Interim Continuing Resolutions (CRs):
Potential Impacts on Agency Operations

Clinton T. Brass
Analyst in Government Organization and Management
November 19, 2010
Congressional Research Service
7-5700
www.crs.gov
RL34700
CRS Report for Congress
P
repared for Members and Committees of Congress

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

Summary
Continuing appropriations acts, often known as continuing resolutions (CRs), have been a
component of the annual appropriations process for decades. When Congress and the President do
not reach final decisions about one or more regular appropriations acts by the beginning of the
federal fiscal year, October 1, they often enact a CR. Two general types of CRs are used. An
“interim” CR provides agencies with stopgap funding for a period of time until final
appropriations decisions are made, or until enactment of another interim CR. A “full-year” CR
provides final funding amounts for the remainder of a fiscal year in lieu of one or more regular
appropriations acts. “Anomalies” may be included in an interim CR to prevent what parties to CR
negotiations perceive as major problems that would be caused if an otherwise uniform approach
were used to provide funding and impose related restrictions. The President, Office of
Management and Budget (OMB), and agencies often are involved with Congress in the process of
formulating, negotiating, and implementing interim CRs. An implication of their involvement is
that they may influence the potential impacts of interim CRs.
Interim CRs typically are intended to both (1) preserve congressional prerogatives to make final
decisions on full-year funding levels and (2) prevent a funding gap and corresponding
government shutdown. Consequently, interim CRs provide relatively restrictive funding levels for
agencies and usually prohibit projects or activities that were not funded in the previous year
(sometimes called “new starts”). Interim CRs also impose some paperwork burden on federal
agencies. Two other potential impacts might be identified. First, the restrictive funding level of an
interim CR may impact upon an agency’s activities, compared to the situation of receiving full-
year appropriations. For example, agency personnel may reduce or delay a variety of actions,
including hiring, award of contracts, and travel. Second, an agency funded by an interim CR may
experience some uncertainty about what its final funding level will be. Uncertainty may cause an
agency to alter its operations, rates of spending, and spending patterns over time, with potential
ripple effects for internal management of the agency and its programmatic activities. Whether any
potential impacts manifest themselves in actual cases would depend on specific circumstances,
including how the interim CR is crafted, the time of year, and an agency’s or program’s particular
operations. OMB and agency documents, as well as Government Accountability Office (GAO)
reports, provide additional perspectives on potential impacts of interim CRs.
Related issues for Congress may include use of anomalies to manage impacts, congressional
access to information and views from agencies and their employees, and the assumptions that are
used when assessing potential impacts.
More extensive analysis on this subject is available in CRS Congressional Distribution
Memorandum, Potential Impacts of Interim Continuing Resolutions (CRs) on Agency Operations
and the Functioning of the Federal Government
, coordinated by Clinton T. Brass (available on
request). This report will be updated annually or more frequently as events warrant.

Congressional Research Service

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

Contents
Introduction ................................................................................................................................ 1
Interim CRs and Their Requirements........................................................................................... 2
Contexts and Purposes of Stopgap Funding ........................................................................... 3
Provisions and Agency Requirements.................................................................................... 4
“Rate for Operations” Formula........................................................................................ 4
Apportionment ................................................................................................................ 4
Restrictions on “New Starts” and Other Activities ........................................................... 5
Anomalies....................................................................................................................... 5
Substantive Legislative Provisions ........................................................................................ 5
“Clean” CRs ......................................................................................................................... 6
Types of Potential Impacts .......................................................................................................... 6
Avoidance of Government Shutdowns................................................................................... 6
Compliance with Administrative Requirements ..................................................................... 6
Funding Level....................................................................................................................... 7
Restrictions on New Projects and Activities........................................................................... 7
Funding Uncertainty ............................................................................................................. 7
Additional Perspectives on Potential Impacts .............................................................................. 8
OMB and Agency Documents ............................................................................................... 8
OMB Documents ............................................................................................................ 8
Agency Documents ......................................................................................................... 9
GAO Reports ...................................................................................................................... 10
GAO Case Study........................................................................................................... 10
Evidence From Other GAO Reports .............................................................................. 11
Potential Issues for Congress..................................................................................................... 12
Managing Potential Impacts of CRs with Anomalies ........................................................... 13
Access to Agency Information and Employee Views ........................................................... 13
Role of Assumptions in Assessing Potential Impacts............................................................ 14

Contacts
Author Contact Information ...................................................................................................... 15

Congressional Research Service

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

Introduction
Continuing appropriations acts, commonly known as continuing resolutions (CRs), have been an
integral component of the annual appropriations process for decades.1 When Congress and the
President do not reach final decisions about one or more regular appropriations acts, they often
negotiate and enact a CR. Two general types of CRs are used. An “interim” CR provides agencies
with stopgap funding for a period of time until final appropriations decisions are made, or until
enactment of another interim CR. A “full-year” CR, by contrast, provides final funding amounts
for the remainder of a fiscal year in lieu of one or more regular appropriations acts. If interim or
full-year appropriations are not enacted, a funding gap and government shutdown occur for
affected agencies and programs.2
This report analyzes potential impacts that interim CRs might have on agency operations.3 CRs
have become commonplace in the federal budget process, with CRs occurring in some form in all
but four years out of a 60-year period from FY1952 to FY2011.4 However, studies of the impacts
of interim CRs are quite limited aside from mostly anecdotal accounts. Furthermore, interim CRs
are formulated differently from time to time, and may affect highly diverse agencies and
programs in varying ways. Without in-depth analysis of specific circumstances, therefore, it may
be difficult, or in many cases impossible, to make generalizable statements about the impacts of
interim CRs on particular agencies at particular times.
It is possible, however, to identify some potential impacts of interim CRs prospectively, utilizing
several approaches.5 This report uses three. First, the report discusses how an interim CR’s
provisions and requirements may impact directly upon an agency, based on what an interim CR
explicitly is formulated to do. Second, the report analyzes Office of Management and Budget
(OMB) and agency documents that have provided guidance or requirements for how an agency
should navigate through periods of interim CRs. The existence and emphases of such documents
may suggest the occurrence, or at least the risk of occurrence, of interim CR-related impacts on
the operations of agencies. Third, the report analyzes brief mentions of claims of impact
contained in Government Accountability Office (GAO) reports from a 20-year span, typically

