Navy Force Structure and Shipbuilding Plans:
Background and Issues for Congress
Summary
The Navy is proposing to maintain in coming years a fleet of 313 ships,
including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88
cruisers and destroyers (including 7 DD(X) destroyers and 19 CG(X) cruisers), 55
small Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime
Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction
amphibious and sealift-type ships. Navy officials have also stated that they hope to
avoid substantial year-to-year changes in the composition of the five- or six-year
Navy shipbuilding plan.
The Navy’s 313-ship proposal is intended to end a period of ambiguity and
uncertainty in Navy ship force structure planning dating back to at least February
2003. This ambiguity, together with year-to-year volatility in the composition of the
Navy’s shipbuilding plan, created difficulties for Congress in conducting oversight
of Navy budgets and programs, and for industry in making rational business-planning
decisions. Ambiguity in Navy force-structure planning may also have created
difficulties for the Navy in defending its requirements in discussions with the Office
of the Secretary of Defense (OSD). Potential oversight issues for Congress include:
! Will the Navy’s 313-ship proposal be endorsed by OSD as an
official Department of Defense (DOD) planning goal? If not, where
would that leave Navy ship force-structure planning?
! Does the 313-ship proposal include an appropriate number of ships?
! Is the 313-ship proposal affordable?
! Does the Navy’s FY2007-FY2011 shipbuilding plan adequately
support the 313-ship proposal?
! Does the Navy’s FY2007-FY2011 shipbuilding plan adequately
support the shipbuilding industrial base?
Regarding the first question, the final report on the DOD 2005 Quadrennial
Defense Review (QDR) refrained from explicitly endorsing the 313-ship plan, stating
only that DOD supports a Navy larger than today’s 281-ship fleet that includes 11
aircraft carriers. Regarding the second question, factors to consider include the
Navy’s role in the global war on terrorism (GWOT) and the potential need in coming
years to counter modernized Chinese maritime military forces. Regarding the third
question, the Navy reportedly estimates that executing the 313-ship proposal would
require an annual average of $13.4 billion per year in 2005 dollars for new ship
construction, while the Congressional Budget Office estimates it would require an
annual average of $18.3 billion per year in 2005 dollars ($19.6 billion per year in
2007 dollars), or about 37% more. Regarding the fourth question, the Navy’s
FY2007-FY2011 shipbuilding plan includes 23 LCSs and 28 larger ships, or an
average of 5.6 larger ships per year, which is less than the average of 7.3 larger ships
per year that would be needed over the long run to maintain over the long run the 258
larger ships included in the 313-ship plan. An associated 30-year shipbuilding plan
submitted to Congress does not maintain a force of 48 SSNs and 88 cruisers and
destroyers consistently over the long run. This report will be updated when events
warrant.

Contents
Introduction and Issue for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Composition Of 313-Ship Proposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Independent Studies On Navy Force Structure . . . . . . . . . . . . . . . . . . . . . . . 4
Navy FY2007-FY2011 Ship-Procurement Plan . . . . . . . . . . . . . . . . . . . . . . 4
Oversight Issues for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Endorsement Of 313-Ship Proposal By OSD . . . . . . . . . . . . . . . . . . . . . . . . 6
Appropriateness Of 313-Ship Proposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Numbers Of Individual Ship Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Historical Fleet Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Previous Force Structure Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Current Force-Planning Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Affordability of 313-Ship Proposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Recent Funding For New Ships: $10.2 Billion Per Year . . . . . . . . . . . 13
Navy Estimate For 313-Ship Proposal: $13.4 Billion Per Year . . . . . 13
CBO Estimate For 313-Ship Proposal: $18.3 Billion Per Year . . . . . . 14
Potential Oversight Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Adequacy Of Shipbuilding Plan For 313-Ship Fleet . . . . . . . . . . . . . . . . . . 15
Concept Of Steady-State Replacement Rate . . . . . . . . . . . . . . . . . . . . 15
Steady-State Replacement Rate For Proposed 313-Ship Fleet . . . . . . 15
Rate Need To Compensate For Below-Steady-State Procurement . . . 16
Planned Procurement Rates Compared to These Rates . . . . . . . . . . . . 17
Attack Submarines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Cruisers And Destroyers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Adequacy Of Shipbuilding Plan For Industrial Base . . . . . . . . . . . . . . . . . . 18
Private-Sector Yards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Potential Areas Of Concern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Debate On Number Of Shipyards Needed . . . . . . . . . . . . . . . . . . . . . . 20
Legislative Activity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
FY2006 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
FY2006 Defense Authorization (H.R. 1815/S. 1042) . . . . . . . . . . . . . 21
FY2006 Defense Appropriation (H.R. 2863) . . . . . . . . . . . . . . . . . . . . 24
National Naval Force Structure Policy Act (H.R. 375) . . . . . . . . . . . . 25
Bills On Aircraft Carrier Force Levels (H.R. 304/S. 145) . . . . . . . . . . 25
FY2005 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
FY2005 Emergency Supplemental (H.R. 1268) . . . . . . . . . . . . . . . . . 25
FY2005 Defense Authorization Act (H.R. 4200/P.L. 108-375) . . . . . 28
FY2004 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
FY2004 Defense Authorization Act (H.R. 1588/P.L. 108-136) . . . . . 30

Appendix A: Previous Ambiguity In Navy Ship Force-Structure Planning . . . . 31
310-Ship Plan From 2001 QDR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Navy 375-Ship Proposal Of 2002-2004 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Early-2005 Navy Proposal For Fleet Of 260 To 325 Ships . . . . . . . . . . . . . 32
Capabilities-Based Planning and Numbers of Ships . . . . . . . . . . . . . . . . . . 34
Implications of Ambiguity in Navy Force-Structure Plans . . . . . . . . . . . . . 35
Appendix B: Independent Studies On Navy Force Structure . . . . . . . . . . . . . . . 38
Force Structure Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Observations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Appendix C: Size of Navy and Navy Shipbuilding Rate . . . . . . . . . . . . . . . . . . 61
List of Tables
Table 1. Recent Navy Ship Force Structure Proposals . . . . . . . . . . . . . . . . . . . . . 3
Table 2. Navy FY2007-FY2011 Ship-Procurement Plan . . . . . . . . . . . . . . . . . . . 5
Table 3. Steady-State Ship Procurement Rate for 313-Ship Fleet . . . . . . . . . . . 16
Table 4. Average Ship Procurement Rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Table 5. CNA-Recommended Force and Other Proposals . . . . . . . . . . . . . . . . . 39
Table 6. Alternative Fleet Structures from OFT Report . . . . . . . . . . . . . . . . . . . 41
Table 7. CSBA-Recommended Force and Other Proposals . . . . . . . . . . . . . . . . 43
Table 8. Battle Force Ships Procured (FY1982-FY2006) or Projected
(FY2007-FY2011) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61


Navy Force Structure and Shipbuilding
Plans: Background and Issues for Congress
Introduction and Issue for Congress
The Navy is proposing to maintain in coming years a fleet of 313 ships,
including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88
cruisers and destroyers (including 7 DD(X) destroyers and 19 CG(X) cruisers), 55
Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning
Force (Future), or MPF(F), squadron with 12 new-construction amphibious and
sealift-type ships.1 Navy officials have also stated that they hope to avoid substantial
year-to-year changes in the composition of the associated five- or six-year Navy
shipbuilding plan.
The Navy’s 313-ship proposal is intended to end a period of ambiguity and
uncertainty in Navy ship force structure planning dating back to at least February
2003. This ambiguity, together with year-to-year volatility in the composition of the
Navy’s shipbuilding plan, created difficulties for Congress in conducting oversight
of Navy budgets and programs, and for industry in making rational business-planning
decisions. Ambiguity in Navy force-structure planning may also have created
difficulties for the Navy in defending its requirements in discussions with OSD. For
details on this previous period of ambiguity, see Appendix A.
The issue for Congress is how to respond to the Navy’s 313-ship proposal and
associated FY2007-FY2011 Navy shipbuilding plan. Decisions that Congress makes
regarding Navy force structure and shipbuilding programs could significantly affect
future U.S. military capabilities, Navy funding requirements, and the Navy
shipbuilding industrial base.
The next section of the report discusses the following background questions:
! What types of ships are included in the 313-ship proposal, and how
does this proposal compare to previous Navy ship force structure
proposals?
! What independent studies are available concerning potential future
Navy ship force structures?
! What ships are proposed for procurement in the Navy’s FY2007-
FY2011 ship-procurement plan?
The section that follows discusses the following potential oversight issues for
Congress:
1 U.S. Department of the Navy, Report to Congress on Annual Long-Range Plan for
Construction of Naval Vessels for FY2007
. Washington, 2006. 8 pp.

CRS-2
! Will the Navy’s 313-ship proposal be endorsed by OSD as an
official DOD planning goal? If not, where would that leave Navy
ship force-structure planning?
! Does the 313-ship proposal include an appropriate number of ships?
! Is the 313-ship proposal affordable?
! Does the Navy’s FY2007-FY2011 shipbuilding plan adequately
support the 313-ship proposal?
! Does the Navy’s FY2007-FY2011 shipbuilding plan adequately
support the shipbuilding industrial base?
The final section of the report presents recent legislative activity on these issues.
Background
Composition Of 313-Ship Proposal
What types of ships are included in the 313-ship proposal, and how does
this proposal compare to previous Navy ship force structure proposals?

Table 1 shows the composition of the Navy’s 313-ship proposal and compares
it to other recent Navy force structure proposals. On the basis of the figures shown
in the table, the 313-ship proposal can be viewed as somewhat or fairly consistent
with other recent Navy ship force-structure proposals.

CRS-3
Table 1. Recent Navy Ship Force Structure Proposals
Reported
Early-2005 Navy
2002-2004
2001 QDR
2006 Navy
proposal for fleet of
Navy
plan for
Ship type
proposal
260-325 ships
proposal
310-ship
for 313-
for 375-
Navy
ship fleet
260-ships
325-ships
ship Navya
Ballistic missile
submarines (SSBNs)
14
14
14
14
14
Cruise missile
4
4
4
4
2 or 4b
submarines (SSGNs)
Attack submarines
48
37
41
55
55
(SSNs)
Aircraft carriers
11
10
11
12
12
Cruisers, destroyers,
88
67
92
104
116
frigates
Littoral Combat
55
63
82
56
0
Ships (LCSs)
Amphibious ships
31
17
24
37
36
MPF(F) shipsc
12c
14c
20c
0c
0c
Combat logistics
30
24
26
42
34
(resupply) ships
Dedicated mine
0
0
0
26d
16
warfare ships
Othere
20
10
11
25
25
Total battle force
313
260
325
375 310 or 312
ships
Sources: 2001 QDR report, U.S. Navy data, and Report to Congress on Annual Long-Range
Plan for Construction of Naval Vessels for FY2007
.
a. Initial composition. Composition was subsequently modified.
b. The report on the 2001 QDR did not mention a specific figure for SSGNs. The Administration’s
proposed FY2001 DOD budget requested funding to support the conversion of two available
Trident SSBNs into SSGNs, and the retirement of two other Trident SSBNs. Congress, in
marking up this request, supported a plan to convert all four available SSBNs into SSGNs.
c. Today’s 16 Maritime Prepositioning Force (MPF) ships are intended primarily to support Marine
Corps operations ashore, rather than Navy combat operations, and thus are not counted as Navy
battle force ships. The Navy’s planned MPF (Future) ships, however, may be capable of
contributing to Navy combat capabilities (for example, by supporting Navy aircraft operations).
For this reason, MPF(F) ships are counted here as battle force ships.
d. The figure of 26 dedicated mine warfare ships includes 10 ships maintained in a reduced
mobilization status called Mobilization Category B. Ships in this status are not readily
deployable and thus do not count as battle force ships. The 375-ship proposal thus implied
transferring these 10 ships to a higher readiness status.
e. Includes, among other things, command ships and support ships.

CRS-4
Independent Studies On Navy Force Structure
What independent studies are available concerning potential future Navy
ship force structures?

Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) required the Secretary of Defense to provide for two independently performed
studies on potential future fleet platform architectures (i.e., potential force structure
plans) for the Navy. The two studies, which were conducted by the Center for Naval
Analyses (CNA) and the Office of Force Transformation (OFT, a part of the Office
of the Secretary of Defense), were submitted to the congressional defense committees
in February 2005.2
A third independent study on potential future fleet platform architectures, which
was conducted by the Center for Strategic and Budgetary Assessments (CSBA) on
its own initiative, was made available to congressional and other audiences in March
2005.
Appendix B summarizes these three studies.
Navy FY2007-FY2011 Ship-Procurement Plan
What ships are proposed for procurement in the Navy’s FY2007-FY2011
ship-procurement plan?

Table 2 shows the Navy’s FY2007-FY2011 ship-procurement plan will be
submitted to Congress in February 2006.
2 Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See H.Rept. 108-354, pp. 28-29, 612-613 and H.Rept. 108-106, pp.
255-256.

CRS-5
Table 2. Navy FY2007-FY2011 Ship-Procurement Plan
(Ships fully funded in FY2006 shown for reference)
Total
FY06
FY07
FY08
FY09
FY10
FY11
FY07-
FY11
CVN-21
1
1
SSN-774
1
1
1
1
1
1
5
DD(X)
2a
0a
1
1
1
5
CG(X)
1
1
LCS
3b
2
3
6
6
6
23
LPD-17
1
1
1
LHA(R)
1
1
2
TAKE
1
1
1
2
LHA(R)-MPF(F)
1
1
TAKE-MPF(F)
1
1
1
3
LMSR-MPF(F)
1
1
2
MLP-MPF(F)
1
1
2
JHSV
1
1
1
3
Total
6
7
7
11
12
14
51
Subtotal larger
ships (i.e., ships

3
5
4
5
6
8
28
other than LCSs)
Sources: Department of the Navy, Highlights of the Department of the Navy FY 2007 Budget, Chart
15 (p. 5-3), and Draft Report to Congress on Annual Long-Range Plan for Construction of Naval
Vessels for FY 2007
.
Key:
CVN-21:
CVN-21 class nuclear-powered aircraft carrier
SSN-774:
Virginia (SSN-774) class nuclear-powered attack submarine
DD(X):
DD(X) class destroyer
CG(X)
CG(X) class cruiser
LCS
Littoral Combat Ship
LPD-17
San Antonio (LPD-17) class amphibious ship
LHA(R)
LHA(R) class amphibious assault ship
TAKE
Lewis and Clark (TAKE-1) class resupply ship
LHA(R)-MPF(F) Modified LHA(R) intended for MPF(F) squadron
TAKE-MPF(F)
Modified TAKE intended for MPF(F) squadron
LMSR-MPF(F)
Modified large, medium-speed, roll-on/roll-off (LMSR) sealift ship intended
for MPF(F) squadron
MLP-MPF(F)
Mobile Landing Platform ship intended for MPF(F) squadron
JHSV
Joint High-Speed Vessel for use as an intratheater connector (i.e., transport)
ship
a. Each of the two DD(X)s to be procured in FY2007 is to be split-funded (i.e., incrementally funded)
across FY2007 and FY2008.
b. Includes one LCS funded through the Navy’s research and development account and two LCSs
funded through the Shipbuilding and Procurement, Navy (SCN) account.

CRS-6
Oversight Issues for Congress
Endorsement Of 313-Ship Proposal By OSD
Will the Navy’s 313-ship proposal be endorsed by the Office of the
Secretary of Defense (OSD) as an official DOD planning goal? If not,
where would that leave Navy ship force-structure planning?

When asked about the Navy’s 313-ship proposal in December 2005, Secretary
of Defense Donald Rumsfeld reportedly replied that it is Navy capabilities, not
numbers of ships, that count.3 When asked about the Navy’s 313-ship proposal at a
January 25, 2006, press conference, Secretary Rumsfeld declined to explicitly
endorse the plan.4
3 Dave Ahearn, “Rumsfeld On Increasing Fleet Size: Capabilities, Not Numbers, Count,”
Defense Today, December 16, 2005.
4 The press conference included the following exchange:
Q. Mr. Secretary, can I take you back to what you said at the outset about
the Navy and the reforms that Admiral [Vernon] Clark [the previous Chief of
Naval Operations, or CNO] put in place to get more use out of a smaller fleet?
RUMSFELD: Uh-huh. (Affirmative response.)
Q. Admiral [Michael] Mullen [the current CNO] is understood now to be
proposing a rebuilding of the Navy, adding more than 30 ships to get back up
over 300. Are you suggesting that perhaps that’s not necessary?
RUMSFELD: No, I agree with Admiral Mullen. He’s doing a good job,
and he was a very intimate part of Vern Clark’s team, along with [previous
Secretary of the Navy] Gordon England. They’ve done an excellent job in the
Navy, and you know — what I’m trying to point out is that if you — if one
focuses only on 20th-century metrics, how many ships, is it 500, 600, 400, 300,
200, you miss the point. The point is how many days do you have ships capable
of being deployed to do what it is that naval vessels are there to do for the United
States of America, to create presence and to be able to provide military power in
various parts of the world.
And a naval ship today, in terms of lethality — first of all, the deployable
days are not any different today with a Navy of just under 300 ships than they
were when the Navy was 4(00) or 500 because we’ve increased their deployable
days. And the lethality of those ships has gone up many fold. We used to talk
about number of aircraft — number of sorties per target. Today, we’re talking
about number of targets per sortie, and the precision weapons make an enormous
difference.
So what the Navy’s done is important, and it’s important for people to
begin to start thinking about it in the 21st century, looking at the right metrics,
rather than the last century’s metrics.
(continued...)

