Order Code RL30440
CRS Report for Congress
Received through the CRS Web
Military Base Closures: Where Do We Stand?
February 18, 2000
David E. Lockwood
Specialist in U.S. Foreign Policy and National Defense
Foreign Affairs, Defense, and Trade Division
Congressional Research Service ˜ The Library of Congress

ABSTRACT
This report examines the current status of U.S. military base closures and realignments.
It includes information on domestic bases, including U.S. territories. The report also looks at
issues involving costs and savings related to U.S. infrastructure reductions. It also examines
current Pentagon efforts to persuade Congress to authorize two new rounds of military base
closings. This report will be updated periodically.

Military Base Closures: Where Do We Stand?
Summary
Approximately 12 years ago, in December 1988, the first military base closure
commission recommended the closing and realignment of 145 U.S. domestic bases
and facilities. This action was the consequence of the Department of Defense’s broad
reevaluation of its mission in conjunction with the weakening and ultimate collapse
of the Soviet Union. There was little need, according to the Pentagon, to continue
to retain the vast Cold War-era infrastructure. Funds saved from closing down
underutilized bases, DOD further noted, could be used to enhance development of
new weapons and improved readiness.
The 1988 round of infrastructure reductions was followed by three additional
rounds in 1991, 1993, and 1995. Since then, no further rounds of base closures and
realignments have been authorized by Congress, despite repeated requests from the
Department of Defense in recent years for two additional rounds. The reasons for
congressional resistance are two-fold. First, there is concern over a likely backlash
from constituents living in or near military installations. Second, many Members of
Congress are wary about a repetition of the perceived political intrusion by the
Clinton Administration that occurred in regard to the 1995 recommendation to close
Kelly and McClellan air force bases.
The four base closure and realignment (BRAC) commissions recommended,
individually, a total of 534 actions to close, realign, or otherwise affect specific bases,
facilities, and activities. Most recently, in December 1998, the General Accounting
Office reported that the four BRAC commissions generated 499 recommendations,
but that in its final tally “only 451 of these ultimately required action, primarily
because 48 were changed in some manner by recommendations of a later
commission.”
The closing of all 451 BRAC installations (major, minor and “other’) from the
four rounds is expected to be completed by the end of FY2001, as originally
scheduled. The disposing of all the closed property, however is expected to take
many more years. The Pentagon’s current estimate of the percentage reduction in
base structure as a result of the first four rounds is 21%. This figure is used as
support for additional infrastructure reductions, since other key indicators, such as the
defense budget and the force structure (personnel and units) have declined 40% and
36%, respectively.
In terms of costs and savings associated with the first four rounds of closures and
realignments, a DOD report (April 1998) estimated a net total savings of about $14
billion through FY2001. It projected that net annual savings, thereafter, would be in
the vicinity of $5.6 to $5.7 billion. As for the two new rounds currently being sought,
the Pentagon has estimated an annual savings of about $3 billion after they are
implemented.



Contents
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Closures and Realignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Problem of Defining Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Scale of the Base Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Base Closure Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Number of Military Bases Closed . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Percent of Base Structure Closed . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Prospects for Future Base Closures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Costs and Savings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
DOD and Agency Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Department of Defense . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Congressional Budget Office . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
General Accounting Office . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Prospects for Future Savings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
List of Figures
Figure 1. Relative Defense Drawdown, 1988 - 2001 . . . . . . . . . . . . . . . . . . . . . 5
Figure 2. BRAC Estimated Costs and Savings, 1990 - 2001 . . . . . . . . . . . . . . . . 7
List of Tables
Table 1. BRAC Estimated Costs and Savings, 1988 - 2001 . . . . . . . . . . . . . . . . 8