1 CRS Report RL32614, Duration of Continuing Resolutions in Recent Years, by Jessica Tollestrup. See also CRS
Report RL30343, Continuing Resolutions: Latest Action and Brief Overview of Recent Practices, by Sandy Streeter.
These measures have been called CRs, because they usually provide continuing appropriations in a joint resolution
rather than a bill. Occasionally, continuing appropriations are provided in bill form. Therefore, “continuing
appropriations act” may be the more general term compared to “CR.”
2 Funding gaps usually require that affected federal agencies cease some operations and furlough many of their
employees. For discussion, see CRS Report RS20348, Federal Funding Gaps: A Brief Overview, by Robert Keith; and
CRS Report RL34680, Shutdown of the Federal Government: Causes, Processes, and Effects, by Clinton T. Brass.
3 For a more extensive analysis, see CRS Congressional Distribution Memorandum, Potential Impacts of Interim
Continuing Resolutions (CRs) on Agency Operations and the Functioning of the Federal Government
, July 8, 2008,
coordinated by Clinton T. Brass.
4 It may be no coincidence that CRs have been pursued with such frequency. In high-stakes negotiations on matters of
strong underlying disagreement, a frequently employed technique is to use time as a source of leverage. See, e.g., G.
Richard Shell, Bargaining for Advantage: Negotiation Strategies for Reasonable People (New York: Penguin, 1999),
pp. 89-114. For discussion of how frequently CRs have been used since the 1950s, see CRS Report RL32614, Duration
of Continuing Resolutions in Recent Years
, by Jessica Tollestrup.
5 In this report, the impacts of interim CRs are addressed as perspectives on potential, though not necessarily actual or
representative, impacts. Close study of specific circumstances is typically necessary to have confidence in a claim of
impact. This report does not verify or validate specific claims of actual impacts, nor does it assess whether claims of
impact in some agencies were representative of other agencies’ experiences.
Congressional Research Service
1

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

made by agency officials without independent GAO validation.6 In addition, a GAO report from
2009 provided the results of a case study, in which GAO evaluated the effects of interim CRs on
six federal bureau-size agencies.7
The possibility that an interim CR might cause impacts may raise corresponding issues for
Congress. One issue relates to the fact that the President, OMB, and agencies may play roles in
the formulation, negotiation, and implementation of interim CRs. An implication of this
involvement is that Congress typically does not solely determine what the impacts of an interim
CR will be, because the President, OMB, and agencies may influence the nature and extent of
potential impacts. Another issue relates to interim CRs as a product of high-stakes negotiation
over major issues of fiscal and substantive policy. Claims about positive or negative impacts of
CRs may be used to argue that changes in CR language, budget priorities, or the budget process
are necessary. The ways in which such claims are framed, however, typically rest on implicit
assumptions about what would have happened in the absence of the interim CR (e.g., a
government shutdown, on one hand, or agreement on final appropriations, on the other). Viewing
interim CRs as a product of high-stakes negotiation helps explain why differing assumptions
sometimes may be plausible. Given the nature of budget deliberations and the potential for
changes in the budget process to change power relationships among participants, the ways in
which the impact of an interim CR may be framed might be viewed as similarly significant. The
report’s final section discusses these and other topics.
Full-year CRs occur less frequently than interim CRs. Historically, the term “CR” has been used
in different ways in the context of providing full-year appropriations amounts.8 In any case, full-
year CRs effectively become regular appropriations acts for the fiscal year, complete with the
certainty of final funding decisions. For this reason, full-year CRs generally are not discussed in
this report.
Interim CRs and Their Requirements
Usage of the term “continuing resolution,” like other budget terms, has varied sometimes to
reflect evolving budget practices. This section of the report discusses several aspects of how
interim CRs typically have been formulated and implemented, in order to identify how interim

6 For more extensive discussion of potential impacts of interim CRs, including potential impacts on the federal budget
process and a handful of specific agencies and programs, see CRS Congressional Distribution Memorandum, Potential
Impacts of Interim Continuing Resolutions (CRs) on Agency Operations and the Functioning of the Federal
Government
, July 8, 2008, coordinated by Clinton T. Brass.
7 U.S. Government Accountability Office (hereafter GAO), Continuing Resolutions: Uncertainty Limited Management
Options and Increased Workload in Selected Agencies
, GAO-09-879, September 2009.
8 Some observers might argue that the category of full-year CRs is limited to those measures that include formulaic
provisions that provide for a “rate for operations” through the end of a fiscal year. Others sometimes have referred to
measures as full-year CRs when they include or refer to full text in a regular appropriations act. For example, see Neal
E. Devins, “Appropriations Redux: A Critical Look at the Fiscal Year 1988 Continuing Resolution,” Duke Law
Journal
, vol. 1988 (April/June 1998), pp. 389-421. According to such a perspective, full-year CRs have included four
types of funding provisions: (1) full text of regular appropriations act; (2) language that incorporates regular acts by
reference to the latest stage of congressional action (usually the conference agreement, if one has been reached); (3)
formulaic provisions that provide for a “rate for operations”; or (4) a combination of the previous three types. When
full-year CRs have included the full text of one or more regular appropriations acts, they also have included all the
myriad general and administrative provisions that typically are included in regular acts. Consequently, they may be
hundreds of pages in length, whereas interim CRs may be a few pages or less.
Congressional Research Service
2

