Order Code RL33558
Nuclear Energy Policy
Updated January 28, 2008
Mark Holt
Specialist in Energy Policy
Resources, Science, and Industry Division

Nuclear Energy Policy
Summary
Nuclear energy policy issues facing Congress include the implementation of
federal incentives for new commercial reactors, radioactive waste management
policy, research and development priorities, power plant safety and regulation,
nuclear weapons proliferation, and security against terrorist attacks.
The Bush Administration has called for an expansion of nuclear power. For
Department of Energy (DOE) nuclear energy research and development and
infrastructure, the Administration requested $801.7 million for FY2008, nearly 30%
above the FY2007 funding level. The request would have boosted funding for the
Advanced Fuel Cycle Initiative (AFCI) from $167.5 million in FY2007 to $395.0
million in FY2008. The FY2008 omnibus appropriations act holds AFCI to $181
million and shifts the mixed-oxide (MOX) fuel program — totaling $281 million —
to the nuclear energy program from the nuclear nonproliferation program. That
brings the nuclear energy total to $970.5 million ($961.7 million with an across-the-
board rescission), about 20% above the request. An additional $75.9 million
provided in the Other Defense Activities account brings the Office of Nuclear
Energy’s total spending level to $1.046 billion ($1.037 billion with the rescission).
Significant incentives for new commercial reactors were included in the Energy
Policy Act of 2005 (P.L. 109-58), signed by the President on August 8, 2005. These
include production tax credits, loan guarantees, insurance against regulatory delays,
and extension of the Price-Anderson Act nuclear liability system. Together with
higher fossil fuel prices and the possibility of greenhouse gas controls, the federal
incentives for nuclear power have helped spur renewed interest by utilities and other
potential reactor developers. Plans for about 30 reactor license applications have
been announced, although no commitments have been made to build the plants. No
reactor has been ordered in the United States since 1978, and all orders since 1973
were subsequently canceled.
The September 11, 2001, terrorist attacks on the United States raised concern
about nuclear power plant security. The Energy Policy Act of 2005 included several
reactor security provisions, including requirements to revise the security threats that
nuclear plant guard forces must be able to defeat, regular force-on-force security
exercises at nuclear power plants, and the fingerprinting of nuclear facility workers.
Disposal of highly radioactive waste has been one of the most controversial
aspects of nuclear power. The Nuclear Waste Policy Act of 1982 (P.L. 97-425), as
amended in 1987, requires DOE to conduct a detailed physical characterization of
Yucca Mountain in Nevada as a permanent underground repository for high-level
waste. DOE had planned to submit a license application for the Yucca Mountain
repository to the Nuclear Regulatory Commission (NRC) by June 30, 2008, with the
repository to open by 2017 at the earliest. However, a substantial budget reduction
in FY2008 is likely to cause delays, according to program officials.
This report will be updated as events warrant.


Contents
Most Recent Developments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Nuclear Power Status and Outlook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Possible New Reactors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Federal Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Global Climate Change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Nuclear Power Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Nuclear Power 2010 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Generation IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Fuel Cycle Research and Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Nuclear Hydrogen Initiative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Nuclear Power Plant Safety and Regulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Domestic Reactor Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Reactor Safety in the Former Soviet Bloc . . . . . . . . . . . . . . . . . . . . . . 14
Licensing and Regulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Reactor Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Nuclear Accident Liability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Nuclear Waste Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Nuclear Weapons Proliferation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Federal Funding for Nuclear Energy Programs . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Legislation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
List of Tables
Table 1. Announced Nuclear Plant License Applications . . . . . . . . . . . . . . . . . . . 4
Table 2. Funding for the Nuclear Regulatory Commission . . . . . . . . . . . . . . . . 23
Table 3. DOE Funding for Nuclear Activities . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Nuclear Energy Policy
Most Recent Developments
The Bush Administration’s FY2008 budget request, released February 5, 2007,
included $801.7 million for Department of Energy (DOE) nuclear energy research
and development and infrastructure, nearly 30% above the FY2007 appropriation.
The request would have boosted funding for the Advanced Fuel Cycle Initiative
(AFCI) from $167.5 million in FY2007 to $395.0 million in FY2008, as the primary
component of the Administration’s Global Nuclear Energy Partnership (GNEP). The
House voted July 17, 2007, to cut AFCI to $120.0 million while providing a total
funding level of $835.2 million for nuclear energy (H.R. 2641, H.Rept. 110-185).
The Senate Appropriations Committee recommended $242.0 million for AFCI and
$795.5 million for nuclear energy overall (S. 1751, S.Rept. 110-127). The FY2008
omnibus appropriations act, signed December 26, 2007 (P.L. 110-161), holds AFCI
to $181 million and shifts the mixed-oxide (MOX) fuel program — totaling $281
million — to the nuclear energy program from the nuclear nonproliferation program.
That brings the nuclear energy total to $970.5 million ($961.7 million with an across-
the-board rescission), about 20% above the request. An additional $75.9 million
provided in the Other Defense Activities account brings the Office of Nuclear
Energy’s total spending level to $1.046 billion ($1.037 billion with the rescission).
The Administration requested $494.5 million for the civilian nuclear waste
program in FY2008, $50 million above the FY2007 level. The House approved the
full request, while the Senate Appropriations Committee voted to hold the program’s
funding to about the FY2007 level. The FY2008 omnibus appropriations act cuts the
program’s funding to $386.4 million. The program is developing a national nuclear
waste repository at Yucca Mountain, Nevada. DOE announced on July 19, 2006, that
it would submit a Yucca Mountain license application to the Nuclear Regulatory
Commission (NRC) by June 30, 2008. DOE had hoped to begin shipping waste to
Yucca Mountain by 2017, but the FY2008 funding reduction is likely to cause delays,
according to program officials.
NRC issued the first nuclear reactor Early Site Permit (ESP) March 15, 2007,
to Exelon Generating Company for a potential new reactor at the company’s Clinton,
IL, nuclear plant. NRC authorized a second ESP on March 27, for the Grand Gulf
site in Mississippi, and a third, for the North Anna site in Virginia, on November 20.
The holders of those ESPs will not have to revisit site-related issues if they seek
licenses for new reactors at those locations during the next 20 years.
The first four applications for combined construction permits and operating
licenses (COLs) for new nuclear power plants recently were submitted to NRC. On
September 20, 2007, NRG Energy submitted an application for two new reactors at
the South Texas Project site. The Tennessee Valley Authority (TVA), as part of a

CRS-2
consortium called NuStart, submitted an application for two new reactors at the
Bellefonte site in Alabama on October 30, 2007. Dominion Energy submitted an
application for a new unit at North Anna on November 27, and on December 13,
Duke Energy submitted an application for a two-unit plant in Cherokee County, SC.
A partial application for a new reactor at the Calvert Cliffs site in Maryland was
submitted in July 2007. Half the costs of the NuStart and Dominion applications are
being paid by DOE under the Nuclear Power 2010 program. NRC is anticipating
COL applications for as many as 31 new reactors through 2009. None of the
applicants have yet committed to actual plant construction, however.
Nuclear Power Status and Outlook
The future of nuclear power in the United States has long been uncertain. No
nuclear power plants have been ordered in the United States since 1978, and more
than 100 reactors have been canceled, including all ordered after 1973. The most
recent U.S. nuclear unit to be completed was TVA’s Watts Bar 1 reactor, ordered in
1970 and licensed to operate in 1996. But nuclear power is now receiving renewed
interest, prompted by higher fossil fuel prices, possible carbon dioxide controls, and
new federal subsidies and incentives.
The U.S. nuclear power industry currently comprises 104 licensed reactors at
65 plant sites in 31 states and generates about 20% of the nation’s electricity.1 That
number includes TVA’s Browns Ferry 1, which restarted May 22, 2007, after a 22-
year shutdown and $1.8 billion refurbishment. TVA’s board of directors voted
August 1, 2007, to resume construction on Watts Bar 2, which had been suspended
in 1985; the project is to cost about $2.5 billion and be completed in 2013.
Electricity production from U.S. nuclear power plants is greater than that from oil
and hydropower, and about the same as natural gas, although it remains well behind
coal, which accounts for about half of U.S. electricity generation. Nuclear plants
generate more than half the electricity in six states. The near-record 823 billion
kilowatt-hours of nuclear electricity generated in the United States during 20062 was
more than the nation’s entire electrical output in the early 1960s, when the first of
today’s operating U.S. commercial reactors were ordered.3
Reasons for the 30-year halt in U.S. nuclear plant orders included high capital
costs, public concern about nuclear safety and waste disposal, and regulatory
compliance costs.
1 U.S. Nuclear Regulatory Commission, Information Digest 2007-2008, NUREG-1350, Vol.
19, August 2007, p. 34.
2 “World Nuclear Generation Sets Record in 2006,” Nucleonics Week, February 15, 2007,
p. 1.
3 All of today’s 104 operating U.S. commercial reactors were ordered from 1963 through
1973; see “Historical Profile of U.S. Nuclear Power Development,” U.S. Council for Energy
Awareness, 1992.