CRS-7
The final report on DOD’s 2005 Quadrennial Defense Review (QDR), released
on February 3, 2006, states that DOD will “Build a larger fleet that includes 11
Carrier Strike Groups....”5 The Navy as of early-February 2006 included 281 ships.
The report specifically mentions force-structure goals for several parts of DOD,6 but
does not mention the Navy’s 313-ship proposal or force-level goals for any ships
other than aircraft carriers.7
Secretary Rumsfeld’s reported response in December 2005, his statements at the
January 25, 2006, press conference, and the final report on the QDR together suggest
that OSD supports a Navy with 11 carrier strike groups and more than the early-
February 2006 total of 281 ships, but not necessarily the Navy’s proposed 313-ship
fleet, including the Navy’s proposed subtotals for ship types other than aircraft
carriers. If the Navy’s 313-ship proposal is not explicitly endorsed by OSD as an
official DOD planning goal, it could lead to a continuation of, rather than an end to,
the recent uncertainty in Navy ship force-structure planning.
4 (...continued)
(Source: DOD transcript of press conference.)
5 U.S. Department of Defense. Quadrennial Defense Review Report. Washington, 2006.
(February 6, 2006) p. 48.
6 The report mentions specific force-structure goals for Army brigades (page 43), Army end
strength (page 43), Marine Corps end strength (page 43), special force battalions (page 44;
these are to be increased by one-third); psychological operations and civil affairs units
(page45; these are to be increased by 3,500 personnel); the Air Force B-52 bomber force
(page 46); Air Force combat wings (page 47); Air Force Minuteman III ballistic missiles
(page 50); and Air Force inter-theater airlift aircraft (page 54).
7 The report also states that based on a series of analyses, DOD
concluded that the size of today’s forces — both the Active and Reserve
Components across all four Military Departments — is appropriate to meet
current and projected operational demands. At the same time, these analyses
highlighted the need to continue re-balancing the mix of joint capabilities and
forces.
(Quadrennial Defense Review Report, op cit, p. 41.)
Regarding the reference to “today’s forces,” the Navy, as mentioned earlier, included a total
of 281 ships as of early-February 2006.
The QDR report also states that
policy decisions, such as mobilization policies and war aims, may change over
time and have implications for the shape and size of U.S. forces. Finally, as part
of a process of continuous reassessment and improvement, this wartime construct
will be further developed over time to differentiate among the Military
Departments as to how they should best size and shape their unique force
structures, for use by the Combatant Commanders, since all parts of the construct
do not apply equally to all capability portfolios.
(Quadrennial Defense Review Report, op cit, pp. 38-39.)

CRS-8
Appropriateness Of 313-Ship Proposal
Does the 313-ship proposal include an appropriate number of ships?
Numbers Of Individual Ship Types. Other CRS reports focus on
individual categories of ships such as aircraft carriers,8 attack submarines,9 cruisers
and destroyers,10 Littoral Combat Ships,11 and amphibious and MPF(F) ships.12 The
discussion below focuses on some issues relating to the potential appropriateness of
the overall size of the 313-ship proposal.
Historical Fleet Numbers. Historical figures for the total number of ships
in the Navy are not necessarily a reliable yardstick for assessing the appropriateness
of the Navy’s proposed 313-ship fleet, particularly if the historical figures are more
than a few years old, because the missions to be performed by the Navy, the mix of
ships that make up the Navy, and the technologies that are available to Navy ships
for performing missions all change over time. Due to changes in these variables, the
historical number of ships in the fleet is at best a partial guide, and at worst a
potentially misleading guide, to whether a 313-ship fleet would be appropriate in
coming years for performing the Navy’s required missions.
The Navy, for example, reached a late-Cold War peak of 568 battle force ships
at the end of FY1987,13 and as of February 13, 2005 had declined to a total of 281
8 CRS Report RL32731, Navy Aircraft Carriers: Proposed Retirement of USS John F.
Kennedy — Issues and Options for Congress
, by Ronald O’Rourke. See also CRS Report
RS20643, Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress,
by Ronald O’Rourke.
9 CRS Report RL32418, Navy Attack Submarine Force-Level Goal and Procurement Rate:
Background and Issues for Congress
, by Ronald O’Rourke.
10 CRS Report RL32109, Navy DD(X), CG(X), and LCS Ship Acquisition Programs:
Oversight Issues and Options for Congress
, by Ronald O’Rourke, and CRS Report
RS21059, Navy DD(X) and CG(X) Programs: Background and Issues for Congress, by
Ronald O’Rourke.
11 CRS Report RL32109, op cit, and CRS Report RS21305, Navy Littoral Combat Ship
(LCS): Background and Issues for Congress
, by Ronald O’Rourke.
12 CRS Report RL32513, Navy-Marine Corps Amphibious and Maritime Prepositioning
Ship Programs: Background and Oversight Issues for Congress
, by Ronald O’Rourke.
13 Some publications, such as those of the American Shipbuilding Association, have stated
that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is
the total number of active ships in the fleet, which is not the same as the total number of
battle force ships. The battle force ships figure is the number used in government
discussions of the size of the Navy. In recent years, the total number of active ships has
been larger than the total number of battle force ships. For example, the Naval Historical
Center states that as of November 16, 2001, the Navy included a total of 337 active ships,
while the Navy states that as of November 19, 2001, the Navy included a total of 317 battle
force ships. Comparing the total number of active ships in one year to the total number of
battle force ships in another year is thus an apple-to-oranges comparison that in this case
overstates the decline since FY1987 in the number of ships in the Navy. As a general rule
(continued...)

CRS-9
battle force ships. The FY1987 fleet, however, was intended to meet a set of mission
requirements that focused on countering Soviet naval forces at sea during a potential
multi-theater NATO-Warsaw Pact conflict, while the February 2006 fleet is intended
to meet a considerably different set of mission requirements centered on influencing
events ashore by countering both land- and sea-based military forces of potential
regional threats other than Russia, including non-state terrorist organizations. In
addition, the Navy of FY1987 differed substantially from the February 2006 fleet in
areas such as profusion of precision-guided air-delivered weapons, numbers of
Tomahawk-capable ships, and sophistication of C4ISR systems.14
In coming years, Navy missions may shift again, to include, as a possible
example, a greater emphasis on being able to counter improved Chinese maritime
military capabilities.15 In addition, the capabilities of Navy ships will likely have
changed further by that time due to developments such as more comprehensive
implementation of networking technology and increased use of ship-based unmanned
vehicles.
The 568-ship fleet of FY1987 may or may not have been capable of performing
its stated missions; the 281-ship fleet of February 2006 may or nor may not be
capable of performing its stated missions; and a fleet years from now with a certain
number of ships may or may not be capable of performing its stated missions. Given
changes over time in mission requirements, ship mixes, and technologies, however,
these three issues are to a substantial degree independent of one another.
For similar reasons, trends over time in the total number of ships in the Navy are
not necessarily a reliable indicator of the direction of change in the fleet’s ability to
perform its stated missions. An increasing number of ships in the fleet might not
necessarily mean that the fleet’s ability to perform its stated missions is increasing,
because the fleet’s mission requirements might be increasing more rapidly than ship
numbers and average ship capability. Similarly, a decreasing number of ships in the
fleet might not necessarily mean that the fleet’s ability to perform stated missions is
decreasing, because the fleet’s mission requirements might be declining more rapidly
than numbers of ships, or because average ship capability and the percentage of time
that ships are in deployed locations might be increasing quickly enough to more than
offset reductions in total ship numbers.
Previous Force Structure Plans. Previous Navy force structure plans,
such as those shown in Table 1, might provide some insight into the potential
adequacy of a proposed new force-structure plan, but changes over time in mission
requirements, technologies available to ships for performing missions, and other
force-planning factors suggest that some caution should be applied in using past force
13 (...continued)
to avoid potential statistical distortions, comparisons of the number of ships in the Navy
over time should use, whenever possible, a single counting method.
14 C4ISR stands for command and control, communications, computers, intelligence,
surveillance, and reconnaissance.
15 For a discussion, see CRS Report RL33153, China Naval Modernization: Implications
for U.S. Navy Capabilities — Background and Issues for Congress
, by Ronald O’Rourke.

CRS-10
structure plans for this purpose, particularly if those past force structure plans are
more than a few years old. The Reagan-era plan for a 600-ship Navy, for example,
was designed for a Cold War set of missions focusing on countering Soviet naval
forces at sea, which is not an appropriate basis for planning the Navy today.16
Current Force-Planning Issues. Current force-planning issues that
Congress may consider in assessing the appropriateness of the Navy’s 313-ship
proposal include the following:
! naval requirements for the global war on terrorism (GWOT) and for
irregular conflicts such as insurgencies;
! naval requirements for countering improved Chinese maritime
military forces;
! new technologies that may affect U.S. Navy ship capabilities;
! additional forward homeporting and the Sea Swap concept;
16 Navy force structure plans that predate those shown in Table 1 include the Reagan-era
600-ship plan of the 1980s, the Base Force fleet of more than 400 ships planned during the
final two years of the George H. W. Bush Administration, the 346-ship fleet from the
Clinton Administration’s 1993 Bottom-Up Review (or BUR, sometimes also called Base
Force II), and the 310-ship fleet of the Clinton Administration’s 1997 QDR. The table
below summarizes some key features of these plans.
Features of Recent Navy Force Structure Plans
Plan
600-ship
Base Force
1993 BUR
1997 QDR
Total ships
~600
~450/416a
346
~305/310b
Attack submarines
100
80/~55c
45-55
50/55d
Aircraft carriers
15f
12
11+1g
11+1g
Surface combatants
242/228h
~150
~124
116
Amphibious ships
~75i
51j
36j
36j
Source: Prepared by CRS based on DOD and U.S. Navy data.
a. Commonly referred to as 450-ship plan, but called for decreasing to 416 ships by end of
FY1999.
b. Original total of about 305 ships was increased to about 310 due to increase in number
of attack submarines to 55 from 50.
c. Plan originally included 80 attack submarines, but this was later reduced to about 55.
d. Plan originally included 50 attack submarines but this was later increased to 55.
e. Plus two or four additional converted Trident cruise missile submarines (SSGNs) for the
2001 QDR plan and four additional SSGNs for the 375-ship proposal.
f. Plus one additional aircraft carrier in the service life extension program (SLEP).
g. Eleven active carriers plus one operational reserve carrier.
h. Plan originally included 242 surface combatants but this was later reduced to 228.
i. Number needed to lift assault echelons of one Marine Expeditionary Force (MEF) plus
one Marine Expeditionary Brigade (MEB).
j. Number needed to lift assault echelons of 2.5 MEBs. Note how number needed to meet
this goal changed from Base Force plan to the BUR plan — a result of new, larger
amphibious ship designs.

CRS-11
! DOD’s increased emphasis on achieving full jointness in U.S.
military plans and operations; and
! potential tradeoffs between funding Navy requirements and funding
competing defense requirements.
Each of these is discussed briefly below.
Global War on Terrorism and Irregular Warfare. The potential effects
of the GWOT and irregular conflicts such as insurgencies on requirements for U.S.
ground forces have received much attention in recent months. The potential effects
of these factors on requirements for U.S. naval forces has received somewhat less
attention. In terms of ships, possible effects on requirements for U.S. naval forces
include an increased emphasis on one or more of the following:
! ships (such as attack submarines, surface combatants, or aircraft
carriers) that can conduct offshore surveillance of suspected
terrorists and irregular military forces using either built-in sensors or
embarked unmanned vehicles;
! ships (such as surface combatants, particularly smaller ones like the
LCS) and smaller surface craft for conducting coastal patrol and
intercept operations, including countering small boats and craft and
countering pirate-like operations;17
! ships (such as attack submarines) for covertly inserting and
recovering Navy special operations forces, known as SEALs;18
! ships (such as amphibious ships) for supporting smaller-scale
Marine Corps operations ashore; and
! ships (such as aircraft carriers or large-deck amphibious assault
ships) that can launch strike-fighters armed with smaller-scale
precision guided weapons.
Although the primary stated missions of the LCS relate to defeating littoral anti-
access forces of opposing countries rather than to countering terrorists, some
observers view the inclusion of 55 LCSs in the Navy’s proposed 313-ship fleet as
evidence that the proposal is aimed in part at meeting operational demands associated
with the Navy’s role in the GWOT. Supporters of the Navy’s planned MPF(F)
squadron argue that this squadron could be valuable in sea-based counter-terrorist
operations. In addition, the Navy in recent months has taken some actions that reflect
a stated specific interest in increasing the Navy’s role in the GWOT. Among these
are the establishment of a Navy riverine force that is to consist of three squadrons of
17 Coast Guard cutters may also be well suited for such operations.
18 SEAL stands for Sea, Air, and Land.

CRS-12
12 boats each, and a total of about 700 personnel. These boats, as small craft, are not
included in the Navy’s proposed total of 313 ships.19
Chinese Maritime Military Forces. China’s naval modernization has
potential implications for required U.S. Navy capabilities in terms of preparing for
a conflict in the Taiwan Strait area, maintaining U.S. Navy presence and military
influence in the Western Pacific, and countering Chinese ballistic missile
submarines. Preparing for a conflict in the Taiwan Strait area could place a premium
on the following: on-station or early-arriving Navy forces, capabilities for defeating
China’s maritime anti-access forces, and capabilities for operating in an environment
that could be characterized by information warfare and possibly electromagnetic
pulse (EMP) and the use of nuclear weapons.
China’s naval modernization raises potential issues concerning the size of the
Navy; the Pacific Fleet’s share of the Navy; forward homeporting of Navy ships in
the Western Pacific; the number of aircraft carriers, submarines, and ASW-capable
platforms; Navy missile defense, air-warfare, anti-air warfare (AAW), antisubmarine
warfare (ASW), and mine warfare programs; Navy computer network security; and
EMP hardening of Navy systems. Aircraft carriers, cruisers and destroyers, and
attack submarines are viewed by some observers as ships that might be particularly
appropriate for countering improved Chinese maritime military forces.20
New Technologies. New technologies that will likely affect the capabilities
of Navy ships in coming years, and consequently the number of ships that may be
needed to perform a given set of missions, include improved radars and other sensors
(including miniaturized sensors); improved computers and networking systems;
unmanned vehicles; reduced-size, precision-guided, air-delivered weapons;
electromagnetic rail guns; directed-energy weapons (such as lasers); and integrated
electric-drive propulsion technology, to name just a few. Historically, the effect of
improving technology historically has often been to increase the capability of
individual Navy ships and thereby permit a reduction in the number of Navy ships
needed to perform a stated set of missions. However, some analysts believe that
networking technology and reduced-sized sensors may argue in favor of a more
distributed force structure that includes a larger number of smaller ships such as the
LCS.
Forward Homeporting and Sea Swap. The Navy is considering
transferring an aircraft carrier from the continental United States to either Hawaii or
Guam and increasing the number of attack submarines homeported at Hawaii or
Guam. The Navy has also experimented with the concept of deploying a Navy ship
for an extended period of time (e.g., 12, 18, or 24 months, rather than the traditional
deployment period of 6 months) and rotating successive crews out the ship every 6
19 For further discussion of the Navy’s role in the GWOT, see CRS Report RS22373, Navy
Role in Global War on Terrorism (GWOT) — Background and Issues for Congress
, by
Ronald O’Rourke.
20 For further discussion, see CRS Report RL33153, China Naval Modernization:
Implications for U.S. Navy Capabilities — Background and Issues for Congress
, by Ronald
O’Rourke.

CRS-13
months — a concept the Navy calls Sea Swap. Other things held equal, homeporting
additional Navy ships in forward locations such as Guam and Hawaii, and applying
the Sea Swap concept to a significant portion of the fleet, could reduce, perhaps
substantially, the total number of Navy ships needed to maintain a certain number of
Navy ships in overseas operating areas on a day-to-day basis. For some types of
ships, additional forward homeporting and use of Sea Swap might reduce the number
of ships needed for maintaining day-to-day forward deployments below the number
needed for fighting conflicts. In such cases, fully implementing the force-level
economies suggested by forward homeporting and Sea Swap could leave the Navy
with inadequate forces for fighting conflicts.21
Jointness. DOD’s increased emphasis on achieving increased jointness (i.e.,
coordination and integration of the military services) in U.S. military plans and
operations could lead to reassessments of requirements for Navy capabilities that
were originally determined in a less-joint setting. Areas where U.S. Navy capabilities
overlap with the those of the Air Force or Army, and where total U.S. capabilities
across the services exceed DOD requirements, might be viewed as candidates for
such reassessments, while capabilities that are unique to the Navy might be viewed
as less suitable for such reassessments. An example of a broad area shared by the
Navy, Air Force, and Army is tactical aviation, while an example of an area that is
usually regarded as unique to the Navy is antisubmarine warfare.
Competing Defense Priorities. A final issue to consider are the funding
needs of other defense programs. In a situation of finite defense resources, funding
certain Navy requirements may require not funding certain other defense priorities.
If so, then the issue could become how to allocate finite resources so as to limit
operational risk over the various missions involving both Navy and non-Navy
mission requirements.
Affordability of 313-Ship Proposal
Is the 313-ship proposal affordable?
The affordability of the Navy’s 313-ship proposal appears to depend in large
part on the Navy’s ability to substantially increase annual funding for construction
of new ships and to constrain ship procurement costs.
Recent Funding For New Ships: $10.2 Billion Per Year. From
FY2000 to FY2005, funding for construction of new ships averaged about $10.2
billion per year.22
Navy Estimate For 313-Ship Proposal: $13.4 Billion Per Year. The
Navy reportedly estimates that executing the 313-ship proposal would require an
21 For additional discussion of Sea Swap, see CRS Report RS21338, Navy Ship
Deployments: New Approaches — Background and Issues for Congress
, by Ronald
O’Rourke.
22 Source: Congressional Budget Office, December 16, 2005.

