The Helium-3 Shortage: Supply, Demand, and Options for Congress

Summary
The world is experiencing a shortage of helium-3, a rare isotope of helium with applications in
homeland security, national security, medicine, industry, and science. For many years the supply
of helium-3 from the nuclear weapons program outstripped the demand for helium-3. The
demand was small enough that a substantial stockpile of helium-3 accumulated. After the terrorist
attacks of September 11, 2001, the federal government began deploying neutron detectors at the
U.S. border to help secure the nation against smuggled nuclear and radiological material. The
deployment of this equipment created new demand for helium-3. Use of the polarized helium-3
medical imaging technique also increased. As a result, the size of the stockpile shrank. After
several years of demand exceeding supply, a call for large quantities of helium-3 spurred federal
officials to realize that insufficient helium-3 was available to meet the likely future demand.
Policymakers now face a number of challenging decisions. In the short term, these decisions are
mainly about how to allocate a scarce resource in the face of competing priorities: science versus
security, the private sector versus the public sector, and national needs versus international
obligations. Applications with unique needs may pose particular challenges. For example, some
types of cryogenic research can only be accomplished using helium-3, whereas in medical
imaging and neutron detection, helium 3 has advantages but also alternatives. In the longer term,
policymakers also face choices about how or whether to increase helium-3 supply or reduce
helium-3 demand and about possible alternative mechanisms for allocating supply. It seems likely
that a combination of policy approaches will be necessary.
In addition to the nuclear weapons program, potential sources of helium-3 include tritium
produced as a byproduct in commercial heavy-water nuclear reactors; extraction of naturally
occurring helium-3 from natural gas or the atmosphere; and production of either tritium or
helium-3 using particle accelerators. Until recently, the ready supply of helium-3 from the nuclear
weapons program meant that these alternative sources were not considered economic. With the
current shortage, this perception may change.
The federal response to the helium-3 shortage began only after the shortage had occurred. Policy
was established first by an ad-hoc interagency group formed by the Departments of Energy
(DOE), Homeland Security (DHS), and Defense (DOD), and then by an interagency committee
established by the National Security Staff. The committee developed a rationing scheme for
allocating the available helium-3. Some federal and private-sector users received no allocation or
an amount less than they had planned. Several federal agencies are investigating alternative
sources of helium-3 and ways to reduce the demand.
Congress is just beginning to grapple with the helium-3 problem. In April 2010, Congress held its
first hearing whose main subject was helium-3. So far, congressional attention appears to be
focused on oversight of the current situation, how it arose, and the processes currently in place for
addressing it. In future hearings and legislation, Congress may address additional issues, such as
increasing the helium-3 supply, reducing demand, or changing how supply is allocated.
This report discusses the nature of the shortage; federal actions undertaken so far to address it;
current and potential sources of helium-3 and options for increasing the supply; current and
projected uses of helium-3 and options for reducing the demand; and options for allocating the
supply if it continues to fall short of the demand.

Congressional Research Service

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Contents
Introduction ................................................................................................................................ 1
What Is Helium-3? ................................................................................................................ 1
How Is Helium-3 Made? ....................................................................................................... 1
What Is Helium-3 Used For?................................................................................................. 1
How Do Consumers of Helium-3 Obtain Supplies? ............................................................... 2
What Is the Public Policy Problem?....................................................................................... 3
Federal Response ........................................................................................................................ 4
Identification of the Problem ................................................................................................. 4
Executive Branch Actions ..................................................................................................... 4
Congressional Actions........................................................................................................... 5
Helium-3 Supply......................................................................................................................... 5
Current Supply...................................................................................................................... 6
Potential Additional Sources ................................................................................................. 8
Tritium from Light-Water Nuclear Reactors .................................................................... 8
Tritium from Heavy-Water Nuclear Reactors................................................................... 9
Tritium or Helium-3 from Particle Accelerators............................................................. 10
Helium-3 from Natural Gas........................................................................................... 10
Helium-3 from the Atmosphere ..................................................................................... 12
Options to Increase Supply.................................................................................................. 12
Increase Domestic Tritium Production........................................................................... 13
Import Tritium .............................................................................................................. 14
Increase Domestic Recycling of Helium-3..................................................................... 15
Import Helium-3 ........................................................................................................... 15
Produce Helium-3 from Alternative Sources.................................................................. 16
Helium-3 Demand..................................................................................................................... 16
Current Uses of Helium-3 ................................................................................................... 17
National and Homeland Security ................................................................................... 17
Science ......................................................................................................................... 18
Medicine....................................................................................................................... 18
Industry ........................................................................................................................ 19
Technological Alternatives to Reduce Demand .................................................................... 19
Alternative Technologies for Neutron Detection ............................................................ 19
Alternative Technologies for Other Applications ........................................................... 20
Encouraging Development and Implementation of Alternative Technologies ................. 21
Adjusting the Timing of Demand ........................................................................................ 21
Allocating the Helium-3 Supply to Users .................................................................................. 21
Current Public Auction System ........................................................................................... 22
Current System for Interagency Distribution ....................................................................... 22
Options for Allocation by the Government .......................................................................... 23
Procedural Options for Government Allocation ............................................................. 23
Criteria for Government Allocation ............................................................................... 23
Allocation by the Market..................................................................................................... 25
Summary of Issues for Congress ............................................................................................... 26

Congressional Research Service

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Figures
Figure 1. Size of the Helium-3 Stockpile, 1990-2010................................................................... 7
Figure 2. Projected Helium-3 Demand, FY2009-FY2018 .......................................................... 17

Contacts
Author Contact Information ...................................................................................................... 26
Acknowledgments .................................................................................................................... 27

Congressional Research Service

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Introduction
The world is experiencing a shortage of helium-3, a rare isotope of helium with applications in
homeland security, national security, medicine, industry, and science. Federal officials have
testified that the shortage is acute and, unless alternatives are found, will affect federal
investments in homeland security, scientific research, and other areas. Scientists have expressed
concern that the shortage may threaten certain fields of research. This report discusses the nature
of the shortage; federal actions undertaken so far to address it; current and potential sources of
helium-3 and options for increasing the supply; current and projected uses of helium-3 and
options for reducing the demand; and options for allocating the supply if it continues to fall short
of demand.
What Is Helium-3?
Helium-3 is an isotope of helium, an inert, nontoxic, nonradioactive gas. Most helium is
helium-4. The natural abundance of helium-3, as a fraction of all helium, is very small: only
about 1.37 parts per million.1 Rather than rely on natural abundance, the federal government
manufactures helium-3 through nuclear decay of tritium, a radioactive isotope of hydrogen.
How Is Helium-3 Made?
By far the most common source of helium-3 in the United States is the U.S. nuclear weapons
program, of which it is a byproduct. The federal government produces tritium for use in nuclear
warheads. Tritium decays into helium-3.2 This means that the tritium needs of the nuclear
weapons program, not demand for helium-3 itself, determine the amount of helium-3 produced.
What Is Helium-3 Used For?
Helium-3 has properties that currently make it in high demand. Like all helium, helium-3 is
nontoxic. Helium-3 also absorbs neutrons. This property has resulted in its widespread use for
neutron detection. Neutron detection is a key component of applications in national and homeland
security, industry, and science. For example, the federal government uses radiation portal
monitors and other neutron detectors at the U.S. border to prevent smuggling of nuclear and
radiological material, and the oil and gas industry uses neutron detectors for well logging.3
Another property that has increased demand for helium-3 in recent years is the ability to polarize
its nucleus. For example, magnetic resonance imaging (MRI) can take advantage of this property
to enable real-time visualization of a patient’s lung capacity and capability.4

1 CRC Handbook of Chemistry and Physics, 79th edition (CRC Press, 1998).
2 It takes about 12.3 years for half of any given quantity of tritium to decay into helium-3. This corresponds to an
annual decay rate of about 5.5%. (CRC Handbook of Chemistry and Physics)
3 Well logging is the measurement of geological formations penetrated by a borehole. The use of neutron sources and
neutron detectors in well logging can indicate properties such as rock porosity and the presence of hydrocarbons.
4 “Take a Deep Breath of Nuclear Spin,” CERN Courier, October 2, 2001. See also, Edwin J. R. van Beek and Jim M.
Wild, “Hyperpolarized 3-Helium Magnetic Resonance Imaging to Probe Lung Function,” Proc. Am. Thorac. Soc., 2
(continued...)
Congressional Research Service
1