Military Base Closures: Where Do We Stand?
Introduction
This report provides information on the current status of U.S. military base
closures and realignments. It includes data on domestic bases, including U.S.
territories. The report also provides information on the costs and savings associated
with implementation of domestic base closings and realignments.1
From 1976 to 1988, virtually no U.S. domestic bases were closed as a result of
congressionally imposed restrictions.2 This situation changed radically in 1988, when
the U.S. Congress passed legislation establishing the first of four independent base
realignment and closure commissions (BRAC). The four commissions (activated in
1988, 1991, 1993, and 1995) generated 499 recommendations for closing and
realigning bases. Only 451 of these ultimately required action, primarily because 48
were changed in some manner by recommendations of a later commission.3
Closures and Realignments
Problem of Defining Terms
It needs to be explained, at the outset, that the term “base closure” is frequently
used loosely and imprecisely. A BRAC action may not involve a base, as one might
commonly envision it to be, but rather a “facility,” “mission,” or “function.” It also
may not involve a closure, or even a realignment, but rather a “disestablishment,”
“relocation,” or “redirection.” In a 1995 report on the BRAC process, the General
Accounting Office (GAO) noted that:
the term base closure often conjures up the image of a larger facility being closed
than may actually be the case. Military installations are rather diversified and can
include a base, camp, post, station, yard, center, home-port, or leased facility.
Further, more than one mission or function may be housed on a given installation.
1 For information on U.S. base closures abroad (a process independent of the domestic base
closing process, and largely completed by the end of 1995), see Base Closures in Europe:
Cost and Procedural Issues,
CRS Report 92-589 F (out of print, but the author can be
contacted for copies at 7-5050), by Richard F. Grimmett, July 27, 1992.
2 See Military Base Closures: Congress and the Executive Branch, CRS Report 85-212 F
(out of print, but the author can be contacted for copies at 7-5050), by Andrew C. Mayer.
December 27, 1985, p. v.
3 See U.S. General Accounting Office, Report No. GAO/NSIAD-99-36, Military Bases:
Status of Prior Base Realignment and Closure Rounds,
December 1998. pp. 2, 3, 12-14.

CRS-2
The report noted, additionally, that:
an individual (BRAC) recommendation may actually affect a variety of activities
and functions without fully closing an installation. Full closures, to the extent they
occur, may involve relatively small facilities, rather than the stereotypically large
military base.4
Thus, “base closure” is a highly amorphous, imprecise term that may serve to
facilitate communication, but often fails, at the same time, to provide an exact
understanding of the action taken.
Scale of the Base Structure
The military base structure of the Department of Defense includes approximately
5,000 properties, worldwide. These properties range widely in personnel assigned
and amount of property controlled -- from unmanned navigational aid stations to
major military bases with thousands of personnel and, in the case of Nellis air force
base, more than a million acres.
The Department of Defense, currently, maintains a web-site list of 583
installations, worldwide.5 This list is a subset of “properties,” excluding numerous
minor activities and smaller properties. The 583 installations are divided into the
following three groups:
(1) -- 50 United States:
519 installations
(2) -- 3 U.S. territories:
3 installations
(3) -- 19 foreign countries:
61 installations
The 522 U.S. installations comprising those within the 50 states and its territories
are grouped according to three categories: major, minor, and “other.” Each major
service determines for itself the method of defining its categories. For example, the
Army defines a major installation as one with 5,000 or more U.S. service members,
DOD civilian employees, and/or other authorized tenants. It defines a minor
installation as one with personnel numbering between 1,000 and 5,000. In its “other”
category, it includes sites and facilities with personnel levels between 300 and 1,000.
The Air Force, on the other hand, has classified major and minor installations on the
basis of wing or squadron size. The Navy determines its categories on the basis of
battlegroup homeport locations, air or land-based squadrons, RDT&E activities, and
so on.
4 See U.S. General Accounting Office, Report No. GAO/NSIAD-95-133 , Military Bases:
Analysis of DOD’s 1995 Process and Recommendations for Closure and Realignment,
April
1995. pp. 19-20.
5 [http://www.defenselink.mil:80/pubs/installations] -- list updated July 17, 1998.

