Order Code RL30624
CRS Report for Congress
Received through the CRS Web
Military Aircraft, the F/A-18E/F
Super Hornet Program:
Background and Issues for Congress
Updated July 13, 2005
Christopher Bolkcom
Specialist in National Defense
Foreign Affairs, Defense and Trade Division
Congressional Research Service ˜ The Library of Congress


Military Aircraft, the F/A-18E/F Super Hornet Program:
Background and Issues for Congress
Summary
The F/A-18E/F Super Hornet is the Navy’s highest priority aviation
modernization program. It is replacing Navy F-14 Tomcat and F/A-18C/D Hornet
combat aircraft.

The decision to undertake F/A-18E/F Super Hornet program was made during
a period of great turbulence in Navy aviation modernization. During this time frame
the Navy struggled to identify and implement the best way to modernize its aging
fleet of F-14 fighters and A-6E attack aircraft. The A-12 program (a stealthy
replacement to the A-6E) was terminated in January 1991. The AFX program,
another proposed replacement for the A-6E, began in 1991, but was also terminated.
The principal alternative to the F/A-18E/F was a modest upgrade of the F-14
— a large, two-seat fighter designed in the 1960s, with potential air-to-surface attack
capabilities. Some observers describe the F/A-18E/F as an upgraded and larger
version of the F/A-18C/D, with increased range and payload capacity and more space
and weight for future improvements. Others assert that the differences between the
baseline Hornet aircraft and the E/F model are so great that they would describe the
Super Hornet as an entirely new aircraft.
The Department of Defense is currently facing a shortage of radar and
communications jamming capability. The Navy and Marine Corp’s EA-6B Prowlers
escort and protect Navy, Marine Corps and Air Force aircraft operating in hostile
airspace. The Prowlers, however, are few and rapidly aging.1 All the Services are
evaluating preferred approaches to ameliorating this shortfall. The Navy’s preferred
approach is to produce a new electronic attack aircraft based on the F/A-18F, called
the EA-18G.
The Defense Department’s Selected Acquisition Report (SAR) of December 31,
2004, estimated the acquisition cost of a 462-aircraft program at $43.98 billion. The
cost of procuring 90 EA-18G electronic attack variants is estimated at $8.65 billion.
The Super Hornet has been approved for international export, but no sales have been
made as of July 2005.
Key issues surrounding the program include how many Super Hornets should
ultimately be procured, and management of the E/F multi-year procurement contract,
and the commonality between the F and G variants.
1 See CRS Report RL30639 for more information on the EA-6B and Electronic Warfare.


Contents
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
The F/A-18E/F Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
System Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Costs, Purchases and Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Sales, Operations, and Basing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
EA-18G “Growler” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Key Issues for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Number of Super Hornets to be Procured . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Program Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Congressional Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
List of Figures
Figure 1. Comparison of F/A-18 Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
List of Tables
Table 1. Comparison of F/A-18 C/D and E/F . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Table 2. F/A-18E/F/G FY2006 Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Table 3. F/A-18E/F/G FY2005 Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12


Military Aviation, the F/A - 18E/F Super
Hornet Aircraft Program: Background and
Issues for Congress
Introduction
The F/A-18E/F Super Hornet is the Navy’s highest priority aviation
modernization program, replacing Navy F-14 Tomcat and F/A-18C/D Hornet combat
aircraft.2 It has been employed in conflicts in Afghanistan and Iraq and is currently
in full rate production. Principal issues surrounding the program include the number
of Super Hornets to be procured and how well the program is being managed.
Background
The decision to undertake the F/A-18E/F Super Hornet program was made
during a period of great turbulence in Navy aviation modernization, when the Navy
was struggling to identify and implement the best way to modernize its aging fleet
of F-14 fighters and A-6E attack aircraft. The A-12 program (a stealthy replacement
to the A-6E) was terminated in January 1991. The AFX program, another proposed
replacement for the A-6E, began in 1991, but was also terminated. Efforts to develop
a carrier-based naval version of the Air Force’s F-22 Advanced Tactical Fighter were
abandoned in 1991 and proposals for a carrier-capable version of the Air Force’s
F-117 were never endorsed by Navy leadership.
In the midst of these program starts and stops, the principal alternative to the
F/A-18E/F (a major upgrade of the F/A-18, a smaller, one- or two-seat strike-fighter
designed in the 1970s as a lower-cost supplement to the F-14) was a modest upgrade
of the F-14: a large, two-seat fighter designed in the 1960s with potential
air-to-surface attack capabilities.
Proponents of the F/A-18E/F argued that upgrading the F/A-18 to take over the
F-14’s air-to-air combat mission would cost less in procurement and operating
expenses than upgrading the F-14 to take over the F/A-18’s air-to-surface attack
mission. Some also argued that the F-14’s long-range air defense mission, known
as the outer air battle, will be less important in the post-Cold War era, when naval
aircraft are expected to be used at shorter ranges in littoral (off-shore) operations in
2 The Navy currently operates four squadrons of F-14s, composed of 39 aircraft. All are
expected to be retired by July 2006. The F-35 Joint Strike Fighter (JSF) program, currently
projected by Defense Department officials to produce up to 680 new fighter/attack planes
for the Navy and Marine Corps, could yield operational aircraft in 2012.


