,
is requesting funding for the procurement of three LCSs in FY2015. If three
LCSs are funded in FY2015, one of the two LCS block buy contracts would not
be fully implemented in its final year.
Start of LX(R) amphibious ship procurement deferred to FY2020. The
FY2015-FY2019 five-year shipbuilding plan defers the procurement of the first
LX(R) amphibious ship to FY2020, compared to FY2019 in the FY2014-FY2018
plan, FY2018 in the FY2013-FY2017 plan, and FY2017 in the FY2012-FY2016
plan. In each of these five-year plans, the lead LX(R) ship was scheduled one
year beyond the end of the five-year period.
MLP/AFSB ship added to FY2017. The FY2015-FY2019 five-year
shipbuilding plan adds an MLP/AFSB (Mobile Landing Platform/Afloat Forward
Staging Base) ship in FY2017. This ship, not previously planned, would likely be
built by General Dynamics/National Steel and Shipbuilding Company
(GD/NASSCO), the builder of prior MLP/AFSB ships. In addition to providing a
platform that would help the Navy meet certain operational needs, adding this
ship to the shipbuilding plan might help the Navy ensure strong competition for
two other Navy ship programs—the TAO(X) oiler program, the first ship of
which is to be procured in FY2016, and the LX(R) amphibious ship program, the
first ship of which is to be procured in FY2020.4

3 For more on MYP contracting, see CRS Report R41909, Multiyear Procurement (MYP) and Block Buy Contracting
in Defense Acquisition: Background and Issues for Congress
, by Ronald O'Rourke and Moshe Schwartz.
4 NASSCO could be a bidder for either or both of the TAO(X) and LX(R) programs. From a competition perspective,
the added FY2017 MLP/AFSB ship might be viewed as a Navy signal to NASSCO that the Navy would not necessarily
(continued...)
Congressional Research Service
4

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

30-Year (FY2015-FY2044) Shipbuilding Plan
Table 3 shows the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan.
Table 3. Navy FY2015 30-Year (FY2015-FY2045) Shipbuilding Plan
FY CVN LSC SSC SSN
SSBN
AWS
CLF
Supt Total
15
2 3 2
7
16
2 3 2
1
8
17
2 3 2
1
3 11
18
1 2 3 2
1
1 10
19
2 2 2
1
1 8
20
2 3 2
1
1
2 11
21
2 3 1
1
1
8
22
2 3 2
1
1
2 11
23
1 2 3 1
1
3 11
24
2 3 2
1
2
1
2 13
25
2 3 1
1
1 8
26
2 2
1
1
1
7
27
2 1
1
1
5
28
1 2 2
1
2
1
1 10
29
2 1
1
1
1
1 7
30
2 1 2
1
1
1
2 10
31
2 1
1
1
1
2 8
32
2 1 2
1
2
1
3 12
33
1 2 1
1
1
1
2 9
34
2 1 2
1
1
2 9
35
2 1 1
1
5
36
2 2
1
5
37
2 4 1
7
38
1 3 4 2
10
39
3 4 1
8
40
3 4 2
2
11
41
3 4 1
8
42
3 4 2
1
10
43
1 2 4 1
1
9
44
2 2 2
2
8
Source: FY2015 30-year (FY2015-FY2044) shipbuilding plan.

(...continued)
award NASSCO the TAO(X) program merely to provide a source work for NASSCO until the LX(R) competition
(because NASSCO would likely receive the FY2017 MLP/AFSB), and consequently that NASSCO would need to
submit a competitive bid for the TAO(X) program. By the same token, the added FY2017 MLP/AFSB ship might be
viewed as a Navy signal to potential bidders for the LX(R) program other than NASSCO that if NASSCO were not
awarded the TAO(X) program, NASSCO would still have enough work to be a strong bidder for the LX(R) program
(again because NASSCO would likely receive the FY2017 MLP/AFSB), and consequently that LX(R) bidders other
than NASSCO would face strong competition from NASSCO. Another potential implication from this perspective is
that if NASSCO wins the TAO(X) competition, the Navy, other things held equal, might see less reason to retain the
FY2017 MLP/AFSB in the shipbuilding plan.
Congressional Research Service
5

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC
= small surface combatants (i.e., Littoral Combat Ships [LCSs]); SSN = attack submarines; SSGN = cruise
missile submarines; SSBN = ballistic missile submarines; AWS = amphibious warfare ships; CLF = combat
logistics force (i.e., resupply) ships; Supt = support ships.
In devising a 30-year shipbuilding plan to move the Navy toward its ship force-structure goal, key
assumptions and planning factors include but are not limited to the following:
• ship service lives;
• estimated ship procurement costs;
• projected shipbuilding funding levels; and
• industrial-base considerations.
Navy’s Projected Force Levels Under 30-Year Shipbuilding Plan
Table 4 shows the Navy’s projection of ship force levels for FY2015-FY2044 that would result
from implementing the FY2015 30-year (FY2015-FY2044) shipbuilding plan shown in Table 3.
As part of its FY2015 budget submission, the Navy is proposing to modify the rules for what
ships to include in the count of the number of battle force ships in the Navy. In its FY2015 budget
submission, the Navy has presented figures for projected Navy ship force levels using both the
existing rules and the proposed modified rules. Table 4 and Table 6 show figures using both the
existing rules and the proposed modified rules.


Congressional Research Service
6

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table 4. Projected Force Levels Resulting from FY2015 30-Year (FY2015-FY2044)
Shipbuilding Plan
Where two figures are shown, the first is the figure using existing rules for counting battle force ships,
and the second is the figure using the Navy’s proposed modified rules for counting battle force ships.
CVN
LSC
SSC
SSN
SSGN
SSBN
AWS
CLF
Supt
Total
306 ship plan
11
88
52
48
0
12
33
29
33
306
FY15
10 85
19/26
54
4
14
30
29
29/32
274/284
FY16
11 88
23/30
53
4
14
31
29
27/30
280/290
FY17
11 90
27/34
50
4
14
32
29
29/32
286/296
FY18
11 92/91
31/38
52
4
14
33
29 29/32 295/304
FY19
11 93
35/40
51
4
14
33
29
31/34
301/309
FY20
11 95
36/37
49
4
14
33
29
33/36
304/308
FY21
11 96
36/33
49
4
14
33
29
32/35 304
FY22
11 97
38/36
48
4
14
33
29
32/35
306/307
FY23
12 98 39
49
4
14
33
29
33/36
311/314
FY24
12 98
41/40
48
4
14
34
29
33/36
313/315
FY25
11 98 43
47
4
14
34
29
34/37
314/317
FY26
11 97 46
45
2
14
36
29
34/37
314/317
FY27
11 99 49
44
1
13
35
29
34/37
315/318
FY28
11 100 52
41
0
13
36
29 34/37
316/319
FY29
11 98 52
41
0
12
35
29
34/37
312/315
FY30
11 95 52
41
0
11
35
29
34/37
308/311
FY31
11 91 52
43
0
11
34
29
34/36
305/307
FY32
11 89 52
43
0
10
34
29
35/37
303/305
FY33
11 88 52
45
0
10
35
29
35/37
305/307
FY34
11 86 52
46
0
10
34
29
35/37
303/305
FY35
11 87 52
48
0
10
32
29
35/37
304/306
FY36
11 88 52
49
0
10
32
29 35 306
FY37
11 90 52
51
0
10
33
29 34 310
FY38
11 91 52
50
0
10
33
29 35 311
FY39
11 92 52
51
0
10
33
29 34 312
FY40
10 90 52
51
0
10
32
29 34 308
FY41
10 89 52
51
0
11
33
29 34 309
FY42
10 87 52
52
0
12
32
29 34 308
FY43
10 84 52
52
0
12
31
29 34 304
FY44
10 83 52
52
0
12
31
29 34 303
Source: FY2015 30-year (FY2015-FY2044) shipbuilding plan.
Note: Figures for support ships include five JHSVs transferred from the Army to the Navy and operated by the
Navy primarily for the performance of Army missions.
Key: FY = Fiscal Year; CVN = aircraft carriers; LSC = surface combatants (i.e., cruisers and destroyers); SSC
= small surface combatants (i.e., frigates, Littoral Combat Ships [LCSs], and mine warfare ships); SSN = attack
submarines; SSGN = cruise missile submarines; SSBN = ballistic missile submarines; AWS = amphibious
warfare ships; CLF = combat logistics force (i.e., resupply) ships; Supt = support ships.
Congressional Research Service
7

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Observations that can be made about the Navy’s FY2014 30-year (FY2014-FY2043) shipbuilding
plan and resulting projected force levels included the following:
Total of 264 ships; average of about 8.8 per year. The plan includes a total of
264 ships to be procured, two less than the number in the FY2014 30-year
(FY2014-FY2043) shipbuilding plan. The total of 264 ships equates to an
average of about 8.8 ships per year, which is slightly higher than the approximate
average procurement rate (sometimes called the steady-state replacement rate) of
about 8.7 ships per year that would be needed over the long run to achieve and
maintain a fleet of 306 ships, assuming an average life of 35 years for Navy
ships.
Proposed modified counting rules affect small surface combatants and
support ships. As can be seen in Table 4, the Navy’s proposed modified rules
for what ships to include in the count of the number of battle force ships (see
“Proposal to Modify What Ships Are Included in the Count of Battle Force
Ships” in “Oversight Issues for Congress for FY2015”) would affect the reported
figures for small surface combatants during the period FY2015-FY2024 and the
reported figures for support ships during the period FY2015-FY2035.
Eleven cruisers proposed for some form of reduced operating status
included in count. As part of its FY2015 budget submission, the Navy is
proposing to put 11 of its 22 Aegis cruisers into some form of reduced operating
status starting in FY2015, and then return them to service years from now. The 11
cruisers proposed for some form of reduced operating status are included in the
count of battle force ships shown in Table 4 and Table 6 during the years that
they are in reduced operating status.
Projected shortfalls in amphibious ships, small surface combatants, and
attack submarines. The FY2015 30-year shipbuilding plan, like many previous
Navy 30-year shipbuilding plans, does not include enough ships to fully support
all elements of the Navy’s 306-ship goal over the entire 30-year period. In
particular, the Navy projects that the fleet would experience a shortfall in
amphibious ships from FY2015 through FY2017, a shortfall in small surface
combatants from FY2015 through FY2027, and a shortfall in attack submarines
in from FY2025 through FY2034.
Ballistic missile submarine force to be reduced temporarily to 10 boats. As a
result of a decision in the FY2013 budget to defer the scheduled procurement of
the first Ohio replacement (SSBN[X]) ballistic missile submarine by two years,
from FY2019 to FY2021, the ballistic missile submarine force is projected to
drop to a total of 10 or 11 boats—one or two boats below the 12-boat SSBN
force-level goal—during the period FY2029-FY2041. The Navy says this
reduction is acceptable for meeting current strategic nuclear deterrence mission
requirements, because none of the 10 or 11 boats during these years will be
encumbered by long-term maintenance.5

5 For further discussion of this issue, see CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile
Submarine Program: Background and Issues for Congress
, by Ronald O'Rourke.
Congressional Research Service
8

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Comparison of First 10 Years of 30-Year Plans
Table 5 and Table 6 below show the first 10 years of planned annual ship procurement quantities
and projected Navy force sizes in 30-year shipbuilding plans dating back to the first such plan,
which was submitted in 2000 in conjunction with the FY2001 budget. By reading vertically down
each column, one can see how the ship procurement quantity or Navy force size projected for a
given fiscal year changed as that year drew closer to becoming the current budget year.