CRS-3
Base Closure Actions
Number of Military Bases Closed. Four base closure and realignment (BRAC)
commissions, on the basis of their individual reports, recommended a total of 534
actions to close, realign, or otherwise affect specific bases, facilities, and activities.
The breakdown for each of the commissions’ reports is as follows:
1988 BRAC:
145 recommendations
1991 BRAC:
82 recommendations
1993 BRAC:
175 recommendations
1995 BRAC:
132 recommendations
The 1995 BRAC commission report, however, stated that the number of BRAC
actions from all four rounds totaled 505 -- not 534. Most recently, in December
1998, the General Accounting Office (GAO) reported that the four BRAC
commissions generated 499 recommendations, but that in its final tally “only 451 of
these ultimately required action, primarily because 48 were changed in some manner
by recommendations of a later commission.”6
These discrepancies make it difficult to pin down the precise number of BRAC
actions. As the GAO report explained, the BRAC commissions have been “somewhat
arbitrary in the way they enumerate recommendations.” The recommendations have
included closures, realignments, disestablishments, relocations, and redirections.7
The closing of all 451 BRAC installations (major, minor, and “other”) from the
four rounds is expected to be completed by the end of FY2001, as originally
scheduled. The disposing of all the closed property, however, is expected to take
many more years. According to GAO, about 464,000 acres of BRAC real property
were determined to be excess, but, as of March 1998, only about 31% of property
designated for non-federal users had been formally transferred.8 The main delaying
factor in the process has been the need to meet strict environmental clean-up
standards. In order to move things along more swiftly, DOD has adopted the use of
interim leases until such time as formal deeds can be issued.
It is difficult to find consistently determined figures on overall BRAC actions.
However, the Department of Defense does provide one such set of statistics, smaller
6 U.S. GAO, “Status...,” op. cit., p. 25.
7 In a closure, all missions carried out at a base either cease or relocate (although some
property may be retained for new purposes), while in a realignment, a base remains open but
loses and sometimes gains missions. Disestablishments and relocations refer to mission; those
disestablished cease operations, while those relocated are moved to another base. Redirection
refers to cases in which a BRAC commission changes the recommendation of a previous
commission. U.S. GAO, ibid., p. 26 (footnote).
8 Only about 8% of the property designated for federal entities had actually been transferred.
U.S. GAO, ibid., p. 25.

CRS-4
in number, that identifies 97 major closures and realignments. The overall baseline
figure for DOD’s major bases (non-BRAC as well as BRAC) is 495. As of
September 30, 1999, the following information on BRAC major closures and
realignments was as follows:
Major BRAC Closures Recommended:
97
1988 Commission
16
1991 Commission
26
1993 Commission
28
1995 Commission
27
Major BRAC Closures Completed:
93
Major BRAC Closures Uncompleted:
4
The four remaining BRAC major bases are scheduled to be closed during fiscal
years 2000 and 2001. They are McClellan AFB, CA; Savannah Army Depot,
Activity, IL; Roslyn Air Guard Station, NY; and Seneca Army Depot, NY.

Percent of Base Structure Closed. In its report to the 1993 Base Closure
Commission, the Department of Defense estimated that, under the first two rounds
(1988 and 1991), domestic base structure was reduced by only 9%, measured by plant
replacement value.9 It stated that adding the 1993 closures (recommended by DOD)
to the previous ones would reduce the domestic base structure by about 15%.
In its recommendations to the 1995 Base Closure Commission, the Department
of Defense estimated that adding the 1995 closures (recommended by DOD) to the
previous ones would reduce the domestic base structure by approximately 21%. The
Pentagon’s current (1999) estimate of the percentage reduction in base structure
remains essentially the same -- 21% (see Figure 1 for comparison with other
indicators of defense drawdown).
For several years, the Department of Defense has been urging Congress to
authorize additional base closure rounds. It has stressed that base structure
reductions lag significantly behind the reductions in the defense budget and in the
force structure (military units and personnel). Additional base closures, according to
DOD, would free up funds urgently needed for the development of new weapon
systems as well as providing for increased training and readiness of the armed forces.
Many, if not most, authorities on defense policy agree with DOD’s assessment.
A few have suggested, however, that the underlying premise of relative parity may be
false. For a start, some argue that the “defense budget” and “military personnel”
columns below represent worldwide figures, while the “domestic base structure”
column represents the fifty United States and its territories. If the U.S. overseas
9 Plant replacement value, as defined by DOD, is what it would cost to replace all the
buildings, pavements, and utilities at a base.