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Finally, helium-3 has unique cryogenic properties. Low-temperature physicists use a mixture of
helium-3 and helium-4 to achieve temperatures just a few thousandths of a degree above absolute
zero (millikelvins). At temperatures below 2.5 millikelvin, helium-3 becomes a superfluid.5
How Do Consumers of Helium-3 Obtain Supplies?
Helium-3 does not trade in the marketplace as many materials do. It is produced as a byproduct of
nuclear weapons maintenance and, in the United States, is then accumulated in a stockpile from
which supplies are either transferred directly to other agencies or sold publicly at auction. The
U.S. producer of helium-3 is the National Nuclear Security Administration of the Department of
Energy (DOE). The seller for the public auctions is the DOE Office of Isotope Production and
Research.
Although public, the helium-3 auction process has not necessarily been competitive. Most auction
sales have been to just two companies: Spectra Gases, Inc., now part of the Linde Group, and GE
Reuter Stokes, Inc. Many of the auctions have had just one purchaser. Spectra Gases owns the
only facility in the United States that is licensed by the Nuclear Regulatory Commission to
remove trace amounts of tritium from raw helium-3, which is necessary for most uses. Despite
declining supply and increasing demand, the auction price of helium-3 has been relatively steady,
at less than $100 per liter.
Before about 2001, production of helium-3 exceeded consumption. In the past decade
consumption has risen rapidly, in part because of the deployment of neutron detectors using
helium-3 at the U.S. border to help secure the nation against smuggled nuclear and radiological
material. Thus starting in about 2001, and more rapidly since about 2005, the stockpile has been
drawn down. By 2009, the government and others recognized that ongoing demand would soon
exceed the remaining supply.
In March 2009, the Departments of Energy, Homeland Security, and Defense formed an
Integrated Product Team to examine helium-3 supply and demand. The team concluded that
further allocations of helium-3 from the federal stockpile would be made only by interagency
agreement. In July 2009, the White House National Security Staff established an interagency
policy committee (IPC) to investigate helium-3 strategies. In September 2009, the IPC concluded
that the auctions should cease, that no further allocations should be made to DHS for radiation
portal monitors, and that allocations to agencies and others would henceforth be based on three
criteria: whether alternatives to helium-3 exist for the planned application; whether the
application increases national or homeland security; and whether the required helium-3 is needed
to complete prior investments in infrastructure.

(...continued)
(6), 528 (2005).
5 Two Nobel Prizes in Physics have been awarded for work related to such low-temperature physics. In 1996, David M.
Lee, Douglas D. Osheroff, and Robert C. Richardson won the Nobel Prize in Physics for their discovery of
superfluidity in helium-3. In 2003, Alexei A. Abrikosov, Vitaly L. Ginzburg, and Anthony J. Leggett won the Nobel
Prize in Physics for pioneering contributions to the theory of superconductors and superfluids.
Congressional Research Service
2

The Helium-3 Shortage: Supply, Demand, and Options for Congress

What Is the Public Policy Problem?
If helium-3 traded in a free marketplace, price could mediate supply and demand, with the
available supply of helium-3 being allocated on the basis of the willingness of users to pay the
price. Because of the peculiar market arrangement for helium-3, however, supply and demand are
effectively disjoined; the price does not reflect the marginal cost of additional supply. In fact, the
price of helium-3 appears to be much lower than the likely cost of additional supply, so it is not
surprising that demand is exceeding supply. In the face of demand outrunning supply, therefore,
the supply of helium-3 is currently being allocated by the interagency policy committee on the
basis of criteria derived from an assessment of national needs. As a result, a set of interrelated
public policy issues arise: (1) whether it is in the public interest to augment supply, and if so, how
best to do so; (2) whether it is in the public interest to curtail demand, and if so, how best to do
so; (3) whether the current process for allocating existing supplies of helium-3 is acceptable and
in the public interest; and (4) whether, looking to the future, an alternative process for allocating
existing helium-3 supplies is warranted—such as a revised set of allocation criteria derived from
further assessment of needs and priorities, or a market-based process based on aligning price with
marginal cost.
Until 2001, helium-3 production by the nuclear weapons program exceeded the demand, and the
program accumulated a stockpile. After the terrorist attacks of September 11, 2001, the federal
government began deploying neutron detectors at the U.S. border to help secure the nation against
smuggled nuclear and radiological material. The deployment of this equipment created new
federal demand for helium-3. Use of the polarized helium-3 medical imaging technique also
increased. Annual demand for helium-3 quickly exceeded the annual supply. As a result, the
stockpile shrank. After several years of demand exceeding supply, federal officials realized that
insufficient helium-3 was available to meet the likely future demand. The federal government and
others have projected that future demand for helium-3 will significantly increase in future years,
causing the disparity between supply and demand to grow.
Other sources of helium-3 exist, both domestically and internationally. Drawing on these sources
might require the development of new technologies and approaches, as well as addressing
potential international export control concerns. The magnitude of the alternative sources and the
ease with which helium-3 could be extracted is unclear. Similarly, demand for helium-3 might be
reduced through rationing or the development of alternative technologies, but these alternatives
are not yet readily available.
No single policy approach will likely yield sufficient additional supply, reduce predicted demand,
or successfully allocate helium-3 to all that wish to possess it. Policymakers may have to use a
combination of supply- and demand-based approaches to address the helium-3 shortage.
Policymakers now face a number of challenging decisions. Currently, these decisions are mainly
about how to allocate a scarce resource in the face of competing priorities: science versus
security, the private sector versus the public sector, and national needs versus international
obligations. Applications with unique needs may pose particular challenges. For example, some
types of cryogenic research can only be accomplished using helium-3, whereas in medical
imaging and neutron detection, helium-3 has advantages but also alternatives. To address future
helium-3 concerns, policymakers also face choices about how or whether to increase helium-3
supply or reduce helium-3 demand and about possible alternative processes for allocating the
supply.
Congressional Research Service
3

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Federal Response
While the events of 2001 increased the profile and use of helium-3, the federal government did
not foresee the impending shortage. Thus, the executive branch response to the helium-3 shortage
began after the shortage had occurred. First an ad-hoc interagency group formed by the
Departments of Energy (DOE), Homeland Security (DHS), and Defense (DOD) set policy, then
that role passed to an interagency policy committee established by the National Security Staff.
The interagency policy committee developed a rationing scheme for allocating the available
helium-3. As a result, some federal and private-sector users received no allocation or an amount
less than they had previously planned. Several federal agencies are investigating alternative
sources of helium-3 and ways to reduce the demand.
Identification of the Problem
The DOE, the agency responsible for manufacture and disbursement of helium-3, did not predict
the imminent shortage. Neither did any other federal agency that used helium-3. Until 2008, DOE
released helium-3 from the stockpile through public auction and interagency transfers, apparently
without anticipation of likely future demand. Even though the outflow of helium-3 from the
stockpile had become notably greater than the inflow, DOE disbursed increasing amounts each
year from 2002 through 2008. In 2008, the call for a large disbursement of helium-3 to the
Spallation Neutron Source (a DOE research facility) apparently coincided with a recognition that
the helium-3 stockpile could be exhausted and that the available supply might not meet future
demand. At a congressional hearing in November 2009, officials of the Domestic Nuclear
Detection Office (DNDO, an agency in DHS) testified about the shortage of helium-3 and
described the efforts of the federal government to address the shortfall.6 Before that date, budget
justification documents, published research and development strategies, and other agency
planning documents did not identify an impending helium-3 shortage, even though they discussed
the need for continued investment in neutron detection technology to improve sensitivity and
other performance characteristics.
Executive Branch Actions
In March 2009, DOE, DHS, and DOD formed an interagency Integrated Product Team (IPT) to
examine helium-3 supply and demand and related technology R&D. The IPT determined that
further allocations of helium-3 would be made only by interagency agreement.7
In July 2009, the White House National Security Staff established an interagency policy
committee (IPC), with broad federal representation, to investigate strategies for decreasing
helium-3 demand and increasing helium-3 supply and to make recommendations about allocation
of the existing supply.8 In September 2009, the IPC determined that DHS would receive no

6 House Committee on Science and Technology, Subcommittee on Investigations and Oversight, The Science of
Security Part II: Technical Problems Continue to Hinder Advanced Radiation Monitors
, hearing held November 17,
2009.
7 William F. Brinkman, Director, DOE Office of Science, and William K. Hagan, Acting Director, DNDO, testimony
before the House Committee on Science and Technology, Subcommittee on Investigations and Oversight, April 22,
2010.
8 Ibid.
Congressional Research Service
4

The Helium-3 Shortage: Supply, Demand, and Options for Congress

additional allocation of helium-3 for use in radiation portal monitors.9 The IPC also determined
that auctions of helium-3 held in the stockpile would cease. Instead of auctions, the IPC would
allocate the available helium-3 to agencies and others based on three criteria: whether alternatives
to helium-3 exist for the planned application; whether the application increases national or
homeland security; and whether the required helium-3 is needed to complete prior investments in
infrastructure.
The consequence of such a prioritization process is necessarily that lower-priority activities will
not have their helium-3 needs met. For example, DHS has had to delay the deployment schedule
for the Radiation Portal Monitor program. Some small users, such as academic researchers, have
seen the price of helium-3 increase dramatically because of its scarcity.10 Some international
obligations and agreements have not been fulfilled due to these allocation decisions.11
Federal agencies have also attempted to locate and recover any unused or surplus helium-3. Some
have issued requests for information and proposals regarding the recovery of helium-3 from
defunct test equipment.12 Others have issued similar notices regarding storage and maintenance of
agency-based helium-3 supplies.13
Congressional Actions
Congress is just beginning to grapple with the helium-3 problem. In April 2010, Congress held its
first hearing focused mainly on helium-3.14 So far, congressional attention has been focused on
oversight of the current situation, how it arose, and the processes currently in place for addressing
it. In future hearings and legislation, Congress may address additional issues, such as increasing
the helium-3 supply, reducing demand, or modifying the allocation of the limited supply.
Helium-3 Supply
At present, helium-3 is only produced as a byproduct of the manufacture and purification of
tritium for use in nuclear weapons. The supply of helium-3 therefore derives mostly, perhaps

