Order Code RS22381
Updated February 27, 2007
National Aeronautics and Space
Administration: Overview, FY2007 Budget in
Brief, and Key Issues for Congress
Daniel Morgan and Carl E. Behrens
Resources, Science, and Industry Division
Summary
The National Aeronautics and Space Administration (NASA) conducts U.S.
civilian space and aeronautics activities. Its regular FY2006 appropriation was $16.623
billion. For FY2007, the Administration requested $16.792 billion, a 3.2% increase (or
a 1% increase if one-time FY2006 funding for hurricane recovery is included). The
NASA Authorization Act of 2005 (P.L. 109-155) authorized FY2007 funding of
$17.932 billion. The House provided $16.709 billion. The Senate Appropriations
Commitee recommended $17.797 billion. The final appropriation was $16.247 billion
(P.L. 110-5). The key issue for Congress is how NASA is implementing the Vision for
Space Exploration, including whether it is maintaining a balanced portfolio of programs
that include science and aeronautics.
Agency Overview
The National Aeronautics and Space Administration (NASA) was created by the
1958 National Aeronautics and Space Act (P.L. 85-568) to conduct civilian space and
aeronautics activities. NASA opened its doors on October 1, 1958, almost exactly a year
after the Soviet Union launched the world’s first satellite, Sputnik. In the five decades
since, NASA has conducted far-reaching programs in human and robotic spaceflight,
technology development, and scientific research.
NASA is managed from headquarters in Washington, DC. It has nine major field
centers: Ames Research Center, Moffett Field, CA; Dryden Flight Research Center,
Edwards, CA; Glenn Research Center, Cleveland, OH; Goddard Space Flight Center,
Greenbelt, MD; Johnson Space Center, near Houston, TX; Kennedy Space Center,
near Cape Canaveral, FL; Langley Research Center, Hampton, VA; Marshall Space
Flight Center
, Huntsville, AL; and Stennis Space Center, in Mississippi, near Slidell,
LA. In addition, it has a federally funded research and development center, the Jet
Propulsion Laboratory
, Pasadena, CA, operated by the California Institute of
Technology. NASA Administrator Dr. Michael Griffin leads a workforce of more than

CRS-2
19,000 civil servants and more than 40,000 contractors and grantees
([http://nasapeople.nasa.gov/Workforce/data/page7.htm]). More information on NASA’s
organization, including details of its four Mission Directorates (Aeronautics Research,
Exploration Systems, Science, and Space Operations) can be found on the NASA website
at [http://www.nasa.gov/centers/hq/organization/].
NASA’s FY2007 Budget
For FY2007, NASA requested $16.792 billion in new budget authority. For
FY2006, the agency received $16.623 billion (when adjusted for two across-the-board
rescissions totaling 1.28%, a transfer of $27 million from the National Oceanic and
Atmospheric Administration, and a supplemental appropriation of $350 million for
recovery from Hurricane Katrina). The net requested increase for FY2007 was 1%, or
3.2% if the one-time hurricane funding was excluded. The House provided $16.709
billion (H.R. 5672, 109th Congress), while the Senate Appropriations Committee
recommended $17.797 billion, of which $1.040 billion would have been emergency
funding (S.Rept. 109-280). The final appropriation in the year-long continuing resolution
was $16.247 billion. For details, see Tables 1 and 2.
In September 2006, before Congress completed action on the FY2007 budget, NASA
announced a change in how it accounts for overhead expenses. The new system is known
as “full cost simplification.” The change increases the stated cost of some programs and
decreases the stated cost of others, without changing actual program content. The
increases and decreases exactly balance, so that NASA’s total budget is not affected. For
any particular program, however, amounts expressed in the new accounting system are
not directly comparable with amounts expressed in the previous accounting system.
Table 1: NASA FY2007 Budget, Action by the 109th Congress
($ millions, previous accounting system)
FY2006
FY2006
FY2007
FY2007
FY2007
(OMB)
(NASA)
Request
House
Sen. Cmte.
Science, Aeronautics, and Exploration
Science
$5,254
$5,254
$5,330
$5,405
$5,362
Solar System Exploration