CRS-5
bases closed are added to those of the domestic base structure, the comparable figure
would be an overall reduction of about 26%.
A second concern has to do with the issue of “reconstitution” -- a potential need
to increase military capability when the United States is confronted, at some future
point, by a hostile and powerful enemy state. The argument is that, while the defense
budget can be increased in a matter of weeks, the same is not true of the force
structure or the base structure. Some believe the problem of reconstitution is
potentially most hazardous with regard to the base structure. Once property is
converted to civilian use, it is for all practical purposes permanently lost as a military
asset.
Prospects for Future Base Closures 10

In mid-1997, Secretary of Defense William Cohen called for two new rounds of
base closures and realignments. He explained that, while four previous rounds had
achieved significant savings, it was important to continue the process of closing
underutilized facilities. Despite DOD pressure, most Members of Congress have been
reluctant to support authorization of new base closure legislation, at this time. The
reasons given included, among others, grass-roots opposition from communities likely
to be affected and President Clinton’s “intervention” in the 1995 base closure
commission’s recommendations regarding McClellan and Kelly air force bases.11 Of
the two chambers, the House of Representatives expressed the stronger and more
united opposition. In the Senate, proponents of new base closure rounds attempted
to attach an amendment to the FY1999 defense authorization bill, but failed.
Figure 1. Relative Defense Drawdown
1988 - 2001
Source: U.S. Department of Defense. Defense Reform Initiative Report. November 1997. p. 37.
The base closing issue, however, was revived at the outset of the 106th Congress.
Proponents believed that their cause would be helped by the fact that it was not an
election year. On January 20, 1999, Senator John McCain, along with Senators Carl
10 For a more extensive discussion of new base closings, see CRS Report RL30051, Military
Base Closures: Time for Another Round?
by David E. Lockwood. August 3, 1999. 9 p.
11 See, for example, Graham, Bradley, “Cohen at a Crossroads after Base Closing Loss.”
Washington Post, May 19, 1998. p. A19.

CRS-6
Levin and Charles Robb, introduced legislation (S. 258) that would authorize two
new rounds of base closures in 2001 and 2003. On February 1, the Clinton
Administration submitted to Congress its budget for FY2000 which included
provision for two more rounds in 2001 and 2005. On May 12 and 13, however, the
Senate Armed Services Committee, in its mark-up of the FY2000 defense
authorization bill (S. 1059), rejected proposals by Senators McCain and Levin to
include authority for new base closings. The two Senators attempted to revive the
base closure proposal during floor debate on S. 1059, but met with defeat by a vote
of 60 to 40.
On January 18, 2000, just prior to the opening of the new session of Congress,
the Department of Defense announced that the Clinton Administration would once
again seek congressional authority to close more military bases, starting in 2003. Its
spokesman said that “this is a particularly opportune time to make such transitions,
since the national economy is so strong.” Additionally, he reassured critics and
sceptics alike that politics would not be allowed to intrude on any future rounds of
base closings.
In its statements urging new rounds of closures, the Pentagon has added its
stamp of approval of the BRAC process, stating that it is “a proven, effective tool to
make difficult decisions that impact both national security and local communities.”
It proposes that future BRAC rounds adopt the same procedures that were used in
the 1995 BRAC round.
Costs and Savings
There are two important aspects of analyzing costs and savings associated with
BRAC closings. The first has to do with the element of chronological timing. In the
early years, base closure costs greatly exceeded savings. At a later point in time
(1998), costs and savings became about equal (see where the two lines in Figure 2
cross). Presently, with the implementation of four BRAC rounds nearing completion
(the deadline is 2001), savings are projected to be significantly greater than costs.
The second, and more fundamentally problematic, aspect has to do with determining
the accuracy of data -- especially data involving savings. The inability of DOD to
locate some of its data, including the original cost and savings estimates it gave to the
BRAC commissions, has complicated matters. These difficulties have been addressed
at some length by DOD as well as by the Congressional Budget Office and the
General Accounting Office (see below).