Congressional Research Service
9


Table 5. Ship Procurement Quantities in First 10 Years of 30-Year Shipbuilding Plans
Years shown are fiscal years
FY of 30-year plan
(year
submitted) 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
FY01
plan
(2000) 8 8 8 8 7 5 6 6 6 7
FY02
plan
(2001)
6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a

FY03
plan
(2002)
5 5 7 7
11
n/a
n/a
n/a
n/a
n/a

FY04
plan
(2003)
7 8 7 7 9
14
15
13
14
15
FY05
plan
(2004)
9 6 8 9
17
14
15
14
16
15
FY06
plan
(2005)
4 7 7 9
10
12
n/a
n/a
n/a
n/a

FY07
plan
(2006)
7 7 11 12 14 13 12 11 11 10

FY08
plan
(2007)
7
11
12
13
12
12
10
12
11
6
FY09
plan
(2008)
7 8 8
12
12
13
13
12
12
13
FY10
plan
(2009)








8 n/a n/a n/a n/a n/a n/a n/a n/a n/a



FY11
plan
(2010)
9 8
12
9
12
9
12
9
13
9
FY12
plan
(2011)
10
13
11
12
9
12
10
12
8 9
FY13
plan
(2012)
10
7 8 9 7
11
8
12
9
12
FY14
plan
(2013)
8 8 7 9 9
10
10
10
11
14
FY15
plan
(2014)
7 8
11
10
8
11
8
11
11
13
Source: Navy 30-year shipbuilding plans supplemented by annual Navy budget submissions (including 5-year shipbuilding plans) for fiscal years shown. n/a means not
available—see notes below.
Notes: The FY2001 30-year plan submitted in 2000 was submitted under a one-time-only legislative provision, Section 1013 of the FY2000 National Defense
Authorization Act (S. 1059/P.L. 106-65 of October 5, 1999). No provision required DOD to submit a 30-year shipbuilding plan in 2001 or 2002, when Congress
considered DOD’s proposed FY2002 and FY2003 DOD budgets. (In addition, no FYDP was submitted in 2001, the first year of the George W. Bush Administration.)
Section 1022 of the FY2003 Bob Stump National Defense Authorization Act (H.R. 4546/P.L. 107-314 of December 2, 2002) created a requirement to submit a 30-year
shipbuilding plan each year, in conjunction with each year’s defense budget. This provision was codified at 10 U.S.C. 231. The first 30-year plan submitted under this
provision was the one submitted in 2003, in conjunction with the proposed FY2004 DOD budget. For the next several years, 30-year shipbuilding plans were submitted
each year, in conjunction with each year’s proposed DOD budget. An exception occurred in 2009, the first year of the Obama Administration, when DOD submitted a
CRS-10


proposed budget for FY2010 with no accompanying FYDP or 30-year Navy shipbuilding plan. Section 1023 of the FY2011 Ike Skelton National Defense Authorization Act
(H.R. 6523/P.L. 111-383 of January 7, 2011) amended 10 U.S.C. 231 to require DOD to submit a 30-year shipbuilding plan once every four years, in the same year that
DOD submits a Quadrennial Defense Review (QDR). Consistent with Section 1023, DOD did not submit a new 30-year shipbuilding plan at the time that it submitted
the proposed FY2012 DOD budget. At the request of the House Armed Services Committee, the Navy submitted the FY2012 30-year (FY2012-FY2041) shipbuilding
plan in late-May 2011. Section 1011 of the FY2012 National Defense Authorization Act (H.R. 1540/P.L. 112-81 of December 31, 2011) amended 10 U.S.C. 231 to
reinstate the requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget.
Table 6. Projected Navy Force Sizes in First 10 years of 30-Year Shipbuilding Plans
Years shown are fiscal years; where two figures are shown, the first is the figure using existing rules for counting battle force ships, and the second is the
figure using the Navy’s proposed modified rules for counting battle force ships.
FY of 30-year
plan (year
submitted)
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
FY01 plan (2000) 316 315 313 313 313 311 311 304 305 305













FY02 plan (2001)
316 n/a n/a n/a n/a n/a n/a n/a n/a
n/a

FY03 plan (2002)

314 n/a n/a n/a n/a n/a n/a n/a
n/a
n/a

FY04 plan (2003)


292 292 291 296 301 305 308 313 317 321










FY05 plan (2004)



290 290 298 303 308 307 314 320 328 326









FY06 plan (2005)

289
293
297
301
301
306
n/a
n/a
305
n/a
FY07 plan (2006)

285
294
299
301
306
315
317
315
314
317
FY08 plan (2007)

286
289
293
302
310
311
307
311
314
322
FY09 plan (2008)

286
287
289
290
293
287
288
291
301
309
FY10 plan (2009)

287
n/a
n/a
n/a
n/a n/a n/a n/a n/a n/a


FY11 plan (2010)

284
287
287
285
285
292
298
305
311
315

FY12 plan (2011)

290
287
286
286
297
301
311
316
322
324

FY13 plan (2012)

285
279
276
284
285
292
300
295
296
298
FY14 plan (2013)

282
270
280
283
291
300
295
296
297
297
FY15 plan (2014)














274/ 280/ 286/ 295/ 301/ 304/ 304 306/ 311/ 313/
284
290
296
304
309
308
307
314
315
CRS-11


Source: Navy 30-year shipbuilding plans supplemented by annual Navy budget submissions (including 5-year shipbuilding plans) for fiscal years shown. n/a means not
available—see notes below.
Notes: The FY2001 30-year plan submitted in 2000 was submitted under a one-time-only legislative provision, Section 1013 of the FY2000 National Defense
Authorization Act (S. 1059/P.L. 106-65 of October 5, 1999). No provision required DOD to submit a 30-year shipbuilding plan in 2001 or 2002, when Congress
considered DOD’s proposed FY2002 and FY2003 DOD budgets. Section 1022 of the FY2003 Bob Stump National Defense Authorization Act (H.R. 4546/P.L. 107-314 of
December 2, 2002) created a requirement to submit a 30-year shipbuilding plan each year, in conjunction with each year’s defense budget. This provision was codified at
10 U.S.C. 231. The first 30-year plan submitted under this provision was the one submitted in 2003, in conjunction with the proposed FY2004 DOD budget. For the next
several years, 30-year shipbuilding plans were submitted each year, in conjunction with each year’s proposed DOD budget. An exception occurred in 2009, the first year
of the Obama Administration, when DOD submitted a proposed budget for FY2010 with no accompanying FYDP or 30-year Navy shipbuilding plan. The FY2006 plan
included data for only selected years beyond FY2011. Section 1023 of the FY2011 Ike Skelton National Defense Authorization Act (H.R. 6523/P.L. 111-383 of January 7,
2011) amended 10 U.S.C. 231 to require DOD to submit a 30-year shipbuilding plan once every four years, in the same year that DOD submits a Quadrennial Defense
Review (QDR). Consistent with Section 1023, DOD did not submit a new 30-year shipbuilding plan at the time that it submitted the proposed FY2012 DOD budget. At
the request of the House Armed Services Committee, the Navy submitted the FY2012 30-year (FY2012-FY2041) shipbuilding plan in late-May 2011. Section 1011 of the
FY2012 National Defense Authorization Act (H.R. 1540/P.L. 112-81 of December 31, 2011) amended 10 U.S.C. 231 to reinstate the requirement to submit a 30-year
shipbuilding plan each year, in conjunction with each year’s defense budget.

CRS-12

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Oversight Issues for Congress for FY2015
Mid-Life Refueling Overhaul of Aircraft Carrier George
Washington (CVN-73)

One potential oversight issue for Congress concerns the Navy’s proposal to defer until FY2016 a
decision on whether to proceed with the mid-life nuclear refueling overhaul of the aircraft carrier
George Washington (CVN-73). To operate for a full 50-year life, existing Nimitz (CVN-68) class
nuclear-powered carriers are given a mid-life nuclear refueling overhaul, called a refueling
complex overhaul (RCOH), when they are 20 to 25 years old, which is when their original
nuclear fuel core has been exhausted. The RCOH gives the ship a new nuclear fuel core sufficient
to power the ship for the remainder of its 50-year life. The RCOH also involves a significant
amount of other overhaul, repair, and modernization work on the ship. An RCOH requires about
44 months from contract award to delivery. RCOHs are funded through the Navy’s shipbuilding
account (the Shipbuilding and Conversion, Navy [SCN] appropriation account).
RCOHs are done primarily at NNS and form a significant part of NNS’s business base, along
with construction of new nuclear-powered aircraft carriers and construction of new nuclear-
powered submarines. RCOHs in recent years have been scheduled in a more or less heel-to-toe
fashion at NNS—when one RCOH is done, the next one is scheduled to begin. RCOHs are done
in a particular dry dock at NNS, so a carrier undergoing an RCOH in that dry dock must have its
work finished and depart the dry dock before the following carrier can be moved into the dry
dock for its RCOH.
The next carrier scheduled for an RCOH is the George Washington (CVN-73). The total
estimated cost of the CVN-73 RCOH in the Navy’s FY2014 budget submission was $4,738.2
million (i.e., about $4.7 billion).
Until the FY2015 budget submission, the CVN-73 RCOH was scheduled for FY2016. The CVN-
73 RCOH received $12 million in advance procurement (AP) funding in FY2012, $69.9 million
in AP funding in FY2013, and $245.8 million in AP funding in FY2014. Under the Navy’s
FY2014 budget submission, another $491.1 million in AP funding was projected for FY2015, and
the balance of the RCOH’s estimated cost of $4,738.2 million was to be provided in FY2016 and
FY2017.
As part of its FY2015 budget submission, DOD removed funding for the CVN-73 RCOH from
the FY2015-FY2019 Future Years Defense Plan (FYDP) and is proposing to defer the question of
whether to proceed with the CVN-73 RCOH until next year, when Congress will consider the
FY2016 defense budget. The Navy’s proposed FY2015 budget includes about $46 million in
funding in the Operation and Maintenance, Navy (OMN) appropriation account to defuel CVN-
73. Defueling the ship (i.e., removing the original nuclear fuel core) is an initial step to be
performed on the ship at NNS, regardless of whether the ship is to undergo an RCOH or be
inactivated.
DOD and Navy officials state that if Congress provides an indication this year that it supports the
defense spending levels in the FY2015-FY2019 FYDP, which are higher than those called for in
the Budget Control Act of 2011 as amended, then the FYDP would be reformulated for FY2016
Congressional Research Service
13

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

and subsequent years to include the roughly $7.0 billion in additional funding that would be
needed over the FYDP to fund the CVN-73 RCOH and keep the ship and its associated carrier air
wing in service.6 Of this $7.0 billion in additional funding, $796.2 million would be required in
FY2015.7
DOD and Navy officials state that if Congress does not provide an indication this year that it
supports the defense spending levels in the FYDP, CVN-73 would instead be inactivated (i.e.,
permanently retired from service), and its associated air wing would be disestablished. Other
things held equal, inactivating CVN-73 would reduce the Navy’s carrier force to 10 ships for the
next 25 years or so (i.e., the period of time that CVN-73 would have remained in service if it had
received an RCOH).
Navy officials state that deferring until next year the decision on whether to proceed with the
CVN-73 RCOH would mean that the RCOH, if were to occur, would be delayed some number of
months from the schedule shown in the Navy’s FY2014 budget submission, and consequently
would likely become an FY2017 action rather than an FY2016 action. Navy officials state that if
the delay in the start of the RCOH were not more than a certain number of months, it would not
cause a cascading delay in the schedule for the following RCOH (to be done on CVN-74),
because there is currently some slack time on the back end of the CVN-73 RCOH period to
absorb some delay in the CVN-73 RCOH without affecting the schedule for the CVN-74 RCOH.
The proposal to defer a decision on the CVN-73 RCOH until next year, and to not include
funding for the CVN-73 RCOH in the proposed FY2015 budget or the FY2015-FY2019 FYDP, is
an issue for Congress in its review of DOD’s proposed FY2015 budget. Potential oversight
questions for Congress include the following:
• 10 USC 5062(b) states that “the naval combat forces of the Navy shall include
not less than 11 operational aircraft carriers.” The requirement as stated in this
statute is not contingent on the DOD budget being at a certain level in coming
years. Is DOD’s proposal to treat the issue of whether to proceed with the CVN-
73 RCOH (and consequently whether there are to be 10 or 11 carriers for the next
25 years or so) as a question to be decided next year, depending on indications of
Congressional support for a certain DOD budget level in coming years,
consistent with 10 USC 5062(b)?
• What would be the operational impact for the Navy of reducing the carrier force
to 10 ships for the next 25 years or so (and also eliminating its associated carrier
air wing)? What impact would it have on the Navy’s ability to fulfill its missions?
• If the FDYP were reformulated to include the $7 billion in additional funding
needed to keep CVN-73 and its associated air wing, what other defense programs
would have their funding reduced, and what would be the impact of these
reductions on DOD’s ability to fulfill its missions?