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

CRs may impact upon the operations of agencies.9 Some related terms also are highlighted, in
order to distinguish between interim CR-related provisions and other provisions that sometimes
appear in the context of CRs.
Contexts and Purposes of Stopgap Funding
The federal fiscal year begins October 1. For agencies and programs that are funded through
annual appropriations acts, appropriations must be enacted by this date if many governmental
activities are to continue operating. These funds pay for most of the routine operations of federal
agencies, including salaries, contracts, and grants.10 Final action on some of the regular
appropriations acts is frequently delayed beyond October 1. A delay may occur, for example,
when negotiations between Congress and the President have not resulted yet in final decisions.
When action on one or more regular appropriations acts is incomplete after the beginning of a
fiscal year, Congress often provides temporary funding for affected agencies by using an interim
CR. The stopgap funding is available until a date specified in the CR, enactment of a new interim
CR, or enactment of full-year appropriations, whichever occurs earliest. In this sense, the term
“continuing” has been used to indicate that appropriations will continue at a certain level (and
subject to certain conditions), pending further decisions.11
Interim CRs usually are enacted in the context of ongoing and high-stakes budget negotiations
between Congress and the President and within Congress. In general, interim CRs typically are
intended to (1) preserve congressional prerogatives to make final decisions on full-year funding
levels and (2) prevent a funding gap and corresponding government shutdown. Consequently,
interim CRs provide relatively restrictive funding levels for agencies. In addition, an interim CR
may be structured purposefully as less than optimal from the perspective of many stakeholders, in
order to retain sufficient incentive for negotiating parties to come to an accord for final
decisions.12 Participants in a negotiation also may find it necessary to compromise, purposefully
accepting what they perceive as some undesirable impacts in an interim CR (e.g., temporary
constraints on funding) in order to achieve what they perceive as more important, desirable
impacts (e.g., achievement of budget policy goals or avoidance of a government shutdown).13 In

9 This section draws in part on CRS Report RL30343, Continuing Resolutions: Latest Action and Brief Overview of
Recent Practices
, by Sandy Streeter; and CRS Report RL32614, Duration of Continuing Resolutions in Recent Years,
by Jessica Tollestrup. For legal analysis of CRs, see U.S. GAO, Principles of Federal Appropriations Law, 3rd ed., vol.
II, GAO-06-382SP, February 2006, ch. 8.
10 Funds subject to annual appropriations constitute a substantial part, though only a portion, of federal spending. See
CRS Report RL33074, Mandatory Spending Since 1962, by D. Andrew Austin and Mindy R. Levit, and CRS Report
RL34424, Trends in Discretionary Spending, by D. Andrew Austin and Mindy R. Levit.
11 A form of interim CR is the “long-term” CR, which extends appropriations for outstanding regular appropriations
bills temporarily from one calendar year into the next, but does not extend funding to the end of the fiscal year.
12 According to one observer, interim CRs might be seen as devices that set “spending levels ... high enough to let
agencies function but not so high that they removed the incentive for Congress and the president to agree on regular
authorization and appropriations bills.” Joe White, “The Continuing Resolution: A Crazy Way to Govern?,” Brookings
Review
, vol. 6 (summer 1988), p. 30. GAO also has discussed how incentives for policymakers “to negotiate seriously
and reach agreement” may be affected by proposals for budget process changes like an automatic continuing resolution.
See U.S. GAO, Budget Process: Considerations for Updating the Budget Enforcement Act, GAO-01-991T, July 19,
2001, p. 12. For further analysis, see CRS Report RL30339, Preventing Federal Government Shutdowns: Proposals for
an Automatic Continuing Resolution
, by Robert Keith.
13 For related discussion, see G. Richard Shell, Bargaining for Advantage, pp. 156-175.
Congressional Research Service
3

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

other words, some impacts of interim CRs may be a product of intentional concessions in
negotiations, in order to achieve other impacts.
Provisions and Agency Requirements
“Rate for Operations” Formula
Interim CRs have remained fairly constant in form and structure in recent years. In contrast to
regular and supplemental appropriations acts, an interim CR generally does not provide specific
amounts of budget authority for an appropriations account. Instead, an interim CR uses a formula
to calculate the funding amounts that are available for continuing appropriations during a period
of time. Specifically, an interim CR typically provides “such sums as are necessary” to continue
funding at a specified “rate for operations,” over a specific period of time, for accounts in bills
covered by the CR. These rates, which are based on annual amounts or levels of spending, may be
set in various ways. For example, funding has been based on formulas such as (1) the lower of the
amounts provided in the House-passed version or Senate-passed version of the bill (assuming
both houses have acted); (2) the amounts provided in a particular committee-reported bill; or (3)
the funding levels available for the previous fiscal year. Interim CRs frequently provide rates that
vary among the regular appropriations bills funded. An agency that hopes to receive an increase
in its full-year funding level compared to the previous year typically would be subject to rate
restrictions, and would not receive the increased level of funding for the duration of an interim
CR, unless special exceptions were made.
Apportionment
After enactment of an interim CR, OMB provides detailed directions to executive agencies on the
availability of funds and how to proceed with budget execution, typically in a bulletin.14 The
bulletin includes announcement of an “automatic apportionment” of funds that will be made
available for obligation, as a percentage of the annualized amount provided by the CR.15 Under a
typical OMB bulletin, part of the annualized amount is apportioned and made available for
obligation. Funds usually are apportioned either in proportion to the time period of the fiscal year
covered by the CR, or according to the historical, seasonal rate of obligations for the period of the
year covered by the CR, whichever is lower. A 30-day CR might, therefore, provide 30 days
worth of funding, derived either from a certain annualized amount that is set by formula or from a
historical spending pattern. In an interim CR, Congress also may provide authority for OMB to
mitigate furloughs of federal employees by apportioning funds for personnel compensation and

14 For example, see U.S. Executive Office of the President, Office of Management and Budget (hereafter “OMB”),
OMB Bulletin No. 07-05, “Apportionment of the Continuing Resolution(s) for Fiscal Year 2008,” September 28, 2007,
available at http://www.whitehouse.gov/omb/bulletins/fy2007/b07-05.pdf. This bulletin directed agencies how to
operate during the interim CR for the period October 1, 2007, through November 16, 2007, as provided for by P.L.
110-92 (110th Cong.; 121 Stat. 989). These bulletins generally may be found at http://www.whitehouse.gov/omb/
bulletins_default/.
15 The Antideficiency Act (31 U.S.C. §§ 1341-1342, 1511-1519) requires the President to “apportion,” in writing, an
executive agency’s appropriation by specific time periods, activity, or a combination of time periods and activities, in
order to prevent the agency from spending at a rate that would exhaust the appropriated funds before the end of the
fiscal year. OMB implements the requirement on the President’s behalf. During an interim CR, Congress may provide
some flexibility on the timing requirements in apportioning funds. For example, see Section 108 of P.L. 110-92 (121
Stat. 990).
Congressional Research Service
4