CRS-14
annual average of about $13.4 billion per year in 2005 dollars for new ship
construction, or about 31% more than the average figure for 2005-2005.
CBO Estimate For 313-Ship Proposal: $18.3 Billion Per Year. The
Congressional Budget Office (CBO), in an analysis released on December 16, 2005,
estimates that executing the 313-ship proposal would require an annual average of
about $18.3 billion per year in 2005 dollars for new ship construction (about $19.6
billion per year in 2007 dollars). This is about 37% more than the Navy’s estimate,
and about 79% more than the average figure for 2000-2005. The report states:
The Navy’s plan to achieve a 313-ship fleet with $14.4 billion in annual
new-ship construction spending appears to assume that costs will somehow be
controlled more stringently on future classes of ships than they have been on
ships that the Navy is building now....
Even if those apparent cost targets for the 313-ship plan can be achieved,
however, the [Navy’s estimate] does not appear to take into account the higher
inflation that the naval shipbuilding industry in the United States has been
experiencing in the past decade. An analysis by the Navy of the inflationary
component of past cost increases in shipbuilding programs indicates that
inflation in such programs is expected to be about 1.3 percent higher per year, on
average, than the inflation anticipated for the Department of Defense’s
procurement programs as a whole, at least through 2011. CBO assumes that the
difference between inflation for general procurement programs and inflation for
ship programs represents real growth in the cost of building ships that should be
included in future estimates.23
Potential Oversight Questions. Potential oversight questions for Congress
include the following:
! Under current and projected budget conditions, how likely is it that
the Navy will be able to increase funding for construction of new
ships from the recent level of about $10 billion per year to the
Navy’s estimated required level of $13.4 billion per year? To
achieve and maintain the $13.4-billion annual average for new ship
construction, what other Navy procurement programs does the Navy
plan to reduce, and what assumptions does the Navy make about its
ability to control personnel and operation and maintenance (O&M)
expenditures? What might be the operational effects of the proposed
reductions to the other Navy procurement programs, and how
reasonable are the Navy’s assumptions regarding its ability to
control personnel and O&M expenditures?
! Is the cost to execute the 313-ship proposal likely to be closer to the
Navy’s estimate or CBO’s estimate? In light of recent cost growth
for Navy ships under construction, and recent increases in estimated
23 Congressional Budget Office, Resource Implications of the Navy’s 313-Ship Plan,
December 16, 2005. 10 pp. The report is available at [http://www.cbo.gov].

CRS-15
procurement costs for Navy ships planned for procurement, which
of these two estimates is likely to be more accurate?
! If the cost to execute the 313-ship proposal turns out to be closer to
CBO’s estimate, how likely is it that the Navy will be able to
increase annual funding for new ship construction to the required
level?
! If the Navy is not able to increase annual funding for new ship
construction to the required level (whether that level is closer to the
Navy’s estimate or CBO’s), what parts of the 313-ship proposal
might be reduced?
Adequacy Of Shipbuilding Plan For 313-Ship Fleet
Does the Navy’s FY2007-FY2011 shipbuilding plan adequately support
the Navy’s 313-ship fleet proposal?

Concept Of Steady-State Replacement Rate. Members of Congress and
other observers have expressed concern in recent years that the rate of Navy
shipbuilding since the early 1990s has been below the so-called steady-state
replacement rate for a fleet of about 300 ships. The steady-state replacement rate is
the average annual ship procurement rate that would be needed over the long run to
maintain a fleet of a certain planned size over the long run. It is equal to the size of
the planned fleet divided by the weighted average service life of the ships making up
the planned fleet.
For example, a planned 300-ship fleet whose ships had a weighted average
service life of 35 years, would have a steady-state replacement rate of 300 divided by
35, or about 8.6 ships per year. Using these figures, maintaining a 300-ship fleet over
the long run would require a long-term (i.e., 35-year) average ship procurement rate
of about 8.6 ships per year. The ship procurement rate could be below 8.6 ships per
year during some years, as long as it was above 8.6 ships per year during other years,
so that the average rate for the entire 35-year fleet replacement period comes back to
8.6 ships per year.
Steady-State Replacement Rate For Proposed 313-Ship Fleet. As
shown in Table 3, the steady-state procurement rate for the Navy’s proposed 313-
ship fleet would be roughly 9.5 ships per year for ships of all types, and roughly 7.3
per year for larger ships (i.e., ships other than LCSs). As shown in Appendix C,
annual procurement of new Navy ships has been below this rate since FY1993.

CRS-16
Table 3. Steady-State Ship Procurement Rate for 313-Ship Fleet
(average annual procurement rates)
Expected
313 ships
service life
Ship type
(years)
Number
Steady-state rate
SSBNs
42
14
0.33
SSGNs
42
4
0.10
SSNs
33
48
1.45
Aircraft carriers
50
11
0.22
Cruisers, destroyers
35
88
2.51
LCSs
25
55
2.20
Amphibious
35
31
0.89
MPF(F)s
35
12
0.34
CLFa
35
30
0.86
Otherb
35
20
0.57
Total all ships
313
9.47
Subtotal larger ships (i.e., ships
258
7.27
other than LCSs)
Source: Prepared by CRS based on U.S. Navy data for ship expected service lives.
a. Combat Logistics Force ships (i.e., ships that resupply Navy combat ships).
b. Includes command ships and support ships.
The planned ship service lives shown in this table are based on Navy planning
data. If actual ship service lives turn out to be shorter than shown in the table, as
some observers believe they might be based on historical evidence with previous
classes of Navy ships, then the steady-state replacement rate figures would be higher
than those shown in the table.
Rate Need To Compensate For Below-Steady-State Procurement.
To compensate for the below-steady-state rate of Navy ship procurement since the
early 1990s (see Appendix C), maintaining a fleet of about 313 ships, including 55
LCSs, will require an average procurement rate in coming years higher than the
steady-state rate shown in Table 3. Assuming an average 35-year life for Navy ships,
the required rate might be about 11.2 ships per year including LCSs, and about 8.7
ships per year for ships other than LCSs.24 If average ship life is assumed to be closer
24 The decline in the rate of Navy ship procurement to relatively low levels began about
FY1993. During the 14-year period FY1993-FY2006, a total of 78 battle force ships
(including 3 LCSs) were procured, or an average of about 5.6 ships per year. Subtracting
these 78 ships from a total fleet of 313 ships would leave a total of 235 ships to be procured
during the remaining 21 years of a 35-year procurement period for replacing the entire fleet.
Procuring these ships over a 21-year period would require an average procurement rate of about
11.2 ships per year. A total of 183 ships other than LCSs (258 ships other than LCSs required
minus 75 ships other than LCSs procured during FY1993-FY2006) would need to be procured
(continued...)

CRS-17
to 30 years, which some observers believe is a more realistic figure, then the required
shipbuilding rate might be closer to about 14.7 ships per year including LCSs, and
about 11.4 ships per year for ships other than LCSs.25
Planned Procurement Rates Compared to These Rates. As shown
in Table 2, the Navy’s proposed FY2007-FY2011 shipbuilding plan includes a total
of 51 ships of all kinds, or an average of 10.2 ships per year. As also shown in Table
2
, however, 23 of the 51 ships are relatively small and inexpensive LCSs. The
remaining 28 larger ships shown in Table 2 equate to an average procurement rate
of 5.6 larger ships per year.
Table 4 compares these planned procurement rates with the steady-state
replacement rates for the Navy’s proposed 313-ship Navy and the rates needed to
compensate for the relatively low rates of Navy ship procurement since the early
1990s.
Table 4. Average Ship Procurement Rates
(Average number of ships procured per year)
Average rate
Steady-state rate
Compensatory
in Navy’s FY2007- for 313-ship fleet rate needed for
FY2011 plan

313-ship fleeta
All ships
10.2
9.5
11.2
Larger ships (i.e., ships
other than LCSs)

5.6
7.3
8.7
Source: Prepared by CRS using Navy data.
a. Average rate needed over next 21 years (FY2007-FY2027) to compensate for relatively
low ship procurement rate during previous 14 years (FY1993-FY2006), so as to achieve
required steady-state replacement rate over the entire 35-year replacement period (FY1993-
FY2027).
As can be seen in the table, the average of 10.2 ships of all types in the FY2007-
FY2011 plan is greater than the steady-state rate of 9.5 ships per year, but less than
the 11.2 ships per year that would be needed to compensate for the relatively low rate
of ship procurement since FY1993. As can also been seen in the table, when the
relatively small and inexpensive LCSs are set aside, the remaining average of 5.6
larger ships per year is less than both the steady-state rate of 7.3 ships per year and
the compensatory rate of 8.7 ships per year. The average larger-ship procurement
rate of 5.6 ships per year, if maintained over a 35-year period, would produce a total
of 196 ships, or 62 ships less than the total of 258 included in the 313-ship plan. If
24 (...continued)
over these 21 years, or an average of 8.7 ships per year for ships other than LCSs.
25 Extending the analysis in the previous footnote, a total of 235 ships of all kinds divided
by the 16 remaining years in a 30-year procurement period equates to an average rate of
about 14.7 ships per year, while a total of 183 ships other than LCSs divided by 16 years
equates to an average rate of about 11.4 ships per year for ships other than LCSs.

CRS-18
these 196 ships are added to the planned total of 55 LCSs, it would produce a total
fleet of 251 ships.
Attack Submarines. Within the Navy’s proposed 313-ship fleet is a
requirement for a force of 48 attack submarines. As discussed in detail in another
CRS report,26 a 30-year Navy shipbuilding plan submitted to Congress in February
2006 — a plan that includes the 5-year period FY2007-FY2011 plus an additional 25
years beyond FY201127 — shows a 30-year procurement profile for attack
submarines that, if implemented, would not maintain an 88-boat attack submarine
force consistently over the long run. As discussed in this CRS report, the attack
submarine force under the 30-year procurement profile would drop below 48 boats
in 2018, reach a minimum of 40 boats (or 17% less than the required figure of 48) in
2028 and 2029, and remain below 48 boats through 2033.
Cruisers And Destroyers. Within the Navy’s proposed 313-ship fleet is a
requirement for 88 cruisers and destroyers. As discussed in another CRS report,28 the
Navy’s 30-year shipbuilding plan submitted to Congress in February 2006 shows a
30-year procurement profile for cruisers and destroyers that, if implemented, would
not maintain an 88-ship cruiser-destroyer force over the long run. As discussed in
this CRS report, the cruiser-destroyer force under the 30-year procurement profile
would drop below 88 ships in 2027, reach a minimum of 62 ships (or 30% less than
the required figure of 88) in 2044-2046, and increase to a long-term plateau of 70
ships (or 20% less than 88) in the 2050s.
Adequacy Of Shipbuilding Plan For Industrial Base
Does the Navy’s FY2007-FY2011 shipbuilding plan adequately support
the shipbuilding industrial base?

Members of Congress and other observers have expressed concern in recent
years that planned rates of Navy shipbuilding might not adequately support the
shipbuilding industrial base, at least in its current form. The shipbuilding industrial
base includes:
! private-sector shipyards that build all the Navy’s ships and also
perform some overhaul and repair work on Navy ships;
26 CRS Report RL32418, Navy Attack Submarine Force-Level Goal and Procurement Rate:
Background and Issues for Congress
, by Ronald O’Rourke. See in particular Table 5 and
the text discussing this table.
27 U.S. Department of the Navy, Report to Congress on Annual Long-Range Plan for
Construction of Naval Vessels for FY2007
. Washington, 2006. 8 pp.
28 CRS Report RL32109, Navy DD(X), CG(X), and LCS Ship Acquisition Programs:
Oversight Issues and Options for Congress
, by Ronald O’Rourke. See in particular Table
8 and the text discussing this table.

CRS-19
! four public-sector shipyards that perform most of the overhaul and
repair work on Navy ships;29
! hundreds of supplier firms in various states that provide materials
and components for Navy ships; and
! laboratories, research and development centers, and independent
naval architectural firms.
Private-Sector Yards. The private-sector yards that build the Navy’s ships
include six larger yards that have built the Navy’s major warships in recent years and
three additional yards that are to build LCSs. The six larger yards are:
! General Dynamics(GD)/Bath Iron Works (BIW) of Bath, ME;
! GD/Electric Boat (EB) of Groton, CT, and Quonset Point, RI;
! GD/National Steel and Shipbuilding Company (NASSCO) of San
Diego, CA;
! Northrop Grumman (NG)/Avondale Shipyards, located near New
Orleans, LA;
! NG/Ingalls Shipbuilding of Pascagoula, MS;30 and
! NG/Newport News Shipbuilding (NGNN) or Newport News, VA.
The three yards that are to build LCSs are:
! Austal USA of Mobile, AL, which is the production shipyard on the
LCS industry team led by General Dynamics;31
! Bollinger Shipyards of Louisiana and Texas, which is one of two
production shipyards on the LCS industry team led by Lockheed
Martin;32 and
! Marinette Marine of Marinette, WI, which is the other production
shipyard on the Lockheed-led LCS industry team.
Private-sector yards other than the nine listed above perform some of the
overhaul and repair work on Navy ships done by private-sector yards.
Potential Areas Of Concern. Potential areas of concern regarding the
adequacy of the Navy’s FY2007-FY2011 shipbuilding plan for supporting the
29 These four yards are the Portsmouth Naval Shipyard at Portsmouth, NH/Kittery, ME;
Norfolk Naval Shipyard at Norfolk, VA; Puget Sound Naval Shipyard at Bremerton, WA;
and Pearl Harbor Naval Shipyard at Pearl Harbor, HI.
30 The Avondale and Ingalls yards, together with a composite fabrication facility at Gulfport,
MS, form Northrop Grumman Ship Systems (NGSS) division.
31 Austal USA was created in 1999 as a joint venture between Austal Limited of Henderson,
Western Australia and Bender Shipbuilding & Repair Company of Mobile, AL. The
Lockheed LCS team also includes GD/BIW as prime contractor, to provide program
management and planning, to provide technical management, and to serve as “LCS system
production lead,”
32 Bollinger operates about 15 shipyards and ship-related facilities in Louisiana and Texas,
of which three, located in Lockport, LA, Gretna, LA, and Amelia, LA, are for building new
ships.

CRS-20
shipbuilding industrial base, at least in its current form, include, among others, the
following:
! whether the plan will include enough destroyers and cruisers, along
with other forms of work, to support both of the two yards that in
recent years have built all of the Navy’s larger surface combatants
— GD/BIW and NG/Ingalls;
! whether the plan will include enough submarine design and
engineering work to maintain the submarine design and engineering
base, which, for the first time in more than 40 years, has no new
submarine-design program in progress; and
! whether the plan will provide enough work to maintain certain
supplier firms, particularly firms that are sole sources for what they
provide the Navy and whose financial health is largely dependent on
the amount of work they receive from the Navy.
Debate On Number Of Shipyards Needed. Following the decline in the
early 1990s in the rate of annual Navy ship procurement, some observers have
questioned whether the shipbuilding industrial base should be maintained in its
current form, and in particular, whether there should be a consolidation in the number
of shipyards involved in building and repairing Navy ships.33 They argue that there
is considerable excess capacity across these yards, and consequently an excess
amount of fixed overhead costs being added into the cost of Navy ships. Supporters
of the industrial base in its current form argue that consolidating work into a smaller
number of yards would reduce the Navy’s ability to use competition or benchmarking
in Navy ship design and construction, to respond to a natural disaster or terrorist
attack at one or more of the yards, and to rapidly increase ship-production rates if
needed to respond to a change in the international security climate.
33 See, for example, John Shephard Jr. and Harvey Sapolsky, “Five Shipyards Too Many,”
Washington Post, November 8, 2005: 19.

CRS-21
Legislative Activity
FY2006
FY2006 Defense Authorization (H.R. 1815/S. 1042).
House. Section 128 of the FY2006 defense authorization bill (H.R. 1815) as
reported by the House Armed Services Committee (H.Rept. 109-89 of May 20, 2005)
states:
SEC. 128. AIRCRAFT CARRIER FORCE STRUCTURE.
(a) Requirement for 12 Operational Aircraft Carriers Within the Navy- Section
5062 of title 10, United States Code, is amended —
(1) by redesignating subsections (b) and (c) as subsections (c) and (d),
respectively; and
(2) by inserting after subsection (a) the following new subsection (b):
`(b) The naval combat forces of the Navy shall include not less than 12
operational aircraft carriers. For purposes of this subsection, an operational
aircraft carrier includes an aircraft carrier that is temporarily unavailable for
worldwide deployment due to routine or scheduled maintenance or repair.’.
(b) U.S.S. John F. Kennedy-
(1) FULLY MISSION CAPABLE STATUS- The Secretary of Defense
shall take all necessary actions to ensure that the U.S.S. John F. Kennedy
(CVN-67) is maintained in a fully mission capable status.
(2) MAINTENANCE- From the amounts provided under section 301 for
operation and maintenance of the Navy for fiscal year 2006, $60,000,000 is
authorized for the operation and routine maintenance of the U.S.S. John F.
Kennedy.
Senate. Section 321 of the FY2006 defense authorization bill (S. 1042) as
reported by the Senate Armed Services Committee (S.Rept. 109-69 of May 17, 2005)
states:
SEC. 321. AIRCRAFT CARRIERS.
(a) FUNDING FOR REPAIR AND MAINTENANCE OF U.S.S. JOHN F.
KENNEDY- Of the amounts authorized to be appropriated for operation and
maintenance for the Navy by this Act and any other Act for fiscal year 2005 and
2006, $288,000,000 shall be available only for repair and maintenance to extend
the life of U.S.S. John F. Kennedy.
(b) LIMITATION ON REDUCTION IN NUMBER OF ACTIVE AIRCRAFT
CARRIERS-
(1) LIMITATION- The Secretary of the Navy may not reduce the number
of active aircraft carriers of the Navy below 12 active aircraft carriers until the
later of the following:
(A) The date that is 180 days after the date of the submittal to
Congress of the quadrennial defense review required in 2005 under
section 118 of title 10, United States Code.