6 The estimated total cost to perform the CVN-73 RCOH and retain the carrier and its associated air wing is about $8.1
billion. (This figure includes about $5.9 to perform the RCOH and keep the ship in service, about $1.4 billion to retain
the air wing, and about $800 million for associated logistics, manpower, and training costs.) The FY2015-FY2019
FYDP currently includes about $1.1 billion to support the inactivation of CVN-73. Reprogramming this $1.1 billion in
inactivation funding to support the RCOH would leave a requirement for about $7.0 billion in additional funding.
7 The total estimated requirement for FY2015 is $842.2 million. This figure includes the $46 million currently in the
budget for the ship’s defueling, leaving a net requirement of $796.2 million in additional funding for FY2015.
Congressional Research Service
14

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• If CVN-73 were inactivated, what portion, if any, of the prior-year funding that
has been appropriated for the CVN-73 RCOH would go to waste?
• What would be the impact on NNS and the other parts of the aircraft carrier
industrial base if CVN-73 were inactivated rather than given an RCOH? What
impact, if any, would this have on the cost of other work performed at NNS
during these years, and on the eventual cost of the CVN-74 RCOH?8
Proposal to Put 11 Cruisers into Reduced Operating Status
A total of 27 Ticonderoga (CG-47) class Aegis cruisers (CGs 47 through 73) were procured for
the Navy between FY1978 and FY1988; the ships entered service between 1983 and 1994. The
first five ships in the class (CGs 47 through 51), which were built to an earlier technical standard
in certain respects, were judged by the Navy to be too expensive to modernize and were removed
from service in 2004-2005, leaving 22 ships in operation (CGs 52 through 73).
As a cost-saving measure, the Navy’s FY2015 budget proposes putting the 11 youngest Aegis
cruisers (CGs 63 through 73) into some form of reduced operating status starting in FY2015.
While in reduced operating status, the ships would be modernized in preparation for their
eventual return to full operational status. The ships would be returned to full operational status
years from now, as one-for-one replacements for the 11 older Aegis cruisers that are to remain in
full operational status (CGs 52 through 62), as each of those 11 older cruisers reaches the end of
its service life. Among the 11 Aegis cruisers that are proposed for reduced operating status are
four that are capable of ballistic missile defense (BMD) operations.9 Under a reported preliminary
version of the Navy’s plan, the 11 cruisers put into reduced operating status would return to
service between FY2019 and FY2026, and the ships would operate into the 2030s and (in some
cases) the 2040s.10 Potential oversight questions for Congress include the following:
• What are the comparative costs to keep the 11 cruisers in operation vs. putting
them into reduced operating status?
• What are the potential operational impacts of putting the 11 cruisers into reduced
operating status? How would it affect the Navy’s ability to perform its missions?
• The 11 cruisers have limited remaining growth potential. Will that growth
potential be enough for the ships to support the combat system equipment that
would be needed to keep the ships mission effective into the 2030s and 2040s?
• The CG-47s have crews of 300 or more personnel. By the 2030s and 2040s, the
Navy will include some number of newer-design surface combatants that

8 For press reports discussing the industrial-base aspects of the issue, see Lara Seligman, “Shipbuilder: Navy’s
Timeline For CVN-73 ‘Not In Accordance With Our Plan,’” Inside the Navy, March 24, 2014; Olga Belogolova, “PEO
Carriers: A Cut From 11 To 10 Carriers Would Impact Industrial Base,” Inside the Navy, February 24, 2014; Michael
Fabey, “Foregoing Carrier RCOH Won’t Disrupt Future Work, HII CEO Says,” Aerospace Daily & Defense Report,
March 25, 2014: 4; Rick Giannini and Darrell Grow, “Why Aircraft Carrier Workers Deserve a Better Plan from the
Pentagon,” Defense One (www.defenseone.com), March 23, 2014.
9 These four ships are CG-67 (Shiloh), CG-70 (Lake Erie), CG-72 (Vella Gulf), and CG-73 (Port Royal). For more on
the Aegis BMD program, see CRS Report RL33745, Navy Aegis Ballistic Missile Defense (BMD) Program:
Background and Issues for Congress
, by Ronald O'Rourke.
10 See USNI News Editor, “Navy’s New ‘Battle Force’ Tally To Include Hospital Ships and Small Patrol Craft,” USNI
News (
http://news.usni.org), March 11, 2014.
Congressional Research Service
15

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

incorporate technologies for reducing crew size so as to reduce annual operating
and support (O&S) costs. Assuming the 11 CG-47s could be made mission
effective (see previous question), would they be considered mission cost effective
by future Navy leaders compared to other Navy surface combatants in the 2030s
and 2040s?
• In light of the two previous questions, can current Navy leaders guarantee that
future Navy leaders years from now will follow-through on the plan to bring
these 11 cruisers back into service and operate them into the 2030s and 2040s? If
Navy leaders cannot guarantee this, what does that affect the balance of potential
costs and benefits of the Navy’s plan?
• If the 11 cruisers are assigned partial crews rather than full crews during the time
they are in reduced operating status, which appears to be part of the Navy’s plan,
how many of these 11 cruisers could be quickly returned to full operational status
and deployed in response to a contingency that might require these ships? If the
answer is less than 11, then should all 11 continue to be included in the count of
battle force ships, as the Navy is doing in its FY2015 30-year shipbuilding plan?
Proposal to Retire All 10 Remaining FFG-7 Frigates in FY2015
As another cost-saving measure, the Navy as part of its FY2015 budget submission is proposing
to retire all 10 of its remaining Oliver Hazard Perry (FFG-7) class frigates in FY2015. By
comparison, under the Navy’s FY2014 budget submission, the Navy planned to retire seven of the
ships in FY2015, two more in FY2017, and the final ship in FY2020. The proposed retirements of
these frigates contribute to the projected shortfall in small surface combatants shown in the earlier
years of Table 4. Potential oversight questions for Congress include the following:
• What are the comparative costs to keep some or all of these 10 frigates in service
vs. retiring them in FY2015?
• What are the potential operational impacts of retiring all 10 of these frigates in
FY2015? How would it affect the Navy’s ability to perform its missions?
• Retired FFG-7 class frigates in some cases have been transferred to foreign
navies. What are the Navy’s plans regarding the post-retirement disposition of the
10 remaining FFG-7 frigates?
Proposal to Modify What Ships Are Included in the Count of Battle
Force Ships

As mentioned earlier, the Navy as part of its FY2015 budget submission is proposing to modify
the rules for what ships to include in the count of the total number of battle force ships in the
Navy. The current counting rules date back to an agreement between the Navy and the Office of
the Secretary of Defense in 1981. The Navy’s proposed changes would:
• include certain ships in the count that have been routinely requested by a U.S.
regional combatant commander (COCOM) and allocated among requesting
COCOMs via DOD’s Global Force Management Allocation Plan (GFMAP)—
such ships would be included in the count on a case-by-case basis as
recommended by the Chief of Naval Operations (CNO) with the approval of the
Congressional Research Service
16

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Secretary of the Navy, as a temporary authorization that would remain in effect in
the ships were no longer requested or were retired; and
• exclude ships from the count that are not self-deployable, unless they are forward
deployed (i.e., forward homeported or forward stationed) and approved for
inclusion in the count by the Secretary of the Navy.
The effect of these changes would be to include in the count the Navy’s 10 Cyclone (PC-1) class
patrol craft, which are currently operating in the Persian Gulf region, the Navy’s two hospital
ships (TAHs), and one high-speed transport (HST) ship, while excluding from the count three
mine countermeasures (MCM) ships. As discussed earlier in connection with Table 4, these
proposed changes would affect the reported figures for small surface combatants during the
period FY2015-FY2024 and the reported figures for support ships during the period FY2015-
FY2035.
In proposing the changes, the Navy argues that the current counting rules “do not capture special
situations, such as regional demand [for ships], where non-battle force ships should be counted on
a temporary basis.” The Navy argues that the proposed new rules are “more flexible in response
to Global Force Management Plans and COCOM demand signals.”11 They could also argue that
the largest single proposed modification—the inclusion of the Navy’s 10 Cyclone (PC-1) class
patrol boats in the count—is consistent with the inclusion of certain patrol craft of the day (then
designated PGs and PHMs) in the original 1981 definition of the types of ships to be counted as
battle force ships.
Skeptics could argue that the proposed changes, if implemented, would make it harder to compare
total numbers of battle force ships over time on an apples-to-apples basis, and that they would
complicate congressional oversight by making the rules less transparent to outsiders, particularly
in terms reconstructing or auditing figures for prior years, since doing so would require access to
records of where individual ships were homeported in a given year and which Secretary of the
Navy approvals were in effect in a given year. Skeptics might also argue that these changes are
being proposed at a time that the Navy is proposing to remove ships from service as a cost-saving
measure, and that the changes, if implemented, would have the effect of obscuring the resulting
reduction in the size of the Navy.12
Potential Impact on Size of Navy of Limiting DOD Spending to
BCA Caps Through FY2021

Another potential issue for Congress concerns the potential impact on the size of the Navy of
limiting DOD spending through FY2021 to levels at or near the caps established in the Budget
Control Act of 2011 (BCA) as amended. Navy officials state that a decision to reduce DOD’s
budget to such levels would eventually lead to a smaller Navy.