9 William K. Hagan, Acting Deputy Director, DNDO, testimony before the House Committee on Science and
Technology, Subcommittee on Investigations and Oversight, November 17, 2009.
10 Limited supplies of helium-3 are available commercially outside the allocation process through the sale of supplies
already held privately, the recycling of helium-3 from defunct equipment, and the purchase of helium-3 from
international sources. Some reports indicate a market price for this helium-3 of up to $2,000 per liter, 10 or more times
higher than the historical norm. (See, for example, W.P. Halperin, Department of Physics, Northwestern University,
testimony before the House Committee on Science and Technology, Subcommittee on Investigations and Oversight,
April 22, 2010.)
11 For example, except for the U.S. mixed oxide fuel facility, all other U.S. international nuclear safeguards support is
on hold as a result of the helium-3 supply shortage. William F. Brinkman, Director, DOE Office of Science, testimony
before the House Committee on Science and Technology, Subcommittee on Investigations and Oversight, April 22,
2010.
12 For example, DOE, “Helium 3 Gas Recycling from Neutron Detectors,” sources sought notice, February 27, 2009,
https://www.fbo.gov/index?id=d9dcf3dacc5b16d99507e0fe01570f0e.
13 For example, DHS, “He3 Purification, Handling, Tracking and Storage for Neutron Detectors,” notice of intent, April
15, 2009, https://www.fbo.gov/index?id=268f2a1f9267724ea41f4f82cd1dec8c.
14 House Committee on Science and Technology, Subcommittee on Investigations and Oversight, Caught by Surprise:
Causes and Consequences of the Helium-3 Supply Crisis
, hearing held April 22, 2010.
Congressional Research Service
5

The Helium-3 Shortage: Supply, Demand, and Options for Congress

entirely, from two sources: the U.S. and Russian governments.15 Other potential sources of
helium-3 do exist, but using these sources would present varying degrees of technical and policy
challenges. Congress has several options for increasing the supply of helium-3, either from
conventional sources or by encouraging the development of new sources. Among the important
characteristics of all these potential sources are their likely cost and the amount of helium-3 they
could potentially supply. The potential annual production of helium-3 from alternative sources is
uncertain. This uncertainty results from incomplete characterization of the sources, variability in
helium-3 content, and other factors, such as the willingness of public or private entities to invest
in infrastructure to enable production at a particular scale. Even for potentially large sources,
producing helium-3 from these sources may be impractical on cost grounds.
Current Supply
The main source of helium-3 in the United States is the federal government’s nuclear weapons
program. For many years, the National Nuclear Security Administration (NNSA) and its
predecessor agencies have produced tritium for use in nuclear warheads.16 Over time, tritium
decays into helium-3 and must be replaced to maintain warhead effectiveness. The NNSA
recycles the mixture of tritium and helium-3 that results from this decay process and reuses the
resulting pure tritium. From the perspective of the weapons program, the extracted helium-3 is a
byproduct of maintaining the purity of the tritium supply. This means that the tritium needs of the
weapons program, not the demand for helium-3 itself, determine the amount of helium-3
produced.
Until 2001, helium-3 production by the weapons program exceeded demand, and the program
accumulated a stockpile. To recoup some of the cost of purifying recycled tritium, the program
transferred helium-3 from the stockpile to the DOE Office of Isotope Production and Research for
sale at auction. Despite these sales, the helium-3 stockpile grew from roughly 140,000 liters in
1990 to roughly 235,000 liters in 2001.17 Since 2001, however, helium-3 demand has exceeded
production. By 2010, the increased demand had reduced the stockpile to roughly 50,000 liters.
See Figure 1. Note that these amounts do not account for helium-3 imports, exports, or helium-3
supplies held by other agencies or the private sector.

15 Other nuclear weapon states may possess limited stockpiles of helium-3.
16 The NNSA, established in 2000, is a semi-autonomous agency in the Department of Energy that is responsible for
stewardship of the U.S. nuclear weapons stockpile. See http://nnsa.energy.gov/.
17 An amount of helium-3 expressed in liters means the amount that would take up that volume in liters if stored at
standard temperature and pressure. In practice, helium-3 is typically stored in pressurized tanks that take up a much
smaller volume.
Congressional Research Service
6


The Helium-3 Shortage: Supply, Demand, and Options for Congress

Figure 1. Size of the Helium-3 Stockpile, 1990-2010

Source: Adapted from Steve Fetter, Office of Science and Technology Policy, “Overview of Helium-3 Supply
and Demand,” presentation at the American Association for the Advancement of Science Workshop on Helium-
3, April 6, 2010.
The U.S. weapons program currently produces tritium by irradiating lithium in a light-water
nuclear reactor. Before 1988, the program used heavy-water reactors at the DOE Savannah River
Site in South Carolina. In 1988, the last operating Savannah River Site reactor, the K reactor, was
shut down for safety reasons. For the next several years, reductions in the nuclear weapons
stockpile meant that tritium recycling met the weapons program’s needs without additional
tritium production.18 Over time, as the tritium produced before 1988 decayed into helium-3, the
total amount of remaining tritium decreased. The annual rate of helium-3 production from the
remaining tritium declined commensurately.
The DOE restarted tritium production for the weapons program in 2003 using the commercial
Watts Bar reactor in Tennessee, operated by the Tennessee Valley Authority (TVA). The tritium
production process used there is new and involves irradiation of lithium-containing Tritium-
Producing Burnable Absorber Rods (TPBARs). The DOE also built the Tritium Extraction
Facility to extract tritium from irradiated TPBARs. This facility, located at the Savannah River

18 For an overview of the debate surrounding the DOE production of tritium in the 1990s, see CRS Report RL30425,
The Department of Energy’s Tritium Production Program, by Richard E. Rowberg (out of print; available from the
authors).
Congressional Research Service
7

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Site, became operational in 2007.19 The NNSA plans to begin irradiating TPBARs at the TVA’s
two Sequoyah reactors in FY2012.20 Currently, TVA irradiates only a small number of TPBARs,
and tritium production is limited.
As shown in Figure 1, the decay of tritium held by the U.S. nuclear weapons program currently
generates approximately 8,000 liters of new helium-3 per year. Historically, the price of helium-3
has been $100 to $200 per liter, with commercial prices rising to $2,000 per liter or more after the
discovery of the shortage.21
Potential Additional Sources
Potential additional sources of helium-3 include increased production of tritium in light-water
nuclear reactors (beyond the amount already produced for the weapons program); extraction of
tritium produced as a byproduct in commercial heavy-water nuclear reactors; production of either
tritium or helium-3 using particle accelerators; and extraction of naturally occurring helium-3
from natural gas or the atmosphere. Until recently, the ready supply of helium-3 from the nuclear
weapons program meant that these alternative sources were not considered economically
attractive. With the current shortage, this consideration may change.
Tritium from Light-Water Nuclear Reactors
The production of additional tritium at the TVA reactors (or by similar means at other reactors)
would increase helium-3 production correspondingly. The Watts Bar reactor currently irradiates
240 TPBARs per refueling cycle. The Nuclear Regulatory Commission has generically approved
the use of approximately 2,300 TPBARs per reactor per cycle.22 If this capacity were fully
utilized at Watts Bar and Sequoyah, annual helium-3 production from the resulting additional
tritium could eventually increase by approximately 25,000 liters.23 At present, however, the site-
specific licenses for Watts Bar and Sequoyah permit irradiation of only a much smaller number of
TPBARs, and the TVA has limited that number still further because of an issue with tritium
permeation into the reactor cooling water.24 If the current rate of 240 TPBARs per cycle at Watts
Bar were successfully extended to both Sequoyah reactors, the result might be an eventual
increase in annual helium-3 production of nearly 3,000 liters.25
To realize these annual production rates, however, the increased tritium production would need to
continue for many years. Because of the slow decay of tritium to helium-3, the production of
helium-3 would increase gradually over several decades. Only after more than a decade of

19 See Savannah River Site, Tritium Extraction Facility factsheet, http://www.srs.gov/general/news/factsheets/tef.pdf,
December 2007.
20 DOE FY2011 congressional budget justification, vol. 1, p. 146.
21 Adrian Cho, “Helium-3 Shortage Could Put Freeze on Low-Temperature Research,” Science, November 6, 2009, pp.
778-779.
22 Nuclear Regulatory Commission, personal communication, June 25, 2010.
23 CRS calculation based on an estimated yield of 0.75 grams of tritium per TPBAR on a typical 18-month cycle.
24 Nuclear Regulatory Commission, personal communication, June 25, 2010.
25 CRS calculation as above.
Congressional Research Service
8