CRS-2
Third-World scenarios. Competing upgrade options were proposed for both the F-14
and the F/A-18. In 1992, the House and Senate Armed Services Committees
recommended development of both the F/A-18E/F and an attack-capable version of
the F-14 (P.L. 102-484, Section 125).
The F/A-18E/F program began officially in May 1992 when the Defense
Acq u i s i t i o n B o a r d ( D A B ) a p p r o v e d t h e c o m m e n c e m e n t o f
engineering/manufacturing development (EMD). On July 21, 1992, the Navy
awarded two contracts to get EMD under way: McDonnell Douglas received $97
million from a $3,964-million contract to develop the airframe and General Electric
received $94 million from a $754-million contract to develop the F414-GE-400
engine. On September 18, 1995, the Navy received the first of seven EMD aircraft
to be flight-tested in 1995-98. By September 1997, these test planes had logged
some 1,500 flight hours, with carrier-based flights beginning in January 1997 aboard
the USS John C. Stennis.
Although derived from an existing aircraft, the F/A-18E/F suffered noteworthy
developmental challenges. In 1996, flight testing was suspended when problems
with the Super Hornet’s engines caused the aircraft to be grounded. The Super
Hornet fleet was grounded a second time in 1998 when engine problems resurfaced.
In December 1997, the F/A-18E/F’s persistent performance problems in high-
speed maneuvers led the Navy to delay FY1998 funding for the program, pending
solution of these problems. First experienced in March 1996, the aircraft’s “wing-
drop” problem may occur during turns at speeds of .6 to .9 Mach (speed of sound),
when the wing loses lift and the plane rolls unexpectedly to the left or right,
preventing the pilot from tracking a target. Since this anomaly was apparently related
to the wing’s leading edge, some feared the wing might have to be redesigned; others
thought the problem could be resolved by modifications of the wing, such as adding
a “porous wing fairing.” After successful flight testing of this modification,
Secretary of Defense Cohen approved FY1998 funding for procurement of another
20 aircraft on April 3, 1998.
The Defense Department’s Quadrennial Defense Review (QDR) of May 19,
1997, recommended reducing procurement of F/A-18E/Fs from 1,000 aircraft to 548,
with the possibility of buying up to 785 if the Joint Strike Fighter (JSF) program were
delayed or if the aircraft were too expensive compared to the F/A-18E/F. Defense
Secretary William Cohen stated that this would set up “creative tension” between the
contractors producing the JSF and the F/A-18E/F. The QDR also recommended
reducing the maximum annual production rate to 48 aircraft. These recommendations
were reflected in the FY1999 budget’s procurement projections.
The F/A-18E/F Program
System Description
Some observers describe the F/A-18E/F as an upgraded and larger version of the
F/A-18C/D, with increased range and payload capacity and more space and weight