CRS-22
(B) The date on which the Secretary of Defense, in consultation with
the Chairman of the Joint Chiefs of Staff, certifies to the congressional
defense committees that such agreements have been entered into to
provide port facilities for the permanent forward deployment of such
number of aircraft carriers as is necessary in the Pacific Command Area
of Responsibility to fulfill the roles and missions of that Command,
including agreements for the forward deployment of a nuclear aircraft
carrier after the retirement of the current two conventional aircraft
carriers.
(2) ACTIVE AIRCRAFT CARRIERS- For purposes of this subsection,
an active aircraft carrier of the Navy includes an aircraft carrier that is
temporarily unavailable for worldwide deployment due to routine or
scheduled maintenance.
In connection with this provision, S.Rept. 109-69 states:
The committee is concerned that the Navy’s decision to reduce the number
of aircraft carriers from 12 to 11 was not based on careful and thorough analysis,
but rather was budget-driven. In testimony before the Committee on Armed
Services in February 2005, the Chief of Naval Operations testified that when he
first submitted the proposed Navy budget for fiscal year 2006, it included 12
aircraft carriers. Further, the last two Quadrennial Defense Reviews, in 1997 and
2001, both supported a force structure of 12 aircraft carriers. The reduction to
11 aircraft carriers was made after the Office of Management and Budget
directed a budget cut for the Department of Defense.
The committee is also aware of the importance of permanent forward
deployment of at least one aircraft carrier in the PACOM AOR. The USS Kitty
Hawk, permanently forward deployed in Yokosuka, Japan, is scheduled for
retirement in fiscal year 2008. The only other conventionally-powered aircraft
carrier is the USS John F. Kennedy. The USS John F. Kennedy was scheduled
to begin a complex overhaul (COH) maintenance period in fiscal year 2005, and
funds for this COH were authorized and appropriated in fiscal year 2005 for this
purpose. The ongoing Integrated Global Presence and Basing Strategy review
might also expand the permanent forward deployment requirements for aircraft
carriers, particularly in the PACOM AOR.
The committee believes it is prudent for the USS John F. Kennedy to
receive its COH and that 12 aircraft carriers remain in the U.S. Navy until such
time as an in-depth analysis is conducted and forward-basing agreements are
reached.
S.Rept. 109-69 also states:
The committee is particularly concerned about the state of the current
shipbuilding program. The committee does not believe that the current or
projected level of funding for shipbuilding is adequate to build the numbers of
ships that will allow the Navy to perform its global missions or to sustain an
increasingly fragile industrial base. The founding fathers were specific in the
United States Constitution that it is the duty of Congress to “maintain” a Navy.
They had the foresight to realize that a Navy cannot be quickly constituted, or
reconstituted. That is as true today as it was over two centuries ago. If the
United States is to remain a global power, it must have a global presence. As a

CRS-23
maritime nation, that presence is often displayed in the form of naval ships, not
only through ensuring open sea lines of communication and trade in international
waters, but also through the inherently diplomatic mission of visiting foreign
ports and “showing the flag.”
The Navy currently has only 288 ships in the fleet. This is the smallest
number of ships in the Navy since before the start of the Second World War. It
is true that these ships possess capabilities far greater than those of the past, but
global presence demands sufficient numbers of ships as well as the capabilities
possessed by those ships.
Numerous officials have testified before this committee that shipbuilding
must become a subject of national debate. They have testified that the
Department of Defense, the Congress, and the shipbuilders need to engage in this
debate. Low shipbuilding rates have resulted in increased costs for ships, as
recently documented by the Government Accountability Office. These increased
costs have translated into even lower shipbuilding rates. The committee believes
this downward spiral needs to be reversed. To accomplish this, the committee
believes that significantly higher funding is required in the shipbuilding budget.
That funding must be stable, and some degree of flexibility is required in the
funding mechanisms for shipbuilding to allow for efficient management while
visibility remains to allow for sufficient oversight.
The committee believes that the shipbuilding budget must be reviewed by
the administration as a matter of the utmost urgency in the coming year. The
committee recommends that the President consider establishing a special
shipbuilding fund, which would be funded apart from the normal give and take
within the Department of Defense budget process, to dedicate a sustained amount
of funding for the construction of naval ships. The Congressional Budget Office
estimates, based on testimony before the committee, that the amount of funding
necessary to maintain a Navy of appropriate size and capability to deter any
potential adversaries and meet U.S. global commitments is at least $15.0 billion
a year, and that it needs to be sustained at that level for a period of 10 to 15
years. (Pages 6-7)
Conference Report. Section 126 of the conference report on H.R. 1815
amends 10 USC 5062 to require that the Navy shall include not less than 12
operational aircraft carriers. The provision states:
SEC. 126. AIRCRAFT CARRIER FORCE STRUCTURE.
(a) Requirement for 12 Operational Aircraft Carriers Within the Navy. —
Section 5062 of title 10, United States Code, is amended —
(1) by redesignating subsections (b) and (c) as subsections (c) and (d),
respectively; and
(2) by inserting after subsection (a) the following new subsection (b):
“(b) The naval combat forces of the Navy shall include not less than 12
operational aircraft carriers. For purposes of this subsection, an operational
aircraft carrier includes an aircraft carrier that is temporarily unavailable for
worldwide deployment due to routine or scheduled maintenance or repair.”.

CRS-24
(b) Funding for Repair and Maintenance of U.S.S. John F. Kennedy. — Of
the amounts available for operation and maintenance for the Navy pursuant to
this Act and any other Act for fiscal year 2006, not more than $288,000,000 shall
be available for repair and maintenance to extend the life of the U.S.S. John F.
Kennedy (CVN-67).
FY2006 Defense Appropriation (H.R. 2863).
House. In its report (H.Rept. 109-119 of June 10, 2005) on H.R. 2863, the
House Appropriations Committee stated:
The Committee remains concerned over the continued instability in Navy’s
shipbuilding program. In last year’s report, the Committee wrote:
“The Committee remains deeply troubled by the lack of stability in the
Navy’s shipbuilding program. Often both the current and outyear ship
construction profile is dramatically altered with the submission of the next
budget request. Programs justified to Congress in terms of mission requirements
in one year’s budget are removed from the next. The continued shifting of the
shipbuilding program promotes confusion and frustration throughout both the
public and private sectors.”

Unfortunately, the fiscal year 2006 budget creates even more instability and
uncertainty than in the recent past. The President’s budget for fiscal year 2006
includes funds for only 4 new ships, (and only 2 under the SCN appropriation).
This is one-half the number funded in fiscal year 2005. However, the long-term
Navy plan suggests that, in only three years, the shipbuilding program will be up
to 9 ships with an annual budget of almost $14 billion. By the end of the Future
Years Defense Program (FYDP), the Navy projects almost $18 billion a year for
12 ships. The Committee believes that not only does fiscal year 2006 constitute
a dangerous “notch” in the shipbuilding plan, but the outyear plan appears
unrealistic. To more effectively address these issues, the Committee directs the
Navy to submit to the congressional defense committees a ten-year shipbuilding
plan, not later than the date of submission of the fiscal year 2007 President’s
budget. This plan should include total program quantities required, unit and
budget costs assumed, and an assessment of technological risks remaining in
each new design class. The plan should include new construction vessels funded
in Research, Development, Test, and Evaluation, Navy, the National Defense
Sealift Fund, and the Shipbuilding and Conversion, Navy appropriation. (Page
144; italics as in the original)
Senate. In its report (S.Rept. 109-141 of September 29, 2005) on H.R. 2863,
the Senate Appropriations Committee stated:
The Committee remains gravely concerned about the overall health and
stability of Navy shipbuilding. Fleet inventory and capability requirements
remain unstable as do program performance and costs.
Of primary concern are soaring cost overruns. The Committee finds
unanticipated cost overruns to be the root cause of much of the instability in the
program. Until budget estimates become more realistic, requirements stabilize
and penalties for exorbitant cost overruns are exercised, ship construction costs
are unlikely to improve. The Committee is aware that the new Chief of Naval

CRS-25
Operations [CNO] is actively reviewing shipbuilding programs and is
considering several options for controlling long-term costs. (Page 126)
National Naval Force Structure Policy Act (H.R. 375). This identical
bills would establish it as “the policy of the United States to rebuild as soon as
possible the size of the fleet of the United States Navy to no fewer than 375 vessels
in active service, to include 15 aircraft carrier battle groups and 15 amphibious ready
groups....” This 375-ship fleet would differ in structure from the Navy’s 375-ship
proposal of 2002-2004, which included 12 carriers and about 12 amphibious ready
groups. Similar legislation was introduced in the 108th Congress (H.R. 375/S. 902).
Bills On Aircraft Carrier Force Levels (H.R. 304/S. 145). These
identical bills would amend Section 5062 of title 10 of the U.S. Code to state that
“The naval combat forces of the Navy shall include not less than 12 operational
aircraft carriers. For the purposes of this subsection, an operational aircraft carrier
includes an aircraft carrier that is temporarily unavailable for worldwide deployment
due to routine or scheduled maintenance or repair.”
FY2005
FY2005 Emergency Supplemental (H.R. 1268).
Conference Report. The conference report (H.Rept. 109-72 of May 3, 2005)
on H.R. 1268, the Emergency Supplemental Appropriations Act for FY2005,
contains a provision (Section 1025) stating:
AIRCRAFT CARRIERS OF THE NAVY
SEC. 1025. (a) FUNDING FOR REPAIR AND MAINTENANCE OF U.S.S.
JOHN F. KENNEDY- Of the amount appropriated to the Department of the
Navy in this Act, necessary funding will be made available for such repair and
maintenance of the U.S.S. John F. Kennedy as the Navy considers appropriate
to extend the life of U.S.S. John F. Kennedy.
(b) LIMITATION ON REDUCTION IN NUMBER OF ACTIVE AIRCRAFT
CARRIERS- No funds appropriated or otherwise made available in this Act may
be obligated or expended to reduce the number of active aircraft carriers of the
Navy below 12 active aircraft carriers until after the date of the submittal to
Congress of the quadrennial defense review required in 2005 under section 118
of title 10, United States Code.
(c) ACTIVE AIRCRAFT CARRIERS- For purposes of this section, an active
aircraft carrier of the Navy includes an aircraft carrier that is temporarily
unavailable for worldwide deployment due to routing or scheduled maintenance.
(d) PACIFIC FLEET AUTHORITIES- None of the funds available to the
Department of the Navy may be obligated to modify command and control
relationships to give Fleet Forces Command administrative and operational
control of U.S. Navy forces assigned to the Pacific fleet: Provided, That the
command and control relationships which existed on October 1, 2004 shall
remain in force unless changes are specifically authorized in a subsequent act.

CRS-26
Note that subsection (a) does not specify the amount of funding that is to be
made available for repair and maintenance of the Kennedy, and that subsection (b)
relates specifically to the obligation and expenditure of funds made available “in this
Act,” meaning H.R. 1268. Subsection (b) does not appear to prevent the Navy from
obligating or expending funds appropriated or otherwise made available by other
Acts, such as the regular FY2005 DOD appropriation act (P.L. 108-287 of August
5, 2005), to reduce the number of active carriers to something less than 12, even
while the Navy performs repair and maintenance work on the Kennedy. The Navy
in the past has sometimes performed repair and maintenance work on ships prior to
deactivating them and putting them into preservation (“mothball”) status, so that the
ships could be more easily reactivated at some point in the future. Subsection (d),
unlike subsection (b), does not contain the words “in this Act.”
Floor Amendments To Earlier Senate Version. Prior to the conference
on H.R. 1268, the Senate on April 20, 2005, passed, 58-38 (Record Vote Number
106), an amendment (S.Amdt. 498) to the Senate version of H.R. 1268, which stated:
AIRCRAFT CARRIERS OF THE NAVY
SEC. 1122. (a) FUNDING FOR REPAIR AND MAINTENANCE OF U.S.S.
JOHN F. KENNEDY. — Of the amount appropriated to the Department of the
Navy by this Act, necessary funding will be made available for such repair and
maintenance of the U.S.S. John F. Kennedy as the Navy considers appropriate
to extend the life of U.S.S. John F. Kennedy.
(b) LIMITATION ON REDUCTION IN NUMBER OF ACTIVE AIRCRAFT
CARRIERS. — No funds appropriated or otherwise made available by this Act
may be obligated or expended to reduce the number of active aircraft carriers of
the Navy below 12 active aircraft carriers until the later of the following:
(1) The date that is 180 days after the date of the submittal to Congress of the
quadrennial defense review required in 2005 under section 118 of title 10, United
States Code.
(2) The date on which the Secretary of Defense, in consultation with the
Chairman of the Joint Chiefs of Staff, certifies to Congress that such agreements
have been entered into to provide port facilities for the permanent forward
deployment of such numbers of aircraft carriers as are necessary in the Pacific
Command Area of Responsibility to fulfill the roles and missions of that
Command, including agreements for the forward deployment of a nuclear aircraft
carrier after the retirement of the current two conventional aircraft carriers.
(c) ACTIVE AIRCRAFT CARRIERS. — For purposes of this section, an active
aircraft carrier of the Navy includes an aircraft carrier that is temporarily
unavailable for worldwide deployment due to routing or scheduled maintenance.
A similar amendment, S.Amdt. 499, was ruled non-germane by the chair.
S.Amdt 499 stated:
AIRCRAFT CARRIERS OF THE NAVY

CRS-27
SEC. 1122. (a) FUNDING FOR REPAIR AND MAINTENANCE OF U.S.S.
JOHN F. KENNEDY. — Of the amount appropriated to the Department of the
Navy by this Act, and by the Department of Defense Appropriations Act, 2005
(Public Law 108-287; 118 Stat. 954), an aggregate of $288,000,000 may be
available only for repair and maintenance of the U.S.S. John F. Kennedy, and
available to conduct such repair and maintenance of the U.S.S. John F. Kennedy
as the Navy considers appropriate to extend the life of U.S.S. John F. Kennedy.
(b) LIMITATION ON REDUCTION IN NUMBER OF ACTIVE AIRCRAFT
CARRIERS. — No funds appropriated or otherwise made available by this Act,
or any other Act, may be obligated or expended to reduce the number of active
aircraft carriers of the Navy below 12 active aircraft carriers until the later of the
following:

(1) The date that is 180 days after the date of the submittal to Congress of the
quadrennial defense review required in 2005 under section 118 of title 10, United
States Code.
(2) The date on which the Secretary of Defense, in consultation with the
Chairman of the Joint Chiefs of Staff, certifies to Congress that such agreements
have been entered into to provide port facilities for the permanent forward
deployment of such numbers of aircraft carriers as are necessary in the Pacific
Command Area of Responsibility to fulfill the roles and missions of that
Command, including agreements for the forward deployment of a nuclear aircraft
carrier after the retirement of the current two conventional aircraft carriers.
(c) ACTIVE AIRCRAFT CARRIERS. — For purposes of this section, an active
aircraft carrier of the Navy includes an aircraft carrier that is temporarily
unavailable for worldwide deployment due to routing or scheduled maintenance.
Differences between the two amendments include the wording of subsection (a)
and the absence in S.Amdt. 498 of the phrase “or any other Act” in subsection (b).
The absence of the phrase “or any other Act” from S.Amdt. 498 raised the possibility
that funds appropriated in P.L. 108-287 could be used to reduce the Navy’s carrier
force from 12 ships to 11, even while the Navy performs repair and maintenance
work on the Kennedy.
S.Amdt 265. An earlier amendment to H.R. 1268, S.Amdt. 265, introduced
on April 4, 2005 and referred to the Committee on Appropriations, would add a
provision stating:
(a) PROHIBITION. — No funds appropriated or otherwise made available by
this Act, or by any other Act, for fiscal year 2005 may be obligated or expended
to reduce the number of operational aircraft carriers of the Navy from 12
operational aircraft carriers to 11 operational aircraft carriers.

(b) OPERATIONAL AIRCRAFT CARRIER. — In this section, the term
“operational aircraft carrier” includes an aircraft carrier that is unavailable due
to maintenance or repair.

CRS-28
FY2005 Defense Authorization Act (H.R. 4200/P.L. 108-375). Section
1014 of the conference report (H.Rept. 108-767 of October 8, 2004) on H.R.
4200/P.L. 108-375 of October 28, 2004) states:
SEC. 1014. INDEPENDENT STUDY TO ASSESS COST EFFECTIVENESS OF
THE NAVY SHIP CONSTRUCTION PROGRAM.
(a) STUDY. — The Secretary of Defense shall provide for a study of the cost
effectiveness of the ship construction program of the Navy. The study shall be
conducted by a group of industrial experts independent of the Department of
Defense. The study shall examine both —
(1) a variety of approaches by which the Navy ship construction program
could be made more efficient in the near term; and
(2) a variety of approaches by which, with a nationally integrated effort over
the next decade, the United States shipbuilding industry might enhance its
health and viability.
(b) NEAR-TERM IMPROVEMENTS IN EFFICIENCY. — With respect to the
examination under subsection (a)(1) of approaches by which the Navy ship
construction program could be made more efficient in the near term, the Secretary
shall provide for the persons conducting the study to —
(1) determine the potential cost savings on an annual basis, with an estimate
of return on investment, from implementation of each approach examined; and
(2) establish priorities for potential implementation of the approaches
examined.
(c) UNITED STATES SHIPBUILDING INFRASTRUCTURE
MODERNIZATION PLAN. — With respect to the examination under subsection
(a)(2) of approaches by which the United States shipbuilding industry might
enhance its health and viability through a nationally integrated effort over the next
decade, the Secretary shall provide for the persons conducting the study to —
(1) propose a plan incorporating a variety of approaches that would
modernize the United States shipbuilding infrastructure within the next decade,
resulting in a healthier and more viable shipbuilding industrial base;
(2) establish priorities for potential implementation of the approaches
examined; and
(3) estimate the resources required to implement each of the approaches
examined.
(d) REPORT. — Not later than October 1, 2005, the Secretary of Defense shall
submit a report to the congressional defense committees providing the results of the
study under subsection (a). The report shall include the matters specified in
subsections (b) and (c).
In discussing this provision, the conference report stated:
The House bill contained a provision (sec. 1012) that would require the
Secretary of Defense to have a study conducted by an entity independent of the
Department of Defense on the cost-effectiveness of the ship construction
program of the Navy. The study would examine various approaches for how the
Navy ship construction program could be made more cost-effective in the
near-term, and how the United States shipbuilding industry might be made
globally competitive through a nationally integrated effort over the next decade.