1,582
1,610

1,610
The Universe

1,508
1,509

1,509
Earth-Sun System

2,164
2,211

2,242
Exploration Systems
3,114
3,050
3,978
3,828
3,922
Constellation Systems

1,734
3,058
3,042
2,961
Exploration Systems R&T

692
646
511
686
Human Systems R&T

624
275
275
275
Aeronautics Research
929
884
724
824
759
Cross-Agency Support Programs
367
534
492
425
492
Reductions not Allocated




–45
Subtotal
9,664
9,721
10,524
10,482
10,489
Exploration Capabilities
Space Operations
6,578
6,870
6,234
6,194
6,235
Space Shuttle

4,778
4,057
4,057
4,057
International Space Station

1,753
1,811
1,778
1,811
Space and Flight Support

339
367
359
367
Subtotal
6,578
6,870
6,234
6,194
6,235
Inspector General
32
32
34
34
34
Return to Flight (emergency)




1,000

CRS-3
Hurricane Katrina (emergency)




40
Total
16,273
16,623
16,792
16,709
17,797
2005 Hurricane Augmentation
350




Grand Total
16,623
16,623
16,792
16,709
17,797
Sources: The first FY2006 column is from Office of Management and Budget, Budget of the United States
Government, FY2007
, p. 272, with the grand total added by CRS. The second FY2006 column is from the
FY2007 NASA budget request ([http://www.nasa.gov/pdf/142458main_FY07_budget_full.pdf]) and reflects
the program allocation of hurricane recovery funds as well as other changes made by the agency’s FY2006
initial operating plan. The FY2007 columns are from the budget request, H.Rept. 109-520, and S.Rept.
109-280. The House did not specify funding for the three themes within Science. The Senate committee
did not specify amounts within the Science, Aeronautics, and Exploration appropriations account; these
amounts are estimated by CRS based on the requested amounts and the program increases and decreases
specified in the Senate committee report. The amount shown as “Reductions not Allocated” is calculated
by CRS as the difference between the recommended overall decrease for the account and the sum of the
specified program increases and decreases.
Notes: R&T = Research and Technology. Comparisons with years before FY2006 are difficult at anything
less than the total agency level because of repeated changes in NASA’s budget structure. The only major
such change for FY2007 is the new Cross-Agency Support Programs category, which consists of the
Education, Advanced Business Systems, and Shared Capabilities Themes and the Innovative Partnerships
Program. Education was previously its own top-level budget category.
Table 2: NASA FY2007 Budget, Action by the 110th Congress
($ millions, new “full cost simplification” accounting system)
FY2006
FY2007
FY2007
Comparable
Request
Appropriated
Science, Aeronautics, and Exploration
Science
$5,359
$5,467
$5,251
Exploration Systems
3,109
4,152
3,402
Aeronautics Research
715
529
890
Cross-Agency Support Programs
542
502
532
Subtotal
9,725
10,650
10,075
Exploration Capabilities
Space Operations
6,516
6,108
6,140
Subtotal
6,516
6,108
6,140
Inspector General
32
34
32
Total
16,273
16,792
16,247
2005 Hurricane Augmentation
350


Grand Total
16,623
16,792
16,247
Source: NASA briefing charts and P.L. 110-5. The FY2006 amounts are the agency’s final operating plan.
Note: Amounts below the detail level specified by P.L. 110-5 are not shown.
The Vision for Space Exploration
On January 14, 2004, President Bush announced new goals for NASA: the Vision
for Space Exploration, often referred to as the Moon/Mars program. The President
directed NASA to focus its efforts on returning humans to the Moon by 2020 and some
day sending them to Mars and “worlds beyond.” (Twelve U.S. astronauts walked on the
Moon between 1969 and 1972. No humans have visited Mars.) The President also
directed NASA to fulfill its commitments to its partners in building the International
Space Station (ISS): Russia, Japan, Canada, and 10 European countries.
The President added only $1 billion to NASA’s budget plan to implement the Vision,
out of the estimated $12.6 billion that would be needed for FY2005-2009; the rest is to