CRS-3
for future improvements. Other observers assert that the differences between the
baseline Hornet aircraft and the E/F model are so great that they would describe the
Super Hornet as an entirely new aircraft. The single-seat F/A-18E and twin-seat
F/A-18F will replace the single-seat C and twin-seat D versions of the F/A-18, which
have been in production since 1986. Compared to the F/A-18C/D, the F/A-18E/F has
a longer fuselage (+4.3 ft) and a 25% larger wing, providing 33% more internal fuel
capacity (14,500 vs. 10,381 lb.); two additional weapon stations (11 vs. 9); and
survivability improvements (e.g., new electronic warfare equipment and reduced
vulnerable areas). The F/A-18E/F is powered by two upgraded F414-GE-400
engines (developed originally for the A-12), producing 36% more thrust than the
C/D’s F404 engines. Using 480-gal tanks increases the E/F’s external fuel capacity
to 9,800 lb. (vs. the C/D’s 6,700 lb. with 330-gal tanks). The use of low-observable
materials and shaping makes the E/F less detectable by radar than the C/D.
Figure 1. Comparison of
F/A-18 Dimensions
In 1992, the F/A-18’s operational requirements specified a combat radius of 410
nautical miles (nm, 1.15 statute miles) for fighter missions and 430 nm for attack
missions. Such ranges were not achieved by the F/A-18C/D, whose range/payload
capabilities have been reduced by weight growth due to equipment added in
successive upgrades since 1982, when its combat radius was 366 nm in fighter
missions and 415 nm in attack missions. In 1992 the Navy projected the F/A-18E/F’s
fighter combat radius to be about 420 nm, with an attack radius of about 490 nm —
exceeding requirements of 410 nm and 430 nm for these missions. In carrier
landings, the F/A-18E/F could bring back 9,000 lb of fuel/ordnance payload vs. the
C/D’s recovery payload of about 6,000 lb.
These improvements in range, payload, and bring-back capability, are viewed
by the Navy as the primary advantages of the E/F over the C/D. In 1996, the General
Accounting Office seriously questioned the F/A-18E/F’s performance advantages
over the C/D variant, arguing that F/A-18C/Ds could provide similar capabilities at


CRS-4
lower costs.3 The Navy did not agree with these GAO conclusions, which were cited
during Senate debate on the F/A-18E/F program in July 1996.
Table 1. Comparison of F/A-18 C/D and E/F
C/D
E/F
Program Unit
$43 milliona
$95.2 millionb
Acquisition Cost
Propulsion
2 F404-GE-402 turbofans
2 F414-GE-400 turbofans
Thrust
17,700 lbs
22,000 lbs
Speed
Mach 1.7
Mach 1.8
External fuel capacity
6,700 lbs
9,800 lbs
Approx.Un-refueled
Fighter: 366 nm
Fighter: 420 nm
Combat Radius
Attack: 415 nm
Attack: 490 nm
Weapon hard points
9
11
First Flight
November 1978
December 1995
Notes:
a. Selected Acquisition Reports, Dec. 31, 1994, DOD Comptroller. Reflects a purchase of 1,026
aircraft. Figure is adjusted for inflation and expressed in 2006 dollars.
b. Selected Acquisition Reports, December 31, 2004. DOD Comptroller, assumes 462 aircraft
purchase, does not include $8.6 billion estimate to procure 90 EA-18G variants.
The F/A-18E/F’s radar will also differentiate it from earlier models. Under
current plans, 419 of the Super Hornets procured by the Navy will be equipped with
active electronically steered array (AESA) radar.4 Conventional radars are limited,
in part, by the speed with which their antennas can be mechanically moved. Recent
improvements in electronics technology enable AESA radars to update a radar’s
computer several times a second.5 AESA radars are expected to offer up to 30 times
the net radar capability of mechanically steered radars.6 The hope is that they are
more reliable than mechanically steared radars and are able to perform several
different functions almost simultaneously.
3 U.S. General Accounting Office, Navy Aviation: F/A-18E/F Will Provide Marginal
Operational Improvement at High Cost
, GAO/NSIAD-96-98, June 1996.
4 284 aircraft will be procured with AESA radars, 135 are hoped to be retrofitted, starting
in FY2010.
5 David Fulghum, “Cool, Small, Cheap Defines Flexible Next Generation Radar,” Aviation
Week & Space Technology,
Sept. 11, 2000, p. 61.
6 Report of the Defense Science Board Task Force on Future DoD Airborne High Frequency
Radar Needs/Resources, April 2001, Office of the Under Secretary of Defense for
Acquisition and Technology.