CRS-29
The Senate amendment contained no similar provision.
The Senate recedes with an amendment that would require the Secretary of
Defense to provide for a group of industrial experts to assess priorities for
potential implementation of the various approaches in the near-term study, with
an assessment of the return on investment. It would also require an assessment
of priorities for potential implementation of the various approaches for the
nationally, integrated effort, with the objective being to create a healthier and
more viable U.S. shipbuilding industrial base.
The conferees believe the group chosen for this study should be five to ten
industrial experts who represent an array of industrial sectors, not just the
shipbuilding industry. Many sectors of the U.S. industrial base have had to retool
processes and equipment to become more competitive. Since the rate of
shipbuilding is much lower, competitiveness has not provided the same incentive
for this sector. The conferees are aware of and support the work of the National
Shipbuilding Research Program-Advanced Shipbuilding Enterprise (NSRP —
ASE), including its lean shipbuilding initiative. The conferees would expect the
group of industrial experts chosen for this study to become familiar with this
work, and to consider the potential for using the NSRP — ASE to implement
some of the various approaches. (Pages 755-756)
In its discussion of a proposed ballistic missile defense interceptor called the
kinetic energy interceptor (KEI), which could be both ground- and sea-based, the
conference report stated:
The conferees remain convinced that the KEI could be an important aspect
of the overall ballistic missile defense architecture, potentially contributing
intercept capabilities in boost, midcourse, and terminal phases of the threat
missile flight. The conferees are concerned, however, with the lack of progress
in defining basing modes. The conferees note that:
(1) Recent justifications for the KEI ground-based variant suggest that it
might serve as the basis for midcourse intercept capability in Europe. At the
same time, however, the budget request included $35.0 million for additional
ground-based interceptors (GBI) for the ground-based midcourse defense
element that could be deployed in Europe; and
(2) Consideration of sea-based concepts of operations and platforms do not
appear to be progressing.
The conferees direct the Director of the Missile Defense Agency to provide
a report to the congressional defense committees by February 1, 2005 that
includes planned ground- and sea-basing modes for KEI (including specific
sea-based platforms) and the concept of operations for each basing mode; how
KEI will enhance ballistic missile defense system capabilities; the role KEI may
play in European missile defense and how that role relates to the fielding of
additional GBIs ground-based interceptors); and a comparison of anticipated
sea-based KEI capabilities with other sea-based missile defense options. (Pages
579-580)

CRS-30
FY2004
FY2004 Defense Authorization Act (H.R. 1588/P.L. 108-136). Section
216 of the conference report (H.Rept. 108-354 of November 7, 2003) on the FY2004
defense authorization bill (H.R. 1588/P.L. 108-136 of November 24, 2003) requires
the Secretary of Defense to provide for two independently performed studies on
potential future fleet platform architectures (i.e., potential force structure plans) for
the Navy. The two studies, which are being conducted by the Center for Naval
Analyses (CNA) and the Office of Force Transformation (or OFT, a part of the Office
of the Secretary of Defense), are to be submitted to the congressional defense
committees by January 15, 2005. (See pages 28-29 and 612-613 of H.Rept. 108-
354.)34
34 Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See H.Rept. 108-106, May 16, 2003, pp. 255-256.

CRS-31
Appendix A: Previous Ambiguity In Navy Ship
Force-Structure Planning
This appendix reviews ambiguity in Navy ship force-structure planning prior to
the Navy’s reported 313-ship proposal.
310-Ship Plan From 2001 QDR
Until the Navy’s reported 313-ship proposal, the last unambiguous ship force
structure plan for the Navy that was officially approved and published by the Office
of the Secretary of Defense (OSD) appeared in the September 2001 report on the
2001 Quadrennial Defense Review (QDR). This plan, like the one approved in the
1997 QDR, included 12 aircraft carriers, 116 surface combatants, 55 nuclear-powered
attack submarines (SSNs),35 and 36 amphibious ships organized into 12 amphibious
ready groups (ARGs) with a combined capability to lift the assault echelons of 2.5
Marine Expeditionary Brigades (MEBs).36 Although the 2001 QDR report did not
mention a total number of ships, this fleet was generally understood to include a total
of about 310 battle force ships.37 The 2001 QDR report also stated that as DOD’s
“transformation effort matures — and as it produces significantly higher output of
military value from each element of the force — DOD will explore additional
opportunities to restructure and reorganize the Armed Forces.”38
Following the publication of the 2001 QDR report, the Navy took steps which
had the effect of calling into question the status of the 310-ship plan. In November
2001, the Navy announced a plan for procuring a new kind of small surface
combatant, called the Littoral Combat Ship (LCS), that the Navy had not previously
planned to procure, and which was not mentioned in the 2001 QDR report.39 And in
35 The plan approved in the 1997 QDR originally included 50 SSNs but was subsequently
amended to include 55 SSNs.
36 U.S. Department of Defense, Quadrennial Defense Review Report, Washington, 2001,
p. 22.
37 Since the beginning of the Reagan Administration, the total number of ships in the Navy
has been calculated using the battle force method of counting ships. Battle force ships are
ships that are readily deployable and which contribute directly or indirectly to the deployed
combat capability of the Navy. Battle force ships include active-duty Navy ships, Naval
Reserve Force ships, and ships operated by the Military Sealift Command that meet this
standard. The total number of battle force ships includes not only combat ships but also
auxiliary and support ships — such as oilers, ammunition ships, and general stores ships —
that transport supplies to deployed Navy ships operating at sea. The total number of battle
force ships does not include ships in reduced readiness status that are not readily deployable,
ships and craft that are not generally intended for making distant deployments,
oceanographic ships operated by the National Oceanic and Atmospheric Administration
(NOAA), and DOD sealift and prepositioning ships that transport equipment and supplies
(usually for the benefit of the Army or Air Force) from one land mass to another.
38 Quadrennial Defense Review Report, op. cit., p. 23.
39 For more on the LCS program, see CRS Report RS21305, Navy Littoral Combat Ship
(continued...)

CRS-32
February 2003, in submitting its proposed FY2004-FY2009 Future Years Defense
Plan (FYDP) to Congress, DOD announced that it had initiated studies on undersea
warfare requirements and forcible entry options for the U.S. military. These studies
could affect, among the other things, the required numbers of SSNs and amphibious
ships. The 310-ship plan is now rarely mentioned by Navy and DOD officials.
Navy 375-Ship Proposal Of 2002-2004
Navy leaders in early 2002 began to mention an alternative proposal for a 375-
ship Navy that initially included12 aircraft carriers, 55 SSNs, 4 converted Trident
cruise-missile-carrying submarines (SSGNs), 160 surface combatants (including 104
cruisers, destroyers, frigates, and 56 LCSs), 37 amphibious ships, and additional
mine warfare and support ships.40
Although Navy leaders routinely referred to the 375-ship proposal from about
February 2002 through about February 2004, Secretary of Defense Donald Rumsfeld,
at a February 5, 2003, hearing before the House Armed Services Committee,
explicitly declined to endorse it as an official DOD goal, leaving it a Navy proposal
only.
In April 2004, Navy leaders began to back away from the 375-ship proposal,
stating that 375 was an approximate figure, that the ships making up the total of 375
were subject to change, and perhaps most important, that the 375-ship figure
reflected traditional concepts for crewing and deploying Navy ships, rather than new
concepts — such as Sea Swap — that could significantly reduce future requirements
for Navy ships.
Early-2005 Navy Proposal For Fleet Of 260 To 325 Ships
At a February 10, 2005 hearing before the Senate Armed Services Committee
on the proposed FY2006 DOD budget and FY2006-FY2011 FYDP, Admiral Vernon
Clark, the Chief of Naval Operations, testified that the Navy in future years may
require a total of 260 to 325 ships, or possibly 243 to 302 ships, depending on how
much the Navy uses new technologies and Sea Swap. Specifically, Clark stated:
As we evolve advanced concepts for employment of forces, we will also refine
analyses and requirements, to include the appropriate number of ships, aircraft,
and submarines....
39 (...continued)
(LCS): Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress
, by Ronald O’Rourke.
40 The composition of the plan was subsequently modified to include 12 aircraft carriers, 52
SSNs, 4 SSGNs, 165 surface combatants (109 cruisers and destroyers and 56 LCSs), 36
amphibious ships, 18 Maritime Prepositioning Force (Future) ships, and additional mine
warfare and support ships.


CRS-33
In a sensor-rich construct, the numbers of platforms are no longer a meaningful
measure of combat capability. And just as the number of people is no longer the
primary yardstick by which we measure the strength or productivity of an
organization in an age of increasing capital-for-labor substitutions, the number
of ships is no longer adequate to gauge the health or combat capability of the
Navy. The capabilities posture of the Fleet is what is most important. In fact,
your Navy can deliver much more combat power, more quickly now than we
could twenty years ago when we had twice as many ships and half again as many
people....
Further, I believe that the current low rate of ship construction and the resultant
escalation of platform cost will constrain the future size of the Fleet. As I have
previously testified, I don’t believe that it’s all about numbers; numbers have a
quality all their own, there’s no question about that. But, it is more important
that we buy the right kinds of capabilities in the ships that we’re procuring in the
future, and that we properly posture our force to provide the speed and agility for
seizing and retaining the initiative in any fight.
The ultimate requirement for shipbuilding, however, will be shaped by the
potential of emerging technologies, the amount of forward basing, and innovative
manning concepts such as Sea Swap. Additional variables range from
operational availability and force posture to survivability and war plan timelines.
The notional diagram [above] illustrates how manning concepts and anticipated
technological adaptation will modify the number of ships required. The [upper
and lower] lines represent levels of combat capability and the ships required to
achieve that capability. For example, the left side of the diagram shows our
current number of ships (290) and the current projection of ships required to
fully meet Global War on Terror requirements (375) in the future. The right side
of the diagram shows a projection that provides the same combat capability but
fully leverages technological advances with maximum use of Sea Swap. It is a
range of numbers because the degree of technological adaptation is a variable,
as is the degree to which we can implement Sea Swap. The middle portion of the
curve [in the ellipse] shows a projected range that assumes a less extensive
projection of technological adaptation and use of Sea swap. Although simplified,

CRS-34
this diagram shows how the application of transformational new technologies
coupled with new manning concepts will enable us to attain the desired future
combat capability with a force posture between 260 and 325 ships.41
Admiral Clark’s testimony did not detail the compositions of these fleets by ship
type or make clear whether any of these potential total ship figures have been
endorsed by the Secretary of Defense as official DOD force-structure planning goals.
In March 2005, the Navy provided a report to Congress showing the notional
compositions of 260- and 325-ship fleets in FY2035.42 Table 1 below compares the
310-ship plan from the 2001 QDR and the Navy’s 375-ship proposal of 2002-2004
with the notional 260- and 325-ship fleets from the March 2005 Navy report to
Congress.
Using the 260-ship fleet as a baseline, the range of 260 to 325 ships equates to
a 25% range of variability in the potential total number of ships. For some ship
categories — such as SSBNs and SSGNs — there is little or no difference between
the 260- and 325-ship fleets. For other categories of ships, there are substantial
percentage ranges of variability — 37% for cruisers, destroyers and frigates, 30% for
LCSs; 41% for amphibious ships; and 43% for maritime prepositioning ships. For
the remaining categories of ships — attack submarines, aircraft carriers, combat
logistics ships, and other ships — the ranges of variability are 10% or less. In the
case of aircraft carriers, the one-ship difference under two fleet plans can translate
into a substantial difference in Navy funding requirements and shipbuilding work.
When asked why the Navy has not expressed its force-level requirements as a
single figure, as it has in the past, or as a more tightly focused range, Navy officials
have stated that additional analyses need to be performed to tighten the range, that
some of the variability is due to the Navy’s inability to predict the future with
precision, and that the Navy needs to work to refine these figures further to establish
a more stable set of requirements for ships.43
Capabilities-Based Planning and Numbers of Ships
As suggested in Admiral Clark’s February 2005 testimony, DOD in recent years
has altered the basis of its force planning, shifting from threat-based planning to
capabilities-based planning. Under threat-based planning, DOD planned its forces
41 Source for quoted text and associated diagram: Statement of Admiral Vernon Clark, USN,
Chief of Naval Operations, Before the Senate Armed Services Committee, Feb. 10, 2005,
pp. 17-19.
42 U.S. Department of the Navy, An Interim Report to Congress on Annual Long-Range Plan
For The Construction Of Naval Vessels For FY 2006
. The report was delivered to the
House and Senate Armed Services Committees on March 23, 2005. Copies of the report
were obtained by defense trade publications, and at least one of these publications posted
the report on its website.
43 See, for example, Geoff Fein, “Navy Needs To Better Refine Shipbuilding Numbers, Says
Sestak,” Defense Daily, Mar. 30, 2005; and Dave Ahearn, “Adm. Sestak Says Future
Shipbuilding Needs Must Be Flexible,” Defense Today, Mar. 30, 2005.

CRS-35
based on what would be needed for conflict scenarios that were defined fairly
specifically. During the Cold War, for example, DOD planned forces that would be
sufficient, in conjunction with allied NATO forces, for fighting a multi-theater
conflict with the Soviet Union and its Warsaw Pact allies. Similarly, in the first few
years of the post-Cold War era, DOD planned forces that would be sufficient for,
among other things, fighting two nearly simultaneous regional conflicts, one in the
Persian Gulf region, the other on the Korean peninsula.
Under capabilities-based planning, DOD is now planning for U.S. military
forces to have a variety of abilities, so that they will be better able to respond to a
wide array of possible conflict scenarios. DOD officials have explained that the shift
to capabilities-based planning responds to the difficulty of predicting, in today’s
security environment, specific future threats and warfighting scenarios.
When asked about required numbers of Navy ships and aircraft, Navy and DOD
officials have argued, as Admiral Clark does in the above-cited testimony, that under
capabilities-based planning, numbers of ships and aircraft per se are not as important
as the total amount of capability represented in the fleet. That may be correct insofar
as the policy objective is to have a Navy with a certain desired set of capabilities, and
not simply one that happens to include a certain number of ships and aircraft. But
that is not the same as saying that a Navy with a desired set of capabilities cannot in
turn be described as one having certain numbers of ships and aircraft of certain types.
Although the Navy is currently working to resolve uncertainties concerning the
applicability of new technologies the Sea Swap concept, it arguably should become
possible at some point to translate a set of desired Navy into desired numbers of ships
and aircraft. Those numbers might be expressed as focused ranges rather than
specific figures, and these focused ranges may change over time as missions,
technologies, and crewing concepts change. But to argue indefinitely that desired
naval capabilities cannot be translated into desired numbers of ships and aircraft
would be to suggest that the Navy cannot measure and understand the capabilities of
its own ships and aircraft. In this sense, the shift to capability-based planning does
not in itself constitute a rationale for permanently setting aside the question of the
planned size and structure of the fleet.
Implications of Ambiguity in Navy Force-Structure Plans
For the Navy. For the Navy, ambiguity concerning required numbers of Navy
ships provided time to resolve uncertainties concerning the applicability of new
technologies and the Sea Swap concept to various kinds of Navy ships. Navy (and
DOD) officials may also have found this ambiguity convenient because it permitted
them to speak broadly about individual Navy ship-acquisition programs without
offering many quantitative details about them — details which they might be held
accountable to later, or which, if revealed now, might disappoint Members of
Congress or industry officials.
This ambiguity may also, however, have made it difficult for Navy officials, in
conversations with the Office of the Secretary of Defense (OSD), to defend programs
for procuring Navy ships in certain total numbers or at certain annual rates because
OSD officials might view alternative total numbers or annual rates as sufficient for

CRS-36
maintaining a Navy that falls somewhere within the broad ranges of total numbers
of ships that Navy officials have presented in their testimony.
For Congress. Ambiguity concerning required numbers of Navy ships made
it more difficult for Congress to conduct effective oversight by reconciling desired
Navy capabilities with planned Navy force structure, and planned Navy force
structure with supporting Navy programs and budgets. With the middle element of
this oversight chain expressed in only general terms, it was more difficult for
Congress to understand whether proposed programs and budgets will produce a Navy
with DOD’s desired capabilities. The defense oversight committees in recent years
have criticized the Navy for presenting a confused and changing picture of Navy ship
requirements and procurement plans.44
For Industry. Ambiguity concerning required numbers of Navy ships may
have made it easier for industry officials to pour into broad remarks from the Navy
or DOD their own hopes and dreams for individual programs. This could have led
44 For example, the conference report (H.Rept. 107-772) on the FY2003 defense
authorization act (P.L. 107-314/H.R. 4546) stated:
In many instances, the overall Department of Defense ship acquisition
message is confused.... The conferees also believe that the DON shares blame
for this confusion because it has been inconsistent in its description of force
structure requirements. This situation makes it appear as if the Navy has not
fully evaluated the long-term implications of its annual budget requests....
The conferees perceive that DOD lacks a commitment to buy the number and
type of ships required to carry out the full range of Navy missions without
redundancy. The DON has proposed to buy more ships than the stated
requirement in some classes, while not requesting sufficient new hulls in other
classes that fall short of the stated requirement. Additionally, the conferees
believe that the cost of ships will not be reduced by continually changing the
number of ships in acquisition programs or by frequently changing the
configuration and capability of those ships, all frequent attributes of recent DON
shipbuilding plans. (Pages 449 and 450)
The House Appropriations Committee, in its report (H.Rept. 108-553) on the FY2005
DOD appropriations bill (H.R. 4613), stated:
The Committee remains deeply troubled by the lack of stability in the Navy’s
shipbuilding program. Often both the current year and out year ship construction
profile is dramatically altered with the submission of the next budget request.
Programs justified to Congress in terms of mission requirements in one year’s
budget are removed from the next. This continued shifting of the shipbuilding
program promotes confusion and frustration throughout both the public and
private sectors. Moreover, the Committee is concerned that this continual
shifting of priorities within the Navy’s shipbuilding account indicates uncertainty
with respect to the validity of requirements and budget requests in support of
shipbuilding proposals. (Page 164)
See also the Legislative Activity section of this report, particularly for comments in
committee reports on the FY2006 defense authorization and appropriation bills.