11 Source: Navy briefing charts on FY2015 30-year shipbuilding plan. See also letter from Secretary of the Navy Ray
Mabus to The Honorable Richard J. Durbin, March 7, 2014, posted at USNI News (http:news.usni.org), March 11,
2014.
12 For press reports discussing the Navy’s proposed changes in counting rules, see Christopher P. Cavas, “New
Counting Rules Add Up To More Ships,” DefenseNews.com, March 11, 2014; USNI News Editor, “Navy’s New
‘Battle Force’ Tally to Include Hospital Ships and Small Patrol Craft,” USNI News (http://news.usni.org), March 11,
2014; Sydney J. Freedberg, Jr., “Outrage On Capitol Hill As Navy Changes Ship-Counting Rules,” Breaking Defense
(
http://breakingdefense.com), March 11, 2014.
Congressional Research Service
17

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Admiral Jonathan Greenert, the Chief of Naval Operations, provided detailed testimony on this
question in his prepared statements for hearings before the Senate Armed Services Committee on
November 7, 2013, and the House Armed Services Committee on September 18, 2013. In his
prepared statement for the November 7, 2013, hearing, which was similar to his prepared
8statement for the September 18, 2013, hearing, Greenert testified that
Consistent with what the Deputy Secretary of Defense told this committee in August, if
fiscally constrained to the revised discretionary caps, over the long term (2013-2023), the
Navy of 2020 would not be able to execute the missions described in the DSG [Defense
Strategic Guidance]. There are numerous ways to adjust Navy’s portfolio of programs to
meet the BCA revised discretionary caps. These are currently under deliberation within the
department. As requested, the following provides perspective on the level and type of
adjustments that will need to be made.
Any scenario to address the fiscal constraints under current law must include sufficient
readiness, capability and manpower to complement the force structure capacity of ships and
aircraft. This balance would need to be maintained to ensure each unit will be effective, even
if the overall fleet is not able to execute the DSG. There are, however, many ways to balance
between force structure, readiness, capability and manpower.
One potential fiscal and programmatic scenario would result in a “2020 Fleet” of about 255-
260 ships, about 30 less than today, and about 40 less than Navy’s PB-14 [President’s
Budget for FY2014] submission. It would include 1-2 fewer CSG [carrier strike groups], and
1-2 fewer ARG [amphibious ready groups] than today. This 2020 fleet would not meet the
DSG requirements for the mission to Provide a Stabilizing Presence. As a result, Navy would
be less able to reinforce deterrence, build alliances and partnerships and influence events
abroad.
• Navy would not increase our global deployed presence, which would remain at about 95
ships in 2020. The lethality inherent in this presence, based on ship type deployed, would be
less than today’s 95-ship presence.
• Navy would not increase presence in the Asia-Pacific, which would stay at about 50 ships
in 2020. This would largely negate the ship force structure portion of our plan to rebalance to
the Asia Pacific region directed by the DSG.
• Navy would not “place a premium on U.S. military presence in—and in support of—
partner nations” in the Middle East, since presence would decrease and, assuming we use the
same ship deployment scheme in the future, there would be gaps in CSG presence totaling 2-
3 months each year.
• Navy would still “evolve our posture” in Europe by meeting our ballistic missile defense
European Phased Adaptive Approach (EPAA) requirements with four BMD-capable DDG
homeported in Rota, Spain and two land based sites in Romania and Poland. Additional
presence would still be provided by forward operating JHSV, MLP, AFSB and some
rotationally deployed combatants.
• Navy would still provide “innovative, low-cost, and small-footprint approaches” to security
in Africa and South America by deploying, on average, one JHSV and one LCS continuously
to both regions and maintaining an AFSB in AFRICOM’s area of responsibility.
In order to sustain a balance of force structure (current and future), modernization and
personnel within our portfolio, continued compliance with the BCA revised discretionary
caps would compel us to reduce our investments in force structure and modernization, which
Congressional Research Service
18

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

would result in a “2020 Fleet” that would not meet DSG direction in the following mission
areas:
Counter Terrorism and Irregular Warfare (CT/IW). We would not have the capacity to
conduct widely distributed CT/IW missions, as defined in the DSG. There would be
inadequate LCS available to allocate to this non-core Navy mission, in the amount defined
by the FSA and concurred upon by Special Operations Command.
Deter and Defeat Aggression. We would not be able to conduct one large-scale operation and
also counter aggression by an opportunistic aggressor in a second theater. In this scenario,
the fleet would have 9-10 CVN/CSG and 9-10 LHA/D and ARG. We would be able to
sustain about one non-deployed CSG and one non-deployed ARG fully certified and able to
surge on required timelines. Together, our presence and surge forces would be sufficient to
conduct all missions associated with only one large scale operation, as defined today. This
overall force and associated readiness would, however, be sufficient to execute Navy
elements of the DSG mission to Conduct Stability and Counterinsurgency Operations.
Project Power Despite Anti-Access/Area Denial (A2/AD) Challenges. Overall, in this
scenario, development of our capabilities to project power would not stay ahead of potential
adversaries’ A2/AD capabilities. We will not meet the projected capability requirements to
assure Joint access in a plausible operational scenario in 2020 due to shortfalls, in particular,
in air and missile defense:
• Some undersea capabilities will be slowed:
• Attainment of the required P-8A inventory (117) would be delayed from 2019 to 2020, and
transition from the P-3C to the P-8A would be delayed from 2019 to 2020.
• Anti-submarine warfare combat system upgrades for DDGs and MFTA installations would
not be affected.
• The LCS ASW Mission Package would be delayed from 2016 to 2017.
• Upgraded sonobuoys and advanced torpedo procurement would still equip all of our
helicopters, SSN, and P-8A in the Western Pacific by 2018.
• Virginia Payload Module (VPM) would still be fielded in 2027 to enable Virginia-class
SSN to replace SSGN that begin retiring in 2026.
• The LCS mine warfare mission package would still field its first increment in 2015 and the
second in 2019.
• Air and missile defense improvements would be slowed:
• SEWIP upgraded electromagnetic sensing and upgraded jamming and deception
capabilities would both be delayed one year (to 2015 and 2018, respectively). Both of these
upgrades are required to counter advances in adversary anti-ship cruise missiles.
• The new Air and Missile Defense Radar (AMDR) would be delivered on only four ships, as
compared to seven under our PB-14 submission, between 2021 and 2024.
• The Evolved Sea Sparrow Missile (ESSM) Block II would still be fielded in 2020, with 80
missiles being delivered to deployed ships.
Congressional Research Service
19

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• The F-35C Lightning II, the carrier-based variant of the Joint Strike Fighter, would still
field in 2019 and join our CVW forward homeported in the Western Pacific in 2020. Overall,
the number of F-35 procured would decrease by about 30 aircraft in 2020.
• All components of the improved air-to-air IR “kill chain” that circumvents adversary radar
jamming would be delayed by two years. The Infrared Search and Track (IRST) sensor
system would field in 2018 and the improved longer-range IRST would not deliver until
2021. The new longer-range AIM-9X Block III missile would not be fielded until 2023.
• Improvements to the air-to-air RF “kill chain” would be slowed down as F/A-18E/F Block
II Super Hornet anti-jamming upgrades would be delayed to 2020. The longer-range AIM-
120D missile would still field in 2014 but equipping of all Pacific carrier air wings would be
delayed by two years to 2022.
• The Navy Integrated Fire Control – Counter Air (NIFC-CA) network would still initially
field with the E-2D Advanced Hawkeye in 2015, but only four CVW (compared to six in our
PB-14 submission) would have it by 2020. Transition to the E-2D would be delayed three
years to 2025.
Operate Effectively in Space and Cyber Space. Plans to recruit, hire and train 976 additional
cyber operators and form 40 computer operations teams by 2017 would not be impacted.
This is a priority in any fiscal scenario. However, the BCA’s reduced funding levels would
delay replacement of our cyber systems and decrease our ability to defend our networks.
Maintain a Safe, Secure, and Effective Nuclear Deterrent. We would still be able to sustain
today’s ballistic missile submarine (SSBN) force. The SSBN(X) would still deliver in 2030
to replace retiring Ohio class SSBN while meeting requirements for SSBN presence and
surge. This is the top priority program for the Navy.
Defend the Homeland and Provide Support to Civil Authorities. We would still meet the
capacity requirements for these missions.
Counter Weapons of Mass Destruction. We would still meet the presence requirements for
this mission.
Conduct Humanitarian, Disaster Relief, and Other Operations. We would still meet the
presence requirements for this mission.
The extent of the fiscal changes in the BCA, when compared to current program and budget
levels, would compel Navy to request relief from several program mandates and force
structure capacity limits, in order to sustain and build a fleet with a balance of ship types. For
example, mandated limits govern the size of the force, minimum funding for certain
activities and facilities, and changes to the number of personnel at a base.13

13 Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the Senate Armed Services
Committee on the Impact of Sequestration on the National Defense, November 7, 2013, pp. 7-11. For Greenert’s
statement for the September 18, 2013, hearing, see Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval
Operations, Before the House Armed Services Committee on Planning for Sequestration in FY 2014 and Perspectives
of the Military Services on the Strategic Choices and Management Review, September 18, 2013, pp. 6-10.
Congressional Research Service
20

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Appropriate Future Size and Structure of Navy in Light of Strategic
and Budgetary Changes

Another potential oversight issue for Congress concerns the appropriate future size and structure
of the Navy. Changes in strategic and budgetary circumstances have led to a broad debate over
the future size and structure of the military, including the Navy. Changes in strategic
circumstances include, among other things, the end of U.S. combat operations in Iraq, the
winding down of U.S. combat operations in Afghanistan, China’s military (including naval)
modernization effort,14 maritime territorial disputes involving China,15 and Russia’s actions to
gain control of Crimea.
On January 5, 2012, the Administration announced that, in light of the end of U.S. combat
operations in Iraq, the winding down of such operations in Afghanistan, and developments in the
Asia-Pacific region, U.S. defense strategy in coming years will include a stronger focus on the
Asia-Pacific region.16 Since the Asia-Pacific region is primarily a maritime and aerospace theater
for the DOD, this shift in strategic focus is expected by many observers to result in a shift in the
allocation of DOD resources toward the Navy and Air Force. DOD officials have indicated that
efforts to support a stronger focus on the Asia-Pacific region will be protected if planned levels of
DOD spending in future years are reduced as a result of the BCA or other legislative action.
The Navy’s current goal for a fleet of 306 ships reflects a number of judgments and planning
factors (some of which the Navy receives from the Office of the Secretary of Defense), including
but not limited to the following:
• U.S. interests and the U.S. role in the world, and the U.S. military strategy for
supporting those interests and that role;
• current and projected Navy missions in support of U.S. military strategy,
including both wartime operations and day-to-day forward-deployed operations;
• current and projected capabilities of potential adversaries, including their anti-
access/area-denial (A2/AD) capabilities;
• regional combatant commander (COCOM) requests for forward-deployed Navy
forces;
• the individual and networked capabilities of current and future Navy ships and
aircraft;
• basing arrangements for Navy ships, including numbers and locations of ships
homeported in foreign countries;

14 For more on the modernization of China’s military (particularly naval) capabilities and its potential implications for
required U.S. Navy capabilities, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy
Capabilities—Background and Issues for Congress
, by Ronald O'Rourke.
15 For a discussion of these disputes, see CRS Report R42784, Maritime Territorial and Exclusive Economic Zone
(EEZ) Disputes Involving China: Issues for Congress
, by Ronald O'Rourke. See also CRS Report R42930, Maritime
Territorial Disputes in East Asia: Issues for Congress
, by Ben Dolven, Shirley A. Kan, and Mark E. Manyin.
16 Department of Defense, Sustaining U.S. Global Leadership: Priorities for 21st Century Defense, January 2012, 8 pp.
For more on this document, see CRS Report R42146, Assessing the January 2012 Defense Strategic Guidance (DSG):
In Brief
, by Catherine Dale and Pat Towell. See also CRS Report R42448, Pivot to the Pacific? The Obama
Administration’s “Rebalancing” Toward Asia
, coordinated by Mark E. Manyin.
Congressional Research Service
21

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• maintenance and deployment cycles for Navy ships; and
• fiscal constraints.
With regard to the fourth point above, Navy officials testified in March 2014 that a Navy of 450
ships would be required to fully meet COCOM requests for forward-deployed Navy forces.17 The
difference between a fleet of 450 ships and the current goal for a fleet of 306 ships can be viewed
as one measure of the operational risk associated with the goal of a fleet of 306 ships. A goal for a
fleet of 450 ships might be viewed as a fiscally unconstrained goal.
Some study groups have made their own proposals for Navy ship force structure that reflect their
own perspectives on the points listed above (particularly the first three and the final one) shows
some of these proposals. For purposes of comparison, also shows the Navy’s 306-ship goal of
January 2013.