CRS-3
High construction costs may pose the most serious obstacle to nuclear power
expansion. Construction costs for reactors completed since the mid-1980s ranged
from $2 to $6 billion, averaging more than $3,000 per kilowatt of electric generating
capacity (in 1997 dollars). The nuclear industry predicts that new plant designs could
be built for less than that if many identical plants were built in a series, but such
economies of scale have yet to be demonstrated.
Average operating costs of U.S. nuclear plants dropped substantially during the
past decade, and costly downtime has been steadily reduced. Licensed commercial
reactors generated electricity at an average of 89.8% of their total capacity in 2006,
according to industry statistics.4
Forty-eight commercial reactors have received 20-year license extensions from
the Nuclear Regulatory Commission (NRC), giving them up to 60 years of operation.
License extensions for more than a dozen additional reactors are currently under
review, and many others are anticipated, according to NRC.5
Industry consolidation could also help existing nuclear power plants, as larger
nuclear operators purchase plants from utilities that run only one or two reactors.
Several such sales have occurred, including the March 2001 sale of the Millstone
plant in Connecticut to Dominion Energy for a record $1.28 billion. The merger of
two of the nation’s largest nuclear utilities, PECO Energy and Unicom, completed
in October 2000, consolidated the operation of 17 reactors under a single corporate
entity, Exelon Corporation, headquartered in Chicago.
Existing nuclear power plants appear to hold a strong position in electricity
wholesale markets. In most cases, nuclear utilities have received favorable regulatory
treatment of past construction costs, and average nuclear operating costs are currently
estimated to be competitive with those of fossil fuel technologies.6 Although eight
U.S. nuclear reactors were permanently shut down during the 1990s, none has been
closed since 1998. Despite the shutdowns, annual U.S. nuclear electrical output
increased by more than one-third from 1990 to 2006, according to the Energy
Information Administration and industry statistics. The increase resulted primarily
from reduced downtime at the remaining plants, the startup of five new units, and
reactor modifications to boost capacity.
Possible New Reactors
The improved performance of existing reactors and the relatively high cost of
natural gas — the favored fuel for new power plants for most of the past 15 years —
have prompted renewed electric industry consideration of the feasibility of building
4 “World Nuclear Generation Sets Record in 2006,” Nucleonics Week, February 15, 2007,
p. 1.
5 [http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html]
6 Energy Information Administration, Nuclear Power: 12 percent of America’s Generating
Capacity,
20 percent of the Electricity, July 17, 2003, at [http://www.eia.doe.gov/cneaf/
nuclear/page/analysis/nuclearpower.html].

CRS-4
new reactors. Electric utilities and other firms have announced plans to apply for
combined construction permits and operating licenses (COLs) for about 30 reactors
(see Table 1). However, no commitments have been made to build them if the COLs
are issued. The Department of Energy (DOE) is assisting with some of the COL
applications and site-selection efforts as part of a program to encourage new
commercial reactor orders by 2010.
Table 1. Announced Nuclear Plant License Applications
Announced
Planned
Site
Reactor Type
Units
Applicant
Application
Alternate Energy Bruneau (ID)
2008
Areva EPR
1
Ameren
Callaway (MO)
2008
Areva EPR
1
Amarillo Power
Near Amarillo (TX) 4Q 2008
Areva EPR
2
Dominion
North Anna (VA)
Submitted
GE ESBWR
1
Nov. 27, 2007
DTE Energy
Fermi (MI)
4Q 2008
Not specified
1
Duke Energy
Cherokee (SC)
Submitted
Westing. AP1000
2
Dec. 13, 2007
Energy Future
Comanche Peak
4Q 2008
Mitsubishi US-
2
(formerly TXU)
(TX)
APWR
Entergy
River Bend (LA)
May 2008
GE ESBWR
1
Exelon
Victoria County
Sept. 2008
GE ESBWR
2
(TX)
FPL
Turkey Point (FL)
Early 2009
Not specified
2
Mid-American
Payette (ID)
2008
Not specified
1
Nuclear Energy
NRG Energy
South Texas Project Submitted
GE ABWR
2
Sept. 20, 2007
NuStart
Grand Gulf (MS)
Nov. 2007
GE ESBWR
1
Bellefonte (AL)
Submitted Oct. Westing. AP1000
2
30, 2007
PPL
Susquehanna (PA)
Late 2008
Areva EPR
1
Progress Energy
Harris (NC)
2008
Westing. AP1000
2
Levy County (FL)
2008
Westing. AP1000
2
SCE&G
Summer (SC)
2007
Westing. AP1000
2
Southern
Vogtle (GA)
Mar. 2008
Westing. AP1000
2
UniStar
Calvert Cliffs (MD)
Submitted July Areva EPR
1
(Constellation
2007 (Part 1)
Energy and
Nine Mile Point
1st half 2008
Areva EPR
1
EDF)
(NY)
Not specified
4Q 2008
Areva EPR
1
Total Units
33
Sources: NRC, Nucleonics Week, Nuclear News, Nuclear Energy Institute, company news releases.

CRS-5
Federal Support
Strong incentives for building new nuclear power plants were included in the
Energy Policy Act of 2005 (EPACT05, P.L. 109-58), signed by the President on
August 8, 2005. Particularly significant is a 1.8-cents/kilowatt-hour tax credit for up
to 6,000 megawatts of new nuclear capacity for the first eight years of operation, up
to $125 million annually per 1,000 megawatts.
The Treasury Department published interim guidance for the nuclear tax credit
on May 1, 2006.7 Under the guidance, the 6,000 megawatts of eligible capacity will
be allocated among reactors that file license applications by the end of 2008 or, after
that date, until enough applications are filed to use the capacity. If license
applications for more than 6,000 megawatts of nuclear capacity are submitted before
the end of 2008, then the tax credit will be allocated proportionally among the
proposed reactors.
The Energy Information Administration (EIA) projects that the nuclear energy
tax credit will stimulate construction of 9 gigawatts of nuclear generating capacity
by 2020. That construction effort will reduce costs for future reactors and lead to 3.5
more gigawatts of capacity by 2030, according to EIA. However, those projections
are highly sensitive to assumptions about growth in electricity demand, the price of
competing fuels, and reactor construction costs. For example, if reactor construction
costs do not decline, only the amount of new nuclear capacity eligible for the tax
credit — 6 gigawatts — would be constructed, according to EIA.8
Because the nuclear industry has often blamed licensing delays for past nuclear
reactor construction cost overruns, EPACT05 authorizes the Secretary of Energy to
pay for up to $500 million in costs resulting from NRC delays for each of the first
two new reactors and up to $250 million for the next four. DOE published a final
rule for the “standby support” program August 11, 2006.9
EPACT05 also authorized federal loan guarantees for up to 80% of construction
costs for advanced energy projects that reduce greenhouse gas emissions, including
new nuclear power plants. The EPACT loan guarantees are widely considered
crucial by the nuclear industry to obtain financing for new reactors. DOE issued
guidelines for the initial round of loan guarantees on August 8, 2006. However, the
initial round is limited to $2 billion and does not include nuclear power plants. The
FY2007 continuing resolution (P.L. 110-5) provided initial administrative funding
for the program and authorized up to $4 billion in loan guarantees (twice the
7 Department of the Treasury, Internal Revenue Service, Internal Revenue Bulletin, No.
2006-18, “Credit for Production From Advanced Nuclear Facilities,” Notice 2006-40, May
1, 2006, p. 855.
8 Energy Information Administration, Annual Energy Outlook 2007, DOE/EIA-0383(2007),
February 2007, p. 84.
9 Department of Energy, “Standby Support for Certain Nuclear Plant Delays,” Federal
Register
, August 11, 2006, p. 46306.