CRS-4
be redirected from other NASA activities. To free funds for the Vision, the space shuttle
program will be terminated in 2010, rather than in 2015 or later as was planned prior to
the 2003 loss of the shuttle Columbia, and U.S. use of the ISS will end by FY2017. A key
issue created by the Vision is whether NASA should be devoted solely to human space
exploration or should retain its commitment to science and aeronautics.
Under the Vision, NASA is to develop a new spacecraft called Orion (formerly the
Crew Exploration Vehicle) and a launch vehicle for it called Ares I (formerly the Crew
Launch Vehicle), with an Earth-orbit capability by 2014 and the ability to take astronauts
to and from the Moon no later than 2020. NASA stresses, however, that this is a “go-as-
you-can-pay” program, with its pace set, in part, by available funding. A cost estimate for
the Vision as a whole has not been provided by NASA. The implementation plan released
on September 19, 2005, estimates that it will cost $104 billion to return astronauts to the
Moon, not including robotic missions or $20 billion to use Orion to service the ISS.
(NASA plans at least two robotic missions to the Moon, the first in 2008, to provide data
on potential landing sites.)
NASA created the Exploration Systems Mission Directorate (ESMD) to implement
the Moon/Mars program. The FY2007 budget request and its out-year projections
proposed shifting about $1.5 billion out of ESMD to help pay for shortfalls in the space
shuttle and ISS programs. In order to fund Orion and Ares I, other ESMD activities were
significantly cut, including Project Prometheus (to develop space nuclear power and
propulsion systems) and microgravity research on the ISS. Final congressional action on
the FY2007 budget reduced funding for ESMD by a further $750 million relative to the
request. These reductions put pressure on the schedule for Orion and Ares I.
Key Congressional Issues
The major issue facing Congress as it debated NASA’s FY2007 budget request was
how to implement the Vision. Debate over NASA’s FY2005 and FY2006 budgets
answered the question of whether the Vision should be adopted: the 2005 NASA
authorization act (P.L. 109-155) directs NASA to establish a program to accomplish the
goals set out by the President. However, that law and NASA’s FY2006 appropriations
act (P.L. 109-108) emphasize that NASA should have a balanced set of programs that
include not only those related to the Vision, but science and aeronautics as well.
Exacerbating the dilemma of how to maintain this balance without a significant long-term
budget increase, NASA is contending with the costs of returning the space shuttle to flight
status, completing the ISS, and overruns in a number of science programs. Dr. Griffin has
stated that “I will do everything I can to keep Orion and Ares I on schedule. That will be
right behind keeping shuttle and station on track, and then after that we’ll fill up the
bucket with our other priorities.”1
Impact on NASA’s Science Programs
The FY2007 request proposed taking $3.1 billion from the Science Mission
Directorate (SMD) over the five-year period FY2007-2011 relative to projections in the
1 Quoted in “NASA Will Protect CEV, Station Against Flat-Budget Squeeze,” Aerospace Daily
and Defense Report
, January 11, 2007.

CRS-5
FY2006 budget. Most of that (about $2 billion) was to cover a shortfall in the space
shuttle and ISS budgets. The proposed budget for SMD increased by 1.5% in FY2007
and 1% in the subsequent four years, less than the projections given in the FY2006 budget
and less than the rate of inflation. In addition, the FY2006 initial operating plan showed
that NASA shifted $176 million from SMD to ESMD in FY2006 and took the entire
congressionally directed general reduction for the Science, Aeronautics, and Exploration
account ($90 million) from SMD. NASA officials stressed that funding for space science
during the 1990s and early 2000s grew at a rate faster than the total NASA budget and
stated that sustaining such increases was not possible. They also said that science
programs accounted for 32% of NASA’s budget in the FY2007 request, significantly
more than the 24% allocated to them in 1992.
The requested budget would have delayed or deferred several space science programs
because of budget constraints. Among these were two space telescopes (the Space
Interferometry Mission and the Terrestrial Planet Finder), several robotic Mars probes,
a dedicated mission to study Jupiter’s moon Europa, research on new space propulsion
and spacecraft power sources, and the Global Precipitation Mission. Funding for
Research and Analysis, which provides grant funding to individual investigators, would
have been cut 15%. No funding was requested for the SOFIA airborne infrared telescope.
On the other hand, the request did include FY2007 funding for missions such as the James
Webb Space Telescope, robotic Mars probes to be launched at each of the next three
launch opportunities (2007, 2009, and 2011), the Juno probe to study Jupiter, the Glory
spacecraft to study atmospheric aerosols and solar irradiance, and a dedicated land remote
sensing satellite to continue the Landsat series. Information on all these programs is
available on NASA’s website at [http://science.hq.nasa.gov/missions/].
The House provided $75 million more than the request for Science: $50 million
more for Research and Analysis, $15 million to initiate planning for a Europa mission,
and $10 million for continued development of the Terrestrial Planet Finder. The Senate
Appropriations Committee recommended an increase of $31.5 million and directed
NASA to fund SOFIA through a reprogramming request. The final appropriation, after
adjusting for “full cost simplification,” was a reduction of $216 million.
Impact on Aeronautics
The FY2007 budget request for the Aeronautics Research Mission Directorate was
consistent with the out-year projection for FY2007 in the FY2006 request, but the
structure and content of the program changed significantly.
In February 2005, NASA proposed transforming the largest element of the
aeronautics program, Vehicle Systems, by placing more emphasis on barrier-breaking
demonstrations and focusing resources on a smaller number of research areas. Among
the topics to be eliminated from the restructured program were hypersonics, rotorcraft,
and most of subsonic aeronautics. This proposal drew strong criticism from the House
and Senate committees with oversight over NASA.
In late 2005, NASA reshaped its plans for aeronautics in a manner that it described
as “consistent with direction received from our Committees.” The new plan, which was
reflected in the FY2007 request, refocused the program on core competencies in subsonic,
supersonic, and hypersonic flight, including rotorcraft. The former Vehicle Systems