17 Spoken testimony of Admiral Jonathan Greenert at a March 12, 2014, hearing before the House Armed Services
Committee on the Department of the Navy’s proposed FY2015 budget, as shown in transcript of hearing.
Congressional Research Service
22

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table 7. Recent Study Group Proposals for Navy Ship Force Structure
Center for
Center for
Navy’s
Project on
Independent
a New
Strategic
306-
Defense
Panel
American
and
ship
Alternatives
Heritage
Cato
Assessment
Sustainable
Security
Budgetary
goal of
(PDA)
Foundation
Institute
of 2010
Defense
(CNAS)
Assessments
January
(November
(April
(September
QDR
Task Force
(November
(CSBA)
Ship type
2013
2012)
2011)
2010)a
(July 2010)
(June 2010)
2008)
(2008)b
Submarines
SSBN
12 7 14c 6 14 7 14 12
SSGN
0 6-7 4
0
4
4
0
2
SSN
48 42 55 40 55 37 40 41
Aircraft carriers
CVN
11 9 11 8 11 9 8 11
CVE
0 0 0 0 0 0 0 4
Surface combatants
Cruiser
22 n/a
18 14
88 72-74 88
85
Destroyer 65
n/a
56
73
Frigate
0 2-7j
14 n/a 0 0 9e
28d
LCS
52 12j 4
n/a
25
48
55
SSC
0
j 0 0 n/a 0 40 0f
Amphibious and Maritime Prepositioning Force (Future) (MPF[F]) ships
Amphibious ships
33 >23 37 23 n/a 27 36 33
MPF(F) ships
0 n/a 0
0 n/a n/a 0
3g
LSD station ships
0 0 0 0 0 0 0 7h
Other: Mine warfare (MIW) ships; Combat Logistics Force (CLF) ships (i.e., at-sea resupply ships), and support ships
MIW
0 14j 14 11 0 0 0 0
CLF ships
29 n/a 33 21 n/a
31
36 40
Support ships
33 n/a 25 27 n/a
31
TOTAL battle
306 230 309 241 346 230 300 326i
force ships
Source: Table prepared by CRS based on the fol owing sources: For Heritage Foundation: A Strong National
Defense[:] The Armed Forces America Needs and What They Will Cost
, Heritage Foundation, April 5, 2011, pp. 25-
26. For Cato Institute: Benjamin H. Friedman and Christopher Preble, Budgetary Savings from Military Restraint,
Washington, Cato Institute, September 23, 2010 (Policy Analysis No. 667), pp. 6, 8-10, and additional
information provided by Cato Institute to CRS by e-mail on September 22, 2010. For Independent Panel
Assessment
: Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting
America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent
Panel
, Washington, 2010, Figure 3-2 on pages 58-59. For Sustainable Defense Task Force: Debt, Deficits, and
Defense, A Way Forward[:] Report of the Sustainable Defense Task Force
, June 11, 2010, pp. 19-20. For CNAS:
Frank Hoffman, From Preponderance to Partnership: American Maritime Power in the 21st Century. Washington,
Center for a New American Security, November 2008. p. 19 (Table 2). For CSBA: Robert O. Work, The US
Navy[:] Charting a Course for Tomorrow’s Fleet
. Washington, Center for Strategic and Budgetary Assessments,
2008. p. 81 (Figure 5). For PDA: Carl Conetta, Reasonable Defense, Project on Defense Alternatives,
November 14, 2012, 31 pp.
Congressional Research Service
23

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is
nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack
submarine; CVN is large nuclear-powered aircraft carrier; CVE is medium-sized aircraft carrier; LCS is Littoral
Combat Ship; SSC (an acronym created by CRS for this table) is smal surface combatant of 1,000+ tons
displacement—a ship similar to late-1990s Streetfighter concept; MPF(F) is Maritime Prepositioning Force
(Future) ship; LSD is LSD-41/49 class amphibious ship operating as a station ship for a formation like a Global
Fleet Station (GFS); MIW is mine warfare ship; CLF is combat logistics force (i.e., resupply) ship.
a. Figures shown are for the year 2020; for subsequent years, reductions from these figures would be
considered.
b. Figures shown are for the year 2028.
c. The report calls for a force of 280 SLBMs, which appears to equate to a force of 14 SSBNs, each with 20
SLBM tubes.
d. The report calls for a force of 28 small surface combatants, and appears to use the term small surface
combatants the same way that the Navy does in the 30-year shipbuilding plan—as a way of collectively
referring to frigates and LCSs. The small surface combatants (SSCs) called for in the November 2008 CNAS
report are separate from and smaller than the LCS.
e. Maritime Security Frigates.
f.
Plan includes 28 patrol craft (PCs) of a few hundred tons displacement each, as wel as 29 boat detachments
and seven riverine squadrons.
g. Plan shows three Mobile Landing Platform (MLP) ships that the Navy currently plans for the MPF(F)
squadron, plus 16 existing current-generation maritime prepositioning force (MPF) ships and 17 existing
prepositioning ships for Army and other service/agency equipment. Plan also shows 67 other DOD sealift
ships.
h. T-LSDs, meaning LSDs operated by the Military Sealift Command (MSC) with a partly civilian crew.
i.
The CSBA report shows a total of 488 units by including 162 additional force units that do not count
toward the 306-ship goal under the battle force ships counting method that has been used since the early
1980s for public policy discussions of the size of the Navy. These 162 additional force units include 16
existing current-generation maritime prepositioning force (MPF) ships and 17 existing prepositioning ships
for Army and other service/agency equipment, 67 other DOD sealift ships, 28 PCs, 29 boat detachments,
and certain other smal -scale units. The CSBA report proposes a new counting method for naval/maritime
forces that includes units such as these in the total count.
j.
The report “prescribes ending procurement of the LCS with the 12 already purchased. The Reasonable
Defense
model foresees a future cohort of 28 to 33 smal surface combatants, including a mix of the 12 LCS
that have already been procured, 14 Mine Counter Measure (MCM) ships already in the fleet, and small
frigates or ocean-going corvettes. As the MCM ships age and leave the fleet, the LCS should assume their
role. The would leave a post-MCM requirement for 16 to 21 additional small surface combatants. For this,
the Navy needs a simpler, less expensive alternative to the LCS.”
A potential key question for Congress concerns whether the U.S. Navy in coming years will be
large enough to adequately counter improved Chinese maritime A2/AD forces while also
adequately performing other missions of interest to U.S. policy makers around the world. Some
observers are concerned that a combination of growing Chinese naval capabilities and budget-
driven reductions in the size of the U.S. Navy could encourage Chinese military overconfidence
and demoralize U.S. allies and partners in the Pacific, and thereby make it harder for the United
States to defend its interests in the region.18 Potential oversight questions for Congress include the
following:

18 See, for example, Dan Blumenthal and Michael Mazza, “Asia Needs a Larger U.S. Defense Budget,” Wall Street
Journal
, July 5, 2011; J. Randy Forbes, “Defence Cuts Imperil US Asia Role,” The Diplomat (http://the-diplomat.com),
October 26, 2011. See also Andrew Krepinevich, “Panetta’s Challenge,” Washington Post, July 15, 2011: 15; Dean
Cheng, Sea Power and the Chinese State: China’s Maritime Ambitions, Heritage Foundation Backgrounder No. 2576,
(continued...)
Congressional Research Service
24

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• Under the Administration’s plans, will the Navy in coming years be large enough
to adequately counter improved Chinese maritime A2/AD forces while also
adequately performing other missions of interest to U.S. policy makers around
the world?
• What might be the political and security implications in the Asia-Pacific region
of a combination of growing Chinese naval capabilities and budget-driven
reductions in the size of the U.S. Navy?
• If the Navy is reduced in size and priority is given to maintaining Navy forces in
the Pacific, what will be the impact on Navy force levels in other parts of the
world, such as the Persian Gulf/Indian Ocean region or the Mediterranean Sea,
and consequently on the Navy’s ability to adequately perform its missions in
those parts of the world?
• To what extent could the operational impacts of a reduction in Navy ship
numbers be mitigated through increased use of forward homeporting, multiple
crewing, and long-duration deployments with crew rotation (i.e., “Sea Swap”)?
How feasible are these options, and what would be their potential costs and
benefits?19
• Particularly in a situation of constrained DOD resources, if enough funding is
allocated to the Navy to permit the Navy in coming years to maintain a fleet of
306 ships including 11 aircraft carriers, how much would other DOD programs
need to be reduced, and what would be the operational implications of those
program reductions in terms of DOD’s overall ability to counter improved
Chinese military forces and perform other missions?20
Affordability of 30-Year Shipbuilding Plan
Another potential oversight issue for Congress concerns the prospective affordability of the
Navy’s 30-year shipbuilding plan. In assessing the prospective affordability of the 30-year plan,
key factors that Congress may consider include estimated ship procurement costs and future
shipbuilding funding levels.
Estimated Ship Procurement Costs
As mentioned earlier, the Navy’s 30-year shipbuilding plan is based on certain assumptions,
including assumptions about ship procurement costs. If one or more Navy ship designs turn out to
be more expensive to build than the Navy estimates, then the projected funding levels shown in
the 30-year shipbuilding plan will not be sufficient to procure all the ships shown in the plan.
Ship designs that can be viewed as posing a risk of being more expensive to build than the Navy
estimates include Gerald R. Ford (CVN-78) class aircraft carriers, Ohio-replacement (SSBNX)

(...continued)
July 11, 2011, p. 10.
19 For further discussion of these options, see CRS Report RS21338, Navy Ship Deployments: New Approaches—
Background and Issues for Congress
, by Ronald O'Rourke.
20 For further discussion, see CRS Report RL33153, China Naval Modernization: Implications for U.S. Navy
Capabilities—Background and Issues for Congress
, by Ronald O'Rourke.
Congressional Research Service
25

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

class ballistic missile submarines, the Flight III version of the DDG-51 destroyer, the TAO(X)
oiler, and the LX(R) amphibious ship.
In recent years, the Congressional Budget Office (CBO) has estimated that certain Navy ships
would be more expensive to procure than the Navy estimates, and consequently that the Navy’s
30-year shipbuilding plan would cost more to implement than the Navy has estimated. In its
October 2013 report on the cost of the FY2014 30-year shipbuilding plan, the CBO estimates that
the plan would cost an average of $19.3 billion per year in constant FY2013 dollars to implement,
or about 15% more than the Navy estimates. CBO’s estimate is about 6% higher than the Navy’s
estimate for the first 10 years of the plan, about 14% higher than the Navy’s estimate for the
second 10 years of the plan, and about 26% higher than the Navy’s estimate for the final 10 years
of the plan.21 Some of the difference between CBO’s estimate and the Navy’s estimate,
particularly in the latter years of the plan, is due to a difference between CBO and the Navy in
how to treat inflation in Navy shipbuilding. Table 8 summarizes the Navy and CBO estimates of
the FY2014 30-year shipbuilding plans.
Table 8. Navy and CBO Estimates of Cost of FY2014 30-Year (FY2014-FY2043)
Shipbuilding Plans
Funding for new-construction ships, in billions of constant FY2013 dollars
First 10 years
Next 10 years
Final 10 years
Entire 30 years

(FY2014-FY2023)
(FY2024-FY2033)
(FY2034-FY2043)
(FY2014-FY2043)
Navy estimate
15.4
19.8
15.2
16.8
CBO estimate
16.3
22.6
19.1
19.3
% difference
6% 14% 26% 15%
between Navy and
CBO estimates
Source: Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2014 Shipbuilding Plan, October 2013,
Table 3 (page 13).
Future Shipbuilding Funding Levels
As mentioned earlier, the Navy’s 30-year shipbuilding plan is based on certain assumptions,
including assumptions about future shipbuilding funding levels. It has been known for some time
that funding requirements for the Ohio-replacement (SSBN[X]) ballistic missile submarine
program will put considerable pressure on the shipbuilding budget during the middle years of the
30-year plan. Although the FY2014 30-year shipbuilding plan reduces procurement of other types
of ships in the middle years of the plan to help accommodate the SSBN(X) program, the Navy
still projects that the shipbuilding budget would need to be substantially higher during the middle
years of the plan than during the earlier or later years of the plan.
If the “hump” in shipbuilding funding during the middle years of the 30-year plan is not achieved,
numerous ships shown for procurement during the middle years of the plan might not be
procured. A potential oversight question for Congress is whether the Navy has received a
commitment or assurance of some kind from DOD leaders that the Navy will be able to budget