CRS-6
Administration request). DOE issued final rules for the program October 4, 2007,10
and invited 16 proposals from the initial solicitation to submit full applications.
DOE’s proposed loan guarantee rules, published May 16, 2007, had been
sharply criticized by the nuclear industry for limiting the guarantees to 90% of a
project’s debt. The industry contended that EPACT05 allows all of a project’s debt
to be covered, as long as debt does not exceed 80% of total construction costs. In its
explanation of the proposed rules, DOE expressed concern that guaranteeing 100%
of a project’s debt could reduce lenders’ incentive to perform adequate due diligence
and therefore increase default risks. In the final rule, however, DOE agreed to
guarantee up to 100% of debt, but only for loans issued by the Federal Financing
Bank. Possible DOE losses resulting from defaults are to be covered by payments
collected up-front from project sponsors.
The amount of loan guarantees to be available for nuclear power was the subject
of considerable debate in the first session of the 110th Congress. Under the Federal
Credit Reform Act (FCRA), federal loan guarantees cannot be provided without an
authorized level in an appropriations act. The Senate Appropriations Committee
contended that, because default payouts would be covered by project sponsors rather
than appropriations, FCRA would not apply to the EPACT loan guarantee program.
In its version of the FY2008 Energy and Water Appropriations bill, the Senate panel
provided that DOE could use “such sums” collected from project sponsors to pay the
cost of the loan guarantees, without referring to FCRA (S. 1751, S.Rept. 110-127).
The Senate-passed version of omnibus energy legislation (H.R. 6) would have
explicitly eliminated FCRA’s applicability to DOE’s planned loan guarantees under
EPACT (Section 124(b)). That provision raised considerable controversy, because
it would have given DOE essentially unlimited loan guarantee authority under
EPACT, but it was dropped from the final legislation (P.L. 110-140). In its version
of the FY2008 Energy and Water Appropriations bill, the House approved $7 billion
in loan guarantee authority — but none for nuclear power plants (H.R. 2641, H.Rept.
110-185).
The FY2008 omnibus funding act (P.L. 110-161) includes the Senate
Appropriations Committee’s bill language that does not refer to FCRA, providing
“such sums” through FY2009.11 The explanatory statement for the bill directs DOE
to limit the loan guarantees for nuclear power plants to $18.5 billion through FY2009
— enough for several large reactors. An additional $2 billion in loan guarantee
authority is provided for uranium enrichment plants, and $18 billion in authority is
provided for non-nuclear energy technologies.12
Global Climate Change
Global climate change that may be caused by carbon dioxide and other
greenhouse gas emissions is cited by nuclear power supporters as an important reason
10 Published October 23, 2007 (72 Federal Register 60116).
11 Congressional Record, December 17, 2007, p. H15585.
12 Ibid., p. H15929.

CRS-7
to develop a new generation of reactors. Nuclear power plants emit relatively little
carbon dioxide, mostly from nuclear fuel production and auxiliary plant equipment.
This “green” nuclear power argument has received growing attention in think tanks
and academia. As stated by MIT in its major study The Future of Nuclear Power:
“Our position is that the prospect of global climate change from greenhouse gas
emissions and the adverse consequences that flow from these emissions is the
principal justification for government support of the nuclear energy option.”13
However, most environmental groups contend that nuclear power’s potential
greenhouse gas benefits are modest and must be weighed against the technology’s
safety risks, its potential for nuclear weapons proliferation, and the hazards of
radioactive waste.14 They also contend that energy efficiency and renewable energy
would be far more economical options for reducing fossil fuel use.15
(For more on federal incentives and the economics of nuclear power, see CRS
Report RL33442, Nuclear Power: Outlook for New U.S. Reactors, by Larry Parker
and Mark Holt.)
Nuclear Power Research and Development
For nuclear energy research and development — including advanced reactors,
fuel cycle technology, nuclear hydrogen production, and infrastructure support —
DOE received $1.037 billion for FY2008. That amount is substantially higher than
the FY2007 funding level and the Administration’s request, but it includes large
transfers from other accounts and eliminates most of the Administration’s proposed
increase for the Advanced Fuel Cycle Initiative (AFCI). The higher AFCI funding
would have allowed DOE to continue developing a demonstration plant for
extracting plutonium and uranium from spent nuclear fuel, as part of the
Administration’s Global Nuclear Energy Partnership (GNEP). The nuclear energy
program is run by DOE’s Office of Nuclear Energy, Science, and Technology.
DOE requested $801.7 million for FY2008, nearly 30% above the FY2007
funding level. The request would have boosted funding for AFCI from $167.5
million in FY2007 to $395.0 million in FY2008. The FY2008 omnibus
appropriation holds AFCI to $181 million and shifts the mixed-oxide (MOX) fuel
program — totaling $281 million — to the nuclear energy program from the nuclear
nonproliferation program. That brings the nuclear energy total to $970.5 million
($961.7 million with the rescission), about 20% above the request. An additional
$75.9 million provided in the Other Defense Activities account brings the Office of
Nuclear Energy’s total spending level to $1.046 billion ($1.037 billion with the
rescission).
13 Interdisciplinary MIT Study, The Future of Nuclear Power, Massachusetts Institute of
Technology, 2003, p. 79.
14 Gronlund, Lisbeth, David Lochbaum, and Edwin Lyman, Nuclear Power in a Warming
World
, Union of Concerned Scientists, December 2007.
15 Thomas, Stephen, et al, The Economics of Nuclear Power, Greenpeace, 2007.

CRS-8
Overall, the House had provided a funding level of $835.2 million for nuclear
energy, including $74.9 million from the Other Defense Activities account and
$167.8 million transferred for the MOX program. The Senate Appropriations
Committee had recommended $795.5 million for nuclear energy, including $75.9
million from Other Defense Activities, while opposing the MOX funding transfer.
According to DOE’s FY2008 budget justification, the nuclear energy R&D
program is intended “to secure nuclear energy as a viable, long-term commercial
energy option, providing diversity in the energy supply.” However, opponents have
criticized DOE’s nuclear research program as providing wasteful subsidies to an
industry that they believe should be phased out as unacceptably hazardous and
economically uncompetitive.
Under the Administration’s GNEP initiative, plutonium partially separated from
the highly radioactive spent fuel from nuclear reactors would be recycled into new
fuel to expand the future supply of nuclear fuel and potentially reduce the amount of
radioactive waste to be disposed of in a permanent repository. Under the initial
concept for GNEP, the United States and other advanced nuclear nations would lease
new fuel to other nations that agreed to forgo uranium enrichment, spent fuel
recycling (also called reprocessing), and other fuel cycle facilities that could be used
to produce nuclear weapons materials. The leased fuel would then be returned to
supplier nations for reprocessing. Solidified high-level reprocessing waste would be
sent back to the nation that had used the leased fuel, along with supplies of fresh
nuclear fuel. However, a GNEP Statement of Principles signed by the United States
and 15 other countries on September 16, 2007, preserves the right of all participants
to develop fuel cycle facilities while encouraging the establishment of a “viable
alternative to acquisition of sensitive fuel cycle technologies.”16
Although GNEP is largely conceptual at this point, DOE issued a Spent Nuclear
Fuel Recycling Program Plan in May 2006 that provided a general schedule for a
GNEP Technology Demonstration Program (TDP),17 which would develop the
necessary technologies to achieve GNEP’s goals. According to the Program Plan,
the first phase of the TDP, running through FY2006, consisted of “program definition
and development” and acceleration of AFCI. Phase 2, running through FY2008, was
to focus on the design of technology demonstration facilities, which then were to
begin operating during Phase 3, from FY2008 to FY2020. The National Academy
of Sciences in October 2007 strongly criticized DOE’s “aggressive” deployment
schedule for GNEP and recommended that the program instead focus on research and
development.18
Nuclear critics oppose GNEP’s emphasis on spent fuel reprocessing, which they
see as a weapons proliferation risk, even if weapons-useable plutonium is not
completely separated from other spent fuel elements, as envisioned by the
16 See GNEP website at [http://www.gnep.energy.gov]
17 DOE, Spent Nuclear Fuel Recycling Plan, Report to Congress, May 2006.
18 National Academy of Sciences, Review of DOE’s Nuclear Energy Research and
Development Program
, prepublication draft, October 2007.