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

benefits at a higher rate for operations, albeit with some restrictions.16 Interim CRs impose some
paperwork burden on agencies as a result of these procedures.
Restrictions on “New Starts” and Other Activities
Congress has used interim CRs to protect its prerogative to set full-year funding levels by
restricting and guiding agency activities in other ways, as well. For example, an interim CR may
prohibit an agency from initiating or resuming any project or activity for which funds were not
available in the previous fiscal year (i.e., prohibit “new starts”).17 In addition, Congress has
included provisions like the following in interim CRs, concerning programs that have high initial
rates or distributions of funds (see Sec. 109, below) and concerning projects and activities
generally (see Sec. 110).
Sec. 109. Notwithstanding any other provision of this joint resolution, except section 106, for
those programs that would otherwise have high initial rates of operation or complete
distribution of appropriations at the beginning of fiscal year 2008 because of distributions of
funding to States, foreign countries, grantees, or others, such high initial rates of operation or
complete distribution shall not be made, and no grants shall be awarded for such programs
funded by this joint resolution that would impinge on final funding prerogatives.
Sec. 110. This joint resolution shall be implemented so that only the most limited funding
action of that permitted in the joint resolution shall be taken in order to provide for
continuation of projects and activities.18
Anomalies
Congress, the President, and agencies sometimes negotiate for the inclusion of “anomalies” to the
formulas and restrictions in a CR, to accommodate what they perceive as exceptional
circumstances for an agency, program, or policy. Anomalies typically are included to prevent
what some or all stakeholders and parties to CR negotiations perceive as major programmatic,
operational, or management problems that would be caused if an otherwise “cookie cutter”
approach were used to provide funding at a uniform rate and with uniform restrictions. However,
when measured against the typical coverage of interim CRs, anomalies tend to be rare.
Substantive Legislative Provisions
CRs do not necessarily provide only stopgap or final funding. Some interim and full-year CRs
have included “substantive” legislative provisions—that is, provisions under the jurisdiction of
committees other than the House and Senate Appropriations Committees—covering a wide range

16 For example, see Section 112 of P.L. 110-92 (121 Stat. 991) and OMB Bulletin No. 07-05, p. 4 (attachment, Section
6). OMB might apportion funds at, essentially, greater than a daily rate, as the period of time covered by an interim CR
elapses. However, Congress may require that the “authority provided under this section shall not be used until after the
department or agency has taken all necessary actions to reduce or defer non-personnel-related administrative expenses”
(Section 112 of P.L. 110-92).
17 For example, see Section 104 of P.L. 110-92 (121 Stat. 990).
18 Sections 109 and 110 of P.L. 110-92 (121 Stat. 990). GAO previously reported that provisions like these had been
included in CRs ever since FY1996. See U.S. GAO, Principles of Federal Appropriations Law, 3rd ed., vol. II, GAO-
06-382SP, pp. 8-16 - 8-17.
Congressional Research Service
5

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

of subjects. CRs are attractive vehicles for such provisions because they are considered must-pass
legislation on which Congress and the President eventually must reach agreement.19
“Clean” CRs
A CR that contains a rate for operations but does not contain any anomalies or substantive
legislative provisions is sometimes referred to as a “clean” CR. However, a CR has at times been
described as clean if it includes a limited number of such provisions that an observer views as
acceptable. The level of cleanliness of a CR is typically in the eye of the beholder, therefore.
Types of Potential Impacts
As discussed above, provisions and requirements of interim CRs may impact upon the operations
of agencies in many ways. If impacts were viewed in more general categories, an interim CR
might be characterized as having several types of potential impacts on the operations of agencies.
Avoidance of Government Shutdowns
In the absence of agreement about full-year appropriations among the House, Senate, and
President, an interim CR may have the impact of preventing funding gaps and shutdowns of
government agencies. Historically, shutdowns prior to FY1996 generally were of short duration
and were seen as having relatively modest effects, especially when they occurred over a weekend.
Partial shutdowns of the federal government in FY1996, however, were more far-reaching in their
effects. A five-day shutdown in November 1995 resulted in the furlough of an estimated 800,000
federal employees. A second, 21-day shutdown occurred a month later, resulting in the furlough
of nearly 300,000 federal employees. A large but unspecified number of federal contractor
employees were also furloughed or laid off as a result of suspended contracts.20 The shutdowns
also had pervasive effects on the delivery of services.
Compliance with Administrative Requirements
Because an interim CR imposes tight restrictions on the obligation of funds for its entire duration,
an interim CR may impact upon an agency’s administrative work. As one study of the potential
impacts of interim CRs on DOD summarized, “[t]he most visible effect” of a short-term CR is its
impact on the time and paperwork necessary to manage the distribution of funds.21 As a

19 House Standing Rules XXI, clause 2, and XXII, clause 5, prohibit legislative provisions or unauthorized
appropriations in general appropriations measures, but these restrictions do not apply to continuing resolutions. The
House typically adopts special rules restricting amendments to continuing resolutions, in part for this reason.
Comparable Senate restrictions on legislative provisions and unauthorized appropriations, located in Senate Rule XVI,
do apply in the case of continuing resolutions. See CRS Report RL30343, Continuing Resolutions: Latest Action and
Brief Overview of Recent Practices
, by Sandy Streeter.
20 For discussion, see CRS Report 95-906, Shutdown of the Federal Government: Effects on the Federal Workforce and
Other Sectors
, by James P. McGrath (archived and available upon request).
21 CRS Report 89-579, Short-Term Continuing Resolutions: The Department of Defense Experience, by Alice C.
Maroni (archived and available upon request).
Congressional Research Service
6