CRS-5
Many believe that in addition to seeking out and locking on to enemy targets,
AESA radars will also offer powerful electronic warfare capabilities, specifically the
ability to jam enemy radars that attempt to target the F/A-18E/F.7 It is currently
unclear exactly how effective this jamming capability will be and if it will
complement or compete with the electronic attack capabilities offered by the
proposed EA-18G model. Other Super Hornet upgrades — Advanced Targeting
Forward Looking Infrared (ATFLIR), Joint Helmet Mounted Cuing System
(JHMCS), JDAM Hornet Autonomous Real-Time Targeting Capability, and, for the
F model, the Advanced Crew Station — are hoped to combine with AESA to give
the Super Hornet superior all weather precision attack capabilities against time-
critical targets.8
Costs, Purchases and Schedule
The Defense Department’s Selected Acquisition Report (SAR) of December 31,
2004, estimated the acquisition cost of a 462-aircraft program at $43.98 billion. The
cost of procuring 90 EA-18G electronic attack variants is estimated at $8.65 billion.
The currently planned F/A-18E/F program reflects the Department of the Navy’s
implementation of its Tactical Air Integration Plan (TAI), which includes an 88-
plane reduction in the number of Super Hornets to be procured. The implications for
the overall program, in terms of cost and other factors, is still being studied.9
On December 7, 1998, the Defense Department announced the Navy’s award
of a contract to start production of the 30 aircraft funded in FY1999. Up to seven
production aircraft began operational testing and evaluation (OT&E) flights in late
May of 1999 at China Lake, CA, which continued through November 1999. In
March 2000, Navy test squadron VX-9 reported that the F/A-18EF had passed its six
month OT&E. The squadron flew 1,233 hours in 850 “missions,” performed more
than 24 carrier operations, and participated in a “Red Flag” exercise. Based on this
successful operational evaluation, on June 16, 2000, the Navy announced the signing
of a multi-year contract with Boeing Company for the F/A-18E/F full rate production.
Under the five-year contract, the Navy agreed to pay $8.9 billion for 222 aircraft.
The second F/A-18E/F multi-year procurement contract — estimated at $8.9 billion
over five years to procure 222 aircraft — was awarded in December 2003.
The FY2006 defense budget projected the following annual buys: FY2006: 38;
FY2007: 30; FY2008: 24; FY2009: 20; FY2010: 22; FY2011: 14. The first
7 Lorenzo Cortes, “AESA Allows Super Hornet to Perform Tactical Electronic Attack, Navy
Official Says,” Defense Daily, Dec. 4, 2002 and “New Sensors Grab Extra Combat Roles,”
Aviation Week & Space Technology, Sept. 11, 2000.
8 Stephen Trimble, “Super Hornet Crews Ponder New Missions as Block II Upgrades
Arrive,” Aerospace Daily, Sept. 9, 2003 and Christopher Castelli, “Navy to Integrate JDAM
HART with Super Hornet’s AESA Radar,” Inside the Navy, Oct. 13, 2003.
9 Key elements of the TAI plan is to operate a smaller number of strike fighters, reduce the
planned procurement of strike fighters, increase the readiness of Navy aircraft, increase
funding for modernization, and increase cross-assignment of Navy and Marine Corps fighter
squadrons. For more information, see CRS Report RS21488, Navy-Marine Corps Tactical
Air Integration Plan: Background and Issues for Congress.