CRS-9
Administration. “As the research of DOE scientists makes clear, the reprocessing
technologies under consideration would still produce a material that is not radioactive
enough to deter theft, and that could be used to make nuclear weapons,” according
to the Union of Concerned Scientists.19
The omnibus appropriation cuts the Administration’s GNEP request to $181
million, including $30 million for upgrades to existing facilities. The remaining
$151 million is for research, development, and design activities, with no funds for
constructing facilities for technology demonstration or commercialization. The
GNEP budget totals, as well as the remaining nuclear program numbers cited below,
do not reflect the 0.91% across-the-board DOE rescission.
Nuclear Power 2010. President Bush’s specific mention of “clean, safe
nuclear power” in his 2007 State of the Union address reiterated the Administration’s
interest in encouraging construction of new commercial reactors — for which there
have been no U.S. orders since 1978. DOE’s efforts to restart the nuclear
construction pipeline have been focused on the Nuclear Power 2010 Program, which
will pay up to half of the nuclear industry’s costs of seeking regulatory approval for
new reactor sites, applying for new reactor licenses, and preparing detailed plant
designs. The Nuclear Power 2010 Program, which includes the Standby Support
Program authorized by the Energy Policy Act of 2005 (P.L. 109-58) to pay for
regulatory delays, is intended to encourage near-term orders for advanced versions
of existing commercial nuclear plants.
Two industry consortia are receiving DOE assistance over the next several years
to design and license new nuclear power plants. DOE awarded the first funding to
the consortia in 2004. DOE requested $114.0 million for Nuclear Power 2010 for
FY2008, more than 40% above the FY2007 funding level of $80.3 million. The
omnibus act provided a $21.0 million increase from the budget request, as
recommended by the Senate Appropriations Committee, for a total of $135.0 million.
The funding increase is intended to accelerate progress on the new reactor licenses.
The House had approved flat funding for the program, contending that funds should
not be provided for reactor design work.
The nuclear license applications under the Nuclear Power 2010 program are
intended to test the “one-step” licensing process established by the Energy Policy Act
of 1992 (P.L. 102-486). Under the process, NRC may grant a combined construction
permit and operating license (COL) that allows a completed plant to begin operation
if all construction criteria have been met. Even if the licenses are granted by NRC,
the industry consortia funded by DOE have not committed to building new reactors.
The following two consortia are receiving COL assistance under the Nuclear Power
2010 program:
! A consortium led by Dominion Resources that is preparing a COL
for an advanced General Electric reactor. The proposed reactor
19 Union of Concerned Scientists, U.S. Nuclear Fuel Reprocessing Initiative, [http://www.
ucsusa.org/global_security/nuclear_terrorism/US_Nuclear_Fuel_Reprocessing_Initiative
.html].

CRS-10
would be located at Dominion’s existing North Anna plant in
Virginia, where the company received an NRC early-site permit with
DOE assistance. Dominion Energy submitted a COL application for
a new unit at North Anna on November 27, 2007.
! A consortium called NuStart Energy Development, including Exelon
and several other major nuclear utilities, which announced on
September 22, 2005, that it would seek a COL for two Westinghouse
reactors at the site of TVA’s uncompleted Bellefonte nuclear plant
in Alabama and for a General Electric design at the Grand Gulf plant
in Mississippi. The Nuclear Power 2010 Program is providing
funding for review and approval of the Bellefonte COL, which was
submitted to NRC on October 30, 2007.
The advanced Westinghouse reactor selected by NuStart, the AP-1000, may first
be built in China. Under a contract signed December 16, 2006, four of the
Westinghouse reactors are to be constructed at two sites, with the first two units to
begin operating by 2013.20 The contract could help pay for detailed engineering and
demonstrate the commercial viability of the new design, which received final design
certification from NRC effective February 27, 2006.21 A preliminary commitment
to provide almost $5 billion in financial support for the China reactor sale was
approved on February 18, 2005, by the Export-Import Bank of the United States.
Critics contend that the Ex-Im financing could provide unwarranted subsidies to the
nuclear power industry and unwisely transfer U.S. nuclear technology to China.
The Nuclear Power 2010 Program also helped three utilities seek NRC Early
Site Permits (ESPs) for potential new reactors in Illinois, Mississippi, and Virginia.
NRC issued the first of these on March 15, 2007, to Exelon Generating Company for
a potential new reactor at the company’s Clinton, Illinois, nuclear plant. Under
Nuclear Power 2010, DOE paid half the $15 million cost of the Clinton ESP. NRC
authorized a second ESP on March 27, 2007, for the Grand Gulf site in Mississippi,
and a third, for the North Anna site in Virginia, on November 20, 2007. The holders
of those ESPs will not have to revisit site-related issues if they seek licenses for new
reactors at those locations during the next 20 years.
Generation IV. Advanced commercial reactor technologies that are not yet
close to deployment are the focus of DOE’s Generation IV Nuclear Energy Systems
Initiative, for which $36.1 million was requested for FY2008 — about the same as
the FY2007 funding level. The omnibus measure nearly tripled the request to $116.0
million, with $74 million devoted to the Next Generation Nuclear Plant (NGNP). At
least $38 million of the NGNP funding is to be spent for developing a conceptual
design and baseline cost estimate, and $36 million is for NRC pre-licensing
activities. Under DOE’s current plans, NGNP will use Very High Temperature
Reactor (VHTR) technology, which features helium as a coolant and coated-particle
fuel that can withstand temperatures up to 1,600 degrees celsius.
20 “Westinghouse Wins China Contract; Chinese Look at Next Expansion,” Nucleonics
Week
, December 21, 2006, p. 1.
21 71 Federal Register 4464, January 27, 2006.

CRS-11
The Energy Policy Act of 2005 authorizes $1.25 billion through FY2015 for
NGNP development and construction (Title VI, Subtitle C). The authorization
requires that NGNP be based on research conducted by the Generation IV program
and be capable of producing electricity, hydrogen, or both. Phase I research on the
NGNP is to continue until 2011, when a decision will be made on moving to the
Phase II design and construction stage, according to the FY2008 DOE budget
justification.
In conjunction with the GNEP Technology Demonstration Program, the
Generation IV Program will also focus on developing a sodium-cooled fast reactor
(SFR). Existing U.S. commercial nuclear reactors use water to slow down, or
“moderate,” the neutrons released by the fission process (splitting of nuclei). The
relatively slow (thermal) neutrons are highly efficient in causing fission in certain
isotopes of heavy elements, such as uranium 235 and plutonium 239.22 Therefore,
fewer of those isotopes are needed in nuclear fuel to sustain a nuclear chain reaction
(in which neutrons released by fissioned nuclei then induce fission in other nuclei,
and so forth). The downside is that thermal neutrons cannot efficiently induce fission
in more than a few specific isotopes.
In contrast, “fast” neutrons, which have not been moderated, are less effective
in inducing fission than thermal neutrons but can induce fission in a much wider
range of isotopes, including all major plutonium isotopes. Therefore, nuclear fuel for
a fast reactor must have a higher proportion of fissionable isotopes than a thermal
reactor to sustain a chain reaction, but a larger number of different isotopes can
constitute that fissionable proportion.
A fast reactor’s ability to fission most heavy radioactive isotopes, called
“transuranics” (TRU), makes it theoretically possible to repeatedly separate those
materials from spent fuel and feed them back into the reactor until they are entirely
fissioned. In a thermal reactor, the buildup of non-fissile isotopes sharply limits the
number of such separation cycles before the recycled fuel can no longer sustain a
nuclear chain reaction.
“Given the benefits of continuous recycling, at this time GNEP-TDP is focused
on the development of fast reactor technologies, recognizing that fast reactor
operating experience is much more limited than thermal reactor operating experience,
and that fast burn reactor fuels, or transmutation fuels, are not fully developed,”
according to the DOE Program Plan.23
The House Appropriations Committee report directed DOE to make the gas-
cooled NGNP a higher priority than fast reactors for GNEP and begin a competitive
solicitation for a commercial demonstration plant at the Idaho National Laboratory.
The Senate panel also emphasized gas-cooled reactors in the Generation IV program.
22 Isotopes are atoms of the same chemical element but with different numbers of neutrons
in their nuclei.
23 Spent Nuclear Fuel Recycling Program Plan, p. 8.