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

consequence, comments from agency budget officials about the impacts of interim CRs might
focus on, or be colored by, this experience.
Funding Level
An interim CR determines the funding level that is available for the duration of the CR. At least
three funding scenarios appear to be possible for an agency that is funded by an interim CR: (1)
less funding than otherwise would have been provided under a full-year appropriation (or,
essentially, a lower rate for operations during the CR’s duration); (2) more funding; or (3) the
same amount. For example, suppose an agency anticipated an increase in its full-year budget
because of apparent consensus on a higher prospective funding level among the House, Senate,
and President. Further suppose, however, that the agency’s budget is included in a legislative
vehicle that is the subject of some controversy due to budget or programmatic issues elsewhere in
the legislation. If the level of policy conflict among the House, Senate, and President were such
that an interim CR were used to provide funding until disagreements were resolved, the agency
might receive a considerably lower rate for operations than was anticipated for the duration of the
CR. Assuming a final funding decision were made at the anticipated level, an agency might or
might not be able to “catch up” with what it had planned to do. By contrast, if an agency expected
a lower full-year amount than the rate that was provided by an interim CR, the agency might
experience more flexibility than previously had been anticipated for the duration of the CR.
Finally, if an agency expected flat funding from one year to another, there might be little or no
impact associated with an interim CR’s funding amount. In the face of a restrictive funding level,
agency personnel may reduce or delay a variety of actions, including hiring, award of contracts,
and travel. Whether any potential impacts manifest themselves in actual cases would depend on
specific circumstances, including how the interim CR is crafted, the time of year, and an agency’s
or program’s particular operations.
Restrictions on New Projects and Activities
Prohibition on new projects and activities may delay or disrupt an agency’s ability to undertake
planned activities. For agencies with little need to engage in “new starts,” this prohibition may
not be significant in its implications. For agencies that typically engage in new projects or change
their funding priorities from year to year, however, the prohibition may have more significant
impacts on operations.22
Funding Uncertainty
Uncertainty related to full-year funding levels may impact upon an agency’s ability to follow its
plans. Uncertainty may have two dimensions, concerning (1) the level of full-year funding that
ultimately will be available and (2) the timing of when the full-year amount will be available. If
one or both kinds of certainty were needed for an agency to make decisions (e.g., when to begin a
critical sequence of actions or events), an interim CR might cause an agency to alter its
operations, rates of spending, and spending patterns over time, with potential ripple effects for
internal management of the agency and its programmatic activities.

22 For related discussion, see CRS Report RS22774, Federal Research and Development Funding: Possible Impacts of
Operating under a Continuing Resolution
, by Dana A. Shea and Daniel Morgan.
Congressional Research Service
7

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

Additional Perspectives on Potential Impacts
Other sources of information may suggest more specific ways in which an interim CR
prospectively might impact, or retrospectively may have impacted, upon an agency’s operations.
OMB and Agency Documents
OMB and agencies have extensive experience operating under interim CRs. It seems plausible
that they have learned many related lessons in recent decades. Perhaps as a consequence of such
lessons, OMB and agencies have provided to their personnel written guidance and requirements
for how to operate under an interim CR and how to avoid undesirable impacts. The existence and
emphases of such documents may suggest the occurrence, or at least the risk of occurrence, of
interim CR-related challenges for the operations of agencies.23
OMB Documents
OMB has issued several documents that provide guidance or requirements to agencies, including
its annually issued Circular No. A-11,24 occasionally issued bulletins,25 and other documents.26
These documents suggest the following:
• There is some risk that an agency may not correctly calculate the funds available
under an interim CR and OMB’s automatic apportionments without close OMB
supervision and guidance. Both Circular No. A-11 and OMB’s occasional
bulletins devote the majority of their attention to CR formulas and apportionment
amounts, in compliance with the Antideficiency Act and the CR-imposed
direction to “operate at a minimal level until after your regular appropriation is
enacted.”27
• There is some risk that an agency may undertake a new project or activity,
contrary to an interim CR’s requirements. Both Circular No. A-11 and OMB’s
occasional bulletins address this point.28
• During a CR of extended duration, there is some risk of “major disruptions to
essential government services” if care is not taken to conduct acquisitions using

23 Even in the face of such potential impacts, however, it is not clear that absence of an interim CR would substantially
reduce the need for similar guidance or requirements under a regular appropriations act. Further study would be
necessary to make a determination.
24 OMB, Circular No. A-11: Preparation, Submission, and Execution of the Budget, July 2010, Section 123, p. 1,
available at http://www.whitehouse.gov/omb/circulars_a11_current_year_a11_toc/.
25 For example, concerning apportionment under CRs in specific circumstances.
26 For example, concerning the conduct of acquisitions under a CR. See OMB, “Conducting Acquisitions Under a
Continuing Resolution,” memorandum from Paul A. Denett, Administrator, Office of Federal Procurement Policy,
February 6, 2007, available at http://www.whitehouse.gov/sites/default/files/omb/assets/omb/procurement/memo/
acquisition_under_cr_2007.pdf.
27 OMB, Circular No. A-11, July 2010, Section 123, p. 1.
28 For discussion of the two potential meanings of “projects or activities” in this context, see U.S. GAO, Principles of
Federal Appropriations Law
, 3rd ed., vol. II, pp. 8-21 - 8-27.
Congressional Research Service
8

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

certain practices and “basic steps.”29 According to OMB, these practices and
steps include determining the availability of funding for existing and new
contract requirements; modifying existing contracts as required by the “fiscal
constraints imposed by the CR”; giving contractors and especially small
businesses appropriate notice of funding limitations; following “prudent
contracting principles and practices” to ensure available funds are used “as
efficiently and effectively as possible” and to “minimize disruption of agency
operations”; and funding only ongoing projects and activities, “not new
initiatives or projects.”
Agency Documents
Agency documents that provide guidance and impose requirements for how to operate under an
interim CR appear to range from the highly elaborate to the more ad hoc. For example, the
Department of the Army issued extensive “general guidance” concerning “rules for operation”
under a CR and during a funding gap.30 The National Aeronautics and Space Administration
(NASA) has integrated CRs and shutdowns into its instructions and process diagrams on budget
execution.31 Smaller entities have created their own guidance memoranda and “instruction”
documents.32 Agencies also may issue documents advising on the status of grant awards under a
CR,33 and providing advice to federal and state officials on how to make timely grant awards
under a CR.34 As with OMB documents, the existence and emphases of agency-level documents
suggest the following:
• There is some risk that agency personnel may not properly comply with CR-
related statutory requirements and non-statutory congressional directives without
detailed guidance on, for example, the execution of new funds for things such as
military personnel appropriations, operation and maintenance appropriations, and
other categories of spending.35