21 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2014 Shipbuilding Plan, October 2013, Table 3
(page 13).
Congressional Research Service
26

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

for the “hump” in shipbuilding funding during the middle years of the 30-year plan without
reducing funding for other Navy program priorities. The Navy’s report on the FY2014 30-year
shipbuilding plan states:
The Department [of the Navy] will encounter several challenges in executing this
shipbuilding plan; perhaps the most important is funding and delivering the Ohio-
replacement (OR) program SSBN. The OR SSBN is projected to cost about $6 billion each
[in constant FY2013 dollars]. Therefore, during the procurement and construction of OR
SSBN between FY2021 and FY2035 an average of $19.2 billion per year is projected to be
required for shipbuilding, which will be a key resourcing challenge for the Department.
In addition to the challenge of funding the OR SSBN, during several years in the early 20202
[the] Navy will also require approximately $2 billion [per year] in additional ship
construction funding to recapitalize the large number of ships decommissioning in those
years. Our current fleet has a large cohort of ships that are about the same age and will thus
retire as a group. These ships were built in the 1980s, some at a rate of three or four ships per
year per class. These retiring ships will need to be recapitalized to reach the FSA-required
battle force size and shape [i.e., the 306-ship goal]....
DoN has historically been able to resource between $12B [billion] and $14B in annual new-
ship procurement funding. During the FY2014-FY2018 FYDP, average annual new-ship
procurement funding is about $14B. This level of investment is based on the need to balance
our resources between manning, maintenance, sustainment, modernization and
recapitalization of our ships, aircraft and weapons.
The cost of the OR SSBN is significant relative to the resources available to DoN in any
given year. At the same time, the Department will have to address the block retirement of
ships procured in large numbers during the 1980s which are reaching the end of their service
lives. The confluence of these events prevents DoN from being able to shift resources within
the shipbuilding account to accommodate the cost of the OR SSBN.
If DoN funds the OR SSBN from within its own resources, OR SSBN construction will take
away from construction of other ships in the battle force such as attack submarines,
destroyers, aircraft carriers and amphibious warfare shps. The resulting battle force will not
meet the requirements of the FSA and will therefore not be sufficient to implement the DSG
[Defense Strategic Guidance]. In addition there will be significant impact to the shipbuilding
industrial base.22
In a situation of reduced levels of defense spending, such as what would occur if defense
spending were to remain constrained to the revised cap levels in the Budget Control Act, the
affordability challenge posed by the 30-year shipbuilding plan would be intensified. Even then,
however, the current 30-year shipbuilding plan would not necessarily become unaffordable.23
The Navy estimates that, in constant FY2013 dollars, fully implementing the current 30-year
shipbuilding plan would require an average of $16.8 billion in annual funding for new-
construction ships, compared to a historic average of $12 billion to $14 billion provided for this

22 Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for FY2014, May 2013, pp.
11-12, 18-19.
23 This paragraph and those that follow are adapted from Statement of Ronald O’Rourke, Specialist in Naval Affairs,
Congressional Research Service, Before the House Armed Services Committee Subcommittee on Seapower and
Projection Forces, on the Navy’s FY2014 30-Year Shipbuilding Plan, October 23, 2013, pp. 1-4.
Congressional Research Service
27

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

purpose.24 The required increase in average annual funding of $2.8 billion to $4.8 billion per year
equates to less than 1% of DOD’s annual budget under the revised caps of the Budget Control
Act. CBO estimates that, in constant FY2013 dollars, fully implementing the current 30-year
shipbuilding plan would require an average of $19.3 billion in annual funding for new-
construction ships, or $2.5 billion per year more than the Navy estimates.25 This would make the
required increase in average annual funding $5.3 billion to $7.3 billion per year, which equates to
roughly 1.1% to 1.5% of DOD’s annual budget under the revised caps of the Budget Control Act.
Some observers, noting the U.S. strategic rebalancing toward the Asia-Pacific region, have
advocated shifting a greater share of the DOD budget to the Navy and Air Force, on the grounds
that the Asia-Pacific region is primarily a maritime and aerospace theater for DOD. In discussing
the idea of shifting a greater share of the DOD budget to the Navy and Air Force, some of these
observers refer to breaking the so-called “one-third, one-third, one-third” division of resources
among the three military departments—a shorthand term sometimes used to refer to the more-or-
less stable division of resources between the three military departments that existed for the three
decades between the end of U.S. participation in the Vietnam War in 1973 and the start of the Iraq
War in 2003.26 In a context of breaking the “one-third, one-third, one-third” allocation with an
aim of better aligning defense spending with the strategic rebalancing, shifting 1.5% or less of
DOD’s budget into the Navy’s shipbuilding account would appear to be quite feasible.
More broadly, if defense spending were to remain constrained to the revised cap levels in the
Budget Control Act, then fully funding the Department of the Navy’s total budget at the levels
shown in the current Future Years Defense Plan (FYDP) would require increasing the Department
of the Navy’s share of the non-Defense-Wide part of the DOD budget to about 41%, compared to
about 36% in the FY2014 budget and an average of about 37% for the three-decade period
between the Vietnam and Iraq wars.27 While shifting 4% or 5% of DOD’s budget to the
Department of the Navy would be a more ambitious reallocation than shifting 1.5% or less of the
DOD budget to the Navy’s shipbuilding account, similarly large reallocations have occurred in
the past:
• From the mid-1950s to the mid-1960s, reflecting a U.S. defense strategy at the
time that placed a strong reliance on the deterrent value of nuclear weapons, the

24 See Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for FY2014, May 2013, p.
18.
25 Congressional Budget Office, An Analysis of the Navy’s Fiscal Year 2014 Shipbuilding Plan, October 2013, Table 3
(page 13).
26 The “one-third, one-third, one-third” terminology, though convenient, is not entirely accurate—the military
departments’ shares of the DOD budget, while more or less stable during this period, were not exactly one-third each:
the average share for the Department of the Army was about 26%, the average share for the Department of the Navy
(which includes both the Navy and Marine Corps) was about 32%, the average share for the Department of the Air
Force was about 30%, and the average share for Defense-Wide (the fourth major category of DOD spending) was about
12%. Excluding the Defense-Wide category, which has grown over time, the shares for the three military departments
of the remainder of DOD’s budget during this period become about 29% for the Department of the Army, about 37%
for the Department of the Navy, and about 34% for the Department of the Air Force.
27 Since the Defense-Wide portion of the budget has grown from just a few percent in the 1950s and 1960s to about
15% in more recent years, including the Defense-Wide category of spending in the calculation can lead to military
department shares of the budget in the 1950s and 1960s that are somewhat more elevated compared to those in more
recent years, making it more complex to compare the military departments’ shares across the entire period of time since
the end of the World War II. For this reason, military department shares of the DOD budget cited in this statement are
calculated after excluding the Defense-Wide category. The points made in this statement, however, can still made on
the basis of a calculation that includes the Defense-Wide category.
Congressional Research Service
28

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Department of the Air Force’s share of the non-Defense-Wide DOD budget
increased by several percentage points. The Department of the Air Force’s share
averaged about 45% for the 10-year period FY1956-FY1965, and peaked at more
than 47% in FY1957-FY1959.
• For the 11-year period FY2003-FY2013, as a consequence of combat operations
in Iraq and Afghanistan, the Department of the Army’s share of the non-Defense-
Wide DOD budget increased by roughly 10 percentage points. The Department
of the Army’s share during this period averaged about 39%, and peaked at more
than 43% in FY2008. U.S. combat operations in Iraq and Afghanistan during this
period reflected the implementation of U.S. national strategy as interpreted by
policy makers during those years.
The point of the foregoing is not to argue whether it would be right or wrong to shift more of the
DOD budget to the Navy’s shipbuilding account or to the Department of the Navy’s budget
generally. Doing that would require reducing funding for other DOD programs, and policy
makers would need to weigh the resulting net impact on overall DOD capabilities. The point,
rather, is to note that the allocation of DOD resources is not fixed, that aligning DOD spending
with U.S. strategy in coming years could involve changing the allocation by more than a very
marginal amount, and that such a changed allocation could provide the funding needed to
implement the current 30-year shipbuilding plan. The alternative of assuming at the outset that
there is no potential for making anything more than very marginal shifts in the allocation of DOD
resources could unnecessarily constrain options available to policy makers and prevent the
allocation of DOD resources from being aligned optimally with U.S. strategy.
As an alternative or supplement to the option of altering the allocation of DOD resources among
the military departments, the 30-year shipbuilding plan could also become more affordable by
taking actions beyond those now being implemented by DOD to control military personnel pay
and benefits and reduce what some observers refer to as DOD’s overhead or back-office costs.
Multiple organizations have made recommendations for such actions in recent years. The Defense
Business Board, for example, estimated that at least $200 billion of DOD’s enacted budget for
FY2010 constituted overhead costs. The board stated, “There has been an explosion of overhead
work because the Department has failed to establish adequate controls to keep it in line relative to
the size of the warfight,” and that “in order to accomplish that work, the Department has applied
ever more personnel to those tasks which has added immensely to costs.” The board stated further
that “whether it’s improving the tooth-to-tail ratio; increasing the ‘bang for the buck’, or
converting overhead to combat, Congress and DoD must significantly change their approach,”
and that DOD “must use the numerous world-class business practices and proven business
operations that are applicable to DoD’s overhead.”28
One potential way to interpret the affordability challenge posed by the Navy’s 30-year
shipbuilding plan is to view it as an invitation by the Navy for policy makers to consider matters
such as the alignment between U.S. strategy and the division of DOD resources among the

28 Defense Business Board briefing, “Reducing Overhead and Improving Business Operations, Initial Observations,”
July 22, 2010, slides 15, 5, and 6, posted online at http://www.govexec.com/pdfs/072210rb1.pdf. See also Defense
Business Board, Modernizing the Military Retirement System, Report to the Secretary of Defense, Report FY11-05,
posted online at http://dbb.defense.gov/Portals/35/Documents/Reports/2011/FY11-
5_Modernizing_The_Military_Retirement_System_2011-7.pdf; and Defense Business Board, Corporate Downsizing
Applications for DoD
, Report to the Secretary of Defense, Report FY11-08, posted online at http://dbb.defense.gov/
Portals/35/Documents/Reports/2011/FY11-8_Corporate_Downsizing_Applications_for_DoD_2011-7.pdf.
Congressional Research Service
29

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

military departments, and the potential for taking actions beyond those now being implemented
by DOD to control military personnel pay and benefits and reduce DOD overhead and back-
office costs. The Navy’s prepared statement for a September 18, 2013, hearing before the House
Armed Services Committee on planning for sequestration in FY2014 and the perspectives of the
military services on the Strategic Choices and Management Review (SCMR) provides a number
of details about reductions in Navy force structure and acquisition programs that could result
from constraining DOD’s budget to the revised cap levels in the Budget Control Act.29 These
potential reductions do not appear to reflect any substantial shift in the allocation of DOD
resources among the military departments, or the taking of actions beyond those already being
implemented by DOD to control DOD personnel pay and benefits and reduce DOD overhead and
back-office costs. The fact that the Navy in its prepared statement did not choose to discuss the
possibility of a changed allocation of DOD resources among the military departments or
additional actions to control DOD personnel pay and benefits and reduce DOD overhead and
back-office costs does not prevent Congress from considering such possibilities.
Legislative Activity for FY2015
FY2015 Funding Request
The Navy’s proposed FY2015 budget requests funding for the procurement of seven new battle
force ships (i.e., ships that count against the Navy’s goal for achieving and maintaining a fleet of
306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class
Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy’s proposed FY2015-
FY2019 five-year shipbuilding plan includes a total of 44 ships, compared to a total of 41 ships in
the FY2014-FY2018 five-year shipbuilding plan.
CRS Reports Tracking Legislation on Specific Navy Shipbuilding
Programs

For funding levels and legislative activity on individual Navy shipbuilding programs, see the
following CRS reports:
• CRS Report RS20643, Navy Ford (CVN-78) Class Aircraft Carrier Program:
Background and Issues for Congress, by Ronald O'Rourke.
• CRS Report R41129, Navy Ohio Replacement (SSBN[X]) Ballistic Missile
Submarine Program: Background and Issues for Congress, by Ronald O'Rourke.
• CRS Report RL32418, Navy Virginia (SSN-774) Class Attack Submarine
Procurement: Background and Issues for Congress, by Ronald O'Rourke.
• CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs:
Background and Issues for Congress, by Ronald O'Rourke.