The Helium-3 Shortage: Supply, Demand, and Options for Congress

increased tritium production would the rate of additional helium-3 production approach even 50%
of the projected long-term level.26
At present, the nuclear weapons program, in effect, subsidizes the cost of production for helium-
3, because the program must manufacture and purify tritium for the ongoing maintenance of its
nuclear weapons. The same would presumably be true for additional helium-3 that resulted from
increased tritium production to meet the weapons program’s needs. If, however, the weapons
program increased tritium production to more than the amount it needed, solely in order to
generate additional helium-3, it might pass the additional infrastructure and processing costs on to
the users of helium-3. According to one estimate, the unsubsidized cost of manufacturing tritium
for the nuclear weapons program is between $84,000 and $130,000 per gram.27 This corresponds
to between $11,000 and $18,000 per liter of eventual helium-3.
Tritium from Heavy-Water Nuclear Reactors
Some nuclear reactors, primarily foreign reactors built on the Canada Deuterium Uranium
(CANDU) design, use heavy water as a moderating material. Over time, neutrons produced by
these reactors convert some of the deuterium in the heavy water into tritium. Some reactor
operators, concerned about radiation exposure, remove the tritium from the heavy water when it
exceeds a certain concentration. There are currently no commercial heavy-water reactors in the
United States, but some foreign facilities have tritium stockpiles that reflect multiple years of
operation and separation. Because tritium decays into helium-3, these foreign tritium stockpiles
are a potential source of helium-3. Separation of helium-3 from this tritium, while a known
industrial procedure, would require specialized facilities and equipment, permits from appropriate
government authorities, and perhaps operational changes.
Most of the world’s CANDU reactors are located in Canada. Other countries with one or more
such reactors include Argentina, China, India, Pakistan, Romania, and South Korea.28 The
international nature of the CANDU reactor operators may provide additional challenges to using
them as a helium-3 source. Each government would likely need to approve the transfer of tritium,
a dual-use material, to the United States.29
Some of the tritium produced in past operation of heavy-water reactors has already decayed into
helium-3 according to its 12.3-year half-life. That helium-3 has probably not yet been separated
from the stored tritium, and it seems likely that some or all of it remains available. If so, that
helium-3 could provide a larger supply in the near term than the annual production available in
subsequent years from continuing decay of the stored tritium. According to one estimate, the
tritium stored at Ontario Power Generation in Canada could produce 130,000 liters of helium-3

26 The additional helium-3 production would reach 50% of its long-term level after the increased tritium production had
been ongoing for about one tritium half-life, or 12.3 years. It would reach 75% of its long-term level after about two
tritium half-lives, or 24.6 years. It would reach 90% of its long-term level after about 41 years. (CRS calculation)
27 Department of Energy, Office of Inspector General, “Modernization of Tritium Requirements Systems,”
DOE/IG-0632, December 2003, p. 4.
28 “World List of Nuclear Power Plants,” Nuclear News, March 2010.
29 Dual-use materials have both a military and a civilian use. The United States and other countries often regulate the
export of dual-use technologies.
Congressional Research Service
9

The Helium-3 Shortage: Supply, Demand, and Options for Congress

over ten years: 20,000 liters per year for the first three years and 10,000 liters per year for the
next seven.30 The amount potentially available from other heavy-water reactors is unknown.
The cost of helium-3 from this source is unknown, because it would depend on the price charged
for tritium by the foreign supplier. There would also be some costs for separating the helium-3
from the tritium and for storing the remaining tritium as it decayed.
Tritium or Helium-3 from Particle Accelerators
During the 1990s, the U.S. nuclear weapons program considered alternative approaches to
producing tritium, especially irradiating lithium with a linear accelerator rather than in a nuclear
reactor. In 1998, DOE decided not to proceed with accelerator production of tritium, except as a
possible backup option, after concluding that it would be more costly and less flexible than
producing tritium in a light-water reactor. Given that decision and the government’s subsequent
investments in tritium production infrastructure, it seems unlikely that accelerator production of
tritium could be an advantageous source of helium-3.
In principle, helium-3 could also be produced directly in an accelerator process, without
intermediate production of tritium. Preliminary estimates suggest, however, that this process is
impractical on cost grounds.31
Helium-3 from Natural Gas
Natural gas reservoirs typically contain impurities as well as the primary component of natural
gas, methane. In some cases, these impurities include significant amounts of helium (up to several
percent). Suppliers of natural gas often extract this helium in order to increase the energy content
of their natural gas and improve its combustion. When a reservoir is relatively helium-rich, it can
be economic to purify the extracted helium and sell it as a commodity. In fact, natural gas is the
primary commercial source of helium. Domestic natural gas producers extract approximately 80
billion liters of helium each year.32
Since 1960, the federal government has maintained a stockpile of raw (unpurified) helium at a
facility near Amarillo, Texas.33 The original purpose of the stockpile was to ensure the availability
of helium for national security uses. In the Helium Privatization Act of 1996 (P.L. 104-273),

30 Steve Fetter, Office of Science and Technology Policy, “Overview of Helium-3 Supply and Demand,” presentation
at the American Association for the Advancement of Science Workshop on Helium-3, April 6, 2010,
http://cstsp.aaas.org/files/he3_fetter.pdf.
31 Richard Kouzes and Edward Siciliano, “Accelerator Based 3He Production,” appendix in R.L. Kouzes, Pacific
Northwest National Laboratory, “The 3He Supply Problem,” PNNL-18388, April 2009. The example considered in this
paper indicates that an accelerator costing several million dollars would take several years to produce even a few tens
of liters of helium-3.
32 Department of the Interior, U.S. Geological Survey, Mineral Commodity Summaries 2010, http://minerals.usgs.gov/
minerals/pubs/mcs/2010/mcs2010.pdf, p. 72.
33 For more information, see Government Accountability Office, Helium Program: Key Developments Since the Early
1990s and Future Considerations
, GAO-10-700T, May 13, 2010; and National Research Council, Selling the Nation’s
Helium Reserve
, 2010.
Congressional Research Service
10

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Congress mandated the sale of all but a small portion of the stockpile by 2015. At the end of
FY2009, however, more than 500 billion liters of helium remained in the stockpile.34
Helium extracted from natural gas, including helium stored in the national helium stockpile,
consists mostly of helium-4 but also includes a small proportion of helium-3. The natural gas
industry has not historically separated helium-3 from helium-4 because, until recently, the federal
supply of helium-3 was perceived to be already greater than the likely demand.
An important cost consideration is that some of the processes required to extract helium-3 from
natural gas are already undertaken in the production of natural gas and commodity helium.
Helium-containing natural gas is purified by liquefaction—cooling it to a temperature at which
the natural gas becomes liquid but the helium remains a gas. The helium is separated and then
purified by further liquefaction—cooling to a still lower temperature at which the impurities
become liquid. The most likely processes for separating helium-3 from helium-4 take place at
even lower temperatures, so the fact that helium produced from natural gas is already very cold
becomes an important cost advantage. If separation of helium-3 from natural gas took place in
conjunction with other natural gas processing, much of the energy required for cooling, and much
of the cost of infrastructure and equipment for liquefaction and separation, would already be built
into the cost of processing the natural gas.
Separation of helium-3 from helium-4 has been demonstrated on a laboratory scale.35 Public or
private investment in process engineering and development would likely be needed before
moving to full-scale production. The amount of helium-3 that could be extracted on a large scale
would depend on several factors: access to helium supplies, the proportion of helium-3 in the
source helium, the capacity of the processing equipment, and the efficiency of the extraction
process.
The U.S. Geological Survey estimates total U.S. helium reserves and resources to be 20.6 trillion
liters.36 Natural gas reservoirs vary in the proportion of helium-3 they contain. A study conducted
in 1990 by the Department of the Interior found ratios of helium-3 to helium-4 that ranged from
70 to 242 parts per billion.37 These figures imply U.S. helium-3 reserves and resources of
between 1 and 5 million liters.38
Because of the factors discussed above, any cost estimate for helium-3 extraction from natural
gas is inexact. According to one estimate, the energy cost, not including the cost of infrastructure
and equipment, might be about $12,000 per liter.39 Most of this cost, however, would be to
separate the commodity helium from the natural gas. Starting with cooled commodity helium, in
conjunction with regular natural gas processing, the incremental energy cost of separating out the

34 Mineral Commodity Summaries 2010.
35 For example, P.C. Hendry and P.V.E. McClintock, “Continuous Flow Apparatus for Preparing Isotopically Pure
He-4,” Cryogenics, vol. 27, pp. 131-138 (1987).
36 Mineral Commodity Summaries 2010.
37 Thomas A. Davidson and David E. Emerson, Bureau of Mines, Department of the Interior, Method and Apparatus
for Direct Determination of Helium-3 in Natural Gas and Helium
, Report of Investigations 9302, 1990.
38 CRS calculation. See also Layton J. Wittenberg, Fusion Technology Institute, University of Wisconsin–Madison,
“Non-Lunar 3He Resources,” July 1994, p. 9, which estimates a total reserve of 700 kilograms of helium-3 or
approximately 5.7 million liters.
39 Layton J. Wittenberg, Fusion Technology Institute, University of Wisconsin–Madison, “Non-Lunar 3He Resources,”
July 1994, p. 11, converted from kilowatt-hours (kWh) to dollars at a typical industrial cost for electricity of 7¢/kWh.
Congressional Research Service
11