29 OMB, “Conducting Acquisitions Under a Continuing Resolution,” memorandum from Paul A. Denett,
Administrator, Office of Federal Procurement Policy, February 6, 2007.
30 U.S. Department of Defense, Department of the Army, Office of the Assistant Secretary of the Army (Financial
Management and Comptroller), Continuing Resolution Authority General Guidance, August 1998, available at
http://www.dtic.mil/srch/doc?collection=t3&id=ADA351724.
31 U.S. National Aeronautics and Space Administration, Office of the Chief Financial Officer, Office Work Instruction:
Budget Execution, March 27, 2002, available at http://nodis3.gsfc.nasa.gov/iso_docs/pdf/
H_OWI_7410_IA000_002_C_.pdf.
32 For example, see Los Alamos National Laboratory, “Guidance Memo on Operating Under a Continuing Resolution
(CR),” memorandum from Thomas M. Palmieri, September 30, 2002, available at http://www.lanl.gov/news/index.php/
fuseaction/nb.story/story_id/3071; and U.S. Department of Commerce, National Oceanic and Atmospheric
Administration, National Weather Service, NWS Guidance for Continuing Resolutions, Instruction 70-204, April 11,
2005, available at http://www.nws.noaa.gov/directives/sym/pd07002004curr.pdf.
33 For example, see U.S. Department of Health and Human Services, National Institutes of Health, “Non-Competing
Grant Awards Under the Current Continuing Resolution,” notice no. NOT-OD-08-001, available at
http://grants.nih.gov/grants/guide/notice-files/NOT-OD-08-001.html.
34 U.S. Environmental Protection Agency, Office of Congressional and Intergovernmental Relations, Best Practices
Guide for Performance Partnership Grants
, no date, available at http://www.epa.gov/ocir/nepps/pp_grants.htm.
35 See U.S. Department of Defense, Department of the Army, Office of the Assistant Secretary of the Army (Financial
Management and Comptroller), Continuing Resolution Authority General Guidance, pp. 3-8.
Congressional Research Service
9

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

• To ensure compliance with congressional directions, agency personnel need to be
instructed that objects of expenditure such as “[t]ravel, training, and other
discretionary costs should be limited to essential programmatic requirements,”
and agency staff need detailed guidance for actions that obligate funds, including
procurement requests and other purchases.36
• There is some risk that agency spending may exceed congressionally directed
minimal amounts in some situations, making it necessary to caution agency
personnel to restrain spending even if both Senate and House versions of
appropriations bills may provide for an increase.37
• Although an agency may have the tools and policies to award grants in a timely
way when operating under an interim CR, and even improve the timeliness of
awards to states under current policies, it is nevertheless “more difficult ... to
make timely awards while the Agency operates under a series of short continuing
resolutions, but it is still possible.”38
• There is some risk that stakeholders and grant recipients will not know that grant
awards may not be fully funded until enactment of full-year appropriations.
Therefore, stakeholders and grant recipients must be notified or reminded.39
GAO Reports
GAO Case Study
A literature review identified a single GAO report that focused primarily on the issue of potential
or actual impacts of interim CRs.40 GAO interviewed officials at six bureau-size agencies about
the effects of interim CRs on “program delivery, management support, and revenue collection.”41
GAO noted that interim CRs enabled agencies to continue to carry out their missions until their
regular appropriations were enacted, and that “legislative anomalies may alleviate some
challenges of operating during the CR period.”42 Nevertheless, although the case study agencies’
experiences varied, GAO found that all of the agencies reported administrative inefficiencies like
delayed hiring (due to funding uncertainty) and some repetitive work (e.g., entering several short-
term contracts or issuing multiple grants instead of annual or quarterly awards). Hiring delays
may have affected some agencies’ abilities to conduct all planned activities (e.g., food and
medical device inspections). Agencies reported also that longer-term interim CRs delayed

36 U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Weather Service, NWS
Guidance for Continuing Resolutions
, Instruction 70-204, pp. 3-5.
37 Los Alamos National Laboratory, “Guidance Memo on Operating Under a Continuing Resolution (CR),”
memorandum from Thomas M. Palmieri.
38 U.S. Environmental Protection Agency, Office of Congressional and Intergovernmental Relations, Best Practices
Guide for Performance Partnership Grants
, pp. 26-27. The “Agency” that is referenced in the quotation is the
Environmental Protection Agency.
39 U.S. Department of Health and Human Services, National Institutes of Health, “Non-Competing Grant Awards
Under the Current Continuing Resolution,” notice no. NOT-OD-08-001.
40 U.S. GAO, Continuing Resolutions: Uncertainty Limited Management Options and Increased Workload in Selected
Agencies
, GAO-09-879, September 2009.
41 Ibid., p. 2.
42 Ibid., p. 9.
Congressional Research Service
10

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

contracts for nonrecurring projects or compressed the time available for discretionary grants.43
However, some agencies shifted their contract and grant cycles to later in the fiscal year to reduce
the amount of additional work required to modify contracts and award grants in multiple
installments.44 Long-term CRs may allow for better planning in the near term, compared to a
series of short-term interim CRs. However, GAO reported that some officials said a prolonged
interim CR “limited their decision-making options, making trade-offs more difficult” (e.g.,
needing to reprioritize funds from other operations to address emergency situations).45
Evidence From Other GAO Reports
Apart from the study described above, GAO reports also may be used to suggest basic categories
of potential impacts. A full-text search of all GAO reports and testimonies from a 20-year span of
time identified a number of items focusing on non-CR topics that also contained brief mentions of
claims of impact associated with interim CRs.46 In most cases, the claims were made by agency
officials without independent validation, because potential or actual CR impacts were not the
focus of the GAO documents. The claims of impact are analyzed and cited here in two categories,
based on their attribution to interim CR-related (1) funding levels or (2) funding uncertainty.
Funding Levels
A number of GAO reports and testimonies cited claims of impact that agency officials attributed
to the funding levels of interim CRs. The claims cited travel expenses being “held to a
minimum”;47 delayed or frozen hiring and cancellation of training;48 possible limitation of
funding available for some construction projects;49 suspension of the issuance of loan
guarantees;50 delayed contracts;51 prolonged interagency transfer of funds and differences