CRS-7
Figure 2. BRAC Estimated Costs and Savings
1990 - 2001
Source: GAO’s analysis of DOD data. 12
DOD and Agency Findings
Department of Defense. At the request of Congress, the Department of
Defense submitted a report in April 1998 on the status of base realignments and
closures.13 In its report, DOD provided data on the estimated costs and savings for
the first four rounds (1988, 1991, 1993, and 1995). The report stated that, overall,
the resultant savings from the shutdown of bases and facilities during BRAC’s rounds
would exceed initial estimates. It also said that the dramatic level of savings would
permit the Department to increase spending on the modernization and transformation
of its forces, while sustaining high levels of readiness.
The DOD report stressed that “all organizations must estimate savings produced
by management reforms, consolidations, and reorganizations. Accounting systems
can keep accurate records of costs; but no parallel systems exist to track savings.”
To determine BRAC savings, the report explained, requires either (1) estimating what
the composition of the DOD budget would have been without BRAC, or (2)
distinguishing the effects of BRAC from the effects of other myriad factors that affect
DOD installations and budgets over more than a decade.
With this caveat, the DOD report proceeded to estimate net total savings from
the four BRAC rounds of about $14 billion through 2001 (see Table 1). It projected
that annual savings, thereafter, would be in the vicinity of $5.6 to $5.7 billion.
12 U.S. GAO. “Status...,” op. cit., p. 36.
13 U.S. Department of Defense. The Report of the Department of Defense on Base
Realignment and Closure,
April 1998. 144 p.

CRS-8
Table 1. BRAC Estimated Costs and Savings, 1988 - 2001
(dollars in billions)
Round
6-Year
Implem. Implem. Net Annual
Total
Net
Implementa-
Period
Period
Recurring
Savings
Savings
tion Period a
Costs a
Savings
Savingsb
Through
Through
(est.)
(est.)
2001c
2001d
BRAC 1988
1990-1995
$2.7
$2.4
$0.8
$6.9
$4.2
BRAC 1991
1992-1997
5.2
6.4
1.5
12.4
7.2
BRAC 1993
1994-1999
7.7
7.5
2.1
11.7
4.0
BRAC 1995
1996-2001
7.3
5.9
1.3
5.9
(1.4)
Total
$22.9
$22.2
$5.7
$36.9
$14.0d
Source: DOD fiscal year 1999 BRAC budget submission.
Note: Amounts presented are current-year dollars consistent with DOD’s budget submissions; totals
may not add due to rounding.
a. Implementation period estimates are the one-time BRAC costs and savings for the 6-year period
authorized to complete a BRAC action. The cost estimates are less any revenues from the sale
of unneeded base property.
b. Net annual recurring savings start the year after completion of the round and are usually based
on estimated savings during the last implementation year for each round.
c. Total savings through 2001 consist of 6-year implementation period savings plus recurring
savings for each year after the end of a round through 2001. For example, BRAC 1991 total
savings of $12.4 billion through 2001 consist of $6.4 billion in savings during the
implementation period and $6 billion in recurring savings for the years 1998 through 2001
($1.5 billion for 4 years).
d. Net savings through 2001 consist of total savings through 2001, less the costs incurred through
2001.
Congressional Budget Office. As required by a provision of law, the
Congressional Budget Office (CBO) and the General Accounting Office (GAO)
reviewed DOD’s 1998 report following its release. CBO found DOD’s estimates of
savings from previous closure rounds, as fully implemented, consistent with its own
estimates -- $5.6 billion as compared to $5.0 billion. CBO also acknowledged that
firm measures of BRAC savings requested by Congress “do not -- and cannot exist.”
It elaborated, as follows:
BRAC savings are really avoided costs -- costs that DOD would have incurred if
BRAC actions had not taken place. Because those avoided costs are not actual
expenditures, DOD cannot observe them and record them in its financial records.
As a result, DOD can only estimate savings rather than actually measure them.14
14 U.S. Congressional Budget Office, Review of the “Report of the Department of Defense
(continued...)