The Helium-3 Shortage: Supply, Demand, and Options for Congress

helium-3 might be $300 per liter.40 Another source estimates $34 per liter, again excluding the
cost of infrastructure and equipment.41 The difference between these two estimates appears to be
their different assumptions about heat exchange efficiency, an issue whose resolution may require
development of a prototype processing system.
Although U.S. helium-3 reserves and resources are large, the rate at which refiners already extract
commodity helium from natural gas limits the amount of helium-3 that could be available per
year at the lower cost range ($34 or $300 per liter plus infrastructure and equipment). According
to one expert, separating helium-3 from all domestically produced helium would make available
about 26,000 liters of helium-3 per year.42 Producing more than this amount would draw on
natural gas that would not otherwise be processed to extract commodity helium, and as a result,
the higher cost estimate ($12,000 per liter plus infrastructure and equipment) would apply.
Helium-3 from the Atmosphere
Like natural gas, the atmosphere contains a small quantity of helium, a fraction of which is
helium-3. Liquefaction and other processes similar to those used to extract helium from natural
gas could similarly be employed to extract helium from air. The processes for separating helium-3
from the resulting mixed helium would also be much the same.
The atmosphere contains approximately 280 billion liters of helium-3. While this makes air by far
the largest potential source of helium-3, extracting helium-3 from air is very unlikely to be cost-
competitive with extracting helium-3 from natural gas. The concentration of helium in the
atmosphere is only about 5 parts per million.43 As a result, the energy cost of producing helium
from air would be about 1,000 times more than that of producing helium from natural gas.44 The
fraction of helium-3 in atmospheric helium is 5 to 20 times more than the fraction of helium-3 in
helium from natural gas, but this is not enough to offset the much larger volume of air that would
need to be processed to extract a given quantity of helium. Moreover, the cost of producing
helium-3 from air would have to include the full energy cost of liquefying the air, whereas the
energy cost of liquefying natural gas is already borne by natural gas refiners as part of their
regular production process.
Options to Increase Supply
The helium-3 shortage is a disequilibrium between supply and demand. One way for
policymakers to address the shortage, therefore, would be to increase the production of helium-3.
The preceding section addressed several possible sources that could be tapped. Increasing the
supply could potentially be accomplished in several ways: by increasing U.S. tritium production
from current or new sources, importing tritium, importing more helium-3, increasing helium-3

40 Ibid., also at 7¢/kWh.
41 Richard L. Garwin, “He-3 from Government-Supplied Commercial Helium,” paper prepared for the American
Association for the Advancement of Science Workshop on Helium-3, April 6, 2010, adjusted by CRS to use an
electricity cost of 7¢/kWh for comparability with other estimates.
42 Richard L. Garwin, “He-3 from Government-Supplied Commercial Helium.”
43 B.M. Olivera, James G. Bradley, and Harry Farrar IV, “Helium Concentration in the Earth’s Lower Atmosphere,”
Geochimica et Cosmochimica Acta, vol. 48, no. 9, September 1984, pp. 1759-1767.
44 Layton J. Wittenberg, “Non-Lunar 3He Resources,” p. 12.
Congressional Research Service
12

The Helium-3 Shortage: Supply, Demand, and Options for Congress

recycling, or producing helium-3 from alternative sources. Congress has a variety of options that
might result in these outcomes.
Increase Domestic Tritium Production
Congress could direct NNSA to increase its tritium production beyond the amount needed for
nuclear weapons purposes to the amount needed to meet helium-3 demand. Alternatively,
Congress could direct DOE or another agency to use a similar technique at other commercial
reactors, or it could encourage the private sector to do so on its own by offering subsidies, tax
incentives, changes in licensing requirements, purchase guarantees for the resulting tritium
production, or other measures. Finally, Congress could decide to reexamine DOE’s decision in the
1990s to reject accelerator production of tritium, such as by funding additional research and
development or new studies that specifically address the context of the helium-3 shortage. An
increased supply of tritium from any of these options would result, in time, in an increased supply
of helium-3. Such an approach has several challenges, including timeliness, capacity, cost, and
nonproliferation concerns.
Timeliness
Even if the federal government increased domestic tritium production immediately, the helium-3
supply would not increase immediately for two reasons. First, the TPBARs used for tritium
manufacture are irradiated for a full reactor refueling cycle, which is typically about 18 months.45
More importantly, once additional tritium is produced, only about 5.5% of it decays into helium-3
each year because of its 12.3-year half-life. These two factors combine to significantly impede
domestic production of tritium as a short-term solution. Years of additional tritium production
would need to occur before it would yield a sizeable annual supply of additional helium-3.
Production and Extraction Capacity
Current circumstances would make it difficult to increase domestic tritium production drastically.
The capacities and licenses of the Watts Bar and Sequoyah reactors limit their capacity to
manufacture additional tritium. With the proper licensing and other arrangements, other
commercial light-water reactors could employ the same technique. Incentives would likely be
necessary, however, because of the operational changes, such as increased uranium enrichment in
the reactor fuel, that are needed to accommodate TPBARs. In 1997, when DOE requested
proposals for the tritium production contract, the TVA was the only operator to submit a
responsive bid.
The capacity of the tritium extraction facility could also be a limiting factor for increasing tritium
production in commercial reactors. If necessary, the capacity of the existing extraction facility
could be expanded, or an additional facility could be built. The cost of the existing tritium
extraction facility was $506 million.46


45 Nuclear Regulatory Commission, Backgrounder on Tritium Production, http://www.nrc.gov/reading-rm/doc-
collections/fact-sheets/tritium.pdf.
46 Savannah River Site, Tritium Extraction Facility factsheet.
Congressional Research Service
13

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Cost
The cost of tritium produced for the weapons program is subsidized by that program. As noted
above, the cost of tritium in excess of the weapons program’s needs might not be similarly
subsidized, in which case it would likely be much higher than the historical helium-3 price.
Nonproliferation Concerns
Because tritium is a component of nuclear weapons, it is possible that increasing tritium
production would raise nuclear nonproliferation concerns. Existing arms control treaties limit the
number of U.S. nuclear warheads, not the tritium that is used in them. Nevertheless, some
countries or activists might perceive an increased tritium production capacity as enabling or
increasing the likelihood of future increases in nuclear warhead capacity. Using civilian facilities
to produce tritium might be seen by these observers as a precedent for blurring the separation
between civilian and military nuclear facilities; such separation is often an element of U.S.
nonproliferation policy in other countries. If U.S. commercial power plants involved in tritium
production became perceived as part of the weapons program, some foreign suppliers might be
less willing to provide them with components and equipment.
Import Tritium
Another approach to increasing the tritium supply, and thus the future supply of helium-3, would
be for the U.S. government to purchase tritium from international sources. Such an approach has
limitations, in general because tritium is export-controlled and more specifically because some
nations have policies that prohibit the export of materials used in nuclear weapons.47
It might be possible to assure supplier countries of non-weapons use by sequestering the imported
tritium and using that supply exclusively for production of helium-3. Extracting and purifying
helium-3 from this sequestered tritium supply, however, might require separate apparatus and
infrastructure. If so, developing and maintaining that duplicate capacity could have substantial
costs and would likely increase the price of the resulting helium-3.
One possible source of imported tritium is foreign heavy-water reactors, such as the CANDU
reactors used in Canada, India, and elsewhere. International export control agreements would
regulate any shipment of tritium from those countries to the United States. Diplomatic efforts or
new international agreements might be needed to facilitate changes in these restrictions. Another
possible source is Russia, which produces tritium for use in its own weapons program. Russia,
however, has a history of exporting helium-3 directly, which may make Russian tritium exports
unlikely.
Timeliness would also likely be an issue. Like domestically produced tritium, imported tritium
would only decay gradually into helium-3. A one-time supply of imported tritium would take
decades to convert into helium-3. Production of helium-3 from a regular annual supply of
imported tritium would take decades to reach its long-term potential level.

47 For example, Canada has historically prohibited tritium exports to the United States. See “Canada Unlikely to
Resolve Any U.S. Tritium Shortage,” The Telegraph, January 14, 1989.
Congressional Research Service
14

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Increase Domestic Recycling of Helium-3
Because helium-3 is stable and chemically inert, it can be reused indefinitely. Losses through
leakage into the atmosphere are essentially unrecoverable, but they are likely to be small in most
applications, especially considering the currently high cost of replacing lost helium-3. In some
applications, such as medical imaging, recovered helium-3 may need to be purified before reuse.
Some opportunities remain, however. For example, Savannah River National Laboratory is
developing a process to extract helium-3 from tritium equipment that would otherwise have been
discarded; this process may ultimately provide as much as 10,000 liters of additional helium-3.48
To increase the domestic supply, Congress could mandate or facilitate recycling of existing
helium-3. The need for congressional action in this area is uncertain, however, because of the
incentive to reuse and recycle that the high market price already provides.
Import Helium-3
Because other countries have supplies of tritium, they either have or could have supplies of
helium-3 arising from tritium decay. Between 2004 and 2008, for example, the United States
imported approximately 25,000 liters of Russian helium-3 per year.49 Russia has suspended
exports of helium-3, but it might be possible to increase imports from elsewhere. Because helium-
3 can be converted back into tritium, it too is generally export-controlled. Some of the export-
control challenges discussed above for importing tritium therefore also apply to importing
helium-3. However, because imported helium-3 would not need additional separation or
purification, a requirement to sequester imported helium-3 would be less burdensome.
Considering the currently high market price of helium-3, it appears likely that any country with
the infrastructure needed to extract helium-3 from tritium would already be doing so. The absence
of such an increased international helium-3 supply suggests that most countries have little or no
helium-3 separation capacity. One way to facilitate increased helium-3 imports would therefore
be to help develop helium-3 separation infrastructure in countries that have heavy-water reactors
or other tritium sources. Such assistance could take many forms, from providing financial
incentives or technical help to establishing a joint venture or providing equipment directly.
If the United States and another country decided to establish an international partnership to
produce helium-3, determining an equitable financing mechanism might be challenging. The
market price of helium-3 is currently much higher than it has been historically. If demand
continues to outstrip supply, developing additional sources may continue to provide a valuable
return. On the other hand, if demand falls, perhaps because the high price drives users to identify
alternatives, then the return on investments in helium-3 production infrastructure may be less
attractive. This uncertainty could be particularly problematic for potential international partners if
the United States simultaneously takes policy actions specifically aimed at reducing demand.