43 Ibid., pp. 14-15.
44 Ibid., p. 19.
45 Ibid., p. 22.
46 Conducted June 2008 using the GAO website’s advanced search function to examine GAO products using CR-
related terms from 1998 to 2008, available at http://searching.gao.gov/query.html?ql=a&charset=iso-8859-1.
Additional items contained brief mentions of claims of impact associated with full-year CRs, as noted below.
47 U.S. GAO, VA Travel: Better Budgeting and Stronger Controls Needed, GAO/GGD-99-137, August 1999, p. 12.
48 U.S. GAO, Internal Revenue Service: Assessment of the 2008 Budget Request and an Update of 2007 Performance,
GAO-07-719T, May 9, 2007, p. 18 (full-year CR); Human Capital: Retirements and Anticipated New Reactor
Applications Will Challenge NRC’s Workforce
, GAO-07-105, January 2007, pp. 1-2, 45, and 64 (full-year CR);
Securities and Exchange Commission: Preliminary Observations on SEC’s Spending and Strategic Planning, GAO-03-
969T, July 23, 2003, p. 2; Securities and Exchange Commission: Review of Fiscal Year 2003 and 2004 Budget
Allocations
, GAO-04-818, July 2004, pp. 2-3, 20; Social Security Administration: Short Time Frame and Workload
Challenges Could Affect Timely Implementation of Income-Based Medicare Part B Premiums
, GAO-07-228R,
November 17, 2006, p. 2; and HHS OIG: Allegations of Misspending Were Unsubstantiated, GAO-04-618R, April 30,
2004, p. 5.
49 U.S. GAO, Military Base Closures: Management Strategy Needed to Mitigate Challenges and Improve
Communication to Help Ensure Timely Implementation of Air National Guard Recommendations
, GAO-07-641, May
2007, pp. 20-21.
50 U.S. GAO, Housing Finance: Options to Help Prevent Suspensions of FHA and RHS Loan Guarantee Programs,
GAO-05-227, March 2005, pp. 11-12.
51 U.S. GAO, Highlights of a GAO Forum: Federal Acquisition Challenges and Opportunities in the 21st Century,
GAO-07-45SP, October 2006, p. 18; and National Science Foundation: Status of the Business Analysis Plan Contract,
GAO-03-832R, July 10, 2003, pp. 1-2, 14.
Congressional Research Service
11

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

between estimated and actual costs;52 impeded use of funds from previous years for a new
agency;53 and delayed delivery of funds to recipients.54 In one instance, GAO cited a claim that an
interim CR should have no impact on the timeliness of assistance payments.55
Funding Uncertainty
In addition, GAO reports and testimonies cited alleged impacts that agency officials attributed to
funding uncertainty related to interim CRs. These claims cited difficulties in managing a new
agency;56 frozen hiring and overtime pay, as well as reduced numbers of cases that were
processed;57 and delayed start-ups of an office, pilot initiative, and process reengineering.58
In the absence of validation studies, it is not clear what conclusions can be drawn about the
potential (or actual) impacts of interim CRs. However, the claims of impact contained in the GAO
publications may suggest a number of hypotheses, including the following:
• impacts of interim CRs may occur in many or all of the cited activities in some
agencies and circumstances;
• some or all of the cited activities may be at risk of impacts from interim CRs
unless an agency undertakes focused planning and execution, or requests that
relevant anomalies be included in interim CRs; and
• agencies that anticipate large funding increases may be at particular risk of
impacts from interim CRs.59
Potential Issues for Congress
The possibility of interim CR-related impacts may raise issues for Congress. Notably, claims of
impacts may generate arguments that changes in CRs, budget priorities, or the budget process are

52 U.S. GAO, Electronic Government: Funding of the Office of Management and Budget’s Initiatives, GAO-05-420,
April 2005, p. 37; and Agricultural Conservation: USDA Should Improve Its Methods for Estimating Technical
Assistance Costs
, GAO-05-58, November 2004, pp. 11-12.
53 U.S. GAO, Transportation Security Administration: Actions and Plans to Build a Results-Oriented Culture, GAO-
03-190, January 2003, p. 8.
54 U.S. GAO, Financial and Management Practices of the Great Lakes Fishery Commission, GAO/NSIAD-98-239R,
August 28, 1998, p. 5; and Project-Based Rental Assistance: HUD Should Update Its Policies and Procedures to Keep
Pace with the Changing Housing Market
, GAO-07-290, April 2007, p. 33.
55 U.S. GAO, Project-Based Rental Assistance: HUD Should Streamline Its Processes to Ensure Timely Housing
Assistance Payments
, GAO-06-57, November 2005, p. 24.
56 U.S. GAO, Budget Issues: Reprogramming of Federal Air Marshal Service Funds in Fiscal Year 2003, GAO-04-
577R, March 31, 2004, p. 2.
57 U.S. GAO, Social Security Disability: Reviews of Beneficiaries’ Disability Status Require Continued Attention to
Achieve Timeliness and Cost-Effectiveness
, GAO-03-662, July 2003, p. 11.
58 U.S. GAO, Small Business Administration: Progress Made, but Transformation Could Benefit from Practices
Emphasizing Transparency and Communication
, GAO-04-76, October 2003, pp. 3, 15; and Agricultural Conservation:
USDA Needs to Better Ensure Protection of Highly Erodible Cropland and Wetlands
, GAO-03-418, April 2003, p. 31.
59 Some of the claims of impact that were cited in the GAO publication corresponded to situations when agencies were
expecting large increases in their budgets. For other examples, see Gregg Carlstrom, “Managers Brace for ‘09 Budget
Delays,” Federal Times, August 25, 2008, p. 9.
Congressional Research Service
12