CRS-12
The Generation IV program is also monitoring international research on lead-
cooled fast reactors, gas-cooled fast reactors, and supercritical water-cooled reactors,
according to the FY2008 budget justification.
Fuel Cycle Research and Facilities. The omnibus act places the
Advanced Fuel Cycle Initiative within the new category of Fuel Cycle Research and
Facilities, along with Mixed-Oxide Fuel Fabrication, which was transferred from the
nuclear nonproliferation account. Funding for the new category totals $462.3
million.
The FY2008 funding request of $395 million for AFCI, the primary component
of GNEP, was more than double the FY2007 funding level of $167.5 million, which
in turn was more than double the FY2006 appropriation. The omnibus act reduced
AFCI to $181.0 million, as discussed above. According to the DOE budget
justification, AFCI will develop and demonstrate nuclear fuel cycles that could
reduce the long-term hazard of spent nuclear fuel and recover additional energy.
Such technologies would involve separation of plutonium, uranium, and other long-
lived radioactive materials from spent fuel for reuse in a nuclear reactor or for
transmutation in a particle accelerator. Much of the program’s research will focus
on a separations technology called UREX+, in which uranium and other elements are
chemically removed from dissolved spent fuel, leaving a mixture of plutonium and
other highly radioactive elements. Proponents believe the process is proliferation-
resistant, because further purification would be required to make the plutonium
useable for weapons and because its high radioactivity would make it difficult to
divert or work with.
FY2008 funding was also to have been used for conceptual design work on an
Advanced Fuel Cycle Facility (AFCF) to provide an engineering-scale demonstration
of AFCI technologies, according to the budget justification. At the same time,
industry design teams were to complete conceptual designs for nuclear fuel recycling
demonstration facilities to be used for GNEP. However, the omnibus measure
specifically rejected funding for development of AFCF in FY2008.
Removing uranium from spent fuel would eliminate most of the volume of spent
nuclear fuel that would otherwise require disposal in a deep geologic repository,
which DOE is developing at Yucca Mountain, Nevada. The UREX+ process also
could reduce the heat generated by nuclear waste — the major limit on the
repository’s capacity — by removing cesium and strontium for separate storage and
decay over several hundred years. Plutonium and other long-lived elements would
be fissioned in accelerators or fast reactors (such as the type under development by
the Generation IV program) to reduce the long-term hazard of nuclear waste. Even
if technically feasible, however, the economic viability of such waste processing has
yet to be determined, and it still faces significant opposition on nuclear
nonproliferation grounds.
Nuclear Hydrogen Initiative. In support of President Bush’s program to
develop hydrogen-fueled vehicles, DOE is requesting $22.6 million in FY2008 for
the Nuclear Hydrogen Initiative, about 10% above the FY2007 funding level but
below the FY2006 appropriation. The omnibus measure provides $10 million for the
program. The House had provided flat funding for the program, and the Senate

CRS-13
Committee had approved the full request. According to DOE’s FY2008 budget
justification, the program will continue laboratory-scale experiments to allow
selection by 2011 of a hydrogen-production technology for pilot-scale demonstration
by 2013.
Nuclear Power Plant Safety and Regulation
Safety
Controversy over safety has dogged nuclear power throughout its development,
particularly following the March 1979 Three Mile Island accident in Pennsylvania
and the April 1986 Chernobyl disaster in the former Soviet Union. In the United
States, safety-related shortcomings have been identified in the construction quality
of some plants, plant operation and maintenance, equipment reliability, emergency
planning, and other areas. In a relatively recent example, it was discovered in March
2002 that leaking boric acid had eaten a large cavity in the top of the reactor vessel
in Ohio’s Davis-Besse nuclear plant. The corrosion left only the vessel’s quarter-
inch-thick stainless steel inner liner to prevent a potentially catastrophic loss of
reactor cooling water. Davis-Besse remained closed for repairs and other safety
improvements until NRC allowed the reactor to restart in March 2004.
NRC’s oversight of the nuclear industry is an ongoing issue; nuclear utilities
often complain that they are subject to overly rigorous and inflexible regulation, but
nuclear critics charge that NRC frequently relaxes safety standards when compliance
may prove difficult or costly to the industry.
Domestic Reactor Safety. In terms of public health consequences, the
safety record of the U.S. nuclear power industry in comparison with other major
commercial energy technologies has been excellent. During approximately 2,800
reactor-years of operation in the United States,24 the only incident at a commercial
nuclear power plant that might lead to any deaths or injuries to the public has been
the Three Mile Island accident, in which more than half the reactor core melted.
Public exposure to radioactive materials released during that accident is expected to
cause fewer than five deaths (and perhaps none) from cancer over the subsequent 30
years. A study of 32,000 people living within 5 miles of the reactor when the
accident occurred found no significant increase in cancer rates through 1998,
although the authors noted that some potential health effects “cannot be definitively
excluded.”25
The relatively small amounts of radioactivity released by nuclear plants during
normal operation are not generally believed to pose significant hazards, although
24 Nuclear Engineering International, “Country averages as at end September 2006,” March
2007, p. 30.
25 Evelyn O. Talbott et al., “Long Term Follow-Up of the Residents of the Three Mile Island
Accident Area: 1979-1998,” Environmental Health Perspectives, published online October
30, 2002, at [http://ehp.niehs.nih.gov/docs/2003/5662/abstract.html].

CRS-14
some groups contend that routine emissions are unacceptably risky. There is
substantial scientific uncertainty about the level of risk posed by low levels of
radiation exposure; as with many carcinogens and other hazardous substances, health
effects can be clearly measured only at relatively high exposure levels. In the case
of radiation, the assumed risk of low-level exposure has been extrapolated mostly
from health effects documented among persons exposed to high levels of radiation,
particularly Japanese survivors of nuclear bombing in World War II.
The consensus among most safety experts is that a severe nuclear power plant
accident in the United States is likely to occur less frequently than once every 10,000
reactor-years of operation. (For the current U.S. fleet of about 100 reactors, that rate
would yield an average of one severe accident every 100 years.) These experts
believe that most severe accidents would have small public health impacts, and that
accidents causing as many as 100 deaths would be much rarer than once every 10,000
reactor-years. On the other hand, some experts challenge the complex calculations
that go into predicting such accident frequencies, contending that accidents with
serious public health consequences may be more frequent.
Reactor Safety in the Former Soviet Bloc. The Chernobyl accident was
by far the worst nuclear power plant accident to have occurred anywhere in the
world. At least 31 persons died quickly from acute radiation exposure or other
injuries, and thousands of additional cancer deaths among the tens of millions of
people exposed to radiation from the accident may occur during the next several
decades.
According to a 2006 report by the Chernobyl Forum organized by the
International Atomic Energy Agency, the primary observable health consequence of
the accident was a dramatic increase in childhood thyroid cancer. The Chernobyl
Forum estimated that about 4,000 cases of thyroid cancer have occurred in children
who after the accident drank milk contaminated with high levels of radioactive
iodine, which concentrates in the thyroid. Although the Chernobyl Forum found only
15 deaths from those thyroid cancers, it estimated that about 4,000 other cancer
deaths may have occurred among the 600,000 people with the highest radiation
exposures, plus an estimated 1% increase in cancer deaths among persons with less
exposure. The report estimated that about 77,000 square miles were significantly
contaminated by radioactive cesium.26 Greenpeace issued a report in 2006 estimating
that 200,000 deaths in Belarus, Russia, and Ukraine resulted from the Chernobyl
accident between 1990 and 2004.27
Licensing and Regulation
For many years, a top priority of the nuclear industry was to modify the process
for licensing new nuclear plants. No electric utility would consider ordering a
nuclear power plant, according to the industry, unless licensing became quicker and
26 The Chernobyl Forum: 2003-2005, Chernobyl’s Legacy: Health, Environmental and
Socio-Economic Impacts,
International Atomic Energy Agency, April 2006.
27 Greenpeace. The Chernobyl Catastrophe: Consequences on Human Health, April 2006,
p. 10.