CRS-6
program was renamed Fundamental Aeronautics to reflect its new character. The other
two programs, Aviation Safety and Airspace Systems, had their content reorganized. A
fourth program, the Aeronautics Test Program, was created to ensure the availability of
aeronautics test facilities, such as wind tunnels, whose continued viability has been under
pressure for several years. Aeronautics research supporters have expressed continuing
concern over the program’s downward funding trend. The impact of that reduced funding
on the NASA workforce has also been an issue for Congress. The new National
Aeronautics Research and Development Policy, required by the FY2006 appropriations
act and issued by President Bush as an Executive Order on December 20, 2006, came too
late to influence action in the 109th Congress.
An amendment to the Senate FY2007 budget resolution (S.Amdt. 3033 to
S.Con.Res. 83) increased the recommended funding for NASA aeronautics by $179
million. The House provided an increase of $100 million. House report language
directed NASA to report on its response to the National Research Council’s decadal
survey of aeronautics released in June 2006. The Senate Appropriations Committee
recommended an increase of $35 million. The final appropriation, after adjusting for the
“full cost simplification” accounting change, was an increase of $361 million.
The Space Shuttle and the International Space Station
Construction of the ISS, suspended after the Columbia disaster, was resumed in
September 2006. NASA plans 13 shuttle flights in 2007-2010 to complete ISS
construction, plus one mission in 2008 to service the Hubble Space Telescope. NASA
has also allocated $500 million over five years to help private-sector companies develop
low-cost space transportation systems that could service the ISS after the shuttle is retired.
The gap between the end of shuttle flights in 2010 and the planned availability of
Orion in 2014 raises several issues. Some analysts are concerned that placing a fixed
termination date on the shuttle may create schedule pressure similar to that identified as
a contributing factor in the Columbia accident. Some question whether the United States
should be dependent on Russia to launch U.S. astronauts to the ISS during the gap period.
A major concern is how NASA will retain its skilled workforce during the transition from
shuttle to Orion, especially if Orion’s schedule slips and the gap lengthens.
Some also question is whether completing the ISS is worth the cost, which is about
$2 billion per year plus $4 billion per year for the shuttle, considering the modest research
agenda that remains. (Following the Vision speech, the President directed NASA to
narrow the program of research on the ISS to include only what is needed to accomplish
the Vision.) Alternatively, some want to restore the ISS research program: the 2005
NASA authorization act (P.L. 109-155), for example, directs that 15% of ISS research
spending be used for non-Vision-related research. Fulfilling U.S. commitments to its
international partners is seen by some observers as sufficient rationale for continued U.S.
involvement in the ISS; others find this argument inadequate.
The House provided $41 million less for Exploration Capabilities than was requested
for FY2007, including $33 million less for the ISS program, in light of “the uncertainties
surrounding the nature and scope of the science to be conducted on the ISS.” The Senate
Appropriations Committee recommended the requested amount. The final appropriation,
after adjusting for “full cost simplification,” was an increase of $32 million.