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

necessary to avoid or modify some purported impacts. Given the high-stakes nature of budget
deliberations and the potential for changes in the budget process to change power relationships
among its participants, claims of impact might be viewed as similarly significant.
Managing Potential Impacts of CRs with Anomalies
If Congress considers pursuing an interim CR, the subject of anomalies usually arises. Anomalies
may be included among the provisions of an interim CR in order to modify or eliminate potential
impacts of an interim CR. Depending upon how an anomaly is structured, an anomaly may cause
the funding for an agency to behave exactly like it would under a regular appropriations act, at
least for the duration of the CR. However, anomalies frequently are not included for many
programs in interim CRs. A potential explanation for the rarity of anomalies is that the granting of
too many anomalies would reduce incentives to negotiate seriously and come to final agreement
on full-year appropriations. Another, related explanation is that an anomaly could, in effect,
constitute a concession during negotiations and reduce a stakeholder’s leverage, unless there were
consensus the anomaly was necessary.
In situations when an agency expects a higher level of funding in an upcoming fiscal year, or if an
agency needs authority to undertake new projects or activities in order to achieve a task, the
agency could request an anomaly. For executive agencies, such a request can be made through the
President and OMB, if the White House elected to propose the anomaly to Congress.
Alternatively, an agency might make such a request directly to Congress, either formally or
informally. An agency could make a request to the President or OMB but have the request denied.
In such a case, an agency might or might not informally make its views or concerns known
directly to Congress. The possibility of direct communications between agencies and Congress
has sometimes been a contentious issue in congressional-executive relations, both generally and
in a budgetary context. In a budgetary context, most executive agencies have operated under
statutory requirements since 1921 that require budget-related requests to be submitted through the
President, as noted below.
Access to Agency Information and Employee Views
The President, OMB, and agencies often are involved with Congress in the process of
formulating, negotiating, and implementing interim CRs. Therefore, they may influence the
potential impacts of interim CRs. Some influence may come from the bargaining power of the
President. Another source of influence, however, may stem from the issue of access to
information from agencies and views of their employees. Because agencies and their employees
are “in the trenches” implementing and formulating public policy, they may have considerable
access to information about the potential impacts of an interim CR. Congress may not always
have ready access to such information. Under the Budget and Accounting Act, 1921, as amended
and recodified,60 Congress has prohibited most executive branch officers and employees from
submitting budget requests to Congress, except through the President and subject to presidential
modification.61 However, Congress has statutorily exempted some agencies from such restrictions
through provisions sometimes referred to as “bypass authority.”62 OMB regulations governing the

60 P.L. 13, 67th Cong., 42 Stat. 20; now codified in Title 31, United States Code.
61 For the relevant provision, see 31 U.S.C. § 1108(e).
62 Administrations and OMB have granted other agencies longstanding “customary” or “informal” bypass authority,
(continued...)
Congressional Research Service
13

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

budget process also direct agency officers and employees to “avoid volunteering” opinions to
Members and committees of Congress that are inconsistent with Administration policies.63
Therefore, the extent to which information and views flow from agencies and their personnel to
Congress about the potential impacts of interim CRs, both formally and informally, may vary.
Role of Assumptions in Assessing Potential Impacts
A claim about the impact of an interim CR may rest on implicit assumptions. The term “impact”
implies a comparison between the described change that is caused by an interim CR, on one hand,
and an assumption about “what otherwise would have happened” without the interim CR, on the
other hand.64 The assumption or estimation of “what otherwise would have happened” is crucial
for any claim about the impact of an interim CR.
For example, suppose an observer characterized an interim CR as having caused a high level of
uncertainty for an agency’s program planning or execution. This statement claims that the CR
caused the stated impact (i.e., high level of uncertainty), which otherwise would not have
happened, all other things being equal. In this case, the claim of impact implicitly assumes a
scenario under which, in the absence of an interim CR, full-year appropriations would have been
passed by October 1. Passage of full-year appropriations, in turn, would have eliminated
uncertainty about funding. However, it also may be plausible that absence of a CR might instead
cause an impasse in negotiations and a government shutdown, rather than enactment of full-year
appropriations, rendering the observer’s claim contestable. The reverse argument may also be
made. Suppose another observer characterized an interim CR as having prevented a government
shutdown. However, it may be plausible that absence of a CR might cause negotiators to reach
agreement on full-year appropriations, thereby avoiding the shutdown without need for a CR.
Claims of an impact or lack of impact can be debatable, therefore, and become subjects of
scrutiny or even controversy. Some observers, for example, might question the validity of an
assumption. An observer might be partly motivated to raise such objections, because claims of
impacts may generate arguments that changes in budget priorities or the budget process are
necessary in order to avoid or modify some purported impacts. Viewing interim CRs as a product
of negotiation, in which parties may come to the table with different underlying values and
assumptions, helps explain why differing perspectives may be plausible. It is conceivable, for
example, that participants in a negotiation may hold opposite perspectives about the impact of an
interim CR in a particular situation. Each participant’s views might be based both on his or her
aspirations for the outcome of negotiations and the negotiating leverage the participant believes
he or she could wield. In other words, because there typically is some uncertainty about the
outcome of any negotiation, contrasting viewpoints may be plausible until decisions are made.

(...continued)
without statutory exemption. See Clinton T. Brass, “Working in, and Working with, the Executive Branch,” in Tobias
A. Dorsey, Legislative Drafter’s Deskbook: A Practical Guide (Alexandria, VA: TheCapitol.Net, 2006), p. 291.
63 OMB, Circular No. A-11, July 2010, Section 22, pp. 1-2. For example, the circular directs employees “when
testifying before any congressional committee or communicating with Members of the Congress” to “give frank and
complete answers to all questions” but also to “avoid volunteering personal opinions that reflect positions inconsistent
with the President’s program or appropriation request.”
64 The concept “what otherwise would have happened” is called a “counterfactual” in the program evaluation field. For
discussion, see CRS Report RL33301, Congress and Program Evaluation: An Overview of Randomized Controlled
Trials (RCTs) and Related Issues
, by Clinton T. Brass, Erin D. Williams, and Blas Nuñez-Neto.
Congressional Research Service
14

Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations


Author Contact Information

Clinton T. Brass

Analyst in Government Organization and
Management
cbrass@crs.loc.gov, 7-4536


Congressional Research Service
15