CRS-15
more predictable, and designs were less subject to mid-construction safety-related
changes required by NRC. The Energy Policy Act of 1992 (P.L. 102-486) largely
implemented the industry’s licensing goals, but no plants have been ordered.
Nuclear plant licensing under the Atomic Energy Act of 1954 (P.L. 83-703;
U.S.C. 2011-2282) had historically been a two-stage process. NRC first issued a
construction permit to build a plant and then, after construction was finished, an
operating permit to run it. Each stage of the licensing process involved complicated
proceedings. Environmental impact statements also are required under the National
Environmental Policy Act.
Over the vehement objections of nuclear opponents, the Energy Policy Act of
1992 provides a clear statutory basis for one-step nuclear licenses, which would
combine the construction permits and operating licenses and allow completed plants
to operate without delay if construction criteria were met. NRC would hold
preoperational hearings on the adequacy of plant construction only in specified
circumstances. DOE’s Nuclear Power 2010 initiative (discussed above) is paying up
to half the cost of combined construction and operating licenses for two advanced
reactors. Also as discussed above, Section 638 of the Energy Policy Act of 2005
authorizes federal payments to the owner of a completed reactor whose operation is
delayed by regulatory action.
A fundamental concern in the nuclear regulatory debate is the performance of
NRC in issuing and enforcing nuclear safety regulations. The nuclear industry and
its supporters have regularly complained that unnecessarily stringent and inflexibly
enforced nuclear safety regulations have burdened nuclear utilities and their
customers with excessive costs. But many environmentalists, nuclear opponents, and
other groups charge NRC with being too close to the nuclear industry, a situation that
they say has resulted in lax oversight of nuclear power plants and routine exemptions
from safety requirements.
Primary responsibility for nuclear safety compliance lies with nuclear plant
owners, who are required to find any problems with their plants and report them to
NRC. Compliance is also monitored directly by NRC, which maintains at least two
resident inspectors at each nuclear power plant. The resident inspectors routinely
examine plant systems, observe the performance of reactor personnel, and prepare
regular inspection reports. For serious safety violations, NRC often dispatches
special inspection teams to plant sites.
In response to congressional criticism, NRC has reorganized and overhauled
many of its procedures. The Commission has moved toward “risk-informed
regulation,” in which safety enforcement is guided by the relative risks identified by
detailed individual plant studies. NRC’s risk-informed reactor oversight system,
inaugurated April 2, 2000, relies on a series of performance indicators to determine
the level of scrutiny that each reactor should receive.28
28 For more information about the NRC reactor oversight process, see [http://www.nrc.gov/
NRR/OVERSIGHT/ASSESS/index.html]

CRS-16
Reactor Security
Nuclear power plants have long been recognized as potential targets of terrorist
attacks, and critics have long questioned the adequacy of the measures required of
nuclear plant operators to defend against such attacks. All commercial nuclear power
plants licensed by NRC have a series of physical barriers against access to vital
reactor areas and are required to maintain a trained security force to protect them.
Following the terrorist attacks of September 11, 2001, NRC began a “top-to-bottom”
review of its security requirements.
A key element in protecting nuclear plants is the requirement that simulated
terrorist attacks, monitored by NRC, be carried out to test the ability of the plant
operator to defend against them. The severity of attacks to be prepared for are
specified in the form of a “design basis threat” (DBT). After more than a year’s
review, on April 29, 2003, NRC changed the DBT to “represent the largest
reasonable threat against which a regulated private guard force should be expected
to defend under existing law.” The details of the revised DBT were not released to
the public.
The Energy Policy Act of 2005 required NRC to further revise the DBT based
on an assessment of terrorist threats, the potential for multiple coordinated attacks,
possible suicide attacks, and other criteria. NRC approved the DBT revision based
on those requirements on January 29, 2007. The revised DBT does not require
nuclear power plants to protect themselves against deliberate aircraft attacks. NRC
contended that nuclear facilities were already required to mitigate the effects of large
fires and explosions, no matter what the cause, and that active protection against
airborne threats was being addressed by U.S. military and other agencies.29
EPACT05 also requires NRC to conduct force-on-force security exercises at
nuclear power plants every three years (which was NRC’s previous policy),
authorizes firearms use by nuclear security personnel (preempting some state
restrictions), establishes federal security coordinators, and requires fingerprinting of
nuclear facility workers.
(For background on security issues, see CRS Report RL34331, Nuclear Power
Plant Security and Vulnerabilities, by Mark Holt and Anthony Andrews.)
Decommissioning
When nuclear power plants end their useful lives, they must be safely removed
from service, a process called decommissioning. NRC requires nuclear utilities to
make regular contributions to special trust funds to ensure that money is available to
remove radioactive material and contamination from reactor sites after they are
closed. The first full-sized U.S. commercial reactors to be decommissioned were the
Trojan plant in Oregon, whose decommissioning received NRC approval on May 23,
2005, and the Maine Yankee, for which NRC approved most of the site cleanup on
29 NRC Office of Public Affairs, NRC Approves Final Rule Amending Security
Requirements
, News Release No. 07-012, January 29, 2007.

CRS-17
October 3, 2005. The Trojan decommissioning cost $429 million, according to
reactor owner Portland General Electric, and the Maine Yankee decommissioning
cost about $500 million.30 Those costs are within the range estimated by a 1996 DOE
report of about $150 million to $600 million in 1995 dollars.
The tax treatment of decommissioning funds has been a continuing issue. The
Energy Policy Act of 2005 provides favorable tax treatment to nuclear
decommissioning funds, subject to certain restrictions.
Nuclear Accident Liability
Liability for damages to the general public from nuclear incidents is addressed
by the Price-Anderson Act (primarily Section 170 of the Atomic Energy Act of 1954,
42 U.S.C. 2210). The Energy Policy Act of 2005 extended Price-Anderson coverage
for new reactors and new DOE nuclear contracts through the end of 2025.
Under Price-Anderson, the owners of commercial reactors must assume all
liability for nuclear damages awarded to the public by the court system, and they
must waive most of their legal defenses following a severe radioactive release
(“extraordinary nuclear occurrence”). To pay any such damages, each licensed
reactor must carry financial protection in the amount of the maximum liability
insurance available, currently $300 million. Any damages exceeding that amount are
to be assessed equally against all covered commercial reactors, up to $95.8 million
per reactor. Those assessments — called “retrospective premiums” — would be paid
at an annual rate of no more than $15 million per reactor, to limit the potential
financial burden on reactor owners following a major accident. According to NRC,
104 commercial reactors are currently covered by the Price-Anderson retrospective
premium requirement.
For each nuclear incident, the Price-Anderson liability system currently would
provide up to $10.8 billion in public compensation. That total includes the $300
million in insurance coverage carried by the reactor that suffered the incident, plus
the $95.8 million in retrospective premiums from each of the 104 currently covered
reactors, totaling $10.3 billion. On top of those payments, a 5% surcharge may also
be imposed, raising the total per-reactor retrospective premium to $100.6 million and
the total available compensation to about $10.8 billion. Under Price-Anderson, the
nuclear industry’s liability for an incident is capped at that amount, which varies
depending on the number of covered reactors, the amount of available insurance, and
an inflation adjustment that is made every five years. Payment of any damages above
that liability limit would require congressional approval under special procedures in
the act.
The Energy Policy Act of 2005 raised the limit on per-reactor annual payments
to $15 million from the previous $10 million, and required the annual limit to be
adjusted for inflation every five years. As under previous law, the total retrospective
premium limit of $95.8 million is to be adjusted every five years as well. For the
30 Sharp, David, “NRC Signs Off On Maine Yankee’s Decommissioning,” Associated Press,
October 3, 2005.

CRS-18
purposes of those payment limits, a nuclear plant consisting of multiple small
reactors (100-300 megawatts, up to a total of 1,300 megawatts) would be considered
a single reactor. Therefore, a power plant with six 120-megawatt pebble-bed
modular reactors would be liable for retrospective premiums of up to $95.8 million,
rather than $574.8 million (excluding the 5% surcharge).
The Price-Anderson Act also covers contractors who operate hazardous DOE
nuclear facilities. The Energy Policy Act of 2005 set the liability limit on DOE
contractors at $10 billion per accident, to be adjusted for inflation every five years.
The liability limit for DOE contractors previously had been the same as for
commercial reactors, excluding the 5% surcharge, except when the limit for
commercial reactors dropped because of a decline in the number of covered reactors.
Price-Anderson authorizes DOE to indemnify its contractors for the entire amount
of their liability, so that damage payments for nuclear incidents at DOE facilities
would ultimately come from the Treasury. However, the law also allows DOE to fine
its contractors for safety violations, and contractor employees and directors can face
criminal penalties for “knowingly and willfully” violating nuclear safety rules.
The Energy Policy Act of 2005 limits the civil penalties against a nonprofit
contractor to the amount of management fees paid under that contract. Previously,
Atomic Energy Act §234A specifically exempted seven nonprofit DOE contractors
and their subcontractors from civil penalties and authorized DOE to automatically
remit any civil penalties imposed on nonprofit educational institutions serving as
DOE contractors. The Energy Policy Act eliminated the civil penalty exemption for
future contracts by the seven listed nonprofit contractors and DOE’s authority to
automatically remit penalties on nonprofit educational institutions.
The Price-Anderson Act’s limits on liability were crucial in establishing the
commercial nuclear power industry in the 1950s. Supporters of the Price-Anderson
system contend that it has worked well since that time in ensuring that nuclear
accident victims would have a secure source of compensation, at little cost to the
taxpayer. Extension of the act was widely considered a prerequisite for new nuclear
reactor construction in the United States. Opponents contend that Price-Anderson
inappropriately subsidizes the nuclear power industry by reducing its insurance costs
and protecting it from some of the financial consequences of the most severe
conceivable accidents.
The United States is supporting the establishment of an international liability
system that, among other purposes, would cover U.S. nuclear equipment suppliers
conducting foreign business. The Convention on Supplementary Compensation for
Nuclear Damage will not enter into force until at least five states with a specified
level of installed nuclear capacity have enacted implementing legislation. Such
implementing language is included in the Energy Independence and Security Act of
2007 (P.L. 110-140, section 934), signed by the President December 19, 2007.
Supporters of the Convention hope that more countries will join now that the United
States has acted. Aside from the United States, three countries have submitted the
necessary instruments of ratification, but the remaining nine countries that so far have
signed the convention do not have the required nuclear capacity for it to take effect.