CRS-6
production aircraft were delivered in 1999 for operational testing and evaluation,
with initial operating capability (IOC) in 2001.
Sales, Operations, and Basing
In June 2001 the Department of Defense approved the Super Hornet for
international export.10 Malaysia, which currently operates the two-seat F/A-18/D,
appears to be a potential importer. On September 4, 2002, DOD notified Congress
of the potential sale of 18 F/A-18Fs to Malaysia as part of a larger $1.48 billion arms
deal, but as of 2005 no sale has taken place.11 The Indian government plans to import
approximately 125 combat aircraft, and the F/A-18E/F has been discussed as a
potential competitor for this contract.12 Other potential F/A-18E/F importers include
Australia, Finland, Japan, Kuwait, Spain, and Switzerland.
Generally speaking, arguments for foreign military sales tend to focus on
advancing U.S. industry, supporting allied countries, and promoting interoperability
with those countries. Arguments against arms sales tend to focus on the negative
aspects of military technology proliferation and the potential for causing regional
instability. The government approves arms sales on a case-by case basis.13
According to press reports, the Boeing Co., with assistance from the Navy, is
aggressively marketing the Super Hornet for export.14 Despite these efforts,
international orders for the F/A-18E/F have not yet emerged. Some believe that a
lack of international business is hindering Boeing’s efforts to reduce the aircraft’s
price.15
Strike Fighter Squadron 115 (VFA-115), based at Naval Air Station Lemoore,
CA, is the first fleet operational F/A-18E/F squadron. VFA-115 Super Hornets
deployed in the summer of 2002 aboard the USS Abraham Lincoln (CVN-72). This
12-plane squadron flew approximately 90 missions over Afghanistan in support of
Operation Enduring Freedom.16 VFA-115 also deployed to the Persian Gulf region
and participated in Operation Southern Watch, enforcing the “No-Fly Zones” over
Iraq. In November 2002, F/A-18E/F aircraft used the Joint Direct Attack Munition
(JDAM) to attack Iraqi surface-to-air missile systems and a command and control
10 “Boeing’s Super Hornet Cleared for International Sales,” Defense Daily, Aug. 7, 2001.
11 Michael Sirak, “Malaysia Seeks Super Hornets to Augment F/A-18 Fleet,” Jane’s Defence
Weekly,
Sept. 18, 2002.
12 See CRS Report RS22148, Combat Aircraft Sales to South Asia: Potential Implications,
for more information.
13 For more information on arms sales, see CRS Report RS20757 and CRS Report RL31529
(out of print; for copies, contact author at 7-2577).
14 Ron Laurenzo, “Boeing Hunts Abroad for Super Hornet Sales,” Defense Today, Aug. 11,
2004 and Jason Ma, “Navy, Boeing Pitch Super Hornet for Potential International Sales,”
Inside the Navy, Oct. 4, 2004.
15 Robert Wall, “Navy Commitment,” Aviation Week & Space Technology, Jan. 5, 2004.
16 Tony Capaccio, “Boeing Super Hornet, New U.S. Fighter, Begins Patrols Over Iraq,”
Bloomberg.com, Oct. 31, 2002.


CRS-7
communications facility.17 F/A-18E/F squadrons from the aircraft carriers Abraham
Lincoln and Nimitz are participating in Operation Iraqi Freedom.
On September 10, 2003, the Navy released its decision to base eight F/A-18E/F
fleet squadrons and one fleet replacement squadron (120 aircraft) at Naval Air
Station (NAS) Oceana, (VA), two fleet squadrons (24 aircraft) at Marine Corps Air
Station (MCAS) Cherry Point (NC) and to construct an outlying field (OLF) in
Washington County, N.C.18 The Washington County site for the OLF has proven
controversial, and the Navy is considering alternatives.19
EA-18G “Growler”
The Department of Defense is currently facing a shortage of radar and
communications jamming capability. The Navy and Marine Corp’s EA-6B Prowlers
escort and protect Navy, Marine Corps, and Air Force aircraft operating in hostile
airspace. The Prowlers, however, are few and rapidly aging.20 All the Services are
evaluating preferred approaches to ameliorating this shortfall. The Navy’s preferred
approach is to produce a new electronic attack aircraft based on the F/A-18F, called
the EA-18G.
Basing the EA-6B’s replacement on the F/A-18E/F airframe is attractive to the
Navy because it is expected to engender less new training, operations and
maintenance than a new type of aircraft. Operating an electronic attack aircraft that
can fly at the same speed and to the same ranges as the strike aircraft it is supporting
should also generate operational benefits. The Marine Corps does not operate, and
currently does not plan to procure, the FA/18-E/F, so fielding the EA-18G is
presumably less attractive to that service. In January 2005, for example, it was
reported that the Marine Corps was embarking on a year-long study to determine the
F-35’s potential to replace the EA-6B.21
F/A-18F and EA-18G models are expected to be produced on the same
production line starting in FY2008 and achieve initial operational capability (IOC)
in late FY2009. The EA-18G would share the F/A-18F’s airframe and avionics and
be built on the same assembly line. The EA-18G would replace the F-model’s
cannon with a nose-mounted jamming processor and carry up to five ALQ-99
jamming pods. These are the same jamming pods currently employed by the EA-6B.
The Navy’s currently envisioned program includes a total buy of 90 EA-18Gs — at
a cost of $8.49 billion — to augment and replace the aging EA-6B force.
17 “Super Hornets Make Combat Debut,” Defense Daily, Nov. 8, 2002, p. 4.
18 “Navy Issues Decision on Super Hornet Basing,” Immediate Release, No. 663-03.
Department of the Navy, Sept. 10, 2003.
19 Kate Wiltrout, “Navy Says It Will Re-Examine Four Alternate Sites For OLF,” Norfolk
Virginian-Pilot,
June 25, 2005.
20 See CRS Report RL30639 for more information on the EA-6B and Electronic Warfare.
21 Robert Wall, “U.S. Marines Realize Time Is Short to Draft EA-6B Follow-on Plan,”
Aviation Week & Space Technology, Jan. 3, 2005.