CRS-37
to excessive industry optimism about those programs. Ambiguity concerning
required numbers of Navy ships also made it more difficult for industry to make
rational business-planning decisions in areas such as production planning, workforce
management, facilities investment, company-sponsored research and development,
and potential mergers and acquisitions.45
45 A July 2004 press article, for example, states that
Philip Dur, chief executive officer of Northrop Grumman’s Shipbuilding
Systems, argued that the Navy’s concept of “capabilities versus numbers” not
only would hurt the service’s operations, but decimate the industry.
If the Navy decides it cannot afford 300 ships, it should come up with a
smaller number and set new ship construction plans based on that number, Dur
said.
It also would be helpful, he added, if both the Navy and the Coast Guard
jointly planned their long-term shipbuilding buys. “I do not know that either
service takes the other service’s capabilities into account,” he said. If both
services set their shipbuilding goals collectively, “then the shipbuilders can lay
out an investment plan, a hiring plan [and] a training plan that was predicated on
the assumption that we would competing for an X-number of platforms per year
on a going-forward basis,” Dur said....
If the Department of Defense can frame a requirement for ships and defend
it, the industry would make the necessary adjustments to either scale down or
ramp up, Dur told reporters during a recent tour of the company’s shipyards in
Louisiana and Mississippi.
(Roxana Tiron, “Lack of Specificity in Navy Shipbuilding Plans Irks the Industry,”
National Defense, July 2004.)

CRS-38
Appendix B: Independent Studies On Navy Force
Structure
Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) required the Secretary of Defense to provide for two independently performed
studies on potential future fleet platform architectures (i.e., potential force structure
plans) for the Navy. The two studies, which were conducted by the Center for Naval
Analyses (CNA) and the Office of Force Transformation (OFT, a part of the Office
of the Secretary of Defense), were submitted to the congressional defense committees
in February 2005.46
A third independent study on potential future fleet platform architectures was
conducted by the Center for Strategic and Budgetary Assessments (CSBA). CSBA
conducted this study on its own initiative and made it available to congressional and
other audiences in March 2005 as an alternative to the CNA and OFT studies.
This appendix summarizes and discusses these three studies.47
Force Structure Recommendations
CNA Report.48 The CNA report uses essentially the same kinds of ships and
naval formations as those planned by the Navy. The report recommends a Navy
force structure range of 256 to 380 ships. The low end of the range assumes a greater
use of crew rotation and overseas homeporting of Navy ships than the high end.
Table 5 below compares the CNA-recommended force range to the Navy’s 375-ship
fleet proposal of 2002-2004 and the notional 260- and 325-ship fleets for FY2035
presented in the Navy’s March 2005 interim report to Congress.
46 Section 216 is an amended version of a provision (Section 217) in the House-reported
version of H.R. 1588. See H.Rept. 108-354, pp.28-29, 612-613; and H.Rept. 108-106, May
16, 2003, pp.255-256.
47 This appendix is adapted from a part of a statement made by the author before the Senate
Armed Services Committee Subcommittee on Seapower, Hearing on Navy Capabilities and
Force Structure, Apr. 12, 2005.
48 Delwyn Gilmore, with contributions by Mark Lewellyn et al., Report to Congress
Regarding Naval Force Architecture
, Center for Naval Analyses, CRM D0011303.A2/1Rev,
Jan. 2005.

CRS-39
Table 5. CNA-Recommended Force and Other Proposals
Notional Navy
Navy
fleets for
375-ship
FY2035
proposal
CNA force
of 2002-
260
325
Ship type
range
2004a
ships
ships
Ballistic missile submarines (SSBNs)
14
14
14
14
Cruise missile submarines (SSGNs)
4
4
4
4
Attack submarines (SSNs)
38 to 62
52
37
41
Aircraft carriers
10 to 12
12
10
11
Cruisers and destroyers
66 to 112
109
67
92
Littoral combat ships (LCSs)
40 to 70
56
63
82
Amphibious ships
18 to 30
36
17
24
Maritime Prepositioning Force (Future)
19 to 21
18
14
20
ships
Combat logistics (resupply) ships
25 to 33
33
24
26
Otherb
22
41
10
11
Total battle force ships
256 to 380
375
260
325
Source: Table prepared by CRS based on CNA report and March 2005 Navy report.
a. Composition as shown in CNA report as the program of record for 2022. An earlier and somewhat
different composition is shown elsewhere in this CRS report.
b. Includes command ships, support ships (such as salvage ships and submarine tenders), dedicated
mine warfare ships, and sea basing connector ships.
OFT Report.49 The OFT report employs eight new ship designs that differ
substantially from the designs of most ships currently in the fleet, under construction,
or planned for procurement. Among the eight new ship designs are four types of
large surface ships that would be built from a common, relatively inexpensive,
merchant-like hull design developed in 2004 for the Navy’s Maritime Prepositioning
Force (Future) analysis of alternatives. These four types of ships, which would all
displace 57,000 tons, include:
! An aircraft carrier that would embark a notional air wing of 30
Joint Strike Fighters (JSFs), 6 MV-22 Osprey tilt-rotor aircraft, and
15 unmanned air vehicles (UAVs). The total of 36 manned aircraft
is about half as many as in today’s carrier air wings, and the OFT
architecture envisages substituting two of these new carriers for each
49 U.S. Department of Defense, Office of the Secretary of Defense, Alternative Fleet
Architecture Design
(Report for the Congressional Defense Committees, Office of Force
Transformation). The OFT report was also published in slightly modified form as Stuart E.
Johnson and Arthur K. Cebrowski, Alternative Fleet Architecture Design. Washington,
National Defense University, 2005. 96 pp. (Defense & Technology Paper 19, Center for
Technology and National Security, National Defense University, August 2005)

CRS-40
of today’s carriers. This new carrier would also have support spaces
for unmanned underwater vehicles (UUVs), unmanned surface
vehicles (USVs), and mission modules for the 1,000-ton surface
combatant described below.
! A missile-and-rocket ship that would be quipped with 360 vertical
launch system (VLS) missile tubes and 4 trainable rocket launchers.
Additional spaces on this ship could be used to support UUVs,
USVs, and mission modules for the 1,000-ton surface combatant.
Alternatively, these spaces could be used to provide limited stowage
and working space for the 100-ton surface combatant described
below, and mission modules for these 100-ton ships.
! An amphibious assault ship that would embark a notional air wing
of either 30 CH-46 equivalents or 6 JSFs, 18 MV-22s, and 3
gyrocopter heavy-lift helicopters. It would also have spaces for
Marine Corps equipment, unmanned vehicles, and mission modules
for the 1,000-ton surface combatant.
! A “mother ship” for small combatants that would contain stowage
and support spaces for the 100-ton surface combatant described
below.
The four other new-design ships in the OFT architecture are:
! A 13,500-ton aircraft carrier based on a conceptual surface effect
ship (SES)/catamaran hull design developed in 2001 by a team at the
Naval Postgraduate School. This ship would embark a notional air
wing of 8 JSFs, 2 MV-22s, and 8 UAVs. The total of 10 manned
aircraft is roughly one-eighth as many as in today’s carrier air wings,
and the OFT architecture envisages substituting eight of these new
carriers for each of today’s carriers. This new ship would have a
maximum speed of 50 to 60 knots.
! A 1,000-ton surface combatant with a maximum speed of 40 to 50
knots and standard interfaces for accepting various modular mission
packages. These ships would self-deploy to the theater and would
be supported in theater by one or more of the 57,000-ton ships
described above.
! A 100-ton surface combatant with a maximum speed of 60 knots
and standard interfaces for accepting various modular mission
packages. These ships would be transported to the theater by the
57,000-ton mother ship and would be supported in theater by that
ship and possibly also the 57,000-ton missile-and-rocket ship.
! A non-nuclear-powered submarine equipped with an air-
independent propulsion (AIP) system. These AIP submarines would
be lower-cost supplements to the Navy’s nuclear-powered
submarines (SSNs) and would be transported from home port to the

CRS-41
theater of operations by transport ships. The OFT architecture
envisages substituting four of these submarines for the SSN in each
carrier strike group.50
The 1,000- and 100-ton surface combatants would be built as relatively
inexpensive sea frames, like the LCS.
The OFT report combines these eight types of ships, plus the Navy’s currently
planned TAOE-class resupply ship, into a fleet that would include a much larger total
number of ships than planned by the Navy, about the same number of carrier-based
aircraft as planned by the Navy, and large numbers of unmanned systems. The OFT
report presents three alternative versions of this fleet, which the report calls
Alternatives A, B, and C. The report calculates that each of these alternatives would
be equal in cost to the equivalent parts of the Navy’s 375-ship proposal. Each of
these alternative force structures, like the equivalent parts of the Navy’s 375-ship
proposal, would be organized into 12 carrier strike groups (CSGs), 12 expeditionary
strike groups (ESGs), and 9 surface strike groups (SSGs). The three alternative force
structures are shown in Table 6 below.
Table 6. Alternative Fleet Structures from OFT Report
Alternative
Ship type
A
B
C
57,000-ton aircraft carrier
24
24
0
57,000-ton missile-and-rocket ship
33
33
33
57,000-ton amphibious assault ship
24
24
24
57,000-ton mother ship
0
24
24
13,500-ton aircraft carrier
0
0
96
1,000-ton surface combatant
417
0
0
100-ton surface combatant
0
609
609
AIP submarine
48
48
48
TAOE-class resupply ship
12
12
12
Subtotal 1,000- and 100-ton ships
417
609
609
Subtotal other ships
141
165
237
Total shipsa
558a
774a
846a
Source: Table prepared by CRS based on figures in OFT report.
a. The totals shown in early copies of the OFT report are 36 ships lower in each case due to an error
in those copies in calculating the numbers of ships in the 12 carrier strike groups.
50 The report states that “Alternatives to the SSNs in formations were diesel Air Independent
Propulsion (AIP) submarines and unmanned undersea vehicles (UUVs). The AIP
submarines were substituted for Virginia class SSNs on a cost basis of roughly four to one.
These submarines could be nuclear-powered if they are designed and built based upon a
competitive, cost suppressing business model.” (Page 60) The strategy of transporting the
AIP submarines to the theater using transport ships is not mentioned in the report but was
explained at a February 18, 2005 meeting between CRS and analysts who contributed to the
OFT report.

CRS-42
The totals shown in the table do not include SSNs, cruise missile submarines
(SSGNs), and ballistic missile submarines (SSBNs) operating independently of the
12 CSGs, 12 ESGs, and 9 SSGs. The totals also do not include combat logistics
ships other than the TAOEs (e.g., oilers, ammunition ships, and general stores ships)
and fleet support ships. The Navy’s 375-ship proposal, by comparison, includes all
these kinds of ships.
As also can be seen from the table, the difference between Alternatives A and
B is that the former uses 1,000-ton surface combatants while the latter uses 100-ton
surface combatants that are transported into the theater by mother ships, and the
difference between Alternatives B and C is that the former uses 57,000-ton aircraft
carriers while the latter substitutes 13,500-ton carriers.
CSBA Report.51 The CSBA report uses many of the same ship designs
currently planned by the Navy, but also proposes some new ship designs. The CSBA
report also proposes ship formations that in some cases are different than those
planned by the Navy. Table 7 below compares the CSBA-recommended force
structure to CNA’s recommended force range, the Navy’s 375-ship fleet proposal of
2002-2004, and the notional 260- and 325-ship fleets for FY2035 presented in the
Navy’s March 2005 interim report to Congress.
51 Robert O. Work, Winning the Race: A Naval Fleet Platform Architecture for Enduring
Maritime Supremacy
, Center for Strategic and Budgetary Assessments (CSBA), 2005.

CRS-43
Table 7. CSBA-Recommended Force and Other Proposals
Notional Navy
Navy 375-
fleets for
ship
FY2035
proposal
CNA force
of 2002-
260
325
Ship type
CSBA force
range
2004a
ships
ships
Ballistic missile submarines
12b
14
14
14
14
(SSBNs)
Cruise missile submarines
6 b
4
4
4
4
(SSGNs)
Attack submarines (SSNs)
54c
38 to 62
52
37
41
Large-deck aircraft carriers
10
10 to 12
12
10
11
(CVNs)
Medium aircraft carriers
4
0
0
0
0
(CVEs)
Afloat forward staging base
1
0
0
0
0
(AFSB)
Cruisers and destroyers
84 or 86
66 to 112
109
67
92
Littoral combat ships
84
40 to 70
56
63
82
(LCSs)
Amphibious ships
32d
18 to 30
36
17
24
Maritime Prepositioning
16e
19 to 21e
18e
14e
20e
Force ships
Combat logistics (resupply)
36f
25 to 33
33
24
26
ships
Otherg
34h
22
41
10
11
Total battle force ships
373 or 375i
256 to 380
375
260
325
Source: Table prepared by CRS based on CSBA report, CNA report, and March 2005 Navy report.
a. Composition as shown in CNA report as the program of record for 2022. An earlier and somewhat
different composition is shown elsewhere in this CRS report.
b. Alternatively, 10 SSBNs and 8 SSGNs.
c. Includes one special-mission submarine. Total number drops slightly over next 12 years.
d. Includes eight LHDs and 24 LPD-17s.
e. In the CSBA force, these are existing MPF ships; in the other fleets, they are MPF(Future) ships.
f. Includes eight TAOEs, 11 TAKEs, and 17 TAOs.
g. Includes command ships, and support ships (such as salvage ships and submarine tenders),
dedicated mine warfare ships, and sea basing connector ships.
h. Includes, among other ships, 2 TAVBs and 8 TLKAs associated with the amphibious and MPF
ships.
i. In addition to these ships, the CSBA report notes that U.S. maritime forces would include 35 DOD
prepositioning and surge sealift ships used primarily by the Army and Air Force, and 91 large,
medium, and fast-response (i.e., small) cutters planned for procurement under the Coast Guard
Deepwater acquisition program.

CRS-44
The CSBA report makes numerous specific recommendations for ship force
structure and ship acquisition, including the following:
Aircraft Carriers. When the George H.W. Bush (CVN-77) enters service in
2008 or 2009:
! Retire the two remaining conventional carriers — the Kitty Hawk
CV-63) and the Kennedy (CV-67).
! Convert the Enterprise (CVN-65) into an afloat forward staging base
(AFSB) with a mixed active/reserve/civilian crew, to be used in
peacetime for aviation testing and in crises for embarking special
operations forces, Army or Marine Corps forces, or joint air wings.
! Begin replacing the 10 Nimitz (CVN-68) class carriers on a one-for-
one basis with CVN-21-class carriers procured once every five years
using incremental funding.
! Redesignate the LHA(R) as a medium sized carrier (CVE) and
procure one every three years starting in FY2007 using incremental
funding.52
Submarines.
! Maintain Virginia-class SSN procurement at one per year for the
next several years, producing an eventual total of perhaps 20
Virginia-class boats.
! Begin immediately to design a new “undersea superiority system”
with a procurement cost 50% to 67% that of the Virginia-class
design, with the goal of achieving a procurement rate of two or three
of these boats per year no later than FY2019.
! Study options for extending the service lives of the three Seawolf
SSNs and the 31 final Los Angeles-class SSNs to mitigate the
projected drop in SSN force levels during the 2020s.
! Reduce the SSBN force from 14 ships to 12 ships and convert an
additional two SSBNs into SSGNs, for a total of six SSGNs.
! Study the option of reducing the SSBN force further, to 10 ships,
which would permit another two SSBNs to be converted into
SSGNs, for a total of eight SSGNs.53
Destroyers and Cruisers.
! Procure a single DD(X) in FY2007, using research and development
funding, as the first of three surface combatant technology
demonstrators.
! Start a design competition for a next generation, modular surface
combatant or family of combatants, with capabilities equal to or
greater than the DD(X)/CG(X), but with a substantially lower
procurement cost.
52 CSBA report, slides 154-158.
53 CSBA report, slides 276, 284, 289, 297, 299.

CRS-45
! Build two additional surface combatant technology demonstrators to
compete against the DD(X) design.
! Use the results of this competition to inform the design of a new
surface combatant, called SCX, with a procurement cost perhaps
one- third to one-half that of the DD(X).
! Begin procuring this new design in FY2015 as a replacement for the
DD(X)/CG(X) program.
! Consider modifying the LPD-17 design into a low-cost naval surface
fire support ship carrying the Advanced Gun System (AGS) that was
to be carried by the DD(X).
! Consider procuring two additional DDG-51s to help support the
surface combatant industrial base in the near-term.54
Littoral Combat Ships and Coast Guard Deepwater Cutters.
! Procure six LCSs per year for a total of 84 LCSs — 42 of the
Lockheed design, and 42 of the General Dynamics design.
! Organize these 84 ships into 42 divisions, each consisting of one
Lockheed ship and one General Dynamics ship, so that each division
can benefit from the complementary strengths of the two designs.
! Ensure that mission packages for the LCS and mission packages for
the Coast Guard’s large and medium Deepwater cutters are as
mutually compatible as possible.
! Include the Coast Guard’s Deepwater cutters when counting ships
that contribute to the country’s total fleet battle network.
! Begin a research and development and experimentation program
aimed at building several competing stealth surface combatant
technology demonstrators for operations in contested or denied-
access waters.55
Amphibious Ships.
! Complete LHD-8 to create a force of eight LHDs.
! Rather than stopping procurement of LPD-17s after the ninth ship in
FY2007, as now planned by the Navy, increase the LPD-17
procurement rate to two ships per year and use multiyear
procurement (MYP) to procure a total of 24 LPD-17s.
! Retire the 12 existing LSD-41/49 class ships, leaving a 32-ship
amphibious fleet consisting of eight LHDs and 24 LPD-17s.
54 CSBA report, slides 246, 249, and 251-253. Slide 249 states that possibilities for a
reduced-cost alternative to the DD(X) include a surface combatant based on the LPD-17
design, a semi-submersible ship built to commercial standards (like a ship called the
“Stryker” that was proposed several years ago), and a large or medium “carrier of large
objects,” perhaps built to relaxed commercial standards.
55 CSBA report, slides 275, 277, and 283.