29 Statement of Admiral Jonathan Greenert, U.S. Navy, Chief of Naval Operations, Before the House Armed Services
Committee on Planning for Sequestration in FY 2014 and Perspectives of the Military Services on the Strategic
Choices and Management Review, September 18, 2013, pp. 6-10.
Congressional Research Service
30

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

• CRS Report RL33741, Navy Littoral Combat Ship (LCS) Program: Background
and Issues for Congress, by Ronald O'Rourke.

Congressional Research Service
31

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Appendix A. Comparing Past Ship Force Levels to
Current or Potential Future Ship Force Levels

In assessing the appropriateness of the current or potential future number of ships in the Navy,
observers sometimes compare that number to historical figures for total Navy fleet size. Historical
figures for total fleet size, however, can be a problematic yardstick for assessing the
appropriateness of the current or potential future number of ships in the Navy, particularly if the
historical figures are more than a few years old, because
• the missions to be performed by the Navy, the mix of ships that make up the
Navy, and the technologies that are available to Navy ships for performing
missions all change over time; and
• the number of ships in the fleet in an earlier year might itself have been
inappropriate (i.e., not enough or more than enough) for the meeting the Navy’s
mission requirements in that year.
Regarding the first bullet point above, the Navy, for example, reached a late-Cold War peak of
568 battle force ships at the end of FY1987,30 and as of April 7, 2014, included a total of 289
battle force ships. The FY1987 fleet, however, was intended to meet a set of mission requirements
that focused on countering Soviet naval forces at sea during a potential multi-theater NATO-
Warsaw Pact conflict, while the April 2014 fleet is intended to meet a considerably different set of
mission requirements centered on influencing events ashore by countering both land- and sea-
based military forces of potential regional threats other than Russia, including improved Chinese
military forces and non-state terrorist organizations. In addition, the Navy of FY1987 differed
substantially from the April 2014 fleet in areas such as profusion of precision-guided air-
delivered weapons, numbers of Tomahawk-capable ships, and the sophistication of C4ISR
systems and networking capabilities.31
In coming years, Navy missions may shift again, and the capabilities of Navy ships will likely
have changed further by that time due to developments such as more comprehensive
implementation of networking technology, increased use of ship-based unmanned vehicles, and
the potential fielding of new types of weapons such as lasers or electromagnetic rail guns.
The 568-ship fleet of FY1987 may or may not have been capable of performing its stated
missions; the 289-ship fleet of April 2014 may or may not be capable of performing its stated
missions; and a fleet years from now with a certain number of ships may or may not be capable of

30 Some publications have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however,
is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle
force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total
number of active ships has been larger than the total number of battle force ships. For example, the Naval History and
Heritage Command (formerly the Naval Historical Center) states that as of November 16, 2001, the Navy included a
total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle
force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another
year is thus an apples-to-oranges comparison that in this case overstates the decline since FY1987 in the number of
ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the
Navy over time should use, whenever possible, a single counting method.
31 C4ISR stands for command and control, communications, computers, intelligence, surveillance, and reconnaissance.
Congressional Research Service
32

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

performing its stated missions. Given changes over time in mission requirements, ship mixes, and
technologies, however, these three issues are to a substantial degree independent of one another.
For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a
reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An
increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to
perform its stated missions is increasing, because the fleet’s mission requirements might be
increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing
number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated
missions is decreasing, because the fleet’s mission requirements might be declining more rapidly
than numbers of ships, or because average ship capability and the percentage of time that ships
are in deployed locations might be increasing quickly enough to more than offset reductions in
total ship numbers.
Regarding the second of the two bullet points above, it can be noted that comparisons of the size
of the fleet today with the size of the fleet in earlier years rarely appear to consider whether the
fleet was appropriately sized in those earlier years (and therefore potentially suitable as a
yardstick of comparison), even though it is quite possible that the fleet in those earlier years
might not have been appropriately sized, and even though there might have been differences of
opinion among observers at that time regarding that question. Just as it might not be prudent for
observers years from now to tacitly assume that the 289-ship of April 2014 was appropriately
sized for meeting the mission requirements of 2013, even though there currently are differences
of opinion among observers on that question (as reflected, for example, in Table 7) simply
because a figure of 289 ships appears in the historical records for 2014, so, too, might it not be
prudent for observers today to tacitly assume that the number of ships of the Navy in an earlier
year was appropriate for meeting the Navy’s mission requirements that year, even though there
might have been differences of opinion among observers at that time regarding that question,
simply because the size of the Navy in that year appears in a table like Table C-1.
Previous Navy force structure plans, such as those shown in Table 1, might provide some insight
into the potential adequacy of a proposed new force-structure plan, but changes over time in
mission requirements, technologies available to ships for performing missions, and other force-
planning factors, as well as the possibility that earlier force-structure plans might not have been
appropriate for meeting the mission demands of their times, suggest that some caution should be
applied in using past force structure plans for this purpose, particularly if those past force
structure plans are more than a few years old. The Reagan-era plan for a 600-ship Navy, for
example, was designed for a Cold War set of missions focusing on countering Soviet naval forces
at sea, which is not an appropriate basis for planning the Navy today, and there was considerable
debate during those years as to the appropriateness of the 600-ship goal.32

32 Navy force structure plans that predate those shown in Table 1 include the Reagan-era 600-ship plan of the 1980s,
the Base Force fleet of more than 400 ships planned during the final two years of the George H. W. Bush
Administration, the 346-ship fleet from the Clinton Administration’s 1993 Bottom-Up Review (or BUR, sometimes
also called Base Force II), and the 310-ship fleet of the Clinton Administration’s 1997 QDR. The table below
summarizes some key features of these plans.
Features of Recent Navy Force Structure Plans
Plan
600-ship
Base Force
1993 BUR
1997 QDR
Total ships
~600 ~450/416a 346
~305/310b
Attack submarines
100 80/~55c 45-55 50/55d
(continued...)
Congressional Research Service
33

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Appendix B. Independent Panel Assessment of 2010
QDR

The law that requires DOD to perform QDRs once every four years (10 U.S.C. 118) states that
the results of each QDR shall be assessed by an independent panel. The report of the independent
panel that assessed the 2010 QDR was released on July 29, 2010. The independent panel’s report
recommended a Navy of 346 ships, including 11 aircraft carriers and 55 attack submarines.33 The
report stated the following, among other things:
• “The QDR should reflect current commitments, but it must also plan effectively
for potential threats that could arise over the next 20 years.… we believe the
2010 QDR did not accord sufficient priority to the need to counter anti-access
challenges, strengthen homeland defense (including our defense against cyber
threats), and conduct post-conflict stabilization missions.” (Page 54)
• “In this remarkable period of change, global security will still depend upon an
American presence capable of unimpeded access to all international areas of the
Pacific region. In an environment of ‘anti-access strategies,’ and assertions to
create unique ‘economic and security zones of influence,’ America‘s rightful and
historic presence will be critical. To preserve our interests, the United States will
need to retain the ability to transit freely the areas of the Western Pacific for
security and economic reasons. Our allies also depend on us to be fully present in
the Asia-Pacific as a promoter of stability and to ensure the free flow of
commerce. A robust U.S. force structure, largely rooted in maritime strategy but
including other necessary capabilities, will be essential.” (Page 51)
• “The United States will need agile forces capable of operating against the full
range of potential contingencies. However, the need to deal with irregular and
hybrid threats will tend to drive the size and shape of ground forces for years to

(...continued)
Aircraft carriers
15e 12
11+1f 11+1f
Surface combatants
242/228g ~150
~124 116
Amphibious ships
~75h 51i 41i 36i
Source: Prepared by CRS based on DOD and U.S. Navy data.
a. Commonly referred to as 450-ship plan, but called for decreasing to 416 ships by end of FY1999.
b. Original total of about 305 ships was increased to about 310 due to increase in number of attack submarines to 55
from 50.
c. Plan originally included 80 attack submarines, but this was later reduced to about 55.
d. Plan originally included 50 attack submarines but this was later increased to 55.
e. Plus one additional aircraft carrier in the service life extension program (SLEP).
f. Eleven active carriers plus one operational reserve carrier.
g. Plan originally included 242 surface combatants but this was later reduced to 228.
h. Number needed to lift assault echelons of one Marine Expeditionary Force (MEF) plus one Marine Expeditionary
Brigade (MEB).
i. Number needed to lift assault echelons of 2.5 MEBs. Changing numbers needed to meet this goal reflect in part
changes in the design and capabilities of amphibious ships.
33 Stephen J. Hadley and William J. Perry, co-chairmen, et al, The QDR in Perspective: Meeting America’s National
Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent Panel
,
Washington, 2010, Figure 3-2 on page 58.
Congressional Research Service
34

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

come, whereas the need to continue to be fully present in Asia and the Pacific and
other areas of interest will do the same for naval and air forces.” (Page 55)
• “The force structure in the Asia-Pacific needs to be increased. In order to
preserve U.S. interests, the United States will need to retain the ability to transit
freely the areas of the Western Pacific for security and economic reasons. The
United States must be fully present in the Asia-Pacific region to protect American
lives and territory, ensure the free flow of commerce, maintain stability, and
defend our allies in the region. A robust U.S. force structure, one that is largely
rooted in maritime strategy and includes other necessary capabilities, will be
essential.” (Page 66)
• “Force structure must be strengthened in a number of areas to address the need to
counter anti-access challenges, strengthen homeland defense (including defense
against cyber threats), and conduct post-conflict stabilization missions: First, as a
Pacific power, the U.S. presence in Asia has underwritten the regional stability
that has enabled India and China to emerge as rising economic powers. The
United States should plan on continuing that role for the indefinite future. The
Panel remains concerned that the QDR force structure may not be sufficient to
assure others that the United States can meet its treaty commitments in the face
of China’s increased military capabilities. Therefore, we recommend an increased
priority on defeating anti-access and area-denial threats. This will involve
acquiring new capabilities, and, as Secretary Gates has urged, developing
innovative concepts for their use. Specifically, we believe the United States must
fully fund the modernization of its surface fleet. We also believe the United
States must be able to deny an adversary sanctuary by providing persistent
surveillance, tracking, and rapid engagement with high-volume precision strike.
That is why the Panel supports an increase in investment in long-range strike
systems and their associated sensors. In addition, U.S. forces must develop and
demonstrate the ability to operate in an information-denied environment.” (Pages
59-60)
• “To compete effectively, the U.S. military must continue to develop new
conceptual approaches to dealing with operational challenges, like the Capstone
Concept for Joint Operations (CCJO). The Navy and Air Force‘s effort to
develop an Air-Sea Battle concept is one example of an approach to deal with the
growing anti-access challenge. It will be necessary to invest in modernized
capabilities to make this happen. The Chief of Naval Operations and Chief of
Staff of the Air Force deserve support in this effort, and the Panel recommends
the other military services be brought into the concept when appropriate.” (Page
51; a similar passage appears on page 67)
In recommending a Navy of 346 ships, the independent panel’s report cited the 1993 Bottom-Up
Review (BUR) of U.S. defense plans and policies. Table B-1 compares the Navy’s 306-ship goal
of March 2012 to the 346-ship Navy recommended in the 1993 BUR (as detailed partly in
subsequent Navy testimony and publications) and the ship force levels recommended in the
independent panel report.
Congressional Research Service
35