CRS-8
The Navy has awarded a $1 billion contract to Boeing for system design and
development (SDD).22 Procurement of 56 EA-18Gs by FY2009 is included in
Boeing’s second MYP contract (154 F/A-18E/Fs fill out the 210-aircraft contract).
If 56 EA-18Gs are not approved, additional F/A-19E/Fs will be produced to maintain
the contract’s 42 aircraft per year minimum quantity. During FY2005 congressional
action, authorizers and Senate appropriators expressed their concerns about the
program’s progress. (See Congressional Action section, below.)
Key Issues for Congress
Principal issues surrounding the program include the number of Super Hornets
to be procured, and how well the program is being managed.
Number of Super Hornets to be Procured
Like other DOD tactical aviation programs (e.g. F/A-22, RAH-66, JSF), the
planned number of F/A-18E/F Super Hornets to be procured has decreased over time.
The current plan is to procure 462 E/F models, about half of the originally planned
quantity. Several factors could influence whether the planned procurement number
continues to decrease or holds steady.
The Department of the Navy has recently implemented a Tactical Aviation
Integration plan, which has reduced the planned number of Super Hornets and F-35s
to be procured and fielded. If this integration of Navy and Marine Corps aviation
appears successful, some may argue for further reductions in these aircraft. The
potential retirement of the aircraft carrier USS John F. Kennedy could also spark
discussion of aircraft reductions. Further in the future, the successful fielding of
naval unmanned aerial vehicles (UAVs) for both surveillance and strike missions
could compete with manned Navy aircraft for deck space. The most discussed factor,
however, influencing the potential purchase of Super Hornets is the F-35 program.
The Navy and Marine Corps are both planning on procuring variants of the F-35
Joint Strike Fighter (JSF). This aircraft is expected to be operational around 2010.
Some argue that the JSF will be a clearly more capable aircraft. It will be stealthy,
employ advanced, integrated avionics, the most modern agile electronically scanned
array (AESA) radars, and is hoped to be cheaper to procure and operate than the
Super Hornet. JSF proponents also argue that the F-35 will field, and that the F/A-
18E/F lacks, advanced computing and communications capabilities that enable
tomorrow’s combat aircraft to fully participate in high speed collaborative targeting.
Sharing and receiving targeting information from other sources appears central, JSF
proponents argue, to effectively engaging challenging targets. Improved enemy air
defenses suggest that the Navy field these kinds of strike fighter attributes quickly
if it is to remain survivable and relevant on tomorrow’s battlefield. In addition to
these operational attributes, the JSF is hoped to be less expensive to procure and to
operate than the Super Hornet.
22 “Navy Awards Boeing $9.6 Billion in Super Hornet and EA-18G Contracts,” Press
Release, The Boeing Company, St. Louis, Dec. 29, 2003.