CRS-19
Under the U.S. implementing legislation, the Convention on Supplementary
Compensation would not change the liability and payment levels already established
by the Price-Anderson Act. Each party to the convention would be required to
establish a nuclear damage compensation system within its borders analogous to
Price-Anderson. For any damages not covered by those national compensation
systems, the convention would establish a supplemental tier of damage compensation
to be paid by all parties. P.L. 110-140 requires the U.S. contribution to the
supplemental tier to be paid by suppliers of nuclear equipment and services, under
a formula to be developed by DOE. Supporters of the convention contend that it will
help U.S. exporters of nuclear technology by establishing a predictable international
liability system.
Nuclear Waste Management
One of the most controversial aspects of nuclear power is the disposal of
radioactive waste, which can remain hazardous for thousands of years. Each nuclear
reactor produces an annual average of about 20 metric tons of highly radioactive
spent nuclear fuel, for a nationwide total of about 2,000 metric tons per year. Each
reactor also annually generates about 50-200 cubic meters of low-level radioactive
waste, plus contaminated reactor components that are also disposed of as low-level
waste, especially after a reactor is decommissioned.
The federal government is responsible for permanent disposal of commercial
spent fuel (paid for with a fee on nuclear power) and federally generated radioactive
waste, whereas states have the authority to develop disposal facilities for commercial
low-level waste. Under the Nuclear Waste Policy Act (42 U.S.C. 10101, et seq.),
spent fuel and other highly radioactive waste is to be isolated in a deep underground
repository, consisting of a large network of tunnels carved from rock that has
remained geologically undisturbed for hundreds of thousands of years. Yucca
Mountain in Nevada is the only candidate site for the national repository. The act
required DOE to begin taking waste from nuclear plant sites by 1998 — a deadline
that under DOE’s latest schedule will be missed by nearly 20 years.
After numerous delays, DOE announced July 19, 2006, that it would submit a
Yucca Mountain license application to NRC by June 30, 2008. If Congress passes
proposed changes in the repository licensing process, according to DOE, nuclear
waste shipments to Yucca Mountain could begin by 2017. The waste program is run
by DOE’s Office of Civilian Radioactive Waste Management (OCRWM).
DOE requested $494.5 million for the nuclear waste program in FY2008, nearly
the same as the FY2006 level and $50 million above FY2007 funding. According
to DOE, the FY2008 funding request would allow OCRWM to submit the Yucca
Mountain license application in FY2008 as currently planned, conduct security and
safety planning, develop a preliminary transportation plan, and improve site
infrastructure and operations.31 The House Appropriations Committee approved the
full request, while the Senate panel voted to hold the program’s funding to about the
31 DOE, FY 2008 Congressional Budget, DOE/CF-017, Vol. 4, p. 490.

CRS-20
FY2007 level. The FY2008 omnibus appropriations act cuts the program’s funding
to $386.4 million — more than $50 million below the FY2007 level. OCRWM
Director Edward F. Sproat told Nevada state legislators January 15, 2008, that the
funding reduction would require him to lay off 500 workers and would probably
force program delays.32
Funding for the program is provided under two appropriations accounts. The
Administration requested $202.5 million from the Nuclear Waste Fund, which holds
fees paid by nuclear utilities, and the final FY2008 appropriation was $187.3 million.
An additional $292.0 million was requested under the Defense Nuclear Waste
Disposal account, which pays for disposal of high-level waste from the nuclear
weapons program in the planned Yucca Mountain repository. The final FY2008
amount for that category was $$199.2 million.
In addition to the funding issue, the Yucca Mountain program faces regulatory
uncertainty. A ruling on July 9, 2004, by the U.S. Court of Appeals for the District
of Columbia Circuit overturned a key aspect of the Environmental Protection
Agency’s (EPA’s) regulations for the planned repository.33 The three-judge panel
ruled that EPA’s 10,000-year compliance period was too short, but it rejected several
other challenges to the rules. EPA proposed a new standard on August 9, 2005, that
would allow higher radiation exposure from the repository after 10,000 years.
The quality of scientific work at Yucca Mountain was called into question by
DOE’s March 16, 2005, disclosure of e-mails from geologists indicating that some
quality assurance documentation had been falsified. DOE announced February 17,
2006, that the technical work conducted by the geologists was sound but that some
work would be redone or further corroborated before submission of a repository
license application.
Further delays in the nuclear waste program could prove costly to the federal
government because of breach-of-contract lawsuits over DOE’s failure to begin
accepting spent fuel by 1998 as required by NWPA. Nuclear plant operators already
have been awarded several hundred million dollars, and DOE estimates the federal
government’s potential liability is about $7 billion.34 (For further details, see CRS
Report RL33461, Civilian Nuclear Waste Disposal, by Mark Holt.)
Nuclear Weapons Proliferation
Renewed interest in nuclear power throughout the world has led to increased
concern about nuclear weapons proliferation, because technology for making nuclear
32 Rogers, Keith, “Yucca Mountain Layoffs Imminent, Official Warns,” Las Vegas Review-
Journal
(via Energy Central), January 18, 2008.
33 Nuclear Energy Institute v. Environmental Protection Agency, U.S. Court of Appeals for
the District of Columbia Circuit, no. 01-1258, July 9, 2004.
34 Statement of OCRWM Director Edward F. Sproat III to the House Budget Committee,
October 4, 2007, p. 3.

CRS-21
fuel can also be used to produce nuclear weapons material. Of particular concern are
uranium enrichment, a process to separate and concentrate the fissile isotope
uranium-235, and nuclear spent fuel reprocessing, which can produce weapons-
useable plutonium.
The International Atomic Energy Agency (IAEA) conducts a safeguards
program that is intended to prevent civilian nuclear fuel facilities from being used for
weapons purposes, but not all potential weapons proliferators belong to the system,
and there are ongoing questions about its effectiveness. Several proposals have been
developed to guarantee non-fuel cycle nations a supply of nuclear fuel in exchange
for commitments to forgo enrichment and reprocessing, which was one of the
original goals of the Bush Administration’s GNEP program (discussed above under
“Nuclear Power Research and Development”).
Several situations have arisen throughout the world in which ostensibly
commercial uranium enrichment and reprocessing technologies have been subverted
for military purposes. In 2003 and 2004, it became evident that Pakistani nuclear
scientist A.Q. Khan had sold sensitive technology and equipment related to uranium
enrichment to states such as Libya, Iran, and North Korea. Although Pakistan’s
leaders maintain they did not acquiesce in or abet Khan’s activities, Pakistan remains
outside the Nuclear Nonproliferation Treaty (NPT) and the Nuclear Suppliers Group
(NSG). Iran has been a direct recipient of Pakistani enrichment technology.
IAEA’s Board of Governors found in 2005 that Iran’s breach of its safeguards
obligations constituted noncompliance with its safeguards agreement, and referred
the case to the U.N. Security Council in February 2006. Despite repeated calls by the
U.N. Security Council for Iran to halt enrichment and reprocessing-related activities,
and imposition of sanctions, Iran continues to develop enrichment capability at
Natanz. Iran insists on its inalienable right to develop the peaceful uses of nuclear
energy, pursuant to Article IV of the NPT. Interpretations of this right have varied
over time. The IAEA Director General, Mohamed ElBaradei, has not disputed this
inalienable right and, by and large, neither have U.S. government officials. However,
the case of Iran raises perhaps the most critical question in this decade for
strengthening the nuclear nonproliferation regime: How can access to sensitive fuel
cycle activities (which could be used to produce fissile material for weapons) be
circumscribed without further alienating non-nuclear weapon states in the NPT?
Leaders of the international nuclear nonproliferation regime have suggested
ways of reining in the diffusion of such inherently dual-use technology, primarily
through the creation of incentives not to enrich uranium or reprocess spent fuel. The
international community is in the process of evaluating those proposals and may
decide upon a mix of approaches. At the same time, there is debate on how to
improve the IAEA safeguards system and its means of detecting diversion of nuclear
material to a weapons program in the face of expanded nuclear power facilities
worldwide.
India and Pakistan each pose a challenge to the international nonproliferation
regime. Both tested nuclear weapons in May 1998, neither has signed the NPT, and
only a limited number of civilian facilities are under IAEA safeguards in each
country. In response to the nuclear tests, President Clinton imposed full restrictions

CRS-22
on all non-humanitarian aid to both countries as mandated by Section 102 of the
Arms Export Control Act. However, Congress and the President acted almost
immediately to lift certain aid restrictions, and all remaining nuclear-related sanctions
on Pakistan and India were removed in October 2001.