CRS-46
! Form eight “distributed expeditionary strike bases” — each of which
would include one LHD, three LPD-17s, one Aegis cruiser, three
Aegis destroyers, two LCSs, and one SSGN.56
MPF and Other Ships.
! Retain the three existing MPF squadrons over the near- to mid-term.
! Reconfigure two of the squadrons for irregular warfare.
! Use the third squadron as a swing asset to either reinforce the two
irregular-warfare squadrons or to provide lift for assault follow-on
echelon amphibious landing forces.
! Develop high-speed intra-theater and ship-to-shore surface
connectors.
! Design an attack cargo ship (TAKA) to help support sustained joint
operations ashore, with a target unit procurement cost of $500
million or less, and begin procuring this ship in FY2014.
! Replace the two existing hospital ships, the four existing command
ships, and existing support tenders with new ships based on the
LPD-17 design.
! Initiate a joint experimental program for future sea-basing platforms
and technologies.57
The CSBA report raises several questions about the Navy’s emerging sea basing
concept for conducting expeditionary operations ashore. The report states:
The work done thus far on sea basing is intriguing, but neither the concept nor
the supporting technologies appear sufficiently mature to justify any near-term
decisions such as canceling LPD-17 [procurement] in favor of MPF(F) ships, or
removing the well deck from the big deck amphibious assault platforms, both of
which would severely curtail the [fleet’s] ability to launch surface assaults over
the longer term.
Given these large uncertainties, no major moves toward the sea basing vision
should be made without further exploring the sea basing concept itself, and
experimenting with different numbers and types of sea base platforms,
connectors, and capabilities.58
Observations
Observations about the CNA, OFT, and CSBA reports can be made on several
points, including the following:
! organizations and authors;
! analytical approach;
56 CSBA report, slides 227 and 236.
57 CSBA report, slides 228-232, and 307.
58 CSBA report, slide 212.

CRS-47
! use of prospective ship-procurement funding levels as a force-
planning consideration;
! fleet size and structure;
! whether the recommended force qualifies as an alternative fleet
architecture;
! fleet capability;
! transition risks; and
! implications for the industrial base.
Each of these is discussed below.
Organizations and Authors.
CNA Report. CNA is a federally funded research and development center
(FFRDC) that does much of its analytical at the Navy’s request. The CNA report’s
discussion of how crew rotation may alter force-level requirements for maintaining
day-to-day forward deployments is somewhat detailed and may have been adapted
from other work that CNA has done on the topic for the Navy.
OFT Report. The OFT report was prepared under the direction of retired Navy
admiral Arthur Cebrowski, who was the director of OFT from October 29, 2001 until
January 31, 2005 and the President of the Naval War College (NWC) from July 24,
1998 to August 22, 2001. During his time at NWC and OFT, Cebrowski was a
leading proponent of network-centric warfare and distributed force architectures.
CSBA Report. The CSBA report was prepared by Robert Work, CSBA’s
analyst for maritime issues. CSBA describes itself as “an independent, policy
research institute established to promote innovative thinking about defense planning
and investment strategies for the 21st century. CSBA’s analytic-based research
makes clear the inextricable link between defense strategies and budgets in fostering
a more effective and efficient defense, and the need to transform the US military in
light of an emerging military revolution.”59 CSBA’s Executive Director is Dr.
Andrew F. Krepinevich, Jr., whose previous experience includes work in DOD’s
Office of Net Assessment, the office directed by Andrew Marshall. Krepinevich is
generally considered a major writer on defense transformation.
Analytical Approach.
CNA Report. The CNA report grounds its analysis in traditional DOD force-
planning considerations and campaign modeling. The report cites past DOD force-
planning studies that reflect similar approaches. The implicit argument in the CNA
report is that its findings have weight in part because they reflect a well-established
and systematic approach to the problem.
59 See CSBA’s website [http://www.csbaonline.org].

CRS-48
OFT Report. In contrast to the CNA report, the OFT report “calls into
question the viability of the longstanding logic of naval force building.”60 The OFT
report grounds its analysis in four major force-design principles that the report
identifies as responsive to future strategic challenges and technological
opportunities.61 The report then seeks to design a fleet that it is consistent with these
principles, and assesses that fleet using a new set of metrics that the report believes
to be consistent with these principles. The implicit argument in the OFT report is
that its findings have weight in part because they reflect major force-design principles
that respond to future strategic challenges and technological opportunities.
CSBA Report. The CSBA report employs an extensive historical analysis of
the missions and structure of the U.S. Navy and other navies. The report argues that
the structure of the U.S. Navy has shifted over time in response to changes in
technology and U.S. security challenges, and that U.S. military forces have entered
a new security era (which the report calls the “Joint Expeditionary Era”) during
which the U.S. Navy will need to do three things.62 To do these three things, the
report argues, the Navy should be structured to include four different force
elements.63 The report constructs these four force elements and then combines them
to arrive at an overall recommended Navy force structure. The implicit argument in
the CSBA report is that its findings have weight in part because they reflect insights
about future missions and force requirements gained through careful historical
analysis of the missions and structure of the U.S. Navy and other navies.
Prospective Ship-Procurement Funding Levels as Consideration.
CNA Report. The CNA report aims at designing a cost-effective fleet. It also
mentions cost estimates relating to the option of homeporting additional attack
submarines at Guam.64 Prospective ship-procurement funding levels, however, are
not prominently featured in the CNA report as a force-planning consideration.
OFT Report. Prospective ship-procurement funding levels are a significant
force-planning consideration in the OFT report. The report argues that an important
metric for assessing a proposed fleet architecture is the ease or difficulty with which
it can be scaled up or down to adapt to changes in ship-procurement funding levels.
60 OFT report, p. 1.
61 The principles are complexity, smaller ships and improved payload fraction,
network-centric warfare, and modularity.
62 These three things are: (1) contribute to the global war on terrorism (GWOT); (2) prepare
for possible nuclear-armed regional competitors; and (3) hedge against the possibility of a
disruptive maritime competition with China.
63 These four force elements are: (1) a sea-based power-projection and regional deterrence
force; (2) a global patrol, GWOT, and homeland defense force; (3) a force for prevailing
over enemy anti-access/area-denial forces; and (4) a strategic deterrence and dissuasion
force.
64 CNA Report, p. 36.

CRS-49
The OFT report contains a fairly detailed discussion of the Navy’s budget
situation that calls into question, on several grounds, the Navy’s prospective ability
to afford its 375-ship proposal. The report concludes that funding for Navy ship-
procurement in future years may fall as much as 40% short of what would be needed
to achieve the Navy’s 375-ship fleet proposal. If the shortfall is 40%, the report
estimates, the Navy could maintain a force of 270 to 315 ships, which is comparable
in number to today’s force of 288 ships, except that the future force would include
a substantial number of relatively inexpensive LCSs. If proportionate reductions are
applied to the OFT fleets shown in Table 6, Alternative A would include 402 to 469
ships, Alternative B would include 557 to 650 ships, and Alternative C would include
609 to 711 ships. Again, these totals would not include certain kinds of ships
(independently operating SSNs, etc.) that are included in the total of 270 to 315 ships
associated with the Navy’s currently planned architecture.
CSBA Report. As with the OFT report, prospective ship-procurement funding
levels are a significant force-planning consideration in the CSBA report. The CSBA
report estimates that in future years, the Navy may have an average of about $10
billion per year in ship-acquisition funding. The report then aims at designing a force
whose ships could be acquired for this average annual amount of funding.
Fleet Size and Structure.
CNA Report. The 380-ship fleet at the high end of the CNA range is similar
in size and composition to the Navy’s 375-ship fleet proposal. The 256-ship fleet at
the low end of the CNA range is similar in size and composition to the Navy’s 260-
ship fleet for FY2035, except that the 260-ship fleet has more LCSs and fewer ships
in the “other ships” category.65
OFT Report. The OFT-recommended fleet would have a much larger total
number of ships than the Navy’s planned fleet. The OFT fleet would also feature a
much larger share of small combatants. Of the ships shown in Table 6, the small
combatants account for about 75% in Alternative A, about 79% in Alternative B, and
about 72% in Alternative C. (Adding into the mix SSNs and other kinds of ships not
shown in Table 6 would reduce these percentages somewhat.) In the Navy’s notional
260- and 325-ship fleets, by contrast, LCSs account for about 25% of the total
number of ships.
The OFT architecture is similar in certain ways to a fleet architecture proposed
by the Naval Surface Warfare Center (NSWC) between 1989 and 1992 and
sometimes referred to as the Carrier of Large Objects (CLO) proposal. The NSWC
architecture, like the OFT architecture, employed a common hull design for a large
65 Additional points of comparison: The CNA range of 256 to 380 ships overlaps with
potential ranges of 290 to 375 ships, 260 to 325 ships, and 243 to 302 ships presented in the
Navy’s February 2005 testimony to Congress. The mid-point of the CNA-recommended
range (318 ships) is similar in terms of total numbers of ships to the 310-ship fleet from the
2001 Quadrennial Defense Review (QDR). Unlike the 2001 QDR fleet, however, the
CNA-recommended force includes several dozen Littoral Combat Ships (LCSs) and smaller
numbers of other kinds of ships.

CRS-50
ship that could be built in several variants for various missions, including aviation,
missile launching and fire support, amphibious warfare, logistics support, and
mother-ship support of small, fast, surface combatants. The small, fast surface
combatants in the NSWC architecture were called scout fighters and were in the same
general size range as the 100- and 1,000-ton surface combatants in the OFT
architecture.66
CSBA Report. The CSBA force would have about the same total number of
ships as the Navy’s 375-ship fleet proposal. CSBA’s subtotals for some ship
categories are similar to subtotals in one or more of the other fleet proposals shown
in Table 5. Significant differences between the CSBA proposal and the other fleet
proposals shown in Table 7 include:
! the four medium-sized aircraft carriers (CVEs);
! the conversion of a carrier into an afloat forward staging base;
! the composition of the cruiser-destroyer force (which would include
SCXs rather than DD(X)s and CG(X)s);
! the composition of the amphibious fleet (which would have
additional LPD-17s in lieu of today’s LSD-41/49s); and
! the composition of the maritime prepositioning force (which would
continue to include, for a time at least, today’s MPF ships rather than
the Navy’s planned MPF(F) ships).
Does it Qualify as an Alternative Force Architecture.
CNA Report. As mentioned earlier, the CNA report uses essentially the same
kinds of ships and naval formations as those planned by the Navy. If an alternative
fleet platform architecture is defined as one that uses ship types or naval formations
that differ in some significant way from those currently used or planned, then the
CNA-recommended force arguably would not qualify as an alternative fleet platform
architecture.
OFT Report. Since the OFT report proposes building ships that are
substantially different from those currently planned, and combines them ships into
formations which, although similar in name to currently planned formations (i.e.,
CSGs, ESGs, and SSGs), might be viewed by some observers as substantially
different in composition from the currently planned versions of these formations, the
66 For more on this proposed fleet architecture, see Norman Polmar, “Carrying Large
Objects,” U.S. Naval Institute Proceedings, December 1990, pp. 121-122; Michael L.
Bosworth et al, “Multimission Ship Design for an Alternative Fleet Concept,” Naval
Engineers Journal
, May 1991, pp. 91-106; Michael L. Bosworth, “Fleet Versatility by
Distributed Aviation,” U.S. Naval Institute Proceedings, Jan. 1992, pp. 99-102; and Victor
A. Meyer, “Naval Surface Warfighting Vision 2030,” Naval Engineers Journal, May 1992,
pp. 74-88. See also “USN’s ‘2030’ Plan For Future Fleet,” Sea Power, Apr. 1992, pp. 79,
82; Edward J. Walsh, “‘Alternative Battle Force’ Stresses Commonality, Capability,” Sea
Power
, Feb. 1991, pp. 33-35; Robert Holzer, “Navy Floats Revolutionary Ship Design for
Future Fleet,” Defense News, May 14, 1990, pp. 4, 52; and Anne Rumsey, “Navy Plans Ship
Look-A-Likes,” Defense Week, Mar. 13, 1989, p. 3.

CRS-51
OFT-recommended force arguably would qualify as an alternative fleet platform
architecture.
CSBA Report. Since the CSBA report proposes building ships that in some
cases are different from those currently planned, and combines these ships into
formations that in some cases are different in composition from those currently
planned, the CSBA-recommended force arguably would qualify as an alternative fleet
platform architecture, though less dramatically so than the OFT-recommended force.
New Ship Designs.
CNA Report. The CNA report does not propose any ship designs other than
those already planned by the Navy.
OFT Report. The 57,000-ton aircraft carrier in the OFT report would be
roughly the same size as the United Kingdom’s new aircraft carrier design, and
somewhat larger than the U.S. Navy’s 40,000-ton LHA/LHD-type amphibious
assault ships. Compared to the U.S. Navy’s aircraft carriers, which displace 81,000
to 102,000 tons, this ship could be considered a medium-size carrier.
The 57,000-ton missile-and-rocket ship in the OFT report could be considered
similar in some respects to the Navy/DARPA arsenal ship concept of 1996-1997,
which would have been a large, relatively simple surface ship equipped with about
500 VLS tubes.67
The 13,500-ton aircraft carrier in the OFT report would be slightly larger than
Thailand’s aircraft carrier, which was commissioned in 1997, and somewhat smaller
than Spain’s aircraft carrier, which was based on a U.S. design and was
commissioned in 1988. Due to its SES/catamaran hull design, this 13,500-ton ship
would be much faster than the Thai and Spanish carriers (or any other aircraft carrier
now in operation), and might have a larger flight deck. This ship could be considered
a small, high-speed aircraft carrier.
The 1,000- and 100-ton surface combatants in the OFT report could be viewed
as similar to, but smaller than, the 2,500- to 3,000-ton Littoral Combat Ship (LCS).
Compared to the LCS, they would be closer in size to the Streetfighter concept (a
precursor to the LCS that was proposed by retired admiral Cebrowski during his time
at the Naval War College).
The AIP submarine in the OFT report could be similar to AIP submarines
currently being developed and acquired by a some foreign navies.
67 For more on the arsenal ship, see CRS Report 97-455, Navy/DARPA Arsenal Ship
Program: Issues and Options for Congress
, by Ronald O’Rourke; and CRS Report 97-1044,
Navy/DARPA Maritime Fire Support Demonstrator (Arsenal Ship) Program: Issues Arising
From Its Termination
, by Ronald O’Rourke. Both reports are out of print and are available
directly from the author.

CRS-52
CSBA Report. The proposal in the CSBA report for an afloat forward staging
base (AFSB) is similar to other proposals for AFSBs that have been reported in
recent years, though other proposals have suggested using commercial ships or
military sealift ships rather than converted aircraft carriers as the basis for the
AFSB.68
The CVE in the CSBA report, like the 57,000-ton carrier in the OFT report, can
be viewed as a medium-sized carrier. With a full load displacement of perhaps about
40,000 tons, the CVE would be somewhat smaller than the 57,000-ton carrier and
consequently might embark a smaller air wing. The CVE, however, would be based
on the LHA(R) amphibious ship design rather than a merchant-like hull, and
consequently could incorporate more survivability features than the 57,000-ton
carrier.
The proposal in the CSBA report for a new undersea superiority system with a
procurement cost 50% to 67% that of the Virginia-class SSN design is similar to the
Tango Bravo SSN discussed earlier in this testimony.
The proposals in the CSBA report for a reduced-cost new-design surface
combatant called the SCX, and for a low-cost gunfire support ship, are broadly
similar to the options for a reduced-cost new-design surface combatant discussed
earlier in this testimony.
Fleet Capability.
CNA Report. The CNA report uses essentially the same kinds of ships and
formations as planned by the Navy, and recommends generally the same numbers of
ships as a function of force-planning variables such as use of crew rotation. As a
consequence, the CNA-recommended force range would be roughly similar in overall
capability to the Navy’s planned architecture.
OFT Report. The OFT architecture differs so significantly from the Navy’s
planned architecture that assessing its capability relative to the Navy’s planned
architecture is not easy. As a general matter, the OFT report stresses overall fleet
survivability more than individual-ship survivability, and argues that fleet
effectiveness can be enhanced by presenting the enemy with a complex task of
having to detect, track, and target large numbers of enemy ships. The OFT report
68 See, for example, Stephen M. Carmel, “A Commercial Approach to Sea Basing — Afloat
Forward Staging Bases,” U.S. Naval Institute Proceedings, Jan. 2004, pp. 78-79;
Christopher J. Castelli, “Budget Anticipates Developing MPF(F) Aviation Variant From
LMSR,” Inside the Navy, Jan. 19, 2004; Christopher J. Castelli, “Brewer Proposes
Commercial Ship To Test Seabasing Technologies,” Inside the Navy, Jan. 27, 2003;
Christopher J. Castelli, “In POM-04, Navy Cancels JCC(X), Plans To Substitute MPF(F)
Variant,” Inside the Navy, Sept. 2, 2002; Christopher J. Castelli, “Navy May Develop New
Support Ships, Pursue Sealift Experimentation,” Inside the Navy, May 27, 2002.

CRS-53
argues that in addition to warfighting capability, a fleet can be judged in terms of its
capability for adapting to changes in strategic demands and funding levels.69
Readers who agree with most or all of these propositions might conclude that
the OFT-recommended architecture would be more capable than the Navy’s planned
architecture. Readers who disagree with most or all of these propositions might
conclude that the OFT-recommended architecture would be less capable than the
Navy’s planned architecture. Readers who agree with some of these propositions but
not others (or who agree with these propositions up to a certain point, but less
fervently than OFT), might conclude that the OFT-recommended architecture might
be roughly equal in total capability to the Navy’s planned architecture.
In addressing the question of fleet capability, the OFT report states:
Alternative fleet formations consisting of small fast and relatively
inexpensive craft combining knowledge and attaining flexibility through
networking appear superior to the programmed fleet for non-traditional warfare
in a variety of settings. This is due to increasing the complexity the enemy faces
and increasing U.S. fleet options that in turn reduce enemy options. The speed
and complexity of the alternative fleets can provide them with the capability to
complicate and possibly defeat the attempts of non-traditional adversaries to
69 The OFT report argues that its recommended fleet architecture would:
! “provide a quantum leap ahead in capabilities against a spectrum of
enemies ranging from large, highly developed competitors to small but
determined asymmetric adversaries” (page 6) and be adaptable, in a
dynamic and less-predictable security environment, to changing strategic
or operational challenges;
! be capable of both participating in joint expeditionary operations and
maintaining “the strategic advantage the Navy has developed in the global
commons,” avoiding a need to choose between optimizing the fleet for
“performance against asymmetric challenges at the expense of its ability
to confront a potential adversary capable of traditional high intensity
conflict,”such as China; (pages 1 and 2)
! pose significant challenges to adversaries seeking to counter U.S. naval
forces due to the “large numbers of combat entities that the enemy must
deal with; a great variety of platforms with which the enemy must
contend; speed; different combinations of forces; distribution of forces
across large areas; and [adversary] uncertainty as to the mission and
capabilities of a given platform;” (page i)
! permit more constant experimentation with new operational concepts, and
thereby achieve higher rates of learning about how to evolve the fleet over
time; and
! recognize potential future constraints on Navy budgets and make the Navy
more smoothly scalable to various potential future resource levels by
shifting from a fleet composed of limited numbers of relatively expensive
ships to one composed of larger numbers of less expensive ships.