48 William F. Brinkman, Director, DOE Office of Science, testimony before the House Committee on Science and
Technology, Subcommittee on Investigations and Oversight, April 22, 2010.
49 Ibid.
Congressional Research Service
15

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Produce Helium-3 from Alternative Sources
Congress could take a variety of actions to encourage the development of alternative helium-3
sources, such as extraction from natural gas and the other techniques described previously in this
report. Options for policymakers include funding research and development on new production
technologies, funding pilot projects to demonstrate practicality, providing tax incentives to
producers, and guaranteeing a minimum future price or a minimum level of future government
purchases. Because these alternative sources are less technologically mature than the existing
infrastructure, the available options for encouraging their development may be promising only in
the long term.
Helium-3 Demand
The demand for helium-3 has increased dramatically since 2001. Prior to 2001, the demand was
approximately 8,000 liters per year, which was less than the new supply from tritium decay. After
2001, the demand increased, reaching approximately 80,000 liters in 2008. Projections show
demand continuing at above the available new supply for at least the next several years. See
Figure 2. These projections contain many variables and therefore considerable uncertainty. Some
estimates project much higher non-governmental demand, perhaps more than 100,000 liters in
FY2011 and FY2012.50 Some estimates appear to measure helium-3 quantities at nonstandard
pressures. Because liters are a volume measure, and all gases change volume depending on their
pressure, inconsistency in measurement has the potential to create confusion when amounts
projected by different analysts are added. Perhaps most important, given such a large mismatch
between supply and demand, users are likely to seek out alternative technologies, reschedule
planned projects, and make other changes that reduce demand below what it would be in the
absence of a shortage. It is unclear whether the available estimates reflect (or indeed, could
reflect) these likely changes. Similarly, it is unclear whether federal agencies and the private
sector can reduce demand sufficiently to match the current helium-3 supply and still meet
priorities for security, science, and other applications.

50 Gregory C. Slovik, DNDO, and John Pantaleo, DOE, “Summary of Helium-3’s Total Requirements,” workshop
presentation, March 24, 2009.
Congressional Research Service
16


The Helium-3 Shortage: Supply, Demand, and Options for Congress

Figure 2. Projected Helium-3 Demand, FY2009-FY2018

Source: Adapted from Steve Fetter, Office of Science and Technology Policy, “Overview of Helium-3 Supply
and Demand,” presentation at the American Association for the Advancement of Science Workshop on Helium-
3, April 6, 2010.
Note: USG = U.S. Government. Science includes both research activities and large laboratory facilities. Another
al otment to the Spal ation Neutron Source underlies the increase in scientific demand in FY2018.
Current Uses of Helium-3
Neutron detection applications in national and homeland security are the largest users of
helium-3, but scientific research, medicine, and industry are also significant.
National and Homeland Security
The demand for helium-3 for national and homeland security purposes falls into two main
categories: the detection of smuggled radiological and special nuclear material and the monitoring
of known special nuclear material to ensure its security.51
The Department of Defense, Department of State, NNSA, and DHS all have deployed radiation
detection equipment to detect smuggled radiological and nuclear material.52 Through programs

51 Special nuclear material is defined by Title I of the Atomic Energy Act of 1954 (P.L. 83-703) as plutonium, uranium-
233, or uranium enriched in the isotopes uranium-233 or uranium-235.
Congressional Research Service
17

The Helium-3 Shortage: Supply, Demand, and Options for Congress

such as Cooperative Threat Reduction, the Second Line of Defense, and the Radiation Portal
Monitor program, these agencies have deployed thousands of radiation portal monitors both
domestically and overseas. Each portal uses approximately 50 liters of helium-3 as the basis for
its neutron detection capability. Some of the programs have been in place since before 2001.
Others, such as those operated through DHS, were established later. The broad expansion of these
deployments has provided the greatest demand for helium-3 and been the largest drain on the
helium-3 stockpile.
The Department of Defense and NNSA also use helium-3 in neutron detectors to ensure that
stores of special nuclear material are fully accounted for. Accurate neutron counting over long
time periods is one way to monitor the continued presence of materials such as plutonium. In
addition, the United States contributes helium-3 to meet the nuclear security and monitoring
needs of the International Atomic Energy Agency (IAEA).
Department of Defense guidance and navigation systems for munitions, missiles, aircraft, and
surface vehicles include ring laser gyroscopes that use helium-3. Testing and qualification are
under way on an alternative gas for this purpose.53
Science
Scientific uses of helium-3 are diverse, ranging from neutron detection to cryogenics, laser
physics, and research on the properties of helium-3 itself. Large-scale government research
facilities, such as the DOE Spallation Neutron Source at Oak Ridge National Laboratory in
Tennessee, may use tens of thousands of liters. Numerous smaller, laboratory-scale users are in
academia and elsewhere. Although individual university researchers use smaller quantities, their
ability to pay the currently high price for market-rate helium-3 may be limited. Although they are
part of the private sector, their research is often funded by federal agencies. The United States
also participates in international science projects that require helium-3, such as ITER (originally
called the International Thermonuclear Experimental Reactor), currently under construction in
France.
The United States, as well as engaging directly in scientific activities that require helium-3, has
historically been a major source of helium-3 for the international scientific community. Some
foreign scientists may depend on U.S.-supplied helium-3 for their research. Although some of
these foreign scientists may work independently, many of them are likely colleagues and
collaborators of U.S. scientists.
Medicine
The development of a polarized medical imaging technique contributed to an expansion of
demand for helium-3 in the late 1990s. This technique depends on patients inhaling polarized gas
so that imaging of the gas using MRI provides a visualization of lung function.

(...continued)
52 For more information, see CRS Report RL34574, The Global Nuclear Detection Architecture: Issues for Congress,
by Dana A. Shea; and CRS Report RL31957, Nonproliferation and Threat Reduction Assistance: U.S. Programs in the
Former Soviet Union
, by Amy F. Woolf.
53 William F. Brinkman, Director, DOE Office of Science, testimony before the House Committee on Science and
Technology, Subcommittee on Investigations and Oversight, April 22, 2010.
Congressional Research Service
18

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Industry
In industrial applications, a neutron-emitting material is coupled with a helium-3 neutron detector
to make density measurements based on the number of neutrons reflected back to the detector.
This technique is used for oil and gas well logging54 and to determine the density of road
construction.
Technological Alternatives to Reduce Demand
One way to address the helium-3 shortage would be to reduce demand by moving helium-3 users
to alternative technologies. For the largest application, neutron detection, DOE National
Laboratories and others have examined numerous alternatives. As discussed below, some
technologies appear promising, though implementation would likely present technical challenges.
For other applications, alternative technologies may not currently exist.
Alternative Technologies for Neutron Detection
Because of its detection performance, nontoxicity, and ease of use, helium-3 has become the
material of choice for neutron detection. Nevertheless, other materials also have a long history of
use. With the current shortage of helium-3, researchers are reexamining past alternatives and
investigating new ones. Existing alternative neutron detection technologies have significant
drawbacks relative to helium-3, such as toxicity or reduced sensitivity. A drop-in replacement
technology does not currently exist.55 The alternatives with most short-term promise as helium-3
replacements are boron trifluoride, boron-lined tubes, lithium-loaded glass fibers, and scintillator-
coated plastic fibers. A new scintillating crystal composed of cesium-lithium-yttrium-chloride
(CLYC) also appears promising. Other materials, less suitable in the short term, show promise for
the long term. Before the helium-3 shortage became apparent, most neutron detection research
was directed toward long-term goals such as improving sensitivity, efficiency, and other
capabilities, rather than the short-term goal of matching current capabilities by alternative
means.56
The neutron detectors used for homeland security present both an opportunity and a challenge.
The large base of already deployed equipment, if retrofit with an alternative technology, could be
a substantial source of recycled helium-3 for other uses. At the same time, the scale of planned
future deployments presents a potentially large future demand for helium-3 if suitable alternatives
are not identified. For retrofitting, any alternative would need to match the dimensions, power
requirements, and other characteristics of the existing technology. For future deployments,
especially beyond the near term, some of these requirements might be relaxed or altered. In either
case, the large number of systems means that any alternative would need to be relatively