CRS-9
In its review, CBO made a number of other interesting observations. It stated
that DOD was unable to locate some of the data requested by CBO, including the
original cost and savings estimates that DOD gave to the BRAC commissions. Also,
CBO noted that estimates of BRAC costs and savings would be more accurate if they
included DOD’s environmental and caretaker costs for some bases after the six-year
implementation period is completed.
General Accounting Office. The General Accounting Office submitted its
review of DOD’s report on November 13, 1998.15 It was longer and provided more
supporting detail than the CBO review. GAO asserted that the four previous BRAC
closure rounds would result in substantial net saving. It noted, also, that “DOD’s
report should be viewed as providing a rough approximation of costs and savings
rather than precise accounting.” It said that “DOD’s data systems do not capture all
savings associated with BRAC actions, nor has DOD established a separate system
to track BRAC savings.”
A pair of consistent messages are present in the three reports reviewed above.
First, there is no practicable way to determine, with precision, the actual costs and
savings from the BRAC rounds; one has to be satisfied with estimates. Second,
regardless of substantial initial costs, much greater savings will be achieved in the long
run as a result of the four rounds of military base closures.
Prospects for Future Savings
The Department of Defense, during the last several years, has repeatedly stated
its need to close more military bases, citing studies that confirm an excess base
capacity in the range of 23%. Most recently, on January 18, Deputy Secretary of
Defense John Hamre announced that the Clinton Administration’s 2001 budget
proposal to Congress will seek authority for two new base closure rounds in 2003 and
2005. According to its estimates, two new BRAC rounds, each roughly the size of
the last two rounds initiated in 1993 and 1995, would generate annual savings of
about $3 billion after they are implemented.16 The Pentagon has declared that failure
to close unneeded bases could seriously impede DOD’s efforts to allocate its
resources in the most efficient and effective manner. It has stated, also, that such
failure could cost the Pentagon, in the future, $20 billion that would be better spent
on ships, jet aircraft, and other crucial military equipment.17
14 (...continued)
on Base Realignment and Closure,” July 1998, 7 p.
15 U.S. General Accounting Office. Military Bases: Review of DOD’s 1998 Report on Base
Realignment and Closure,
November 1998, 54 p.
16 U.S. Department of Defense, op. cit., pp. 19-22.
17 Burns, Robert. “Clinton to Seek More Base Closings,” AP, Jan. 18, 2000.

CRS-10
Conclusion
The Department of Defense and many analysts state that the high cost of
maintaining a base structure far in excess of its current, and most likely future,
requirements imposes a substantial financial burden on the Department of Defense.
The removal of this burden has become a major theme in the Pentagon’s annual
dialogue with Capitol Hill. It will be an important item on DOD’s agenda as it
presents its budget to the current session of Congress. However, due to the fact that
it is a presidential election year, DOD confronts a hurdle of awesome proportions.
Its present strategy appears to be one of: first, securing authority from Congress as
soon as possible, and; second, setting the dates far enough down the road (2003 and
2005) to allay fears of those who may be impacted by new closures.