CRS-54
elude surveillance. The enemy could have difficulty determining what to expect
and how to defeat them all. The superior speed and more numerous participants
than in the programmed fleet provide a stronger intelligence base and more
numerous platforms from which to conduct strikes and interceptions. This
appears to be true even if the smaller craft are individually somewhat less
capable and less able to sustain a hit than the larger ships in the programmed
fleet.
If these circumstances are not achieved, and the enemy can continue to
elude and deceive, the [Navy’s] programmed fleet often is as good as the [OFT]
alternatives, sometimes even better. It is not necessarily better in cases in which
individual ship survivability dominates, a perhaps counterintuitive result until we
realize that fleet survivability not individual ship survivability is what dominates.
An area in which programmed fleets might have an advantage would be
when the long loiter time or deep reach of CTOL [conventional takeoff and
landing] aircraft on programmed big-deck CVNs [nuclear-powered aircraft
carriers] is needed. That said, there need be no great sacrifice. With airborne
tanking, the VSTOL [very short takeoff and landing] aircraft in the alternatives
could meet the deep strike and long loiter demands. Also, as mentioned earlier,
a combination of advances in EMALS [electromagnetic aircraft launch system]
and modifications to the JSF will make it possible to launch the JSF with only
a marginal range-payload capability penalty. Moreover, trends in technology are
providing unmanned aircraft greater capability, including greater loiter time and
sensor capability.70
CSBA Report. The CSBA report argues that its architecture would provide
a total capability equal to that of the Navy’s planned architecture, but at a lower total
cost, because the CSBA architecture would:
! employ new ship designs, such the new undersea superiority system
and the SCX, that, because of their newer technologies, would cost
less than, but be equal in capability to, current designs such as the
Virginia-class SSN and DD(X) destroyer; and
! make more use of the LPD-17 hull design, whose basic design costs
have already been paid, and which can be produced efficiently in
large numbers and adapted economically to meet various mission
requirements.
It is plausible that using newer technologies would permit new, reduced-cost,
ship designs to be more capable than such designs would have been in the past.
Whether the increases in capability would always be enough to permit these ships to
be equal in capability to more expensive current designs is less clear. The Navy may
be able to achieve this with a new SSN design, because several new submarine
technologies have emerged since the Virginia-class design was developed in the
1990s, but achieving this with a new large surface combatant design could be more
challenging, because the DD(X) design was developed within the last few years and
few new surface combatant technologies may have emerged since that time. If one
70 OFT report, pp. 75-76. Italics as in the original.

CRS-55
or more of the reduced-cost designs turn out to be less capable than current designs,
then the CSBA architecture would not generate as much total capability as the report
projects.
The CSBA report also argues that its architecture would produce a force with
a mix of capabilities that would better fit future strategic demands. To achieve this,
the report recommends, among other things, reducing currently planned near-term
procurement of new destroyers and MPF(F) ships, increasing currently planned
procurement of new amphibious ships, and a changing the currently planned
investment mix for aircraft carriers.
Readers who agree with CSBA’s description of future strategic demands, and
who agree that CSBA’s recommended investment changes respond to those demands,
might conclude that the CSBA-recommended architecture would be better optimized
than the Navy’s planned architecture to meet future needs. Readers who disagree
with one or both of these propositions might conclude that the Navy’s planned
architecture might be better optimized, or that neither architecture offers clear
advantages in this regard.
Implementation Risks.
CNA Report. Implementation risks associated with the force recommended
in the CNA report include developing and designing the various types of ships
included in the plan — including in particular the DD(X) destroyer, which is to
incorporate a number of new technologies — and the issue of whether Navy funding
levels in coming years would be adequate to build and maintain the recommended
fleet.
OFT Report. The OFT report does not include a detailed plan for transitioning
from today’s fleet architecture to its proposed architecture,71 but such a plan could be
71 On the topic of transitioning to the proposed fleet architecture, the report states:
Implementation of the alternative fleet architecture should start now and
should target option generation, short construction time, and technology
insertion. The alternative further provides an opportunity to reinvigorate the
shipbuilding industrial base. The many smaller ships, manned and unmanned, in
the alternative fleet architecture could be built in more shipyards and would be
relevant to overseas markets. The potential longevity of the existing fleet will
sustain existing shipyards as they move into building smaller ships more rapidly
in this broader market and more competitive environment. The shipyards would
develop a competence, broad relevance, and operate in an environment driven by
market imperatives instead of a framework of laws that frustrates market forces.
As the new ships enter service and the fleet has the opportunity to
experiment with new operational concepts (expanded network-centric warfare
in particular) existing ships can be retired sooner to capture operations savings.
At this point, the sooner the existing fleet is retired, the sooner the benefits of the
alternative fleet architecture design will accrue. (Page 3)
(continued...)

CRS-56
developed as a follow-on analysis. The plan could involve replacing existing ship
designs and associated formations as they retire with OFT’s recommended new ship
designs and associated formations. Implementation risks associated with the force
recommended in the OFT report include developing and designing the eight new
types of ships included in the plan, including the four types of large ships based on
the 57,000-ton commercial-like hull, the 13,500-ton SES/catamaran aircraft carrier
(since it would be much larger than other SES/catamaran ships), the AIP submarine
(since the AIP technology is relatively new and a non-nuclear-powered submarine
has not been designed and built for the U.S. Navy since the 1950s), and the 1,000-
and 100-ton surface combatants (since new technologies are needed to achieve the
increased payload fraction that these ships are to have). The OFT-recommended
force could pose implementation risks due to the new kinds of naval formations that
would be used, which could require development of new doctrine, concepts of
operations, and tactics.
CSBA Report. A stated goal of the CSBA report is to provide a detailed,
practical transition road map for shifting from today’s fleet structure to the report’s
recommended fleet structure. The many specific recommendations made in the
report could be viewed as forming such a road map. Implementation risks associated
with the force recommended in the CSBA report include developing and designing
the reduced-cost SSN and the reduced-cost SCX surface combatant, particularly since
these two new ship designs are be equal in capability to the more expensive designs
they would replace.
Implications For Industrial Base.
CNA Report. Since the CNA report uses essentially the same kinds of ships
and naval formations as those in use today or planned by the Navy, and recommends
similar numbers of ships, the industrial-base implications of the CNA-recommended
force would appear to be similar to those of the Navy’s current plans.
OFT Report. The OFT report seeks to reduce unit shipbuilding costs, and
thereby permit an increase in total ship numbers, by shifting the fleet away from
complex, highly integrated ship designs that are inherently expensive to build and
toward less-complex merchant-like hulls and small sea frames that are inherently less
expensive to build. Similarly, the OFT report seeks to increase shipbuilding options
for the Navy by shifting the fleet away from complex, highly integrated ship designs
that can be built only by a limited number of U.S. shipyards and toward less-complex
merchant-like hulls and small sea frames that can be built by a broader array of
shipyards. The OFT report also aims to make it easier and less expensive to
modernize ships over their long lives, and thereby take better advantage of rapid
developments in technology, by shifting from highly integrated ship designs to
merchant-like hulls and sea frames.
As a consequence of these objectives, the OFT report poses a significant
potential business challenge to the six shipyards that have built the Navy’s major
71 (...continued)
Additional general discussion of implementation is found on pp. 76-77 of the report.

CRS-57
warships in recent years. The report’s discussion on implementing its proposed
architecture states in part:
The shipbuilding industrial base would also need to start to retool to build
different types of ships more rapidly. Smaller shipyards, which presently do
little or no work for the Navy could compete to build the smaller ships, thereby
broadening the capabilities base of ship design and construction available to the
Navy. The change to smaller, lower unit cost ships would also open up overseas
markets. With more shipyards able to build the ships and potential for a broader
overall market, the U.S. shipbuilding industry would have the chance to expand
its competence, innovation and relevance. Taken together this would sharpen the
industry’s ability to compete and provide alternatives to a ship procurement
system that is beset by laws and regulations that frustrate, even pervert, market
forces.72
The report’s concluding section lists five “dangers” that “risk the Navy’s ‘losing
the way.’” One of these, the report states, is “Shielding the shipbuilding industrial
base from global competition,” which the report states “guarantees high cost, limited
innovation, and long cycle times for building ships.”73
CSBA Report. The CSBA report similarly raises significant potential issues
for the six shipyards that have built the Navy’s major warships in recent years. The
report states that “Rationalizing the defense industrial base is... a critical part of
DoN’s [the Department of the Navy’s] maritime competition strategy, and should be
the subject of immediate consideration and deliberation by the Congress, DoD, and
the DoN.”74 The report states:
Numerous studies have indicated that the six Tier I yards [i.e., the six yards that
have built the Navy’s major warships in recent years] have “exorbitant excess
capacities,” which contribute to the rising costs of [Navy] warships, primarily
because of high industrial overhead costs. These capacities are the result of
“cabotage laws and fluctuating national security acquisition policies that force
shipbuilders of combatants to retain capacities to address required surges in
coming years.” This last point is especially important: the DoN contributes
greatly to the problem of “exorbitant capacities” by its consistent tendency to
portray overly optimistic ramp ups in ship production in budget “out years.”75
The report recommends the following as part of its overall transition strategy:
! Minimize production costs for more expensive warships (defined in
the report as ships costing more than $1.4 billion each) by
consolidating production of each kind of such ship in a single
shipyard, pursuing learning curve efficiencies, and requesting use of
multiyear procurement (MYP) whenever possible.
72 OFT report, p. 76.
73 OFT report, p. 80.
74 CSBA report, slide 314.
75 CSBA report, slide 315.

CRS-58
! Minimize production costs for warships and auxiliaries costing less
than $1.4 billion each by emphasizing competition, shifting
production to smaller “Tier II” yards, using large production runs,
and enforcing ruthless cost control.76
The report states that “the strategy developed in this report suggests that [Navy]
planners might wish to:”
! maintain production of aircraft carriers at NGNN,
! consolidate production of large surface combatants and amphibious
ships at NG/Ingalls, and
! consolidate submarine building GD/EB, or with a new, single
submarine production company.77
The report states that the second of these possibilities is guided by the building
sequence of LPD-17s and SCXs recommended in the report, NG/Ingalls’ ability to
build a wider variety of ships than GD/BIW, NG/Ingalls’ surge capacity, and the
availability of space for expanding NG/Ingalls if needed.78
The report states that the third of these possibilities is guided by the low
probability that procurement of Virginia-class submarines will increase to two per
year, the cost savings associated with consolidating submarine production at one
yard, GD/EB’s past experience in building SSBNs and SSNs, GD/EB’s surge
capacity, and the fact that building submarines at GD/EB would maintain two
76 CSBA report, slide 316. Other steps recommended as part of the report’s overall
transition strategy (see slides 124 and 125) include the following:
! Plan to a fiscally prudent steady-state shipbuilding budget of $10 billion
per year.
! Maximize current capabilities and minimize nonrecurring engineering
costs for new platforms by maintaining and pursuing hulls in service, in
production or near production that can meet near- to mid-term GWOT
requirements and that are capable of operating in defended-access
scenarios against nuclear-armed regional adversaries.
! Identify and retain or build large numbers of common hulls that have a
large amount of internal reconfigurable volume, or that can carry a variety
of modular payloads, or that can be easily modified or adapted over time
to new missions.
! Pursue increased integration of Navy and Marine warfighting capabilities
and emphasize common systems to increase operational effectiveness and
reduce operation and support (O&S) costs.
! Focus research and development efforts on meeting future disruptive
maritime challenges, particularly anti-access/area-denial networks
composed of long-range systems and possibly weapons of mass
destruction.
77 CSBA report, slides 317-318.
78 CSBA report, slide 318.

CRS-59
shipyards (GD/EB and NGNN) capable of designing and building nuclear-powered
combatants of some kind.79
The report acknowledges that yard consolidation would reduce the possibilities
for using competition in shipbuilding in the near term and increase risks associated
with an attack on the shipbuilding infrastructure, but notes that DOD consolidated
construction of nuclear-powered carriers in a single yard years ago, and argues that
competition might be possible in the longer run if future aircraft-carrying ships, the
SCX, and the new undersea superiority system could be built in Tier II yards.80
The report states:
Given their current small yearly build numbers, consolidating construction of
aircraft carriers, surface combatants, and submarines in one yard [for each type]
makes sense. However, the same logic does not hold true for auxiliaries and
smaller combatants. These ships can normally be built at a variety of Tier I and
Tier II yards; competition can thus be maintained in a reasonable and cost-
effective way. For example, competing auxiliaries and sea lift and maneuver sea
base ships between NASSCO, Avondale, and Tier II yards may help to keep the
costs of these ships down.
Building multiple classes of a single ship [type] is another prudent way to
enforce costs, since the DoN can divert production of any ship class that exceeds
its cost target to another company/class that does not. Simultaneously building
both the [Lockheed] and [General Dynamics] versions of [the] LCS, and the
Northrop Grumman National Security Cutter, Medium [i.e., the medium-sized
Deepwater cutter] gives the DoN enduring capability to shift production to
whatever ship stays within its cost target....
Of course, Congress and the DoN may elect to retain industrial capacity, and to
pay the additional “insurance premium” associated with having excess
shipbuilding capacity. For example: Congress and the DoN might wish to retain
two submarine yards until the [undersea superiority system] design is clear, and
wait to rationalize the submarine building base after potential [undersea
superiority system] yearly production rates are clear....
In a similar vein, Congress and the DoN might wish to retain two surface
combatant yards until the design of the SCX is clear, and wait to rationalize the
surface combatant building base after potential SCX yearly production rates are
clear. In this regard, Congress could consider authorizing a modest additional
number of [Aegis destroyers] to keep both BIW and Ingalls “hot” until the SCX
is designed....
The key point is that the US shipbuilding infrastructure must be rationally sized
for expected future austere shipbuilding budgets, and whatever fiscally prudent
[Navy] transition plan is finally developed by DoN planners.81
79 CSBA report, slide 318. See also slide 298.
80 CSBA report, slides 318-319.
81 CSBA report, slide 319.

CRS-60
Summary
In summary, the following can be said about the three reports:
! The CNA report presents a fairly traditional approach to naval force
planning in which capability requirements for warfighting and for
maintaining day-to-day naval forward deployments are calculated
and then integrated. The CNA-recommended force parallels fairly
closely current Navy thinking on the size and composition of the
fleet. This is perhaps not surprising, given that much of CNA’s
analytical work is done at the Navy’s request.
! The OFT report fundamentally challenges current Navy thinking on
the size and composition of the fleet, and presents an essentially
clean-sheet proposal for a future Navy that would be radically
different from the currently planned fleet. This is perhaps not
surprising, given both OFT’s institutional role within DOD as a
leading promoter of military transformation and retired admiral
Cebrowski’s views on network-centric warfare and distributed force
architectures.
! The CSBA report challenges current Navy thinking on the size and
composition of the fleet more dramatically than the CNA report, and
less dramatically than the OFT report. Compared to the CNA and
OFT reports, the CSBA report contains a more detailed
implementation plan and a more detailed discussion of possibilities
for restructuring the shipbuilding industrial base.

CRS-61
Appendix C: Size of Navy and Navy Shipbuilding
Rate
The total number of battle force ships in the Navy reached a late-Cold War peak
of 568 at the end of FY1987 and began declining thereafter.82 The Navy fell below
300 battle force ships in August 2003 and included 281 battle force ships as of
February 14, 2006.
Table 8 below shows past (FY1982-FY2006) and projected (FY2007-FY2011)
rates of Navy ship procurement.
Table 8. Battle Force Ships Procured (FY1982-FY2006) or
Projected (FY2007-FY2011)
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
17
14
16
19
20
17
15
19
15
11
11
7
4
4
5
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
4
5
5
6
6
6
5
7
8
6
7
7
11
12
14
Source: CRS compilation based on examination of defense authorization and appropriation
committee and conference reports for each fiscal year. The table excludes non-battle force ships that
do not count toward the 310- or 375- ship goal, such as sealift and prepositioning ships operated by
the Military Sealift Command and oceanographic ships operated by agencies such as the National
Oceanic and Atmospheric Administration (NOAA).
82 Some publications, such as those of the American Shipbuilding Association, have stated
that the Navy reached a peak of 594 ships at the end of FY1987. This figure, however, is
the total number of active ships in the fleet, which is not the same as the total number of
battle force ships. The battle force ships figure is the number used in government
discussions of the size of the Navy. In recent years, the total number of active ships has
been larger than the total number of battle force ships. For example, the Naval Historical
Center states that as of Nov. 16, 2001, the Navy included a total of 337 active ships, while
the Navy states that as of Nov. 19, 2001, the Navy included a total of 317 battle force ships.
Comparing the total number of active ships in one year to the total number of battle force
ships in another year is thus an apple-to-oranges comparison that in this case overstates the
decline since FY1987 in the number of ships in the Navy. As a general rule to avoid
potential statistical distortions, comparisons of the number of ships in the Navy over time
should use, whenever possible, a single counting method.