54 Well logging is the measurement of geological formations penetrated by a borehole. The use of neutron sources and
neutron detectors in well logging can indicate properties such as rock porosity and the presence of hydrocarbons.
55 Thomas R. Anderson, GE Reuter Stokes, testimony before the House Committee on Science and Technology,
Subcommittee on Investigations and Oversight, April 22, 2010.
56 For more information on the available alternatives, including their advantages, disadvantages, and possible cost, see
R.M. Van Ginhoven, R.T. Kouzes, and D.L. Stephens, Pacific Northwest National Laboratory, “Alternative Neutron
Detector Technologies for Homeland Security,” PIET-43741-TM-840, PNNL-18471, June 9, 2009; and William K.
Hagan, Acting Director, DNDO, testimony before the House Committee on Science and Technology, Subcommittee on
Investigations and Oversight, April 22, 2010.
Congressional Research Service
19

The Helium-3 Shortage: Supply, Demand, and Options for Congress

inexpensive. In addition, because of how and where the equipment is used, any alternative would
need to be rugged, safe, and reliable.
These requirements raise several policy questions:
• To what performance standard should new detectors be held? If the actual
performance of currently deployed systems exceeds the specification required
when they were procured, should new detectors be required to match the actual
performance or just the specification? If current actual performance in the field
does not meet the specification, should new detectors be required to meet the
specification anyway?
• To what extent could a reduced performance standard be acceptable to meet other
criteria, such as cost, toxicity, and making helium-3 available for other needs?
• How should the performance of the new systems be evaluated? To what extent is
acquiring experience in the field sufficient, or is formal testing necessary prior to
deployment?
• Should new technology be retrofit to existing systems or used only for new
deployments? When considering this question, how should the long-term value of
recovered helium-3 be balanced against the short-term costs of retrofitting? What
operational reasons exist that would prefer using a single type of detector rather
than a mixture of old and new systems?
The requirements for applications outside the homeland security arena vary and may raise
different policy concerns. In the scientific realm, requirements such as large detector areas and
rapid data rates may be paramount.57 Industrial applications may need to withstand vibrations and
operate in constrained spaces.
Alternative Technologies for Other Applications
For medical imaging, alternative gases exist that could potentially be used in much the same way
as helium-3. The most discussed example is xenon-129, which may be a viable alternative for
some medical imaging applications within 5 to 10 years.58 The required properties of the inhaled
gas are very specific, however: polarizability, no toxicity or anesthetic effect, and a high signal-
to-noise ratio for the MRI process. Helium-3 is not the only gas with these properties, but it has
increasingly become the preferred choice.
For some scientific applications, no satisfactory alternative may exist. For example, helium-3 is
the only known way to accomplish very low-temperature cryogenics research.

57 For example, see Oak Ridge National Laboratory, “PartTec to Market SNS-Developed Neutron Detector System,”
EurekAlert press release, March 11, 2010, http://www.eurekalert.org/pub_releases/2010-03/drnl-ptm031110.php.
58 Jason C. Woods, Washington University in St. Louis, testimony before the House Committee on Science and
Technology, Subcommittee on Investigations and Oversight, April 22, 2010. This source also discusses the limitations
of xenon-129 as an alternative to helium-3 for medical imaging applications.
Congressional Research Service
20

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Encouraging Development and Implementation of Alternative Technologies
Congress could encourage the development and implementation of alternative technologies in a
variety of ways. For federal uses such as homeland security, Congress could simply direct
agencies to change the technology they use. For the private sector, it could mandate or provide
incentives for the use of alternatives. Congress could also attempt to stimulate future availability
by funding research and development or demonstration projects or by giving the private sector
incentives to do so. Widespread federal use of alternatives might indirectly increase their
availability and desirability for the private sector.
Adjusting the Timing of Demand
In addition to whatever helium-3 is currently in the stockpile, the decay of the existing tritium
supply produces new helium-3 each year. If a need for helium-3 can be deferred, future
production might meet that need even if the current helium-3 supply cannot. In other words,
stretching out deployment schedules might defer helium-3 demand enough that future supplies
could meet it. This approach could be an adjunct to the options already described for increasing
the future helium-3 supply.
Deferring federal demand is most likely to be a successful approach if a particular helium-3 use is
a one-time event or varies significantly from year to year. In such cases, delaying deployment
could smooth out the fluctuating demand such that its peaks are below a sustainable level of
annual production. One example that meets this description is the continuing deployment of
radiation portal monitors by DHS. That deployment is likely to be self-limiting: the number of
locations where DHS could usefully deploy the radiation portal monitors is limited, and once all
those locations have received a portal, the need for helium-3 to field new portals appears likely to
decline (as indicated in Figure 2).
Adjusting deployment schedules is not a short-term solution to the helium-3 shortage, and even in
the long term it is unlikely to be a solution unless additional supply is located. For example, even
if DHS indefinitely postponed radiation portal monitor deployment, the remaining demand for
helium-3 would still exceed the supply. However, adjusting the timing of demand might
contribute to a solution that also included other supply and demand measures.
Allocating the Helium-3 Supply to Users
As described above, NNSA extracts helium-3 during the maintenance of the nation’s tritium
supply and transfers it to the DOE Office of Isotope Production and Research. That office
disburses helium-3 to users through two mechanisms: public auctions and interagency transfers.
At present, users can receive helium-3 through these mechanisms only if they have an allocation
approved by the interagency policy committee (IPC). Congress may wish to consider the criteria
that the IPC uses to prioritize these allocations. Alternatively, it could choose to move to a
market-based system in which, as with other commodities, the market price of helium-3
establishes the balance between supply and demand and determines the allocation of the limited
supply.
Congressional Research Service
21

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Current Public Auction System
The Office of Isotope Production and Research provides helium-3 to nongovernmental purchasers
by public auction. The amount of helium-3 it sells varies from year to year, but, as already noted,
increased significantly after 2001, mostly because companies needed more helium-3 to supply
neutron detectors to the government for homeland and national security. The auction price for
helium-3 has remained relatively steady at less than $100 per liter.59
Note that under this model, when DHS, DOE, or another federal agency purchases a device such
as a radiation portal monitor, the vendor provides the equipment complete with the helium-3
required to operate it. The vendor purchases that helium-3 from a gas supplier, just as it purchases
the other components of the device from other component suppliers. The gas supplier purchases
the helium-3 from the federal government. Thus a federal agency that purchases such equipment
is, in effect, purchasing helium-3 that was originally sold at auction by DOE.
Although the auction process is public, few companies have historically been interested in
purchasing helium-3 and performing any necessary remaining refining steps. Indeed, most of the
auction sales have been to just two companies: Spectra Gases Inc., now part of The Linde Group,
and GE Reuter Stokes Inc. Many of the auctions have had just one purchaser. Spectra Gases owns
the only facility in the United States that is licensed by the Nuclear Regulatory Commission to
remove trace amounts of tritium from raw helium-3.
Several factors appear to have influenced the low price of helium-3. Until the shortage was
recognized a few years ago, the size of the stockpile seemed large. For most of the history of the
program, the supply was sufficient each year to meet the demand, and it was often large enough
that the stockpile grew. Projections of future demand, even if they showed increases, may have
been unclear or uncertain. Because the production cost of helium-3 was subsidized by the nuclear
weapons program, there was no need to recoup the costs of production and extraction. The Office
of Isotope Production and Research is responsible for funding its operations through isotope
sales.60 Its need to match its revenue with its expenses may have contributed to its focusing on
how to sell helium-3 efficiently, rather than on conserving the helium-3 stockpile or maximizing
the stockpile’s long-term value to the Treasury, neither of which was its mission.
Current System for Interagency Distribution
In addition to public auction, helium-3 from the stockpile is sometimes transferred within DOE or
to other agencies to meet specific agency needs. For example, in 2008, DOE’s Spallation Neutron
Source research facility received 35,000 liters of helium-3 for use in scientific neutron detectors.
Such transfers are direct and do not use the public auction mechanism. Similarly, in 2009, NNSA
and DHS received allocations of helium-3 for homeland and national security needs.
The NNSA and DHS allocations in 2009 took a different approach from the model described
above. In the pre-2009 model, when an agency purchased equipment, it was up to the equipment

59 Prices have typically been between $70 and $85 per liter. Exact prices are not made public because they are
considered business sensitive. (NNSA, personal communication, February 1, 2010)
60 The Office of Isotope Production and Research sells many different isotopes, not only helium-3, and is the source of
many different isotopes in limited supply and demand.
Congressional Research Service
22