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table B-1. Comparison of Navy’s 306-ship goal, Navy Plan from 1993 BUR, and Navy
Plan from 2010 QDR Review Panel
2010 QDR
Independent
Navy’s 306-ship goal of
Bottom-Up Review
Review Panel
Ship Type
March 2012
(BUR) (1993)
(July 2010)
SSBNs 12-14
18
14
(SSBN force was later
reduced to 14 as a result of
the 1994 Nuclear Posture
Review)
SSGNs 0-4
0
4
(SSGN program did not yet
exist)
SSNs
~48
45 to 55
55
(55 in FY99, with a long-term
goal of about 45)
Aircraft carriers
11 active
11 active + 1
11 active
operational/reserve
Surface combatants
~145
124
n/a
(114 active + 10 frigates in
Naval Reserve Force; a total
of 110-116 active ships was
also cited)
Cruisers and destroyers
~90
n/a
n/a
Frigates
0
n/a n/a
(to be replaced by LCSs)
LCSs
~55
0
n/a
(LCS program did not exist)
Amphibious ships
~32
41
n/a
(30 operational ships
(Enough to lift 2.5 MEBs)
needed to lift 2.0 MEBs)
Dedicated mine
0
26
n/a
warfare ships
(to be replaced by LCSs)
(LCS program did not exist)
CLF ships
~29
43
n/a
Support ships
~33
22
n/a
TOTAL ships
~306
346
346
(numbers above add to
331-341)a
Source: Table prepared by CRS. Sources for 1993 Bottom-Up Review: Department of Defense, Report on the
Bottom-Up Review
, October 1993, Figure 7 on page 28; Department of the Navy, Highlights of the FY 1995
Department of the Navy Budget
, February 1994, p. 1; Department of the Navy, Force 2001, A Program Guide to the
U.S. Navy
, 1994 edition, p. 15; Statement of VADM T. Joseph Lopez, U.S. Navy, Deputy Chief of Naval
Operations (Resources, Warfare Requirements & Assessments), Testimony to the Military Forces and Personnel
Subcommittee of the House Armed Services Committee, March 22, 1994, pp. 2-5. Source for independent
panel report:
Stephen J. Hadley and William J. Perry, co-chairmen, et al., The QDR in Perspective: Meeting
Congressional Research Service
36

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

America’s National Security Needs In the 21st Century, The Final Report of the Quadrennial Defense Review Independent
Panel
, Washington, 2010, Figure 3-2 on pages 58-59.
Notes: n/a is not addressed in the report. SSBN is nuclear-powered ballistic missile submarine; SSGN is
nuclear-powered cruise missile and special operations forces submarine; SSN is nuclear-powered attack
submarine; LCS is Littoral Combat Ship; MPF(F) is Maritime Prepositioning Force (Future) ship; CLF is combat
logistics force (i.e., resupply) ship; MEB is Marine Expeditionary Brigade.
a. The Navy testified in 1994 that the planned number was adjusted from 346 to 330 to reflect reductions in
numbers of tenders and early retirements of some older amphibious ships.
In a letter dated August 11, 2010, Secretary of Defense Robert Gates provided his comments on
the independent panel’s report. The letter stated in part:
I completely agree with the Panel that a strong navy is essential; however, I disagree with the
Panel’s recommendation that DoD should establish the 1993 Bottom Up Review’s (BUR’s)
fleet of 346 ships as the objective target. That number was a simple projection of the then-
planned size of [the] Navy in FY 1999, not a reflection of 21st century, steady-state
requirements. The fleet described in the 2010 QDR report, with its overall target of 313 to
321 ships, has roughly the same number of aircraft carriers, nuclear-powered attack
submarines, surface combatants, mine warfare vessels, and amphibious ships as the larger
BUR fleet. The main difference between the two fleets is in the numbers of combat logistics,
mobile logistics, and support ships. Although it is true that the 2010 fleet includes fewer of
these ships, they are all now more efficiently manned and operated by the Military Sealift
Command and meet all of DoD’s requirements….
I agree with the Panel’s general conclusion that DoD ought to enhance its overall posture and
capabilities in the Asia-Pacific region. As I outlined in my speech at the Naval War College
in April 2009, “to carry out the missions we may face in the future… we will need numbers,
speed, and the ability to operate in shallow waters.” So as the Air-Sea battle concept
development reaches maturation, and as DoD’s review of global defense posture continues, I
will be looking for ways to meet plausible security threats while emphasizing sustained
forward presence – particularly in the Pacific.34




34 Letter dated August 11, 2010, from Secretary of Defense Robert Gates to the chairmen of the House and Senate
Armed Services and Appropriations Committees, pp. 3 and 4. The ellipsis in the second paragraph appears in the letter.
Congressional Research Service
37

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Appendix C. Size of the Navy and Navy
Shipbuilding Rate

Size of the Navy
Table C-1 shows the size of the Navy in terms of total number of ships since FY1948; the
numbers shown in the table reflect changes over time in the rules specifying which ships count
toward the total. Differing counting rules result in differing totals, and for certain years, figures
reflecting more than one set of counting rules are available. Figures in the table for FY1978 and
subsequent years reflect the battle force ships counting method, which is the set of counting rules
established in the early 1980s for public policy discussions of the size of the Navy.
As shown in the table, the total number of battle force ships in the Navy reached a late-Cold War
peak of 568 at the end of FY1987 and began declining thereafter.35 The Navy fell below 300
battle force ships in August 2003 and included 289 battle force ships as of April 7, 2014.
As discussed in Appendix A, historical figures for total fleet size might not be a reliable yardstick
for assessing the appropriateness of proposals for the future size and structure of the Navy,
particularly if the historical figures are more than a few years old, because the missions to be
performed by the Navy, the mix of ships that make up the Navy, and the technologies that are
available to Navy ships for performing missions all change over time, and because the number of
ships in the fleet in an earlier year might itself have been inappropriate (i.e., not enough or more
than enough) for the meeting the Navy’s mission requirements in that year.
For similar reasons, trends over time in the total number of ships in the Navy are not necessarily a
reliable indicator of the direction of change in the fleet’s ability to perform its stated missions. An
increasing number of ships in the fleet might not necessarily mean that the fleet’s ability to
perform its stated missions is increasing, because the fleet’s mission requirements might be
increasing more rapidly than ship numbers and average ship capability. Similarly, a decreasing
number of ships in the fleet might not necessarily mean that the fleet’s ability to perform stated
missions is decreasing, because the fleet’s mission requirements might be declining more rapidly
than numbers of ships, or because average ship capability and the percentage of time that ships
are in deployed locations might be increasing quickly enough to more than offset reductions in
total ship numbers.

35 Some publications have stated that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however,
is the total number of active ships in the fleet, which is not the same as the total number of battle force ships. The battle
force ships figure is the number used in government discussions of the size of the Navy. In recent years, the total
number of active ships has been larger than the total number of battle force ships. For example, the Naval History and
Heritage Command (formerly the Naval Historical Center) states that as of November 16, 2001, the Navy included a
total of 337 active ships, while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle
force ships. Comparing the total number of active ships in one year to the total number of battle force ships in another
year is thus an apples-to-oranges comparison that in this case overstates the decline since FY1987 in the number of
ships in the Navy. As a general rule to avoid potential statistical distortions, comparisons of the number of ships in the
Navy over time should use, whenever possible, a single counting method.
Congressional Research Service
38

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table C-1. Total Number of Ships in the Navy Since FY1948
FYa Number FYa Number FYa Number
1948 737 1970 769 1992 466
1949 690 1971 702 1993 435
1950 634 1972 654 1994 391
1951 980 1973 584 1995 373
1952 1,097 1974 512 1996 356
1953 1,122 1975 496 1997 354
1954 1,113 1976 476 1998 333
1955 1,030 1977 464 1999 317
1956 973 1978 468 2000 318
1957 967 1979 471 2001 316
1958 890 1980 477 2002 313
1959 860 1981 490 2003 297
1960 812 1982 513 2004 291
1961 897 1983 514 2005 282
1962 959 1984 524 2006 281
1963 916 1985 541 2007 279
1964 917 1986 556 2008 282
1965 936 1987 568 2009 285
1966 947 1988 565 2010 288
1967 973 1989 566 2011 284
1968 976 1990 547 2012 287
1969 926 1991 526 2013 285
Source: Compiled by CRS using U.S. Navy data. Numbers shown reflect changes over time in the rules
specifying which ships count toward the total. Figures for FY1978 and subsequent years reflect the battle force
ships counting method, which is the set of counting rules established in the early 1980s for public policy
discussions of the size of the Navy.
a. Data for earlier years in the table may be for the end of the calendar year (or for some other point during
the year), rather than for the end of the fiscal year.
Shipbuilding Rate
Table C-2 shows past (FY1982-FY2014) and requested or programmed (FY2015-FY2019) rates
of Navy ship procurement.
Congressional Research Service
39

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Table C-2. Battle Force Ships Procured or Requested/Programmed, FY1982-FY2019
(Procured FY1982-FY2014; requested or programmed FY2015-FY2019)
82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00
17 14 16 19 20 17 15 19 15 11 11 7 4 4 5 4 5 5 6
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
6 6 5 7 8 4a
5a
3a 8 7 10 11b 11c 8 7 8 11
10 8
Source: CRS compilation based on Navy budget data and examination of defense authorization and
appropriation committee and conference reports for each fiscal year. The table excludes non-battle force ships
that do not count toward the 306-ship goal, such as certain sealift and prepositioning ships operated by the
Military Sealift Command and oceanographic ships operated by agencies such as the National Oceanic and
Atmospheric Administration (NOAA).
a. The totals shown for FY2006, FY2007, and FY2008, reflect the cancel ation two LCSs funded in FY2006,
another two LCSs funded in FY2007, and an LCS funded in FY2008.
b. The total shown for FY2012 includes two JHSVs—one that was included in the Navy’s FY2012 budget
submission, and one that was included in the Army’s FY2012 budget submission. Until FY2012, JHSVs were
being procured by both the Navy and the Army. The Army was to procure its fifth and final JHSV in
FY2012, and this ship was included in the Army’s FY2012 budget submission. In May 2011, the Navy and
Army signed a Memorandum of Agreement (MOA) transferring the Army’s JHSVs to the Navy. In the
FY2012 DOD Appropriations Act (Division A of H.R. 2055/P.L. 112-74 of December 23, 2011), the JHSV
that was in the Army’s FY2012 budget submission was funded through the Shipbuilding and Conversion,
Navy (SCN) appropriation account, along with the JHSV that the Navy had included in its FY0212 budget
submission. The four JHSVs that were procured through the Army’s budget prior to FY2012, however, are
not included in the annual totals shown in this table.
c. Figure shown does not reflect potential quantity reduction resulting from March 1, 2013, sequester on
FY2013 funding.