On July 18, 2005, President Bush announced he would “work to achieve full
civil nuclear energy cooperation with India.” Nonproliferation experts have argued
that the potential costs of nuclear cooperation with India to U.S. and global
nonproliferation policy may exceed the benefits. For example, the Nuclear Suppliers
Group would have to amend its guidelines to allow cooperation with a non-NPT
state, potentially prompting some suppliers, such as China, to justify supplying other
states outside the NPT regime, such as Pakistan. It is also argued that supplying
nuclear fuel to India could free up its domestic production of nuclear material for
weapons use. This could in turn lead to increased fissile material production for
weapons in Pakistan. Supporters of the agreement argue that the U.S.-India nuclear
cooperation would allow for India’s increased participation in the nonproliferation
regime by expanding the number of safeguarded facilities and promoting stricter
export controls. The international community continues to struggle to find effective
ways to discourage the further spread of the most sensitive nuclear fuel technologies.
(For more information, see CRS Report RL34234, Managing the Nuclear Fuel
Cycle: Policy Implications of Expanding Global Access to Nuclear Power, by Mary
Beth Nikitin, Coordinator.)
Federal Funding for Nuclear Energy Programs
The following tables summarize current funding for DOE nuclear fission
programs and NRC. The sources for the funding figures are Administration budget
requests and committee reports on the Energy and Water Development
Appropriations Acts, which fund all the nuclear programs. President Bush submitted
his FY2008 funding request on February 5, 2007. FY2007 funding for the programs
was provided by a continuing resolution enacted February 15, 2007 (H.J.Res. 20, P.L.
110-5). Funding for individual sub-accounts for FY2007 is described in an Operating
Plan submitted by DOE on March 16, 2007. The House approved the FY2008
Energy and Water Appropriations Bill on July 17, 2007 (H.R. 2641, H.Rept. 110-
185). The Senate Appropriations Committee approved its version of the measure on
June 28, 2007 (S. 1751, S.Rept. 110-127). Final funding levels for FY2008 are
provided in the Consolidated Appropriations Act, signed December 26, 2007 (P.L.
110-161). The accompanying funding tables can be found in the December 17, 2007,
Congressional Record beginning on page H15940.

CRS-23
Table 2. Funding for the Nuclear Regulatory Commission
(budget authority in millions of current dollars)
FY2008
FY2007
FY2008
FY2008
FY2008
Senate
Approp.
Request
House
Final
Comm.
Nuclear Regulatory Commission
— Reactor Safety
— a
709.0
— a
— a
— a
— Nuclear Materials and

199.4



Waste
— Inspector General
8.3
8.2
8.1
8.7
8.7
Total NRC budget authority
824.9
916.6
933.7
919.3
926.1
— Offsetting fees
666.7
765.1
765.1
765.6
779.1
Net appropriation
158.2
151.5
168.6
153.7
147.0
a. Subcategories not specified.
Table 3. DOE Funding for Nuclear Activities
(budget authority in millions of current dollars)
FY2008
FY2007
FY2008
FY2008
FY2008
Senate
Approp.
Request
House
Finalb
Comm.
Nuclear Energy (selected programs)
University Reactor
16.5
0
0
15.0
0
Assistance
Nuclear Power 2010
80.3
114.0
80.3
135.0
135.0
Generation IV Nuclear
35.6
36.1
115.1
55.0
116.0
Systems
Nuclear Hydrogen
19.3
22.6
19.3
22.6
10.0
Initiative
Advanced Fuel Cycle
167.5
395.0
120.0
243.0
181.0
Initiative
Nuclear R&D
236.4
157.7
261.2
249.7
241.5
Infrastructure
Program Direction
62.6
76.2
71.4
76.2
81.6
Total, Nuclear Energy
618.2
801.7
835.2
795.5
961.7
Civilian Nuclear Waste
444.5
494.5
494.5
446.1
386.4
Disposala
a. Funded by a 1-mill-per-kilowatt-hour fee on nuclear power, plus appropriations for defense waste
disposal and homeland security.
b. FY2008 totals for nuclear energy and nuclear waste reflect an across-the-board rescission in
Division C, Section 312, while individual nuclear energy program totals do not.

CRS-24
Legislation
H.R. 994 (John Hall)/S. 649 (Clinton)
Requires NRC to conduct an independent safety assessment of the Indian Point
nuclear power plant in New York. House bill introduced February 12, 2007; referred
to Committee on Energy and Commerce. Senate bill introduced February 15, 2007;
referred to Committee on Environment and Public Works.
H.R. 1133 (Berkley)
Freedom through Renewable Energy Expansion (FREE) Act. Repeals
provisions of the Energy Policy Act of 2005 (P.L. 109-58) regarding the next
generation nuclear plant project. Introduced February 16, 2007; referred to multiple
committees.
H.R. 2162 (Lowey)
Nuclear Power Licensing Reform Act of 2007. Requires that nuclear power
plants before receiving an initial or renewed license be found not to pose an
unreasonable threat because of safety or security vulnerabilities and have adequate
evacuation plans approved by the relevant federal agencies and states within 50 miles
of the facility. Introduced May 3, 2007; referred to Committee on Energy and
Commerce.
H.R. 2282 (Schmidt)
Nuclear Waste Storage Prohibition Act. Prohibits DOE from using GNEP funds
to store nuclear waste at any site where reprocessing facilities are not operating or
under construction. Introduced May 10, 2007; referred to Committee on Energy and
Commerce.
H.R. 2641 (Visclosky)/S. 1751 (Dorgan)
Energy and Water Development Appropriations for FY2008. Includes funding
for DOE nuclear waste program and GNEP. Reported as an original measure by the
House Committee on Appropriations June 11, 2007 (H.Rept 110-185) following
committee markup June 6, 2007. Passed by House July 17, 2007, by vote of 312-
112. Senate bill reported as an original measure by Senate Committee on
Appropriations July 9, 2007 (S.Rept. 110-127) following committee markup June 28,
2007. Final FY2008 Energy and Water Development funding included in
Consolidated Appropriations Act, signed December 26, 2007 (P.L. 110-161).
H.R. 2814 (Marchant)
Authorizes the Secretary of Energy to provide loan guarantees for 100% of the
cost of construction of new domestic nuclear power production facilities. Introduced
June 21, 2007; referred to Committees on Energy and Commerce and Science and
Technology.
S. 37 (Domenici)
Nuclear Waste Access to Yucca Act. Permanently withdraws Yucca Mountain
site from public use, authorizes nuclear waste interim storage facilities at Yucca
Mountain, repeals the Yucca Mountain capacity limit, and makes other changes in

CRS-25
the nuclear waste program. Introduced May 23, 2007; referred to Committee on
Energy and Natural Resources.
S. 280 (Lieberman)
Climate Stewardship and Innovation Act of 2007. Includes provisions
establishing research program on nuclear fuel cycles and a demonstration program
to reduce nuclear power plant licensing costs. Introduced January 12, 2007; referred
to Committee on Environment and Public Works.
S. 784 (Reid)
Federal Accountability for Nuclear Waste Storage Act of 2007. Requires
commercial nuclear power plants to transfer spent fuel from pools to dry storage
casks and then convey title to the Secretary of Energy. Introduced March 6, 2007.
Referred to Committee on Environment and Public Works.
S. 1008 (Sanders)
Requires the Nuclear Regulatory Commission to develop and implement
procedures for independent safety assessments of nuclear power plants. Introduced
March 28, 2007; referred to Committee on Environment and Public Works.
S. 2551 (Inhofe)
Provides for interim nuclear waste disposal license at Yucca Mountain site.
Introduced January 24, 2008; referred to Committee on Environment and Public
Works.