CRS-9
JSF advocates argue that the F/A-18E/F program should be truncated and the
JSF program should be accelerated. It makes little sense, they say, to continue
purchasing two types of aircraft that perform essentially the same role, especially
when one is clearly superior. The Super Hornet is a “compromise” program, JSF
proponents say, designed to fill the void left by the cancelled A-12. It isn’t as good
a fighter aircraft as the F-14 Tomcat, nor it as good an attack aircraft as was the A-6E
Intruder.
The ease with which the U.S. Air Forces have dominated its recent military
opponents (e.g., Kosovo, Afghanistan, Iraq) suggest that the current inventory of F-
14s and F/A-18C/Ds will continue to be effective until the JSF is fielded. Much can
be saved by truncating the Super Hornet and buying the JSF in even greater numbers.
Acting DOD acquisition chief Michael Wynne reportedly suggested that truncating
the F/A-18E/F purchase in favor of the JSF could be considered if DOD had to
reduce its tactical aviation procurement budget.23
While the Navy looks forward to the JSF’s eventual deployment, F/A-18E/F
proponents point out that it is still in development and there is no guarantee that it
will be fielded on time. Many aviation programs, such as the C-17 Globemaster,
RAH-66 Comanche, and the V-22 Osprey, take much longer to develop and procure
than planned. The F/A-18E/F is a bird in the hand, its supporters say, and its rapid
and continued procurement is essential to executing the Navy’s current and evolving
military strategy.
Super Hornet advocates argue that while the JSF will be a valuable contribution
to the Navy inventory, its capabilities complement the F/A-18E/F rather than
supercede it. It is not clear that stealth technology is required immediately and
stealthy aircraft have not proven invulnerable in recent conflicts. Also, to maintain
its stealthy signature, the JSF must carry its weapons internally, which limits its
payload.
Proponents of the F/A-18E/F acknowledge that the plane lacks some of the
F-14D’s mission capabilities speed and all-weather attack capability and the A-6E’s
range/payload, but they argue that advances in weapons and targeting capabilities
make up for these shortcomings. Further, they argue, the Super Hornet offers
considerable upgrade potential. Modernizing the F/A-18E/F with software-
programmable radios, computers and other networking equipment is relatively
straightforward, proponents argue.
Program Management
The F/A-18E/F program is viewed by its proponents as a logical and successive
upgrade of the C/D version that does not involve any major technical risks. They
point out that the E/F modifications to the airframe and weapon systems are the
culmination of studies that began in 1987 with the proposed Hornet 2000 design,
which was later modified and refined to more modest proportions. Its critics note
23 Dave Ahearn, “Wynne Weighs Overlap of F/A-18, JSF Carrier Versions,” Defense Today,
Dec. 16, 2004.


CRS-10
that the program involved the design and fabrication of new wing and tail structures,
lengthened fuselage, installation of a new engine with redesigned air inlets, and
incorporation of more advanced avionics and cockpit features. The Defense Science
Board concluded in February 1993, however, that the F/A-18E/F program involved
fewer technical risks than the Air Force’s F-22 stealth fighter program.
Now produced by Boeing (since its acquisition of McDonnell Douglas in 1997),
the F/A-18E/F has found strong support in the Congress, despite sporadic criticism
by advocates of other aircraft or those concerned about the cost and performance of
the F/A-18E/F. For example, in a letter to Defense Secretary Cohen on November
23, 1998, Senator Russell Feingold voiced concern “about the performance of the
Super Hornet in maneuvering dogfights” and asked Secretary Cohen to suspend
release of FY1999 procurement funds pending an investigation by DOD’s Inspector
General and correction of all maneuvering deficiencies identified in recent
operational testing. Navy operational testers concluded that the aircraft’s “positive
attributes ... outweighed the negative impacts for all critical issues,” and in early
December 1998, the Navy awarded Boeing a contract to start production of the 30
planes funded in FY1999.
In December 2003, the Navy awarded Boeing a $8.6 billion multiyear
procurement contract to build 210 Super Hornets between 2005 and 2009. Two
aspects of this contract appear noteworthy. The first multiyear procurement contract
(for up to 222 Super Hornets by 2004) was for a production rate of 48 aircraft per
year, with the flexibility of adding or subtracting up to 6 aircraft annually without
affecting the contract’s terms. The new multiyear procurement contract specifies a
production rate of only 42 aircraft per year, and allows the Navy to increase orders
by 6 aircraft annually. The annual order can not be reduced without incurring
additional costs. Also, the lower annual production rate could hinder attempts to
reduce the Super Hornet’s per-unit cost.24
Another management issue concerns the degree of commonality that will exist
between the F and G models. In May 2003, it was announced that the Navy had
decided that the E/F and G models would not share as much commonality as
previously planned. F-model F/A-18s are being designed so that they can be easily
and cheaply converted into a G-model if the need arises. EA-18Gs however, will not
be easily or cheaply converted to F-models.25
24 For more information, see Bloomberg News, “Navy Awards Boeing $9.6 Billion in
Contracts,” Los Angeles Times, Dec. 30, 2003; Robert Wall, “Navy Commitment,” Aviation
Week & Space Technology,
Jan. 5, 2004. “Navy Awards Boeing $9.6 Billion in Super
Hornet and EA-18G Contracts,” Press Release, The Boeing Company, St. Louis, Dec. 29,
2003.
25 Stephen Trimble, “EA-18G Design Begins to Diverge from Super Hornet,” Aerospace
Daily,
May 28, 2003.