The Helium-3 Shortage: Supply, Demand, and Options for Congress

vendor to obtain the helium-3 required to operate the equipment. In the new approach, NNSA and
DHS were given helium-3 allocations that limited their equipment purchases. When they
contracted with vendors to supply equipment, the contracted vendors could withdraw the
allocated amount of helium-3 from the stockpile at a specified price, without going through the
auction process.
Options for Allocation by the Government
One approach to allocating a scarce commodity is to control its use according to national policy
priorities. This approach is the one currently taken by the interagency committee, which both
determines the priorities and implements the allocation. Other organizational arrangements for
prioritization and implementation are also possible, however. Establishing the criteria for
prioritization is a key policy decision, because users that fall below a priority cutoff will likely
have little or no access to helium-3.
Procedural Options for Government Allocation
At present, the IPC both determines the policy priorities for allocating helium-3 and implements
the allocation process. Congress could establish new mechanisms for these tasks. For example, it
could establish prioritization criteria directly through legislation, it could direct DOE or another
executive branch agency to establish such criteria through the regulatory process, or it could
mandate an external advisory committee or a public consultation process. It could assign
responsibility for prioritization and implementation to a single agency, or to multiple agencies,
rather than to the IPC, which lacks specific statutory authority. Even if Congress determined that
the current IPC system is satisfactory, it might wish to formalize it in statute. Alternatively, if
Congress concluded that the current system is working well, it might choose to focus its efforts
on oversight, rather than new legislation or new programs.
Criteria for Government Allocation
Any allocation system will struggle to balance the complex relationships among multiple
competing priorities: science versus security, the private sector versus the public sector, and
national needs versus international obligations. Similarly, an allocation system might weigh
whether or not an alternative approach exists to helium-3 use.
Science vs. Security
Science and security are the two largest applications for helium-3. Large scientific facilities
designed to use helium-3 may not be able to function without it, and investment in their
infrastructure might be wasted if a lack of helium-3 prevented them from operating as planned.
For individual scientists whose research requires helium-3, the inability to obtain it might hinder
scientific progress and career advancement. On the other hand, security applications such as
radiation portal monitors at the U.S. border aim to protect the nation against nuclear and
radiological terrorism. It is unclear how to balance these two priorities. The IPC has established
an application’s contribution to increased national or homeland security as one criterion for
receiving a helium-3 allocation. At the same time, however, it considers whether helium-3 is
needed to complete infrastructure investments, a criterion that appears to favor several large
scientific facilities.
Congressional Research Service
23

The Helium-3 Shortage: Supply, Demand, and Options for Congress

For both science and security, some uses may have diminishing returns. For example, once
neutron detectors are deployed at multiple locations on the border, the incremental security
benefit of deploying additional detectors may be less. Similarly, if the leading cryogenic scientists
are able to obtain helium-3 for their research, providing supplies to newly established laboratories
may be less important.
Public vs. Private
Most private-sector users of helium-3 have designed and developed equipment and procedures
based on an expectation that the federal government will make helium-3 available. For example,
the oil industry previously used other neutron detection materials for well logging, but has now
converted almost entirely to the use of helium-3. Meanwhile, the shortage has resulted largely
from increased use of helium-3 by the public sector for radiation detection equipment.
Policymakers might decide to prioritize private-sector uses because of their economic importance,
because it is mostly the public sector that created the shortage, or because of a general sense that
the private sector should come first. Alternatively, they might prioritize public-sector uses
because of national needs such as security, because it is the public sector that produces the
nation’s helium-3 supply, or because of the availability of previously employed alternative
methods.
National vs. International
The United States has domestic needs for helium-3, but it is also involved in international
agreements and collaborations that require helium-3. In some cases, such as the International
Atomic Energy Agency (IAEA), the purpose of these international uses is security. In others, such
as the International Thermonuclear Experimental Reactor (ITER), the aims are scientific. A
fundamental question is whether the United States should provide helium-3 to international
partners when the domestic supply is restricted. International transfers of helium-3 in support of
the IAEA have been scaled back because of the shortage.61 On the other hand, international
security organizations contribute to U.S. security, and international scientific collaborations may
provide unique facilities for U.S. scientists.
Alternatives to Helium-3
Some uses of helium-3 have viable but less optimal alternatives, while others do not. For
example, DOE National Laboratory scientists are assessing alternative detection systems for use
in homeland security applications.62 Scientists attempting to perform ultra-low temperature
research have no comparable alternative. An allocation system might weigh the ability to switch
to an alternative technology as lessening its priority for helium-3 disbursement. This might
elevate unique uses to a higher priority, allowing such work to continue. In contrast, such a
criterion might lower the disbursement priority applications deemed by some policymakers as
particularly important, for example homeland or national security uses where alternatives exist.

61 William F. Brinkman, Director, DOE Office of Science, testimony before the House Committee on Science and
Technology, Subcommittee on Investigations and Oversight, April 22, 2010.
62 R.M. Van Ginhoven, R.T. Kouzes, and D.L. Stephens, Pacific Northwest National Laboratory, “Alternative Neutron
Detector Technologies for Homeland Security,” PIET-43741-TM-840, PNNL-18471, June 9, 2009
Congressional Research Service
24

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Such a criterion will depend heavily on how policymakers define the acceptable performance and
technology availability for an alternative to helium-3.
Allocation by the Market
A very different approach would be to allow the market price of helium-3 to determine its use. If
the demand increased, the price for the limited supply of helium-3 would increase. This might
serve to price some users out of being able to purchase helium-3. On the other hand, a high price
would allow all users access to the available supply on equal terms and would provide economic
incentives to use that supply sparingly and seek out alternatives. A high market price would also
provide incentives to develop new sources of supply, although that incentive might not be
effective if the production of helium-3 remained a government function.
Congress might identify applications that are essential for policy reasons but would be unable to
afford a sufficient supply of helium-3 at the market price. In that case, it could choose to
subsidize the purchase of helium-3 for such applications through direct funding, tax credits, or
other measures. While the need for such subsidies might create complexity and increase
administrative burdens, it might have the benefit of clarifying the economic costs of policy
decisions.
For government users that currently obtain helium-3 through direct transfer rather than purchase,
moving to a market model for allocation would increase costs. At the same time, however, the
sale of government-produced helium at an increased price would increase revenue. Determining
the likely net effect of increased costs and increased revenue would require further analysis and a
more detailed picture of how the government would interact with the helium-3 market.
A key component of the helium-3 shortage is that, until recently, the market price for helium-3
did not appreciably fluctuate as demand increased. In part, this is because helium-3 is a byproduct
of the U.S. nuclear weapons program, which subsidizes its cost of production. In part, it is
because only a few commercial entities have historically been interested in obtaining helium-3
from the government to meet commercial needs. Finally, it may be significant to policymakers
that the federal office responsible for sales of helium-3 does not produce the helium-3, is not
responsible for maintaining a stockpile of helium-3, and is not in charge of determining the
commercial or government-wide need for helium-3.
One challenge for a more market-based system is the interface between the market and the
government. On the surface, the public auction process currently in place resembles a market
process. In practice, it has several deficiencies. Because the government produces helium-3 as a
byproduct of tritium production for the nuclear weapons program, production costs and market
demand have little or no influence on the price the government is willing to accept or the amount
it is willing to produce. Although the process is structured as an auction, the number of potential
buyers is very small. The agency managing the auctions has incentives to match its revenues with
its operating costs, rather than to recover the government’s production costs or to maximize the
revenue to the Treasury in the short or long term. The agency managing the auctions may not
have full access to information about supply and demand, even information that already exists in
other federal agencies.
It is unclear how effectively a market system would incentivize the private sector to develop new
sources of helium-3 or new technologies to replace helium-3. The current market price for
helium-3 obtained outside the federal allocation system is already much higher than the historical
Congressional Research Service
25

The Helium-3 Shortage: Supply, Demand, and Options for Congress

market price and already reflects the scarcity of supply relative to demand. Nevertheless, there is
as yet no sign of significant private-sector involvement in development of new production or
utilization technologies. It may be that the market for helium-3 is simply too small to be attractive
to the private sector, or it may be that uncertainty about future government decisions is dissuading
the private sector from becoming involved until the situation is clearer. For example, private
companies might not wish to invest capital in facilities to separate helium-3 from natural gas if
they fear that the government will increase its production of tritium through the weapons
program, or if they fear that the government may facilitate or subsidize purchases of helium-3
from other countries. To offset such uncertainty, the government might provide incentives to
private producers through subsidies, tax credits, or other means.
Summary of Issues for Congress
In summary, Congress could address the helium-3 shortage in a variety of ways:
• Oversight of the current situation, how it arose, and the processes currently in
place for addressing it.
• Actions to increase supply:
• Mandate or encourage increased tritium manufacture by the government or
by the private sector through measures such as subsidies or tax incentives.
• Facilitate access to international sources, perhaps through support for
international agreements.
• Seek alternative sources: commission studies, fund R&D projects or
demonstration plants, provide subsidies or incentives.
• Mandate or facilitate recycling.
• Actions to reduce demand:
• Fund or encourage the development of alternative technologies.
• Provide incentives for the use of alternative technologies.
• Choices about how the supply should be allocated:
• Establish a process and criteria for prioritized allocation by the government.
• Establish a market-based process for allocation.


Author Contact Information

Dana A. Shea
Daniel Morgan
Specialist in Science and Technology Policy
Specialist in Science and Technology Policy
dshea@crs.loc.gov, 7-6844
dmorgan@crs.loc.gov, 7-5849


Congressional Research Service
26

The Helium-3 Shortage: Supply, Demand, and Options for Congress

Acknowledgments
The authors wish to acknowledge the valuable assistance of CRS intern Nayanee Gupta.

Congressional Research Service
27