CRS-11
Congressional Action
Congress has provided some $32 billion for F/A-18E/F and EA-18G funding
from FY1992-FY2005. The administration’s FY2006 budget requested $3,581.4
million in procurement and $497.8 million in RDT&E funds for F/A-18 aircraft.
Congressional action on this request is summarized in the table below. Adjustments
to the request are highlighted with bold font.
Table 2. F/A-18E/F/G FY2006 Budget
($ millions)
Procurement
RDT&E
$
#
$
Request
E/F FY06
2,736.2
38
F/A-18 Squadrons
88.7
E/F APCY
86.1
-
EA-18G
409.0
G FY06
310.2
4
G APCY
26.5
-
Mods
442.4
-
H.R. 1815
E/F FY06
2,739.4
38
F/A-18 Squadrons
88.7
(H.Rept. 109-
E/F APCY
86.1
-
EA-18G
409.0
89)
G FY06
310.2
4
G APCY
26.5
-
Mods
442.4
-
S. 1042
E/F FY06
2,739.4
38
F/A-18 Squadrons
91.9
(S.Rept. 109-
E/F APCY
86.1
-
EA-18G
409.0
69)
G FY06
310.2
4
G APCY
26.5
-
Mods
462.4
-
Authorization
Conference
H.R. 2863
E/F FY06
2,736.2
38
F/A-18 Squadrons
88.7
(H.Rept. 109-
E/F APCY
86.1
-
EA-18G
400.0
119)
G FY06
310.2
4
G APCY
26.5
-
Mods
417.4
-
Appropriation,
Senate
Appropriation
Conference
The administration’s FY2005 budget requested $3,406 million in F/A-18
procurement funds and $134 million in F/A-18 RDT&E. Congressional action on
this request is summarized in the table below. Adjustments to the request are
highlighted with bold font.


CRS-12
Table 3. F/A-18E/F/G FY2005 Budget
($ millions)
Procurement
RDT&E
$
#
$
Request
FY05
2,907.5
42
F/A-18 Squadrons
134.5
APCY
78.3
EA-18G
357.5
EA-18G APCY
8.2
Mods
412.5
H.R 4200
FY05
2931.5
45
F/A-18 Squadrons
134.5
(H.Rept. 108-
APCY
78.3
EA-18G
357.5
491)
EA-18G APCY
0.0
Mods
412.5
S. 2400
FY05
2,907.5
42
F/A-18 Squadrons
134.5
(S.Rept. 108-
APCY
78.3
EA-18G
357.5
260)
EA-18G APCY
0.0
Mods
432.5
H.R. 4200
FY05
2,907.5
42
F/A-18 Squadrons
134.5
(H.Rept. 108-
APCY
78.3
EA-18G
357.5
767)
EA-18G APCY
0.0
Mods
412.5
H.R. 4613
FY05
2,907.5
42
F/A-18 Squadrons
136.5
(H.Rept. 108-
APCY
78.3
EA-18G
357.5
553)
EA-18G APCY
0.0
Mods
423.9
S.2559 (S.Rept. FY05
2,907.5
42
F/A-18 Squadrons
136.5
108-284)
APCY
78.3
EA-18G
357.5
EA-18G APCY
8.2
Mods
412.5
H.R.4613
FY05
2,907.5
42
F/A-18 Squadrons
138.2
(H.Rept. 108-
APCY
78.3
EA-18G
357.5
553)
EA-18G APCY
8.2
Mods
420.9
House appropriators (H.Rept. 108-553, H.R. 4613) recommended eliminating
EA-18G advance procurement because it believed the program to be overly
aggressive and wanted the Navy to conduct more testing before acquisition (p.145).
Increases to F/A-18 procurement (modifications) funded improvements to safety and
targeting capabilities.26 Increases to the F/A-18’s RDT&E account funded improved
displays, data recorders, and information systems.27
26 H.R. 4613 (H.Rept. 108-553) p. 174.
27 Ibid. p. 305.